Loading...
HomeMy WebLinkAbout23-15 Buffkin, WillardPermit Class NEW Permit Number 23-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to _Willard Buffkin, 229 Gazebo Court, Wilmington NC 28409 Authorizing development in New Hanover County at Inlet Point Canal, 229 Gazebo Court, Inlet Point SID Wilmington , as requested in the permittee's application dated 11/21/14. including the attached workplan drawings (3), 2 dated 11/14/14 and 1 dated 11/21/14 This permit, issued on February IS, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Bulkhead 1) The bulkhead shall be constructed in the same alignment as depicted on the attached workplan drawings. 2) No backfill material shall be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. 3) The temporary placement or double handling of fill materials within waters,or vegetated wetlands is not authorized. 4) The bulkhead shall be constructed prior to any backfilling activities. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on IDecember 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee A Willard Buffkin Permit #23-I5' Page 2 of 3 ADDITIONAL CONDITIONS 5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 6) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 7) All backfrll material shall be clean and free of any pollutants except in trace quantities. Sedimentation and Erosion Control 8) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 9) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. At a minimum,'a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 10) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 11) No vegetated wetlands shall be excavated or filled,'even temporarily, outside of the area depicted on the attached workplan drawings. 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 13) The permttee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. Willard'Buffkin Permit #23-15 Page 3 of 3 AIDIDITIONAL CONIDITIONS NOTE: The N.C. Division of Water Resources has authorized the proposed project under DWR Project No. 01-0038v2. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2014-02355, which was issued on 1/8/15. NOTE: An application processing fee of $250 was received by DCM for this project. ON Mr-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT �, primary Rppllcarit/ l andowner 106rmation Project Name (it applicable) Business Name Applicant 1: First Name MI Last Name / r'"J 1 l ,r u C e Applicant 2: First Name MI Last Name _ 9additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Boxcity State p� L C r _0, �. a o.Q ZIP Country Phone No. AX No. 9LI-/0 S I US9)0 �94- 700?exl Sheet Address (d d#f~ from above) City State F�nail Business Name 6G J Agent/ Contractor 1: First Name MI Last Name !`c O�L Agent/ Contractor 2: First N e - MI Last Name Mailing Address / 1( PO Box City (�' State I /U L 3 / / i L L�5 U i�(�e L) -. 1 0, ,J ZIP - Phone No. 1 Plane No. 2 g v 3 q'10 -air KN etd. ext. FAX No. Contractor # Street Address rd dKierent from above) City State ZIP FJneil .RECEIVED UtLIJPM <Form continues on back> " �ECI= ixzr. OCM W MINGTON, NC 252-808-2808 :: 9-888.4RCOAST :: www.nccoastalmanagement.net 2014. Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit a. -- County (can be multiple) Street Address Stale Rd. # rOe Lla'DJ le j% /� P l�aZ f%O t�OL✓y� Subdivision Name p[ city r r N State C Zip I P r p I J � Phone No. Lot No.(s) ( many, attach additional page with list) " 7e�'Ob ext. I I I , a. In which NC river basin is the project located? b. Name of bodv of water nearest to orrnv+serl project d. Name the closest major water body to the proposed project site. c. Is the water body Identified in (b) above, natural or manmade? Oatural PWanmade ❑Unknown Mt 4 1(e ��o So J c ce 1,0/ e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ` ❑No work falls within. T h.7E'r.J No—oJ c- CV 4. Site pescription a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft) .Sao` 3 7 d o c> ss'� c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or r 40() o 5 S T-i­ NWL (normal water fevej) F (If many lot sizes, please attach additional page with a list) I5NHW or ❑NWL e. Vegetation on tract po Q".)ATcye. �!ov-elf MOJCh SI`G SS I. Man-made features and uses now on tract /� N n. // {-� (�� / I % L;��� to u((c �E POOR NousP/POD( Pte, �J10Ct"5 j�oL(C/r3oa�Y g. Identify and describe the existing land/uses adjacent to the proposed project site. lra r`S�t�CiJ h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? r�P'Sr r~ ro / (Attach zoning compliance certificate, if applicable) 5Ves ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Dyes ;9No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Dyes f No DNA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a Dyes 9No ❑NA National Register listed or eligible properly? RECEIVED <Form continues on next page> RECEIVED DEC f j 7frM DCM 41WINGTON, NC NOV 24 252-808-2808 .. 1-888-4RCOAST .. www.necoastalmanagement.net _/S- Form D,CM MP-t (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? Yes []No (ii) Are there coastal wetlands on the slte? ;F( es ❑No (III) If yes to either (I) or (ii) above, has a delineation been conducted? [-]Yes j91d0 (Attach documentation, if available) n. Describe existing wastewater treatment facilities. eoa �(7 5ewe o. Describe e)dsting drinking water supply source r r C�/ C Y W p. Describe existing storm watermanagement or treatment systems. SL4 ac e f UN a4-lc a. Will the project be for commercial, public, or private use? ❑Commercial .�❑PubliGGovemment WrivatevCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. qr �e loa({c(i.ao0 L. (( �ee�c.`� Ul.e 0"0510� 0, �t, s PFopose00 p. /-�e ._,cecPs —e-..,4 e-.—e-..,o� e 0topS�., r Y'hr r.a 404 it. c. Describe the proposed constnrction methodology, types of construction equipment to be used during construction, the number of each type of equipmentandwhere it is to be stored. ppyOle 0'lo t e s S 0/` U ,86 a or �a 6" P. d. List all development activities you propose. e. Are the proposed activities maintenance of an existing project, new work, or both? e—,) t70 �/Z f. What Is the approximate total disturbed land area resulting from the proposed project? 8d C j$Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area []Yes JSNo ❑NA that the public has established use of? h. Describe location and type of existing and pr'opoosed discharges to waters of the state. S L`t((pC e P�'r `Taf— i. Will wastewater or stormwater be discharged into a wetland? []Yes KNo (]NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ❑NA I. Is there any mitigation proposed? []Yes Q[No []NA If yes, attach a mitigation proposal. ECEIVED <Form continues on bath RECEIVED . DCM WILMINGTON, NC DEC 1 ) PIJ NOV 2 4 2014 252-808-2808 :: 1-888-4RCOAST :: www.necoastal m a m a gam'ent.net �\ J Form 4CM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit kit. Additfoftal/nfomiation, (Z =taaddr[iort;othrGpmplefcda lrcahon�oan, M - eTolid. ern da;'appl irYrtlstsutimittedlnordeifor the appfrcatirxt `packagerobe campteto,'ltams:toj-(f)arc atwa}5'afip fcab(o fo any major development appfroaflon. Please consult the applx-atkrri "instri 0ton' on how to properly Prepare the re-quired rtemstrelow a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims this to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. �'�i r: = Kw Name �, /r `f o,-;* 1-1019 Ui-w y C7w e..+s Phone No. Address � (� Cu/bretf Oe:ue, L. ); �.`�� /0.0 ?vqo> c� g. A list of previous state or federal permits issued for work on the project tra nclude permit numbers, permittee, and issuing dates. 6 o66I' �I az � ul 3 2/ 20-V Z bQC Ira J I It. Signed consultant or agent authorization form, ff applicable. I. Wetland delineation, ff necessary. I. A signed AEC Hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), ff necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of r(�y�knowledge. Date Print Name '2' RECEIVED Signature Please indicate application attachments pertaining to your proposed project. ObCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information DEC f 1 ?n14 ©EM-MHD CITY RECEIVED . DCM WILMINGTON, NC NOV 2 4 2014 252-808-2808 .. 1-888-4RCOA3T ., www. necoastaimanagement. net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA - NA Depth 1. EXCAVATION AThis section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High ground excavation in cubic yards. _ ._(CW). submerged aquatic vegetation (SAV), shell. bottom (SB),� or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (4) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL XThis section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? d. (1) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ONO ❑NA (ii) If no, attach a letter granting permission from the owner. (4) If yes. where? e. (i) Does the disposal area include any coastal wetlands/marsh I. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ❑NA or other wetlands (WL)? If any boxes are checked, provide the (ii) If yes, how much water area is affected? number of square feet affected. ❑CW, _ , ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: RECEIVED DEC 11 704 RECEIVED DCM WILMINGTON, NC 3. SHORELINE STABILIZATION ❑ This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Type or shoreline stabilization: b. Length: 3 ,08ulkhead ❑Riprap ❑breakwater/Sill ❑Other: _ c. Average distance waterward of NHW or 4WL: ` d. e. Type of stabilization material: W I. S' Q A. r Width: I# Maximum d87 waterward of NHW or NW L: (i) Has there been shoreline erosion during preceding 12 monlhO Ayes ❑No ❑NA (ii) If yes, slate amount of erosion and source of erosion amount information. n 0v 2' f Visk�SC n t4S&etA%4,1T g. Number of square feet of fill tollhplacedbelowwater level. In. Type of fill material. Bulkhead backfill _ __321 Aprap Breakwater/Sill Other i. Source of rill material. pTT Sr�(G SOS rut. _ r...x 4. OTHER FILL ACTIVITIES Whis section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA . _b._(i)_Witt fill material be placed in coastal wetlands/marsh (CW). If yes, suomergeo aquatic vegetation tarv/, sneu oouom taol, or a Amount of material to be laced in the water - other wetlands (W Q7 If any boxes are checked, provide the () P number of square feet affected. (iii) Dimensions of fill area - - ❑CW ❑SAV — ❑SS (iv) Purpose of fill OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL How will excavated or fill material be kept on site and erosion controllerd?�) //II % / f / j r� T/QC PC!/ bP ti",t `�1' 6U'lcln "Aa/' c. (i) Will navigational aids be required as a result of the project? ❑Yes J2No ❑NA (ii) If yes, explain what type and how they will be implemented. Dale Project Name What type of construction equipment will be used (e.g.. dragline. backhoe,(�or hydraulic dredge)? J dU„ Ip �lriC.it-S7, ' aC- �10 c d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes )BU0 ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. n Applicant Name Ap ' ant Si nature RECEIVED RECEIVED DCM WILMINGTON, NC NOV 2 4 2014 tyrA'NlWi4lr!'IIi � _\i U w --.Pro[ a 9 � a � «.exis7l, � --—"`'/.��GJCl c lci..�--- — eKiS�li--- z— Fn KO -- ---- — Z _ _ g C Uree - ---------- - - -114_ C'f A -- - o-- -- --- ---- -- ------ Tip NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary January 28, 2015 Mr. Willard Buffkin 229 Gazebo Court Wilmington, NC 28409 Subject: EXEMPTION Stormwater Project No. SW8141213 Buffkin Bulkhead Project Gazebo Court New Hanover County Dear Mr. Buffkin: The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of the CAMA Major Permit Application for the subject project on December 9, 2014. Staff review of the plans and specifications has determined that the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this letter, we are informing you that this project will not require a stormwater management permit. If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed, whichever occurs first. If you have any questions or need additional information concerning this matter please contact Linda Lewis at (910) 796-7215, or e-mail her at linda.lewis@ncdenr.gov. Since ly, or Tracy E. D is, P.E., Director Division of Energy, Mineral, and Land Resources GDSiarl: G:IWQISharedlStormwaterlPermits & Projects120141141213 Exemption12015 01 permit 141213 cc: Jimmy North; Coastal Marine Construction New Hanover County Building Inspections RECEIVED Robb Mairs/Shaun Simpson Jonathan Howell, DCM FEB 10 2M Wilmington Regional Office Stormwater File Division of Energy, Mineral, and Land Resoumm Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 • (910) 796-72151 Fax (910) 350-2004 �F RDIRMAR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary February 23, 2015 Willard Buffkin 229 Gazebo Court Wilmington, N.C. 28409 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, A Douglas V. Huggetf Major Permits and Consistency Manager 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.ncooastalmanagement.net An Equal Opportunity/Affirmative Action Employer DCM Coordinator: Aut (/ Permit #: 3 - / L MAILING DISTRIBUTION SHEET w�l DCM Field Offices Elizabeth City Morehead City l Was n �,r5 ilmin o tom" US ACOE Offices: (with revised work plan drawings) Washington: Raleigh Bland Wilmington: T r Crumble r r— Cultural Resources: Renee Gledhill -Early or (e ' o neental.review@ncdcr.gov) Public Water Supply: Di a J. Williams (WIRO i oey Wnife k W ARO) NC DOT: en P Shellfish Sanitation: P tti Fowl State Property: 4CGm Walt '— Water Resources: en ' gins.(Ralei JoHennessy (NC DOT) Washington: Anthony Scarborough Wilmington: Joanne Steenhuis - 401 C o urn - 401 Lm a wis - Stormwater Wildlife Resources: is Dunn (WARD) r-- LPO: Fax Distribution: Permitee #: Agent #: ( ✓ �/ X V z 4 2014 c-o; ITIG 1J .0 O� ��q—LtQL�'9 ('a(�,- Ac, Quin rZ X-3 t f - U C- ( u en o ,-I. CA /Ic- NPOd eH Ian-; 11" ( �5, e- eurre^.N7 Pn`le 6' erosSn..-3 i �� 00 usL �m�l E,T orp.�!a�e Q0 `wtLe (jarn� e�'D '�c� %%eacs� c,.),Le1e CYLe HO/� IVOOQs q_—A..) al� ��Q -� I Tug i� ae�c�ss Y4e��o..�°f oT �•`s RECENED DCM WIECg sTC1N, NS roP rcy" DEC 112014 NOV 2 4 P014 y-kNgw rMib iJ DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Willard Bufjkin COUNTY: New Hanover PROJECT NAME: Bujybn Bulkhead Replacement LOCATION OF PROJECT: 229 Gazebo Ct., adjacent to Inlet Pt. Harbor Canal & Myrtle Grove Snd, in Wilmington DATE APPLICATION RECEIVED COMPLETE BY FIELD:11-24-14 FIELD RECOMMENDATION: Attached: YES CONSISTENCY DETERMINATION: Attached: n/a FIELD REPRESENTATIVE: Mairs DISTRICT MANAGER REVIEW: .D B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE RECD: 12-12-14 ADJ. RIP. PROP NOTICES RECD: APPLICATION ASSIGNED TO: �� C) 75 DAY DEADLINE: MAIL OUT DATE:12-9-14 12:111]m "0a111WeNY lI7i PERMIT FINAL ACTION: ISSUE DENY To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE RECD: 250 END OF NOTICE DATE: 1-2-15 DEED RE ON: 1 11 I 150 DAY DEADLINE: STATE DUE DATE: 1-2-15 FED COMMENTS RECD: DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative 12- ((-14 ✓ Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section (DEMLR) Division of Water Resources (401) 1 _ p� - S 1 003 8 Storm Water Management (DEMLR) 1 Z_ Z y _ 1 y i V State Property Office P 1141,5 i/ Division of Archives & History L. T-t - ILA Division of Environmental Health Division of Highways I2-1q- 14 ✓ Wildlife Resources Commission iZ -1 S-14 ✓ Local Permit Office I- y -1 S RECEIVED Division of Marine Fisheries / DCM 11 -1Z-IN ,/ DEC 1 I ' "A Corps of Engineers t-1s A o 14 - G = 01y @w s 1-2- 1s- 111 we NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 RECEIVED John E. Skvarla, III Secretary Division of Coastal Management DEC 1 0 2014 MEMORANDUM: DOA STATE PROPERTY TO: Tim Walton OFFICE Dept of Administration State Property Office FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ / le Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: U r>� Viy�� SIGNED —This, agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE — 1 Z I JAN 14 205 stal Management mPw-" WRA " 127 Cardinal Drive Ext., Wilmington, NC 26405 Phone: 910-796-7215 \ FAX: 910-395.3964 Internet: www.ncoDastalmanagement.net An Equal Oppodunity 1 Affirmative Action Empoyer RECEIVED JAN 14 1015 Mti�, rwnrrrra NCDENR North Carolina Department of Environment and Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM: Natural Resources ZO 0 9 W2, John E. Skvarla, III Secretary TO: Chad Coburn _ 401 Wetlands DWR - WiRO FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, INC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January Z 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. L REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED •\'� DATE ©/— 6)6--Dr«/ RECEIVED N.C. Division of Coastal Management 1AN 08 Nii 127 Cardinal Drive Ext., Wilmington, NC 28405 DCM-MHD CITY Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.necoastalmanagement.net An Equal Opportunity t Affirmative Action Employer A& MENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor. January 6, 2015 Mr. Willard Buffkin 229 Gazebo Court Wilmington NC 28409 Donald R. van der Vaart Secretary DWQ Project # 01-0038v2 New Hanover County Subject Property: 229 Gazebo Court — Wilmington NO WRITTEN CONCURRENCE NEEDED Dear Mr. Buffkin, You have our approval, in accordance with the attached conditions to construct a new bulkhead water ward of an existing bulkhead as described in your application received by the N.C. Division of Water Resources (DWR) on December 10, 2014. After reviewing your application, we have decided these impacts are below the threshold for written authorization as long as all conditions of General Water Quality Certification Number 3885 (GC3885) are met. This certification may also be viewed on our website at htto://yortal.ncdenr.ore/web/wg/swp/ws/401/certsandpermits. This Certification allows you to use the Regional General # 197800080 Permit when issued by the US Army Corps of Engineers. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached Certificate of Completion to the 401/Wetlands Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. 1617 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-8600 1 Internet: www.ncdenr.gov An Equal Opportunity 1 Afrmafive Acfion Empbyer- Made in part by recycled paper 2 Willard Butikin New Hanover County 2001-003M r Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Karen Higgins in the Central Office in Raleigh at 919-807-6301 or Chad Coburn in the DWR Wilmington Regional Office at 910-796- 7215. Sincerely, �Z_ ,a4- Chad Coburn Senior Environmental Specialist Wilmington Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDENR Enclosures: GC3885 Certificate of Completion cc: Jimmy North — Coastal Marine Construction, 6314 Wrightsville Avenue, Wilmington, NC 28403 Tyler Crumbley — USACE Wilmington Field Office Robb Mairs — DCM Wilmington Jonathan Howell — DCM Morehead City Karen Higgins — Wetlands, Buffers, and Stormwater Compliance and Permitting Unit WiRO RECEIVED JAN 0 8 > DCM•MHD:CI FY Certification of Completion DWR Project No.: Applicant: _ Project Name: Date of Issuance of Wetland Permit: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification 1, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: RECEIVED JAN 0 8 7°"s jjYAkN .•AWM C"V hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date /J RECEIVED JAN09i;, OQIA-MHp CITV DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLYTO ATTENTION OF. December 31, 2014 Regulatory Division Action ID No. SAW-2014-02355, General Permit No. 197800080 Mr. Willard Buf do 229 Gazebo Court Wilmington, North Carolina 28409 Dear Mr. Buffkin: Through coordination with the North Carolina Division of Coastal Management, we have learned of your request to replace an existing bulkhead at 229 Gazebo Court, Inlet Point . subdivision, adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County, North Carolina. On January 1, 2011, we renewed general permit No. 197800080, (copy enclosed), that authorizes the maintenance, repair, construction and backfill of bulkheads and riprap structures along eroding high ground shorelines and construction of riprap structures to protect eroding wetland shorelines in navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the Rivers and Harbors Act of 1899. Your work is authorized by this permit provided it is accomplished in strict accordance with your proposed plans, the enclosed general conditions, and the following special conditions: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Please read the enclosed permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. RECEIVED 1AN 0 8.1015 FRh t-MHD CITY spa Thank you for your time and cooperation. If you have questions, please contact Tyler Crumbley, of the Wilmington Regulatory Field Office, telephone: (910) 251-4170 Sincerely, TylerGCruVmbley, Project Manager Wilmington Regulatory Field Office Enclosure GP 80 conditions Copy Furnished (w/enclosure): Coastal Marine Construction Attn: Mr. Jimmy North 6314 Wrightsville Avenue Wilmington, North Carolina 28403 Copy Furnished (w/o enclosure): Mr. Robb L. Mairs Division of Coastal Management North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Mr. Jonathan Howell Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 RECEIVED 1AN 0 0 {�FM-fAMG Clly Pat M4 Cror/ Goremor 90 MR North Carolina'Department of EmAronment and Natural 96sources December 9, 2014 Division of Coastal Management MEMORANDUM: John E. Skvat9a, lli .5va6tary TO Patricia Roberts LPO New Hanover County FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct, adjacent to Inlet Point Harbor Canal/Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: .L This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to theroject for reasons described in the attached comments. S t SIGNED`'. a1i° , DATE �' ;j. •. N.C. DivisM o1 Coadta; Managartut 127 Cardinal Dive Fe., VAlOngto, NC 28405 f'hcna: 91OM72151 F1%4IMS53984Iniamet: www.ncemstalmanagement.net .ac7 �-�c;;e,t4�ty;l:�Ruma�va h^i�n Eir. cyi' NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM: TO: Anthony Law NC DOT New Hanover County DISTRICT 3 UEC 10 2014 °.~ti`��e.etlCD John E. Skvarla, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal / Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January Z 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED" DATE rZ ,/5 I w RECEIVED DEC 18 2011 N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 9611111 cri Phone: 910-796-72151 FAX: 910-395-3964Internet: www.nccoastalmanagement.net An Equal Opportunity � Affirmative Action Employer RECEIVED DEC 19 1014 DCM-MHD CITY r s� NCD NR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM: TO: Jeremy Humphrey NH DEH Shellfish Sanitation Section John E. Skvarla, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE !Z /it I / 4 O ") lei RECENED DEC 17 N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 DCM-MHD CITY Phone: 910-796-7215 \ FAX: 910-395-3964Internet: www.n=astalmanaaement.net An Equal opportunity \ Affirmative Action Employer A'4 5 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management @ @ b MEMORANDUM: �ullll DEC O orWsron 9 2Q14 TO: Heidi Cox Environmental Engineer WOO -Water p WicWaeeSurces Public Water Supply John E. Skvarla, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 2 j 1 RECEIVED DEC 15 7`1 N.C. Division of Coastal Management DErN_MMD Clt, 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity\ Affirmative Action Employer /� ,A��, �j- NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor e'. Iy. 11. rl. or December 9, 2014 Division of Coastal Management MEMORANDUM: TO: FROM: SUBJECT: Applicant: Maria Dunn NCWRC WaRO / WiRO DEC 2014 RECEIVED M,4 "iii 'q:. fd�3:erV?ti0n • z, Pr�r4m _, John E. Skvarla, III Secretary Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) CAMA / Dredge & Fill Application Review Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal / Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED l —`I r DATE Iz-tz- 1+ RECEIVED N.C. Division of Coastal Management DEC 15 P" 127 Cardinal Drive Ext., Wilmington, NC 28405 gip #PM� R`IAy Phone: 910-796-72151 FAX: 910-395-3964Internet: www.ncoDastalmanaQement.net An Equal opportunity 1 Affirmative Action Emooyer A�,� r NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM: TO: FROM: SUBJECT: Applicant: Georgette Scott Stormwater Section DEMLR - WiRO �EGEIVE' DEC 0 9 2014 'i BY. -- John E. Skvarla, III Secretary Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) CAMA / Dredge & Fill Application Review Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal / Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015, If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: �is agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE /2111 �l RECEIVED N.C. Division of Coastal Management 127 Cardinal Drive EM., Wilmington, NC 28405 DEC 2 A 2014 Phone: 910-796-7215 \ FAX: 910-395-3964Internet: www.nocoastalmanagement.net AnE Equal DCM-MHD CITY q OppoMnity\AHirmative Action Employer ®PA �.....M NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM: FROM: SUBJECT: Applicant Dan Sams District Manager DEMLR - WiRO DLcC 09 2014 John E. Skvarla, III Secretary Jonathan Howell, INC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) CAMA / Dredge & Fill Application Review Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal / Mytrle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. nFr 21 7nl4 This agency has no comment on the proposed project. u(.""-"""^ylt* This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE Z)tC 17 Zo 4 N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, INC 28405 Phone: 910-796-7215 \ FAX: 910-395-3964Internet: www.nccoastalmanaaement.net / An Equal Opportunity \ Affirmative Action Employer 1 RECOMMENDATIONS FOR Willard Buffkin December 9, 2014 It is the staffs recommendation that the proposal to fill coastal wetlands and construct a new vinyl/timber bulkhead waterward of an existing timber bulkhead is CONSISTENT with the Rules of 15 NCAC 7H.0208 (b) (7) (D)(ii) Use Standards for Bulkheads and Shore Stabilization Measures states 'the bulkhead alignment extends no further below approximate mean high water or normal water level than necessary to allow recovery of an area eroded in the year prior to the date of application, to align with adjacent bulkheads, or to mitigate the unreasonable hardship resulting from unusual geographic or geologic features". The proposed alignment would tie into the existing bulkheads to the north and south. This office has no objection to the proposed work, provided it is consistent with all other state and federal permitting requirements. Any permit issued should include the following conditions: 1. The alignment of the authorized bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 2. The bulkhead must be constructed prior to any backfilling activities. 3. The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure 4. The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 5. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 6. All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead. 7. No backfill material is to be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. 8. In order to protect water quality, runoff from the construction must not visibly increase the amount of suspended sediments in adjacent waters. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. RECEIVED DEC 112014 DCM.MHD ERV 14• �� r U North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 .,RECEIVED Division of Coastal Management DEC 110 MEMORANDUM: t)cm-ptohedee wARO TO: Shane Staples Fisheries Resource Specialist DCM - WaRO John E. Skvada, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Willard Buffkin Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ Myttle Grove Sound, New Hanover County Proposed Project: replacement of an existing bulkhead Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796-7423 when appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of, the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED ��%!_ate DATE N.C. Division of Coastal Management 127 Cardinal D&e Ext., Wilmington, NC 28405 Phone: 910-796.72151 FAX 910-39539841ntemet: www.nccoastalmanaaemeni.net An Equal eppoMnlryyAlpumpve Action Employer NCD MR �40hU11 � 520141va U Nth -Carolina Department.of Environmentand Natural ResourLes,--- rn„T � Pat McCrory yt Governor Secretary December9, 2014 r3 f1 2720 Division of Coastal Management MEMORANDUM: t1 TO: Renee Gledhill -Early Dept. of Cultural Resources Archives & History FROM: Jonathan Howell, NC DENR-DCM-Assistant Major Permits Coordinator 400-Commerce Avenue, Morehead City„ NC 28557 (Cour/er 1142-09) SUBJECT:. CAMA/'Dredge'& Fill Application, Review Applicant:' Willard Buffkln tJ131kl Project Location: 229 Gazebo Ct., adjacent to Inlet Point Harbor Canal/ Mytrie Grove Sound, New, .Hanover County_ P.roposed,Projdct: replacement of an,'exlsting bu&head .Please indicate below your age ncy's.position'gr Viewpointon'the proposed project and return, this form to Jonathan Howell at the address above by January 2, 1015. If you have any,questions regarding the proposed project, contact Robb Mairs at (910)796-7423 When appropriate, in depth comments with supporting data is requested. REPLY: This agency has no objection'to the project.as proposed. This agency has, no comment on'rthe proposed project. 'This agency approves of the_project only.if the recommended changes are incorporated. See attached. This agency'objects to the.projectJoiF reasons described in the attached comments. SIG_ NED DATE, to N.C. ONIs(on of Coastal Management 127 Cardinal Drive Ext.. Wi'.m Von, NC 28405 Phone: 910=7902151 FAX, 91M95.39&9In:emet: mro.n=stalmanaoement:nel n DEC' 1 2 Zp14 N DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Willard Buffkin c/o Jimmy North 2. LOCATION OF PROJECT SITE: Site is located at 229 Gazebo Court adjacent to Inlet Point Harbor Canal and Myrtle Grove Sound, in Wilmington, New Hanover County. Photo Index - 2006: 21.7379 N, 5 2000: 21.259 0, 4 1995: 21.241 N, 6.7 State Plane Coordinates - X: 2336886 V. 11118902 GPS -NA Lat:34104'16.94"N Long:77°53'15.85"W 3. INVESTIGATION TYPE: CAMA/ D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 09/10/2014 and 09/15/2014 Was Applicant Present - Yes and Agent 5. PROCESSING PROCEDURE: Application Received-11/24/2014 (Completed) Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan- New Hanover County Land Classification From LUP - Resource Protection (B) AEC(s) Involved: CW, EW, PTA, ES (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing- Municipal sewer Planned- N/A (F) Type of Structures: Existing- Single family residence, pool, timber bulkhead, private docking facility Planned- New vinyl/timber bulkhead (G) Estimated Annual Rate of Erosion: -2' per year per property owner monitoring 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (Coastal Wetlands) (B) Non -Vegetated Wetlands (Open Water) 72 sq. ft. (C) Other- Highground disturbance (D) Total Area Disturbed: 1,390 sq. ft. (0.03 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: Closed 8. PROJECT SUMMARY: The applicant proposes to construct a new bulkhead waterward of existing timber bulkhead. RECEIVED DEC 1 1 1014 DCM-MMO elTy Willard Buffkin Page 2 9. PROJECT DESCRIPTION The project site (property) is located at 229 Gazebo Court (off NC Hwy 421), off Inlet Point Canal which is adjacent to the AIWW/Myrtle Grove Sound, in Wilmington, New Hanover County. To locate the property from Market Street travel south on College Road (NC Hwy 132) and continue south for approximately 5 miles on Carolina Beach Rd. (NC Hwy 421). Make a U-turn on Carolina Beach Road just past the entrance to Inlet Point Harbor Subdivision, then take the first right onto Inlet Point Drive and keep to the right on Inlet Point Drive South until you reach Gazebo Court. Turn left onto Gazebo Court and continue east until you reach the property of interest. There is a gate at the entrance to the subdivision and the gate code is #4633. Existing structures on the project site include a single family residence, pool and a private docking facility, which includes an access pier (-6 feet x 280 feet) and a partially covered platform (-28 feet x 40 feet) into Myrtle Grove Sound authorized under CAMA General Permit No. 22459-D, which was issued on 3/21/2000. The project site is approximately 0.87 acres and is vegetated primarily with maintained lawn grass and ornamental landscaping. The project site has approximately 500 feet of shoreline frontage along Inlet Point Harbor canal and Myrtle Grove Sound, which is currently stabilized with a combination of fiberglass and timber sheet -piles. The portion of the shoreline along the northern end of the property and the Inlet Point Harbor canal apparently is maintained by the Inlet Point Harbor Home Owners Association (HOA). The remaining is maintained by the applicant and was authorized under CAMA General Permit No. 20661-D, which was issued on 11/2I1998. The northeast portion of the shoreline appears to be experiencing increased erosion due to its proximity facing the AIWW and the mouth of the access channel to the east. There is a small patch of Coastal Wetlands at this location consisting primarily of Smooth Cordgrass (Spartina a#emiflora), which the substrate of this area is currently being undermined due to the increased erosion. The remaining approximately 130 linear feet of bulkhead is located above the normal high water (NHW) boundary a distance ranging from approximately 8 feet to 14 feet. The area between the NHW boundary and the existing timber bulkhead appears to be highground with upland type vegetation. Waterward of this area of highground and the NHW boundary is an area of Coastal Wetlands, which consists primarily of Smooth Cordgrass (Spartina altemiflora) in an area of approximately 100 feet in width (See Sheets 1 through 4 of 4, on -site photographs and Project Narrative). The New Hanover County Land Use Plan classifies the adjacent waters as Conservation and the adjacent high ground portion as Developed. The waters of Inlet Point Canal and Myrtle Grove Sound are classified as SA, by the NC Division of Water Resources. These waters are designated as PNA by the NC Division of Marine Fisheries and are closed to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to construct a new bulkhead waterward of existing timber bulkhead. The application states that the initial 30 linear feet of the proposed 153 linear feet vinyl or timber bulkhead would be located approximately 2 feet to 8 feet waterward of the existing timber bulkhead along the most northeast portion of the property where the shoreline of the applicant's property is experiencing increased erosion. The remaining approximately 123 linear feet of new bulkhead would be located just above the NHW boundary and tie into the existing timber bulkhead along the applicant's southern property boundary. The area between the new bulkhead and the highground would be filled with clean fill material from an upland source and would be brought in to bring the final grade up approximately 6 feet to match the existing grade of the existing bulkhead (See Sheets 1 through 4 of 4, on -site photographs and Project Narrative). 10. ANTICIPATED IMPACTS The proposed new bulkhead would incorporate approximately 96 sq. ft. of Estuarine Waters and Public Trust Areas and approximately 1,230 sq. ft. of highground for associated backfill material and tie -back anchor system. The proposed bulkhead would incorporate approximately 72 sq. ft. sq. ft. of Coastal Wetlands, which primarily consists of Smooth Cordgrass (Spartina aftemiflora) within the northeast portion of the shoreline experiencing increased erosion. The bulkhead would disturb approximately 1,800 sq. ft. of highground for the associated backfill and tie -back anchor system. Minor increases in turbidity should be expected during construction. Submitted by: Robb Marrs Date: December 9, 2014 Office: Wilmington RECEIVED DEC I 1 91114 Beivi-- "Ps P,ry _� RECEIVED DEf. Y 1 gnu BPrtn=rtns p� ILHlru-nTr>$j Hj8u$&'a¶'%M (EQA°§z<a+) 3 iTrc!g>—Osy'a'al—Pt)P=z%$i$c6R=T5#Pt°8%.�G4[n� s Hui l 1 J30 03AI3038 H ] }FM=11%1011PQ_Lf1»0'0.4nFbaMKlLii xa w4 ch*J_4&6-FAL'�MdZMV+al—r,vcal/,> zebu° »ZVIH tY■perZ« Postal Servimm QTIFIPn MILT,, RECEIP N 1 a+ N In _ IAL • USE N Postage $ 4i �L EACy to CaNfed Fee O p N Retum Receipt Fee (Endorsement Required) 7 Here a A O RestrictedDelive7Fee (Endorsement Required) •nN V 2 4 201m ,CD O mp Total Postage A Fees $ $7.4 11124/2014 N mH______________,_._.__.Cu.___. eM To / ra C3 n or PO Box No M1 . . Clly, SYatae, DP+4 Postal CERTIFIED MAILr, RECEIPT (Domestic Mail OnlY, No Insurance C,,,,,g, Ln N J7 � Postage IS �l m .30 07 Certified Fee i O OW. FeepekA p(Endorse ent Reqiuiired) 2 4 20 00 C3 Restricted Delivery Fee C3(EndorseeerdRequired) •00 m „p Total Postage a Fees $ t7 • I /2014 N Sent To J Ao ry —I)ga� Cu`-r� or PO Box Ab. cSmare, Z/r 1 �µ- J '4-2 4i� C;L U �. Z 00 Z V- > c9 ]� U Z- aq W J �� C) L�J Z 10 NCDENR North Carolina Department of Environment and Division of Coastal Management Pat McCrory Braxton C. Davis Governor Director Natural Resources John E. Skvarla, III Secretary AGENT AUTHORIZATION FORM Date: Name of Property Owner Applying for Permit: Name of Authorized Agent for this project: i Owner's Mailing Address: a Gcn Z c.4o o Co W 1 C_..); A-D C . Phone Number (4/0) 7S 4 - ?00 8 Agent's Mailing Address: / Phone Number (9/0) 23 / - P S/ V I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct the following (activity): For my property located at This certification is valid thru (date) 0 Property Owner Signi Date 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastaimanagemenl.net RECEIVED DEC 1 i Yme f4"0P!�#AWihA"1hx'Y One NorthCarolina Natural cEIVED DCM WILMINGTON, NC An Equal opportunity I Affirmative Action Employer NOV 2 4 2014 5 It s F i Alt OF ' �tss osa� . i JM 22 $ 99 S'".90 .'98 ,11 a' seal Eawe RECORDED l KCRIFIED ' To SIARY 5UE DOTS +: REGISTER Or DEEDS NEW HANOVER CO -:IC man y600.00 etmmel.aYr.ttsst.aa rsr Pasco idtmtidw No. Q 08S// —Orr{- 0/S- ode 7ir Id Ne. Comb w He dsy of • u— Veraw by b man Att w recording to leataelsat IXYLOR tv�zlz a Grseo• r cP — 16 B. PIrra AVtdDB 1fIINItlG1OR HC 28401 Te/A inoUmmml, our prepared by "M"= unin, 1020 W Brut dteeriplia0 for the Index lT 7a,l�ET yMf7 e1Q SllDlislO NORTH CAROLINA GENERAL WARRANTY DEED ,.am nawrn e.r. thi. 22nd _ oar of JagraxY .1998 , by and between GBANf06 ROOM C. IIWJS, JR. and wife, BOIS18 WELLS Route 1. Bus 427 Rosebulo. IC 28392 CHP1cs a-.... WIL ARD S. BOFPKIA, JR- and wife, BEVERLY G. BUFFERS 229 GAZE O COURT ttIIMI0GTaB, RC 28409 seen, a..wr.rrrr weet ea _ b rarer: es.e. sons. a..t Y .w,+YY. � of .r0).. a_s_+ere or rwaa� TbA deriwpatfea Grantor and Geautse As used henna shall include said parties, their heirs, soccessora, And a..iges, sad shall include arrtwular, plural, m moliDe, feminine or neuter As r,oi ed by context Wf7NfL9.4BTN. that the Grantor, for a valuable couiier•tion paid by the Grantee. the receipt of wbich is hereby .caaowledaed, has am by these Presents does wrest. hargAim -01 and Ones" unto the Grantee in fee simple, all that certain tot or parcel of land situated in the City of w INEUS rOff Tosn.hip, La BANDVwt COUWY County. Korth Carolina and aresn Particularly described As follows: BEING ALL OF LOT 36, INLET POINT HARBOR SUBDIVISIGE AS THE SAM IS SHOWN ON NAPS 11U6REOP RECORDED IN MAP BOOK 31 AT PAGES 134 THROUGH 139 IN THE NUN HANOVER COUNTY REGISTRY, REFERENCE To UHICN IS MUUMY MWE MR A MORE PARTICULAR DESCRIPTION_ RECEIVED DEC 1 1 " RETURNED TO RECEIVED ffri<' Qr DCM WILMINGTON, X.C. eex A..oaiatfm roomBo• L-3. 0 1976, Reseed a 1977 014 a, .. c. w aer„l_ se >r .. t. esrYre_ . 50.11560 BOOK PACE 2299 0510 Abet ln8 ,._1,065 __,,,_ 1ha 8a4mD' 6e:sirabore described a esquirtd by Groaner k fmtda�t aaespdtN r _____....._._.L._.>�e A am alawiu the abuse described PmPerfp is recorded in Hook 31' Page 134; Hoot 31, Page 135; Book Sf ha. fls aY 311, slue tar, amt 31. P. t31: be* _ to TO HAY$ AND TO HOLD the aforesaid lot or Parcel of lard atM all privileges and appazteaa■ees AbON bNuaP4 the Grantee in fee simple. And the Grantor co eaaots with the Grantee, that Grantor is seized of the Premises in fee simple has the riskt to convey the roe it fee simple, that title is mahetable sad free and clear of all encumbrances. that Creator will warrant and defend the title at pinom t the lawful claim of all Perusal wheoerer except for the es. sa exceptions hereinafter slated. Title to the properly bereioabove described is subject to the followiea exceptum: The pxoriaicss of all applicable zoning and land me oxdinemcea, statutes and r:egulatitms; 1998 ad valorem Cate,: and all applicable xestrictive covenants and utility saaem uts of record; and the raatrletive COvenanta recorded in Book 1507 at Page 1 ", Hook 1517 at Page 580 and any and all ameodsents thereto, all in the cleat ilanovfr County Registry_ as worse wlOvia ' tr NY.[Y aY envy. Ye aY ar. .r WL Y r .wP�w1, Y. Yr•. YY ar..rt Y r 1�W r b aam.Yw YYe ar 6 ale aamYaer ararY W 6 W Y ae WAl. .leer U YOMre ! b ar. Y MSYfe. Y b �a lY. M[ Yew etesa -- maim C.Ii�J/.e. jNXAA- _____.--. Hd arOalh Z ._—..--- -- -«----------- _----------------------- - .„e.twayly d N9El_FAHSrRIt_LQ[RiTS_____n.wr. t{a ye.w.wWea..vW sr.aaemti serem t t a xtl Msi$ _._. gifg,BQMiS6_aHf�J,S______________________-______�_________..__.«_..«—_ rY: iP - 'a s� nt�.+ttr arP.•wa atl.n Ye Yr w W wawuss.s tb esaeY.a r M earetmw alYlllma� seem aw l.• refer: $ aW va .rafal tuq m Yat lar a11' pA. e.r tl ._ __ _ -_ _ _ m911.« y''•�.....•�`Q►�''� 4µ�'�'e"� �'• :---. RECEIVED —/ b{FB.ip rodr`,1. sr rommlmm tartre.:-_/o-.{�- 800 -----••-------- �' --- --- - ----- oar. t 6Ll4irAYr -NOarY CARD '•�4 _____ -------------- y� x a Ntlur RYk tl r. rwW W [YY tltlmaY, wrYr YY ..- .____ •�--�j}":'t a N.eeWlr YYe wane Ye YY e.r W L-k--k*s" IYl _ b Is .-- - a ____ ____ ____ _____________------- _----------- _-------- . Xmi&"muss .wPYmis% N met tr sYbtar am [I.ea at Y tee ut tl Ye c.rprarw. U. r..som YIY.Yrar m Y[M Y b arm. 1. Y a S rwNaYx watts vtY tt. •.roar.t. .e.r W attewN n ____..____ r ar ....... - ... __.a.sr.n wla ' sr W. W o w .YYr - .W IeY ___--W Y __-_..__«_r Y--r Yr cowehalea n*m--.------- - .___- -. « t1Ywr odor 1he etaa[a. Cwuncmahf a ._-___-_-___.____.._-___— ---- ------------------- ...........-....._.._...._.._—.___-. .._..««_...__________ _,..____- _-__________________-.____.._____..._....____.._______________----_--__«._________.___....«....._...______-__.______..___,._._______ bl. MUo*' Y N wrrRt ray maem ut ass OY rmmrwa .Y Our t.614mea 4 Ya w4 W eM W Y tY aM W ren Yarn M Sm try M. aer..t- - -------�llm---___.___________.".Mm Or va.o[ you ______. CjJQ-.AT_---__-____q la_____CPPaeB RECEIVED DCM WILMINGTON, arc, a..i.w a 199y N.C. ta14 r Anaoolatim ro:, No.fr3, a++r4Tf � NYY.. as IW W ewM ttlWr b' r(p Y{ a a.relsls ra b a. e. llisfsti ar btV'a•. le[. ��J1� CDEE R North Carolina Department of Environment and Natural Resources Pat McCrory Governor John E. Skvarla, III December 9, 2014 Secretary Mr. Jimmy North c/o Coastal Marine Construction 6314 Wrightsville Ave. Wilmington, North Carolina 28403 Dear Mr. North: The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Mr. Willard Buffkin for State approval for the proposed development at property located at 229 Gazebo Court, off Carolina Beach Road, adjacent to Inlet Point Harbor Boat Basin/Myrtle Grove Sound, in New Hanover County. It was received as complete on November 24, 2014, and appears to be adequate for processing at this time. The projected deadline for making a decision is February 9, 2015. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have hot been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from November 24, 2014, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS I I3A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. hLah el yr�'dti` 'Ro Field Representative Wilmington District Office N.C. Division of Coastal Management cc: Jonathan Howell, DCM RECEIVED Tyler Crumbley, USACE Patricia Roberts, NH Co. DEf. 1 1 w"s Willard Buffkin, Applicant BP.nn-WOfiliATM N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910395-3964 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Afirmarbw Action Employer ✓l bull Gro NOTI(01017i LAMA PERMIT APPLIED FOR PROJ IV rI WWNNvI' III II man Ems ■ffMi\/■■y ■ VV/ffY I ffN//VYVI vvMff7 LY c n F7 m a r n n yr m ViCOMMENTS ACCEPTED THROUGH ✓anualy 2_ 2ois APPLICANT: Coastal arine Construction c/o Jimmy North 6314 Wrightsville Ave. Wilmington, NC 28403 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: it NC niv_ of Coastal Management 127 Cardinal Or FYtensinn Wilmington, N!- gnAnS Rnhh Mairs, Field RPnresentative 910-796-7423 For: Willard Bufflcin I FA LTMA A 4 NCDEE R North Carolina Department of Environment and Natural Resources Pat McCrory, Governor John E. Skvarla, III Secretary December 9, 2014 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice in New Hanover County: • Willard Buftkin • James L. Ratcliff III Kyle & Heather: Please publish the attached Notice in the Friday, December 12, 2014 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Divison of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by Credit Card (number on file with Elsa Lawrence, Ref acct # 796-7215). Please send a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. Sincerely, Shaun K. s Sim on P Permit & Customer Support Division of Coastal Management cc: WiRO Jonathan Howell - MHC DCM Tyler Crumbley - USACE RECEIVED Michele Walker- DCM DEC 1 1 9014 Dem"n9 ern N.C. Division of Coastal Management 127 Cardinal Drive Ext., Wlmington, NC 28405 Phone: 910-796.7215 \ FAX: 910-395.3964 Internet: www.necoastalmanagement.net An Equal OppDaunity \ Alfinnative Action Employer J NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that the following applications were submitted for development permits in Areas of Environmental Concern as designated under the CAMA, in Wilmington, New Hanover County. On November 24, 2014, Willard Buffkin proposed to replace an existing bulkhead at 229 Gazebo Ct., adjacent to Myrtle Grove Sound, and on December 1, 2014, James Ratcliff proposed to install a bulkhead and make improvements to the existing docking facility at 20 Pelican Dr., adjacent to Lee's Cut, in Wrightsville Beach. A copy of the applications can be examined or copied at the office of Robb Mairs, N.C. Dept. of Environment & Natural Resources, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910- 796-7423) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to January 2, 2015 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECENED DEC 1 1 90A rp":wMM M" Y MAJOR PERMIT FEE SCHEDULE Willard Buffkin /$250 / New Hanover Co. DCM % DWQ % Development Type Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does of involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% $0 III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if r$25C) General Water Quality Certification No. 3490 See attached can be applied: 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% $240 40% $160 III(D). If General Water Quality Certification No. 490 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands ,and/or open water areas: $475 60% $285 40% $190 RECEIVED DEC 1 1 7^11 Bt?'t91-t91HI9 CITY �l v/ DENR CAMA Daily Check Log for WIRO _ Date Reealved Check From (Name) Name of Permit Holder Vendor Check Number Check amount _. Parmtt NumbedComments 1024/2014 iSteen Moss _ _ William G. MCReiney - Mark Lewis Craw Boats Inc. Cba Old Town Marin same NC SECU 1433 7939 _ $600.00 $200.00 _ GP 64076D GP 64075DI 1024/2014 172014 0R _ -- _ Parks _ Fit Co rsmmunity_Bank Swan Point Marina PNC Bank 1959 4173 $260.00 $400.00 major fee, Swan Point Marina, Ons. GP 65010D 10272014 Coastal Earth Works Inc Barbara Hulek Zucker _ _ First Bank - 10282014 Poteet-Smith Preperties, LLC __ Henderson _ Wells Fargo Bank 1053 $400.00 major fee, E. Beach Dr. Oak Island 10282014 Jerty D. Edwards and Karen C. Edwards same First Citizens Bank 6531 $400.00 GP 64034D 10292014 Tarn of Topsail Beach same (First Citizens Bank 002WB $200.00 GP 65011D - 10/302014 Southeastern Coastal Construction Cc Murphey First Fe_ tl_e_ral 9283 $200.00 GP 65013D 1013112014 Allied Mature Contractors LLC Glenn Holloday IB of A 6919 $400.00 GP 64035D 1013112014 Backwater Marine Construction Inc. Knight, Windham, Braswell IBBBT First Citizens Bank 1694 062221 $600.00 $100.00 GPs 64077D, 64078D, 64079D renewal request, 190-05 l l/U2014 Town of Surf City same 11/J/Z014 Dale E. and Cynthia M. Joslin same B of A 9000 $200.00 GP for 800 #B Canal Dr., CS 11/42014 Stacey Hamm and Kevin M. Hamm same PNC Bank 655 $200,00 GP 65016D 11/42014 Pippin Marine Construction, LLC Scott Sullivan Wells Fargo Bank 3179 $200.00 GP 65015D 11/42014 Wrightsville Beach Marina Sam Clary/Wrightsville Beach Marine Wachovia 2331 $100.00 MP renewal, #173-00 11/52014 F and S Marine Contractors Inc Brock and Scott PNC Bank 4113 $200.00 GP 65012D 11/52014 Connaway Marine Construction, Inc B of A 6862 $200.00 lots 11 & 12 Pensacola/ PN Co. 11/6/2014 Pleasure Island Partners, LLC Stewart Pitbnan for Pleasure Island Partners, Bank of the Ozarks 2008 $400.00 major fee, Pleasure Island Partners, LLC 1116I2014 Maritech LLC Paul M. Wiles B of A 1845 $200.00 GP 65017D 1 V72014 Gary and Lynne Greene Dockside Wells Fargo Bank 4272 $400.00 major fee, Dockside, NHCo _ 1 V72014 Conaway Marine Construction, Inc Michael Saintsirg & John Koloski B of A 6867 $200.00 lots 2 & 4 The Peninsula @SC 11/72014 Inlet Yew Bar 7 Grill Shallotte Point Phase II BB&T 2549 $100.00 mod. Fee, 185-08 11/102014 Mark Lewis Crew Boats Inc. dba Old Town Marini Swan Point Marina PNC Bank 1967 $150.00 Ck#2 t #1959 for major fee, Swan Point Marna, Ons. 11/102014 Chades F. Riggs & Associates Inc. Eddie Keith Wood First Citizens Bank 13732 $100.00 minor fee, 1681 New River Inlet Rd, NTB Ons 11/122014 Bostic Building Corporation McLeod, III First Citizens Bank 5656 $100.00 minor fee, TB 14-14. PNCo. 11/122014 CESROK LLC _ - Simmons BNC Bank 2042 $100.00 _ minor fee, SH 14-01, BRCo. 11/122014 Town of Betville same First Bank Belville 58M $100.00 minor fee, RivenaalkOBelville 11/132014 Bald Head Island LTD. Planning and Permits same First Citizens Bank 1496 $100.00 transfer fee, 208-86, LTD to Village 11/132014 The Village of Bald Head Island same PNC Bank 57057 $100.00 mod fee, MP 208-86 11/142014 John W. Thompson Caswell 105, LLC First Bank 1239 $100.00 minor fee, 105 Caswell Rd, Caswell Beach, BrCo 11/142014 Brandon Grimes, Money Order Volney Warner Wells Fargo Bank 59098506577 $400.00 GP 650220 11/142014 Brandon Grimes, Money Order Julia Rivenbark Wells Fargo Bank 59098506W8 $400.00 GP 65021D 11/142014 Dr. Gwendolyn Faye Jones same First Citizens Bank 3843 $600.00 GP 63203D 11/14/2014 Ted and Shamn Hudier same BB&T isle $200.00 GP 64080D 11/182014 Holden Dock & Bulkheads Russell Salisbury First Community Bank 5951 $200.00 GP 65020D 11/182014 WF Boucher William Boucher B of A 7973 $100.00 renewal fee, 164-97 11/182014 Conaway Marine Construction, Inc S Sail ng and Koloski 8 of A 6871 $200.00 GP 65025D 11/192014 Amants Cabinet and Trim JoOph and Laurette Arrant BUT 1037 $200.00 383 Lockwood Folly Rd, Bolivia 1111=014 Land Management Group, Inc. H i s ter Marina First Bank 44757 $100.00 mod fee. MP 48-14 11/192014 Bald Head Island LTD/Bruoe Marek .4 Balitillcad Island Marina First Citizens Bank 1489 $100.00 mod fee, MP 172-87 11202014 Clements Marine Construction Inc - - Jam Properbes/Dan Smith First Citizens Bank 3642 $200.00 GP 65026D 11212014 J. Dean Burge Linda Averette Community One 2335 $200.00 GP 64081 D 11212014 Holden Dock & Bulkheads First Community Bank 5952 $600.00renewal GP 64082D 11242014 Bruce L. Kirk Jr. Chemserve Terminal of Wilmington S of A - 1282 $100.00 fee, MP.2 11242014 Town of Sunset Beech same, for beach bulldozing First Citizens Bank 13073 $100.00 renewal fee, MP 40-01 11252014 CB Marina, LLC same, transfer from Saint Joseph's Marina LL SunTrust 1087 $100.00 transfer flee, MP 36-04 1 M52014 Logan Marine LLC Norton & Rowlett major permit Caning Federal Credit Un 1117 $250.00 I major fee, NHCo, Norton & Rowlett 11252014 F and S Marine Contractors Inc Flaughen PNC Bank 4182 $400.00 GP 65029D 11252014 Willard S Bunkin same BB&T 3434 $250.00 1 major fee, NHCo Buil kin