and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Managernent7
Issued to MUR Partnership—, authorizing development in Ocean Hazard AEC at 2021 N. Shore Drive
as requested in the permittee's application, dated 12-08-03 . This permit, issued on 12-22-03
, is subject to compliance with the application and site drawing (where consistent with the permit), all
applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
PERMIT TO BUILD SINGLE-FAMILY DWELLING UNIT
1. The structure shall comply with the North Carolina Building Code and the Local Flood Damage Prevention
Ordinance as required by the National Flood Insurance Program. If any provisions of the building code or a flood
damage prevention ordinance is inconsistent with any of the following AEC standards; the more restrictive
provision shall control.
2. The structure must be elevated on pilings with a diameter of at least 8 inches and the first habitable floor level
measured to top of floor in AE Zone and bottom of lowest horizontal supporting member in VE Zone to meet 100-
year flood elevation.
3. This permit may be renewed for one year if requested before the expiration date.
4. All proposed development must be consistent with all -applicable Federal, State, and Local standards.
5. All proposed development and associated construction must be done in accordance with the permitted workplat
drawings as originally submitted and dated May 13, 2003.
6. Any change or changes in the plans for development, construction, or land use activities will require a re-
evaluation and modification of this permit.
7. Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold or otherwise
disposed of to a third -party.
8. Any structure shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline
configuration. The structure(s) shall be relocated or dismantled within two years of the time when it becomes
imminently threatened, and in any case upon its collapse or subsidence. However, if natural shoreline recovery or
beach renourishment takes place within two years of the time the structure becomes imminently threatened so
that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time. This
condition shall not affect the permit holder's right to seek authorization of temporary protective measures allowed
under CRC Rules.
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2006
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
oral P iit Ol�c
(� re) �F ENS
C$tlave Padgett
PO Box 2475
Surf City, NC 28445
P oor(signalise required if co dlions above apply to permit)
Locality ZA I J(k (�
Permit Number D`I . (") 3
ease Ocean Hazard AL Estuarine Shoreline
rmt
que!
HY' GENERAL INFORMATION
LAND OWNER
Address
HY1 City
AUTHORIZED AGENT
rA
you _
Address
City —
ORW Shoreline _Public Trust Shoreline _Other_
(For official use only)
State G_ Zip Phone %/0
State
Zip Phone
LOCATION OF PROJECT. ((Address, street name and/or dikections to site. If not oceanfront, what is the name of
the adjacentwaterbody?) (goo ( mre IJl�1 Ve.�)
you
DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.) �l�eCiT�
)EVI n 1 t r. 1_ - / n a _ . i _f
SIZE OF LOT/PARCEL: , 4Cyp square feet acres
PROPOSED USE: Residential ✓ (Single-family ✓Multi -family _) Commerical/Industrial _
Other
40T TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI-
RONMENTAL CONCERN (AEC): ___/4uf79 square feet (includes all floors and roof -covered decks)
-lave
• SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON SURFACES IN
THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): —l� sq. ft.
(Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or masonry patios,
etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
Choose the AEC area that applies to your property:
(1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC
(2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstanding
Resource Waters
Si (3) within 30 feet of the Public Trust Shoreline AEC
Si (Contact your Local Permit Officer if you are not sure which AEC applies to your property.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a
State Stormwater Mana ement Permit issued by the N.C. Division of Water Quality?
YES_ NO
Dai If yes, list the total built -upon area/impervious surface allowed for your lot or parcel. /10 square feet.
Rev]
OTHER PERMITS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA minor
y
development permit. As a service we have compiled a list of the kinds of permits that might be required. We suggest you check over the list
b
with your LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic Tank (or other sanitary waste
treatment system), Burning, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification,
Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway, Connection, and others.
0
z
STATEMENT OF OWNERSHIP:
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein. This interest can be
described as: (check one)
owner or record title. Title is vested in
page in the
County Registry of Deeds.
_an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
see Deed Book
_if other interest, such as written contract or lease, explain below or use a separate sheet and attach to this application.
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a LAMA permit.
(1)
(2)
(3)
(4)
(Name) (Address)
A_d z Sr,e" r. Ili-Ic a l og M . K1CW 2"
N
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to
erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associ-
ated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing tech-
niques.
PERMISSION TO ENTER ON LAND:
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to
enter on the aforementioned lands in connection with evaluating information related to this permit application.
This application includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor-
mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated
without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any
person developing in an AEC without permit is subject to civil, criminal and administrative action.
This the 5!�-day of CIM LT , 20 6
Landowner or person authorized to act as his agent fo �Poseof a CAMA permit application.
CAMAI
NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits
in Areas of Environmental Concern hereby gives NOTICE that on 12-08-03, MUR Partnership
applied for a CAMA permit to build a Single Family Dwelling with landscaping and grading in
the Ocean Hazard AEC at 2021 N. Shore Drive. The application may be inspected at the address
below. Public comments received by 12-18-03 will be considered. Later comments will be
accepted and considered up to the time of permit decision. Project modifications may occur
based on further review and comments. Notice of the permit decision in this matter will be
provided upon written request.
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
(910)-328-4131
Please publish on 12-10-03
Project Is In An
Date Lot Was Platted:
AEC HAZARD NOTICE
Ocean Erodible Area X High Hazard Flood Area inlet Hazard Area
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules onbuildingstandards, oceanfront
setbacks and dune alteration are designed to minimize, but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
fuarantee the safety of the development and assumes no
Inability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
—,2— feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as
much as V-rfeet landward in a major storm.
The flood waters in a major storm are predicted to be about
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
plicant's Signature
Date
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development in this
999vegetation
December 31 of the third year following the
the permit was issued. Shortly before work
project site, the Local Permit Officer will
line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. It is impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
Local Permit Officer
,Ue< Z q 7f
Address
� G tics
Locality
Phone
Revised 11193
Y/C/N/TY,fIAP
nv.sr�e� r
LOT/a SLOwY25
M L'7AW 4
OW 5E7TLEfl5LF4CH
OWOWC12 RAM
MAPdx7Y9PgGE7/
LOT W - 1
p .100050, FT. /O-//4BAC
O 2O.?1At rY-9,U9FaWW
ti AMR BMW
9C?PA6E/5B
OCSLOW CQAFZZ PSdt9.
/Q10'
H
d
LOTS"
�
P1gOatSE00M£ZLbw"' I
n�
5531je4u"W 50.00'
NOTE:
TNFPAq�EATY.ShE7/NVHEREgV/SICit�O F-5:
ado,
PtAo
0
NORTH SHOREDR/iiE 60'RZW
00'Q4M.4 647E QrZI F
/Yyfa)frn a 11 0I All
Postal
CERTIFIED
MAIL,,, RECEIPT
(Domegfic Mail Only,
No insurance Coverage
Provided)
OFFICIAL
USE
p
Postage
$
��
CerWied Fee
13 a
,•�
�(�P�`+
p
Realm%t
(Endorsement.tFee
Req quired)
n F
�, N
4
p
Resirictetl DBIWery Fee
J } '• i
-0
(Endorsement RequyIF"
r9
Total Postage & Fees
`•lam._. %--'" ,g
m
p
sam o
1
`�
p
------- tiL9L L
_4i7 ._
�t
_tom--•----
1
m
.a
FFICIAL
USE
0
Postage $
Caditied Fee
p
C3
Retum Reclept Fee ^5�
(Emtomment Requlmd) 7
p
�
ResMcted Delivery Fee
(En doreenrent Required)
t7
rrq
-lbtal Postage & Fees $
2
m
'Il
o_
__
M1
Saee4 APL No.; As
---------