HomeMy WebLinkAboutKB_03-008_Bumbaloe Beach—N . C .
Loco Government
99-
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
Health, and Natural Resources and the Coastal Resources Commission for development
in an area of environmental concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management."
Issued to Thomas Bumbalo
03-008H
Permit Number
authorizing development in Kure Beach N.C. ,at 1106 Fort Fisher Blvd- N_
as requested in the permittee's application dated June 16, 2003
This permit, issued on June 30- 2001Js subject to compliance with the application and site drawing (where consistent
with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void.
CONDITIONS:
1. All proposed development and associated construction must be done in accordance
with the permitted work plat drawing(s) submitted on June 16, 2003.
2. All construction must conform to the N.C. Building Code requirements and all
other local, State and Federal regulations.
3. Any change or changes in the plans for development, construction, or land use
activities will require a re—evaluation and modification of this permit.
4. The structure must be located entirely off of the frontal dune, and if a
primary dune is present, behind the crest of the primary dune.
5. Dune disturbances will be allowed only to the extent necessary for development
and if the dune's protective value is not weakened or reduced. Disturbed areas
will be immediately stabilized.
6. All disturbed areas shall be vegetatively planted and mulched within 30 days
of construction completion.
7. Any structure shall be relocated or dismantled when it becomes imminently
threatened by changes in shoreline configuration. The structure(s) shall
be relocated or dismantled within 2 years of the time when it becomes
imminently threatened, and in any case upon its collapse or subsidence.
However, if natural shoreline recovery or beach renourishment takes
place within 2 years of the time the structure becomes imminently threatened
so that the structure is no lonter imminently threatened, then it need not
This permit action may be appealed by the permitlee or
other qualified persons within twenty (20) days of the issuing date.
From the date of an appeal, any work conducted underlhis permit
must cease until the appeal is resolved.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
Any maintenance work or project modifications not covered
under this permit requires further written permit approval.
All work must cease when this permit expires on
December 31, 2005
In issuing this permit it is agreed that this project is consis-
tent with the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without
the written approval of the Division of Coastal Management.
Local Per it fiver (signature)
William A. Hanna, Jr.
name
117 Settlers Lane, P.O. Box 3
address
Kure Beach, NC 28449
C
Permittee
(signature required if specill conditions above apply to permit)
Page 1 of 2
K&e Beach, N.C.
Local Government
03-008H
Permit Number
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment
and Natural Resources and the Coastal Resources Commission for development
In an area of environmental concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management."
Issued to Thomas Bumbalo authorizing development in Kure Beach, N.C.
at 1106 Fort Fisher Blvd. N.
as requested in the permittee's application, dated June 16, 2003
This permit, issued on June 30, 2003 is subject to compliance with the application and site drawing (where consistent
with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject
permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
CONDITIONS cont'd.
7. cont'd. be relocated or dismantled at that time. This condition shall not
affect the permit holder's right to seek authorization of temporary
protective measures allowed under Rule .0308(a) (2) of this section.
8. Pursuant to 15 NCAC, Subchapter 73 .0406(b), this permit may not be
assigned, transferred, or otherwise disposed of to a third party.
This permit action may be appealed by the permittee or other
quplified persons within twenty (20) days of the issuing data.
From the date of an appeal, any work conducted under this per-
mit m st cease until the appeal is resolved.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
Any maintenance work or project modifications not covered
under this permit requires further written permit approval.
All work must cease when this permit expires on December
31. 2005_
In issuing this permit it is agreed that this project is consistent
with the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without
the written approval of the Division of Coastal Management.
41/4 1 i v
/614 4VZA
59 local Per icer (signature)
William A. Hanna, Jr.
name
117 Settlers Lane, P.O. Box 3
address
Kure Beach, NC 28449
Permittee
(signature required if specia conditions above apply to permit)
Page 2 of 2
0
APPLICATION FOR
CAMA
MINOR
��-DEVELOPMENT ��
,
PERMIT
"orth Carolina General Assembly passed
a Management Act and set the stage for
ment in the fragile and productive areas
ie state's sounds and oceanfront. Along
ing special care by those who build and
a General Assembly directed the Coastal
fission (CRC) to implement clear regula-
h minimize the burden on the applicant.
i for a minor development permit under
rt of the Commission's effort to meet the
,nt of the General Assembly. It has been
be straightforward and require no more
necessary from the applicant. Please go
r with the Local Permit Officer (LPO) for
vhich you plan to build to be certain that
'stand what information he or she needs.
QA'iegulations, the minor permit is to be
25 days once a complete application is in
ass time is needed if the project is simple.
s generally takes about 18 days. You can
oval process by making certain that you
complete and signed, that your drawing
specifications given inside and that your
application fee is attached.
are sometimes required for development
area. While these are not CAMA-related,
to check with the Local Permit Officer to
vhich of these you may need. A listing is
included on page 2 of this folder.
We appreciate your cooperation with the North
Carolina Coastal Management Program and your
willingness to build in a way which protects the
our beautiful and productive coast.
Coastal Resources Commission
Division of Coastal Management
PERMIT
"orth Carolina General Assembly passed
a Management Act and set the stage for
ment in the fragile and productive areas
ie state's sounds and oceanfront. Along
ing special care by those who build and
a General Assembly directed the Coastal
fission (CRC) to implement clear regula-
h minimize the burden on the applicant.
i for a minor development permit under
rt of the Commission's effort to meet the
,nt of the General Assembly. It has been
be straightforward and require no more
necessary from the applicant. Please go
r with the Local Permit Officer (LPO) for
vhich you plan to build to be certain that
'stand what information he or she needs.
QA'iegulations, the minor permit is to be
25 days once a complete application is in
ass time is needed if the project is simple.
s generally takes about 18 days. You can
oval process by making certain that you
complete and signed, that your drawing
specifications given inside and that your
application fee is attached.
are sometimes required for development
area. While these are not CAMA-related,
to check with the Local Permit Officer to
vhich of these you may need. A listing is
included on page 2 of this folder.
We appreciate your cooperation with the North
Carolina Coastal Management Program and your
willingness to build in a way which protects the
our beautiful and productive coast.
Coastal Resources Commission
Division of Coastal Management
Locality/�, a Al 1, . Permit Number OJ ` Wg 17
GENERAL INFORMATION
LAND OWNER
Name 1 bOrv10.S GU44, a.b to
Address I Zo1 MQdt CaS Q 2ytdt-r Dri✓Q,
City Wdm#' 34orV State NC, Zip c97eNO3 Phone 3r41-3ao4)
AUTHORIZED AGENT
Name
Address
City
State Zip
Phone
LOCATION OF PROJECT !Iota Foef Fisk¢r Blvd Huto_ 6QLt2i�L NL %W?
(If not oceanfront, is waterbody natural or manmade?)
DESCRIPTION OF PROJECT D.LVLL t
AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION
(To filled in by the Local Permit Officer prior to completing application.)
Ocean Hazard Estuarine Shoreline ORW Shoreline Public Trust Shoreline
PROPOSED USE
Residential Commerical/Industrial _ Other
Other
SQUARE FOOTAGE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR
BUILT -UPON SURFACES (such as driveways, etc.) within 75 feet of the estuarine shoreline, or 575 feet of an
ORW shoreline, or 30 feet of the public trust shoreline. 3 o y o
SQUARE FOOTAGE OF TOTAL FLOOR AREA OF BUILDING 43 (05, q
SQUARE FOOTAGE OF SITE to, Uso
OTHER PERMITS MAY BE REQUIRED:
The activity you are planning may require
permits other than the CAMA minor
development permit. As a service we have
compiled a listing of the kinds of permits that
might be required. We suggest you check
over the list with your LPO to determine if
any of these apply to your project.
Zoning, Drinking Water Well, Septic Tank
(or other sanitary waste treatment system),
Burning, Electrical, Plumbing, Heating and
Air Conditioning, Insulation and Energy
Conservation, FIA Certification, Sand Dune,
Sediment Control, Subdivision Approval,
Mobile Home Park Approval, Highway
Connection, and others.
U- I W111YR
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in
an AEC or a person authorized to act as an agent for purposes of applying for a CAMA minor development
permit, certify that the person listed as landowner on this application has a significant interest in the real
property described therein. This interest can be described as: (check one)
an owner or record title, Title is vested in -Tk'Dm 0. s s G u v`balo XIi, see Deed Book 3�_(,
page%oin the lJW tleUOduar County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
_ if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this
application.
NOTIFICATION OF ADJACENT PROPERTY OWNERS
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I
have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for
a CAMA permit.
(Name) (Address)
_fh+hleevl Marve I1321
nJ NQncy McC7ee. YOM; Si13 Turkeu Cre'e
KnIel-14t NG Z7&13
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
-Ia inn i!G
I acknowledge that the land owner is aware that the proposed development is planned for an area which may
be susceptible to erosion and/or floodin&. I acknowledge that the local permit officer has explained to me the
particular hazard problems associated with this lot. This explanation was accompanied by recommendations
concerning stabilization and floodproofing techniques.
PERMISSION TO ENTER ON LAND
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer
and his agents to enter on the aforementioned lands in connection with evaluating inforrhation related to this
permit application.
This application includes: general information (this form), a site drawing as described on the back of this application,
the ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality,
and any information as may be provided orally by the applicant. The details of the application as described by these
sources are incorporated without reference,in any permit which may be issued. Deviation from these details will
constitute a violation of any permit. Any person developing in an AEC without permit is subject to civil, criminal
and administrative action.
This the _jam day of Sung 20 U 3_.
Land owner or -person authori d to act as ttsnagent ]
for purposes of filing a CAMA ermit application.
AEC HAZARD NOTICE
Project Is In An: _Ocean Erodible Area High Hazard Flood Area_ Inlet Hazard Area
Date Lot Was Platted:
']'his notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, wluch is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules onbuildingstandards, ocean front
setbacks and done alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
2 feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as 3JQ feet landward in a major storm.
The toodwatersinamajorstormarepredictedtobeabout
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
Eroliibi ted. Temporary devices, including sand bags, may
e allowed under certain conditions.
This structure shall be relocated ordismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
JC;' s L Gz
Applicant's Signature Gwn--�
(011($(U
Dale
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storinsanderosion. Permits issued for development inthis
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the ppermit must be renewed and anew
setback line established..It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
c a 01P e r Ami t Mo �ff iZ e r
i
12filyity
qyo- - 65 -r�
Phone
Revised 11/93
Date ---
Dear -"-a-c L_
This letter is to inform you as an adjacent land owner of
Mr./M"%-- _ k bade -__-------- that they plan to
construct a -DunR1
at e--------- __ ___ on their property
_jLOlo _hI_ Fo, t; in Kure Beach. The sketch on
the reverse side of this letter depicts the proposed construction
as close as possible.
Please check the appropriate box below, sign, date and
return this letter along with any written comments, as soon as
possible, to:
William A. Hanna, Jr., L.P.O.
P.O. Box 3
Kure Beach, NC 28449
Written comments must be received within 10 days of receipt
of this notice. Failure to respond within that time will be
interpreted as no objection.
Sincerely,
C I I have no objection to the project as presently proposed
and hereby waive the right of objection as provided in
North Carolina General Statute 113-229.
C 1 I have objections to the project as presently proposed and
have enclosed my comments.
------------
Signature
Date
�j e- e 4- VJ ic_'i�\J. r-<_ o r� 1' P _ ✓ s - o
1, f4 /
L)NIiVV/Ivh Ur t- "UJC(�l
SHOW:
LOT SIZE
SETBACKS
LOCATION OF- PROJECT ON LOT
AMOUNT OF IMPERVIOUS SURFACE
STREET LOT FRONTS ON
�N
0
Date fin t la Li' 3
Dear Co _h lees _Ma'V L
This letter is to inform you as an adjacent land owner of
Mr./Mew-- ----- u n-1 r a Q--------------- that they plan to
construct a __du �p----- _ on their property
at 11i112 u r_o.f_ f-5hry _Illy d in Kure Beach. The sketch on
the reverse side of this letter depicts the proposed construction
as close as possible.
Please check the appropriate box below, sign, date and
return this letter along with any written comments, as soon as
possible, to:
William A.
P.O. Box 3
Kure Beach,
Hanna, Jr., L.P.O.
NC P9449
Written comments must be received within 10 days of receipt
of this notice. Failure to respond within that time will be
interpreted as no objection.
Sincerely,
C ] I have no objection to the project as presently proposed
and hereby waive the right of objection as provided in
North Carolina General Statute 113-229.
C ] I have objections to the project as presently proposed and
have enclosed my comments.
---------------------------
Signature _ -----------
Date
Ip1 ( `MY-r 0)
. r.
rr ..
(Domestic•
Ir
ti i? g i (: I A
L. U S E
ti
Q I~ F
I C.,
I A
L U
$
p-.. Postage s ��� � S.'y, 1, I Postage
,
o Q o
\ �-
cadmea Fee
{
c
certified Fee
•'. y�
0 Retum Receipt Fee 1 G Return Receipt Fee.Hlra
�11 (Endorsement Required(
„p
(Endorsement Requled)cli
r,
Rsah Cc
ked Reel
(Endorearn
(ErtloreemenlRequlred)
NO TOWPoetege A Fees N Total Postage A Fees
4
c
I , (� (� 1�.1'.C�.(�./ Sheet, API, No.; ] T1 `y n
�l ► F�PPI�L- r�...... 3..... 0I PO 9CI IiP.... �.�%-- _ 1 V --mac - -C -Y-4--0---t-
............................ ..-------.....-- (s--------------------------------------ttt
nirtc+) N DF,yl ch14$fat01%, oIn NL 6)7Co13
.
Public Notice
Town of Kure Beach
PERMIT NOTI
Pursuant to N.C.G.S. 113A-119(b), the Town of Kure Beach a
locality authorized to issue CAMA permits in areas of environmental
concern, hereby gives NOTICE that on June 1�2p�p3, Thomas
Bum applied for a CAMA permit to erect a [wo-f mile dwelling at
1 l06 Fort Fisher Blvd Kure Beach, N.C.
Persons desiring to inspect the application, to comment thereon
or to appeal the local decision are directed to contract the local permit
officer at the below address. It is anticipated that a decision will be
reached on this application in approximately seven days.
William A. Hanna, Jr.
Local CAMA Permit Officer
Kure Beach Town Hall
117 Settlers Lane
Kure Beach, NC 28449
a5
r