HomeMy WebLinkAboutHB_04-013_Roberts,. TOWN OF HOLDEN BEACH
TOWN OF Hfir�DEN 110 ROTHSCHILD STREET Pe mit N umber
BEACH
HOLDEN BEACH, NC 28462 Permit Number
Local Gnvernmpnt CAMA
-- MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the coastal Resources Commission for development
in an area of environment concern Stat"� c "Coastal Areaat3A-118 of the
GeneManagem nC
Issued to IC_I gc'1.L - '—!S _,__authorizing development —in Estuarine Shoreline Area at
fey_+as requested in the permittee's application, dated _t'�4 This
permit, issued on a —ALL_, is subject to compliance with the application and site drawing (where
consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any
violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the
permit to be null and void.
PERMIT TO INSTALL POOL, UNCOVERED DECKING, AND HOT
TUB AND A 4 FOOT WIDE WALKWAY..... • • 170eMD
1� 0 1�e(1) All proposed development and associated co stru io must one inactor
permitted work plat drawings(s) submitted on S MAR 1 5 2004
(2) All construction must conform to the International Building o e re coRfs,o R16#1 other
local, State and Federal regulations and the local flood damage 1 V7pad49AW,4^,""T
by the National Flood Insurance Program.
(3) Any change or changes in the plans for development, construction, or land use activities will
require a re-evaluation and modification of this permit.
(4) The total amount of land disturbing activity shall not exceed one acre.
(5) All unconsolidated material resulting from associated grading and landscaping shall be
retained on site by effective sedimentation and erosion contro easureS.
This permit action may be appealed by the penniftee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit, may not be transferred to another party without the
written approval of the Division of Coastal Management.
Permit Official
RHONDA PHILLIPS
CAMA Local Permit Official
rA'r-1'
Permittee (signature req red if conditions above apply to permit)
AEC HAZARD NCTECE
Project Is In An: Ocean Erodible Area_ High Hazard Flood Area _ et Hazard Area
`Date Lot Was Platted:
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge -that
notice in writing before a permit for development can be
issued.
The Commission's rules onbuilding standards, oceanfront
setbacks and dune alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
ero on rate for the area where your property is located is
! feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as" -Meet landward in a major storm.
The floodwaters in amajor storm are predicted to be about
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper si nature, the application will not be
complete. -
I �
Applicant's Signature
Date
SPECIAL NOTE: This hazard notice -is -required for --
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
Jo—aJill�ermit cer
w
LL Lll
N
zQ
_O Q
Uti
O
U
Revised 11193
J
J Name
Minor Permit # HB dZD04-6)Ag
Page Two
(6) The terms of the settlement agreement requires that the project is in compliance with
7H.0306(c). In keeping with that regulation no direct or indirect public funds may be used
for the proposed project. This includes expenditures for construction and perpetual
maintenance of roads, waterlines, sewer lines and associated facilities. Costs incurred to
maintain all roads and utilities shall be the responsibility of the developers and /or the Holden
Beach West Property Owners Association.
(7) Pursuant to 15 NCAC, Subchapter 7J .0406 (b), this permit may not be assigned, transferred,
or otherwise disposed of to a third party, except by the Division Director.
(8) All development will be subject to the conditions and use standards for inlet hazard areas as
described in NCAC T15A:07H.0310.
(9) Permittee is not authorized to commence work until the proposed adjacent road is complete
and the necessary utilities area approved and installed.
(10) The structure must be set back 60 feet from the fast line of stable natural vegetation
(FLSNV). The permittee is required to contact the Local Permit Officer shortly before he plans
to begin construction to arrange a setback measurement which will be effective for sixty (60)
days barring a major shoreline change. Construction must begin within sixty (60) days of the
determination or the measurement is void and must be redone.
(11) The structure must be located entirely off of the frontal dune, and if a primary dune is
present, landward of the crest of the primary dune.
(12) Any structure shall be relocated or dismaa4tW when it becomes immir'ientl!y threatened by
changes in shoreline configuration. The struc )�s]a�)-)Qd6located or disnA'4ntled within 2
years of the time when it becomes imminently atened case its collapse or
subsidence. MW T
ON OF
(13) No impermeable surface shall be allowed over a �dGCOEW septic system.
Septic system must be installed according to BrtGQ ty ealth Department # .
All piling shall be located minimum of five feet from all portions of the septic sytem.
This permit action may be appealed by the perniflee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 37,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
eaLocal Permit Official (signature
bin Co �� PS
LAMA Lail Peermd Official
�?r ryI N/ ��
Permittee (signature required if conditions above apply to permit)
Name v''/',/�,
Minor Permit #HB 2004-0t3
Page Three
(14) All pilings shall be not less than-8-(eight) inches o a side of square.
(15) All pilings shall have tip penetration greater than 16 feet below the lowest ground elevation
under the structure. For those structures so located on the primary dune or nearer to the ocean,
the pilings must extend to 5 feet below mean sea level.
(16) All foundations and structures shall be designed to be stable during applicable fluctuations
in ground elevation and wave force during a 100 year storm.
(17) In accordance with T15A NCAC 7H. 0308(a), no seawall or riprap revetments will be
will be allowed in the future should any structure become threatened from erosion.
(18) Permanent structures shall be permitted at a density of no more than one unit per 15,000
square feet of land.
(19) Only residential structures of four units or less or non-residential structures of ess tharn
5,000 square feet total floor area shall be allowed. This condition shall not apply to the
subdivision access road.
ft
(20) The structure must be elevated and bottom of lowest Horizontal Structural Member
excluding pilings must meet the 100 — year flood level elevation of '-� 3 feet.
(21)No fill material is to be placed within the 60 foot ocean setback on Lots 200-213. No
land disturbance or dune disturbance is to occur within the 60 foot setback.
(22)No retaining wall or bulkheads will be allowed on the oceanfront lots 200-213.
(23)Prior to the placement of any soil fill material on the lots, the property owner or their tL
appointed representative shall apply for a Stormwater Permit from the Toivv HooldenL.
Beach which. Your Stormwater Permit was approved on March 20, 2001. _� CS4g 2 Q
(24) Driveways to oceanfront lots are to "ramp -up" to meet the elevation of the g, 43 rQ
2
topography. Natural dunes and topography is to be preserved preserved to�textr,�g
possible.p��
This permit action may be appealed by the pennidee or other
he issuing date.
qualified date persons peal, anthin enty work20) days of conductedlunderr this permit must
the date of an appeal, y
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
Local Permit Official
Pe !ties (signature required It conditions above apply to penned)
,Nafne
Minor Permit #HB 2004-a �3
Page Fvur
(25) No disturbance of a dune area will he allowed when other techniques of construction can
utilized and alternative site locations exits to avoid unnecessary dune impacts.
(26) All development and construction shall meet all code requirements located in the
Code of Ordinances for the Town of Holden Beach.
This permit action may be appealed by the permiftee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this pemrit must
cease unfit the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In Issuing this permit it is agreed that this project is consistent with
the local land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
MAR 15 2004
DIVISION OF
COASTAL MANAGE
f� Local Permit Official 4signature)
Vl0 la d � 149S
CAMA Local Permit Official
Permittee (signature requ!Wd conditions above apply to permit)
TOWN OF HOLDEN BEACH
/ TOWN OF HOLDEN 110 ROTHSCHILD STREET HB 2004 -"013
BEACH HOLDEN BEACH, NC 28462 Permit Number
Local Government CAMA
--- -- MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management"
Issued to VRGI L �Rvber'CS ____authorizing development —in Estuarine Shoreline Area at
as requested in the permittee's application, dated This
permit, issued on _�= a' �_, is subject to compliance with the application and site drawing (where
consistent with the permit), all applicable regulations and special eWt� �a�t d3t elow. Any
violation of these terms may subject permittee to a fine, impris n r 1 a cause the
permit to be null and void.
MAR 15 2a14
PERMIT TO INSTALL POOL, UNCOVERED DE AMMIAWMFY T
TUB AND A 4 FOOT WIDE WALKWAY!!! ►! ►�O
(1) All proposed development and as co stru .o must be done in accordance with the
permitted work plat drawings(s) submitted on S
(2) All construction must conform to the International Building Code requirements and all other
local, State and Federal regulations and the local flood damage prevention ordinance as required
by the National Flood Insurance Program.
(3) Any change or changes in the plans for development, construction, or land use activities will
require a re-evaluation and modification of this permit.
(4) The total amount of land disturbing activity shall not exceed one acre.
(5) All unconsolidated material resulting from associated grading and landscaping shall be
retained on site by effective sedimentation and erosion controLkneasures.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing dale. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit, may not be transferred to another party without the 1
written approval of the Division d Coastal Management.
Local Permit
RHONDA PHILLIPS
CAMA Local Permit Official
Permittee (signature requIred H conditions above apply to permit)
AEC HAZARD NOTICE
Project Is In An: Ocean Erodible Area High Hazard Flood Area Hazard Area
-Date Lat-Was-Platted: - -- -
_ - -SPECIAL 1VOTE: Tlus-hazard—"notice rs requi ei�br
This notice issintended to make you, the applicant, aware development in areas subject to sudden and massive
of the special risks and conditions associated with storms and erosion. Permits issued for developmentin this
P area expire on December 31 of the third year following the
development in this area, which is subject to natural ear in wMch the permit was issued. Shortlybefore work
hazards such as storms, erosion and currents. The rules of y p
the Coastal Resources Commission require that you beginsmion the project site, the Local Permit Officer will
receive an AEC Hazard Notice and acknowledge that determine the vegetation line and setback distance at your
notice in writing before a permit for development can at site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
issued. LPO will inform you that you may begin work. It is impor-
The Comm ission's rules on building stand ards, oceanfront tant that you check with the LPO before the permit expires
setbacks and dune alteration are designed to minimize,but for official approval to continue the work after the permit
not eliminate, property loss from hazards. By granting has expired. Generally, if foundation pilings have been
permits, the Coastal Resources Commission does not placed and substantial progress is continuing, permit
guarantee the safety of the development and assumes no renewal may not be necessary. If substantial progress has
liability for future damage to the development. not been made, the permit must be renewed and a new
- - — - -- m-- -- -- --- setback -line established. Itisunlawful-to-continue wort —
The best available inforation, as accepted by the Coastal after permit expiration without this approval.
Resources Commission, indicates that the annual ocean
ero on rate for the area where your property is located is
feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as. S.�feet landward in a major storm.
The flood waters in a major storm are predicted to be about
3 feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures. el
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing tl-s notice in the below space.
Without the proper si nature, the application will not be
complete.
Applicant's Signature
Date
For more information, contact:
14
cal Permit Officer
11 `o 4—
Address
1� Y a- (D�g
b 0
p2Q
C/) J
o
co
O
U
Revised 11193
,- ')� jQ
Name
Minor Permit # HB 6WO4'01-q
Page Two
(6) The terms of the settlement agreement requires that the project is in compliance with
7H.0306(c). In keeping with that regulation no direct or indirect public funds may be used
for the proposed project. This includes expenditures for construction and perpetual
maintenance of roads, waterlines, sewer lines and associated facilities. Costs incurred to
maintain all roads and utilities shall be the responsibility of the developers and /or the Holden
Beach West Property Owners Association.
(7) Pursuant to 15 NCAC, Subchapter 7J .0406 (b), this permit may not be assigned, transferred,
or otherwise disposed of to a third party, except by the Division Director.
(8) All development will be subject to the conditions and use standards for inlet hazard areas as
described in NCAC T15A:07H.0310.
(9) Permittee is not authorized to commence work until the proposed adjacent road is completed
and the necessary utilities area approved and installed.
(10) The structure must be set back 60 feet from the first line of stable natural vegetation
(FLSNV). The permittee is required to contact the Local Permit Officer shortly before he plans
to begin construction to arrange a setback measurement which will be effective for sixty (60)
days barring a major shoreline change. Construction must begin within sixty (60) days of the
determination or the measurement is void and must be redone.
(11) The structure must be located entirely off of the frontal dune, and if a primary dune is
present, landward of the crest of the primary dune.
(12) Any structure shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled within 2
years of the time when it becomes imminently threatened, and in any case upo its collapse or
subsidence.
(13) No impermeable surface shall be allowed any functional part of ptic system.
Septic system must be installed according to Bruns i Co IVItIONIpartn t TO VV-.
All piling shall be located minimum of five feet fr portions of the se tic s
iT6id-i EME`NT
�TAL MAC
This permit action may be appealed by the permitee or other
qualified persons within twenty (20) days of the issuing date. From
the dale of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
CAMAA L�ennil Official
Permittee (signature required if conditions above apply to permit)
Name vv
Minor Permit #HB 2004-013
Page Three
pilings -shall be-not-less-than-8-(eight) inches to"de of
(15) All pilings shall have tip penetration greater than 16 feet below the lowest ground elevation
under the structure. For those structures so located on the primary dune or nearer to the ocean,
the pilings must extend to 5 feet below mean sea level.
(16) All foundations and structures shall be designed to be stable during applicable fluctuations
in ground elevation and wave force during a 100 year storm.
(17) In accordance with T15A NCAC 7H. 0308(a), no seawall or riprap revetments will be
will be allowed in the future should any structure become threatened from erosion.
(18) Permanent structures shall be permitted at a density of no more than one unit per 15,000
square feet of land.
(19) Only residential structures of four units or less or non-residential structures of less
5,000 square feet total floor area shall be allowed. This condition shall not apply to the
subdivision access road.
(20) The structure must be elevated and bottom of lowest Horizontal Structural Member
excluding pilings must meet the 100 — year flood level elevation of , feet.
(21)No fill material is to be placed within the 60 foot ocean setback on Lots 200-213. No
land disturbance or dune disturbance is to occur within the 60 foot setback.
(22)No retaining wall or bulkheads will be allowed on the oceanfront lots 200-213.
(23)Prior to the placement of any soil fill material on the lots, the pr owner or their
appointed representative shall apply for a Stormwater Pe o Town of Holden
Beach which. Your Stormwater Permit was approved on '1 Al
(24) Driveways to oceanfront lots are to "ramp -up" to meet thielration of the eting, natural
topography. Natural dunes and topography is to be erv*o 641greatest extent
possible. ACC =
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
(signature)
Local
Permittee (signature required if conditions above apply to permit)
Name 7�r��rl
Minor Permit #HB 2004-U1-3
Page Four
(25) No disturbance of a dune area will be allowed when other techniques of construction can
utilized and alternative site locations exits to avoid unnecessary dune impacts.
(26) All development and construction shall meet all code requirements located in the
Code of Ordinances for the Town of Holden Beach.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further whiten permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management
MAR 15 2004
DIVISION OF
COASTAL MANAGEMENT
Local Permit Official signature)
( on ca l I I tes
CAMA Local Pe mit Dlficial
� .NL
Perittee (signature requi d conditions above apply to permit)
CAMA PERMIT NOTICE
Pursuant to NCGS 113A-119(b), the
municipality of Town of Holden Beach, a
locality authorized to issue CAMA permits
in the areas of environmental concern,
hereby gives NOTICE that on January 15,
2004, applicant Virgil Roberts, applied for a
CAMA minor development permit to in-
stall a swimming pool, hot tub and decking
at 1347 Ocean Blvd. West.
The application may be inspected at the
below address. Public comments received
by January 30, 2004, will be considered. La-
ter comments will be accepted and consid-
ered up to the time of permit decision. Pro-
ject modifications may occur based on fur-
ther review and comments. Notice of the
permit decision in this matter will be pro.
vided upon written request.
Local LAMA Permit Officer
110 Rothschild Street
Holden Beach, NC 28462
(910)B42-0498
Jan. 22
TOWN OF HOLDEN BEACH
110 ROTHSCHILD STREET
HOLDEN BEACf-R. NC 28-4!32
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK
afJD'Y-0/-3
AFFIDAVIT OF PUBLICATION
Before the undersigned, a Notary Public of said County and State,
duly commissioned, qualified, and authorized by law to administer
oaths, personally appeared
Scott R. Harrell
who, being first duly sworn, deposes and says: that he is
Publisher
(Owner, partner, publisher, or other officer or employee
authorized to make this affidavit)
of The Brunswick Beacon, a newspaper published, issued, and en-
tered as periodical mail in the Town of Shallotte in the said County
and State; that he is authorized to make this affidavit and swom state-
ment; that the notice or other legal advertisement, a true copy of
which is attached hereto, was published in The Brunswick Beacon on
the following date(s):
January 22, 2004
and that the said newspaper in which such notice, paper document or
legal advertisement was published, was at the time of each and every
such publication, a newspaper meeting all the requirements and qual-
ifications of Section 1-597 of the General Statutes of North Carolina
and was a qualified newspaper within the meaning of Section 1-597
of the General Statutes of North Carolina.
This the 22nd day of January, 2004.
................. ..............................
(Signature of person making affidavit)
Sworn to and subscribed before me this 22nd day of
January, 2004.
•�a,•
%,0TAR
(Notary Public) 's9G�.? p(�BI�G r ?