Loading...
HomeMy WebLinkAbout71-15EX Harkers Island Sewer CoPermit Class NEW (EXPRESS PERMIT PROGRAM) STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Harkers Island Sewer Co., LLC, PO Box 370, Harkers Island, NC 28531 Permit Number 71-15 Authorizing development in Carteret County at Back Sound and NPS boat Basin. Harkers Island as requested in the permittee's application dated 5/22/15 incl. attached workplans (5), 02-04 and 06 dated 5/13/15 and 05 dated revised 5/22/15. This permit, issued on July 1, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may oe suoiect to tines, imprisonment or civic action; or may cause me permit to oe unit ana vom. Upland Development 1) Unless specifically altered herein, this permit authorizes only the land disturbing activities associated with the construction of the authorized lift station and force main to serve the National Park Service facility at the eastern end of Harkers Island, including all associated grading and filling, all as expressly and specifically set forth in the permit application and depicted on the attached work -plat drawings. Any additional land disturbing activities and/or construction shall be evaluated on a case - by -case basis by a representative of the Division of Coastal Management (DCM) to determine additional permit requirements. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. / Br odn C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Barkers Island Sewer Co., LLC r Permit #71-15 Page 2 of 2 ADDITIONAL CONDITIONS EROSION & SEDIMENTATION CONTROL NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, Land Quality Section, 127 Cardinal Drive. Extension, Wilmington, NC 28405. 2) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 3) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 4) A ground cover sufficient to restrain erosion shall be provided within the shorter of 15 working or 30 calendar days of completion of any phase of grading on cut or filled slopes. General 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 6) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any required encroachment or right-of-way agreements required from the N.C. Department of Transportation, any required stormwater management permits from the Division of Energy; Mineral and Land Resources, or any required sewer transmission line permits. NOTE: Future development of the permittee's property may require a modificationof this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. NOTE: An express permit application processing fee of $2,000 was received by the Department of Environment and Natural Resources for this project. Permit Class NEW (EXPRESS PERMIT PROGRAM) STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Verint"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Harkers Island Sewer Co., LLC, PO Box 370, Harkers Island, NC 28531 Permit Number 71-15 Authorizing development in Carteret County at Back Sound and NPS boat Basin, Harkers as requested in the permittee's application dated 5/22/15 incl. attached workplans (5), 02-04 and 06 dated 5/13/15 and 05 dated revised 5/22/15. This permit, issued on July 1, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Upland Development 1) Unless specifically altered herein, this permit authorizes only the land disturbing activities associated with the construction of the authorized lift station and force main to serve the National Park Service facility at the eastern end of Harkers Island, including all associated grading and filling, all as expressly and specifically set forth in the permit application and depicted on the attached work -plat drawings. Any additional land disturbing activities and/or construction shall be evaluated on a case - by -case basis by a representative of the Division of Coastal Management (DCM) to determine additional permit requirements. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires. further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. BrnfdA C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Harkers Island Sewer Co., LLC ADDITIONAL CONDITIONS EROSION & SEDIMENTATION CONTROL Permit #71-15 Page 2 of 2 NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Division of Energy, Mineral and Land Resources, Land Quality Section, 127 Cardinal Drive. Extension, Wilmington, NC 28.405. 2) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 3) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 4) A ground cover sufficient to restrain erosion shall be provided within the shorter of 15 working or. 30 calendar days of completion of any phase of grading on cut or filled slopes. General 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 6) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to any required encroachment or right-of-way agreements required from the N.C. Department of Transportation, any required stormwater management permits from the Division of Energy; Mineral and Land Resources, or any required sewer transmission line permits. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. NOTE: An express permit application processing fee of $2,000 was received by the Department of Environment and Natural Resources for this project. APPLICATION for RECEIVED Molor Development Permit MAY 2 2 2015 n,r o-. uvnra k;h• (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant(Landowner Information Business Name Project Name (if applicable) Harkers Island Sewer Company, Llc National Park Service Lift Station & Force Main Applicant 1: First Name MI Last Name Mike Laws Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State P.O. Box 370 Harkers Island NC ZIP Country Phone No. FAX No. 28531 USA 919 - 810 - 4929 ext. - Street Address (if different from above) City State ZIP 270 Pintail Drive Lexington NC 27295- Email miaws@harkersislandsewercompany.com 2. Agent/Contractor Information Business Name Arendell Engineers Agentl Contractor 1: First Name MI Last Name James W. (Bill) Forman, Jr., P.E. Agent( Contractor 2: First Name MI Last Name John J. Wade, P.E. Mailing Address PO Box City State 105 North 10' Street, Suite 4 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # 252 622 4505 C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com; john@arendellengineers.com <Form continues on back> 252.808-2808 :: 1-888-4RCOAST :: www. nccoastal management. net Form DCM MP-1 (Page 2 of 4) RECEIVED APPLICATION for Major Development Permit MAY 2 2 20b 3. Project Location County (can be multiple) Street Address State Rd. A Carteret 1800 Island Road 1335 Subdivision Name city State Zip Harkers Island NC 28531 - Phone No. Lot No.(s) (if many, attach additional page with list) 919 - 810 - 4929 ext. 3-11, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Back Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Back Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. Carteret County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) N/A 12,597 linear feet of force main within the NCDOT Right - of -Way c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A NWL (normal water level) (If many lot sizes, please attach additional page with a list) +5 NAVD88 ®NHW or ❑NWL e. Vegetation on tract Primarily forest. The route of the force main contains grass, trees, and shrubs. There is one location where wetlands may be encountered and the force main will be installed using an underground directional bore. f. Man-made features and uses now on tract The lift station tract is currently undeveloped. The NCDOT right-of-way is developed by State Road 1335. g. Identify and describe the existing land uses add acent to the proposed project site. Cape Lookout National Park facility, Core Sound Waterfowl Museum & Heritage Center, adjacent land uses to the NCDOT right-of-way include mixed uses of residential and commercial (adjacent to the sewer line installation). h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, it applicable) []Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808.2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Eorm DCM MP-1 (Page 3 of4) RECEIVED APPLICATION for MAY 2 2 2015 Major Development Permit oCne-rotraB 101t0 m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Existing wastewater treatment facilities include septic tanks that are currently failing on National Park Service property. o. Describe existing drinking water supply source. Drinking water is supplied by the Harkers Island Water System, a division of the Carteret -Craven Electric Cooperative. p. Describe existing storm water management or treatment systems. There are currently no storm water management or treatment systems on the site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑PubliclGovernment ❑PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The project includes a lift station to pump wastewater from the existing facility to an existing wastewater treatment facitlity on Harkers Island. The existing septic tanks on the site are failing and the National Park Service wishes to have a long tens solution to their wastewater needs. The force main will run approximately 12,597 linear feet mainly along Island Road to the lift station at the West Bay subdivision. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of -way. Encroachment agreements have been applied for construction within the NCDOT rights -of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. d. List all development activities you propose. Development activities include the installation of a 6' interior diameter lift station and associated appurtenances and 12,597 linear feet of 4" PVC and ductile iron pipe. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? 122,283 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area Yes []No ❑NA JJCWr - that the public has established use on In. Describe location and type of existing and proposed discharges to waters of the state. There will be no discharges to waters of the state. I. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ZNA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252-808-2808 :: 1-888.4RCOAST :: www.ticcoastaimanagement.net Form DCM MP-1 (Page 4 of4) &CEIVED APPLICATION for MAY 22 2015 Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to propedy prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Max D. Abernethy, Sr. Phone No. Address 2910 Howards Creek Mill Road, Vale, NC 28168 Name Stacy M. Davis Phone No. Address 106 Stacy Road, Harkers Island, NC 28531 Name Timothy Van Noy Phone No. Address 101 Saddle Court, Mullica Hill, NJ 08062 g. A list of previous stale or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NCDENR WQ0024023 NCDOT Encroachment Permit - Pending NCDENR - Erosion & Sediment Control Permit - Pending h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1.10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only th The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application/is truthful to the best of my knowledge. Date �2�-��S Print Name 0. AGe cat Y•4r C ��j�rJ: AGr,.JT Signature 9�f) Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ❑DCM MP-4 Structures Information 252-808-2808 :: 1.888-4RCOAST :: www.nccoasta lmanagement. net RECEIVED Form DCM MP-3 MAY 2 2 2015 UPLAND DEVELOPMENTncu-mmoelTy (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. 2; 1 - National Park Service property, 2 - NCDOT right-of- 1 6' interior diameter lift station and associated way appurtenances, 12,597 linear feet of 4" PVC force main c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes []No ❑NA (ii) If yes, list the date submitted: April 30, 2015 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0% I. Give the percentage of the entire tract to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or panting. 0.31 % at the lift station location j. Describe proposed method of sewage disposal. Existing facility currently has failing septic tanks. The lift station will pump sewage from the facility to an existing wastewater treatment facility on Harkers Island. 1. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriall commercial effluent, "wash down" and residential discharges). There will be no discharge to state waters. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 122,283 SF f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Impervious surfaces include a 36' x 12' gravel driveway, the concrete lift station and valve box, and a 6' x 3' roof to cover the associated control panel. h. Projects that require a CAMA Major Development Permit may also require a Stonnwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? []Yes []No ®NA III) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? []Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stonnwater design? ❑Yes ❑No ORA If yes, attach appropriate documentation. 252-808-28082 :: 1.8884RCOAST :: www.no¢oastalmanagement.net revised: 12126/06 . Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Existing facility currently has water provided by the Harkers Island Water System. o. When was the lot(s) platted and recorded? N/A Date A n. (i) Will water be impounded? []Yes El No ®NA (ii) If yes, how many acres? HFULINLU MAY 2 2 2015 H' WA-"MkA qIt* p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes []No ®NA i✓.iTlo.✓sG FA,919 S091119,C A1AV- N7-.i3OaJ J7402cG MfA/n/ Project Name /Alin¢ VAe. ,/v r 252.808-2808 :: 1-888-4RCOAST :: wwwmccoastalmananement.net revised: 12126/06 3 4" 0 PVC FORCE MAIN W-1 W-q O z 0 a a U L_J �\ / / 575' AEC LINE 1 I I RIGHT-OF-WAY LINE � I I I \N y I \ by I PRESSURE SEWER FROM NATIONAL PARK SERVICE I � / SCALE (IN FEET): 0' 20' 40' M 50' WETLANDS// \ SETBACK Hy 404 WETLANDS \ ` \ RECEIVED MAY ts.015 �" I>rr�uG�wlna lal�aj \ ARENDELL PROJECT: CLIENT. DRAWING TITLE: ENGINE,ERS FORCE MAIN AND UFT STATION HARKERS ISLAND SEWER LIFT STATION xoaims°.2wea CAPE LOOKOUT NATIONAL COMPANY, LLC M ""'""°( NCB aFM P.O. BOX 370 SITE PLAN P5z°°Lsnaro .,. L'Sn8""1505 znm.� ARKERREFAND,N HARKERS ISLAND, NC HARKERS ISLAND, NC 28531 wnc.w,.crtuae"ne awu sr•� s*a 1'=29 Ow 3 ogre. 05173175 oa xw BY JJW aaoemx 75006 ISLAND ROAD ROAD CENTERLINE 2FCEIVED MAY 2 2 2015 nrrn! rr�nb ,.r+ao EDGE OF ROAD 4" 0 PVC / EDGE OF TRENCH — — — FORCE MAIN — — — 2' WIDE, TYP. 5' TYP. NCDOT RIGHT-OF-WAY LINE / r � % I TYPICAL TRENCH PLAN SCALE: NOT TO SCALE MOUND BACKFILL OVER TRENCH TO ALLOW FOR SETTLEMENT 36" UNCLASSIFIED BACKFRILL 85% STANDARD PROCTOR METALLIC TRACER TAOE V ABOVE ALL PVC SEWER FORCE MAINS SELECT BACKFILL COMPACTED TO 98% STANDARD PROCTOR. USE HANDOPERATED EQUIPMENT ONLY 12 GAUGE SINGLE STRAND PLASTIC COATED, COPPER TRACER WIRE TO BE INSTALLED ON ALL NON-METALLIC PIPE TAPED TO PIPE AT MIN 10' SPACING. TRENCH BOTTOM SHALL CONSIST OF PIPE O.D. + 16" FIRM, STABLE MATERIAL & SHALL NOTE: PROVIDE UNIFORM SUPPORT NO TRENCHES ARE TO REMAIN THROUGHOUT LENGTH OF PIPE OVERNIGHT. TRENCHESARE TO BE FILLED, COMPACTED, AND SEEDED THE SAME DAY. TYPICAL TRENCH SECTION SCALE: NOT TO SCALE PROJECT.': CLIENT: DRAWING TIRE: NTSA�ARENDELL .,�ENGINeiFORCE �4 MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL HARKERSISLANDSEWER COMPANY, LLCLIFT STATION ]DATI '�".* mws SEASHORE FACIIJTY P.O. BOX 37O SRE PLAN �' ,I,LW`.Mnea+r>aHARKERSISLAND, NC HARKERS ISLAND, NC 28531 e IDCM Coordinator: IJ Permit #: ('-15- 1N MLE'4G DISTRIBUTION SBEET PI Pr 6 DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington 5CAfe y rrVKCIIauuf C({�, 6 z � 5-s7 US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NCOT) J Wilmington: Tyler Crumbly �// �v make or ccpy Cultural Resources: Renee Gledhill -Early VI / -[�' cyp 4/-m5 Rlt/ Public Water Supply: Diane Williams (WIRO) ✓ dtoq -9, l e , Loek5 Joey White (WARD) -/ Marine Fisheries: Shane Staples V/ � Cl I50 pI �y 5� Scun NC DOT: Ken Pace i// Shellfish Sanitation: Patti Fowler VI 11 @ arer�Qell en y,nee/5 ,C�/h State Property: Tim Walton ✓ Water duality: Karen Higgins (Raleigh) V John Hennessy (NC DOT) Washington: AnthonyScarbraugh-401 �dv Scott Vinson-Stormwater Wilmington: Joanne Steenhuis - 401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WARO) Vacant (WIRO) LPO: Fax Distribution: Permitee Agent #:_ ®BM MF4 APPLICATION for RECEIVED Major Development Permit MAY �2 015 A14- DP.tJwAnPJ.aJri (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1: FrlmaryApp(icant/tandowner,I forritat' 'n. _,.,. e .. Business Name Project Name (if applicable) Harkers Island Sewer Company, Lie National Park Service Lift Station & Force Main Applicant 1: First Name MI Last Name Mike Laws Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box - City State P.O. Box 370 Harkers Island NC ZIP Country Phone No. FAX No. 28531 USA 919-810-4929 ext. - Street Address (if different from above) City State ZIP 270 Pintail Drive Lexington NC 27295- Email - - - mlaws@harkersislandsewercompany.com 2 '.Age"ViContractorinforniation: _...: Business Name Arendell Engineers Agent/ Contractor 1: First Name MI Last Name James W. (Bill) Forman, Jr., P.E. Agent/ Contractor 2: First Name MI Last Name John J. Wade, P.E. Mailing Address PO Box City State 105 North 10�1 Street, Suite 4 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor# - 252 622 4505 C-1509 Street Address (if different from above) _ City State - ZIP Email bill@arendellengineers.com; john@arendellengineers.com <Form continues on back> 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) RECEIVED APPLICATION for w MAY 2 2015 ajor Development Permit 3. Project Location . County (can be multiple) Street Address State Rd. # Carteret 1800 Island Road 1335 Subdivision Name City - State Zip Harkers Island NC 28531 - Phone No. Lot No.(s) (if many, attach additional page with list) 919 - 810 - 4929 ext. 3-11, 1 1 , a. In which NC river basin is the project located? - b. Name of body of water nearest to proposed project White Oak Back Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Back Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. Carteret County 4 ' Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) N/A 12,597 linear feet of force main within the NCDOT Right - of -Way c. Size of individual lolls) - d. Approximate elevation of tract above NHW (normal high water) or N/A, I NWL (normal water level) (If many lot sizes, please attach additional page with a list) - +5 NAVD88 ®NHW or ❑NWL - e. Vegetation on trail Primarily forest. The route of the force main contains grass, trees, and shrubs. There is one location where wetlands may be encountered and the force main will be installed using an underground directional bore. f. Man-made features and uses now on tract The lift station tract is currently undeveloped. The NCDOT right-of-way is developed by State Road 1335. g. Identify and describe the existing land uses adiacent to the proposed project site. Cape Lookout National Park facility, Core Sound Waterfowl Museum & Heritage Center, adjacent land uses to the NCDOT right-of-way include mixed uses of residential and commercial (adjacent to the sewer line installation). In. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) ❑Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? . - ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it Involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :: - q-888.41FICOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) RECEIVED APPLICATION for MAY 2 2 2915 Major Development Permit OCf'n-rvl-'IPJ Fir, m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Existing wastewater treatment facilities include septic tanks that are currently failing on National Park Service property. o. Describe existing drinking water supply source. _ Drinking water is supplied by the Harkers Island Water System, a division of the Carteret -Craven Electric Cooperative. p. Describe existing storm water management or treatment systems. There are currently no storm water management or treatment systems on the site. 5- Activities and Impacts- a. Will the project be for commercial public, or private use? ®Commercial ❑Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The project includes a lift station to pump wastewater from the existing facility to an existing wastewater treatment tactility on Harkers Island. The existing septic tanks on the site are failing and the National Park Service wishes to have a long term solution to their wastewater needs. The force main will run approximately 12,597 linear feet mainly along Island Road to the lift station at the West Bay subdivision. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. - The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of -way. Encroachment agreements have been applied for construction within the NCDOT rights -of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. d. List all development activities you propose. Development activities include the installation of a 6' interior diameter lift station and associated appurtenances and 12,597 linear feet of 4" PVC and ductile iron pipe. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? 122,283 ®Sq.Ft or[]Acres g. Will the proposed project encroach on any public easement, public accessway or other area NYes ❑No- ❑NA � C/JVr - that the public has established use of? _ h. Describe location and type of existing and proposed discharges to waters of the state. There will be no discharges to waters of the state. I. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No XNA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252-808.2808 :: 1-888-4RCOASa :: www. nccoastal management. net Form DCM MP-1 (Page 4 of 4) RECEIVED APPLICATION for MAY 2 2 2015 Major Development Permit 6:•Addit►onal4n0ormation, J In addition to thlecompleted appbgabon form,`'(MP 1) fhe follgwmg rtems,tielow if applicable must be submitted in orderfortheappkcabon'� package'.to be complete: lt6mn (a); (o are always applicable to any major development application:' Please oonsultfhe application mstructfo, n bookW ad how to properly prepare the regwred items below 7 3 a. A project narrative. - b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. -Name Max D Abernethy Sr Phone No Address 2910 Howards Creek Mill Road; Vale NC`28,166 �.._ Name Stacy M. Davis - Phone No. Address 106 Stacy Road, Harkers Island, NC 28531 Name Timothy Van Noy , `.Phone No ' Address 101 Saddle Court Mulhca Hill NJ;08082� `'� a , g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dales. NCDENR WQ0024023 NCDOT Encroachment Permit - Pending NCDENR- Erosion& Sediment Control Permit -Pending h. Signed consultant or agent authorization form, K applicable.' I. Wetland delineation, if necessary. - - - j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this applicationis truthful to the best of my knowledge. in Date 572t-J15 Print Name NiP/A" N. 2Nvf P46� IF AG�iJT Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ❑DCM MP-4 Structures Information 252-808-2808 :: 1=888-4RCOAST :: www. nccoastal management. net RECEIVED Form DCM MP-3 MAY 2 2 2015 ?UPLAND DEVELOPMENT c�cv_vmpoeITY (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1 E4 ERI L'UPLAND,DEVEGOPMENT e and number a. Type of buildings, facilities, units or structures proposed. 1 6' interior diameter lift station and associated appurtenances, 12,597 linear feet of 4" PVC force main c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: April 30, 2015 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0% I. Give the percentage of the entire tract to be covered by Impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0.31 % at the lift station location j. Describe proposed method of sewage disposal. Existing facility currently has failing septic tanks. The lift station will pump sewage from the facility to an existing wastewater treatment facility on Harkers Island. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ , commercial effluent, "wash down" and residential discharges). There will be no discharge to state waters. b. Number of lots or parcels. 2; 1 - National Park Service property, 2 - NCDOT right-of- way d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 122,283 SF f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Impervious surfaces include a 36' x 12' gravel driveway, the concrete lift station and valve box, and a 6' x 3' roof to cover the associated control panel. h. Projects that require a CAMA Major Development Permit may also require a Stormwaler Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ❑No ®NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stonnwater design? []Yes ❑No ®NA If yes, attach appropriate documentation. 252-808-28082 c 1-888.4RCOASY :: vvww.nccoastalmananement.net revised: 12/26/06 Ir®6'm ®C iW RP-3 (Upland ®eve9epment, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Existing facility currently has water provided by the Harkers Island Water System. o. When was the lot(s) platted and recorded? N/A n. (i) Will water be impounded? ❑Yes ❑No ®NA (ii) If yes, how many acres? MAY 2 2 2015 t+"Aau+nm 101-T? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes []No ®NA ^0,1 AJ 252-808-2808 :: d-888-4RCOASY :: www.nccoastalmanagement.net revised: 12/26/06 ISLAND ROAD ROAD CENTERLINERECEIVED MAY 2 2 2015 ncrr��,1P�±r°I EDGE OF ROAD 4" 0 PVC / EDGE OF TRENCH FORCE MAIN 2' WIDE, TYP. ---------------- --------------------- — � .� rr— _ ---------------- I51TYP.-------- I_ NCDOT RIGHT-OF-WAY LINE! / r r � r r TYPICAL TRENCH PLAN SCALE: NOT TO SCALE r I MOUND BACKFILL OVER TRENCH TO ALLOW FOR SETTLEMENT 36" 12 GAUGE SINGLE STRAND PLASTIC UNCLASSIFIED BACKFRILL 85% STANDARD PROCTOR METALLIC TRACER TAOE V ABOVE ALL PVC SEWER FORCE MAINS SELECT BACKFILL COMPACTED TO 98% STANDARD PROCTOR. USE HANDOPERATED EQUIPMENT ONLY COATED, COPPER TRACER WIRE TO BE INSTALLED ON ALL NON-METALLIC PIPE TAPED TO PIPE AT MIN 10' SPACING. TRENCH BOTTOM SHALL CONSIST OF PIPE O.D. + 16° FIRM, STABLE MATERIAL &SHALL NOTE: PROVIDE UNIFORM SUPPORT NO TRENCHES ARE TO REMAIN THROUGHOUT LENGTH OF PIPE OVERNIGHT. TRENCHESARE TO BE FILLED, COMPACTED, /+ AND SEEDED THE SAME DAY. TYPICAL TRENCH SECTION SCALE: NOT TO SCALE a ARENDELL PROJECT. m ENGINEERS FORCE MAIN AND UFT STATION I°SN CAPE LOOKOUT NATIONAL dClVheel,&b1ncrosn pmom ab,xoro:: lrNleazxe SEASHORE FACILITY ;Ax(MM4m NARKERS ISLAND, NO Nau CmB,e Ce9i66, M G/509 CIJENT.. DRAWMG TIRE: � NB A HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 LIFT STATION SITE PLAN c �Y DAIS 05n0n5 DRAWN Dr. w HARKERS ISLAND, NC 28531 PR #.. 15ms WENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary July 1, 2015 Harkers Island Sewer Co. P.O. Box 370 Harkers Island, N.C. 28531 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Wi— Douglf6' V. Huggett 'O/ Major Permits and Consistency Manager N.C. Division of Coastal Management 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Harker Island Sewer Co., LLC County: Carteret LOCATION OF PROJECT: 1800 Island Rd., Harkers Island. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 6/4/15 FIELD RECOMMENDATION: Attached: No To Be Forwarded: Yes CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: Yes FIELD REPRESENTATIVE: Roy Brownlow DISTRICT OFFICE: Morehead City DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: 6/9/15 FEE REC'D: $2000.00 PUBLIC NOTICE REC'D: Yes END OF NOTICE DATE: 6/30/15 ADJ. RIP. PROP NOTICES REC'D: Yes DEED REC'D: Yes APPLICATION ASSIGNED TO: Doug Huggett C) 75 DAY DEADLINE: EXPRESS MAIL OUT DATE: 6/9/15 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DENY ON: 6/10/15 150 - DAY DEADLINE: STATE DUE DATE: EXPRESS FED COMMENTS REC'D: DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS. YES NO NOTES Coastal Management -Regional Representative 2 /— Coastal Management - LUP Consistency Determination Division of Community Assistance / Land Quality Section S 1 ..W C Division of Water Quality Storm Water Management (DWQ) Ll State Property Office Division of Archives & History Division of Environmental Health Division of Highways Wildlife Resources Commission L ) Local Permit Office Division of Marine Fisheries L Cogs of Engin,c,, NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary MEMORANDUM: TO: DOUG HUGGETT FROM: ROY BROWNLOW SUBJECT: COMMENTS & RECOMMENDATIONS — CAMA EXPRESS MAJOR PERMIT- HARKERS ISLAND SEWER CO., LLC DATE: 06/23/2015 The following are the comments and recommendations regarding the aforementioned proposal. The proposal is consistent with NCAC 7H .0208 use standards for the Coastal Shoreline AEC. Based on'these factors, it is recommended that the applicant be authorized to install a sewer pump lift station and install sewer lines and force mains as proposed, contingent upon the standard permit conditions and the following specific conditions for this project: Any boring beneath coastal wetlands would require authorization under Section 10 of the Rivers and Harbors Act from the USACE prior to commencing work. 2. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 3. Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials resulting from the excavation of the estuarine shoreline for the directional boring drilling site or the lift station site do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. 5. No Coastal Wetlands or non -coastal wetlands shall be excavated or filled, even temporarily. 6. The Erosion and Sediment Control permit, Encroachment Agreements with the NCDOT, and the Sewer Transmission Line permit must be obtained prior to commencing work. Cc: Ryan Davenport, Field Representative 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper 57e NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary June 9, 2015 RECEIVEDINCDERR/M MEMORANDUM: JUN 112015 TO: Linda Lewis Water'Quality Regional . Operations section Joanne S�iilidis witinington Regional Office Division of Water Resources FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: EXPRESS 'CAMA/DREDGE& FILL Permit Application Review Applicant: Harkers Island Sewer Co., LLC Project Location: Carteret County at 1800 Island Rd., Harkers Island. Proposed Project: Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately "12,597linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. ' Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015 . If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. I This agency has no comment on the proposed project. ►Jb (f41 2E0 OY-5 W3011S This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project forreasonsdescribed in the attached comments. SIGNED (`r o pa A�prphaad dKIC r`arnl'nn MR �I P ne: 52-808-28081 AV 252-247-33301Internet: www.nccoastalmanagement.net An Equal Opportunity !Affirmative Action Employer PIMA N-EWIR North Carolina Department of Environment and Natural Resources Pat McCrory Govemor June 9, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Donald R. van der Vaart Secretary Maureen Meehan Division of Coastal Management Doug Huggett Major Permits Processing Coordinator EXPRESS CAMA/DREDGE & FILL Permit Application Review Harkers Island Sewer Co., LLC Carteret County at 1800 Island Rd., Harkers Island. Proposed Project: Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015. If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. REPLY: � This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE ommerce Avenue7gorehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247.33301 Internet: www.nocoastalmanagement.net An Equal Opportunity I Affirmative Action Employer 0o � NCDENR 4V North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 9, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Linda Lewis Joanne Steenhuis Division of Water Resources Doug Huggett Major Permits Processing Coordinator Donald R. van der Vaart Secretary ECEWE JUN 1 1 2015 BY: EXPRESS CAMA/DREDGE & FILL Permit Application Review Harkers Island Sewer Co., LLC Carteret County at 1800 Island Rd., Harkers Island. Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,5971inear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will he within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015 . If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. JUL 01 1015 w;w�-uNhd �+f+c This agency has no comment on the proposed project. t This agency approves of the projecs only if the recommended changes are incorporated. See attached. /Vaz--! CWa-5A1 pg--M, f' This agen�o the project for reasons described in the attached comments. SIGNED 07�/_on CnmmPrra Avanna MnrPhPad C jA� Carolina 28557 �� �/� Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nocoastalmanagement.net An Equal Opportunity I Affirmative Action Employer North Pat McCrory Governor June 9, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: A_ NUMMA Carolina Department of Environment and Natural Resources G,15. V&.11. b I Maria Dunn NC Wildlife Resources Commission Doug Huggett Major Permits Processing Coordinator Donald R. van der Vaart Secretary 4 .1U1d 2015 (R11_7p� otg EXPRESS CAMA/DREDGE & FILL Permit Application Review Harkers Island Sewer Co., LLC Carteret County at 1800 Island Rd., Harkers Island. Proposed Project: Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015 . If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. JUL 01 2015 OWN-wmw L:Ipt /This agency has no comment on the proposed project. ✓ This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 400 Commerce Avenue, Morehead f ftlil rth Carolina 28557 ternet: An Equal Opportunity / Affirmative Action Employer 411;_ . 1 6 2 4- 2.715 'r,7-A' North Carolina Wildlife Resources Commission i Gordon Myers, Executive Director 1u1- u 1 .7TTI ul TO: Doug Huggett, Express Permits Coordinator Division of Coastal Management North Carolina Department of Environment and Natural Resources FROM: Maria T. Dunn, Coastal Coordinator Division of Habitat Conservation DATE: June 26, 2015 SUBJECT: Express CAMA Dredge/Fill Permit Application for Harkers Island Sewer Co., LLC Carteret County, North Carolina. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located at 1800 Island Drive Road in Harkers Island, NC. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of the island. Approximately 12,597' of 4" PVC will be trenched in the NCDOT right of way. A wetland crossing is proposed to be directionally bored. Sewage will be pumped to the West Bay Wastewater Treatment facility located at West Bay Circle on Harkers Island. The NCWRC has reviewed the permit application and does not object to permit issuance since the wetland crossing will be directionally bored. We do request that if sewer service is expanded to areas other than the National Park Service, that any development utilizes recommendations from our publication, Guidance Memorandum to Address and Mitigate Secondary and Cumulative Impacts to Aquatic and Terrestrial Wildlife Resources and Water Quality (August 2002) found at the link below: http://www.ncwildlife.orWPortais/0/Conserving/documents/2002 GuidanreMemorandumforSecondar,Lan dCumulati velmpacts.ndfl. RECEIVED We appreciate the opportunity to review and comment on this permit application. If you need further assistance or additional information, please contact me at (252) 948-3916. JUL 01 1015 Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 4 ��� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 9, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary Diane Williams Public Water Supply Doug Huggett Major Permits Processing Coordinator EXPRESS CAMA/DREDGE & FILL Permit Application Review Harkers Island Sewer Co., LLC Carteret County at 1800 Island Rd., Harkers Island. Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015. If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. JUL O 12015 This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. 2 SIGNED Sx �""� I' �a DATE r ommerce venue, ore ea ity, North Carolina 28557 Phone: 252.808.28081 FAX 252-247.33301 Internet: www.nccoastaimanagement.net ��" An Equal opportunity I Affirmative Action Employer . k;yt V tRV , Wl 9-0 r NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Govemor Secretary June 9,2015 RECEIVED MEMORANDUM: JUN 12 2015 TO: Tim Walton DOA State Property Office STATE PROPERTY OFFICE RECEIVED FROM: Doug Huggett JUL 01 10b Major Permits Processing Coordinator �M*M4 pl+t; SUBJECT: EXPRESS CAMA/DREDGE & FILL Permit Application Review Applicant: Harkers Island Sewer Co., LLC Project Location: Carteret County at 1800 Island Rd., Harkers Island. Proposed Project: Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015 . If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. -�pr�w� This agency has no comment on the proposed project. • iy,�`°d'�J This agency approves of the project only if the recommended changes are 'moo incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED ATE 0 Commerce Avenue, �hed Cit , North Carolina�28557 n 2 -8 28081 FAX 252-24 ternet: www.nccoastalmanagement.net Equal OppoAunity ative Action Employer RECEIVED JUL 01 M ,01004+AHU e-" RECEIVED v JUN 2 2 2015 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor June 9, 2015 MEMORANDUM: TO: FROM: SUBJECT: _ Applicant: Project Location: Proposed Project: Donald R. van der Vaart Secretary Lee Padrick Division of Community Assistance Doug Huggett Major Permits Processing Coordinator EXPRESS CAMA/DREDGE & FILL Permit Application Review Harkers Island Sewer Co., LLC Carteret County at 1800 Island Rd., Harkers Island. Proposes to construct a lift station and force main to service the National Parks Service facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear ft. of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 29, 2015. If you have any questions regarding the proposed project, please contact Roy Brownlow, District Manager at (252) 808-2808. Ext. 217. When appropriate, in-depth comments with supporting data is requested. REPLY: - This agency has no objection to the project as proposed. t/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED�( v� DATE �j l /f 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808.28081 FAX 252-247-33301 Internet: www.nocoastalmanagement.net An Equal Opportunity/ Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Harkers Island Sewer Company, LLC; Authorized Agent: Arendell Engineers, c/o Bill Foreman. 2. LOCATION OF PROJECT SITE: 1800 Island Road, Harkers Island, Carteret County Photo Index - 2006: 49.6343 grids: M16, N16 — 24, 017 State Plane Coordinates - X: 2,743,143.647 Y: 350,283.95 Longitude:-76.527653 Latitude: 34.68703 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: 5. PROCESSING PROCEDURE: Dates of Site Visit — 6/8/2015 Was Applicant Present - No Application Received — 06/04/2015 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Carteret County Land Classification From LUP — Limited Transition (B) AEC(s) Involved: ES, ORW, CW (C) Water Dependent: No (D) Intended Use: Municipal (E) Wastewater Treatment: Existing — Municipal sewer Planned - Municipal sewer (F) . Type of Structures: Existing — Sewer transmission lines & wastewater infrastructure Planned - Wetwell, duplex grinders and liftstation with force main sewer lines HABITAT DESCRIPTION: DREDGED FILLED 0M ER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands (C) Other— High ground disturbance 129,373 sf (D) Total Area Disturbed: 129,373 square feet (E) Primary Nursery Area: No (F) Water Classification: SA, ORW Open to shellfish harvesting: Closed areas in vicinity of project are NPS boat basin; Calico Jacks Marina; Barbours Harbor Marina; and Harkers Island Fishing Center. 8. PROJECT SUMMARY: The applicant is proposing to construct a lift station and force main to service the National Park Service (NPS) facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching approximately 12,597 linear feet of 4" PVC force main piping. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment Facility located on West Bay Circle, Harkers Island. The force main piping will be within the NCDOT ROW. Ili Field Investigation Report: Harkers Island Sewer Company, LLC c/o Arendell Engineers, Bill Foreman Page 02 9. Project Description The proposed lift station would be located on the southwest comer of a 2.17 acre, vacant, undeveloped tract owned by the National Park Service (NPS) on Cape Point Drive. To find this site, travel to Harkers Island and follow Island Road (SR1335) to the east end of Harkers Island. Near the end Island Road, turn left (north) onto Cape Point Drive and travel approximately 630 feet. The site is located at the intersection of Cape Point Drive and Charles Street, east of Cape Point Drive and north of Charles Street. The 4' PVC force main piping would be installed from the lift station site on the west ROW of Cape Point Dr, back to the Island Rd. The piping would then be installed on the south ROW of Island Rd. Turn right and travel west on Island Rd approximately 2 miles to Guthrie Dr. Turn right onto Guthrie Dr (piping installed on the west ROW) and travel north approximately 630 feet to Fulford Dr. Turn left (west) onto Fulford Dr and travel approximately 380 feet to Middle St. Turn left (west) onto Middle St and travel west approximately 315 feet to Old Ferry Dock Rd. Turn right (north) onto Old Ferry Dock Rd and travel approximately 330 feet north to the entrance of the West Bay Wastewater Treatment facility. The lift station site off Cape Point Dr. is located outside (landward) of the Estuarine Shoreline (ES) 575' Oustanding Resource Water (ORW) Area of Environmental Concern (AEC). The project site is predominately maritime forest vegetation consisting of mixed pine, hardwoods, and underbrush. The topography is relatively flat with an elevation of +5' NAVD88. The force main is located within the NCDOT Rights -of -Way and almost entirely within the ES ORW AEC. This area is comprised mostly of lawn grasses, paved surfaces, woody perennials and maritime forest. The elevation varies along the force main route from approximately +1 NAVD88 to approximately +11 NAVD88. The installation of the force main would be open trench, bore and jack, and horizontal drilling. There is a location of the south side of Island Road, approximately 1,500 feet west of Cape Point Dr. where the force main may have to be bored beneath coastal wetlands. The wetlands consist of Salt Meadow Hay (Spartina patens) and are located in a transitional zone to high ground. The landward extent of the coastal wetlands is located approximately 18r20' feet from the edge of the existing pavement. There appears to be sufficient high ground for the trench construction between the wetlands and the pavement; however, circumstances might still require a directional bore beneath the coastal wetlands, This is the closest extent of the force main to the normal high water of Back Sound at approximately 44' feet. Along the force main route, the land uses are mixed among residential and commercial properties abutting the NCDOT Rights -of -Way. The waters of Back Sound adjacent to the project areas are classified as "SA, ORW" by the Division of Water Resources. There are no nearby Primary Nursery Areas. According to the maps provided by the Shellfish Sanitation Section of the NC Division of Marine Fisheries, the waters are predominately open to shellfish harvesting adjacent to the proposed project. Closed shellfish harvesting areas in vicinity of project are NPS boat basin; Calico Jacks Marina; Barbours Harbor Marina; and Harkers Island Fishing Center according to the Section's maps. Field Investigation Report: Harkers Island Sewer Company, LLC c/o Arendell Engineers, Bill Foreman Page 03 There is no development proposed within navigable waters and there are no know historic or archaeological areas of value known within the project sites. Proposed Project The applicant is proposing to construct and install a lift station and force main to service the Cape Lookout National Park Service (NPS). This sewer service is requested to replace failing on -site septic tank systems according to the applicant and to provide service to the new restrooms currently under construction at the NPS facility. The permit request would be for the construction of the lift station and approximately 12,597 linear feet of 4" PVC force main. The lift station would be located outside, or landward of the Estuarine Shoreline ORW 575' Area of Environmental Concern. The lift station would pump wastewater from the NPS to the West Bay Wastewater Treatment Facility located on West Bay Circle, Harkers Island. The force main would be installed within the NCDOT's Rights -of -Way and discharge into the equalization tank at the West Bay Treatment Facility. The project involves the construction of a 6' interior diameter wet -well and lift station with duplex wastewater pumps. The project would include the installation of two sewer services on the NPS property. The services are duplex grinder low pressure sewer units that pump through approximately 881 linear feet of 2" force main directly to the lift station. The duplex grinders would be located approximately 150' feet from normal high water on the NPS property. 10. Anticipated Impacts: The proposed development would result in the disturbance of approximately 2.97 acres (129,373 sf) for both the lift station and force main. At the wetland crossing on the south side of Island Road, the piping would be bored using a trenchless hydraulic boring machine so there would be no impacts to wetlands. A bore pit would be constructed on one side of the wetlands and the pipe pulled at least 3' beneath the substrate. Roads and paved driveways would also be bored using the same methodology. Trenching for the force main would be with a 2' wide bucket on a backhoe or a 6" trencher depending upon the location and existence of other installed utilities in the area and excavated to a depth of 36" inches below the grade level. Total disturbed area for the trencher and backhoe would be a 10' wide work corridor for the length of the force main. The applicant reports they have submitted an Erosion and Sediment Control plan to NCDEMLR; applied for Encroachment Agreements with the NCDOT; and reports that the Sewer Transmission Line permit has been applied for and is currently being processed. Submitted by: Roy Brownlow Date: 06/09/2015 Morehead City District Office May 22, 2015 Mr. Roy Brownlow N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Re: CAMA Major Permit — Express, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County Mr. Brownlow: A ARENDELL COASTAL 105 North 10th Street Morehead City, Norp Carolina 28557 (252)622.4338 N.C. CeA tion No. C-1509 RECEIVED MAY 2 2 2015 We have revised the CAMA Major Permit package for the National Park Service Lift Station & Force Main on behalf of the Harkers Island Sewer Company, LLC per your email of May 21, 2015. The National Park Service is currently finalizing the easement agreement with Harkers Island Sewer Company, LLC. Once this is completed, we will provide it to your office The following revisions have been made: 1. DCM Form MP-1 has been revised per your email; 2. DCM Form MP-3 has been revised per your email; 3. The project narrative has been revised per your email; 4. We have included two additional drawings: a 404 crossing profile and trench section. Also, we have sent via Certified Mail the CAMA package to the three adjacent property owners. Once we receive all three green cards, we will submit them to your office. The NCDOT is currently reviewing the encroachment agreement for construction within the right-of-way and we will submit that permit once it is completed. The sewer transmission line permit has been submitted and is currently in the permit process. We expect this permit to take the longest. Once we have received this permit, we will submit it to your office. Please call me if you have any questions or need additional information. Sincerely, ARENDELL ENGINEERS IePlz Wi.(Bi ll) Forman, Jr., .,Senor Engineer Enclosures cc: Mike Laws, Harkers Island Sewer Company, LLC CAPE LOOKOUT NATIONA PARK SERVICE LIFT STATION & FORCE MAIN HARKERS ISLAND SEWER COMPANY, LLC HARKERS ISLAND, CARTERET COUNTY, NORTH CAROLINA May 13, 2015 Revised May 22, 2015 INTRODUCTION RECEIVED MAY 2 8 2016 M?."-WAr1W i-l+ % The Cape Lookout National Park Service (NPS) Lift Station & Force Main for Harkers Island Sewer Company, LLC will provide sewer service to the facility located on the eastern end of Harkers Island in Carteret County. The NPS has begun providing ferry services for visitors to Cape Lookout and is expecting an increase in visitors to the facility. Additional bathroom facilities are being developed for visitor use on the Harkers Island site. Collection of the wastewater from the NPS office building and associated bathroom facilities will be conveyed by two low pressure sewer to the lift station. A permit is requested for construction of a lift station and approximate 12,597 linear foot 4" PVC force main to serve the Cape Lookout National Seashore Facility at the east end of Harkers Island in Carteret County, North Carolina. The lift station will be located outside of the 575' AEC line. Sewage disposal at the site is currently by septic tanks which are failing. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment Facility located on West Bay Circle, Harkers Island within the North Carolina Department of Transportation's right-of-way. The force main will discharge into the equalization tank of the West Bay Treatment Facility. HISCO is considered as a public utility by the N. C. Utilities Commission. National Park Service LS & FM Major CAMA Permit Application — Narrative Page 1 of 5 May 13, 2015 Revised May 22, 2015 RECEIVED MAY 2 2 lot r'ip�-Mnw t+tt+ The National Park Service facility includes offices, a visitor's museum, ferry service, and recreational areas. Based on visitation data provided by Mike Baker, Facility Manager for the NPS, the projected flow from the NPS is estimated to be 2,800 gallons per day. This includes 42 employees @ 25 GPD/employee and 350 visitors/day @ 5 GPD/visitor. Visitation is based on the peak day for 2014 plus a growth factor based on the increase based on the actual growth in visitation for a Saturday in the month of July. It was estimated that the peak day for 2014 had 320 visitors. The facility currently uses septic tanks to treat the wastewater generated by the site which are currently failing. PROJECT DESCRIPTION This project includes construction of a 6 foot interior diameter wetwell and lift station with duplex wastewater pumps pumping at a rate of 100 gpm at approximately 100 feet TDH. The lift station pumps through 12,597 linear feet of 4 inch force main to an existing wastewater treatment facility at the West Bay subdivision (WQ0024023). The lift station will be located outside of the 575' AEC buffer. The force main will be installed within the North Carolina Right -of -Way and will not encroach on private property. The closest the force main will be to the normal high water line is approximately 44'. The project includes installation of two sewer services on the Park Service site to replace failing septic tanks and to provide sewerage to a new rest room facility currently under development. The services are duplex grinder low pressure sewer units that pump through approximately 881 linear feet of 2 inch force main directly to the lift station. The closest the grinder stations will be to the normal high water line is approximately 150' on National Park Service property. The closest the force main will be to the normal high water line is approximately 44 ft as shown on Sheet 05. EXISTING CONDITIONS Site Topography and Hydrography - The topography at the lift station is relatively flat with an elevation of +5 NAVD88. Along the route of the force main, the elevation varies between approximately +1 NAVD88 at its' lowest to approximately +11 NAVD88 at its' highest. The base flood elevation at the lift station site is 7 feet NAVD88. National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Revised May 22, 2015 Page 2 of 5 RECEIVED MAY 2 2 1015 Land Use —The site where the lift station will be located is currently wooded. There is no development on the parcel. Adjacent to this parcel is the National Park Service's Cape Lookout National Seashore Harkers Island Visitor Center. The island is adjacent to Back Sound which along the route of the force main is SA;ORW waters. Along the route of the force main, land uses vary between residential, commercial, and religious uses. Wetlands - There are 404 wetlands on the parcel south of the proposed lift station. There will be no impact to the wetlands on the site. There is one location on the south side of Island Road where the force main may be bored beneath coastal wetlands. Wetlands are located approximately 18 feet from the edge of pavement, adequate space for trenched construction. If it is necessary to bore beneath the wetlands, the methods described in Methods of Construction will be used. Areas of Archeological or Historic Value — There are no known areas of archeological or historic value known within the project site. Navigation — There is no proposed construction within any navigable waters. METHODS OF CONSTRUCTION The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of - way. At the wetland crossing on the south side of Island Road, the pipe will be bored using a trenchless hydraulic boring machine so that there are no impacts to the wetlands. A bore pit will be constructed on one side of the identified wetlands approximately 4' x 6' in size. The pipe will then be pulled beneath the wetlands no less than 3' beneath the ground surface. Roads and concrete & asphalt driveways will also be bored using the same methods. Construction of the force main will be with a 2 foot wide bucket or a 6" trencher depending on the location and existence of existing utilities in areas other than the wetlands and road crossings. Total disturbed National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Revised May 22, 2015 Page 3 of 5 RECEIVED MAY 2 2 2015 area for the trencher and backhoe work will be a work area approximately 10 feet in width. Total disturbed area for the lift station and force main is approximately 2.97 acres, as indicated on the submitted Erosion & Sediment Control plan. Encroachment agreements have been applied for construction within the NCDOT rights -of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. PROJECT SCHEDULE Construction of the lift station and force main is expected to start immediately once a permit is issued and within the permitted time frame. The installation of the lift station and force main is at the expense of the Harkers Island Sewer Company with reimbursement by the federal government. COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. National Park Service LS & FM Major CAMA Permit Application — Narrative Page 4 of 5 May 13, 2015 Revised May 22, 2015 Major CAMA Permit Application National Park Service LS & FM Harkers Island, North Carolina May 13, 2015 proposed by: Harkers Island Sewer Company, LLC P.O. Box 370 Harkers Island, NC 28531 prepared for: North Carolina Department of Environment & Natural Resources Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 prepared by: Arendell Engineers RECEIVED 105 North 10th Street, Suite 4 MAY 19 P15 Morehead City, North Carolina 28557 Phone: (252) 622-4338 N,,w-unnAJs.ux N.C. Certification No. C-1509 LMG LAND MANAGEMENT GROUP INC. Environmental Consultants DATE: May 15, 2015 SUBJECT: Preliminary and general evaluation of portions of the Harkers Island National Park Service property (<4 acres) for potenfial 404 or Isolated Wetland areas. Tract located east of Cape Point Drive, east end of Harkers Island, Carteret County, North Carolina. TO: Mr. Bill Forman, PE Mr. Mike Laws Arendell Engineers Harkers Island Sewer Company 105 N. 10w Street, Suite 4 270 Pintail Drive Morehead City, NC 28557 Lexington, NC 27295 (252) 622-4338 [o]; 259-7224 [m] (919) 810-4929 Land Management Group completed a preliminary and general evaluation of portions of the Harkers Island National Park Service properties (-4 acres) to determine the general limits of potential 404 or Isolated wetland areas. The areas evaluated have been historically developed with roads, ditching, and buildings with the balance in unmanaged mixed pine, hardwood, and underbrush. Jurisdictional 404 wetlands and Waters of the U.S. come under the authority of the U.S. Army Corps of Engineers (USACOE), EPA, and NCDENR-DWR. Jurisdictional 404 wetlands and Waters cannot be filled or massively disturbed without Federal & State permit approvals. Isolated wetlands come under NCDENR-DWR jurisdiction only. This evaluation was completed through limited geomorphic transects within the tract, aerial photo interpretation, and review of existing information. A complete 404 wetlands evaluation and physical delineation of the upper limits of potential 404 wetland areas was not completed during this evaluation. The currently used U.S. Army Corps/EPA 1987 Federal Wetlands Delineation Manual" and regional supplements were used as general guidelines to determine potential 404 Wetland, Isolated wetlands, and/or Waters of the U.S. areas. The enclosed map shows the general location of uplands vs. the potential 404 wetlands within the specific areas evaluated (see map). These areas appear to be potential jurisdictional 404 wetlands and not isolated wetlands. There were no Waters of U.S. found within the area evaluated, including the existing adjacent roadside ditches. Nationwide general fill permits without mitigation for wetland losses may be available for minor amounts <0.5 acre of wetland fill or disturbance. An individual permit is typically required for fill amounts >1 acre with mitigation for wetland losses. Private wetland mitigation is typically costly in both time and monies (12-18 months permitting time & costs). Another mitigation alternative is to purchase wetland fill credits from NC's eco-enhancement program at costs of —$20,000 - $50,000 /acre after avoidance and minimization criteria have been satisfied. Any final 404 Wetland jurisdictional limits or "Waters of the U.S." will need to be physically delineated in the field, approved by the USACOE, and then surveyed for final approval by the USACOE. Any final 404 wetland approval of a wetland survey is typically valid for a 5 year time period before having to be reauthorized. This report and preliminary map should be used for broad general planning purposes only, as specific on -site evaluations, delineations, approvals, and permits are required by respective regulatory agencies before initiating any development activities. C;1�7�e AZL-� C%AJU/- Larry F. Baldwin CPSS/Sc #2183; NCLSS #1040 RECENED MAY 19 Z015 DCPV-"H" efts www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 0 P.O. Box 2522, Wilmington, NC 28402 t- mneakno restore xeport rage i of 1 MAY 19 1015 team-npw em+ http://carteret2.connectgis.com/DownloadFile.ashx?i=__ags_rnap029b334352b344e985b 1 a... 5/12/2015 wnnec[via reamre mpor[ Page 1 of 1 Carteret2 CONNECTGis Printed May 12, 2015 svcE. t<_.3 TV See Bela. fo, 'r p\ i 2693 `cT 842 6191 3409_ l �€ 5434 1453 8802 9313 2396- ! b ' 5247� l+ 2283��_,, l _ ,1 �, -- ry rr 5170 d` Jt 2; f 8058 I a: I II15�d52 lea 4663 U i l r w 5309 "�1 1 � 'F S 200 Feet -- _ r---1 fhe information displayed by this website is prepared for the inventory ofteal property found within thisjursdicron and is compiled from recorded deeds, plats, and othe mblic records and data. Users of this information are hereby no5fied that the aforementioned public primary information sources should be camulted for verifiutlon o :he information contained an this site. Carteret County assumes no legal responsibility for the information contained on this site. Carteret County does not guarantee the :he data and map services will be available to users without interruption or error. Furthermore, Carteret County may modify or remove map services and access MII. �����CC::EEIIVV metlndsa p 3 MAY 19 1015 v�nn=enm� efn http://caiteret2. connectgi s. com/DownloadFile.ashx?i=_ags_map70175f 74dcOd4fl7ad9ccf... 5/12/2015 H id"+ NWI Map -- NIPS Harkers Island, NC National Wetlands Inventorav May 12, 2015 Wetlands FreSRMMrr Enrorgent - Fmv infer Foresiedeshnub ® Estuanne ano Marine OeePemfer cstuannr anc Mxme Mshwofer Ponn lake A1wJnc - glfler F Tlda V M Iu yanaral NO naa oMd. TM U9 Flan and Wpolaa aerdaa Ia nm ropomlga FM p ae.' or uumnlnuo W It. Iwo data flh w on MY map, MI waw"d nMad "a M -Id ea —6 In eacordanu MMI, Yw try navadala lound en Na mu.4a Mepura at.. mUser Remarks: n Z m O PRELIMINARY EVALUATION & MAP PORTION of HARKERS ISLAND-NPS SEWER PUMP SITE FOR POTENTIAL 404 or ISOLATED WETLAND AREAS vs UPLAND AREAS Harkers Island East End - Carteret County - North Carolina C,, AWCONNEC i GIS printed May 15, 201- 'aE6 tl.•n: See Beawfor oisc:aimer 3 � Al 91 V Q T `Y at . _Ir J Q- p Y N I Q. J.y. � I � Y ry GF a /'16 ej S 1:200 Feet he infmtro6on displayed by this website is prepared for the invent" of real property found ssithin tlis jtrMction and :s compiled from recorded deeds, plats, aro other ublic records end dap. Users of tttis informaccr are Ne eby ratified that tie afom"r,boned pvbiic ptimary Infcrma-�r sources shevld be consulted for vnc c�ation . ite information cwtained on this site. Carteret Cowry assurnes no legal responsibility for ;he inrcrmation Contained on dris site Carteret County does rat guarantee tha he data and map services will be available to users without interruption or error. furthermore, Carteret County may modify or remove map services and access methods a wit I Dktm do not appear to be Waters of the U.S. May - 2015 Ifb Land Manaaement Group. Inc. PRELIMINARY EVALUATION & MAP PORTION of HARKERS ISLAND-NPS SEWER PUMP SITE FOR POTENTIAL 404 or ISOLATED WETLAND AREAS vs UPLAND AREAS Harkers Island East End - Carteret County - North Carolina • • — Dteobse do not appear to be waters of ft u.s. May - 2015 Ifb Land Manaaement Group. Inc. l � RIGHT-OF-WAY o•Ri��yo %' l yT'0 016 \ l 04 \\ \ \ / ' ° I \^ ` 4"PVC / It° ` FORCE MAIN — RIGHT -OF b °A /No\ ARENDELL ® ENGINEERS m ................._....... .ww m we F �A*. au,mays .onc.en. casa.w crsw - DA '57' I �L��va �oAi� oA — D Zi / -_ y— vav�— va va — v N/F VAN NOY, TIMOTHY % It N/F \ TUX LINDA M DAVIS, STACY M SR ETUX L/T ANNA APPROX.NORMAL \ HIGH WATER LINE PROJECT: )RCE MAIN AND LIFT STATII CAPE LOOKOUT NATIONAL SEASHORE FACAUTY HARKERS ISLAND, NC CLIENT. HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 / N/F / ABERNETHY, % MAX D SR MAY 19 Z9b DRAN1NG TITLE ADJACENT PROPERTY OWNERS — AS SHONN "•. DAM 051+y+5 DUPLIN PENDER OAK HAMMOCK DRIVE LENOIR CRAVEN PAMLICO JONES ONSLOW JCCAOUNTyTERET WEST BAY WWTP HARKERS ISLAND ISLAND ROAD FORCE MAIN ROUTE BACKSOUND SA, ORW ARENDELL PROJECT: CLIENT.' ENGINEERS FORCE MAIN AND DFT STATION HARKERS ISLAND SEWER 105No^10"S°`c �4 CAPE LOOKOUT NATIONAL COMPANY, LLC a SEASHORE FACILITY P.O. BOX 370 ";m.,°IIy HARKERS ISLAND, NC HARKERS ISLAND, NC 28531 wnc.m.u�m,nn aws nc N RECEIVED MAY 19 2015 AREA OF INTERESTI 1,49" HMN" NATIONAL PARK SERVICE FACILITY DRAWING 7I7LE — ASSHWM ��• VICINITYMAP O' DIE MY15 JJYI r Tl 15006 DCM Coordinator: R04 prlAG Aj 6C4 Permit #• Permitee: Agents: DCM Field Offices MAILING DISTRIBUTION SHEET N Elizabe City (with revised work plan drawings) orehead CI Was gton Wilmington US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) ✓Wilmington: Tyler Crumbly ✓ Cultural Resources: Renee Gledhill -Early ✓Public Water Supply: Diane Williams (WIRO) Joey White (WARD) Marine Fisheries: Shane Staples Gregg Bodnar --'NC DOT: Ken Pace Shellfish Sanitation: Mate Property: Water Quality: Washington: Patti Fowler Tim Walton Karen Higgins (Raleigh) John Hennessy (NC DOT) Anthony Scarbraugh-401 Scott Vinson-Stormwater Wilmington: ✓ Joanne Steenhuis — 401 Chad Coburn - 401 Linda Lewis - Stormwater 4 /Vc d0 1L W(tw DA,-J SaMs Wildlife Resources: ✓ Maria Dunn (WARD) Vacant (WIRO) LPO: ArtV,%.:f (6und�( ! 144t k Wo 2tA Fax Distribution: Permitee #: Agent #:_ A ARENDELL u t tit RS CIVIL - COASTAL• ENVIRONMENTAL 105 North loth Street, Suite 4 Morehead City, NC 28557 (252) 622-4338 FAX (252) 622-4505 DATE: June 9, 2015 TO: Roy Brownlow NC CAMA TRANSMITTAL FROM: John J. Wade, P.E. Vice President RE: Harkers Island Sewer Company — Express Major Permit SENDING VIA ❑ FAX ❑ Postal ❑ UPS ❑ Email Overnight ❑ U. S. Mail ® Personal ❑ FedEx ❑ Other Delivery The following is transmitted: COPIES DATE PAGES DESCRIPTION 1 619 1 USPS Certified Mail Green Cards ❑ As requested ❑ For approval ❑ For information ❑ For signature ❑ For review and comment ❑ For distribution ❑ Forbids due MESSAGE Copy to: Signature: QTCMIM JJN n g mis DCO-0142 Clry A-EIVED MAY 2 2 2015 f 5,' 1K-mrty "t, x ADJACENT PROPERTY OWNERS Letters notifying adjacent properties owners of Cape Lookout National Park Service Lift Station & Force Main CAMA Permit Application have been sent to the following properties owners by certified mail. Copies of those letters are attached. Adjacent Riparian Property Owners Max D. Abernethy, Sr. 2910 Howards Creek Mill Road Vale, NC 28168 Stacy M. Davis 106 Stacy Road Harkers Island, NC 28531 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 National Park Service LS & FM Major CAMA Permit Application — Narrative Page 5 of 5 May 13, 2015 Revised May 22, 2015 '"`This is a word processing form to be completed In Microsoft Word" NC Division of Coastal Management Major Permit Application Computer Sheet (01 /08/2007) Applicant: Harkers Island Sewer Co., LLC Go Arendell Engineers, Bill Foreman Date: 6/92015 Project Site County Carteret Staff: Roy Brownlow District: ❑Elizabeth City ®Morehead City ❑Washington ❑Wilmington Project Name: NPS Lift Station & Force Main, Harkers Island Rover File: NA Photos Taken: Yes Z No Date application "received as complete" in the Field office (EX: 1/82007): 06/04/2015 Permit Authorization: CAMA Dredge & Fill []Both SITE DESCRIPTION INFORMATION Sandbags: Yes ZNo Not Sure Critical Habitat: []Yes ®No Not Sure Shell Bottom: Yes IgNo Not Sure 15 foot waiver obtained: ❑Yes ®No Did the land use classification come from county LUP: ®Yes ❑No Environmental Assessment Done: ❑Yes ®No (Secondary water classification — OPTIONAL choose MAX of 4) ® ORW ❑PNA ❑Nutrient Sensitive EIHQW ❑Swamp waters NC NaUScenic river LIFed Wild/Scenic river WETLANDSIMPACTED ❑ Juncus roemedanus(black needlerush) LJ Distichlis spicata(sah or spike grass) ❑ Salicomia sp.(glasswort) ❑ Spartina cynosuroides(salt or giant reed grass) Spartina patens(saltlmeadow grass) ❑ Limonium sp.(sea lavender) ❑ Spartina aftemafiora(salt marsh cordgrass) ❑ Scirpus sp.(bullrush or three square) ❑ Cladium jamaicense(saw grass) ❑ Typha sp.(cattail) ❑ Borrichia frutescens(sea oxeye) ❑ Iva frutescens(marsh elder) ❑ Jurisdictional wetlands (Corp. of Engineers) 252-808.2808 :: 1-888.4RCOAST :: www.nccoastaimanagement.net revised: 01/08/07 INC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Appiicant:Harkers Island Sewer Co., LLC cto Arendell Engineers, Bill Foreman Date: 6/9/2015 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. Choose One Choose One Activity Name Dimension 1 Dimension 2 Dimension 3 Dimension 4 High Ground New Work Replace Disturbance 12,597 10 Maint ❑ ❑ Y ® N Trenching New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work -ET —Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N revised 011/011/07 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant:Harkers Island Sewer Co., LLC c/o Arendell Engineers, Bill Foreman Date: 6/9/2015 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name (Applied for. TOTAL Sq. Ft.7Excludes Disturbance totalbance. includes any anticipated restoration orr tempimpacts) Sq. Ft. ated final any ration temp amountlem TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or im ads FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp im ad amountHigh Choose One Ground 129,373 ,373 129,373 129,373 Drege ❑ Fill ❑ Both ❑ Other Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1-8883RCOAST :: wwwmccoastalmanaaement.net revised: 01/08/07 -0 ru nu ru Ir 17i. Postage $ Certified Fee M C3 Return Receipt Fee C3 (Endorsement Required) C3 Restricted Delivery Fee (Endorsement Required) M LrI Total Postage & Fees L$ rorPC'B=�C3 k-- ---- No.-- =. 'Ll USN U.30 05 PaaOtrerk f2.70 Here $0.00 P.61 05/19/2015 Certified Mail Provides: ■ A mailing receipt ■ A unique identifier for your mailpiece ■ A record of delivery kept by the Postal Service for two years Important Reminders: ■ Certified Mail may ONLY be combined with First -Class Mail® or Pdodty Mails. ■ Certified Mail is not available for any class of international mail. is NO INSURANCE COVERAGE IS PROVIDED with Certified Mail. For valuables, please consider Insured or Registered Mail. is For an additional fee, a Return Receipt maybe requested to provide proof of delivery. To obtain Return Receipt service, please complete and attach a Return Receipt (PS Form 38111 to the article and add applicable postage to cover the fee. Endorse mailpiece Return Receipt Requested". To receive a fee waiver for a duplicate return receipt, a USPSa postmark on your Certified Mail receipt Is required. in For an additional fee, delivery may be restricted to the addressee or addressee's authorized agent. Advise the clerk or mark the mallpiece with the endorsement "Restricted Delivary". ■ If a postmark on the Certified Mail receipt Is desired, please present the arti- cle at the post office for postmarking. If a postmark on the Certified Mail receipt is not needed, detach and affix label with postage and mail. IMPORTANT: Save this receipt and present It when making an Inquiry. PS Fame 3800, August 2006 (Reverse) PSN 7530-02-000.9047 UNrrED STATESt;:l First-class Mail w Postage &Fees Paid LISPS 2 3 MAY `IS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box* (OS j�a n+ to-- 15T., S�.TE i M tte— N L ZS S S-1 �s5-�ea-7� Illmllphl�r,lllw„iq.I��Il�alrrlldlh�h�d��lil�drl ■ Complete items 1, 2, and 3. Also complete item A if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or,on the front if space permits. 1. Article Addressed to: M A% O. Ok-,- IE ZrW y 5-2- 291 ttor *70:> C.2.�1Fr—Mt�� 20. VAL4 Nc. RECEIVED JUN 0 4 1015 A. Signature {� ❑ Agent ❑ Addressee B. Recelved by (Primed Alarne) C. ate of Delivery D. Is dd Mtem 1? LI Yes If YIS, low: ❑ No 3. Service S \1� ❑ Certified odty Mail Express" ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? Pft Fee) ❑ Yes 2. Article Number (Transfer from service iabeq 7014 0150 0000 4790 2226 Ps Form 3811, July 2013 Domestic Return Receipt AE ARENDELL ENGINEERS CIVIL -;GAf TAL • EN VIPONMENTAL 105 North 10t^ Street Morehead City, North Carolina 28557 (252) 622.4= N.C. Certification No. C-1509 BY CERTIFIED MAIL May 13, 2015 Max D Abernethy, Sr. 291 Howards Creek Mill Road Vale, NC 28168 Re: Force Main in NCDOT Right -of -Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS (Bill) Forman, Jr., P Senior Engineer Enclosures RECEIVED cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC MAY 19 20b i-a-m'A ntdl-1t5 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse s � that we can return the card to you. ■ Attactrthis card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to ,STAGY M. O11✓�� 1O(e ,TAc.Y IZc)AO NAyc.oL5 To,A j42 /J G Z853t A. B. Received by ❑ Agent Delivery D. Is delivery address d iverent from tern 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type ❑ Certified Mails ❑ Priority Mail Express'" ❑ Registered ❑ Return Receipt for Merchandise 4. Restricted Delivery? (EMra Fee) ❑ Yes 2. Article Number 7014 0150 0000 4790 2233 (fiansler Irom service labeQ I: PS Form 3811, July2013 Domestic Return Receipt UNITED STATES S'�1��. CE Fi;'st-Class Mail �'cL. Postage 8 Fees Paid Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box• tOs /JtaiTN t�M ST.� Spa ,TY y �„� F}L NG 785S1 RECEIVED 1UN 0 0 2015 -aE3�F -may PrPq�1111r4�rllll�lllhlll�Idhl�Ilu4�gwhvriP�II Certified Mail Provides: ■ A mailing receipt ■ A unique Identifier for your mailpiece ■ A record of delivery kept by the Postal Service for two years Important Reminders: in Certified Mail may ONLY be combined with First -Class Maile or Priority Mail, ■ Certified Mail is not available for any class of international mail. ■ NO INSURANCE COVERAGE IS PROVIDED with Certified Mail. For valuables, please consider Insured or Registered Mail. ■ For an additional fee, a Return Receipt mar be requested to Provide proof of delivery. To obtain Return Receipt service, please complete antl attach a Return Receipt (PS Form 3811) to the article and add applicable postage to cover the fee. Endorse mailpiece "Return Receipt Requested'. To receive a fee waiver for a dupplicate return receipt, a USPSa postmark on your Certified Mail46ceipt is required. ■ For an additional fee, delivery may be restricted to the addressee or addressee's authorized agent. Advise the clerk or mark the mailpiece with the endorsement 'Restricted Delivery'. - ■ If a postmark on the Certified Mail receipt is desired, DIease present thryea arti- cle at the post office for postmarking. If a postmark on the Certfli . Mail receipt Is not needed, detach and affix label with postage and mail. IMPORTANT: Save this receipt and present It when making an Inquiry. PS Form 3800, August 2006 (Reverse) PSN 7530-02-0 9017 iC3 I° M1 S 0 O G G O Ln S r^i O M1 Postage Certified Fee ReturnReceipt Fee (Endorsement Required) Re tricted Delivery Fee (En rsementRequired) Total Postage B Fees $ 11.61 0557 05 Postmark Here 05/19/2015 53, 30 iL. �� $0.011 $ P.61 Or O :. --------------------------------------------------------------------- PS Form 3800, August 2006 See Reverse for Instructions ARENDELL ENGINEERS CIVIL• COASTAL• ENVIRONMENTAL 105 North 10t^ Street Morehead City, North Carolina 28557 (252) 622-4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL May 13, 2015 Stacy M Davis 106 Stacy Road Harkers Island, NC 28531 Re: Force Main in NCDOT Right -of -Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS /lam . (Bill) Forman Senior Engineer Enclosures RECEIVED cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC MAY 19 2015 r)cm-KAAO 14" ■ Complete items 1, 2, and 3. Also complete A. Signaler item 4 if Restricted Delivery is desired. 0 ❑ Agent X ■ Print your name and address on the reverse [ ❑ Addre so that we can return the card to you. B. Receive by (PAnted Name) C. Date of Del ■ Attach this card to the back of the mailpiece, 13��5. or on the front if space permits. V 1. Article Addressed to: l," VAJ 4Ja r lot SAoot.e (-�002--r N.,`,Iqr 4, L_ NJ 084)(-7- D. Is delivery address different from Item 1? ❑ Ye: If YES, enter delivery address below: ❑ No 3. Service Type 2LCertiged Mail® ❑ Priority Mail Express" ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? (Extre Fee) ❑ Yes 2. Artrms Number ( (transfer fromm7014 0150 0000 4790 2240 service la6eq Ps Form 3811, July 2013 Domestic Return Receipt UNITED STATES POSTAL SERVICE I I I II I First -Class Mail Po USPSstage & Fees Paid Permit No. G-10 • Sender: Please print your name, address, and ZIP+4® in this box• ,�),a r t tO' ` rr- , SJcr6 Y !OS - p.� iJ Certified Mail Provides: ■ A mailing receipt ■ A unique identifier for your mailpiece ■ A record of delivery kept by the Postal Service for two years Important Reminders: ■ Certified Mail may ONLY be combined with First -Class Mail® or Priority MaI61 ■ Certified Mail is notavailable for any class of international mail. ■ NO INSURANCE COVERAGE IS PROVIDED with Certified Mail. For valuables, please consider Insured or Registered Mail. ■ For an additional fee, a Return Receipt maybe requested to provide proof of delivery. To obtain Return Receipt service, please complete and attache Return Receipt (PS Form 3811) to the article and add applicable postage to cover the fee. Endorse mailpiece'Return Receipt Requested'. To receive a fee waiver for a duplicate return receipt, a USPSa postmark on your Certified Mail receipt is required. ■ For an additional fee, delivery may be restricted to the addressee or addressee's authorized agent. Advise the clerk or mark the mailpiece with the endorsement 'Restricted Delivery'. ■ If a postmark on the Certified Mail receipt Is desired, please present the arti- cle at the post office for postmarking. If a postmark on the Certified Mail receipt is not needed, detach and affix label with postage and mail. IMPORTANT: Save this receipt and present it when making an Mquiry. PS Form 3e00, August 2008 (Reverse) PSN 753002-0 9047 'o 'r IU rU M1 - Postage $ tl•61 IiSjj Certified Fee 53,30 US O Postmark C7 F Retum Receiptrea (Endorsement ReQuired) .2•�1) Here 0 O Restricted Delivery Fee �i).i)1) (Endorsement Required) O LnTotal Postage B Few $ S7. bl 05M/2015 0 em o S rq$beBf. 0 apt Na.:-••••••••______________________________________________________________ 1UN 0410t orPOBO.W. Ci- ---'Stat-e,ZIPF-------------------------- ry, A -------------------------- ARENDELL ENGINEERS CIVIL• COASTAL• ENVIRONMENTAL 105 North to"b street Morehead City, North Carolina 26557 (252) 6224836 N.C. Certification No. C-1509 BY CERTIFIED MAIL May 13, 2015 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 Re: Force Main in NCDOT Right -of -Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr., RE Senior Engineer Enclosures RECENED cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC MAY 19 2015 A ARENDELL %aINLLk CIVIL• COASTAL• ENVIRONMENTAL 105 North to" Street, Suite 4 Morehead City, NC 28557 (252) 622-4338 FAX (252) 6224505 DATE: June 4, 2015 TO: Roy Brownlow NC CAMA TRANSMITTAL FROM: John J. Wade, P.E. Vice President RE: Harkers Island Sewer Company — Express Major Permit SENDING VIA ❑ FAX ❑ Postal ❑ UPS ❑ Email Overnight ❑ U. S. Mail E Personal ❑ FedEx ❑ Other Delivery The following is transmitted: COPIES DATE PAGES DESCRIPTION 1 6/4 2 USPS Certified Mail Green Cards 2 6/4 3 USPS Certified Mail receipts ❑ As requested ❑ For approval ❑ For information ❑ For signature ❑ For review and comment ❑ For distribution ❑ Forbids due MESSAGE Copy to: Signature: RECEIVED JUN 04 2015 krEn uNnu �iM r -c North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Donald R. van der Vaart Governor Secretary June 9, 2015 Arendell Engineers ATTN: Mr. Bill Foreman, Jr. P.E. 105 North 101^ Street Morehead City, NC 28557 Dear Mr. Foreman: The Division of Coastal Management hereby acknowledges receipt of your application, submitted on behalf of the applicant (Harkers Island Sewer Company, LLC) for development activities in the NCDOT Rights of Way and on National Park Service property, in Harkers Island, Carteret County. It was received as complete on June 4, 2015, and appears to be adequate for processing at this time. You have requested that the application be processed under the Express Review Permitting Program. Under this expedited process, the projected date for making a decision will be on or around July 6, 2015. Please be advised that this project may also require authorization from the US Army Corps of Engineers. The majority of CAMA major permit applications that also require Federal authorization are processed as a joint review under the CAMA Major Permit I Corps of Engineers 291 General Permit process. Under most circumstances, the Federal review of these applications would be after July 6, 2015. If the US Army Corps of Engineers does not render a decision on your project by the time a CAMA permit decision can be made, the Division of Coastal Management will render a permit decision on the CAMA Permit only. Should that occur, the US Army Corps of Engineers would most likely process your project as a General Permit 291. Should you wish to place your project on hold before July 6, 2015, pending the receipt of the Federal decision, the Division of Coastal Management will render a decision once the Federal comments are received. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. Due to the nature of this proposed development, additional placards are suggested to be posted at the Harkers Island Post Office and the National Park Service visitor Center. You should post these notices at conspicuous points along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. Sincerely, ('�L Roy Brownlow District Manager Enclosure cc: Doug Huggett, DCM Ryan Davenport, DCM Joann Steinhuis, DWR Tyler Crumbley, COE Ken Pace, NCDOT Dan Sams, NCDMLR klIEDT EC':1/) i iz PROJECTo The applicant is proposing to construct a lift station and force main to service the National Park Service (NPS) facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching within the NC®OT ROW approximately 12,597 linear feet of 4" PVC force main piping to West Bay Treatment Facility. APPLICANT: Harkers Island Sewer Co., LLC c/o Arendell Engineers 105 North 70th Street Morehead City, NC 28557 (252) 622-4338 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Roy Brownlow - ®CM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 ext. 217 11 V PROJECT: The applicant is proposing to construct a lift station and force main to service the National Park Service (NPS) facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching within the NCDOT ROW approximately 12,597 linear feet of 479- PVC force main piping to West Bay Treatment facility. APPLICANT: Harkers Island Sewep Co., LLC c/o Arendell Engineers 105 North 10" Street Morehead City, NC 28557 (252) 622-4338 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Roy Brownlow - DCM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 ext. 217 { � LJ`nq E PROJECT: The applicant is proposing to construct a lift station and force main to service the National Park Service (NPS) facility at the eastern end of Markers Island. The work will involve construction of lift station and trenching within the NCDOT ROW approximately 12,597 linear feet of 491 PVC force main piping to West Ray Treatment Facility. APPLICANT: Markers island Sewer Co., LLC c/o Arendeil Engineers 105 North 10th Street Morehead City, KC 28557 (252) 622-4338 Jdw,g o 6,9 2015 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Roy Brownlow - ®CM 400 Commerce Avenue Morehead City, IBC 28557 (252)808-2808 ext. 217 ,- , a STATE OF NORTH CAROLINA ROUTE S.R. 1355, 1399, PROJECT Force Main COUNTY OF Carteret GoPY 1451. 1450, 1336 Construction DEPARTMENT OF TRANSPORTATION -AND- Harkers Island Sewer Company, LLC P.O. Box 370, Harkers Island, NC 28531 RIGHT OF WAY ENCROACHMENT AGREEMENT PRIMARY AND SECONDARY HIGHWAYS RECEIVED MAY 2 8 28t iH1*rw•rrfiRM la" THIS AGREEMENT, made and entered into this the day of 20 by and between the Department of Transportation, party of the first part; and Harkers Island Sewer Company, LLC party of the second part, WITNESSETH THAT WHEREAS, the parry of the second part desires to encroach on the right of way of the public road designated as Route(s) 1355, 1399, 1451, 1450, 1336 , located On Harkens Island, Carteret County with the construction and/or erection of. A 4' force main constructed of schedule 80 PVC and ductile iron pipe WHEREAS, it is to the material advantage of the party of the second part to effect this encroachment, and the party of the first part in the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the right of way as indicated, subject to the conditions of this agreement, NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part the right and privilege to make this encroachment as shown on attached plan sheet(s), specifications and special provisions which are made a part hereof upon the following conditions, to wit: That the installation, operation, and maintenance of the above described facility will be accomplished in accordance with the party of the first parts latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS -OF -WAY, and such revisions and amendments thereto as maybe in effect at the date of this agreement. Information as to these policies and procedures may be obtained from the Division Engineer or State Utility Agent of the party of the first part. That the said party of the second pan binds and obligates himself to install and maintain the encroaching facility in such safe and proper condition that it will not interfere with or endanger travel upon said highway, nor obstruct nor interfere with the proper maintenance thereof, to reimburse the party of the first part for the cost incurred for any repairs or maintenance to its roadways and structures necessary due to the installation and existence of the facilities of the party of the second part, and 0 at any time the party of the first part shall require the removal of or changes in the location of the said facilities, that the said party of the second part binds himself, his successors and assigns, to promptly remove or alter the said facilifies, in order to conform to the said requirement. without any cost to the party of the first part. That the party of the second part agrees to provide during construction and any subsequent maintenance proper signs, signal lights, flagmen and other warning devices for the protection of traffic in conformance with the latest Manual on Uniform Traffic Control Devices for Streets and Hiahways and Amendments or Supplements thereto. Information as to the above rules and regulations may be obtained from the Division Engineer of the party of the first part. That the party of the second part hereby agrees to indemnity and save ham less the party of the first part from all damages and claims for damage that may area by reason of the installation and maintenance of this encroachment That the party of the second part agrees to restore all areas disturbed during installation and maintenance to the satisfaction of the Division Engineer of the party of the first part. The party of the second part agrees to exercise every reasonable precaution during construction and maintenance to prevent eroding of soil; silting or pollution of rivers, streams, lakes, reservoirs, other water impoundments, ground surfaces or other property; or pollution of the air. There shall be compliance with applicable rules and regulations of the North Carolina Division of Environmental Management, North Carolina Sedimentation Control Commission, and with ordinances and regulations of various counties, municipalities and other official agencies relating to pollution prevention and control. When any installation or maintenance operation disturbs the ground surface and existing ground cover, the party of the second part agrees to remove and replace the sod or otherwise reestablish the grass cover to meet the satisfaction of the Division Engineer of the party of the first part. That the party of the second part agrees to assume the actual cost of any inspection of the work considered to be necessary by the Division Engineer of the party of the first part. That the party of the second part agrees to have available at the construction site, at all times during construction. a copy of this agreement showing evidence of approval by the party of the first part. The party of the first part reserves the fight to stop all work unless evidence of approval can be shown. Provided the work contained in this agreement is being performed on a completed highway open to traffic; the party of the second part agrees to give written notice to the Division Engineer of the party of the first part when all work contained herein has been completed. Unless specifically requested by the party of the first part, wntlen notice of completion of work on highway projects under construction will not be required. That in the case of noncompliance with the terms of this agreement by the party of the second part, the party of the first part reserves the right to stop all work until the facility has been brought into compliance or removed from the right of way at no cost to the parry of the first part. That it is agreed by both parties that this agreement shall become void if actual construction of the work contemplated herein is not begun within one (1) year M1nm the date of authorization by the party of the first part unless written waiver is secured by the parry of the second part from the party of the first part. During the performance of this contract, the second party, for itself, its assignees and successors in interest (hereinafter referred to as the 'contractor"), agrees as follows: a. Compliance with Regulations: The contractor shall comply with the Regulations relative to nondiscrimination in Federally - assisted programs of the U. S. Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. b. Nondiscrimination The contractor, with regard to the work pertormed by it during the contract, shall not discriminate on the FORM RIW 16.1 (Rev. July 1, 1977) grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations, c. Solicitations for Subcontracts, includina Procurements of Materials and E ui men: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractors obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. d. Information and Reports: The contractor shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Department of Transportation or the Federal Highway Administration to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of a contractor is in the exclusive RECEIVED possession of another who fails or refuses to furnish this information, the contractor shall so certify to the Department of Transportation, or the Federal Highway Administration as appropriate, and shall act forth what efforts it has made to obtain 2 2015 the information. MAY 2 e. Sanctions for Noncompliance: In the event of the contractors noncompliance with the nondiscrimination provisions of this �y„fvf_fvfri{.) filly contract, the Department of Transportation shall impose such contract sanctions as it or the Federal Highway Administration may determine to be appropriate, including, but not limited to, (1) withholding of payments to the contractor under the contract until the contractor complies, and/or (2) cancellation, termination or suspension of the contract, in whole or in part. L Incorporation of Provisions: The contractor shall include the provisions of paragraphs 'a' through'P in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the Department of Transportation or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the Department of Transportation to enter into such litigation to protect the interests of the State, and, in addition, the contractor may request the United Stales to enter into such litigation to protect the interests of the United States. RM (161) : Party of the Second Part certifies that this agreement is true and accurate copy of the form RIW (161) incorporating all revisions to date. IN WITNESS WHEREOF, each of the parties to this agreement has caused the same to be executed the day and year first above written. DEPARTMENT OF TRANSPORTATION BY: DIVISION ENGINEER ATTEST OR WITNESS: James W. (Bill) Foo�ri l Y. P.E Harkers Island Sewer Company, LLC Mike Laws, Mana ' Pa% r INSTRUCTIONS When the applicant is a corporation or a municipality, this agreement must have the corporate seal and be attested by the corporation secretary or by the empowered city official, unless a waiver of corporate seal and attestation by the secretary or by the empowered City official is on file in the Raleigh office of the Manager of Right of Way. In the space provided in this agreement for execution, the name of the corporation or municipality shall be typed above the name, and this of all persons signing the agreement should be typed directly below their signature. When the applicant is not a corporation, then his signature must be witnessed by one person. The address should be included in this agreement and the names of all persons signing the agreement should be typed directly below their signature. This agreement must be accompanied, in the forth of an attachment, by plans or drawings showing the following applicable information: 1. All roadways and ramps. 2. Right of way lines and where applicable, the control of access lines. 3. Location of the existing and/or proposed encroachment. 4. Length, size and type of encroachment. 5. Method of installation. 6. Dimensions showing the distance from the encroachment to edge of pavement, shoulders, etc 7. Location by highway survey station number. If station number cannot be obtained, location should be shown by distance from some identifiable point, such as a bridge, road, intersection, etc (To assist in preparation of the encroachment plan, the Department's roadway plans may be seen at the various Highway Division Offices, or at the Raleigh office.) 8. Drainage structures or bridges if affected by encroachment (show vertical and horizontal dimensions from encroachment to nearest part of structure). 9. Method of attachment to drainage structures or bridges. 10. Manhole design. 11. On underground utilities, the depth of bury under all traveled lanes, shoulders, ditches, sidewalks, etc. 12. Length, size and type of encasement where required. 13. On underground crossings, notation as to method of crossing - boring and lacking, open cut, etc. 14. Location of vents. 1. Any attachment to a bridge or other drainage stmcure must be approved by the Head of Structure Design in Raleigh prior to submission of encroachment agreement to the Division Engineer. 2. All crossings should be as mar as possible normal to the centerline of the highway. 3. Minimum vertical clearances of overhead wires and cables above all roadways must conform to clearances set out in the National Electric Safety Code. 4. Encasements shall extend from ditch line to ditch line in cut sections and 5' beyond toe of slopes in fill sections. 5. All vents should be extended to the right of way line or as otherwise required by the Department. 6. All pipe encasements as to material and strength shall meet the standards and specifications of the Department. 7. Any special provisions or specifications as to the performance of the work or the method of construction that may be required by the Department must be shown on a separate sheet attached to encroachment agreement provided that such information cannot be shown on plans or drawings. 8. The Department's Division Engineer should be given notice by the applicant prior to actual starting of installation included in this agreement. Brownlow, Roy From: Bennett, Ronda Sent: Friday, June 05, 2015 8:34 AM To: Brownlow, Roy Subject: FW: Public Notice Please print for file, Thanks. From: Legals[mailto:legalsCalthenewstimes.com] Sent: Friday, June 05, 2015 8:07 AM To: Bennett, Ronda Subject: Re: Public Notice This ad is set and scheduled to run on June 10, 2015 in the amount of S 49.08. NOTICE OF FUND OF APPLICATION FOR CAMIIMAJOR DEVELOPMENT PERMR Tile CepaMenl of Envimmrenl and Nssurel Resources hereby gives Wblic nonce as required by NCOS 11U-119(b) mat a,boxapon for a EevebprreM permh In an Area of Envvalmenrel Comm as 0esgrateb uMer me CAMA was rq N on Jt 4, M15. Apxrang to sand applsa , Arontlell Engiraaas, awanaec ¢gent ftr Makers Islad Sewer Company, TLC, b oposas to conbym c a btt stabou as lace man ttrasmrcbre within Me NCDOT ngtts-oi-way arM on a parcel kbssad on tre oomer of Cape Point Or ant Cl alas, St Ra4reas Is1eaM, Canvass County. A mpy of Me ¢Mire apbl c may be examkreE or copteol at me M of Roy Rrombw, NC Division of Coastal Management bcssetl at 400 Commerce Avenue, Moralreatl City, NC, (2 ) 9 2909 eumg normal b aaness (burs. Cgmnanb oaten b Braxbn Davis, Oirarb, Olveon of Cogs@I ManapenaV, 4g0Cdmmace Avenue, Maenea0 Cty. N.C. 28 7, Pv b Jere W. 2015, volt be constOareC m rrekxp Ma penM eeosion. later MannrenlE wit De au'acten ant mWEeltl W b YIB Noe W pssmtt netiam. Pmjart maattiraoon mry oavr baser m resrew ant mmman M me pWkc a1n stale ant IeOerel agent<s. Norm W Ne petmn Eetistm in iris mattes will be pmri0an upon wnMMl reyuekL Ju10 On Jun 4, 2015, at 3:52 PM, Bennett, Ronda wrote: Please send invoice and affidavit to Arthur Stadiem at NC Coastal Management, 400 Commerce Ave., Morehead City. 28557. NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR 11) VADIID) ,u13ayWDII'MIll1 The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on June 4, 2015. According to said application, Arendell Engineers, authorized agent for Harkers Island Sewer Company, LLC, proposes to construct a lift station and force main infrastructure within the NCDOT rights -of -way and on a parcel located on the comer of Cape Point Dr and Charles St, Harkers Island, Carteret County. A copy of the entire application may be examined or copied at the office of Roy Brownlow, , NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to June 30, 2015, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: June 10, 2015 *E-Mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.* <image002jpg> 2 Please visit www.nccoastalmanagement.net to subscribe to Coastal Management's quarterly newsletter, the CAMAgram. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. <image002Jpg><Bennett Ronda vcfl Judy Allred Legal Assistant - Carteret County News -Times 4206 Bridges Street I Morehead City, NC 28557 Phone: 252-726-7081 ext. 207 1 Fax: 252-726-2653 Lenals(&TheNewsTimes.com - www.CarolinaCoaslOnline.com May 13, 2015 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re: Authorized Agent Agreement Harkers Island Sewer Company, LLC Mr. Davenport: This is to inform you that Bill Forman and Arendell Engineers are the Authorized Agent for the referenced project. Mr. Forman is authorized to act on behalf of the applicant on matters related to the CAMA Major Permit and related federal permits. Please call me if you have any questions or need additional information. Sincerely, Mike aws Managing ember Harkers Island Sewer Company, LLC RECEIVED MAY 19 20B ARENDELL ENGINEERS CIVIL- COASTAL' ENVINOMMENTAL 105 North 10w Street Morehead City, North Carolina 28557 (252)622-4338 N.C. Certification No. C-1509 May 13, 2015 Mr. Roy Brownlow N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Re: CAMA Major Permit - Express Harkers Island Sewer Company, LLC Harkers Island, Carteret County Mr. Brownlow: On behalf of Harkers Island Sewer Company, the attached Express Major Permit Application for the Cape Lookout National Park Service is submitted for your review and approval. A check for $2,000 is enclosed payable to NCDENR. Please call me if you have any questions or need additional information. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr., E. Senior Engineer Enclosures cc: Mike Laws, Harkers Island Sewer Company, LLC C'J"S'� .--W 1 Do A ^-XA— - a, 000, RECEIVED MAY 19105 4pM;Mge errr 14 CAMA Maior Development Permit Application Checklist �� y This checklist is provided solely as an informational resource to assists in the preparation of the permit application. Although this checklist is not required to be filled out as part of the tiiS permitting process, nor is it required that this checklist be provided to the Division of / Coastal Management (DCM), the items included within the checklist are required to complete the permit application. During the pre -application or application submittal meeting, a DCM representative will sit down with you and review the application package for completeness. The Division representative will refer to this checklist to determine whether or not an application is deemed to be complete or to be insufficient. If an application package is deemed incomplete, the specific deficiencies will be noted on the application checklist. A copy of the checklist will be provided to the applicant, or applicant's agent, at the end of the meeting. Once the items have been addressed, the applicant or agent should contact the local field representative to schedule a final meeting. PERMIT APPLICATION FORMS All applicants must completely fill out all three pages of the DCM MP-1 form. Depending on the scope of the proposed development, you will also need to fill out some or all of the additional form(s) listed below. A checkmark beside the applicable form(s) indicates that the forms are required for the proposed development. ti 9- MP-2 Excavation and Fill Information v MP-3 Upland Development NIL MP4 Structures Information/Marina MP-5 Bridges and Culverts * All questions on the application form(s) must be complete, or the letter "N/A" must be placed in each item that does not apply to your proposed project. All of the information provided in these forms must accurately correspond with the submitted workplan drawings. WORKPLAN DRAWINGS J All drawings must be neat, clear, and of standard size to permit photographic reproduction. If blue prints or sheets larger than 11" x 17" are used, 27 copies must be submitted (it is advisable to request that a Division representative inspect a final copy of the workplan drawing(s) prior to making the required 27 copies). Drawings larger than 11" x 17" should be folded to legal size or smaller. If color coded drawings are submitted, regardless of paper size, then 27 (preapproved) copies will be required. The workplan drawings must be accurately drawn to an engineers scale (1"-200' or less) (example 1"=30'), 1"=50', 1"=60% 1"=100', etc.). The scale must be indicated on the drawings. y The following list of items must be indicated on the workplan. drawings. No application or workplan drawings will be accepted as complete until all of the applicable items on the checklist have been approved by the DCM. A DCM representative will review the permit application and workplan drawing(s) and mark off each item(s) listed on the checklist that is deemed to be complete. An item that has not been "checked off' indicates that additional information is needed in order to accept the application as complete, or that the item is "Not Applicable" to the proposed project. A copy of the checklist will be provided to you at the end of the pre -application meeting, or submission meeting, once the entire permit application package has been reviewed Workalan Drawinas LOcz-�" Simple Title Block (indicating name of applicant) d C 1 P N"""'� Drawing Number(s) — (example: drawing/page/sheet 1 of 4) v p Date workplan was prepared y t1d Vicinity Map Standard North arrow r Legend and scale NL2 Dunes (primary and frontal dunes if applicable for development within the Ocean Hazard Area of Environmental Concern) Al Shoreline Waterbodies (indicate name of water body) �nr Width of adjacent water body _✓ Marsh Lands (federal wetlands) Coastal Wetlands (indicate both upper and lower limits) '404" Type Wetlands Existing and proposed -man-made structures _ Exact areas and 4imensions.)of proposed excavation (for both high ground and in water excavatio &) t�P«C Wt .t �L 5" i -C-tk� QAn4U -v3 Exact areas and dimensions for fill and -or spoil disposal (for both high ground and in water fill) �y Existing water depths relative to Normal Water Level (indicate datum used to determine depths and whether or not soundings were collected based on elevation or vegetation; also indicate proposed water depths for dredging / projects) ✓ Approximate Normal Water Level (NWL) Approximate Normal Low Water (NLW) Property boundaries 1- Riparian Corridors (for structures located over public trust waters) Distance of proposed structures to the federally maintained channel(s) ✓ Names of adjacent property owners 7 Area of Environmental Concern (AEC) boundary (example: 75-foot Estuarine Shoreline AEC, 575-foot Estuarine Shoreline ORW Shoreline AEC, Ocean Hazard AEC, Inlet Hazard AEC, etc.) �} 30-foot Coastal Shoreline Buffer First Line of Natural Stable Vegetation Small and Large Structure setbacks erL Depth and elevation of existing structures ila� Proposed work relative to the existing ground level Cross -Sectional (side -view) Drawing(s) Al DWQ Riparian Buffer Zones Elevation of existing dunes (applicable to Ocean Hazard projects) First floor and building height elevations relative to Mean Sea Level (MSL) for any proposed buildings Roadway cross-section (including right of way limits)( - Estuarine Shoreline AEC Normal High Water — (in Blue ink) --------------- NHW-------------- 7� > Normal Low Water — (in Black ink) --------------- NLW-------------- Coastal Wetlands — (in Green ink) --------------- CWs--------------- Federal "404" type Wetlands — (in Magenta ink)----------404 wetlands--------- PropertyBoundaries ----Property boundary/line----- 75-foot Estuarine Shoreline AEC---------75' Estuarine Shoreline AEC--------- 575-foot ORW Shoreline----------575' ORW Shoreline---------- 30-foot Coastal Shoreline Buffer----------30' Coastal Shorline Buffer---------- OceanHazard AEC Ocean Hazard AEC ----------Ocean Hazard AEC ----------- Small Structure Setback ---------????' Small Structure Setback---------- LargeStructure Setback ---------????' Large Structure Setback---------- FirstLine of Natural Stable Vegetation --------First Line of Vegetation------- OTHERREQUIRED INFORMATION (checkmark indicates that information is complete) Project Narrative Application Fee C Signed Certified Mail receipts from adjacent riparian property owners Deed (or other legal instrument under which the applicant claims the right to develop the property in question) Consultant/Agent Authorization agreement form 1 a Wetlands Delineation Approval (from the U.S. Army Corp of Engineers) .v a- Stormwater Management Certificate Ocean and Inlet Hazard Notices Q�T Other Information (any supplemental information that the Division of Coastal A Management requests for processing) A,� Primary Nursery Area (PNA) � } Submerged Aquatic Vegetation (SAV) �f J Outstanding Resource Waters (ORW) // I Shellfish Waters Open _Closed l ` PA" Comments: C Cal to OV -) Applicant/Ag ,nt signature DCM Representative Date Brownlow, Roy J From: Brownlow, Roy Sent: Thursday, May 21, 2015 9:56 AM To: 'Bill Forman' Cc: 'Daniel Govoni'; Howell, Jonathan; Davenport, Ryan; Doug Huggett (Doug. Huggett@ ncdenr.gov) Subject: Harkers Island Sewer Cc, LLC importance: High Bill: Hope this finds you doing well. Thank you for submitting an Express CAMA Major Permit application package on behalf of Harkers Island Sewer Co., LLC for development in Harkers Island, Carteret County. The DCM received the application on May 19, 2015. A review for completeness of application has been conducted and there are still some items outlined in this email correspondence that need to be addressed before the NC Division of Coastal Management can accept the application as complete: DCM Form MP-1: 1) 3b: List the major water body "i.e., Back Sound;" 2) 3f: Please list "Carteret County;" 3) 4b: should list the 12,597 LF in the ROW; 4) 4c: please provide "N/A" where applicable; 5) 4d: should be NHW; 6) 4e: specify the underground directional bore; 7) 4f: the ROW is developed by State Road 1335 8) 4g: Should include the NCDOT ROW and the mixed uses of residential and commercial (adjacent to the sewer line installation); 9) 4h: Should be N/A 10) 4n: Please clarify where the septic tanks are failing (Le, at the NIPS location?); 11) Sa: This project is considered "commercial;" 12) 6d: Please provide a copy of the NCDOT agreement and for the location of the lift station; 13) 6g: Please provide previous/existing permit history (i.e, WQ0024023); DCM Form MP-3 14) a.: include sewer transmission line 15) b.: There are two tracts where the development is proposed: the NCDOT ROW and the tract near the NPS; 16) g. should be 0%or as appropriate; 17) L: specify the lift station; 18) I.: Specify no discharge to state waters or as appropriate; Project Narrative 19) Project Description: Include the NCDOT rights -of -way; 20) Describe the closet point of the entire project to the NHW (sewer lines and lift station); 21) 404 Wetlands: Describe the directional bore methodology, location (entry, exit locations), and other information as appropriate; 22) Describe the trenching process Maps 23) Provide a detail of the 404 crossing (directional bore) including a profile view of the bore; 24) Provide a detail of a typical trench section with dimensions of trench; f:�,. v>> 25) Please provide the certified mail "green cards" from the notifications; 26) Please provide a copy of the NCDOT rights of way agreement; 27) Please provide a copy of the sewer line extension permit. Please let me know if you would like to schedule a meeting to discuss these items to the application package. Please call me at your earliest convenience to do so at: 252-808-2808 ext 217. If you have any questions or concerns in the interim, ple �'—�I.free to contact me. Please note that I will be out of the office from May 25 through May 29. 1 will be returning '—If-vou should need immediate assistance, Ryan Davenport will be able to assist you. Thank yc Roy Bro APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Harkens Island Sewer Company, Llc National Paris Service Lift Station & Force Main Applicant 1: First Name MI Last Name Mike Laws Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State P.O. Box 370 Harkers Island NC ZIP Country Phone No. FAX No. 28531 USA 919-810-4929 ext. Street Address (d different from above) City State ZIP 270 Pintail Drive Lexington NC 27295- Email mlaws@harkersislandsewercompany.com 2. Agent/ContractorInformation Business Name Arendell Engineers Agent/ Contractor 1: First Name MI Last Name James W. (Bill) Forman, Jr., P.E. Agent(Contractor 2: First Name MI Last Name John J. Wade, P.E. Mailing Address PO Box City State 105 North 101^ Street, Suite 4 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # 252 622 4505 C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com; john@arendellengineers.com <Form continues on back> KtluI v of MAY 19 2915 nP,K-"oWt'1 252-808-2808 .. 1-888.4RCOAST .. www.nCcoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 1800 Island Road 1335 Subdivision Name City State Zip Harkers Island NC 28531 - Phone No. Lot No.(s) (d many, attach additional page with IiaV 919 - 810 - 4929 ext. 3-11, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak 404Wetlands -jar—/ �cIA)u� c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Back Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. (� 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) - __, N/A 94,525 - lift station tract; unknown alon ute roof force main c. Size of individual lot(s) I A d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) - (If many bt sizes, please attach additional page with a list) +5 NAVD88 ❑NHW or ❑NWL� e. Vegetation on tract Primarily forest. The route of the force main contains grass, trees, and shrubs. There is one location where wetlands may be encountered and the force main will be drilled beneath the wetlands. f. Man-made features and uses now -on tract Q ( (U.�(% — I U �G Pled i 5 t The tract is currently undeveloped. r g. Identify and describe the existing land uses adiacent to the proposed project site. r�I Cape Lookout National Park facility, Core Sound Waterfowl Museum & Heritage Center ry Peal U�46 h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? n �;•h (Attach zoning compliance certificate, if applicable) []Yes []No JINA /(/ j. Is the proposed activity, part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> MAY 19 jp% N__W_"rJ1q FN+"f 252.808-2808 .. 1-888.4RCOAST .. www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (III If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Existing wastewater treatment facilities include septic tanks that are currently failing. �� S r u! o. Describe existing drinking water supply source. Drinking water is supplied by the Harkers Island Water System, a division of the Carteret -Craven Electric Cooperative. p. Describe existing stone water management or treatment systems. There are currently no storm water management or treatment systems on the she. 5. Activities and impacts — A I a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government e/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The project includes a lift station to pump wastewater from the existing facility to an existing wastewater treatment facitlity on Harkers Island. The existing septic tanks on the site are failing and the National Park Service wishes to have a long tern solution to their wastewater needs. The force main will run approximately 12,597linear feet mainly along Island Road to the lift station at the West Bay subdivision. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of -way. Encroachment agreements have been applied for construction within the NCDOT rights -of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. d. List all development activities you propose. Development activities include the installation of a 6' interior diameter lift station and associated appurtenances and 12,597 linear feet of 4" PVC and ductile iron pipe. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? 122,283 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There will be no discharges to waters of the state. i. Will wastewater or stornwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED MAY 19 205 <Form continues on back> mom' npq p(jp (it,( 252.808-2808 :: 1.888.4RCOAST :: www.nccoastalinanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit u W" AI 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. d A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. . The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Max D. Abernethy, Sr. Phone No. Address 2910 Howards Creek Mill Road, Vale, NC 28168 Name Stacy M. Davis Phone No. Address 106 Stacy Road, Harkers Island, NC 28531 Name Timothy Van Noy Phone No. Address 101 Saddle Court, Mullica Hill, NJ 08062 g. A list of pravkm state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. IAt ',o, �e Airs 2 e-v"y 0-KA1 U0 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, 0 necessary. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fad grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Adgcy / 49_ ZG / S Print Na Signatul Please indicate application attachments pertaining to ❑DCM MP-2 Excavation and Fill Information ODCM MP-3 Upland Development ❑DCM MP-4 Structures Information LJDGM MP-5 Bridges and Culverts RECEIVED MAY 19 2015 f-r!?'ktMrna 01ty 252-808-2808 .. 1-888.4RCOAST .. www.nccoastaimanagement.net Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT I a. Type and number of buildings, facilities, units or structures proposed. 1 6' interior diameter lift station and associated appurtenances c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: April 30, 2015 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. I. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or /parking. 0.31% t% i i G Stujcl j. Describe proposed method of sewage disposal. Existing facility currently has failing septic tanks. The lift station will pump sewage from the facility to an existing wastewater treatment facility on Harkers Island. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriall commercial effluent, "wash down" and residential discharges). The only surface runoff will be from the gravel driveway, concrete tanks, and control panel. b.r of lots or parcel LkJiS 1 Z �'c d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 122,283 SF f. List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. Impervious surfaces include a 36' x 12' gravel driveway, the concrete lift station and valve box, and a 6' x 3' roof to cover the associated control panel. h. Projects that require a CAMA Major Development Permit may also require a Storrrwater Certification. (1) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ❑No ®NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? []Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes []No ®NA If yes, attach appropriate documentation. RECEIVED 1 MAY 19 20b 252-808-28082 :: 1-888-4RCOAST :: www.nccoastalmananement.net revised: 12/26/06 Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Existing facility currently has water provided by the Harkens Island Water System. o. When was the lot(s) platted and recorded? N/A NtI-;e ".0r , 20/`7 Date ugrYr'g1F t }�¢t� Al1/EE.1 Project Name Ailscrd4EL w3- 4,4 IuS Applicant Name Appli ig ? n. (i) Will water be impounded? []Yes ❑No ®NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA RECEIVED MAY ) 9 2015 k!kaMwt"O.05 n!'-v 252-808-2808 :: 1-8884RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06 CAPE LOOKOUT NATIONA PARK SERVICE LIFT STATION & FORCE MAIN HARKERS ISLAND SEWER COMPANY, LLC HARKERS ISLAND, CARTERET COUNTY, NORTH CAROLINA PROJECT NARRATIVE May 13, 2015 INTRODUCTION The Cape Lookout National Park Service (NPS) Lift Station & Force Main for Harkers Island Sewer Company, LLC will provide sewer service to the facility located on the eastern end of Harkers Island in Carteret County. The NPS has begun providing ferry services for visitors to Cape Lookout and is expecting an increase in visitors to the facility. Additional bathroom facilities are being developed for visitor use on the Harkers Island site. Collection of the wastewater from the NPS office building and associated bathroom facilities will be conveyed by two low pressure sewer to the lift station. A permit is requested for construction of a lift station and approximate 12,597 linear foot 4" PVC force main to serve the Cape Lookout National Seashore Facility at the east end of Harkers Island in Carteret County, North Carolina. The lift station will be located outside of the 575' AECline. Sewage disposal at the site is currently by septic tanks which are failing. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment Facility located on West Bay Circle, Harkers Island. The force main will discharge into the equalization tank of the West Bay Treatment Facility. HISCO is considered as a public utility by the N. C. Utilities Commission. The National Park Service facility includes offices, a visitor's museum, ferry service, and recreational areas. Based on visitation data provided by Mike Baker, Facility Manager for the NPS, the projected flow from the NPS is estimated to be 2,800 gallons per day. This includes 42 employees @ 25 GPD/employee and 350 visitors/day @ 5 GPD/visitor. Visitation is based on National Park Service LS & FM Major CAMA Permit Application — Narrative May 13, 2015 Page 1 IVEo MAY 19 1015 powm""na jolty the peak day for 2014 plus a growth factor based on the increase based on the actual growth in visitation for a Saturday in the month of July. It was estimated that the peak day for 2014 had 320 visitors. The facility currently uses septic tanks to treat the wastewater generated by the site which are currently failing. PROJECT DESCRIPTION This project includes construction of a 6 foot interior diameter wetwell and lift station with duplex wastewater pumps pumping at a rate of 100 gpm at approximately 100 feet TDH. The lift station pumps through 12,597 linear feet of 4 inch force main to an existing wastewater treatment facility at the West Bay subdivision (WQ0024023). The force main will be installed within the P-0.'C North Carolina Right -of -Way and will not encroach on private property. The project includes installation of two sewer services on the Park Service site to replace failing septic tanks and to provide sewerage to a new rest room facility currently under development. The services are duplex grinder low pressure sewer units that pump through approximately 881 linear feet of 2 inch force main directly to the lift station. EXISTING CONDITIONS `%�'0^ ? t Site Topography and Hydrography - The topography at the lift station is relatively flat with an elevation of +5 NAVD88. Along the route of the force main, the elevation varies between approximately +1 NAVD88 at its' lowest to approximately +11 NAVD88 at its' highest. The base flood elevation at the lift station site is 7 feet NAVD88. Land Use — The site where the lift station will be located is currently wooded. There is no development on the parcel. Adjacent to this parcel is the National Park Service's Cape Lookout National Seashore Harkers Island Visitor Center. The island is adjacent to Back Sound which along the route of the force main is SA;ORW waters. Along the route of the force main, land uses vary between residential, commercial, and religious uses. Wetlands - There are 404 wetlands on the parcel south of the proposed lift station. There will be no impact to the wetlands on the site. (Cl National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Page 2 of 4zECEivED MAY 19 1015 t�nx•wmr� a�ro Areas of Archeological or Historic Value — There are no known areas of archeological or historic value known within the project site. Navigation — There is no proposed construction within any navigable waters. METHODS OF CONSTRUCTION The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of - way. Encroachment agreements have been applied for construction within the NCDOT rights - of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. PROJECT SCHEDULE Construction of the lift station and force main is expected to start immediately once a permit is issued and within the permitted time frame. The installation of the lift station and force main is at the expense of the Harkers Island Sewer Company with reimbursement by the federal government. �ow Un L i II,( COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. RECEIVED MAY 19 20b f�tW-�ana wwy National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Page 3 of 4 ADJACENT PROPERTY OWNERS Letters notifying adjacent properties owners of Cape Lookout National Park Service Lift Station & Force Main CAMA Permit Application have been sent to the following properties owners by certified mail. Copies of those letters are attached. Adjacent Riparian Property Owners Max D. Abernethy, Sr. 2910 Howards Creek Mill Road Vale, NC 28168 Stacy M. Davis 106 Stacy Road Harkers Island, NC 28531 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 RECEIVED MAY 19 2015 F=—M-MMi Q!7 National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Page 4 of 4 ' l ",,AV Q-� - ovyw/Olv;w�� O '4T s o� r, 11*,,,n7 3r""d �, 7w- i rs - 6' ry LSD c-pr� -- L ..1 •1.; r _ 1 _}` T <r ea .r �-(;s } �` • - �, �„� ,` `1 '11� Ate_ St ir,�A. L r ; r i 2pr 4:�2 0 F7 9�f CAPE LOOKOUT NATIONA PARK SERVICE LIFT STATION & FORCE MAIN HARKERS ISLAND SEWER COMPANY, LLC HARKERS ISLAND, CARTERET COUNTY, NORTH CAROLINA Table of Contents DCM MP —1 Application for Major Development Permit DCM MP — 3 Upland Development PROJECT NARRATIVE INTRODUCTION PROJECT DESCRIPTION EXISTING CONDITIONS Site Topography and Hydrography Land Use Wetlands Areas of Archaeological or Historic Value Navigation METHODS OF CONSTRUCTION PROJECT SCHEDULE i COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT ADJACENT PROPERTY OWNERS Application Drawings Sheet 1— Vicinity Map Sheet 2 — Site Plan Sheet 3 — Lift Station Site Plan Sheet 4 — National Park Service Site Plan Land Management Group, Inc. Wetlands Report RECEIVED Adjacent Property Owner Notification Letters MAY 19 1015 Authorized Agent Agreement e1M nW "`This is a word processing form to be completed in Microsoft Word` NC Division of Coastal Management Major Permit Application Computer Sheet (01108/2007) Applicant: Harkers Island Sewer Co., LLC c/o Arendell Engineers, Bill Foreman Date: 6/9/2015 Project Site County Carteret Staff: Roy Brownlow District: []Elizabeth City ❑Washington ®Morehead City ❑Wilmington Project Name: NPS Lift Station & Force Main, Harkers Island Rover File: NA Photos Taken: Yes N No❑ Date application "received as complete" in the Field office (EX: 1/8/2007): 06/04/2015 Permit Authorization: NCAMA ❑Dredge & Fill [-]Both SITE DESCRIPTION INFORMATION Sandbags: ❑Yes NNo ❑ Not Sure Critical Habitat: [-]Yes NNo ❑Not Sure Shell Bottom: ❑Yes NNo ❑ Not Sure 15 foot waiver obtained: ❑Yes NNo Did the land use classification come from county LUP: NYes ❑No Environmental Assessment Done: ❑Yes NNo (Secondary water classification - OPTIONAL choose MAX of 4) WETLANDS IMPACTED ❑ Juncus roemerianus(black needlerush) ❑ Distichlis spicata(salt or spike grass) ❑ Salicornia sp.(glasswort) ❑ Spartina cynosuroides(salt or giant reed grass) N Spartina patens(salt/meadow grass) ❑ Limonium sp.(sea lavender) ❑ Spartina alternaflora(salt marsh cordgrass) ❑ Scirpus sp.(bullrush or three square) ❑ Cladium jamaicense(saw grass) ❑ Typha sp.(cattail) ❑ Borrichia frutescens(sea oxeye) ❑ Iva frutescens(marsh elder) ❑ Jurisdictional wetlands (Corp. of Engineers) 252-808-2808 :: 1.888.411COAST :: www.nccoastaimanagement.net revised: 01/08/07 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant:Harkers Island Sewer Co., LLC c/o Arendell Engineers, Bill Foreman Date: 6/9/2015 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. Choose One Choose One Activity Name Dimension 1 Dimension 2 Dimension 3 Dimension 4 High Ground New -Work® Replace Disturbance 12,597 10 Maint ❑ ❑ Y ON Trenching New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [IN - New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work D Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work El Replace Malm ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N revised 01/08107 INC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant:Harkers Island Sewer Co., LLC c/o Arendell Engineers, Bill Foreman Date: 6/9/2015 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp Impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Choose One High Ground 129,373 129,373 129,373 129,373 Drege ❑ Fill ❑ Both ❑ Other Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Dregs ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ Dregs ❑ Fill ❑ Both ❑ Other ❑ Dregs ❑ Fill ❑ Both ❑ Other ❑ Drege ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOAST :: w .nccoastalmanagement.net revised: 01/08/07 N0T1(0'$17mA CAMA PERMIT APPLIED FOR PROJECT: The applicant is proposing to construct a lift station and force main to service the National Park Service (NPS) facility at the eastern end of Harkers Island. The work will involve construction of lift station and trenching within the NCDOT ROW approximately 12,597 linear feet of 4" PVC force main piping to West Bay Treatment Facility. COMMENTS ACCEPTED THROUGH -July s, 2015_ APPLICANT: Harkers Island Sewer Co., LLC c/o Arendell Engineers --� 105 North 10"' Street Morehead City, NC 28557 (252) 622-4338 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Roy Brownlow - DCM 400 Commerce Avenue Morehead City, NC 28557 (252)808-2808 ext. 217 CAMA PERMIT APPLIED FOR PROJECT: COMMENTS ACCEPTED THROUGH APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: NOkTA RIVER AND HARKERS ISLAND Area Ir6 & Ir7 (Map 27) PROHIBITED TERRITORY (Prohibited areas are hatched) CK�111�11II'f[K�� � �17�1� r �a Map 27 (SEE BACK OF MAP FOR AREA DESCRIPTIONS.) NORTH RIVER & HARKERS ISLAND AREA PROHIBITED AREA CARTERET COUNTY Areas E-6 & E-7 (Map 27) (Prohibited Areas are Hatched) (a) Knuckles Landing Harbor -All those waters in the Knuckles Landing Harbor upstream of a straight line beginning at a point 340 42.5756' N -760 35.1152' W on the north shore; running southeasterly to a point 340 42.5264' N -760 35.0948' W on the south shore. (b) Coats Landing Harbor Rush Creek and Harkers Village Marina -All those waters in the Coals Landing Harbor (Rush Creek) and Harkers Village Marina upstream of a straight line beginning at a point 340 42.3227' N -760 35.0586' W on the north shore; running southwesterly to a point 340 42.2400' N -760 35.0864' W on the south shore. (c) Harkens Island Fishing Center - All those waters within Harkers Island Fishing center and extending beyond the dockage facilities 175 feet beginning at a point 340 41.6181' N -760 33.6419' W on the shore west of the marina; running southerly to a point 340 41.5356' N -760 33.6644' W; running easterly to a point 340 41.5153' N -760 33.5350' W; running northerly to a point 340 41.5978' N -760 33.5125' W on the store east of the marina. (d) Barbours Harbor Marina - All those waters within Barbours Harbor Marina and extending beyond the dockage facilities 150 feet beginning at a point 340 41.3646' N -760 32.6534' W on the shore west of the marina; running southerly to a point 340 41.3056' N -760 32.6624' W; running easterly to a point 340 41.299T N -760 32.5831' W; running northerly to a point 340 41.3587' N -760 32.5741' W on the shore east of the marina. (a) Calico Jacks Marina -All those waters within Calico Jacks Marina and extending beyond the dockage facilities 150 feet beginning at a point 340 41.1675' N -760 31.9303' W on the shore west of the marina; running southwesterly to a point 340 41.1101' N -760 31.9565' W in the sound; running southeasterly to a point 340 41.0786' N -760 31.8554' W in the sound; running northeasterly to a point 340 41.1311' N -760 31.8315' W on the shore east of the marina. (f) National Park Service Boat Basin - All those waters within 200 feet of the last dockage space in the Park Service Boat Basin at Shell Point beginning at a point 340 41.141.1051' N -760 31.5441' W on the northern shore of the basio entrance; running southeasterly to a point 340 41.1004' N -760 31.5353' W in the sound; running southwesterly to a point 340 41.0759' N -760 31.5542' W in the sound; running northwesterly to a point 340 41.0803' N -760 31.5623' W on the shore south of the basin entrance. (g) Ervin* Marina - All those waters within Ervins Marina and extending beyond the dockage facilities 275 feet beginning at a point 340 41.8854' N -760 32.8179' W on west shore; running easterly to a point 340 41.8825' N -760 32.8101' W on the east shore. (h) L.R. Rose Boatworks - All those waters within L.R. Rose Boatworks and extending beyond the dockage facilities 200 feet beginning at a point 340 41.9132' N -760 32.8452' W on west shore; running easterly to a point 340 41.9100' N -760 32.8276' W on the east shore. (i) Harker's Island Boating Club I Bawiew Marina- All those waters within the Harker's Island Boating Club and Bayview Marina basin and extending beyond the dockage facilities 325 feet beginning at a point 340 41.8271' N -760 33.0533' W on the west shore of the canal; running southeasterly to a point 340 41.8234' N -760 33.0446' W on the east shore of the carnal. Q) Eft Bay Boatworks I Garners Marina - All those waters within the basin at East Bay Boatworks and Garners Marina and extending beyond the dockage facilities 275 feet beginning at a point 340 42.0552' N -760 33.5294' W on the shore west of the basin; running northerly to a point 340 42.1069' N -760 33.5130' W; running easterly to a point 340 42.1025' N -760 33.4886' W. (k) Harker's Island Canals - All those waters within a boundary beginning at a point 340 42.3366 N -760 33.8333' W on the shore; running easterly to a point 340 42.3223' N -760 33.7442' W on marsh; running southwesterly to a point 340 42.1180' N -760 33.8498' W on Harkers Island; to include the canals both north and south of Jennifer Drive and Westnouth Bay Drive. (I) Marshallbem Boat Harbor - All those waters within the Marshallberg Boat Harbor and extending beyond the dockage facility 325 feet beginning at a point 340 43.3589' N - 76031.3116' W on the shoreline northwest of the boat basin near the mouth of Sleepy Creek; running southwesterly to a point 34*43.2999' N - 760 31.3343' W; running southeasterly to a point 340 43.2676' N - 760 31.2799' W on the shoreline south of the boat basin. (m) Straits Canal (Between Whitehurst Drive and Straits Point Road)- All those waters in the canal upstream of a line beginning at a point 340 43.4242' N - 760 33.9246' W on the west shore; running easterly to a point 340 43.4113' N - 760 33.8955' W on the east shore. (n) Gaskill Creek - All those waters in Gaskill Creek upstream of a straight line beginning at a point 340 43.3526' N -760 34.1691' W on the west shore; thence to a point 340 43.3587' N -760 34.1442' W on the east shore. (o) Stewart Drive- All those waters within the canal west of Stewart Drive upstream of a straight line beginning at a point 340 43.4819' N -760 33.5022' W on the north shore; running southerly to a point 340 43.4699' N -760 33.5054' W on the south shore. (p) Rahway Landing Basin- All those waters within the Railway Landing Basin upstream of a straight line beginning at a point 340 43.3770' N - 760 31.8659' W on the west shore; running easterly to a point 340 43.3758' N -760 31.8542' W on the east shore. (q) Brown's Island - All those waters within a boundary beginning at a point 340 42.4905' N -760 32.7312' W on the northwestern shore of Brown's Island; running westerly approximately 250 yards to a point 340 42.4773' N -760 32.8795' W in the sound; running southerly to a point 340 42.3074' N -760 32.8415' W on the western shore of Brown's Island; running southerly, then easterly and northeasterly following the shoreline across all creek mouths to a point 340 42.1637' N -760 31.2370' W on the eastern shore of Brown's Island; to include all the marshes and waters of southern Brown's Island. ARENDELL ,,..�oASTAL- ERERS 105 North IP Street Morehead City, North Carolina 28557 (252) 622-4338 N.C. Certification No. C-1509 May 13, 2015 Mr. Roy Brownlow N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Re: CAMA Major Permit - Express Harkers Island Sewer Company, LLC Harkers Island, Carteret County Mr. Brownlow: On behalf of Harkers Island Sewer Company, the attached Express Major Permit Application for the Cape Lookout National Park Service is submitted for your review and approval. A check for $2,000 is enclosed payable to NCDENR. Please call me if you have any questions or need additional information. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr.,/.E. Senior Engineer Enclosures cc: Mike Laws, Harkers Island Sewer Company, LLC Cp, r-k.--W i oo1 Avvxt- aJ000. RECENED MAY 19 2015 0"-v,049 env Major CAMA Permit Application National Park Service LS & FM Harkers Island, North Carolina May 13, 2015 proposed by: Harkers Island Sewer Company, LLC P.O. Box 370 Harkers Island, NC 28531 prepared for: North Carolina Department of Environment & Natural Resources Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 prepared by: Arendell Engineers RECEIVED 105 North 10"' Street, Suite 4 MAY 19 7A Morehead City, North Carolina 28557 Phone: (252) 622-4338 N.C. Certification No. C-1509 CAPE LOOKOUT NATIONA PARK SERVICE LIFT STATION & FORCE MAIN HARKERS ISLAND SEWER COMPANY, LLC HARKERS ISLAND, CARTERET COUNTY, NORTH CAROLINA Table of Contents DCM MP —1 Application for Major Development Permit DCM MP — 3 Upland Development PROJECT NARRATIVE INTRODUCTION PROJECT DESCRIPTION EXISTING CONDITIONS Site Topography and Hydrography Land Use Wetlands Areas of Archaeological or Historic Value Navigation METHODS OF CONSTRUCTION PROJECT SCHEDULE COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT ADJACENT PROPERTY OWNERS Application Drawings Sheet 1 — Vicinity Map Sheet 2 — Site Plan Sheet 3 — Lift Station Site Plan Sheet 4 — National Park Service Site Plan Land Management Group, Inc. Wetlands Report RECEIVED Adjacent Property Owner Notification Letters MAY 19 2015 Authorized Agent Agreement 0CM Mr-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Harkers Island Sewer Company, Llc National Park Service Lift Station & Force Main Applicant 1: First Name MI Last Name Mike Laws Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State P.O. Box 370 Harkers Island NC ZIP Country Phone No. FAX No. 28531 USA 919 - 810 - 4929 ext. - Street Address (d different from above) City State ZIP 270 Pintail Drive Lexington NC 27295- Email miaws@harkersislandsewercompany.com 2. Agent/Contractor Information Business Name Arendell Engineers Agentl Contractor 1: First Name MI Last Name James W. (Bill) Fonnan, Jr., P.E. Agent/ Contractor 2: First Name MI Last Name John J. Wade, P.E. Mailing Address PO Box City State 105 North 101^ Street, Suite 4 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # 252 622 4505 C-1509 Street Address (if different from above) City State ZIP Email bill@arendellengineers.com; john@arendellengineers.com <Form continues on back> MAY 19105 r$r'61 dr1N 010 252.808-2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 1800 Island Road 1335 Subdivision Name City State Zip Harkers Island NC 28531 - Phone No. Lot No.(s) (d many, attach additional page with list) 919 - 810 - 4929 ext. 3-11, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak 404 Wetlands c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade ❑Unknown Back Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) N/A 94,525 - lift station tract; unknown along route of force main c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) +5 NAVD88 ❑NHW or ❑NWL e. Vegetation on tract Primarily forest. The route of the force main contains grass, trees, and shrubs. There is one location where wetlands may be encountered and the force main will be drilled beneath the wetlands. f. Man-made features and uses now on tract The tract is currently undeveloped. g. Identify and describe the existing land uses adjacent to the proposed project she. Cape Lookout National Park facility, Core Sound Waterfowl Museum & Heritage Center h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, K applicable) ❑Yes []No (RNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> MAY 19 20b tR-*!WnM F+HOf 252-808-2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (III) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Existing wastewater treatment facilities include septic tanks that are currently failing. o. Describe existing drinking water supply source. Drinking water is supplied by the Harkers Island Water System, a division of the Carteret -Craven Electric Cooperative. p. Describe existing storm water management or treatment systems. There are currently no storm water management or treatment systems on the site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The project includes a lift station to pump wastewater from the existing facility to an existing wastewater treatment facitlity on Harkers Island. The existing septic tanks on the site are failing and the National Park Service wishes to have a long term solution to their wastewater needs. The force main will run approximately 12,597 linear feet mainly along Island Road to the lift station at the West Bay subdivision. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of -way. Encroachment agreements have been applied for construction within the NCDOT rights -of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. d. List all development activities you propose. Development activities include the installation of a 6' interior diameter lift station and associated appurtenances and 12,597 linear feet of 4" PVC and ductile iron pipe. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work I. What is the approximate total disturbed land area resulting from the proposed project? 122,283 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area Was ❑No DNA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There will be no discharges to waters of the state. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. RECEIVED MAY 19 2ob <Form continues on back> Mh'MNwnw k'ttt 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (n are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required Rams below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Max D. Abernethy, Sr. Phone No. Address 2910 Howards Creek Mill Road, Vale, NC 28168 Name Stacy M. Davis Phone No. Address 106 Stacy Road, Harkers Island, NC 28531 Name Timothy Van Noy Phone No. Address 101 Saddle Court, Mullica Hill, NJ 08062 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. It. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date / B _ ZO / S Print Na Signatui Please indicate application attachments pertaining to ❑DCM III Excavation and Fill Information ®DCM MP-3 Upland Development ❑DCM MP-4 Structures Information ❑DCM MP-5 Bridges and Culverts RECEIVED MAY 19 2015 re11M-�nrta alrr 252-808-2808 :: 1-888-4RCOAST :: www. nccoastal management. net Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 1 6' interior diameter lift station and associated appurtenances c. Density (give the number of residential units and the units per acre). N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ®Yes []No ❑NA (ii) If yes, list the date submitted: April 30, 2015 g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. N/A i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0.31 % j. Describe proposed method of sewage disposal. Existing facility currently has failing septic tanks. The lift station will pump sewage from the facility to an existing wastewater treatment facility on Harkers Island. I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industriall commercial effluent, 'wash down" and residential discharges). The only surface runoff will be from the gravel driveway, concrete tanks, and control panel. b. Number of lots or parcels. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 122,283 SF f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Impervious surfaces include a 36' x 12' gravel driveway, the concrete lift station and valve box, and a 6' x 3' roof to cover the associated control panel. h. Projects that require a CAMA Major Development Permit may also require a Stornwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? []Yes []No UNA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? []Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stornwater design? ❑Yes []No UNA RECEIVED If yes, attach appropriate documentation. MAY 19 2015 uwlw^uwnu r.r�5 252-808.28082 :: 1-888-4RCOAST :: w .necoastalmanagement.net revised: 12126/06 Form DCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Existing facility currently has water provided by the Harkers Island Water System. o. When was the lot(s) platted and recorded? N/A Date U,rrioaaf- zIgrYr���}a¢tF �nAr.l Project Name A41 C-WREL WJ - L,a Kl s Applicant Name Appli ig n. (i) Will water be impounded? ❑Yes ❑NO ®NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes []No ®NA RECEIVED MAY 19 1015 HMII em 252-808-2808:: 1-888-4RCOAST :: w .nccoastalmanaoernent.net revised: 12/26/06 CAPE LOOKOUT NATIONA PARK SERVICE LIFT STATION & FORCE MAIN HARKERS ISLAND SEWER COMPANY, LLC HARKERS ISLAND, CARTERET COUNTY, NORTH CAROLINA PROJECT NARRATIVE May 13, 2015 INTRODUCTION The Cape Lookout National Park Service (NPS) Lift Station & Force Main for Harkers Island Sewer Company, LLC will provide sewer service to the facility located on the eastern end of Harkers Island in Carteret County. The NPS has begun providing ferry services for visitors to Cape Lookout and is expecting an increase in visitors to the facility. Additional bathroom facilities are being developed for visitor use on the Harkers Island site. Collection of the wastewater from the NPS office building and associated bathroom facilities will be conveyed by two low pressure sewer to the lift station. A permit is requested for construction of a lift station and approximate 12,597 linear foot 4" PVC force main to serve the Cape Lookout National Seashore Facility at the east end of Harkers Island in Carteret County, North Carolina. The lift station will be located outside of the 575' AEC line. Sewage disposal at the site is currently by septic tanks which are failing. The lift station will pump wastewater from the NPS to the West Bay Wastewater Treatment Facility located on West Bay Circle, Harkers Island. The force main will discharge into the equalization tank of the West Bay Treatment Facility. HISCO is considered as a public utility by the N. C. Utilities Commission. The National Park Service facility includes offices, a visitor's museum, ferry service, and recreational areas. Based on visitation data provided by Mike Baker, Facility Manager for the NPS, the projected flow from the NPS is estimated to be 2,800 gallons per day. This includes 42 employees @ 25 GPD/employee and 350 visitors/day @ 5 GPD/visitor. Visitation is based on National Park Service LS & FM Major CAMA Permit Application — Narrative May 13, 2015 Page 14KAIVED MAY 19 2015 the peak day for 2014 plus a growth factor based on the increase based on the actual growth in visitation for a Saturday in the month of July. It was estimated that the peak day for 2014 had 320 visitors. The facility currently uses septic tanks to treat the wastewater generated by the site which are currently failing. PROJECT DESCRIPTION This project includes construction of a 6 foot interior diameter wetwell and lift station with duplex wastewater pumps pumping at a rate of 100 gpm at approximately 100 feet TDH. The lift station pumps through 12,597 linear feet of 4 inch force main to an existing wastewater treatment facility at the West Bay subdivision (WQ0024023). The force main will be installed within the North Carolina Right -of -Way and will not encroach on private property. The project includes installation of two sewer services on the Park Service site to replace failing septic tanks and to provide sewerage to a new rest room facility currently under development. The services are duplex grinder low pressure sewer units that pump through approximately 881 linear feet of 2 inch force main directly to the lift station. EXISTING CONDITIONS Site Topography and Hydrography - The topography at the lift station is relatively flat with an elevation of +5 NAVD88. Along the route of the force main, the elevation varies between approximately +1 NAVD88 at its' lowest to approximately +11 NAVD88 at its' highest. The base flood elevation at the lift station site is 7 feet NAVD88. Land Use — The site where the lift station will be located is currently wooded. There is no development on the parcel. Adjacent to this parcel is the National Park Service's Cape Lookout National Seashore Harkers Island Visitor Center. The island is adjacent to Back Sound which along the route of the force main is SA;ORW waters. Along the route of the force main, land uses vary between residential, commercial, and religious uses. Wetlands - There are 404 wetlands on the parcel south of the proposed lift station. There will be no impact to the wetlands on the site. National Park Service LS & FM Major CAMA Permit Application — Narrative May 13, 2015 Page 2 of 42ECEivEo MAY 19 20b W .M-Mna rntt Areas of Archeological or Historic Value — There are no known areas of archeological or historic value known within the project site. Navigation — There is no proposed construction within any navigable waters. METHODS OF CONSTRUCTION The lift station will be constructed using standard construction equipment including bull dozers and graders. Construction methods to be used for force main installation will be open trench, bore and jack and horizontal directional drilling installation primarily in the NCDOT rights -of - way. Encroachment agreements have been applied for construction within the NCDOT rights - of -way including Island Drive, Guthrie Drive, Fulford Street, Middle Street, and Old Ferry Dock Road. PROJECT SCHEDULE Construction of the lift station and force main is expected to start immediately once a permit is issued and within the permitted time frame. The installation of the lift station and force main is at the expense of the Harkers Island Sewer Company with reimbursement by the federal government. COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. RECEIVED MAY 19 2015 N+-Nr-uanN �µ+s National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Page 3 of 4 ADJACENT PROPERTY OWNERS Letters notifying adjacent properties owners of Cape Lookout National Park Service Lift Station & Force Main CAMA Permit Application have been sent to the following properties owners by certified mail. Copies of those letters are attached. Adjacent Riparian Property Owners Max D. Abernethy, Sr. 2910 Howards Creek Mill Road Vale, NC 28168 Stacy M. Davis 106 Stacy Road Harkers Island, NC 28531 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 RECEIVED MAY 18 7015 WPm,M11W 441TT National Park Service LS & FM May 13, 2015 Major CAMA Permit Application — Narrative Page 4 of 4 DUPLIN FENDER OAK HAMMOCK DRIVE LENOIR v-� CRAVEN PAMLICO JONES ONSLOW 4CAORTERET CUNTY WEST BAY WWTP HARKERS ISLAND ISLAND ROAD BACK SOUND SA, ORW TIC N RECEIVED MAY 19 2015 AREA OF INTERESTHw-" 171W NHr ARENDELL vaaEcr: cuENr. oaAlnMcnTte" AssHOWN FORCE MAIN AND LIFT STATION HARKERS ISLAND SEWER °" 09I91s CAPE LOOKOUT NATIONAL COMPANY, LLC VICINITY MAP onrwx o1 w. v�are �mse SEASHORE FACILITY P.O. BOX 370 'jw .. HARKERS ISLAND, NC HARKERS ISLAND, NC 25531 tsroa n.,n�mm. cac.. w uxs 4" 0 PVC FORCE MAIN W-4 , kv-q , Lo . a z / a 575' AEC LINE I RIGHT-OF-WAY LINE I I ,,.50- WETLANDS,' \ PRESSURE SEWER FROM SETBACK % NATIONAL PARK SERVICE a, \ I \ 404 WETLANDS SCALE (IN FEET): �` \ RECEIVE � MAY ratoe 0' 20' 40' �' \ Av ARENDELL PROJECT': .:6,,.'<; FORCE MAIN AND LIFT STATION IN CAPE LOOKOUT NATIONAL w.n.aq.xcxer mart: PINmme SEASHORE FACILITY FM: 0400"ISIN 0 HARKERS ISLAND, NC nonc.w,.a�n.re asm CLIENT. DRAWING TIRE •� 1•-27 HARKERS ISLAND SEWER COMPANY, LLC�: P.O. BOX370 LIFT STATION SITE PLAN 03 MW ,,,, HARKERS ISLAND, NC 28531 ^`" twos l� l RIGHT-OF-WAY 60Ri hIlk l bb\\ 7 �`� It If \\� n 40PVC FORCE MAIN % bO'V./ 1� RIGHT-OF-WAYWT . \ y 44� \ / \ tv ARENDELL ENGINEERS �axa�ia.s.xa:i"� w.n.eab.ncas W 7a rvt MWaes N/F DAVIS, STACY M SR ETUX L/T ANNA PROJECT.': RGE MAIN AND LIFT STATH CAPE LOOKOUT NATIONAL SEASHORE FACILITY HARKERS ISLAND, NC / T DA IDA -5T �� -4Q7 N-q� va _ D4 --\o✓� oA D va WA va — va — v NIF r11 `-,\ VAN NOY, TIMOTHY / G ETUX LINDA M APPROX. NORMAL HIGH WATER LINE CLIENT.' HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 / % N/F / ABERNETHY, % MAX D SR / / RECEIVED MAY 19 N pIpMM�IWnwl Wit* DRAWING 717L.E: ADJACENT PROPERTY OWNERS sry AS SHOWN [A]OVUM DAM EW D JJw rno.ccre Im Ate�LMG LAND MANAGEMENT GROUP nac. Environmental Consultants DATE: May 15, 2015 SUBJECT: Preliminary and general evaluation of portions of the Harkers Island National Park Service property (<4 acres) for potential 404 or Isolated Wetland areas. Tract located east of Cape Point Drive, east end of Harkers Island, Carteret County, North Carolina. TO: Mr. Bill Forman, PE Mr. Mike Laws Arendell Engineers Harkers Island Sewer Company 105 N. 10"' Street, Suite 4 270 Pintail Drive Morehead City, NC 28557 Lexington, NC 27295 (252) 622-4338 [o]; 259-7224 [m] (919) 810-4929 Land Management Group completed a preliminary and general evaluation of portions of the Harkers Island National Park Service properties (-4 acres) to determine the general limits of potential 404 or Isolated wetland areas. The areas evaluated have been historically developed with roads, ditching, and buildings with the balance in unmanaged mixed pine, hardwood, and underbrush. Jurisdictional 404 wetlands and Waters of the U.S. come under the authority of the U.S. Army Corps of Engineers (USACOE), EPA, and NCDENR-DWR. Jurisdictional 404 wetlands and Waters cannot be filled or massively disturbed without Federal & State permit approvals. Isolated wetlands come under NCDENR-DWR jurisdiction only. This evaluation was completed through limited geomorphic transacts within the tract, aerial photo interpretation, and review of existing information. A complete 404 wetlands evaluation and physical delineation of the upper limits of potential 404 wetland areas was not completed during this evaluation. The currently used U.S. Army Corps/EPA "l987 Federal Wetlands Delineation Manual" and regional supplements were used as general guidelines to determine potential 404 Wetland, Isolated wetlands, and/or Waters of the U.S. areas. The enclosed map shows the general location of uplands vs. the potential 404 wetlands within the specific areas evaluated (see map). These areas appear to be potential jurisdictional 404 wetlands and not isolated wetlands. There were no Waters of U.S. found within the area evaluated, including the existing adjacent roadside ditches. Nationwide general fill permits without mitigation for wetland losses may be available for minor amounts <0.5 acre of wetland fill or disturbance. An individual permit is typically required for fill amounts >1 acre with mitigation for wetland losses. Private wetland mitigation is typically costly in both time and monies (12-18 months permitting time & costs). Another mitigation alternative is to purchase wetland fill credits from NC's eco-enhancement program at costs of —$20,000 - $50,000 /acre after avoidance and minimization criteria have been satisfied. Any final 404 Wetland jurisdictional limits or "Waters of the U.S." will need to be physically delineated in the field, approved by the USACOE, and then surveyed for final approval by the USACOE. Any final 404 wetland approval of a wetland survey is typically valid for a 5 year time period before having to be reauthorized. This report and preliminary map should be used for broad general planning purposes only, as specific on -site evaluations, delineations, approvals, and permits are required by respective regulatory agencies before initiating any development activities. Larry F. Baldwin CPSS/Sc #2183; NCLSS #1040 RECEIVED MAY 19 1015 DCru V-N!!5 eat" www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 9 P.O. Box 2522, Wilmington, NC 28402 ConnectGIS Feature Report Page 1 of 1 &COF Yi V EC 1 � IS 201S Cart Printed May ]2, 015 WEB tsDStavD See Belowfor Disclaimer VW <- r 'firr q,,j: 80 + :a 7U5t'�i,3 s h � 4t � t�; Yx ` ltl 'YR G he information displayed by this website is prepared for the inventory of real property found within thisjudsdiction and is compiled from recorded deeds, plats, and othe ublic records and data. Users of this information art hereby notified that the aforementioned public primary information sources should be consulted for verification o he information contained on this site. Carteret County assumes no legal responsibility for the information contained on this site. Carteret County does not guarantee the data and map services will be available to users without interruption or emor. Furthermore, Carteret County may modify or remove map services and access methods a RECEIVED MAY 19 2015 HFiM*tr11MR eta http://carteret2.connectgis.core/DownloadFile.ashx7i=_ags_map029b334352b344e985b 1a... 5/12/2015 ConnectGIS Feature Report Page 1 of 1 4WCONNECTGIS Printed May 12, 2015 Can 2015 WES nOSitNG See Below for Disclaimer 10 it1 2693 y 842 2 (f39} 6191 3409) 5434 1453 9313 ry 92 5247 8412 53U9 0 N S 1 .200� Feet y the information displayed by this website is prepared for the inventory of real property found within this jurisdiction and is compiled from recorded deeds, plats, and athe public records and data. Veen of this information are hereby notified that the aforementioned public primaryinformation sources should be consulted for vedFication o the information contained on this site. Carteret County assumes no legal responsibility for the information contained on this site. Carteret County does not guarantee that the data and map services will be available to users without interruption or error. Wrthemrore, Carteret County may modify or remove map servioes and access ng'L T" D will ����ttl�. MAY 19 2015 IaJ irtiM laps ere http://carteret2.connectgis.com/DownloadFile.ashx?i=_ags_map70l75f 74dcOd4fl7ad9cef... 5/12/2015 1 j 'TM1it�r$�"!Y NWI Map -- NPS Harkers Island, NC National Wetlands Inventory May 12, 2015 Wetlands Ffeanwxlel Fmelgent - FM"valer Fueated�Shfuh - £atuanne ann Marine Ceep•wator y p. cs:uanne ant? Marne { Fres-water POnn - -axe - Rivo-rroc Cllder 7 Thb m.P i. im Nr. W-1. oNY. iM US Fi.h .nJ MdHfn Hrvkv a nol ropanYW. la I a my o USA* 'mnln. o of tbo UadWO %h* m (ryb m.p. All w Wntl. ml.. M. NUWJ b....tl L,..c.rd.nm wNF Yro I.Yx � dMo fond on U.W.Ibntl. MOWr, .11.. User Remarks: M 0 m M G O PRELIMINARY EVALUATION & MAP PORTION of HARKERS ISLAND-NPS SEWER PUMP SITE FOR POTENTIAL 404 or ISOLATED WETLAND AREAS vs UPLAND AREAS Harkers Island East End - Carteret County - North Carolina _ .. _ Ok ns do not appm to be ftbm a to U.S. May - 2015 Ifb Land Manaaement Grouo. Inc. PRELIMINARY EVALUATION & MAP PORTION of HARKERS ISLAND-NPS SEWER PUMP SITE FOR POTENTIAL 404 or ISOLATED WETLAND AREAS vs UPLAND AREAS Harkers Island East End - Carteret County - North Carolina ral GIS 0 IF— . -,xAm cater"" Panted May 15, 2015 i.i a". to! O'scL.ngr Uw ' 497St Ir # . y� it law 2N Feet lie information dispbyed by this webslte is prepared for the inventory of real property found within ttss jurisdiction and rs compiled F.om recorded deeds, pia' an: othe- o ublic mcords and data Users of Uds btformation are hereby, ratified that the aforementioned pubic primay information sources should be com.1ted for verification o .he information ccotained on this site Carteret County assumes . legal responsibility for the inlprrmricn contained on this site Carteret Ccunty does rot gua•antee tha he data and map services wilt be avawfable to users wits out interruption or enpr %urthenr ore. CanrCounty nsay modify or remove map services ant access methcds a Mll Dkhm do not appar b be WON of fo U.B. May - 2015 Ifb Land Manaaement Grouo. Inc. ARENDELL - ENGINEERS CML• COASTAL• LNVIROMMRNTAL 105 North loth Street Morehead City, North Carolina 28557 (252) 622.4338 N.C. Certification No. C•1509 BY CERTIFIED MAIL May 13, 2015 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 Re: Force Main in NCDOT Right -of -Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concem: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr., RE Senior Engineer Enclosures RECEIVED cc: Mike Laws, Harkers Island Sewer Company, LLC MAY 1 9 jp>5 Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC rat-WA1CA11y t-Hb IrmARENDELL ENG11 CIVIL•COXTAL- ENVIRONMENTAL 105 North 10w Street Morehead City, North Carolina 28557 (252)622.4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL May 13, 2015 Stacy M Davis 106 Stacy Road Harkers Island, NC 28531 Re: Force Main in NCDOT Right -of -Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS . (Bill) Forman, Senior Engineer Enclosures RECEIVED cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC MAY 19 2015 ncnn_ta�gM �It+► ARENDELL ENGINEERS t_ CIVIL • COASTAL - ENVIRONMENTAL 105 North 10t^ Street Morehead City, North Carolina 28557 (252) 622.4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL May 13, 2015 Max D Abernethy, Sr. 291 Howards Creek Mill Road Vale, NC 28168 Re: Force Main in NCDOT Rigbt-of-Way, Revised Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. The only revision contained within this package is the location of the lift station which has been moved out of the 404 wetlands at the National Park Service site. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within thirty days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr., P. . Senior Engineer Enclosures RECENED cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC MAY 19 2015 Hr"Wv "nH rffr May 13, 2015 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re: Authorized Agent Agreement Harkers Island Sewer Company, LLC Mr. Davenport: This is to inform you that Bill Forman and Arendell Engineers are the Authorized Agent for the referenced project. Mr. Forman is authorized to act on behalf of the applicant on matters related to the CAMA Major Permit and related federal permits. Please call me if you have any questions or need additional information. Sincerely, �Ma ws Managing tuber Harkers Island Sewer Company, LLC RECEIVED MAY 19 2015 �" " DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 June 23, 2015 Regulatory Division Action ID No. SAW-2015-00037 Arendell Engineers Attn: Mr. James W. Forman, Jr., P.E. 105 N. I Oh Street, Suite 4 Morehead City, North Carolina 28557 Dear Mr. Forman: In coordination with.the NC Division of Coastal Management, we have received a copy of your May 23, 2015 proposal to construct a lift station and force main to service the National Park Service facility at the eastern end of Harkers Island, at 1800 Island Road, Harkers Island, Carteret County, North Carolina. A review of your plans reveals that the proposed activity will not involve work in wetlands, waters of the United States or navigable waters of the United States. Therefore, no Department of the Army authorization is required for your work. Should your proposed scope of work change, please contact this office to discuss possible required authorization. Please be advised that this does not relieve you of the need to obtain all necessary authorizations, including a valid permit from NCDCM, prior to beginning work. Should you have any questions or comments you may call me at (910) 251-4049. Sincere , � Liz air; Pro t ager Wilmington egulatory Field Office Copies Furnished: Thomas G. Walker, U. S. Attorney Eastern District of North Carolina 310 New Bern Avenue, Suite 800 RECEIVED Terry Sanford Federal Building & US Courthouse JUL 01 2N Raleigh, North Carolina 27601-1461 woo-"nw W46 bI Ms. Molly Davis, Chief Wetlands Enforcement Section Water Protection Division Clean Water Enforcement Branch U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 Mr. Shelton Sullivan Division of Water Resources North Carolina Department of Environment and Natural Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557 April 17, 2015 Mr. Ryan Davenport N.C. Division of Coastal Management 400 Commerce Avenue Morehead City *'r s"' Re: Harkers Island Sewer Company, Harkers Island, Carteret County Mr. Davenport: AARENDELL NGINEERS CIVIL - CO AiTAL - ENVIRONMENTAL 105 North I Street Morehead City, North Carolina 28557 (252)622.4338 N.C. Certification No. C-1509 4_' LA M" On behalf of Hankers Island Sewer Company, ty&4ttached General Lookout National Park Service is sub mitt r your review and* payable to NCDENR. j Please call me if you have any or need pdd�itional inforrry Sincerely, ARENDELL ENGINEERS (Bill) Forman, Jr., P.E. Senior Engineer Enclosures cc: Mike Laws, Harkers Islar Gam* 1'5)Ls a 1600 Application for the Cape A check for $400 is enclosed r",,/ v..tl SS ud4�t 0 w S I .� "DAAJ,o.n 0 p D " U � VV, oV '%-r you• W I/ April 17, 2015 N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Re: Authorized Agent Agreement Harkers Island Sewer Company, LLC Mr. Davenport: This is to inform you that Bill Forman and Arendell Engineers are the Authorized Agent for the referenced project. Mr. Forman is authorized to act on behalf of the applicant on matters related to the CAMA General Permit and related federal permits. Please call me if you have any questions or need additional information. Sincerelv. Harkers Island Sewer Company, LLC RECEIVED APR 2 7 20b ARENDELL EnCIVIL ENGINEERS A•COASTAL-LMVIRONMLNTAL 105 North 1 P Street Morehead City, North Carolina 28557 (252)622.4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL April 17, 2015 Max D Abemethy, Sr. 291 Howards Creek Mill Road Vale, NC 28168 Re: Force Main in NCDOT Right -of -Way Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within ten days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS RECEIVED .W. (Bill) Forman, Jr., P.E. APR $ 7 20b Senior Engineer Ht'RCIOINO&" Enclosures cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC AARENDELL CIVIL COASTAL ENVIRONMENTAL 105 North 10t^ Street Morehead City, North Carolina 28557 (252)622-4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL April 17, 2015 Stacy M Davis 106 Stacy Road Harkers Island, NC 28531 Re: Force Main in NCDOT Right -of -Way Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within ten days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS RECEIVED (Bill) Forman, Jr., P.E. APR 2 7 10?5 Senior Engineer ,uNr-win, aN4 Enclosures cc: Mike Laws, Harkers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC ARENDELL ENr,' CIVIL• C015TI.LEP vPO NMEN iI.L 105 North 101h Street Morehead City, North Carolina 28557 (252) 622.4338 N.C. Certification No. C-1509 BY CERTIFIED MAIL April 17, 2015 Timothy Van Noy 101 Saddle Court Mullica Hill, NJ 08062 Re: Force Main in NCDOT Right -of -Way Harkers Island Sewer Company, LLC Harkers Island, Carteret County, North Carolina To Whom It May Concern: In accordance with the requirements of the Division of Coastal Management CAMA Major permitting process, a copy of the permit application and supporting documentation for the referenced project is provided for your information. Please be advised that, if you have comments concerning the project, they must be submitted to the Division of Coastal Management within ten days of receipt of this notice. No response will be interpreted by the Division of Coastal Management as no objection. Submit comments to N.C. Division of Coastal Management, 400 Commerce Ave, Morehead City, North Carolina 28557. Thank you for your assistance on this matter. Sincerely, ARENDELL ENGINEERS .W. (Bill) Forman, Jr., PIE RECEIVED Senior Engineer APR 2 7 1015 VI: Nx-w,nr_7 y Enclosures cc: Mike Laws, Hankers Island Sewer Company, LLC Ryan Davenport, N. C. Division of Coastal Management, Morehead City, NC I NORTH CAROLINA ATLANTIC OCEAN LENOIR CRAVEN PAMLICO JONES DUPLIN RECEIVED ONSLOW APR 2 7 10b CARTERET COUNTY rjo PENDER AREA OF INTEREST WEST BAY WWTP OAK HAMMOCK DRIVE HARKERS ISLAND ISLAND ROAD NATIONAL PARK FORCE MAIN SERVICE FACILITY ROUTE BACK SOUND SA, ORW AARENDELL vRaecr.: CLIENT oaawiNcnnF HDAM FORCEMAINANDOFTSTATION HARKERS ISLANDSEWERfCAPELOOKWTNATIONAL COMPANY, LL ..drr�,..m. HARKERS ISLAND, NC C HARKERS ISLAND, NC 28531 VICINITYMAP1v"oretr,�eameSEASHOREFAgLITYP.O.BOX31D i ok 40, -� ol , 575' AEC LINE / ,' J-- RIGHT-OF-WAY LINE ,� % , • 404 WETLAND DISTURBANCE, / - APPROX. 1,312 SF TO BE FILLED i - i 40 i i W& F„ F PRESSURE SEWER FROM \ / �. ;Y NATIONAL PARK SERVICE i 4" 0 PVC 3 FORCE MAIN 4k / 404 WETLANDS RECEDED / APR 2 y tog 4p �IH9 CITY SCALE (IN FEET): / 0' 20' 40' A ARENDELL L'ERS PROJECT. CLIENT DRANWG VILE p=Lp �� MIT/% inrvniam se,.t s.e� FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL HARKERS ISLAND SEWER COMPANY, LLC LIFT STATION 03 " .Ci ,.� v w Inn enure SEASHORE FACILITY P.O. BOX 370 SITE PLAN Hwn c.wceree.r. rawroc HARKERS ISLAND, NC HARKERS ISLAND, NC 28531 "'a"T` ism w 60, 1po o y- y\ / RIGHT -OF -WA / RIGHT-OF-WAY If / NIF DAVIS, STACY M SR ETUX LIT ANNA MAIN \ W� ,57, \ � W-4 --� W-4 5'TYW- t -�-�_ P. Nx T - - VAN NOY, TIMOTHY G ETUX LINDA M APPROX. NORMAL HIGH WATER LINE RECEIVED APR 2 7 2915 miow-mmoo Wit* NIF / ABERNETHY, % MAX D SR / R E N D E L L PROJECT. CLIENT DRAWING I TLE ASEE AA POKE MAIN AND LIFT STATION LOOKOUT NATIONAL HARKERS ISLAND SEWERADJACENT COMPANY, LLCOWNERSSEASHORE PROPERTYCAPE FACILITY P.O. BOX 370HARKERS wnc.warsnwuwo ISLAND, NC HARKERS ISLAND, NC 28531 fl1O"" WESTMOUTH BAY (SA; HQW) ►-`,ice L • ��1� �I��_ I GUTHRIE DRIVE 1i BACKSOUND (HQ; ORW) NCDOT RIGHT-OF-WAY NOTES: 1. FORCE MAIN TO BE CONSTRUCTED WITHIN THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY, TYPICALLY WITHIN 5' OF RIGHT-OF-WAY LINE. 2. WETLANDS DELINEATED BY TYLER CRUMBLEY, U.S. ARMY CORPS OF ENGINEERS, REGULATORY BRANCH. 3. FORCE MAIN WILL BE CONSTRUCTED A MINIMUM OF 36" BELOW FINAL GRADE. 4. THERE WILL BE NO CHANGE TO THE FINISHED CONTOURS ALONG THE ROUTE OF THE FORCE MAIN. SCALE (IN FEET): 5. ANY EXCESS MATERIAL WILL BE REMOVED TO AN UPLAND DISPOSAL AREA. 6. EXCAVATED AREAS WILL BE STABILIZED WITH SEEDING AND 0' 800, 1609 MULCHING AT THE END OF EACH DAYS WORK. N0. DESCRIPTION BY DATE 7. NO EXCAVATED TRENCHES WILL BE LEFT OPEN OVER NIGHT AARENDELL ,OS Na 10M 54<„ Sui@ < 0-1-a', NC20557 PNONE. (252I 622-1 FAM(252)6224A MI 9rreem mn MVY, C.o6w IXr4fi,vem Na Gfyq I � I i, EASTMOUTH BAY I I 'ISLAND ROAD [% 575' AEC LINE NORMAL HIGH WATER LINE rra:IR HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 4' 0 PVC FORCE MAIN LOCATION OF CROSSING PROJECT. FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL SEASHORE FACITILY HARKERS ISLAND, NC 575' AEC LINE DRAWING WILE. - SITE PLAN O NPS FACILITY RECEIVED MAY 19 2015 ww#,o-wnM wi" 1` 800 05/17H5 iiw iff 15M EXISTING /— WATERLINE REP COPY \\ 575' AEC LINE NCDOT RIGHT-OF-WAY r / r r r r r r f�ORMAL HIGH YVATER LINE r i I i PROP. 4' FORCE MAIN TO WWTF r �Z ! r r�fl RARENDELL s ENGINEERS IMN mes a 4 w.e..a pry. WO PRONE: =�Sb PAC CMS r PROPOSED LIFT STATION r i ! EX. FUEL yZi FARM 1 ! �\ /f r PROP. GRINDER A PUMP STATION FRM 404 WETLANDS CUEN! HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 A PRESSURE SEWER TO LIFT STATION � V PROP. GRINDER PUMP STATION PRMCP FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL SEASHORE FACITILY HARKERS ISLAND, NC .REP COPY NOTE: ADDITIONAL SITE WORK ON NATIONAL PARK SERVICE PROPERTY BY OTHERS. RECEIVED MAY ) 9 20b pA+Mxv!Ngkl k1ttM SCALE IN FEET 0' 100' 200' DRAWING 7IRE: NATIONAL PARK SERVICE SITE PLAN r=im MUM ajw JWF ISX6 a WESTMOUTH BAY (SA; HOW) GUTHRIE DRIVE BACK SOUND (HQ; ORW) NCDOT RIGHT-OF-WAY I / EASTMOUTH BAY (SA; HQW) NUNN��� I � III 11 ■ � ,11 I►Ii� �I■ III111�� II11 ��II i�%` � = ���II/ �� • %III • NOTES: 1. FORCE MAIN TO BE CONSTRUCTED WITHIN THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY, TYPICALLY WITHIN 5' OF RIGHT-OF-WAY LINE. 2. WETLANDS DELINEATED BY TYLER CRUMBLEY, U.S. ARMY CORPS OF ENGINEERS, REGULATORY BRANCH. 3. FORCE MAIN WILL BE CONSTRUCTED A MINIMUM OF 36" BELOW FINAL GRADE. 4. THERE WILL BE NO CHANGE TO THE FINISHED CONTOURS ALONG THE ROUTE OF THE FORCE MAIN. SCALE (IN FEET): 5. ANY EXCESS MATERIAL WILL BE REMOVED TO AN UPLAND DISPOSAL AREA. 6. EXCAVATED AREAS WILL BE STABILIZED WITH SEEDING AND 0' 800, 1600' MULCHING AT THE END OF EACH DAYS WORK. 7. NO EXCAVATED TRENCHES WILL BE LEFT OPEN OVER NIGHT __IIIIIIIIIIIIIIIII, _IIIIIIIIIIIIIIIII♦ ARENDELL ENGINEERS eu ad fty,NC �1e1 PHONe (42 NC aS] PHONE 2) WE3J8 �FP%: lay c¢i5R5 Nwle CeoOne CefificeLm Ah G1509 NORMAL HIGH WATER LINE CUErn HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 4" 0 PVC FORCE MAIN LOCATION OF CROSSING PROJECT.' FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL SEASHORE FACITILY HARKERS ISLAND, NC 575' AEC LINE DRAWWG n7LE: SITE PLAN -lwa-ql = NPS FACILITY RECEIVED MAY 19 2015 I.lVFIXJ-iV,/l7� O&Q/15 �2 JJw JWF 15N06 \ EDGE OF / ROAD ISLAND- - - J ROAD 4" O PVC FORCE MAIN \1 / APPROX. WETLANDS LINE, MEASURED IN FIELD 05-22-15 \ / /TIMBER WALKWAY 44 �-'` _ J/ \ WA , GRASS SWALE NORMAL HIGH WATER LINE / ; SCALE (IN FEET): / 0' 30' 60' / NO. DESCRIPTION BY DATE 1 PER ROY BROWNLOW EMAIL, MAY 21.2015 JJW 05I22Is A` AREND ELL ENGINEERS IM Na IMSW kS 4 Na hWCity, NCZdd)` PHONE: M' M1 M»vbsdMn9mvaMn NMAfmmSna farfiRrEmAH f fYp 15' 10, 5' m -5' m CLIENT.' HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX370 HARKERS ISLAND, NC 28531 RECEIVED MAY 2 2 2015 .......... .....................3....................... . 0+00 1+00 PROJECT: FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL SEASHORE FACITILY HARKERS ISLAND, NC DRAWMG ME SITE PLAN 2+00 b acre ASSHOWN Dare 05/13/15 OJ oaamueY: w arPRwEoar. JWF PRO$OTR 15006 EXISTING WATERLINE NCDOT RIGHT-OF-WAY r , / r r r / r r I�IORMAL HIGH ,WATER LINE J � r i r r r N0. DESCRIPTION BY DATE 575' AEC LINE PROP. 4" FORCE MAIN TO WWTF c I PROPOSED LIFT STATION 1 ! j ` T EX. FUEL FARM /f ! PROP. GRINDER / PUMP STATION 404 WETLANDS PRESSURE SEWER TO LIFT STATION PROP. GRINDER PUMP STATION NOTE: ADDITIONAL SITE WORK ON NATIONAL PARK SERVICE PROPERTY BY OTHERS. i I1�\ IIS RECEIVED MAY 18 10b ppn mmw kilt* /� SCALE IN FEE As 0' 100, 200' A A R E N D E L L CUENT PROJECT DRAWING 771E HARKERS ISLAND SEWER COMPANY, LLC FORCE MAIN AND LIFT STATION P.O. BOX 370 CAPE LOOKOUT NATIONAL SEASHORE FACITILY NATIONAL PARK SERVICE rxHG* Mzl HARKERS ISLAND, NC 28531 HARKERS ISLAND, NC SITE PLAN W rr�I IM"LscfuC G1SfV BLNE. bXEEiM r=1ar E. 05r13/15 b.. JJw 04 u"x DW. JWF rn w. 15M WESTMOUTH BAY (SA; HQW) �J a V WEST BAY WWTp OLD FERRY DOCK ROAD EASTMOUTH BAY MIDDLE STREET (SA; HQW) FULFORD DRIVE -7rf FORCE MAIN 4" 0 PVIN BACK SOUND FORCE MAIN \U�/ (HQ; ORW) // / / NHW LINE 575' AEC LINE NOTES: NPS LIFT 1. FORCE MAIN TO BE CONSTRUCTED WITHIN THE NORTH STATION CAROLINA DEPARTMENT OF TRANSPORTATION LOCATION OF RIGHT-OF-WAY, TYPICALLY WITHIN 5' OF RIGHT-OF-WAY LINE. CROSSING 2. FORCE MAIN WILL BE CONSTRUCTED A MINIMUM OF 36" NPS FACILITY BELOW FINAL GRADE. • 3. THERE WILL BE NO CHANGE TO THE FINISHED CONTOURS ALONG THE ROUTE OF THE FORCE MAIN. 4. ANY EXCESS MATERIAL WILL BE REMOVED TO AN UPLAND RECEIVED SCALE (IN FEET): DISPOSAL AREA. 5. EXCAVATED AREAS WILL BE STABILIZED WITH SEEDING AND APR 2 7 2015 MULCHING AT THE END OF EACH DAYS WORK. Y 800' 1600' kJlawrw nM N.,� 6. NO EXCAVATED TRENCHES WILL BE LEFT OPEN OVER NIGHT. NO. DESCRIPTION BY DATE A- ARENDELL v ENGINEERS ,65 Norb IM BML& 4 Mn MQly NCffi PHONE: =' BY3 FM (EO)GM1 CLIENT.' HARKERS ISLAND SEWER COMPANY, LLC P.O. BOX 370 HARKERS ISLAND, NC 28531 PROJECT: FORCE MAIN AND LIFT STATION CAPE LOOKOUT NATIONAL SEASHORE FACITILY HARKERS ISLAND, NC DR4MNG 777LE: 9WE: r - 800 SHEET. MM 04/17/15 SRE PLAN O/� (� wurM Br: '"jw .PPNo.Eoer JWF PROftT. 1500E Miscellaneous 25) Please provide the certified mail "green cards" from the notifications; 26) Please provide a copy of the NCDOT rights of way agreement; 27) Please provide a copy of the sewer line extension permit. Please let me know if you would like to schedule a meeting to discuss these items to the application package. Please call me at your earliest convenience to do so at: 252-808-2808 ext 217. If you have any questions or concerns in the interim, please feel free to. contact me. Please note that I will be out of the office from May 25 through May 29. 1 will be returning on Monday June 1. If you should need immediate assistance, Ryan Davenport will be able to assist you. Thank you, Roy Brownlow