Loading...
HomeMy WebLinkAbout56-15 Minor Mod 2019 Camp Don LeePermit Class MODIFICATION/MINOR Permit Number 56-15 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vertnt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Camp Don Lee 315 Camp Don Lee Rd Arapahoe NC 28510 Authorizing development in Pamlico County adi. to the Neuse River, at 315 Camp Don Lee Road, in Arapahoe , as requested in the permittee's letter dated 4/6/19, including the attached workplan drawings (2) Pages 1-2 of 2 both dated 3/21/19. This permit, issued on May 16, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization — Bulkhead Addition 1) The bulkhead alignment shall be located landward of the existing rip rap, as depicted on the attached workplan drawings. 2) The bulkhead shall be constructed prior to any backfilling activities. 3) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Br con C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Camp Don Lee Permit No. 56-15 Page 2 of 2 ADDITIONAL CONDITIONS 4) The fill material shall be clean and free of any pollutants except in trace quantities. 5) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 6) No backfill material is to be placed within 30 feet of the normal water line, except that which will be used to backfill the area behind the permitted bulkhead. General 7) No additional open water shall be excavated or filled, even temporarily, outside of the approved rip rap alignment for the purposes of the rip rap consolidation. 8) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 9) This Minor Modification shall be attached to the original Permit No. 56-15, which was issued on 5/4/15, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 10) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2015-00679. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 2015-280 V2. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Coastal Management ENVIRONMENTAL QUALITY Camp Don Lee 315 Camp Don Lee Rd. Arapahoe, NC 28510 Dear Sir or Madam: May 17, 2019 ROY COOPER Gover Ior MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Director FILE The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150E with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure (JO`164 ely, d yl-- Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 B. PRESCOTT MARINE CONSTRUCTION, LLC NC MARINE CONTRACTOR #67655 April 6, 2019 Mr. Brad Connell Division of Environmental Quality 400 Commerce Dr. Morehead City, NC 28557 Dear Mr. Connell, I would like to request a modification for Major CAMA Permit # 56-15 on behalf of Camp Don Lee. The original permit included two Phases. We are proposing an additional 360' of Vinyl Bulkhead to stabilize the shoreline that had previously not been included. The vinyl bulkhead will be constructed of Vinyl Sheets 12' in length. The wall will be a Navy System including a double water system with a piling driven on the water ward side of the wall. The Bulkhead will also include a Deadman Anchor System. Please feel free to contact me if any additional information is required. Enclosed is a $100 Processing Fee. Project Coordinator B. Prescott Marine Construction, LLC RECEIVED APR 0 S 2019 PO BO% 874 • ORIENTAL. NC 28571 • PHONE: 252�249-0149 -FAX: 252.249-038DCM-MHD CITY Camp Don Lee Bulkhead Phase III March 21, 2019 Page 1 of 2 Scale: 1" = 84' Drawing by Brandi P. Robertson pWa��e2 ' Existing Nature Center L?bD ' J c Proposed 360' Vinyl Bulkhead za=ftertle,ulkheadisconstruam' g Rock will be Re•siacked W Neuse River Existing Dock � � U � o S / W ^ ir Q A 1 Shoreline De 0' Tie Back Rod 12' Vinyl Sheet Piling 2'H x 6'W Rip Rap Nary System Piling Camp Don lee Bulkhead Cross Sectional View Oak : 3/011 liI Drawing by Brandi P. Robertson JrA (G : `1t = Z� W N U > W W °Q o 2 ' U Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM DATE: April 9, 2019 TO: Gregg Bodnar Qp� THRU: Roy Brownlow FROM: Brad Connell 9c SUBJECT: Camp Don Lee and State Permit # 56-15 ROY COOPER Govemor MICHAEL S. REGAN Sacrelary BRAXTON C. DAVIS Danclor Please find correspondence enclosed dated April 6, 2019 from Bobby Prescott Marine Construction, LLC requesting a permit modification. State Permit #56-15 was issued for the construction of shoreline stabilization adjacent to the Neuse River, Pamlico County. The permit expires on December 31, 2021. The request by the permittee is to modify the existing permit to include 360 more feet of vinyl bulkhead. Camp Don Lee sustained a significant increase in shoreline erosion in the wake of Hurricane Florence and wishes to reinforce the shoreline with bulkhead on the landward side of the existing rip rap revetment located in front of the existing Nature Center at the camp. By copy of this memo, the DCM is requesting that the DEMLR and DWR provide any comment that your agency may have on the proposed project to Gregg Bodnar, of DCM's Morehead City office, within 14 days of the receipt of this memo. A check in the amount of $100 (#7350) has been received in order to process the request. Enclosure Cc: Chris Pullinger, DWR Carl Dunn, DEMLR Skip Lee, Pamlico County LPO --�!3Nothing Compares' State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2908 T ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front If space permits. 1. Article Addressed to: hC 096 A. X Rei fad by (PRnted Name) - I CC.. Is delivery address different from item If YES, enter delivery address below: IIIIIIIII IIII IIIIIIIIIIIIIII IIIII II II I III II ICIrvice e Suit Signature AdO Signature Restricted Delivery 9590 9403 0514 5173 3461 41 ❑ Certirred Mall® ❑ Certified Mail Restricted Delivery ❑ Collect on Delivery 2. Article Number (Transfer from service label) ❑ collect on Delivery Reelected Delivery 7013 3020 0000 5359 9382 �;d1Mail MailReselctedoellvery _ol 1 ❑ Agent ❑ Addre lyte of i 3, / ❑ es r° ❑ Priority Mail Express® ❑ Registered Mailn- ❑ R".tared Mail Resekhdl Delvery ❑ ReWrn Recelpt for Merchandise ❑ Signature ConfinnatlonT^ ❑ signature Confirmation Restrcted Delivery PS Form 3811, April 2015 PSN 753D-02-000-9053 C—lk Domestic Return Receipt UNITED STATES POSTAL SERVICE First -Class Mail Postage a Fees Paid � USPS Permit No. G-10 Sender: Please print your name, address, and ZIP+4® in this box* 6 PRESCOTT MARINE CONSTRUCTION, LLC 0 PO BOX 874 ORIENTAL, NC 28571 � a USPS TRACKING# 9590 9403 0514 5173 3461 41 ■ Complete items 1, 2, and 3. , , 0 , I, ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if solace Dennits. i. evnciaraarasseew ��1iZ�F' tm,�ci �'�i\I II I IIIIIIII I II I II I I III II I� III 9590 9403 0514 5173 346158 WA 7013 3020 0000 5359 A. S4nature T11_ < ( ❑ Agent X 1 =4✓1 �l�,t �.�-- ❑ Addressee W Recsivedby f ftled Wre) I C. Data of Delivery Is delivery address different from Rem 17 ❑ Yes If YES, enter delivery address below: ❑ No 3. iervlae lype ❑ Priority Mall Express® tlun Signature ❑ Registered Mail" Signature Restricted Delivery ❑ Certified M810 ❑ Reglsteretl Mail Restricted Delivery ❑ Certified Mall Restricted Delivery ❑ Return Receipt for ❑ Collect on Delivery Merchandise ❑ Collect on Delivery Restricted Delivery ❑ Signature Confonatlon^ 9399 ail ❑ Re tricteed re Confirmation eli Delivery Restricted Delivery Domestic Return Receipt UNITED STATESF4WICE First -Class Mail ' I I I I Postage 8, Fees Paid 'i'K, emllvA USPS 30 MAR '3 Permit No. G-10 •, Sender: Please print your name, address, and ZIP+4® in this box* B PRE=TT MARINE CONSTRUCTION, LLC PO BOX 874 ORIENTAL, NC M71 O1V' as 111�� �O USPS TRACKING# IIIIIIIIIIIIIIIIII1II,IJI�IIIIJ,III III I�I�I,fi��t�l,,,,,,,,,,,,,,,,,,, , °; 9590 9403 ❑51 4 517 �461 58 im Bodnar, Gre From: Brandi Robertson <brandiprobertson@gmail.com> O X4(WA=A,0✓I Sent: Thursday, April 11, 2019 9:35 AM (J tee To: Bodnar, Gregg ZQ mp �ti Subject: [External] Camp Don Lee Modification ( V\ rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Please see the following statement. Brandi Prescott Robertson B Prescott Marine Construction, LLC 252-249-0149 brandiprobertson@email.com Begin forwarded message: From: Kate Metts <kateCa)donleecenter.orq> Subject: Re: Major CAMA Permit Date: April 10, 2019 at 2:33:15 PM EDT To: Brandi Robertson <brandiorobertson(a.)gmail.com> Brandi Prescott Robertson has permission to act as the authorized agent for permitting purposes for Camp Don Lee. Kate Metts Director Sent from my Whore On Apr 10, 2019, at 2:05 PM, Brandi Robertson <brandiprobertson@email.com> wrote: Dear Kate, The modification to the Major CAMA permit has been submitted and is in the review process. During the review they noticed that the Authorized Agent form that they have on file for me has expired. This form allows me to act on behalf of the property owner to obtain necessary permits. Please respond to this email confirming that I have permission to act as Camp Don Lee's Authorized Agent. I will then be able to forward this email to the CAMA office and the review will proceed. .r a Please let me know if you have any questions. Thank you, Brandi Prescott Robertson B Prescott Marine Construction, LLC 252-249-0149 brandiprobertson@gmaii.com Received F Permit No.: Applicant's Project Address: NC Division of Coastal Management Cashier's Official Receipt 8045 A B (C)D Date:' 20 _J. Check No.: —7 County: I Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: Signature of Field Representative:= IA n A - v x � m n N O_ t0 Date: '�j//'jl//�('/y�, Date: �! � // 1 / DCM Coordinator: Gregg Bodnar Distributed Yes® No ❑ Applicant: Camp Don Lee Distribution Date: 4/25/2019 AGENCY WIRO WARD LPO Rachel L e drick MHC Rachel Love Adrick Washingon DCM Planner Mike Christenbury Wilmington Charlan Owens Enz City US COE: Liz Hair Raleigh Bland (Beaufort, Camden, (Carteret Onslow, Pender) Chowan, Craven, Hertford, Hyde, Tyler Crumbley (Temporarily away Perquimans, Tyrrell) everything goes to Liz) Josh Peletier — (Bertie, Currituck, Dare, US COE (NC DOT) (Brunswick, New Hanover) Gates, Pamlico, Posquotank, Washington) DOT Brad Shaver DOT - Tom Steffans — (Beaufort, Carteret, (Brunswick, New Hanover, Onslow, Craven, Pamlico Pender) Mark Zeigler (Onslow, Pender, New Community Assistance Hanover, Brunswick) Lee Padrick (Beaufort, Carteret Craven, Lee Padrick (Beaufort, Carteret Eliz City, Pamlico, Washington) Craven Eliz City, Pamlico, Washington Cultural Resources Renee Gledhill -Earley Renee Gledhill -Earley Chris Southerly or Nathan Henry Underwater Archaeology Chris Southerly or Nathan Henry Div. of Water Infrastructure Heidi Cox Clif Whitfield Curt Weychert WIRO Marine Fisheries Shane Staples MHC Shane Staples WARD/ECRO NC DOT David Harris David Harris Shellfish Sanitation Shannon Jenkins & Sharon Shannon Jenkins & Sharon Gupton Gupton State Property Tim Walton & Mike Moser Tim Walton & Mike Moser DEMLR/DWR: Sheri A. Montalvo Sheri A. Montalvo C (NC DOT) Kristy Lynn Carpenter Kristy Lynn Carpenter DEMLR 1 Sediment & Erosion Dan Sams Sami Dumpor Storm water Christine Hall Roger Thorpe DWR 401 Robb Mairs (Carteret, New Hanover Anthony Scarbraugh Onslow, Pender,) Chad Coburn (Brunswick) (NC DOT) Joanne Steenhuis Brunswick, New Garcy Ward Hanover, Onslow, Pender WRC Maria Dunn ( WARD) Maria Dunn (WARD) WRC (NC DOT) Travis Wilson Travis Wilson Natural Heritage Program Rodney Bulter Rodney Butter X H:\Major Permit\Maj Comment Disrution Sheets\Maj Comment Distribution Sheet 2019.docx Revised: 6/29/2018 Bodnar, Gregg From: Bodnar, Gregg Sent: Wednesday, April 24, 2019 4:10 PM To: Day, Susan Subject: Cam Don Lee Minor Mod Hey Susan, DWR in WaRO can't find the minor mod circulation. Can you send to Chris Pullinger and Sheri again? Thanks, Gregg j 1 • Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext Z35 (Office) Greee.Bodnar@ ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties. v ; ROY COOPER cavernor .s, .a MICHAEL S. REGAN Secnrary Coastal Management BRAXTON C. DAVIS ENVIRONMENTAL QUALITY flue MEMORANDUM RECEIVED DATE: April 9, 2019 TO: Gregg Bodnar MAY 1 4 2019 THRU: Roy Brownlow MP SECTION MHD FROM: Brad Connell 9G SUBJECT: Camp Don Lee and State Permit # 56-15 Please find correspondence enclosed dated April 6, 2019 from Bobby Prescott Marine Construction, LLC requesting a permit modification. State Permit 456-15 was issued for the construction of shoreline stabilization adjacent to the Neuse River, Pamlico County, The permit expires on December 31, 2021. The request by the permittee is to modify the existing permit to include 360 more feet of vinyl bulkhead. Camp Don Lee sustained a significant increase in shoreline erosion in the wake of Hurricane Florence and wishes to reinforce the shoreline with bulkhead on the landward side of the existing rip rap revetment located in front of the existing Nature Center at the camp. By copy of this memo, the DCM is requesting that the DEMLR and D WR provide any comment that your agency may have on the proposed proj ect to Gregg Bodnar, of DCM's Morehead City office, within 14 days of the receipt of this memo. A check in the amount of $100 (#7350) has been received in order to process the request. REPLY: This agency Me no objection to Me Project as pmponsi Enclosure "Mtlltional comments may W attaol \ This agency has no comment on the proposed project _ This agency approves of the project only it Ua recommentletl changes are Incorporates See t aachea. This agency objects to the project for reasons tlemnbed in Me allache0 — Cc: Chris Pullinger, DR bimmenla. Carl D11''Tns n, DEMLR PRINT NAME WYY Chris Wllinger AGENCY DiAsion ofWaler Resmvoea- Washington Skip Lee, Pamlico County LPO a oil,, SIGNATURE DATE May 15, M19 Zo 1S — L 80 V 2 —'Nothing Compares7�, State of NoRh Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 2528082808 T DCM Coordinator: 0bj ArD Permit #: MAILING DISTRIBUTION SHEET��� N C DCM Field Offices Elizabeth City Morehead City Washington Wilmington US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: � z 0f(c� 8 7� (with revised work plan drawings) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Berrie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Shane Staples David Hams Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Clif Whitfield (WARD) Curt Weychert Washington: Anthony Scarbraugh-401 of;.t Roger Thorpe-Stormwater' Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARD) Natural Heritage Program Rodney Butler LPO: 5�k' p t4G Fax Distribution: Permittee (NCDOT) Travis Wilson May 8, 2015 Regulatory Division Action ID No. SAW-2015-00679 and State Permit No. 56-15 Phillip Nanney Camp Don Lee 315 Camp Don Lee Road Arapahoe, NC 28510 Dear Mr. Nanney: Reference your application for a Department of the Army permit to construct two vinyl bulkheads and an adjacent rip -rap revetment adjacent to the Neuse River, in Pamlico County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence . construction activity in strict accordance with applicable State authorization and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office, Regulatory Division, telephone (910) 251-4605. Sincerely, RECEIVED Josh Pelletier Regulatory Project Manager MAY 2 2 2019 MP SECTION Mil®