Loading...
HomeMy WebLinkAbout16-15 The Bluffs HOAThis permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Permit Number Permit Class 1616-15 NEW STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Perm for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to The Bluffs HOA c/o Tom Bell PO Box 10188 Goldsboro NC 27532 Authorizing development in Carteret County ad'. to Bo ue Sound at 4869 South Shore Drive xn 'y,Paa City as requested in the permittee's application dated 11 /t t !1 d inrzudlrlghie in attached work lan drawings 1 dated 4/26/14. This permit, issued on Fehr , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2) Unless specifically altered herein, this permit authorizes only the reconfiguration of the previously authorized marina facility and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) Signed by the authority of the Secretary of D] Chairman of the Coastal Resources Commission. and ff Braxton C. Davis, Director 1.' Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee l The Bluffs IIOA Permit # 16-15 Page 2 of 2 ADDITIONAL CONDITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit does not authorize any additional slips at the previously authorized 27 marina facility. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) The permittee and/or contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6491 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2015-00015. w NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 3, 2015 The Bluffs HOA c/o Tom Bell P.O. Box 10188 Goldsboro, N.C. 27532 Dear Sir or Madam: Donald R. van der Vaart Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits and Consistency Manager 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247.33301 Internet: www.nGcoastalmanagement.net An Equal Opportunity I Affirmative Action Employer RECEIVED 1UN 10 2015 Ilxay.wnu !-Ih% Permit Class NEW Permit Number 16-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission 'Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to The Bluffs HOA c/o Tom Bell PO Box 10188 Goldsboro, NC 27532 Authorizing development in Carteret County ado. to Bogue Sound at 4869 South Shore Drive. in Morehead City . as requested in the permittee's application dated ,11/11/14_ including the attached workolan drawings (1) dated 4/26/14 This permit, issued on Febru= 2. 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2) Unless specifically altered herein, this permit authorizes only the reconfiguration of the previously authorized marina facility and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. the authority of the Secretary of DENR and the of the Coastal Resources Commission. 90 & V. H 6 ' Braxton C. Davis, Director Division of Coastal Management RECEIVED This permit and its conditions are hereby accepted. JUN 10 1015 of Permittee The Bluffs HOA Permit # 16-15 Page 2 of 2 ADDITIONAL CONDITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit does not authorize any additional slips at the previously authorized 27 marina facility. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) The permittee and/or contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6491 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE �' tt �d. No. SAW-2015-00015. JUN 10 2015 gem Nti4 APPLICATION for major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name The Bluffs Homeowners Association Project Name (if applicable) Pier/Dock Replacement Applicant 1: First Name Tom MI Last Name Bell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 10188 PO Box 10188 City Goldsboro State NC ZIP 27532 Country USA Phone No. 252-726-3167 ext. FAX No. Street Address (dditerent from above) 73�4; 4801 South Shore Drive ity State INC ZIP 28557- Email 2. Agent/Contractorinfonnadon Business Name Andrew Consulting Engineers, Pc Agent/ Contractor 1: First Name MI Last Name Everett B. Pannkuk Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box city state 3811 Peachtree Avenue, Suite 300 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403-2762 910-202-5555 ext.112 ext. FAX No. Contractor # 910 202 5556 RECENED Street Address (if different from above) City State ZIP JUN 10 7015 Email kJ6"-"MW wit - eb@andrewengineers.com <Form continues on back> IVCVO•, 111 NOV ) 4 20T4 pia=,r Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Perk 3. Project Location County (can be multiple) Street Address State Rd. # Morehead City 4869 S. Shore Drive Subdivision Name City State Zip The Bluffs Morehead City NC 28557 - 2762 Phone No. Lot No.(s) (If many, attach additional page with list) 252 - 726 - 3167 ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sa.ft.) 640' 179,467 sq.ft c. Size of individual lots) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) NIA, I I (If many lot sizes, please attach additional page with a list) 7' ®NHW or ❑NWL e. Vegetation on tract Long grasses along shoreline, short grass and trees at condos. No development at high ground. I. Man-made features and uses now on tract Townhouses, pool, pier with gazebo & fixed docks g. Identify and describe the existing land uses adiacen to the proposed project site. The two adjacent properties are vacant. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Multi -family (Attach zoning compliance certificate, 9 applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA RECE If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? DCM-MIN <Form continues on next page> i<ECEI`•; ED vnV a 4 2,914 ED Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (II) Are there coastal wetlands on the site? ®Yes ❑No (III) If yes to either (1) or (II) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. City system o. Describe existing drinking water supply source. City drinking water p. Describe existing storm water management or treatment systems. Existing sheet flow. & Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Recreational boat wetslips c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. This will be constructed by barge with an excavator that has a vibration attachment. The equipment will not not be stored. d. List all development activities you propose. Replacement of existing docks. e. Are the proposed activities maintenance of an existing project, new work, or both? Replacement of existing project. f. What is the approximate total disturbed land area resulting from the proposed project? None. ❑Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accesswey or other area []Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. RECEIVED WA JUN 10 2015 W"M-wnk I. Will wastewater or storrnwater be discharged into a wetland? ❑Yes ®No DNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes [:]No ®NA If yes, attach a mitigation proposal. <Form continues on back> WC.IND "iryi 1 d ?n't rC"n--: C:,r'" zez-sas- 6Gs :: sT .: P. -. r . - Form DCM MI (Page 4 of 4) APPLICATION for Major Development Permit 6. AdditionalInformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consuk the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims file to the affected properties. e. The appropriate application fee. Check or money order made payable to DENT f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Warren Perry Phone No. Address PO Box 1475, Kinston, NC 28503 Name Perry Management, Inc. Phone No. Address PO Drawer 1475, Kinston, NC 28503 Name Phone No. Address g. A list of previous state or federal permits Issued for work on the project tract. Include permit numbers, permittee, and issuing dates. I Signed consultant or agent authorization form, if applicable. I. Wetland delineation, If necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 11 1 r /of Print Name Everett Pannkuk, P.E. Signature .f Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP4 Structures Information RECEIVED JUN 10 2015 IJbux-Wny 41Kr pjiilf 7 A 7;?1A Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (I) Is the docking facility/marina: b. (I) Will the facility be open to the general public? ❑Commercial ❑PublidGovemment ®Private/Community ❑Yes ONO c. (1) Dock(s) and/or plans) d. (I) Are Finger Piers included? ®Yes ONO (11) Number If yes: (III) Length (II) Number 15 (iv) Width (III) Length 13-25': 2-35' (v) Floating ❑Yes ONO (iv) Width 25' - 3'-6': 35' - T-6" (v) Floating ®Yes ONO e. (1) Are Platforms included? ®Yes ONO f. (1) Are Boatlifts included? ❑Yes ONO If yes: If yes: (11) Number 5 (li) Number (ili) Length A (121'). B(121'). C(32'-10"). D(53'-6"1. E(68'1 (III) Length (iv) Width A(8T B(8'1 C(10'). D(8'). E(6') (iv) Width (v) Floating ®Yes ❑No Note: Roofed areas are calculated from ddpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 0 ❑ Full service, including travel lift and/or rail, repair or (11) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 27 ® Dockage ('Wet slips) only, number of slips: 27 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: 1. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel open runabout ®Open water; no dredging required ❑Other; please describe: RECEIVED JUN 10 2015 Wt:M:iWOH Nlty k. Typical boat length: 25' I. (1) Will the facility be open to the general public? ❑Yes ENO m. (i) Will the facility have be pilings? DECEIVED ®Yes ONO (11) If yes number of be pilings? 14 <5a-8o8-2$rSiS ::r •'.: is-8-�°%2t.GA57 :: w�.vr.r:ccosiaEnrana_ggrnent.rz��i. revisek•1: 2/27/06 Form QCM, MP-4 (Structures, Page 2 of 4) 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and d. How will overboard discharge of sewage from e. (i) Give the location and (ii) Give the location f. Describe the special g. Where will residue from vessel h. Give the number of channel 1. Give the location of fuel-han Sewage applicable, j. What will be the marina policy on controlled? rge" signs prop) " signs proposed,. i i dustrial type pc ice be dis o "No Wake° signs osed. and describe the s ty measures it and live -aboard dockage? k. Describe design measures that promote boat basin flushing? waste and petroleum products. to protect area water quality. I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes []No RECEIVED bMiM'AIMIa (r(�; JOV x d 1014 --0: 9 2!27!OC Form DCM MP-4 (Structures, Page 3 of 4) n. Is the madna/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No o. Is the madna/docking facility proposed within or adjacent to coastal wetiands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wedands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ®None p. Is the proposed marma/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity, to the lease. 13. BOATHOUSE (including covered lifts) ®This section not applicable a. (1) Is the boathouse structure(s): ❑Commercial ❑PubliGIGovemment ❑Private/Community (it) Number (Ili) Length (iv) Width Note: Roofed areas are calculated from ddphne dimensions. 14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (h) Length _ (Ili) Width 15. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable I a. Length c. Maximum distance beyond NHW, NWL or wetlands & MOORING PILINGS and BUOYS a. Is the structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community e Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Average distance from NHW, NWL, or wetlands section not applicable b. Number d. Description of buoy (color, inscription, size, anchor, etc) RECEIVED JUN 10 1015 Hg RECEIVED NnV t d 2014 OCM-MHU CITY 1-888.411COAS1 :: www.nccoastaimanavement.net_ revised: 12/27;0 1 Form DCM, MP-4 (Structures, Page 4 of 4) a. Proximity of structures) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 25'to West; 280'to East 135'to West; >1,500'to East Note: For buoy or mooring piling, use arc of swing Including length ofvessel. c. Width of water body >6.000' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (li) If yes, explain what type and how they will be Implemented. d. Water depth at waterward end of structure at NLW or NWL 2.5' & OTHER ®This sedion not applicable a. Give complete description: Date The Bluffs Dock Replacement Project Name Everett Pannkuk, P.E. Applicant Name Applicant Signature 252-SQ8•<But; :: 1-U8a•�"&?i, i.'`.k a`"A' :: vvvv.r.ccc�sta!mvnuno nt_net RECEIVED JUN 10 2915 Yfl JEeffSlt 1f21L AI"�. 0ANDREW CONSULTING ENGINEERSi, P.C. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT September 25, 2014 CAMA Attn: Heather Styron 400 Commerce Avenue Morehead City, NC 28557 Re: The Bluffs Pier Replacement CAMA Major Permit Application Dear Heather: Please see CAMA Major permit application — attached. Project Narrative: The Bluffs Home Owner's Association proposes to remove their existing fixed timber docks and replace with a timber floating dock system in a similar configuration. The new docks will improve boater safety, will reduce wave action on the vessels from passing boaters, and will reduce the number of timber piles at this existing site. Please contact us if you need any additional information. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. NC Firm PE License C-2461 �,"111 II Il N CARO, %�nL•_ 033+07 Jam\ Everett B. Pannkuk, P.E., SECB TT,IBI P ,",,\ icy Enclosures: CAMA Major Permit Application. Proposed Floating Dock Layout by Marina Design Associates, Inc. dated 4/26/2014. Existing Fixed Timber Docks by William Robert Wakeham, Architect dated 8/18/1997 Site Map by William Robert Wakeham, Architect dated 10120/1987 RECEIVED JUN 10 20b U�:�:1W11u ?1iG RECEIVED Nov 1 d 2014 DCM-MHD !^! 3811 Peachtree Avenue :: Suite 300 :: Wilmington, NC 28403 :: Phone: 910.202.5555 :: Fax: 910.202.5558 :: web: andrewengineers.com HCDEHR North Carolina Department of Environment and Natural Resources Pat McCrory Governor January 12, 2015 The Bluffs HOA Attn: Tom Bell PO Box 10188 Goldsboro, NC 27532 Donald R. van der Vaart Secretary DWR Project # 1997 0524 v2 Carteret County Subject Property: The Bluffs HOA dock reconfiguration, Morehead City No written Concurrence Needed Dear Mr. Bell: You have our approval, in accordance with the attached conditions.and those listed below to reconfigure the existing 27 slip docking facility and adding 14 tie pilings, as described in your CAMA application dated December 16, 2014 and received by the Division of Water Resources (DWR) in the Wilmington Regional Office (WiRO) on December 18, 2014. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 3883 (GC 3883). This Certification allows you to use the General Permit 1987D0056-when issued by the US Army Corps of Engineers and the LAMA Major Permit when issued by the Division of Coastal Management. In addition, you should obtain or otherwise comply with,any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. _..___ :Also,-thisapproval toproceed-Wth your -proposed Impacts or to conduct Impacts to water: as depicted in your application shall expire upon expiration of the General Permits or CAMA Permit This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of,this General Certification and approval letter and is thereby responsible for complying with all conditions. If total Hills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed on the following pages. The Additional Conditions of the Certification are: I. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name 115A NCAC 02H .0501 and .0502). 127 Cardinal Drive Extension, Wilmington, North Carolina 2NOS Phone: 910.796.7215% Internet: vow ncdenneov An Equal 0pppNn41AffMVhVACb0n Empbrm-Madam pri br ia*W paper e The Bluffs HOA Attn: Tam Bell DWR Project n 1997 0524 Q January 12, 2015 Page 2 of 4 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit (15A NCAC O2H .0501 and .0502). 3. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 28..0221. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains s hall be used as appropriate. Please notify this Office if any turbidity Issues arise at 910.796.7215 4. SAVs Please note that the area surrounding the pier contains submerged aquatic vegetation (SAVs). No impacts to SAVs are authorized by this certification. [35A NCAC 028.0221(1) and 15A NCAC 071-11.0208 (b)] 5. Any final construction plans for this project must include or reference the application and plans approved by the DWR under the authorization letterand certification. The applicant will also be - - -- - required to evaluate albacquired permits to assure that they are consistent and all relative Impacts are accounted for and shown on the construction plans .[15A NCAC 02H .0502 (b) and 35A NCAC 02H .0506(4)) 6. The permitee shall require its contractors and/or agents to comply with the terms of this permit In the construction and maintenance of this project, and shall provide each of Its contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. 115A NCAC 02H .0507 b® and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 7. All mechanized equipment will be regularly Inspected and maintained to prevent contamination of waters and wetlands from hydrocarbons or other potential toxic chemicals: In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington regional office at 920.796.7215 or Steve Lewis at 919.807.6308 and after hours and on weekends call the USCG National Response Center at 1.800.424.8802. management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. 115A NCAC 021-1.0506 (b)(3) and (c)(3),15A NCAC 020. 0200 (3)(0, and GS 143 Article 21 A] The Bluffs HOA Attn: Tom Bell MR -Project #19970524W2 January 12, 2015 Page 3 of 4 7. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [1SA NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)) B. This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. Continuing Compliance: 9. The applicant/permltee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification. 135A NCAC 02H .0507(d)] 10. Certificate of Completion The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within 30 (thirty) days of project completion. Mail to: NCDENR DWR 401 and Buffers Unit North Carolina Division of Water Resources,1617 Mail Service Center, Raleigh, NC, 27699. The certification of completion is available at: htti):Hportal ncdenr oryJweb/wa/swp/ws/401/certsandi)ermits/apply/formsl. [15A NCAC 02H .0505(b)(5)] 11. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours (15A NCAC 02H .0502 (e)). Violations of any condition herein setforth may result In revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If ypu wish to contest any conditions in the enclosed certification (associated with the approvedwetland or waters impacts) you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00 pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The Bluffs HOA Attn: Tom Bell DWR Project # 2997 0524 Q January 32, 2015 Page 4 of 4 The petition may be faxed -provided the original and one copy of the document is received by the Office of Administrative Hearings within rive (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: John Evans, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this certification and its conditions are final and binding This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act and 15A NCAC 02H .0500. If you have any questions, please telephone Jennifer Burdette in the Central Office in Raleigh at 919.807.6364 or by e-mail lennifer.Burdette@ncdenr.eov or myself in the DWR Wilmington Regional Office at 910.796.7305 or by e-mail Joanne.Steenhuis@ncdenr.eov. Enclosures: GC 3883 Sincerely, Joanne Steenhuis Senior Environmental Specialist Wilmington Regional Office Division of Water Resources, NCDENR cc: Everett Pannkuk —Andrew Consulting Engineers, PC —electronic copy Tyler Crumbley- USACE Wilmington Regulatory Field Office Jennifer Burdette - DWR 401 Wetlands and Buffers Unit Jonathan Howell - DCM Morehead City— electronic copy Heather Styron - DCM Morehead City —electronic copy WiRO Permit Class NEW Permit Number 16-15 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to The Bluffs IIOA c/o Tom Bell PO Box 10188 Goldsboro NC 27532 Authorizing development in Carteret County adi to Bogue Sound at 4869 South Shore Drive, in Morehead Cily as requested in the permittee's application dated 11/11/14 includingthe attached workplan drawings (1)dated 4/26/14 This permit, issued on February 2 2015 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ha mihien4 to fiinec imnrisnnment or civil action: or may cause the permit to be null and void. Marina 1) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2) Unless specifically altered herein, this permit authorizes only the reconfiguration of the previously authorized marina facility and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty t2u) aays or me isswng date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2018 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. l naun,au Vi ury vvuuw. .mow...... r1 Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee The Bluffs IIOA Permit # 16-15 Page 2 of 2 AIDIDITIONAL CONIDITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 7) This permit does not authorize any additional slips at the previously authorized 27 marina facility. General 8) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) The permittee and/or contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6491 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2015-00015. IBM MF1 APPLICATION for Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name The Bluffs Homeowners Association Project Name (if applicable) Pier/Dock Replacement Applicant 1: First Name Tom MI Last Name Bell Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 10188 PO Box 10188 City Goldsboro State NC ZIP 27532 Country USA Phone No. 252-726-3167 ext. FAX No. - Street Address (H dhTerent from above) 4801 South Shore Drive city Morehead City State NC ZIP 28557- Email 2. Agent/Contractor Information Business Name Andrew Consulting Engineers, Pc Agentl Contractor 1: First Name MI Last Name Everett B. Pannkuk Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 3811 Peachtree Avenue, Suite 300 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403 -2762 910 - 202 - 5555 ext. 112 ext. FAX No. Contractor # 910 202 5558 Street Address() ditrant from above) City State ZIP Email eb@andrewengineers.com <Form continues on back> iti:ctrveu NOY 14 M4 DCM-MdH2O CICY 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form RCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Morehead City 4869 S. Shore Drive Subdivision Name City State Zip The Bluffs Morehead City NC 28557 - 2762 Phone No. Lot No.(s) (ff many, attach additional page with list) 252 - 726 - 3167 ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body Identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade []Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 640' 179,467 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, NWL (normal water level) (if many lot sizes, please attach additional page with a list) 7' ®NHW or ❑NWL e. Vegetation on tract Long grasses along shoreline, short grass and trees at condos. No development at high ground. I. Man-made features and uses now on tract Townhouses, pool, pier with gazebo & fixed docks g. Identify and describe the existing land uses adiacent to the proposed project site. The two adjacent properties are vacant. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Multi -family (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA J. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes []No ®NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED Nnv 14 2014 DCM-MHD CITY 252-808-2808 .. 11-888-41[,c:c,AST .. w"vw ,,ccoastalmanagement.net Form D,CM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (it) Are there coastal wetlands on the site? ®Yes []No (III) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. City system o. Describe existing drinking water supply source. City drinking water p. Describe existing storm water management or treatment systems. Existing sheet flow. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment ®Privale/Community b. Gtve a brief description of purpose, use, and daily operations of the project when complete. Recreational boat wetslips c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. This will be constructed by barge with an excavator that has a vibration attachment. The equipment will not not be stored. d. List all development activities you propose. Replacement of existing docks. e. Are the proposed activities maintenance of an existing project, new work, or both? Replacement of existing project. f. What is the approximate total disturbed land area resulting from the proposed project? None. ❑Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A i. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> Nov I d 2014 DCM-MHD CITY 252-808-2808 .. 1-886 www. nccoasta[management. net Form ,.QCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Warren Perry Phone No. Address PO Box 1475, Kinston, NC 28503 Name Perry Management, Inc. Phone No. Address PO Drawer 1475, Kinston, NC 28503 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pernittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. 1. Wetland delineation, if necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Il l r /of Print Name Everett Pannkuk, P.E. Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development RECEIVED ®DCM MP-4 Structures Information Nov 14 2M4 DCM-MHD CITY 252-808-2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Govemment OPrivate/Community ❑This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No c. (I) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes []No (ii) Number If yes: (III) Length (it) Number 15 (iv) Width (III) Length 13-25'; 2-35' (v) Floating ❑Yes ❑No (iv) Width 25' - 3'-6': 35' - T-6" (v) Floating ®Yes ❑No e. (i) Are Platforms included? ®Yes ®No f. (1) Are Boallifts included? ❑Yes ®No If yes: If yes: (0) Number 5 (ii) Number (Ili)Length A (121'). B(121'). C(32'-10"). D(53'-6"). E(68'1 (lii) Length (iv) Width A (8'). B(8T C(10'). D(8'). E(6') (Iv) Width (v) Floating ®Yes ❑No Note: Roofed areas are calculated from drlpllne dimensions. g. (!)Number of slips proposed h. Check all the types of services to be provided. 0 ❑ Full service, including travel lift and/or rail, repair or (II) Number of slips existing maintenance service 27 ❑ Dockage, fuel, and marine supplies ® Dockage ('Wet slips') only, number of slips: 27 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: _ ❑ Other, please describe: I. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25' m. (i) Will the facility have tie pilings? ®Yes []No (11) If yes number of be pilings? 14 j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout I. (i) Will the facility be open to the general public? ❑Yes ®No RECEIVED NOY 14 7111+41 DCM-0A',4D G'IT"i 252.808-2808 :: 1-688.4RCOAST :: www.nccoastaimanaRement.net revised: 12/27/06 Form D,CM, MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and d. How will overboard discharge of sewage from e. (i) Give the location and nujnber oXNo Sewage (ii) Give the location controlled? signs signs proposed. I. Describe the special design, ' applicable, for col tainIng i di g. Where will residue from vessel intenance be disp o h- Give the number of channel mark and "No Wake" signs { I. Give the location of fuel -handling fa it ies, and describe the type pollutants, su4h asbaint, sandblastinla waste and petroleum products. r measures pl nned to protect area water quality. j. What will be the marina policy on overAtit and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? D m. Is the marina/docking facility proposed within a primary or secondary nursery area? NOY 1 d 711114 ❑Yes ❑No DCM-MHDCnv 252-808-2808 n 1.8884RCOAST :: www.nccoastaimana@Sement.net revised: 12/27/06 Form D(CM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlanda/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lilts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliciGovemment ❑Private/Community (it) Number (III) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (1) Number (it) Length (!!!)Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS X gThis section not applicable a. Is the structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED Nnv t e 2014 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/27/06 Form DCM, MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 25'to West; 280'to East Note: For buoy or mowing piling, use arc of swing including length of vessel. c. Width of water body >6.000' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (it) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 135'to West;>1,500'to East d. Water depth at waterward end of structure at NLW or NWL 2.5' 8. OTHER ®This section riot applicable a. Give complete description: tfbr//�( Date The Bluffs Dock Replacement Project Name Everett Pannkuk,P.E. Applicant Name Applicant Signature RECEiVEn NOV 14 2014 DCM-MHD CITY 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 OANDREW CONSULTING ENGINEERSi, P.C. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT September 25, 2014 CAMA Attn: Heather Styron 400 Commerce Avenue Morehead City, NC 28557 Re: The Bluffs Pier Replacement CAMA Major Permit Application Dear Heather: Please see CAMA Major permit application — attached. Project Narrative: The Bluffs Home Owner's Association proposes to remove their existing fixed timber docks and replace with a timber floating dock system in a similar configuration. The new docks will improve boater safety, will reduce wave action on the vessels from passing boaters, and will reduce the number of timber piles at this existing site. Please contact us if you need any additional information. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. NC Firm PE License C-2461 CAROB ���ESSigti .. Vn . 033407 J: ��ip '•E,tiCINE�'�� Everett B. Pannkuk, P.E., SECB � / T B,?Q' 9` Enclosures: CAMA Major Permit Application. Proposed Floating Dock Layout by Marina Design Associates, Inc. dated 4/26/2014. Existing Fixed Timber Docks by William Robert Wakeham, Architect dated 8/18/1997 Site Map by William Robert Wakeham, Architect dated 10/20/1987 RECEIVED Nov 14 2014 DCM-MHD CITY 3811 Peachtree Avenue :: Suite 300 :: Wilmington, NC 28403 :: Phone: 910.202.5555 :: Fax: 910.202.5558 :: web: andrewengineers.com North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary December 16, 2014 MEMORANDUM: TO: Maureen Meehan Division of Coastal Management FROM: Daniel Govoni Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: The Bluffs HOA Project Location: Carteret 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the.reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This ency objects to the project for reasons descrriibeed� in the attached comments. SIGNED DATE ` 1 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.ncooastalmanagement.net An Equal Opportunity / Affirmative Action Employer DCM Coordinator: / J/ 6/2J 1- / Permit Permit Agents DCM Field Offices Elizabeth City Morehead City+/ Washington Wilmington (with revised work plan drawings) US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler — - William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbly Cultural Resources: Renee Gledhill -Early [/ Public Water Supply: Diane Williams (WIRO) Joey White (WARD) Marine Fisheries: Shane Staples Jessi Baker NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: Tim Walton Water Quality: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Scott Vinson-Stormwater Wilmington: Joanne Steenhuis — 401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: LPO: Maria Dunn (WARO)-"' Vacant (WIRO) Fax Distribution: Permitee #: Agent #: ' E �A North Carolina Department of Environment and Natural Resources Pat McCrory Governor February 3, 2015 The Bluffs HOA c/o Tom Bell P.O. Box 10188 Goldsboro, N.C. 27532 Dear Sir or Madam: Donald R. van der Vaart Secretary The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff - colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733- 2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, tk Douglas V. Huggett Major Permits and Consistency Manager 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: The Bluffs HOA 2. LOCATION OF PROJECT SITE: 4869 South Shore Drive adjacent to Bogue Sound Morehead City, Carteret County Photo Index - 2000: 41-522 O, P, Q (15) 2006: 41-8040 I, J, K (10) State Plane Coordinates - X: 2665351.52 Y: 362359.05 . LAT 34043'30.88 LON 76047'07.76 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 11/25/14 Was Applicant Present —no 5. PROCESSING PROCEDURE: Application Received—10/20/14 Application Accepted Complete- 11/14/14 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Town of Morehead City 2007 Land Classification from LUP — Medium Density Residential with Conservation (B) AEC(s) Involved: Public Trust Area, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: Private/Community (E) Wastewater Treatment: Existing — municipal sewer Planned — none (F) Type of Structures: Existing — condos, roads, sidewalks, dock, riprap, asphalt parking Planned — reconfiguration of existing 27-slip docking facility and tie pilings. (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water N/A N/A 4616.1 ftz Shaded 18,573 ftz Incorp (D) Total Area Disturbed: 18,573 ftz (E) Primary Nursery Area: no (F) Water Classification: SA/HQW Open: yes 8. PROJECT SUMMARY: The applicant is proposing the reconfiguration of the existing 27- slip docking facility and the installation of 14 tie pilings. 9. Narrative Description: The Bluffs HOA project is located at 4869 South Shore Drive in Morehead City, Carteret County. South Shore Drive is found by following Highway 70 East (approximately 2,968' east The Bluffs HOA 4869 South Shore Drive Page 02 of the HWY 24/Bridges St. Ext four-way stop light). As you follow Highway 70 the turn off will be located directly past Kmart of Morehead City. Turn right onto Mansfield Parkway and continue to the end. The Bluffs condos are located at the end of this road. The site is located on the north side of Bogue Sound in this area. Bogue Sound has a width of 6000' within this area. The subject property is 179,467 square feet (4.12 Acres) in its entirety and averages 7' in elevation above NHW. Currently on the high ground portion of the site are existing sidewalks, condos, roads, rip rap, asphalt parking, typical vegetation (grass) and oak trees. Extending southward off of the high ground, down a riprap bluff area and approximately 16 F from the western property line and 420' from the eastern property line is the existing pier access for a 27-slip docking facility. The existing pier is approximately 6' x 577' with a 23' x 65' platform (includes covered gazebo and 4' wide dropdowns for slip access) at the terminus of the pier access. There are also 4' wide dropdowns (approximately 2' below pier) for slip access that extend approximately 83' from the north side (landward side) of the existing platform and are along the east and west side of the existing pier access. A major permit (104-97) for this existing structure was issued in 1997. The existing pier angles towards the western property line. There is existing riprap along the bluff area (no escarpment) as well as native vegetation (typical grasses and. shrubs) which includes jurisdictional wetlands. Along the shoreline at the southern extent of the bluff area is a 20' to 40' wide x 715' long expanse of coastal wetlands consisting of Smooth Cordgrass (Spartina altemiflora). The shoreline along this area is 715' with water depths ranging -2' nlw to -6' nlw depending on location (field verified). The bottom substrate is sand within the project area. The Division of Water Resources classifies this area as SA/HQW Waters. Bogue Sound is not a designated Primary Nursery Area and is open to the taking of shellfish. There are no shellfish leases within this area. Through field verification, SAV habitat was not observed within the project area, but can be seen through aerial photography, approximately 100' landward of the existing platform. SAV was not observed within the slip areas and since the water depths within the slip areas range from -2- to -6' nlw depending on location, there should be minimal disturbance to any SAV habitat that may exist. Morehead City's Land Use Plan dated 2007 classifies this area as Medium Density Residential with Conservation within the AEC. The Federal Channel Setback adjacent to the project area is 80'. There is approximately 1,133' from nhw to the AIWW setback with the proposed development a distance of 498' north of the AIWW setback as well. There are single- family residences with private docks to the east and west of the project site. Pelletier Creek is located approximately 1500' to the east of the existing 27-slip docking facility. 10. Proiect Description: The applicant is proposing to reconfigure the existing 27-slip docking facility which includes converting the fixed fingers and platforms to floating platforms as well as add 14 new tie pilings. The existing fixed pier, platforms, finger piers, tie pilings and slips (27) are currently The Bluffs South Shore Drive Page 03 perpendicular to the shore, located along the western side of the docking facility and are a total distance (to the most waterward tie piling) of approximately 625' from nhw, and approximately 600' from the edge of marsh. There is a 4' x 25' "loading/unloading" finger pier located on the east side of the pier approximately 82' landward of the existing main platform. The applicant is proposing to keep the existing fixed pier and main platform as is (includes the existing drop downs in this area). Currently all 27 slips are housed on the western side of the pier. The applicant is proposing to widen the slips and relocate 8 of the existing slips to the east side of the pier access. There would be (8)12.5' wide slips (numbered 9-16) along the east side of the pier with (4) tie pilings, (4) 3.5' x 25' floating finger piers, (1) 8' x 122' floating platform (B) and (1) floating 6' x 25' finger pier distinguishing the slip areas. Platform B would be accessed by a 4' x 16' gangway with 14' of this located over platform and would extend from the eastern dropdown along the pier. Slips 9-16 would start 480' from nhw and would not exceed a maximum distance of 513' from nhw. The western side of the pier encompasses a total of nineteen 12.5' x 25' wide slips. The proposed 8' x 121' floating platform (A) that encompasses slips 1-8 would be located 80' landward of the existing main fixed platform, would start 480' from nhw, would not exceed a maximum distance of 513' from nhw and would be accessed by a 4' x 16' gangway (14' of gangway located over platform) that would extend west from the existing western drop down. A total of 4 tie pilings, (4) 3.5' x 25' floating finger piers and (1) floating 6' x 25' finger would distinguish slips 1-8. The remaining 11 slips (17-27) would be located along the western side of the existing fixed platform area. Platforms C (10' x 32.83') and D (8' x 53.5) would extend to the west from the western dropdown by way of a 4' x 16' gangway(14' to be located over platform) and would intersect with platform E (6' x 68'). A total of 6 tie pilings, (3) 3.5' x 25' floating finger piers and (2) 3.5' x 35' floating finger piers would distinguish slips 17-27. Slips 17- 22 would be 12.5' in width with slips 23-27 a width of 15.8'. The tie pilings and finger piers for slip areas 23- 27 would not exceed a distance of 625' waterward of nhw and would be within the existing footprint of the slip areas currently onsite. Water depths within the slip areas range from -2' nlw to -6' nlw, depending on location, were field verified and meet a rate of 1' per 100' beyond the 400'. The existing pier and platform angles towards the western property line (25' from western riparian access line & 280' from eastern riparian access line) and riparian access lines have been drawn 90' from the USACOE channel. The distance from nhw to the most waterward portions of the project (includes outer tie pilings and finger piers) would be a maximum of 625' from nhw, 600' from the edge of coastal wetlands and 498' from the USACOE Channel Setback. Although SAV was not found within the slip areas during the site visits, the water depths within this area range from -2' to -6' nlw (field verified) and >-3' at the end of the existing fixed platform and therefore should not interfere with any possible SAV habitat that may exist landward or north of the proposed scope area. All portions of development would not exceed a maximum distance of 625' below nhw and 600' from the edge of coastal wetlands into a 6,000' wide water body and would be would be located approximately 490' The Bluffs South Shore Drive Page 04 landward of the 80' Federal USACOE setback. The typical boat to be served would be open runabout and have an average length of 25'. 11. Anticipated Impacts: The proposed dock reconfiguration (which includes floating platforms, finger piers and tie pilings) would shade 4616.1 ftz of estuarine bottom while incorporating 18,573 ft2 of public trust open water. The water depths within the slip areas are -2' nlw to -6'nlw depending on location, so the depths should be sufficient for continued use of this area. The setting of pilings has the potential to cause a temporary increase in turbidity during construction. There should be no undue interference to navigation resulting from this project, as the existing dock currently at the site is of equal length and has been constructed since the late 80's to early 90's and would be reconfigured to be a distance of approximately 498' landward of the USACOE channel setback. SAV habitat was observed through aerial photography approximately 100' landward (north) of the existing platform, however none was located during the site visit within the existing slip areas or within the proposed relocated slip areas along the east side of the existing pier. The water depths within the slip areas range from -2' nlw to -6' nlw, depending on location, and therefore should be of sufficient depth as to not affect any potential SAV habitat within this area of the proposal. HEATHER STYRON Morehead City December 16, 2014 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: The Bluffs HOA County: Carteret LOCATION OF PROJECT: At 4869 South Shore Dr., adj. Bogue Sound, in the Town of Morehead City. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 11/14/14 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: Yes FIELD REPRESENTATIVE: Heather Styron DISTRICT OFFICE: Morehead Citv DISTRICT MANAGER REVIEW: Roy Brownlow, B) DATE RECEIVED BY MAJOR PERMITS UNIT: 12/16/14 FEE REC'D: $250.00 PUBLIC NOTICE REC'D: Yes END OF NOTICE DATE: 1/6/15 ADJ. RIP. PROP NOTICES REC'D: Yes DEED REC'D: Yes APPLICATION ASSIGNED TO:/D Govoni ON: 12/16/14 C) 75 DAY DEADLINE; delgil S 150 - DAY DEADLINE: MAIL OUT DATE: 12/16/14 STATE DUE DATE: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency Discrimination (L t C Division of Community Assistance (/ Land Quality Section Division of Water Quality Storm Water Management(DWQ) _ State Property Office Division of Archives & History Division of Environmental Health Division of Highways -, R'ildlife Resources Commission ..Z Local Permit Office Division of Marine Fisheries Corps of Engineers y/ (,r gaol S Govoni, Daniel From: Jenkins, Shannon Sent: Monday, February 02, 2015 8:45 AM To: Govoni, Daniel Cc: Fowler, Patti; Haines, Andrew; Nelson, Shawn Subject: Bluffs HOA dockage Daniel, This email will serve as our comments for the Bluffs FICA dockage reconfiguration project as we discussed recently. This dockage facility is located in waters classified as Conditionally Approved Open for shellfish harvest. The reconfiguration to 27 slips without any restrictions (no boats with heads or cabins and no boats greater than 24 feet) would result in a shellfish closure there of 100 feet from the dockage facility. We will not need to make the closure at this time unless/until the facility is reconfigured and used as proposed in the application. We will monitor the facility for any changes during our routine shoreline surveys. Please give me a call if needed. thanks Shannon Jenkins NCDENR-DMF-Shellfish Sanitation and Recreational Water Quality Section 3441 Arendell St. Morehead City, NC 28557 Phone:252-726-6827 shannon.ienkins@ncdenr.sov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Pat McCrory Govemor December 16, 2014 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: �ICYDENR North Carolina Department of Environment and Natural Resources Ken Pace NC DOT, State Construction/Materials Branch Daniel Govoni Major Permits Processing Coordinator John E. Skvarla, III Secretary n" XA ::<. Ivy JAN 8 2015 NEW BERN DISTRICT OFFICE CAMA/DREDGE & FILL Permit Application Review The Bluffs HOA Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. RECEIVED JAN 14 10b REPLY: This agency has no objection to the project as proposed. DCM-MHD CITY ZThis agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This -agency objects to the project for reasons described in the attached comments. SIGNED DATE/0) O 7 400 Commerce Avenue, Morehead City, N rth Carolla 28557 Phone: 252-808-28081 FAX 252-247-33301 Internet: www.nccoastaimanagement.net An Equal Opportunity/Affirmative Action Employer WNW North Carolina Department of Environment and Natural Resources ry ier 16, 2014 I,,, ...RANDUM: TO: FROM: SUBJECT: Applicant: Project Location: John E. Skvarla, III Secretary Dan Sams Division of Energy, Mineral & Land Resources Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review The Bluffs HOA Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the reconfiguration of the existing 27 slip docking facility and the installation of.14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. 12EPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE i��ci 12or4 400 Commerce Avenue, Morehead City, North Carolina 28557 RECEIVED Phone: 252.808-28081 FAX 25M47.33301 Internet: www.nccoastalmanagement.net �pN 1 S 101i An Equal Opportunity I Affirmative Action Employer DCM-MHD CITY C-6- R North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 16, 2014 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: John E. Skvaria, III Secretary IEIVE DEC 18 2014 BY: Joanne Steenhuis Division of Water Resources Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review The Bluffs HOA Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. REPLY: ✓ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE RECEIVED 400 C A M h d Ci hirth C 1' 28557 JAN 0 8 106 ommerce venue, ore ea ity, o aro ma Phone: 252-808-28081 FAX 252-247-33301 Internet: www.ncroastaimanagement.net DCM-MHD CITY An Equal Opportunity I Affirmative Action Employer OCROR North Carolina Department of Environment and Natural Resources Pat McCrory Governor G.14F 12.1&01 December 16, 2014 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Maria Dunn NC Wildlife Resources Commission Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review The Bluffs HOA John E. Skvarla, III Secretary \- DEC 2014 RECEIVED, HANtat C.owi Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. JAN 0 2 2015 t/ This agency has no comment on the proposed project. DCM-MHD CITY This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED /"► �� DATE 17 -,;o- yz l* 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808.28081 FAX 252-247.33301 Internet: www.nccoastalmanagement.net An Equal Opportunity I Affirmative Action Employer WMENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 16, 2014 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: John E. Skvarla, III Secretary it @ @ Q 0�7Q oivisioDEC 18 ?O14 wino . or W. Publi filer RWater Sey jpPl Diane Williams Public Water Supply Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review The Bluffs HOA Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. RECEIVED REPLY: This agency has no objection to the project as proposed. DEC 2 8 7014 This agency has no comment on the proposed project. Bem=rmr+a enr This agency approves of the project only if the recommended changes are incorporated. See attached. T is agency 4jects to the project for reasons described in the attached comments. SIGNED ��� DATE 400 Commerce Avenue; Morehead City, North Carolina 28557 Phone: 252.808-28081 FAX 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer W"zo I�CDE�IR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary December 16, 2014 MEMORANDUM: TO: Lee Padrick Division of Community Assistance FROM: Daniel Govoni Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: The Bluffs HOA Project Location: Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. L�This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �t ��C�L.�jC� DATE 1.2, RECEIVED 400 Commerce Avenue; Morehead City, North Carolina 28557 DEC 2 2 1014 Phone: 252.808-28081FAX 252-247-33301Internet: www.nccoastalmanagement.net DCM-MHD CITY An Equal Opportunity I Affirmative Action Employer 12/19/2014 17:53 2527262267 TOWN OF MOREHEAD CTY PAGE 01/01 Pat McCrory Governor December 16, 2014 MEMORANDUM: TO; FROM: SUBJECT: Applicant: Project Location: AAA 122 IWDENR North Carolina Department of Environment and Natural Resources John E. Skvada, III Secretary Local Permit O:fticer Town of Morehead City Daniel Govoni Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review The Bluffs HoA Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency s position or viewpoint on the proposed project and return this form by January 5, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. f This agency has no comment on the proposed project, This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �'', V ,Ta b ` DATE I ;�L / 9 North Carolina 28557 Phone: 252-8 8- 80B I FAX 262-247 3330 1 nt met: www nccoaslalmenagement.net An Equal Opportunity! AfTirmative Action Employer ��� NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor MEMORANDUM TO: Daniel Govoni THRU: Roy Brownlow FROM: Heather M. Styron John E. Skvarla, III Secretary December 2, 2014 SUBJECT: Comments and Recommendations - CAMA Major Permit —The Bluffs FICA, Morehead City, Carteret County The following is my assessment and consequent recommendations of the above referenced proposal: This proposal involves the reconfiguration of the existing 27-slip docking facility. The applicants are proposing the removal of the existing fixed platforms and fingers with the placement of floating platforms and finger piers. Water depths within this area range from -2' nlw to -2.5' nlw (per applicant) depending on location. Field verification found the water depths to range from -2' nlw to 4 nlw with no SAV observed within this area. Aerial photography shows SAV beds approximately 100' landward of the north side of the existing main fixed platform. The development conforms to the guidelines set forth under 15A NCAC 07H .0208. The adjacent waters of Bogue Sound are open to shellfish harvest and are not Primary Nursery Area. Assuming that state and federal agencies concur with the proposal, the District recommends the project be authorized as proposed, contingent upon the following conditions: 1 The reconfigured 27-slip docking facility shall not extend farther than approximately 596' from the edge of marsh, 635' from NHW or 35' waterward of the existing main fixed platform. These measurements would not extend beyond the "existing footprint". 2 A maximum of 15 finger piers, 5 floating platforms and a total of 14 tie pilings shall be authorized. 3 No new slips are authorized (27 existing slips). 4 All portions of the docking facility shall be a minimum of 15' from the riparian access lines. 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808.2808 \ FAX 252-247-3330 \ Internet: wvvw.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer I uovemor December 16, 2014 MEMORANDUM TO: FROM: SUBJECT: - Applicant: PD1p1q�p,yn��g9 ��y, * R Carolina Department of Environment and Natufal Renee Gledhill -Early NC, Department of Cultural Resources Daniel Govoni Major Perniiis Processing Coordinator CAMA/DREDGE &: MCI, Permit Application Review The, Bluffs 1IOA ,,rtt e? r�i0 Project Location: Carteret County} at 4869 South Shore.Drive, adjacent Boguc.Sound,-in the Town. of Morehead, City. Proposed Project: Proposes the reconfiguration of `the existing 27 slip docking facility nndT the installation of 14 tic pilings. Please indicate below youragency'sposition or viewpoint on.the proposed project and return this form by January 5, 2615, Ifyotthave any questionsregarding the proposed project, please: contact I-Ieather Styrgn,. Permit officer af,(252) 808-2808. Ext. 216. Nhenappropriate, in-depth comments with supporting data is requested. REPLY; This agency has no objection fo-the project as proposed. This agency has no comment on the proposed project. This agency approves of the l>roject,only if the recommended changes are incorporated. See attached. This agency,objects toahe projecCfor reasons described in the attached comments. SIGNED DATE ' /5 400 Commerce Avenue, Morehead Citv,,North Carolina 28557 Phone: 252.808.28081EAX2:i2-24tN3 30IInternet vr�nv:nxnastalmanagemeni.nat An Equal Opp rtunityd Affirmative Action Employer DEC 2 2 2014 y. J Pat McCrory John E. Skvarla, III Governor RECEIVED Secretary DEC 18 2014 oCM-Fisherles WARO December 16, 2014 laWky)(•la�►I� Zih�A TO: Shane. Staples Division of Coastal Management FROM: Daniel Govoni Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: The Bluffs HOA Project Location: Carteret County, at 4869 South Shore Drive, adjacent Bogue Sound, in the Town of Morehead City. Proposed Project: Proposes the reconfiguration of the existing 27 slip docking facility and the installation of 14 tie pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by un ZP'If you have any questions regarding the proposed proj ect, please contact Heather Stycon, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth continents with supporting data is requested, REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached, �Q This agency objects to the project for reasons described in the attached comments. SIGNED <� DATE 400 Commerce Avenue; Morehead City, North Carolina 28557 Phone: 252-808.28081 FAX 252-247.33301 Internet: www.nccoastalmanagement.net An Equal OpportunitylAffirmative Action Employer Govoni, Daniel From: Crumbley, Tyler SAW <Tyler. Crumbley@usace.army. mil> Sent: Monday, January 05, 2015 11:05 AM To: Govoni, Daniel Cc: Styron, Heather M.; Crumbley, Tyler SAW Subject: The Bluffs HOA Dock Reconfigure / SAW 2015-00015 Daniel, We have received the application for the Bluffs HOA Dock reconfiguration at 4869 South Shore Drive, Morehead City NC. It appears that this project will qualify for use of a GP 56 for reconfiguring the existing docking facility. We have assigned the project AID: SAW 2015-00015. Thank you. Tyler Crumbley Project Manager U.S Army Corps of Engineers -Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax:910-251-4025 email: tvler.crumblev@usace.army.mil "The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://regulatory.usacesurvey.com/" N THIS DEED, made this the 30th day of May, 1980, by and between THE BLUFFS, INC., a North Carolina corporation having its principal office in the City of Goldsboro, Wayne County, North Carolina, HOME SAVINGS AND ..___LOAN..ASSO.CIATION, a North Carolina banking corporation having an office in Rocky Mount, North Carolina, and F. P. SPRUILL, JR., acting as Trustee, parties c/olNe 8"FFSINO ?C BOAIISI of the first part, and THE BLUFFS HOMEOWNERS ASSOCIATION, a North Carolina G""ka`¢`'Al C. J 1) non-profit corporation with its principal office in Morehead City, Carteret County, North Carolina, party of the second part; W I T N E S S E T H: That the parties of the first part, in consideration of TEN DOI.T aR.S and other valuable considerations to them in hand paid by the party of the second part, the receipt of which is hereby acknowledged, have bar:;,:ined and sold, and by these presents do bargain, sell and convey to the narty the second part, its successors and assigns, that certain lit or parcel of .an" situate in Morehead Township, Carteret County, North ^arolina, �-ounded and Lesc-ibed as follows: See Schedule A attached hereto, incorporated herein by reference, and made a part of this conveyance. TO HAVE AND TO HOLD the af-rasaid lot or parcel of land and all rlv4le2es and appurtenances thereunto 7,elonging t,nto the party of tha second part, and its successors and assigns, to its only use and behoof, forever. And The Bluffs, Inc., for itself, its successors and assigns, hereby covenants to and with the party of the second part, and its executors, administrators and assigns, that it is seised of said premises in fee and has a perfect right to co_tvey the same in fee simple, that the same are free and clear fro^ all encumbrances, and that it will warrant and defend the said title to the same against the lawful claims of all persons. Home Savings and Loan Association and F. P. Spruill, Jr., Trustee, join in the execution of this instrument solely for tae purpose of releasing the hereinabove described lots, fixtures, and personal property from the lien of the deed of trust dated May 25, 1978 and recorded in Book 412 at Page 227 in the Carteret County Registry. Except for the lots, fixtures, and personal /I! MCUAW1 WAS YftEYgpYD 9Y RECEIVED RMM Ar LJW Nnv 14 1014 ow IM88 maeft X P. aft DCM-MHDCITY IN TESTIMONY WHEREOF, THE BLUFFS, INC., has hereunto caused this instru- ment to be signed in its name by its President, attested by its Secretary, and its corporate seal to be hereunto affixed, all by authority of ire Board of Directors duly given, and the said HOME SAVINGS AND LOAN ASSOCIATION has hereunto caused this instrument to be signed in its name by its President, attested by its Secretary, and its corporate seal to be hereunto affixed, all by authority of its Board of Directors duly given, and the said F. P. SPRUILL, JR., Trustee, has hereunto set his hand and seal. ATTEST: y) CAI -N Llezg- S tary THE BLUT, INC. - By:_t lI Pr/esidert- HOME SAVINGS AND LOAN ASSOCIATION O,.f President ATTEST: ` 1 1 Secretary /y I (SEAL) F. P pruill, Jr., Trustee NORTH CAROLINA WAYNE COUNTY June This 12th _day of 5U7, 1980, personally came before me, Evelyn R. Paul a Notary Public in and for said County and State, JOHN T. BELL, who, being by me duly sworn, says that he is President of THE BLUFFS, INC., and that the seal affixed to the foregoing instrument is writing is the corporate seal of said Company and that said writing was signed and sealed by him in behalf of said Corporation, by its authority duly given. And the said John T. Bell acknowledged the said writing to be the act and deed of said Corporation. WITNESS my hand and notarial seal. le, Noaa e_ P v nry Public My commission expires: Oct. 12. 1980 STATE OF NORTH CAROLINA COUNTY OF •� n..z�� This /j,40L day of , 1980, personally came before me,AlgZuT, a. Notary Public in and for said County and State, e.. %.,.. ./-�zn.esr who; being by me duly sworn, says that he isv'�reesident of HOME SAVINGS AND LOAN ASSOCIATION and chat the seal affixed to the foregoing instrument in writing is the corporate seal of said Company, and that said writing was signed and sealed RECEIVED NOY i d 7m4 DCM-MHO) Cny wii a a anorar3. seal. My cIKATHY S. PUBHERTI NOTARY PUBLIC HASH CLl!11 JY, ry,C, Notary PublicZJ on exp Y�Y. l-/z-d'_'� _ STATE OF T9 OLINA COUNTY OF I, l.Ul 'i'd Notary Public in and for said County and State, doh eby certify th t . P. SP UILL, JR., TRUSTEE, personally appeared before me this day and acknowledged the due execution of the foregoing deed for the purposes therein expressed. WITNESS my hand and notarial seal Ny nsioi expires: JO ANN BISHOP No:agi pabfie County C. Nash this day of 'fa9, 1980. Notary Public This ? a Of11i,i ��•., . r• Rc;is'n of Do is BY atct. 17�4 y7 Assistant, De" ZtTle' WC) RECEIVED NOV 14 1014 DCM-MHD CITY -3- BEGINNING at an iron stake on the Southern right of way of South Shore Drive, said iron stake being located S. 83' 27' E. 38.07 feet, S. 77' 56' E. 44.53 feet, S. 71' 48' E. 44.92 feet to an iron stake on the Southern right of way of South Shore Drive at the most Northeastern corner of The Bluffs, Section No. Two as shown on a map recorded in Map Book 16, Page 58 A,B,C,D in the Carteret County Registry; thence from th-, beginning leaving the Southern right of way of South Shore Drive, S. 10' 58' 59" W. 64.07 feet to a stake; thence S. 79' 01' 01" E. 7.17 feet to a stake; thence S. 00' iu' 54" E. 103.26 feet to a stake; thence N. 89' 49' 06" E. 65.32 feet to a stake; thence N. 00' 10' 54" W. 40.79 feet to a stake; thence S. 89' 49' 06" W. 4.00 feet to a stake; thence N. 00' 10' 54" W. 37.46 feet to a stake; thence S. 89' 49' 06" W. 4.00 feet to a stake; thence N. 00' 10' 54" W. 25.01 feet to a stake; thence S. 89' 49' 06" W. 57.32 faet to a stake; thence N. 79' 01' 01" W. 7.17 fee17 to a stake; thence S. 10' 58' 59" W. 54.29 feet to an iron stake, a corner of The Bluffs, Section No. Two as shown on a map recorded in Map Book 16, Page 58 A,B,C,D in the Carteret County Registry; thence with the line of The Buffs, Section No. Two, S. 00' 05' 45" W. 162.36 feet to an iron stake Ja the mean high tide line of Bogue Sound; thence with the mean high tide line of Bogue Sound, S. 78' 06' 49" E. 37.00 feet to a stake; thence continuing with the mean high tide line of Bogue Sound, S. 65' 17' E. 52.50 feet to a stake; thence with the mean high tide line of Bogue Sound, S. 88' 37' E. 54.93 feet to an iron stake, said iron stake being at the intersection of the mean high tide line of Bogue Sound and the Western right of way of Georgia Avenue; thence leaving the mean high tide line of Bogue Sound, with the Western right of way of Georgia Avenue, N. 1' 33' W. 31.86 feet to a stake; thence leaving the Western right of way of Georgia Avenue, N. 89' 54' 56" W. 34.94 feet to a stake; thence N. 00' 05' 04" W. 65.00 feet to a stake; thence S. 89' 54' 56" W. 37.63 feet to a stake; thence S. 00' 05' 04" E. 6.00 feet to a stake; thence S. 89' 54' 56" W. 37.50 feet to a stake; thence N. 00' 05' 04" W. 1.00 feat to a stake; thence S. 89' 54' 56" W. 23.03 feet to a stake; thence S. 00' 05' 04" E. 56.00 feet to a stake; thence N. 89' 54' 56" E. 23.03 feet to a stake; thence S. 00' 05' 04" E. 6.00 feet to a stake; thence N. 89' 54' 56" E. 37.50 feet to a stake; thence N. 00' C5' 04" W. 2.00 feet to a stake; thence N. 89° 54' 56" E. 37.63 feet to a stake; thence S. 89' 54' 56" E. 34.94 feet to a stake on the Western right of way of Georgia Avenue; thence with the Western right of way of Georgia Avenue, N. 1' 33' W. 170.32 feet to an iron stake at the intersection of the Western right of way of Georgia Avenue and the Southern right of way of South Shore Drive; thence with the Southern right of way of South Shore Drive, N. 32' 41' W. 85.34 feet to an iron stake; thence with the Southern right of way of South Shore Drive, N. 56' 11' W. 28.09 feet to an iron stake; thence with said right of way, N. 64' 11' W. 45.66 feet to an iron stake on the Southern right of way of South Shore Drive, the point of beginning containing 22,084 square feet or 0.507 acre more or less., and being all of that area delineated as "Total Common Area" as shown on that plat of The Bluffs, Section Number 3, prepared by Bobby Rex Kornegay, Registered Surveyor, dated June 11, 1980 and recorded in Map Book IOC at Page 76 in the Carteret County Register of Deeds. f Ilay- 171 RECEIVED Nov 7 d jQp DCM-MMD CITY NCDETIR North Carolina Department of Environment and Natural Resources Pat McCrory Governor The Bluffs HOA C/O Andrew Consulting Engineers 3811 Peachtree Ave. Wilmington, NC 28403 Dear Sirs: John E. Skvarla, III Secretary December 16, 2014 The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located at 4869 S. Shore Dr. along Bogue Sound in Morehead City, Carteret County. The application was received as complete on 11/14/14, and appears to be adequate for processing at this time. The projected deadline for making a decision is 1/29/15. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from 11/14/14, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. 7ely, Bather M. Styron Coastal Management Representative 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX 252-247.3330 \ Internet: www.ncooastalmanagement.net An Equal Opportunity / Affirmative Action Employer t.: NC ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Carteret News Times PO Box 1679 Morehead City, NC 28557 Re: Public Notice — The Bluffs HOA Dear Sir: Please publish the attached Notice in the 12/17/14 issue of the Carteret News Times. John E. Skvarla, III Secretary December 2, 2014 The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Hdather M. Styron Coastal Management Representative V)y 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX 252.247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity / Affirmative Action Employer NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 11/14/14. According to said application, The Bluffs HOA proposes the reconfiguration of the existing docking facility located at 4869 South Shore Drive in Morehead City, NC. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808 2808 during,normal business hours. Comments mailed to Braxton Davis, Dirl tpr Dl ision of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 12425� , a considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISH ON: 12/17/14 Bennett, Ronda From: Styron, Heather M. Sent: Tuesday, December 16, 2014 8:45 AM To: Bennett, Ronda Subject: FW: please publish on Wednesday 12/17/14 From: Legals rmaiito:legals(o)thenewstimes.com] Sent: Tuesday, December 16, 2014 8:34 AM To: Styron, Heather M. Subject: Re: please publish on Wednesday 12/17/14 This ad is set and scheduled to run on December 17, 2014 in the amount of $ 44.99. Proof: NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by Ni 119A-119(b) that epplication for a development permit In an Area of Environmental Concern as designated under the CAM was received as complete an 11114114. According to said application, The Bluffs HOA proposes the reconfiguration of the existing docking facility located at 4869 South Shore Drive In Morehead City, NO. A copy of Me entire application may be examined or copied at the office of Heather Shoran, NC Division of Coastal Management located at 400 Commerce Avenue, Morehead City, NC, (252) 8082808 during normal business hours. Comments mailed 0 Braxtan Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 26557, prior to 1015. will be considered In making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by Me public and state and federal agencies. Notice of the permit decision in this matterwill be provided upon written request. D1T On Dec 16, 2014, at 8:23 AM, Styron, Heather M. wrote: Carteret News Times PO Box 1679 Morehead City, NC 28557 Re: Public Notice — The Bluffs HOA Dear Sir: December 2, 2014 Please publish the attached Notice in the 12/17/14 issue of the Carteret News Times. r The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808- 2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, Heather M. Styron Coastal Management Representative NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received as complete on 11/14/14. According to said application, The Bluffs HOA proposes the reconfiguration of the existing docking facility located at 4869 South Shore Drive in Morehead City, NC: A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808 2808 during normal business hours. Comments mailed to Braxton Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 116/15, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISH ON: 12/17114 North Carolina Department of Environment and Natural Resources Divislon of Coastal Management Pat McCrory gmMon C. DaWs John E. Skveria, IA Governor Director Secretary AGENT AUTHORIZATION FORM Date: 8 11 /y Name of Property Owner Applying for Permit: Name of Authorized Agent for this project: TTA'.Bltitrt: HOil F 8. RX.M1nkuk tiD.E• C/o Ct)QI %Gibb6,Irw-, Owner's Mailing Address: Po B,.v 1o71 moteAe,J C.fy + A)C- ZBtS.? Phone Number j3 f� 'Id(n 31l. '1 Jeannse q-3ric*, I N%r. Agent's Raging Address; f3 tl Pe4c4fece ke. too /fit' Y PhoneNumber(110) toZ-S55s I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to (I�nstall or construct the following (activity): T/4c-a fixcofsloc.L w k Y%ef,No Gar-ks For my property located at This certification Is valid thru (date) 7/1/Z of S r 8•ci�-I'f Property Owner�8 gneture Date N04 127 Ca s inel Me EMI., Mm4glon, NO 28405 Phone: 91 D-795-721 5 1 FA% 91OM3M Internal: mvaaceomIalmanopemenl.nd RECEIVED NOY 14 M4 DCM-MHD Cay M E1u41 OXVW dH 1 AR Imc lac AGM Eff"i 7014 1200 0001 7603 3847 ��o .. m T 3m 0�y .3 dx BvgT p6 py 7014 1200 0001 7603 3854 Kyy my M oa 33 3m m a� 2 9 iA M M RECEIVED OCT 03 2ou DCM-MHD CRV H ■ Complete items 1, 2, and 3. Also complete item 4 If Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. 1 Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: W,c'f4 f jo :!C�0)� 14- 5 p/gyro/� , N C ? %14) . I AASignature X 40-7 B_Received by C. J6 Agent ❑ Addra - LljAiQt j4 Falb 1 gIBD D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type - ❑ Certified Mall* ❑ Priority Mail Express- 0 Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Dellvery? prin, Fee) ❑ Yes 2. Article Number 7014 1200 0001 7603 3847 (Tians/er from service label) PS Forth 3811, July 2013 Domestic Return Recelpt .. �IENDEIR: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY I and 3. Also complete A. Signature :Complete items 1, 2, _ Agent Rem 4 R Restricted Delivery is desired. X Addressee � Print your name and address on the reverse noted Neme) C. Date of Delivery so that we can return the card to you. B. Received by (P " II Attach this card to the back of the mailpiece, or on the front R space Pemtlts. D. Is delivery address different from Rem 1? ❑ Yes I. Article Addressed to: If YES, enter delivery address below: ❑ No(47 3. Service Type ❑ Certffled Mall• ❑ Priority Mail Express" ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mall ❑ Collect on Delivery 4. Restricted Delivery? (Eittre Fee) ❑ Yes 2. AuueNumber 7014 1200 0001 7603 3854 (rmnsfer from service label) PS Form 3811, July 2013 Domestic Rak"n Receipt RECEIVED OCT 0 R 2014 DCM-MHD CITY CERTIFIED MAIL • RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NO TIF IC ATION/WAIVER FORM Name of Property Owner: __Wd ((fX1�Pi1�/� ! Address of Property: TOO, I475 1 �i1.( on KC Ztd50) (((Lot or Street #, Street or Road, City & County) Agent's Name#: (er1 &514lii llet/MailingAddress:.3y)IlTeaCl'ier-C AJC. S4e- 3( Agent'sphone#: )O.202.5555 W1lm,q�Aog, NC zwg l I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing with dimensions must be Provided with this letter. I have no objections to this proposal. _ I have objections to this proposal - If you have obiectlons to what Is being proposed, you must notify the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Correspondence should be malled to 127 Cardinal Drive E%t, Wilmington, NC, 28405.3845. DCM representatives can also be contacted at (9fO) 796-7215, No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) �y I do wish to waive the 15' setback requirement. /1� N . 1 do not wish to waive the 15' setback requirement. (Property Owner Information) Signature Print or Type Name Mailing Address Cfty/ Iate/Zip Telephone Number Date (Adj a rly n Information) l�Qd Signature w n S. Pock l/ Print or Type Name 1 5-18 6/vd Mailing Address kin 9%ri/ N C 2$ 5-01 Cityll%taop ZSZ- SZS/07 Telephone Number RECEIVED — Or.T 16 ?nu Date DCM-MHD CITY Revised 611812012 CERTIFIED MAIL RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONANAIVER FORM Name of Property Owner. P N.16 366 /�)y2725/d4�1 Address of Property: —iU yiaW Z 1422 &((1S EOr 1 NL' Z�So (Lot or Street #, Street or Road, City 8 County) Agent's Name 6t11ulij Agent's phone #: 9 I • ZO Z. 5555 Mai1ingAddress:t(1-PC'aclr}✓fC Aqc 34e• 300 bl i I�-}orb, I�1C zB�p 3 I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A_ description or drawing. with dimansinrs mwt ha nrnvlrlerl umi, stile Iews. I have no objections to tWs proposal. I have objections to this proposal. 1/you have obOctions to what /s being proposed, you must notify the Division ofCoasiel Management (DCM) in writing within 10 days of receipt Of this notice. Correspondence should be mailed to 127 Cardinal Ddve Ext, IMlmington, NC, 2805-3845. DCM representatives can also be contacted at (91`0) 796-7215, No response is considered the same as no obleetlon if you have been nnfNrmr by r•�.emed iu9e WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. A5L_ I do not wish to waive the 15' setback requirement. (Property Owner information) Signature Pnnt or Type Name Mailing Address Clty/State/Zlp Telephone Number Date (Ad)ac n Pr pe l caner Information) Are S ature 4nntr Type Name Sl Lf 'P/u2ei /V J. Mailing Address snn z s� City/State2fiV ip Telephone Number Dale Revised 61182012 RECEIVEC OCT IF DCM=MHC C+l' ***This is a word processing form to be completed in Microsoft Word*** NC Division of Coastal Management Major Permit Application Computer Sheet (02/15/2010) Applicant: The Bluffs HOA Date: 12/2/14 Project Site County Carteret Staff: Heather District: ❑Elizabeth City ❑Washington ®Morehead City ❑Wilmington Project Name: The Bluffs HOA Rover File Date application "received in the Field office (EX: 1/8/2007): 10/3/14 Date application accepted as complete in Field Office: 11/14/14 Permit Authorization: ®CAMA ❑Dredge & Fill ❑Both SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes NNo Photos Taken: Yes N No[] Setback Required (riparian): [_]Yes NNo Critical Habitat: ❑Yes NNo []Not Sure 15 foot waiver obtained: ❑Yes NNo Hazard Notification Returned: ❑Yes NNo SAV: NYes ❑No [-]Not Sure Shell Bottom: ❑Yes NNo ❑ Not Sure Temporary Impacts: NYes ❑No Sandbags: ❑Yes NNo []Not Sure Did the land use classification come from county LUP: ❑Yes NNo Mitigation Required (optional): ❑Yes NNo Moratorium Conditions: [-]Yes NNo ❑NA Environmental Assessment Done: ❑Yes NNo ❑NA SECONDARY WATER CLASSIFICATION - OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) ❑Swamp Waters (SW) N High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORW) WETLANDSIMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina alterniflora) cynosurcides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncus ❑ (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ II. Public or commercial/no dredge $100 and/or fill - $400 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: The Bluffs HOA Date: 12/2/14 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Platform A 1 New Work ® Replace 121' 8' Maint ❑ ❑ Y ON Platform B 1 New Work ® Replace 121' 8' Maint ❑ ❑ Y ON Platform C 1 New Work ® Replace 32.83' 10, Maint ❑ ❑ Y ❑ N Platform D 1 New Work ® Replace 53.5' 8' Maint ❑ ❑ Y ❑ N 1 New Work ® Replace Platform E Maint ❑ ❑ Y ON 68' 6' mooring 14 New Work ❑ Replace n/a n/a flings Maint ® ❑ Y ON Finger piers 2 New Work ® Replace 35' 3.5' Maint ❑ ❑ Y ❑ N 11 New Work ® Replace Finger piers Maint ❑ El El 25' 3.5' 2 New Work ® Replace Finger Piers Maint ❑ ❑ Y ❑ N 25' 6' New Work ® Replace Maint ❑ ❑ Y ❑ N New Work ® Replace Maint ❑ ❑ Y ❑ N New Work ® Replace Maint ❑ ❑ Y ❑ N New Work ® Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N revised 02/15/10 NC Division of Coastal Mgt. application Computer Sheet, Page 3 of 3) Applicant: The bluffs HOA Date: 12/2/14 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Open Water Dredge ❑ Fill ❑ Both ❑ Other ® 4,616.1 4,4616.1 Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-2808 :: 1.888-4RCOA5T :: www.nccoastalmonagement.net revised: 02/15/10 Vicinity Photo (Photo 1 of 2) RECEIVED NOV 14 M14 SUP SUMMARY 22 - 25' SLIPS 5 - 35' SLIPS 27 TOTAL SUPS 403 LINEAR FEET SIDE TIE i i I Riparian :eess Line Proposed Dock, Replacement Drawing (Drawing 1 of 3) 480' to shore. 121' $. A -2' at MLW 33' 1 - 1 �1 f 25' 1 2 13 4 5 6 7 ql� 11 v O O O O O v 3'-6" —� �— �--- 25 0 o n o 0 0 , 1 v1 it r 17 18 19 20 21 22 5 23 -2.5' MLW �J - - - - - -'' - - -. E e. C 10' GANGWAY 1 - - E 68' O 1 1 35. 1 1 23 24 i 25 1 1 1 1 - v o v o 31'-5" �-- 3'-6" EI EXSTING ELEVATED FISH CLEANING STATION 121' — GANGWAY GA>NGWAY_.. - -. - a - (- B $. 0 11 EXISTING DECK FISHING AREA -2' at MLW 1 d 1 1 1 9 10 11 12 a Ie# o v1 I o v f-- 25 ---I EXISTING GAZEBO �-12" CLEAT (TYP.) 1 26 27 RECEIVED DOCK FENDERING (TYP.) JUN 10 1OE 1 ! O TIMBER PILE (TYP.) Corps Channel Setback is 498' to the south 3 3 r 280' Z N ~ to Riparian Access Line $ a c .q V N f r -- � d r_ o s z 33' # i 16 # # o 6 RECEVEDD RECEIVED N JUN 10 2015 "00*IMW S,Ig Sf4't /'Zo d S, W Zo F Z 00 Q Q J UZ w 00 LL w LL a Uj0 f!] In w 0 a 0y IL a. 1 Olverall Site Plan (D-cawing 3 of 3) 1 i r Se„le f �N6 Y�L.OW '61.d� hi.I.F15H I�Fj�� ?esr=.v gr*9SN _ ram._ .11, 11 IM•rl9lil'1 .u. < ... r".y� •. 010 I Nnr V. r. ; 43n13036 y-INF9 G{HHF1 - - . swarms rya aW+uFi MFI•KE r ei�r utaE PROPOSED NEW BOAT SLIPS FOR THE BLUFFS upewwmrxam tw.aw. ., :..eoacrwmwa uawemer •werx•wmuxowe DETAIL PLAN Z _: N k ILL LL �f < S p I H i uwup xwwa . � � :I �w •wmw *for reference only. Vicinity (Photo 2 of 2) Photo - with Street Nar.es RECEIVED JUN 1 0 1015 9 i sc Overall Site Plan (Bzawing 3 of 3) , �'�s`•t�kf`��'yt pf � �: ' .i� � � is i RI 1 +, I I � PI�P�Sm HEW AnA /C O N 4EE 7?WL P✓-N VICINITY MAP C t i s n- fl 0 9 z s 0 z ScoIG O So too is** p(p9liN6 YE.I..pW ''GLoSF� •SNELI.Friil Mt�A� nxs�ao s..cu *for reference only. ^%ICa AaI og. A.I TLJO MI I:COC Tn%AfKfUn AACC i of .... _ F' h ru�rre•� � - aww+n. AµlgatR r " S �i1k'vv;R PROPOSED NEW BOAT SLIPS FOR THE BLUFFS DETAIL PLAN RECEIVED NOY 14 8? t DCM-m-- _ 1; rx~ Z� . ,n en a:1,, U � Q CJa oxw a cd 0, Owo= �Uw. w �Y < o• Z = •i � c cc LL •:...: J e mLLJ i C O ! 94'nP 4eo'd= co eso' fi Ifto — IV -- me] a ............... • V7 °o I 1 ' - ��CAD-C;TY Mir SLIP SUMMARY Proposed Dock Replacement Drawing EXISTING ELEVATED (Drawing 1 of 3) WALKWAY 22 - 25' SLIPS 2801 5-3S'SLIPS 4801 to shore. to Riparian 27TOTAL SUPS Access Line FISH CLEANING STATION 403 LINEAR FEET SIDE TIE 121' 121' AY GANGWAY 8- V-21at MLW -2' at MLW 33' 3325' 1 2 3 4 6 78 9 10 11 12 13 14 15 16 000 0 0 0 0� o �o o �o� o v 6' 3'-6" 25' 25 4-4 Q w a z z G O 3•-6• 25.010.. � 1 17 18 19 20 21 22 25• 23' EXISTING GAZEBO h 5 o Riparian -2.5' MLW EXISTING DECK RECEIVED .caess Line - - .� - - $. "C 10 NGWAY NOV 1 L _L DCBrY-Whk )Cg11,�/ 68' FISHING AREA 12- CLEAT (iYP.) N 35' 23 24 25 26 27 DOCK FENDERING (TYP.) o o 6' TIMBER PILE (TYP.) 31'-5' 3'-6" Corps Channel Setback is 498' to the south. O S l0 Lo' �d � Z Oar P �o N V1 rps V Z a � m G pC p 2 F- z J QY •• UZ In 00 LL h a Uj0 CO LUl Ln 0 = a 0 0r a z V Z N W 0 i z o z LA a < `s s v' W x a Y - ZW W F � z s YY 4 ; 0 ti 6 ti - i r t yrr f •1 '}. � _ e 'ate �- ♦ i±�, _ - _ _ ' s ! >H � •'• ,(,t i'�11t _ ._ • :i ! . �a. .r -L �.F � .r- a�i -. --.�°1 t' �• �.fJ�rq. ou�A' - �y i s i Ail 3 / 4 q • � � ,a .tea I �. I, 1- 02014 ror�I, Google earth MAJOR APPLICATION TRACKING APPLICANT e P Lv-�-ks {ACA PROJECT LOCATIOM qe 9 s, 5- b2 e- `D2 . MokE H LFAb FIELD REP: +l e-art"h e r (Or) COUNTY: DATE REC'D IN OFFICE: Oct 3 10 DAYS DEADLINE: DISTRICT MGR. REC'D: CHECK CORRECT: YES/NO Comments: /'�r DEED ADDITIONAL REP FIELD REP OF YES/NO corle-S ATTACHED: YES/NO DATE REQUESTED: DATE REC'D CHECK ENCLOSED: YES/ NO AMOUNT OF CHECK: CHECK # ANDREW CONSULTING ENGINEERS, P.C. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT MEMORANDUM TO: Heather Styron / NC-DENR — CAMA FROM: E.B. Pannkuk, P.E., SECB Andrew Consulting Engineers, P.C. DATE: September 25, 2014 ACE PROJECT: 14005 / The Bluffs Pier ----------------------------------------------------------------------------------------- We hereby submit these United States Postal Domestic Return Receipts, received by us from the Adjacent Property Owners of the Bluffs, indicating their receipt of the "Adjacent Riparian Property Owner and Notification/Waiver Forms" and plans for the Bluffs pier replacement project. Cc: Jeannie Brickey/The Bluffs HOA RECEIVED OCT I! JW4 °C +'(Q" 3811 Peachtree Avenue :: Suite 300 :: Wilmington, NC 28403 :: Phone: 910.202.5555 :: Fax: 910.202.5558 :: web: andrewengineers.com IN Mr-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name The Bluffs Homeowners Association Project Name (if applicable) Pier/Dock Replacement Applicant 1: First Name Tom MI Last Name Bell Applicant 2: First Name MI Last Name if additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 10188 PO Box 10188 City Goldsboro State NC ZIP 27532 Country USA Phone No. 252-726-3167 ext. FAX No. Street Address (d different from above) South Shore Drive 7MoreheadCity State NC ZIP4801 28557- Email 2. Agent/Contractor Information Business Name Andrew Consulting Engineers, Pc Agent/ Contractor 1: First Name MI Last Name Everett B. Pannkuk Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 3811 Peachtree Avenue, Suite 300 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403 -2762 910 - 202 - 5555 ext. 112 ext. FAX No. Contractor # 910 202 5558 Street Address (if different from above) City State ZIP Email eb@andrewengineers.com <Form continues on back> RECEIVED OCT 0..17914 DCM-MHD CITY 252-808-2608 :. 1-888-4RCOAST :: www. nccoasta l manage me nt. net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Morehead City 4869 S. Shore Drive Subdivision Name City State Zip The Bluffs Morehead City NC 28557 - 2762 Phone No. Lot No.(s) (d many, attach additional page with list) 252 - 726 - 3167 ext. I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project N/A c. Is the water body Identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Intercoastal Waterway e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 640' 179,467 sq. ft. c. Size of individual lots) d. Approximate elevation of tract above NHW (normal high water) or N/A, I I NWL (rwrmal water level) (ff many lot sizes, please attach additional page with a list) 7' ®NHW or ❑NWL e. Vegetation on tract N/A f. Man-made features and uses now on tract Townhouses, pool, pier with gazebo & fixed docks g. Identify and describe the existing land uses adiacent to the proposed project site. The two adjacent properties are vacant. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Multi -family (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. [-]Yes []No j9J. NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> RECEIVED OCT OR DCM-unL < 252-808-2808 :: 1-888-4RCOAST :: www. nccoasta lmanagement. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? []Yes ®No (11) Are there coastal wetlands on the site? ®Yes [-]No (III) If yes to either (i) or III) above, has a delineation been wnducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. City system o. Describe existing drinking water supply source. City drinking water p. Describe existing storm water management or treatment systems. City system & Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ❑Public/Govemment ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. Recreational boat wetslips c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. This will be constructed by barge with an excavator that has a vibration attachment. The equipment will not not be stored. d. List all development activities you propose. No development. Replacement of existing docks. e. Are the proposed activities maintenance of an existing project, new work, or both? Replacement of existing project. I. What is the approximate total disturbed land area resulting from the proposed project? 4,688-same as existing ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. WA I. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> OCT 03 ?card DCM-.BAHD CI7Y 252.808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Addition/ Infonnadon In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — M are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims He to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Phone No. Address Name Phone No. Address Name Plane No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permi8ee, and issuing dates. It. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) It. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of m/y knowledge. Date Print Name 6-V e V.e�{i-1 Signature1 Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development RECEIVED CDCM MP-4 Structures Information OCT O! ?n++. DCM#tl 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 7. UUUF%IN(f I-A(;IL11 Y/MAKINA UHAKA(; I :Hlb IlU: i ❑This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? []Commercial ❑PublidGovemment ®Private/Community ❑Yes ®No c. (i) Dock(s) and/or pier(s) (li) Number 27 (III) Length 2 x 121'. 1 x 68' (Iv) Width 8' (v) Floating ®Yes ❑No e. (1) Are Platforms included? []Yes []No If yes: (ii) Number (!it) Length (iv) Width (v) Floating ❑Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (!)Number of slips proposed 0 (li) Number of slips existing 27 I. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 25' m. (I) Will the facility have be pilings? ®Yes []No (Ii) If yes number of be pilings? 14 d. (i) Are Finger Piers included? ®Yes ❑No If yes: (ii) Number 13 (III) Length 25' (Iv) Width T-6' (v) Floating []Yes ❑No f. (I) Are Boatlifts included? []Yes ®No If yes: (II) Number (III) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ('Wet slips") only, number of slips: 27 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout I. (i) Will the facility be open to the general public? RECEIVED ❑Yes ®No OCT 0.1 IM4 DCMA##,� *v 2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanaoement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 2 of 4) a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. _; Location: ❑ Showers ❑ Boat holding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge' signs proposed. (it) Give the location and number of'Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and 'No Wake" signs proposed. I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. J. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No OCT OA MA n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? DCMUK) CITY ❑Yes []No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within dose proximity to any shellfish leases? []Yes []No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse strudure(s): ❑Commercial ❑PublidGovemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PubliciGovemment ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent dockinb 25r >Zoor Note: For buoy or mooring piling, use arc of swing including length of vessel. DCM 400 Crpr 252-808-2808:: 1•888-4RCOAST :: w .nccoastalmanagement.net revised: 12'2706 Form DCM MP-4 (Structures, Page 4 of 4) c. Width of water body e. (i) Will navigational aids be required as a result of the project? ❑Yes 1�gNo ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL —Z ZS NLW & OTHER ®This section not applicable a. Give complete description: Date L3I,t-r5 YOCk leeoekce.., Q�f Project Name Fib ►°Q..J't Applicant Name Applicant Signature RECEIVED OCT es?" DCM-AA off. 252-808-2808::1-888.4RCOAST::w .nccoastalnnanaoennent.net revised: 12/27/06 ®ANDREW CONSULTING ENGINEERS,, P.C. STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT September 25, 2014 CAMA Attn: Heather Styron 400 Commerce Avenue Morehead City, NC 28557 Re: The Bluffs Pier Replacement CAMA Major Permit Application Dear Heather: Please see CAMA Major permit application — attached. Project Narrative: The Bluffs Home Owner's Association proposes to remove their existing fixed timber docks and replace with a timber floating dock system in a similar configuration. The new docks will improve boater safety, will reduce wave action on the vessels from passing boaters, and will reduce the number of timber piles at this existing site. Please contact us if you need any additional information. Sincerely, ANDREW CONSULTING ENGINEERS, P.C. NC Firm PE License C-2461 Everett B. Pannkuk, P.E., SECB Enclosures: \, uinn 10 CAR �� ..�C 033407 Bz�9��s/��� CAMA Major Permit Application. Proposed Floating Dock Layout by Marina Design Associates, Inc. dated 4/26/2014. Existing Fixed Timber Docks by William Robert Wakeham, Architect dated 8/18/1997 Site Map by William Robert Wakeham, Architect dated 10/20/1987 RECEIVED OCT 0 3 2OU 3811 Peachtree Avenue :: Suite 300 :: Wilmington, NC 28403 :: Phone: 910.202.5555 :: Fax: 910.202.5558 :: web: andrewengineers.com MINOR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvada, III Governor Director Secretary AGENT AUTHORIZATION FORM Date: 8 l l 1 ` ( Name of Property Owner Applying for Permit: NameofAuthorized A//gennt for this project: TAt r. 1,J s U04Pawn�cck+f,E o Cha►l�+Gibbs,Zr,G Owner's Mailing Address: Po t30x 107q 1't'to/e%e,j 6,4u I Nc- Z$SS-P PhoneNumbercag Jennnlc �n'c)ley l N�r. Agent's MallingAddress: 3 sZ 11 Peaclnlffer Ave. Sit;k 30o L, ):Iw ;Ajjo,n , ,uc z1?yo3 Phone Number (910) ?oL-SSSS I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to Install or construct the following (activity): For my property located at`ia01 Se..4k 5400-e be. mb,,-�kcgj C.fy, NC This certification Is valid thru (date) 7 ///Z 04 S Property OwneDate h)070 �c� MO/� RECEIVED OCT 03 N"4 127 Caldnal Me Ezl., 019ml Im, NC 2905 ' DCM-MHD CRY Mona: 910.796.72151 FAX: 910-39639641nlemel: wvw.nccoaslelmanspemed.nel M Eq0310^dU r I ARM311, Iaem Eff"i > rt N 0 0 cn 3 R m A m ° vv mm m X v Z v Ll 3 D H O IN O m Cl - O w N N 0 N7- W N N O O O -�—1 °_ _ MARINA DESIGN ._ ASSOCIATES, INC. THE ARCHITECTURAL ELEMENTS OF MARINA DESIGN 425 RIVIERA DRIVE WILMINGTON. NC 28411 - 910.409.7783 - WWW.MARINADESIGNASSOCIATES.COM 4 N MJ O V N N C to y v Z U2 C p N G CNC D m < m m X. co 0 rt 0 to 0 FISHNG AREA D� N Z < m m Z m 0 O O Z I x I- I Z F G1 , I W ° rw o r E t Cal:N r 0 , I N w m 1 O > rt N 0 0 00 0 0 m W �— to r Has l— II � w w --I ED ] THE BLUFFS MARINA PROPOSED DOCK LAYOUT OPTION I Date: 4/26/14 Scale: Not To Scale Ref, TheBluffsMarina job NO: 20140425 Drawn By: T.S.Garrett Checked By: T.S.Garrett Notes: c I ( =24 r o vm - 9' ?f 4 nIq . k. — 1 4 1 _� • -14 . A++44 tiY 4L II It �r 4��11� 5d ATE z s s c �� ieo �_ �xfEF1f9F9 C oII �G AY7 �F/SIN _ WITH co p��(a� M if m. lu V7 �_- 11va -v51 �6� Tn is l _ f XX' K 12 g.ou I a DIIAIVINR RELEASER R 7 S t RE -CONSTRUCTION. QF DATE Evislows WILLIAM ItUBERT . EEECRIPTgN PEV. _Q- p • THE BLUFFS MARINA; I ARCHITECT WAKL�nm I� p INOREHEAD CITY N9" BUR OAK CIRCLE 6 AIA RALEIGH, NORTHCAROL-CAROL2 12 T'ELEPHONE7R78` ELEASEDF° VICINITY MAP $SkW�t �'l a t`'=h�` -EDGE or c,✓f r 44 REv_. - 4W+NEl Ar/444 i9 _ +, SE6�InAN�AdI � ! *' i i 14= C 2 l r�H.1.F15 PJ(19TN6 eW.FrDW 9H ^gf�kr PG4f6D� { i OVERALL PLAN THE BLUFFS TOWNHOMES. +-Zml sofkY'urie - �F-f•F�P�F7" uNE 4HE i •AIL PROPOSED NEW BOAT SUPS FOR THE BLUFFS ;oe�:mprcn;mCww+ .uissiM�c•wmwtuAxionex w•m4xpnxc�nnlu DETAIL PLAN RECENEC OCT 03 p- DCM-MHD C,, v i{Q C iLL F d < i co _ i p H, s no. � r-s