Loading...
HomeMy WebLinkAbout109-15 Minor Mod Gull Harbor Yacht ClubClass Permit Number 109-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for v; .. X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 _ Excavation and/or filling pursuant to NCGS 113-229 dto Gull Harbor Yacht Club, c/o Will S. Wallin, 109 Gull Harbor Drive, Newport, NC 28570 orizing development in Carteret County adjacent to Boeue Sound at 127 Gull for Drive in Newport as requested in the permittee's letter dated 5/28/17, including the nit, issued on July 13, 2017 , is subject to compliance with the application (where consistent permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may :t to fines, imprisonment or civil action; or may cause the permit to be null and void. Unless specifically altered herein, this Minor Modification authorizes the marina expansion, all as expressly and specifically set forth in the attached letter and workplan drawing. Any additional development activities may require a modification of this permit. All portions of the authorized marina expansion shall be a minimum distance of 11 feet from Coastal Wetlands along the east side of the marina expansion to allow access to the adjacent tributary. This permit modification does not authorize any formalized docking spaces along the east side of the authorized marina expansion. (See attached sheet for additional conditions) nit action may be appealed by the permittee or other persons within twenty (20) days of the issuing date. permit must be accessible on -site to Department mel when the project is inspected for compliance. tenance work or project modification not covered requires further Division approval. must cease when the permit expires on December 31, 2018 this permit, the State of North Carolina agrees that :ct is consistent with the North Carolina Coastal mt Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. N V � Brax on C. Davis, Director 'bivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Gull Harbor Yacht Club Permit No.109-15 Page 2 of 2 ADDITIONAL CONDITIONS NOTE: Signage or other means shall be installed to ensure the east side of the authorized marina expansion is not used for dockage. 4) This permit authorizes an additional 6 formalized boat slips for a maximum of 41 boat slips. 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 6) This Minor. Modification/Renewal shall be attached to the original Permit No. 109-15, which was issued on 10/l/15, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 7) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2015-01527. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2015-0638. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Coastal Management ENVIRONMENTAL QUALITY DATE: June 14,2017 TO WHOM IT MAY CONCERN Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Heather Styron, MHCDO Field Rep THROUGH: ROY BROWNLOW, District Manager SUBJECT: STATE PERMIT NO.109-15 MINOR MODIFICATION DWR PROJECT ID No.: 20150638 USACE ACTION ID NO. SAW-2015-01527 Gull Harbor Dock Extension, 6 Slip Addition, and 6 Finger Piers Addition ROY COOPER MICHAEL S. REGAN BRAXTON DAVIS By copy of this memo, DCM is requesting that your agency provide any comment it may have on the proposed project to GREGG BODNAR, Asst Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find correspondence enclosed dated 05/28/2017 from GHYC, Inc., requesting a permit mod!fNation. State Permit No. 109-15 was issued on 10/01/2015 for the expansion of docking facilities on Bogue Sound, Carteret County. The permit expires on 12/31/2018. The applicant is requesting to expand existing docking facility, add 6 additional slips (increase to a total of 41 docking spaces) and construct 6 additional finger piers. A processing fee of $100 was received on 05/28/2017, #1949. Please contact me at the Morehead City District office if you have any questions. Sate of North Carolina I Fovualmemal Quality I Coastal Managenlmt 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 T ROY COOPER A Cinvemnr s MICHAEL S. REGAN Secmiay BRAXTON DAVIS Coastal Management ENVIRONMENTAL QUALITY Director MEMORANDUM: June 15, 2017 To: Gregg Bodnar From: Heather Styron Thru: Roy Brownlow RE: Minor Modification of permit #109-15, Gull Harbor Yacht Club, Inc. Please find enclosed a request from Mr. Ned Robie representing Gull Harbor Yacht Club, INC. to modify the CAMA permit issued to Gull Harbor Yacht Club. This permit, #109-15, was issued on 10/1/15, and is set to expire on 12/31/18. The permit authorized the reconfiguration of an existing 30 slip docking facility and the addition of 5 new slips for a total of 35 slips. Subsequent to the issuance of this permit, the applicant is proposing to add six additional slips, access pier extension and six additional finger piers for a total of 41 slips. The proposal is consistent with the specific guidelines found in 15A NCAC 07H.0208. I recommend the modification be authorized as proposed, contingent all original conditions as well as the following specific conditions stated below are followed: • All work must be done as shown on plan dated received by DCM on 6/1/17. .. All portions of the proposed development shall be a minimum distance of 11' from coastal wetlands along the east side of the proposal to allow kayaks, jon boats and similar vessels access to the shallow (<1') tributary. —• This permit does not authorize any formalized docking spaces along the east side of the proposed dock. D NOTE: Signage or other means should be installed to ensure that the east side is not used for dockage. State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 May 28, 2017 GHYC, Inc. 135 Gull Harbor Dr. Newport, NC 28570 To Whom It May Concern, Please consider the following request for modification to Gull Harbor Yacht Club Inc.'s (GHYC) CAMA Major Permit #109-15. A scoping meeting was held on February 10, 2017 at the CAMA offices in Morehead City, NC. The scoping meeting request, GHYC's proposal, and the list of attendees at the meeting are enclosed. Representatives from the State considered GHYC's proposal for six slips to be added to the Gull Harbor marina located in the Gull Harbor subdivision, in Newport, NC, at ICW channel marker 14 in Bogue Sound. CAMA requested that the design be changed so that the walkway for the new slips be at least 10 feet from the marsh grass on the entrance to the tidal creek, and that steps be taken to prevent vessels from being moored on the east side of the walkway to ensure small craft may continue to have free and clear access to the tidal creek. GHYC has modified its design so that the walkway is now 11 feet from the grass on the entrance to the tidal creek. We will also ensure that no vessels are moored on the east side of the walkway by posting signs on that section of the walkway stating, "No Mooring," and adding an explicit GHYC marina rule that says such mooring is prohibited. The new design and previously submitted additional depth information is enclosed. Enclosed is a check for the $100 major permit modification application fee. If you require any additional information, please email me at nrobie@gmail.com or call at 919-606-9684. Sincerely, Ned Robie L-3 17 President OJ GHYC, Inc. Av, C " /OD, RECEIVED JUN 01 2017 DCM- MHD CITY 5/27/2017 Gmail - Gull Harbor Marina 6 slip proposal M Gmail Gull Harbor Marina 6 slip proposal 1 message Ned Robie <nrobie@gmail.com> To: "Styron, Heather M." <heather. m. styron@ncdenr.gov> Cc: "Gull Harbor Yacht Club, Inc. GHYC" <ghycinc@gmail.com> Bcc: Joe Mauro <jmauroent@gmail.com> Hi Heather, Ned Robie <nrobie@gmail.com> Tue, Feb 21, 2017 at 3,48 PM Attached is a new proposed design. The walkway is at least 11 feet from the grass and does not extend past CAMA's southern boundary. I wanted to run this by you before distributing to the others who attended the scoping meeting, for their consideration. I would appreciate any comments or suggestions you may have. Thank you -- Ned Robie President, GHYC Six slips.jpg 407K RECEIVED JUN 01 2017 DCM- MHD CITY smnpn six slip%jrs DECEIVED JUN 01 2017 DCM— MHD CITY 5/28/2QI7 Gmail - Re: FW: Gull Harbor Marina 6 slip proposal MGmail Ned Roble<nrobie@gmail.com> Re: FW: Gull Harbor Marina 6 slip proposal 1 message Ned Robie <nrobie@gmail.com> Sun, Apr 9, 2017 at 3:17 PM To: "Styron, Heather M." <heather. m. styron@ncdenr.gov> Cc: "Bodnar, Gregg" <gregg.bodnar@ncdenr.gov>, "Staples, Shane" <shane.staples@ncdenr.gov>, Joe Mauro <jmauroent@gmail.com>, Will Wallin <wswallin@hotmail.com> Hi Heather, The depth on the back side at low tide is 0 feet, at high tide is 1 foot. The distance of the dredging for the basin from the marsh edge would be 16.5 feet. Please let me know if you require any additional information. Thanks -- Ned On Mon, Apr 3, 2017 at 12:51 PM, Styron, Heather M. <heather.m.styron@ncdenr.gov> wrote: I spoke with Gregg and he feels possibly the water depths on the back side as well as the distance of the dredging for the basin from the marsh edge. Please let me know if I can be of further assistance. Thanks, Heather From: Ned Robie [mailto:nrobie@gmail.com] Sent: Monday, April 03, 2017 12:09 PM To: Styron, Heather M. <heather.m.styron@ncdenr.gov> Subject: Re: FW: Gull Harbor Marina 6 slip proposal Hi Heather, You are correct in saying the creek can only accommodate canoes, kayaks and very small boats. What additional information, if any, could we provide to show this? Taking water depths in this area is tricky, as only small craft can navigate this creek, even at high tide, and even then taking depths in the shallow areas is dangerous because it requires getting out in waders where it's easy to get stuck and fall on sharp shells. (I have scars from the last soundings we took to prove it.) Thanks RECEIVED JUN 01 2017 5/28/2Q 17 — Ned Gmail -Re: FW: Gull Harbor Marina 6 slip proposal On Mon, Apr 3, 2017 at 10:14 AM, Styron, Heather M. <heather.m styron@ncdenr.gov> wrote: Here are questions from the major permit coordinator (see below) and I will also send a responding email with the Fishery specialist comment and concerns. From: Styron, Heather M. Sent: Tuesday, February 21, 2017 4:43 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Brownlow, Roy <roy.brownlow@ncdenrgov>; Huggett, Doug <doug.huggett@ncdenr.gov>; Staples, Shane <shane.staples@ncdenr.gov> Subject: RE: Gull Harbor Marina 6 slip proposal From what I can remember this area is shallow (1.5' or less) at low tide, so only kayaks or very small boats could access this area. I have not taken water depths in that area so I could be wrong O From: Bodnar, Gregg Sent: Tuesday, February 21, 2017 4:17 PM To: Styron, Heather M. <heather.m.styron@ncdenr.gov>; Brownlow, Roy <roy.brownlow@ncdencgov>; Huggett, Doug <doug.huggett@ncdencgov>; Staples, Shane <shane.staples@ncdencgov> Subject: RE: Gull Harbor Marina 6 slip proposal I think Doug may have brought it up during discussions at some point. But would this allow access at low tide, not knowing if that opposite shoreline was a gentle slope that may not provide water depth? Gregg From: Styron, Heather M. Sent: Tuesday, February 21, 2017 3:58 PM To: Brownlow, Roy <roy.brownlow@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdencgov>; Huggett, Doug <doug.huggett@ncdenr.gov>; Staples, Shane <shane.staples@ncdenrgov> Subject: FW: Gull Harbor Marina 6 slip proposal Thoughts on this new layout (the Gull Harbor Scoping meeting) RECEIVED JUN 01 2017 From: Ned Robie [mailto:nrobie@gmail.com] DCMP MHD Sent: Tuesday, February 21, 2017 3:49 PM CITY 5/2MOP Gmail - Re: FW: Gull Harbor Marina 6 slip proposal To; Styron, Heather M. <heather.m.styron@ncdencgov> Cc: Gull Harbor Yacht Club, Inc. GHYC <ghycinc@gmail.com> Subject: Gull Harbor Marina 6 slip proposal Hi Heather, Attached is a new proposed design. The walkway is at least 11 feet from the grass and does not extend past CAMA's southern boundary. I wanted to run this by you before distributing to the others who attended the scoping meeting, for their consideration. I would appreciate any comments or suggestions you may have. Thankyou Pd20110.10M President, GHYC RECEIVED JUN 01 Z017 DCM- MHD CITY Bodnar, Gregg From: Staples, Shane Sent: Wednesday, June 28, 2017 2:02 PM To: Bodnar, Gregg Subject: Gull Harbor Dock Extension #109-15 Gregg, I do not have comments for the proposed modifications since it seems they incorporated everyone's comments. Thanks Shane F. Staples Fisheries Resource Specialist Division of Coastal Management Department of Environmental Quality 252 948 3950 office shane.staples(@ncdenr.gov 943 Washington Square Mall Washington, NC 27817 Nothing Compares ..,... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Gupton, Sharon Sent: Tuesday, June 20, 2017 3:53 PM To: Styron, Heather M. Cc: Bodnar, Gregg Subject: Permit #109-15 Minor Modification The memo requesting any comments for the Gull Harbor Dock Extension, 6 slip addition, and 6 finger piers addition has been received and reviewed. The Shellfish Sanitation Section under the direction of Shannon Jenkins has no comments pertaining to this 6/14/17 modification. Sharon Gupton Administrative Assistant Shellfish Sanitation & Recreational Water Quality Division of Marine Fisheries N.C.Department of Environmental Quality 252-808-8118 office sharon.gupton(a ncdenr.gov P.O. Box 769 Morehead City, NC 28557 !'/'Nothing Compares.-... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Dunn, Maria T. Sent: Monday, July 03, 2017 8:58 AM To: Bodnar, Gregg Subject: Gull Harbor Yacht Club, Carteret Co. Gregg, I have reviewed the modification request for #109-15. The proposal includes the addition of 6 finger piers to outline 6 additional slips, increasing the marina's dockage to 41. A scoping meeting was conducted on 2.10.17 where concerns were stated with regard to dredging and hindrance of navigation to a tidal creek from the position of the slip extension. While NCWRC still has concern with access to the tidal creek and impacts to shallow water habitats, we will not submit comments stating the project will have significant impacts to wildlife resources. The applicant has made attempts to minimize impacts by removing dredging from the proposal and by positioning the dock spine 11' from marsh. We would have concerns with dredging this area now or within the future. Thank you for the opportunity to review this modification request. Please do not hesitate to call or email if I can of further assistance. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 off ice:252-948-3916 fax:252-975-3716 www.ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Gerald Jones <Gerald.Jones@carteretcountync.gov> Sent: Wednesday, July 05, 2017 4:23 PM To: Bodnar, Gregg Subject: RE: Gull Harbor CAMA minor modification Yes I did, I do not see any issues on our end From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Wednesday, July 05, 2017 11:03 AM To: Gerald Jones <Gerald.Jones@carteretcountync.gov> Subject: Gull Harbor CAMA minor modification Morning Mr. Jones, I did not get a chance before the holiday to check in and see if you had received the minor mod packet OK. Let me know if it came through OK and if you need anything else. Thanks again, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg. Bodnar(o)ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Disclaimer: The content of this message and all attachments are subject to NC Public Record Law. According to the law all information except the property of a private individual is considered public record and subject to disclosure upon request to third parties without prior notification. If you are not the intended recipient of this message contact the sender immediately and delete the message from your files. Thank you for your cooperation. N Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403.1343 July 6, 2017 Action ID No. SAW-2015-01527, General Permit No. 197800056 State Permit No. 109-15 Gull Harbor Yacht Club Attn: Mr. Ned Robie 109 Gull Harbor Drive Newport, North Carolina 28570 Dear Mr. Robie: Through coordination with the North Carolina Division of Coastal Management, we have learned of your request to modify the work associated with your Department of the Army (DA) permit issued on July 16, 2015. The proposed modification requires an additional 6 boat slips and 3 finger piers at 127 Gull Harbor Drive, Gull Harbor Marina, along Bogue Sound, in Newport, Carteret County, North Carolina. Coordinates are: 34.72973 N,-76.84667 W. Your proposal continues to be consistent with the provisions and objectives of general permit No. 197800056 (copy enclosed). The permit is hereby modified. It is understood that all other conditions of your permit remain applicable. The expiration date of your DA permit is December 31, 2021. Your work is authorized provided it is accomplished in strict accordance with your submitted plans, the enclosed general and special conditions. Please read the enclosed permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. -2- Thank you for your time and cooperation. If you have questions, please contact Ms. Liz Hair, of the Wilmington Regulatory Field Office, telephone: (910) 251-4049. Sin rely, i ai jec Manager Wilmington Regulatory Field Office Enclosure: Drawing CAMA Permit GP 56 conditions Electronic copies (w/o enclosures): Ms. Karen Higgins/NCDEQ/DWR Ms. Heather, Styron/NCDEQ/DCM Mr. Robb Mairs/NCDEQ/DWR Mr. Greg Bodnar/NCDEQ/DCM Mr. Doug. Huggett/NCDEQ/DCM Bodnar Gregg From: Mairs, Robb L Sent: Friday, July 07, 2017 4:29 PM To: Bodnar, Gregg Subject: RE: Updates Hey Gregg, Thanks and hope you had a good one too. ITAC 246- the application packet we received had no permit history so we have emailed their acting agent for more information regarding the permit history of this existing marina. Ned Grady- this proposal will not require written approval. Watersedge MHP- as discussed, this will require written approval for the proposed expansion of the existing boat -ramp within ORIN waters through our GC 4097 (DWR #20150059v2). Gull Harbor- this will not require written approval. =--Milkman-investmentsiiE{}0016-Coast Guard Road) -this- proposal wilLnot-mquire-written- approval. Thanks and if I don't speak to you in the meantime, hope you have a nice trip out west with your bro. Robb Robb Mairs Environmental Senior Specialist Division of Water Resources North Carolina Department of Environmental Quality 910 796.7427 office robb. mairs(&ncdencaov 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg Sent: Wednesday, July 05, 2017 10:47 AM To: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: Updates Morning Robb, Hope the holiday was fun and restful. I apologize fat the volume of check ins today. a am getting ready to go on leave for 3 weeks on 7/14 and I don't want to leave too much for Doug and Heather to deal with. So any info or r� ��r , annraciat�y °n CO1fIT11�T1[Sl0 T � '1'����"I't1y�11 ITAC 246 Major Permit in Carteret County Ned Grady Minor mod AKA Croatan MHP #28-16, DWR # 12-1139 Permit Class MODIFICATION/NHNOR Permit Number 109-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermtt for e" X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Gull Harbor Yacht Club, c/o Will S. Wallin,109 Gull Harbor Drive, Newport, NC 28570 Authorizing development in Carteret County adjacent to Bogue Sound at 127 Gull Harbor Drive in Newport , as requested in the permittee's letter dated 5/28/17, including the attached workplan drawings dated "Received 6/29/17". This permit, issued on July XX, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to tmes, imprisonment or civil action; or may cause the permit to be null and void. I) Unless specifically altered herein, this Minor Modification authorizes the marina expansion, all as expressly and specifically set forth in the attached letter and workplan drawing. Any additional development activities may require a modification of this permit. 2) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Petmittee Gull Harbor Yacht Club ADDITIONAL CONDITIONS Permit No. 109-15 Page 2 of 2 3) This Minor Modification/Renewal shall be attached to the original Permit No. 109-15, which was issued on 10/1/15, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 4) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2015-01527. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2015-0638. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Permit Class MODIFICATION/NHNOR STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ,Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 109-15 Issued to Gull Harbor Yacht Club, c/o Will S. Wallin,109 Gull Harbor Drive, Newport, NC 28570 Authorizing development in Carteret County adiacent to Bol?ue Sound at 127 Gull Harbor Drive in Newport , as requested in the permittee's letter dated 5/28/17, including the attached workplan drawings dated "Received 6/29/17". This permit, issued on July XX, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this Minor Modification authorizes the marina expansion, all as expressly and specifically set forth in the attached letter and workplan drawing. Any additional development activities may require a modification of this permit. 2) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Gull Harbor Yacht.Club ADDITIONAL CONDITIONS Permit No.109-15 Page 2 of 2 3) This Minor Modification/Renewal shall be attached to the original Permit No. 109-15, which was issued on 1011115, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 4) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2015-01527. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2015-0638. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. DCM Field Rep: / J _ PLEASE E-MAIL, FAX, OR MAIL TO THE FOLLOWING (Checked): US ACOE Offices: Washington: ❑ Raleigh Bland (Craven Co.) ❑j Josh Peletier (Pamlico Co.) Wilmington: Liz Hair (Carteret Co, Onslow Co.) Marine Fisheries: 1 Shane Staples Curt Weychert Shellfish Sanitation: LEI Shannon Jenkins Water Quality: Washington: ❑ Anthony Scarbraugh (401) ❑ Roger Thorpe (Stormwater) Wilmington:] Robb Mairs (401) J N Georgette Scott Stormwater rg ( ) 5W 2ot5- d(S2-7 Wildlife Resources: U Maria Dunn (WARD) (WIRO) Vacant cP�LPO: Cc Distribution: ❑ Permitee ❑ Agent: ❑ Other (specify): DCMCoordinator:Permit# MAILING DISTRIBUTION SHEET - _.,. . DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico.) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) j Brad Shaver (NCDOT-Brunswick, NAv Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Earley Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARD) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins ' State Property: Tim Walton DEMLR/DWR: Karen Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401 (Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Fax P is MTNion: Mapa Dunn (WARO) 6e62/2 'xoVttS Permittee #: Agent# Coastal Management ENVIRONMENTAL QUALITY July 18, 2017 Gull Harbor Yacht Club c/o Will Wallin 109 Gull Harbor Dr. Newport, N.C. 28570 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, Enclosure ./ Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management Nothing Compares� State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 8082808 C,�. 7p- North Carolina Division of Coastal Management RECEIVED JAN 2 9 2016 DCM- MHD CITY NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Please use this card to schedule a pre -construction conference immediately BEFORE you begin work on your permitted project. The pre -construction meeting will give you the opportunity to discuss permit conditions, construction techniques and any questions you may have with a Coastal Management representative. This will enable you to proceed with your project as quickly and smoothly as possible. When you are ready to begin construction, fill out his card and mail it to the Division of �Tt�rak the address on the reverse side of this card. Thank You. C lC �rVV CC5 Permit Number iDse1'1 5 BAN 2 9 2016 �I Expiration Date (1A3,1 1 ` (I7r M- MHD CITY Issued to: I �to b re Contact Person: IN t 4 l l 1 N Telephone Number a 72 — "I / 7 Project Starting Date 0^k — — NC. --'^Nothinq Compares N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, N.C. 28557 RECEIVED OCT;3 0 2017 DCM- MHD CITY Please use th s char c edulF pre -construction conference immediately BEFORE you be m work on your permitted project. 2S OCT 017 The pre-constrq*ejtijeting will give you the opportunity to discuss permit conditions, construction techniques and any questions you may have with a Coastal Management representative. This will enable you to proceed with your project as quickly and smoothly as possible. When you are ready to begin construction, fill out his card and mail it to the Division of Coastal Management at the address on the reverse side of this card. Thank''%t. Permit Number: M_)) — r�,V-A goj Expiration Date: ( .41 1k Ilk Q DCM- Mi9$lI6VlWmber: 17N 6q`f Project Starting Date: �¢c eM a ZOl--f 1 6. Im e,4 4 1.0 Al, V, i i