HomeMy WebLinkAboutSC_04-86_HunterSurf City/Pender
Local Government
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
Health, and Natural Resources and the Coastal Resources Commission for development
In an area of environment cwncem pursuant to Section 113A-118 of the
General Statues, "Coastal Area, ManagemenC
SC 04/86
Permit Number
Issued to Milton & Douglas Hunter , authorizing development in Ocean Hazard AEC at 1120 N. Shore
Drive as requested in the permittee's application, dated 3-15-04 . This permit, issued on3 25-04 • is
subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
PERMIT TO BUILD A SINGLE FAMILY DWELLING WITH LANDSCAPING, BEACH CROSSOVER PER SUBMITTED PLAT AND DEMO
EXISTING STRUCTURE
I- Time structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 44-45, 2000
Residential Building Coda and the Local Flood Damage Prevention Ordinance as required by the National Flood lavuance, Program. Nmy
provisions of the building code or a flood damage prevention ordinance is inconsistent with any of the following AEC sumderdv, the more
restrictive provision shall control.
2- Tho structure must set back 60 feat from the fast line of stable natural vegetation.
3- The structure must be located entirely off of the frontal dune, and if a primary done is present, behind the crest of the primary dune.
4- The structure must be elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structural member must meet the 100-year
flood level elevation of determined for this lot
3- AB pilings shall have a tip penetration of 16 fat below existing grado or 5 feel below memm sea level whichever is less. For those structures so
located on the primary dune or nearer to the oceaq the pilings must extend to five fed below mean sea level.
6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced
disturbed areas will be immediately stabilized
7- This permit may be renewed for one year if requested before the expiration date.
8- The permittee, is required to contact the Local Pemtil officer shortly hot= he plans to begin construction to arrange a setback measurement which
will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the detemtinatim or the measurement
is void and must be redone.
9- Saud used to strengthen done, mug be bought in from an outside source and must be of the same nature as the sand in the area in which it is to be
placed. No send is to be removed from the hot.
10- Sand held in storage in any dune, other than final or primary dunes may be moved laterally in order to strengthen edging primary or frontal
does if the work would enhance the protection to the proposed development activity and the send is immediately stabilized.
11. AB development must be consistent with all -applicable, Federal, State, and Local standards.
12. Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by flanges in the shoreline
configuration. The structure shall be relocated or dismantled within two years ofthe time when it becomes imminently threatened, and in any case,
upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two years ofthe time the
structure becomes imminently threatened, so that the structure is no longer imminently threatened, them it need not be relocated or dismantled at
that time. This condition shalt not affect the permit holder's right to seek authorization oftempormy protective measures allowed under CRC
Rules.
13- All construction will be landward of (be vegetation Bee.
14- Pursuant to 1 SA NCAC, Subchapter 7f.0406(b), this permit may not be assigned, transferred, sold or otherwise disposed of to a third -party.
This permit action may be appealed by the permittee or other — I'll
qualified parsons within wanly (20) days of the issuing date. From total T Official (signature)
the date of an appeal, any work conducted under this permit must y�7 L
cease until the appeal is resolved.
This permit must be on the project site and accessible to the pemtil
officer when the project is inspected for compliance. APR 0 6 2004 e Padgett
Any maintenance work or project mocification not covered trade(
this permit require Hamer written permit approval. DIVISION OF P 0 Box 2475
All work must cease when this permit expires on December 31, 1 A STA L M 4 N ACi. E'" fU II
2007 I NC 28445
In issuing this permit it is agreed met this project is consistent Will
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal ManWrient.
Pernitlee
fsionahae recruited if special conditions above apDly to Dermit)
Sort City/Pander SC 04/86
Local Government Permit Number
MAR 3 2004
CMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Departrnent of Environment,
Health, and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management'
Issued to Milton & Douglas Hunter , authorizing development in Ocean Hazard AEC at 1120 N. Shore
Drive as requested in the permittee's application, dated 3-15-04 . This permit, issued on 3-25-04 , is
subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
PERMIT TO BUILD A SINGLE FAMILY DWELLING WITH LANDSCAPING. BEACH RO OV R PER SUMMED PLAT AND DEMO
EXISTING STRUCTURE
I- The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 44A5, 2000
Residential Building Code, and the Local Flood Damage Prevention Ordinance as required by the National Flood Insurance Program. If any
provisions, of the building code or a flood damage prevention ordinance is inconsistent with any of the following AEC standards, the more
restrictive provision shall control.
2- The structure must set back 60 fed from the first line of stable natural vegetation.
3- The structure must be located entirely off of the frontal done, and if a primary done is present, behind the crest of the primary dune.
4- The structure must be elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structurd member must meet the 100-year
flood level elevation of determined for this IoL
5- All pilings shall have a tip penetration of 16 feet below existing gook or 5 feel below mean sea level whichever is less. For those structures so
located on the primary dum or nearer to the ocem the pilings must extend to five feet below mean sea Ievel.
6. Done disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced
disturbed areas will be immediately stabilized-
7- This permit may be renewed for one year if requested before the expiration date.
8- The pemtince is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which
will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the determination or the measurement
is void and must be redone.
9- Sand used to strengthen duties must be brought in firm an outside source and must be of the same name as the stud in the area in which it is to be
placed No sand is to be removed from the lot
to- Sand held in storage in any dune, other than fiordal or primary duties may be moved laterally in order to strmgtleo existing primary or fromal
dunes ifthe work would enhance the protection to the proposed development activity and the sand is immediately stabilized.
11- All development must be consistent with all -applicable, Fedcr4 State, and Local standards
12. Any structure authorized by this permit shall be relocated or dismantled when it bewares imminently threatened by changes in the shoreline
configuration. The structure shall be relocated or dismantled within two years ofthe time when it becomes imminently threatened, and in any case,
upon its collapse or subsidence. However, if natural shoreline recovery or beach re-nourishmem takes place within two years of the time the
structure becomes inmrhently threatened, so that the structure is no longer imminently threatrned, then it need not be relocated or darmurtled at
that time. This condition shall not affect the permit holder's right to seek authorization oftemporary protective measures allowed under CRC
Rules.
13- All construction will be landward ofthe vegetation line.
14- Pursuant to 15A NCAC, Subchapter 710406(b), this permit may not be assigned, tranderred, sold or tshewise disposed of to a third -party.
This permit action may be appealed by the permittee or other
qualified persons within iwmty, (20) days of the issuing data. Fran
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, requite further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
vrttten approval of the Division of Coastal Management
Official (signature)
Steve Padgett
P 0 Box 2475
Surf City NC 28445
Pennittee
(signature reouireed if special conditions above aoolv to Dermit)
Locality s/ rf / (tr 1, Permit Number
Ocean Hazard - .— Estuarine Shoreline __ORW Shoreline _,Public Trust Shoreline Other
(For official use only) ,
GENERAL INFORMATION
LAND OWNER
Name
Address /7 I ) f p4 i Cr ee
City
AUTHORIZED ki AGENT,f
Name f kfi) ka f'P1() S
Address _ KA-5- M1,P v Deli
City i/)sl Yh �T� 0 (1 State f>%
V
Ne _29s / 9
LOCATION OF PROJECT- (Address, street name and/or
directions to site. If not oceanfront, what is the name of
the adjacent waterbody?) 1130 /�N � %D r I A i V
So' T 6I L, JI ) /'
DESCRIPTION OF PROJECT: (List all proposed construction and land dismr6o.,P 1
t _
SIZE OF LOTMARCEL: j F RQ square feet acres
PROPOSED USE: Residential-i (Single-family Multi -family _) Commerical/Industrial _
Other
TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI-
RONMENTAL CONCERN (AEC): - _1866 square feet (includes all floors and roof -covered decks)
I
SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON_ $U ACES IN
THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): - sq.ft.
(Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or mq �¢t
etc. that are within the applicable AEC. Attach your calculations with the project drawing.)asn
Choose the AEC area that applies to your property-
(1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC 1 9 2004
(2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstan aia
Resource Waters OF
ION T
(3) within 30 feet of the Public Trust Shoreline AEC p1�V 1 AN AGEj�11EN
(Contact your Local Permit Officer if you are not sure which AEC applies to your property.) C0As
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a
State Stormwater Management Permit issued by the N.C. Division of Water Quality?
YES— NO_.�<_
If yes, list the total built -upon area/impervious surface allowed for your lot or parcel. N I 11 square feet.
OTHER PERMITS MAYBE REQUIRED: The activityyou are planning may require permits other than the CAMA minor
development permit. Asa service we have compiled a list of the kinds of permits that might be required. We suggest you check over the list
w thyour LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic Tank (or other sanitary waste
treatment system), Building, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification,
Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway, Connection, and others.
STATEMENT OF OWNERSHIP:
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein. This interest can be
described as: (check one)
_an owner or record title. Tide is vested in
page in the County Registry of Deeds.
_an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
if other interest, such as written contract or lease explain below or use a separate
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
see Deed Book
attach to this application.
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(Name) (Address)
(1)
(2)
(3)
(4)
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which l,R a ible to
erosion and/or flooding. I acknowledge that the local permit officer has explained to me + I soci-
ated with this lot. This explanation was accompanied by recommendations concern a " i oodproofi h-
niques.
PERMISSION TO ENTER ON LAND: �(A , 9 3N
plvlsl( , EMEND
I furthermore certify that I am authorized to grant and do in fact grant permission to the local pgrglit ii" and his agents to
enter on the aforementioned lands in connection with evaluating information related toGi��ermit application.
r
O
Z
s
This application includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor-
mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated C
without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any
person developing in an AEC without permit is subject to civil, criminal and administrative action.
This the /6 day of /L 20
Ai AO .J1.r=5
Landowner or person authorized to act as his agent for purpose of filing a CAMA permit application
AEC HAZARD NOTICE
Project Is In An: Y Ocean Erodible Area High Hazard Flood Area _ Inlet Hazard Area
Date Lot Was Platted:
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on buildingstandards, oceanfront
setbacks and dune alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
.4 feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as l'b5 feet landward in a major storm.
Th flood waters in a major storm are predicted to be about
II q feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
Applicant's Signature
X R
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
�S-Rw PadynTO-4
Local Permit Officer
F.o . Bpi
Address
SL,rF CL41A INC a W6
Locality
1() �32 &'
enone � C IN th \
MAR 19 2004
��pppt�,Vl`'t0� O EMEl",T
/�l 4 � pd �4�`*4U
Revised 11193
CAMAI
NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits
in Areas of Environmental Concern hereby gives NOTICE that on 3-15-04, Mdton and Douglas
Hunter applied for a CAMA permit to demo existing home and erect a new house with a beach
crossover walkway with landscape and grading in the Ocean Hazard AEC at 1120 N. Shore
Drive. The application may be inspected at the address below. Public comments received by 3-
25-04 will be considered. Later comments will be accepted and considered up to the time of
permit decision. Project modifications may occur based on further review and comments. Notice
of the permit decision in this matter will be provided upon written request.
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
(910)-328-4131
Please publish on 3-17-04
�0STIS Orr
MAC 19 2004
DIVISIN V- ,
Cop,STAI- MP,
0
o
F1�1AL USE
�C-, 7
p postage $ �
b /
p cenlned Fee C 'ten
p
p ReNm Reciept Fee (�
O (Endorsement Required)
p Restrktad�elNary
(Endorsement Required)
r-I $ /
m
p
p
r
m
.n
m,.
ru O
m Post
F
7 C,gryadFee
mF
O Redepi Fee
p CendOrs°n'aniPequire�
p (Ereidoraemen.'RQ hed)
ra
mTotal foam, &Fee
mp `e
C3 lird
& Al
Ott JM�
G
OP J-lP�-M
A T L A N T I C
NEW RIYp1
VICINITY MAP — NOT
o C L A
LOT DATA:
AREA: 7,733.62 S
ZONE: R_3
SEIVACXA FRONT
soc__
SETT M
LEGEND:
SIS -
SET IRON STA
CP .
COMPUTED Pol
R/W = RIGHT Of WA
S8 +
SETBACK
+8.05
- SPOT ELEV�
SPK
SET PK NAIL
EPK
EXISTING PK I
50-38' }
.,_. -1— —gam T �-1W 51nuC1URE5 i
J BLOCK14 � ke1).Rs a 80
— ——SHORE DRIVE — 50' R/W�
veil
t6
BOUNDARY k TOPOGRAPHIC SURVEY
REF: M.�, 3, p, 86 AND PRELIUINARY 01 nT 01 A►N .___