HomeMy WebLinkAboutSC_02-100_New Century HomesSurf City/Pende
Local Government
02/100
Permit Number
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment
and Natural Resources and the Coastal Resources Commission for development
in an area of environmental concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management "
Issued to New Century Homes authorizing development in Ocean Hazard
at_826 North Topsail Drive
as requested in the permittee's application, dated 1 2 / 1 6 / 0 2
This permit, issued on 1 2 / 3 0 / 0 2 is subject to compliance with the application and site drawing (where consistent
with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
PERMIT TO BUILD A SINGLE FAMILY DWELLING
1- The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction standards, Chapter 40A 1,
Volume 7, and the Local Flood Damage Prevention Ordinance as required by the National Flood Insurance Program If any provisions of
the building code or a flood damage prevention ordinance is inconsistent with my ofthe following AEC standards, the more restrictive
provision shall control.
2- The structure must set back 60 feet from the first line of stable natural vegetation
3- The structure must be located emirely off of the fiontal dune, and if a primary dune is present, behind the crest of the primary dune.
4- The structure must be elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structural member must meet the
100-year flood level elevation of detamwted for this lot
5- All pilings shall have a tip penetration of 16 feet below existing grade or 5 feel below mean sea level whichever is less. For those structures
so located on the primary done or nes erto the ocean, the pilings must extend to five feet below mean sea level.
6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or
reduced disturbed areas will be immediately stabilized
7- This permit may be renewed for one year if requested before the expiration date.
8- The pemilnee is requred to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement
which will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the determination or the
measurement is void and must be redone.
9- Sand used to strengthen dunes roust be brought in from an outside source and must be of the same nature as the sand in the area in which it
is to be placed. No said is to be removed from the lot
10- Send held in storage in any duns, other than frontal or primary dunes may be moved laterally in order to strengthen existing primary or
frontal duties if the work would enhance the protection to the proposed development activity and the sand is immediately stabilized
It- An development must be consistent with an -applicable, Federal, State, and Local standards.
12- Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in the shoreline
configuration. The structure shell be relocated or dismantled within two years of the time when it becomes imminently threatened, and in
any case, upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes plea within two years of
the time the structure becomes imminently treatened, an that the structure is no longer imminently threatened, then it need not be relocated
or dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary, protective measures
allowed under CRC Rules.
13- An construction will be landward of the vegetation line.
14. Pursuant to I5A NCAC, Subchaptar 710406(b), this permit maybe asait;04 transferred, sold or otherwise disposed ofto a third -party.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
From the date of an appeal, any work conducted under this per-
mit m,.st cease until the appeal is resolved.
This permit must be on the project she and accessible to the
permit officer when the project is inspected for compliance.
Any maintenance work or project modifications not covered
under this permit requires further written permit approval.
All work must cease when this permit expires on December
31. 2005
In issuing this permit it is agreed that this project is consistent
with the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without
the written approval of the Division of Coastal Management.
ermit Officer (signature)
Steve Padgett
P O Box 2475 name
't�j 1�9 `' ►L��l �I i,�
l� i1
GEME'
(signature required if special conditida""Tip. permit)
Locality % ()QtC (7,tr;( 11-2ojoE e, Permit Number 6,2 be) o
GENERAL INFORMATION
LAND OWNER
Name
Address 9.0. Go X U 2 2 %
City D ur A State Ili, C " Zip ;?833Y Phone 92 - 1/3 YS
AUTHORIZED AGENT
Name Ti W r -1
Address
City .Sut / F C � f .+ State /1/, C� _ Zip Phone
LOCATION OF PROJECT
(If not oceanfront, is waterbody natural or manmade?)
DESCRIPTION OF PROJECT A%e -J S/ rtq[P ra r✓, t
AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION
(To beilled in by the Local Permit Officer prior to completing application.)
Ocean Hazard Estuarine Shoreline ORW Shoreline Public Trust Shoreline Other
PROPOSED USE
Residential Commerical/Industrial Other
SQUARE FOOTAGE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR
BUILT -UPON SURFACES (such as driveways, etc.) within 75 feet of the estuarine shoreline, or 575 feet of an
ORW shoreline, or 30 feet of the public trust shoreline. 1i 4
SQUARE FOOTAGE OF TOTAL FLOOR AREA OF BUILDING %'] 7 2-
SQUARE FOOTAGE OF SITE.
OTHER PERMITS MAY BE REQUIRED:
The activity you are planning may require
permits other than the CAMA minor
development permit. As a service we have
compiled a listing of the kinds of permits that
might be required. We suggest you check
over the list with your LPO to determine if
any of these apply to your project.
g1. F-�-;
Zoning, Drinking Water Well, Septic Tank
(or other sanitary waste treatment system),
Burning, Electrical, Plumbing, Heating and
Air Conditioning, Insulation and En
Conservation, FIA Certification, San
Sediment Control, Subdivision Appr
Mobile Home Park Approval, High
Connection, and others.
v 3 2003
ISION OF
PAANAGEM
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in
an AEC or a person authorized to act as an agent for purposes of applying for a CAMA minor development
permit, certify that the person listed as landowner on this application has a significant interest in the real
property described therein. This interest can be described as: (check one)
_ an owner or record title, Title is vested in , see Deed Book
page in the County Registry of Deeds.
_ an owner by virtue of inheritance. Applicant is an heir to the estate of ;
probate was in County.
--t,—/if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this
application.
Ll
NOTIFICATION OF ADJACENT PROPERTY OWNERS
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I
have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for
a CAMA permit.
(Name) (Address)
(1) S..rC U..,�i' Quu..�� 4 �[� �,> >! ZG G � .S..i✓ 1G ��'�� ✓�L- Z�yy S
(2) �'tr..vi < / Z C 3 ptr try., s 4an P An ,-wits✓f}. 2-2`6
(3)
(4)
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may
be susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the
particular hazard problems associated with this lot. This explanation was accompanied by recommendations
concerning stabilization and floodproofing techniques.
PERMISSION TO ENTER ON LAND
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer
and his agents to enter on the aforementioned lands in connection with evaluating information related to this
permit application.
This application includes: general information (this form), a site drawing as described on the back of this application,
the ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality,
and any information as may be provided orally by the applicant. The details of the application as described by these
sources are incorporated without reference in any permit which may be issued. Deviation from these details will
constitute a violation of any permit. Any person developing in an AEC without permit is subjecttivilI c * p R
and administrative action. ��I�jE�"�� ((�U� J��° lilt \\VN
This the day of 20_.
jo-.N 3 2003
DIVISION OF
vTAL MANAGEM
AEC HAZARD NOTICE
Project Is In An: _✓ Ocean Erodible Area
Date Lot Was Platted:
High Hazard Flood Area Inlet Hazard Area
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on building s tandards, oceanfront
setbacks and dune alteration are designed to minimize, bu t
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
_.7 -_ feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also kdicate that the shoreline could move as
much as J35feet landward in a major storm.
The flood waters inamajorstorm arepredicted tobe about
-1 C- feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
mmnlete.
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expzf ed. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
Local Permit Officer
/0 D /1✓ D ';R V 7.5
Address
Locality
?/o -
Phone
(CEIVE
JAN C 3 2003
DIVISION OF
COASTALV/9EN
I
D--
p Postage
r•
Certilied Fee
f1J
Return Receipt Fee
(Endorsement Requirso
O
O
Restricted Delivery Fee
(Endorsement Required)
�
Total Postage 6 Fees
L3
0
Pee�P/anti /,(ame Ip/e¢sE
p
beef, Apt. No.; (y�
r
7
.
r
ru
m
Postage
$
m
a Certified Fee
,a Return Receipt Fee
O (Endorsement Required)
O Restricted Delivery Fee
O (Endorsement Required)
$
Total Postage & Fees
O
sent To C u1 ,
fU
Sbea( Apt. No.;
O
or PO Box No. 0
0
V/
Posbilerk
Hera
m
DIVISION OF
COASTAL MANAGEMI
AFFIDAVIT
OF
PUBLICATION
The Pender Chronicle
110 Courthouse Avenue
P.O. Box 726 • Burgaw, NC 28425
State of North Carolina
County of Pender
Personally appeared before me the under-
signed principle clerk of the above indicated
newspaper published in the City of Burgaw,
County and State aforesaid, who, being duly
sworn, says that the advertisement of
(copy attached)
appeared in the issues of said newspaper
on the following day(s):
Subscribed and sworn to
'�
before this � day
of po/YYIt.
A.D. 20 ��
NOTARY PUBLIC
My Commission Expires June 16, 2003
(Principle Clerk)
CAMAI
NOTICE OF FILING OF
APPLICATION FOR
CAMA MINOR
DEVELOPMENT PERMIT
Pursualli to NCG$.i 13-3101b1. Town of
Surf City. 'a locality aulhmlzed to issue
CAMA permils3n. Areas of Environmental
Concern hereby gives NOTICE that. on 12-
16-02. HomeCo Builders Inc. applied for a
CAMA'pennit to erect a: single famllydwell%
Ing unit In the Ocean Hazard AEC at 826 N
.Topsail Drive, Tile application may be In-
spected al the address below. Public com.
ments received by d2.25-02 will be consid-
ered. Laker comments will be accepted and
considered up tothe time of permil deci-
sion, 'Project modifications may occur
'based on further review and '.comments.
Notice of the permit decision In this matter.
will be provided upon written request.
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
T9101-328-4131
2714 . Dee. 18, 2002
�FC�l�'�
JAN 0 3 2003
DIVISION OF
COASTAL MANAGEME
CAMA I
NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits
in Areas of Environmental Concern hereby gives NOTICE that on 12-16-02, HomeCo Builders
Inc. applied for a CAMA permit to erect a single family dwelling unit in the Ocean Hazard AEC
at 826 N Topsail Drive. The application may be inspected at the address below. Public comments
received by 12-25-02 will be considered. Later comments will be accepted and considered up to
the time of permit decision. Project modifications may occur based on further review and
comments. Notice of the permit decision in this matter will be provided upon written request.
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
(910)-3284131
Please publish on 12-18-02
JAN 0 3 2003
DIVISION OF
COASTAL MANAGEMENT
A T L A N T I C O C E A N
MODS
MODS
NERS wC.
iATIY MAT THE SUB.ECT PROPERTY
IN RWD ZONE VARIES WIN IS A
CO HAZARD AREA AS OETEFMINEO
.M.A'. COMMUNITY PANEL
ne6 - 00oR s nOmR - ODDS 0
ECTIK DATE OF JANUARY 0. ISIMS
EFkY TNAT NIS MAP Is A TRUE
IN OP THE PROPERTY HEREON AS
ACTUAL WRAY OF ME PREMISES
ERE ARE NO ENCROACHMEN3 ACCORD -
MET OF MY FNONIFOLE, EXCEPT AS
RAIIQ, OFOR IS 110.WOH.
J l.rli:
tE; R¢3 " E-taw
E °
yr
M1 .
".... XV L vlGirr''
I
MRI'DTWE
�C�
:) 60'
xR19TSA'I
_
7 AIRT"
(eiftY prt)
N
8.
y
sue--_
M
\
IT
x
,__---------__
AIR 9 w2p w
90.x_ v -----7
s \
r
m ® \s
name ttrt.,
® r U ® \ &. 10T 2-A o
08 IB]:
o .min Rx
`--------------—___--_--
` — 0N011 TOPSAIL DRIVE - 60' R/w
---------------------------------
-
_ _ _ — — — _ — — — — — _
NOTE:
WATER k SERER PRONDEO BY
TYWM OF AIRE OTT.
l
ul
LL W
pi
O Q
IT
Z Z
cR't
c
0 Q
Cn
Q
Q U
1d1SdO0 � '° S
1N3W30d 30 NISI�Ia of .}
d J
� d O