Loading...
HomeMy WebLinkAboutHB_04-013_Roberts,. TOWN OF HOLDEN BEACH TOWN OF Hfir�DEN 110 ROTHSCHILD STREET Pe mit N umber BEACH HOLDEN BEACH, NC 28462 Permit Number Local Gnvernmpnt CAMA -- MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment, and Natural Resources and the coastal Resources Commission for development in an area of environment concern Stat"� c "Coastal Areaat3A-118 of the GeneManagem nC Issued to IC_I gc'1.L - '—!S _,__authorizing development —in Estuarine Shoreline Area at fey_+as requested in the permittee's application, dated _t'�4 This permit, issued on a —ALL_, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. PERMIT TO INSTALL POOL, UNCOVERED DECKING, AND HOT TUB AND A 4 FOOT WIDE WALKWAY..... • • 170eMD 1� 0 1�e(1) All proposed development and associated co stru io must one inactor permitted work plat drawings(s) submitted on S MAR 1 5 2004 (2) All construction must conform to the International Building o e re coRfs,o R16#1 other local, State and Federal regulations and the local flood damage 1 V7pad49AW,4^,""T by the National Flood Insurance Program. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (4) The total amount of land disturbing activity shall not exceed one acre. (5) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion contro easureS. This permit action may be appealed by the penniftee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit, may not be transferred to another party without the written approval of the Division of Coastal Management. Permit Official RHONDA PHILLIPS CAMA Local Permit Official rA'r-1' Permittee (signature req red if conditions above apply to permit) AEC HAZARD NCTECE Project Is In An: Ocean Erodible Area_ High Hazard Flood Area _ et Hazard Area `Date Lot Was Platted: This notice is intended to make you, the applicant, aware of the special risks and conditions associated with development in this area, which is subject to natural hazards such as storms, erosion and currents. The rules of the Coastal Resources Commission require that you receive an AEC Hazard Notice and acknowledge -that notice in writing before a permit for development can be issued. The Commission's rules onbuilding standards, oceanfront setbacks and dune alteration are designed to minimize,but not eliminate, property loss from hazards. By granting permits, the Coastal Resources Commission does not guarantee the safety of the development and assumes no liability for future damage to the development. The best available information, as accepted by the Coastal Resources Commission, indicates that the annual ocean ero on rate for the area where your property is located is ! feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies also indicate that the shoreline could move as much as" -Meet landward in a major storm. The floodwaters in amajor storm are predicted to be about feet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. Hard erosion control structures such as bulkheads, seawalls, revetments, groins, jetties and breakwaters are prohibited. Temporary devices, including sand bags, may be allowed under certain conditions. This structure shall be relocated or dismantled within two years of becoming imminently threatened. The applicant must acknowledge this information and requirements by signing this notice in the below space. Without the proper si nature, the application will not be complete. - I � Applicant's Signature Date SPECIAL NOTE: This hazard notice -is -required for -- development in areas subject to sudden and massive storms and erosion. Permits issued for development in this area expire on December 31 of the third year following the year in which the permit was issued. Shortly before work begins on the project site, the Local Permit Officer will determine the vegetation line and setback distance at your site. If the property has seen little change and the proposed development can still meet the setback requirement, the LPO will inform you that you may begin work. It is impor- tant that you check with the LPO before the permit expires for official approval to continue the work after the permit has expired. Generally, if foundation pilings have been placed and substantial progress is continuing, permit renewal may not be necessary. If substantial progress has not been made, the permit must be renewed and a new setback line established. It is unlawful to continue work after permit expiration without this approval. For more information, contact: Jo—aJill�ermit cer w LL Lll N zQ _O Q Uti O U Revised 11193 J J Name Minor Permit # HB dZD04-6)Ag Page Two (6) The terms of the settlement agreement requires that the project is in compliance with 7H.0306(c). In keeping with that regulation no direct or indirect public funds may be used for the proposed project. This includes expenditures for construction and perpetual maintenance of roads, waterlines, sewer lines and associated facilities. Costs incurred to maintain all roads and utilities shall be the responsibility of the developers and /or the Holden Beach West Property Owners Association. (7) Pursuant to 15 NCAC, Subchapter 7J .0406 (b), this permit may not be assigned, transferred, or otherwise disposed of to a third party, except by the Division Director. (8) All development will be subject to the conditions and use standards for inlet hazard areas as described in NCAC T15A:07H.0310. (9) Permittee is not authorized to commence work until the proposed adjacent road is complete and the necessary utilities area approved and installed. (10) The structure must be set back 60 feet from the fast line of stable natural vegetation (FLSNV). The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which will be effective for sixty (60) days barring a major shoreline change. Construction must begin within sixty (60) days of the determination or the measurement is void and must be redone. (11) The structure must be located entirely off of the frontal dune, and if a primary dune is present, landward of the crest of the primary dune. (12) Any structure shall be relocated or dismaa4tW when it becomes immir'ientl!y threatened by changes in shoreline configuration. The struc )�s]a�)-)Qd6located or disnA'4ntled within 2 years of the time when it becomes imminently atened case its collapse or subsidence. MW T ON OF (13) No impermeable surface shall be allowed over a �dGCOEW septic system. Septic system must be installed according to BrtGQ ty ealth Department # . All piling shall be located minimum of five feet from all portions of the septic sytem. This permit action may be appealed by the perniflee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 37, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. eaLocal Permit Official (signature bin Co �� PS LAMA Lail Peermd Official �?r ryI N/ �� Permittee (signature required if conditions above apply to permit) Name v''/',/�, Minor Permit #HB 2004-0t3 Page Three (14) All pilings shall be not less than-8-(eight) inches o a side of square. (15) All pilings shall have tip penetration greater than 16 feet below the lowest ground elevation under the structure. For those structures so located on the primary dune or nearer to the ocean, the pilings must extend to 5 feet below mean sea level. (16) All foundations and structures shall be designed to be stable during applicable fluctuations in ground elevation and wave force during a 100 year storm. (17) In accordance with T15A NCAC 7H. 0308(a), no seawall or riprap revetments will be will be allowed in the future should any structure become threatened from erosion. (18) Permanent structures shall be permitted at a density of no more than one unit per 15,000 square feet of land. (19) Only residential structures of four units or less or non-residential structures of ess tharn 5,000 square feet total floor area shall be allowed. This condition shall not apply to the subdivision access road. ft (20) The structure must be elevated and bottom of lowest Horizontal Structural Member excluding pilings must meet the 100 — year flood level elevation of '-� 3 feet. (21)No fill material is to be placed within the 60 foot ocean setback on Lots 200-213. No land disturbance or dune disturbance is to occur within the 60 foot setback. (22)No retaining wall or bulkheads will be allowed on the oceanfront lots 200-213. (23)Prior to the placement of any soil fill material on the lots, the property owner or their tL appointed representative shall apply for a Stormwater Permit from the Toivv HooldenL. Beach which. Your Stormwater Permit was approved on March 20, 2001. _� CS4g 2 Q (24) Driveways to oceanfront lots are to "ramp -up" to meet the elevation of the g, 43 rQ 2 topography. Natural dunes and topography is to be preserved preserved to�textr,�g possible.p�� This permit action may be appealed by the pennidee or other he issuing date. qualified date persons peal, anthin enty work20) days of conductedlunderr this permit must the date of an appeal, y cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Local Permit Official Pe !ties (signature required It conditions above apply to penned) ,Nafne Minor Permit #HB 2004-a �3 Page Fvur (25) No disturbance of a dune area will he allowed when other techniques of construction can utilized and alternative site locations exits to avoid unnecessary dune impacts. (26) All development and construction shall meet all code requirements located in the Code of Ordinances for the Town of Holden Beach. This permit action may be appealed by the permiftee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this pemrit must cease unfit the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2007 In Issuing this permit it is agreed that this project is consistent with the local land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. MAR 15 2004 DIVISION OF COASTAL MANAGE f� Local Permit Official 4signature) Vl0 la d � 149S CAMA Local Permit Official Permittee (signature requ!Wd conditions above apply to permit) TOWN OF HOLDEN BEACH / TOWN OF HOLDEN 110 ROTHSCHILD STREET HB 2004 -"013 BEACH HOLDEN BEACH, NC 28462 Permit Number Local Government CAMA --- -- MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment, and Natural Resources and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statues, "Coastal Area Management" Issued to VRGI L �Rvber'CS ____authorizing development —in Estuarine Shoreline Area at as requested in the permittee's application, dated This permit, issued on _�= a' �_, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special eWt� �a�t d3t elow. Any violation of these terms may subject permittee to a fine, impris n r 1 a cause the permit to be null and void. MAR 15 2a14 PERMIT TO INSTALL POOL, UNCOVERED DE AMMIAWMFY T TUB AND A 4 FOOT WIDE WALKWAY!!! ►! ►�O (1) All proposed development and as co stru .o must be done in accordance with the permitted work plat drawings(s) submitted on S (2) All construction must conform to the International Building Code requirements and all other local, State and Federal regulations and the local flood damage prevention ordinance as required by the National Flood Insurance Program. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (4) The total amount of land disturbing activity shall not exceed one acre. (5) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion controLkneasures. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing dale. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit, may not be transferred to another party without the 1 written approval of the Division d Coastal Management. Local Permit RHONDA PHILLIPS CAMA Local Permit Official Permittee (signature requIred H conditions above apply to permit) AEC HAZARD NOTICE Project Is In An: Ocean Erodible Area High Hazard Flood Area Hazard Area -Date Lat-Was-Platted: - -- - _ - -SPECIAL 1VOTE: Tlus-hazard—"notice rs requi ei�br This notice issintended to make you, the applicant, aware development in areas subject to sudden and massive of the special risks and conditions associated with storms and erosion. Permits issued for developmentin this P area expire on December 31 of the third year following the development in this area, which is subject to natural ear in wMch the permit was issued. Shortlybefore work hazards such as storms, erosion and currents. The rules of y p the Coastal Resources Commission require that you beginsmion the project site, the Local Permit Officer will receive an AEC Hazard Notice and acknowledge that determine the vegetation line and setback distance at your notice in writing before a permit for development can at site. If the property has seen little change and the proposed development can still meet the setback requirement, the issued. LPO will inform you that you may begin work. It is impor- The Comm ission's rules on building stand ards, oceanfront tant that you check with the LPO before the permit expires setbacks and dune alteration are designed to minimize,but for official approval to continue the work after the permit not eliminate, property loss from hazards. By granting has expired. Generally, if foundation pilings have been permits, the Coastal Resources Commission does not placed and substantial progress is continuing, permit guarantee the safety of the development and assumes no renewal may not be necessary. If substantial progress has liability for future damage to the development. not been made, the permit must be renewed and a new - - — - -- m-- -- -- --- setback -line established. Itisunlawful-to-continue wort — The best available inforation, as accepted by the Coastal after permit expiration without this approval. Resources Commission, indicates that the annual ocean ero on rate for the area where your property is located is feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies also indicate that the shoreline could move as much as. S.�feet landward in a major storm. The flood waters in a major storm are predicted to be about 3 feet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. el Hard erosion control structures such as bulkheads, seawalls, revetments, groins, jetties and breakwaters are prohibited. Temporary devices, including sand bags, may be allowed under certain conditions. This structure shall be relocated or dismantled within two years of becoming imminently threatened. The applicant must acknowledge this information and requirements by signing tl-s notice in the below space. Without the proper si nature, the application will not be complete. Applicant's Signature Date For more information, contact: 14 cal Permit Officer 11 `o 4— Address 1� Y a- (D�g b 0 p2Q C/) J o co O U Revised 11193 ,- ')� jQ Name Minor Permit # HB 6WO4'01-q Page Two (6) The terms of the settlement agreement requires that the project is in compliance with 7H.0306(c). In keeping with that regulation no direct or indirect public funds may be used for the proposed project. This includes expenditures for construction and perpetual maintenance of roads, waterlines, sewer lines and associated facilities. Costs incurred to maintain all roads and utilities shall be the responsibility of the developers and /or the Holden Beach West Property Owners Association. (7) Pursuant to 15 NCAC, Subchapter 7J .0406 (b), this permit may not be assigned, transferred, or otherwise disposed of to a third party, except by the Division Director. (8) All development will be subject to the conditions and use standards for inlet hazard areas as described in NCAC T15A:07H.0310. (9) Permittee is not authorized to commence work until the proposed adjacent road is completed and the necessary utilities area approved and installed. (10) The structure must be set back 60 feet from the first line of stable natural vegetation (FLSNV). The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which will be effective for sixty (60) days barring a major shoreline change. Construction must begin within sixty (60) days of the determination or the measurement is void and must be redone. (11) The structure must be located entirely off of the frontal dune, and if a primary dune is present, landward of the crest of the primary dune. (12) Any structure shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline configuration. The structure(s) shall be relocated or dismantled within 2 years of the time when it becomes imminently threatened, and in any case upo its collapse or subsidence. (13) No impermeable surface shall be allowed any functional part of ptic system. Septic system must be installed according to Bruns i Co IVItIONIpartn t TO VV-. All piling shall be located minimum of five feet fr portions of the se tic s iT6id-i EME`NT �TAL MAC This permit action may be appealed by the permitee or other qualified persons within twenty (20) days of the issuing date. From the dale of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. CAMAA L�ennil Official Permittee (signature required if conditions above apply to permit) Name vv Minor Permit #HB 2004-013 Page Three pilings -shall be-not-less-than-8-(eight) inches to"de of (15) All pilings shall have tip penetration greater than 16 feet below the lowest ground elevation under the structure. For those structures so located on the primary dune or nearer to the ocean, the pilings must extend to 5 feet below mean sea level. (16) All foundations and structures shall be designed to be stable during applicable fluctuations in ground elevation and wave force during a 100 year storm. (17) In accordance with T15A NCAC 7H. 0308(a), no seawall or riprap revetments will be will be allowed in the future should any structure become threatened from erosion. (18) Permanent structures shall be permitted at a density of no more than one unit per 15,000 square feet of land. (19) Only residential structures of four units or less or non-residential structures of less 5,000 square feet total floor area shall be allowed. This condition shall not apply to the subdivision access road. (20) The structure must be elevated and bottom of lowest Horizontal Structural Member excluding pilings must meet the 100 — year flood level elevation of , feet. (21)No fill material is to be placed within the 60 foot ocean setback on Lots 200-213. No land disturbance or dune disturbance is to occur within the 60 foot setback. (22)No retaining wall or bulkheads will be allowed on the oceanfront lots 200-213. (23)Prior to the placement of any soil fill material on the lots, the pr owner or their appointed representative shall apply for a Stormwater Pe o Town of Holden Beach which. Your Stormwater Permit was approved on '1 Al (24) Driveways to oceanfront lots are to "ramp -up" to meet thielration of the eting, natural topography. Natural dunes and topography is to be erv*o 641greatest extent possible. ACC = This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. (signature) Local Permittee (signature required if conditions above apply to permit) Name 7�r��rl Minor Permit #HB 2004-U1-3 Page Four (25) No disturbance of a dune area will be allowed when other techniques of construction can utilized and alternative site locations exits to avoid unnecessary dune impacts. (26) All development and construction shall meet all code requirements located in the Code of Ordinances for the Town of Holden Beach. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further whiten permit approval. All work must cease when this permit expires on December 31, 2007 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management MAR 15 2004 DIVISION OF COASTAL MANAGEMENT Local Permit Official signature) ( on ca l I I tes CAMA Local Pe mit Dlficial � .NL Perittee (signature requi d conditions above apply to permit) CAMA PERMIT NOTICE Pursuant to NCGS 113A-119(b), the municipality of Town of Holden Beach, a locality authorized to issue CAMA permits in the areas of environmental concern, hereby gives NOTICE that on January 15, 2004, applicant Virgil Roberts, applied for a CAMA minor development permit to in- stall a swimming pool, hot tub and decking at 1347 Ocean Blvd. West. The application may be inspected at the below address. Public comments received by January 30, 2004, will be considered. La- ter comments will be accepted and consid- ered up to the time of permit decision. Pro- ject modifications may occur based on fur- ther review and comments. Notice of the permit decision in this matter will be pro. vided upon written request. Local LAMA Permit Officer 110 Rothschild Street Holden Beach, NC 28462 (910)B42-0498 Jan. 22 TOWN OF HOLDEN BEACH 110 ROTHSCHILD STREET HOLDEN BEACf-R. NC 28-4!32 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK afJD'Y-0/-3 AFFIDAVIT OF PUBLICATION Before the undersigned, a Notary Public of said County and State, duly commissioned, qualified, and authorized by law to administer oaths, personally appeared Scott R. Harrell who, being first duly sworn, deposes and says: that he is Publisher (Owner, partner, publisher, or other officer or employee authorized to make this affidavit) of The Brunswick Beacon, a newspaper published, issued, and en- tered as periodical mail in the Town of Shallotte in the said County and State; that he is authorized to make this affidavit and swom state- ment; that the notice or other legal advertisement, a true copy of which is attached hereto, was published in The Brunswick Beacon on the following date(s): January 22, 2004 and that the said newspaper in which such notice, paper document or legal advertisement was published, was at the time of each and every such publication, a newspaper meeting all the requirements and qual- ifications of Section 1-597 of the General Statutes of North Carolina and was a qualified newspaper within the meaning of Section 1-597 of the General Statutes of North Carolina. This the 22nd day of January, 2004. ................. .............................. (Signature of person making affidavit) Sworn to and subscribed before me this 22nd day of January, 2004. •�a,• %,0TAR (Notary Public) 's9G�.? p(�BI�G r ? My commission expires: December 29, 20u3sby'••K..C•• ;',,,