Loading...
HomeMy WebLinkAbout87872_SRIR Enterprises LLC_20220902 e`-''"` FIICAMA DREDGE & FILL TKi No 87872 A (B-) D GENERAL PERMIT Previous permit i �� �� Date previous permit issued , n New n Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected n CW n EW [ I PTA [ I ES n PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA Li UW n SPIMA n PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length > 1 "� r Access Length , ",,.- ! r `F kJ ,'<. 1 Pier(dock)length I Fixed Platform(s) 1 Floating Platform(s) . _. irir J ,._..„` :t._t• 1 r' ) a-1- Total Platform area , I _� f f I I 1 I Groin length/# _ I I . Bulkhead/Riprap length i _i___...._— ': —_____.--..__.._ . _ _4 T. Avg distance offshore _ Breakwater/Sill --- _r Max distance/length L•' ;- . (— • `~ Basin,channel l�" j j r` �',_.I Cubic yards l Boat ramp — �_. - r— r: ) Boathouse/Boathft a. , 1"', Beach Bulldozing + G+ Other i i ‘4 SAV observed: yes no - , ; t) m_ J 1 ) I. Moratorium: n/a yes no P f ••I +, i 1, Site Photos: yes no ��` Riparian Waiver Attached: yes no 1 . r ' f ; r� I r`''!-. A building permit/zoning permit may be required by: Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTEp Narl*,_4. ,.._..,. -.... — - ..„......----"` Signature"Please read compliance statement on back of permit** Signature r Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 3��`°"'"� CAMA I DREDGE & FILL 1>>~5 o 87872 AB CD � Previous permit GENERAL PERMIT i �� Date previous permit issued New Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) - Email Subdivision City ZIP Affected I I CW EW PTA ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): OEA I I IHA I I UW SPIMA I I PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity - 7 ' (Scale: / ) Shoreline Length I Access Length •<: ____._.._._?— —___.._.-..____ i 1 . . I I i I Pier(dock)length y i I ' Fixed Platform(s) I I i Floating Platform(s) 1 I j i . I j i i Finger pier(s) ;, I i I I _____.. _..___ I , i i i I i Total Platform area j ) I I I , 1 Groin length/# { I - . _ j Bulkhead/Riprap length f j -"' --___..— I Avg distance offshore •-__.r--j- _ i __ sBreakwater/Sill - -I- 1 Max distance/length . + Basin,channel ' I i tom _. _ _ __�... _ .._ _- , ,_ ' ► - Cubic yards I I i Boat ramp j —i - ! --_.. I Boathouse/Boat ift /" I I i Beach Bulldozing ; Other j 1 • I I ' . l , t i I ; I SAV observed: yes no i Moratorium: n/a yes no i j I Site Photos: yes no I - i " - Riparian Waiver Attached: yes no - — �i • Y_•' . I . i i A building permit/zoning permit may be required by: Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one) See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S.Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie,Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL COALtTY Do or BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico& Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 028.0233& .0259. The Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or lard clearing to a civil penalty by DWR of up to$25,000 per day per violation. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly(which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.The alignment shall minimize the removal of woody vegetation to the greatest extent practicable 2 Pervious Materials.All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3 Access Width:The width of the pier or docking facility access way shall be limited to six (6) feet. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way.This drawing will be used to aid in compliance and monitoring efforts. ��� • Pre-project Site conditions: &IL r S �" ��� 7.40:3' l — ----- > -� - -By your signature below you agree to be held responsible for meeting all of the conditions listed ab and verify that all information provided is complete and accurate. Dann.`_ lQ1(1t4C.'L Agent or Applicant Printed Name P it lc s Signature- 2-22. Agen or Applicant Signature Issue Date CAMA GENERAL PERMIT State of North Carolina ;Environmental Quality Coastal Management Washington Office'g-13 Washington Square Stall Washington,NC 27884 i 252-g4b•15.181 Wilmington Office t27 Cardinal Drive Ext Wilmington.NC 23405-38451 9lO T9b-721S Morehead City Office!tot)Commerce Avenue Morehead City,NC 28557 252-808-2808 N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONIWAIVER FORM • CERTIFIED MAIL- RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portiontis to be completed by owner or their agent) Name of Property Owner. S rcAU.. E4&spes LLC Address of Property: 431 Waxer ramp Rata /NGeeat A/C 2ts a Mailing Address of Owner. 4)Q Box $92; ape(c ihauuJ- NC 2Il0H Owner's email: Scndoy. rolxvsan@Lpcla-L,vit.drP• a Owner s Phone#: (?,52) 319-3503 Agents Name: bwijiA Ikarnenek Agent Phone# (2s2) ,q r-3 Qoo Agent's Email: din CaCkI$S r Af pnnq i .Gary ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adiacent Property Owner) I hereby certify that I own property adjacent tothe above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing,the development they are proposing.A description or drawing,with dimensions,must be provided with this letter. 2 I DO NOT have objections to this proposal. I DO have objections to this proposal. tf you have objections to what is being proposed you must notify the N.C. Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice Correspondence should be mailed to400CommrrceAvv,MareheadCity,MC28557.DCYr pdativescanalsobecontacted at(252)808-2808.No response is considered the same as no objection If you have been notified by Certified Mail WAIVER SECTION I understand that any proposed pier,dock,mooring pilings,boat ramp,breakwater,boathouse,lift,or groin must be set back a minimum distance of 154 from my area of riparian access untess waked by me (this does not apply to bulkheads or ri rap revetments).(If you wish to waive the setback,you must sten the appropriate blank below.) I DO wish to wake some/all of the 15'setback Signahue of er -OR- I do not wish to waive the 15'setback requirement(Initial the blank) Signature of Adjacent Riparian Property Owner.Typed/Printed name of ARPO: Ken Oa 1)51NC T1 k-t Mailing Address ofARPO: t`t(i9 C1'Fi5 . Paki5t, uL Z�%U3 ARPO's email; tCa0. Ill.OtherI O11L.hXXR ss ph.* 24). -4 q 7 Date: 9/L/ZO Z Z-+p a et is valid for up to one year from ARPO's Signature* Revised July 2021 • - r - .[.at'V v. •4U.;-• •;. q,-.i • 1-: r.1,)r_.. 1 y.- t..:: n1 4 f 3Se10. • •7 1V..j :n • _• 4 ' k T. b..1 . r .r to•I , a NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue,Governor James H,Gregson,Director Dee Freeman,Secretary Date August 31, 2022 Name of Property Owner Applying for Permit: SRJR, LLC!C. Saunders Roberson,Jr. Mailing Address: Post Office Box 8427 Rocky Mount, North Carolina 27804 I certify that I have authorized(agent) Daniel Hancock to act on my behalf,for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct(activity) Dock at(my property located at) 682 Weaver Camp Road, Merritt, North Carolina 28556 This certification is valid thru(date) January 1, 2025 August 31, 2022 Property S wner Signature Date 400 Commerce Avenue,Morehead City,North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity tNtmnativeAction Employer—50%Recycled 110%Post Consumer Paper N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER WAVER FORM CERTIFIED MAIL - RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Properly Owner. / cS 2Jg E4itt f r`Se$ CP Address of Property: U i l.(/°may e,/ Q_1 An !n / �G Z gss([ Mailing Add ressofOwner. Po )30X IL/� 7 pCG/^ / l/I .�v/ C Y� Owners email: Owners Phone* ✓4 Agents Name: l�i9r�/ Fl6✓1Ce1Gdt Agent Phone#:7 S Z -C 75-$70() Agents Email: ADJACENT RIPARIAN PROPERTY O (Bottom portion to be completed b the Adjacent property Owner I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A descri lion or drawin with dimensions must be rovided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what Is being proposed, you must notify the N.C. Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 400 Commerce Ave.,Morehead City,NC 28557.DCM representatives can also be contacted at(252)808-2808.No response is considered the same as no objection if you have been notified by Certified Mail. WAVER SECTION I understand that any proposed pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift,or groin must be set back a minimum distance of 15'from my area of riparian arks unless waived by me (this does not apply to bulkheads or riprap revetments).(If you wish to waive the setback,you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback Dj Signatu of Adjacen Riparian Property Owner -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner. Typed/Printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date:_ 'waiver is valid for up to one year from ARPO's Signature' Revised May 2021