Loading...
HomeMy WebLinkAboutSC_04-63_MUR PartnershipSurf City/Onslow Local Government 04/63 Perm Number CAMA MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environment, and Natural Resources and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statues, "Coastal Area Managernent7 Issued to MUR Partnership—, authorizing development in Ocean Hazard AEC at 2021 N. Shore Drive as requested in the permittee's application, dated 12-08-03 . This permit, issued on 12-22-03 , is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. PERMIT TO BUILD SINGLE-FAMILY DWELLING UNIT 1. The structure shall comply with the North Carolina Building Code and the Local Flood Damage Prevention Ordinance as required by the National Flood Insurance Program. If any provisions of the building code or a flood damage prevention ordinance is inconsistent with any of the following AEC standards; the more restrictive provision shall control. 2. The structure must be elevated on pilings with a diameter of at least 8 inches and the first habitable floor level measured to top of floor in AE Zone and bottom of lowest horizontal supporting member in VE Zone to meet 100- year flood elevation. 3. This permit may be renewed for one year if requested before the expiration date. 4. All proposed development must be consistent with all -applicable Federal, State, and Local standards. 5. All proposed development and associated construction must be done in accordance with the permitted workplat drawings as originally submitted and dated May 13, 2003. 6. Any change or changes in the plans for development, construction, or land use activities will require a re- evaluation and modification of this permit. 7. Pursuant to 15A NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold or otherwise disposed of to a third -party. 8. Any structure shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time when it becomes imminently threatened, and in any case upon its collapse or subsidence. However, if natural shoreline recovery or beach renourishment takes place within two years of the time the structure becomes imminently threatened so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary protective measures allowed under CRC Rules. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on December 31, 2006 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. oral P iit Ol�c (� re) �F ENS C$tlave Padgett PO Box 2475 Surf City, NC 28445 P oor(signalise required if co dlions above apply to permit) Locality ZA I J(k (� Permit Number D`I . (") 3 ease Ocean Hazard AL Estuarine Shoreline rmt que! HY' GENERAL INFORMATION LAND OWNER Address HY1 City AUTHORIZED AGENT rA you _ Address City — ORW Shoreline _Public Trust Shoreline _Other_ (For official use only) State G_ Zip Phone %/0 State Zip Phone LOCATION OF PROJECT. ((Address, street name and/or dikections to site. If not oceanfront, what is the name of the adjacentwaterbody?) (goo ( mre IJl�1 Ve.�) you DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.) �l�eCiT� )EVI n 1 t r. 1_ - / n a _ . i _f SIZE OF LOT/PARCEL: , 4Cyp square feet acres PROPOSED USE: Residential ✓ (Single-family ✓Multi -family _) Commerical/Industrial _ Other 40T TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI- RONMENTAL CONCERN (AEC): ___/4uf79 square feet (includes all floors and roof -covered decks) -lave • SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON SURFACES IN THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): —l� sq. ft. (Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or masonry patios, etc. that are within the applicable AEC. Attach your calculations with the project drawing.) Choose the AEC area that applies to your property: (1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC (2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstanding Resource Waters Si (3) within 30 feet of the Public Trust Shoreline AEC Si (Contact your Local Permit Officer if you are not sure which AEC applies to your property.) STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a State Stormwater Mana ement Permit issued by the N.C. Division of Water Quality? YES_ NO Dai If yes, list the total built -upon area/impervious surface allowed for your lot or parcel. /10 square feet. Rev] OTHER PERMITS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA minor y development permit. As a service we have compiled a list of the kinds of permits that might be required. We suggest you check over the list b with your LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic Tank (or other sanitary waste treatment system), Burning, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certification, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway, Connection, and others. 0 z STATEMENT OF OWNERSHIP: I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person listed as landowner on this application has a significant interest in the real property described therein. This interest can be described as: (check one) owner or record title. Title is vested in page in the County Registry of Deeds. _an owner by virtue of inheritance. Applicant is an heir to the estate of probate was in County. see Deed Book _if other interest, such as written contract or lease, explain below or use a separate sheet and attach to this application. NOTIFICATION OF ADJACENT PROPERTY OWNERS: I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a LAMA permit. (1) (2) (3) (4) (Name) (Address) A_d z Sr,e" r. Ili-Ic a l og M . K1CW 2" N FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS: I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associ- ated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing tech- niques. PERMISSION TO ENTER ON LAND: I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. This application includes: general information (this form), a site drawing as described on the back of this application, the ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor- mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any person developing in an AEC without permit is subject to civil, criminal and administrative action. This the 5!�-day of CIM LT , 20 6 Landowner or person authorized to act as his agent fo �Poseof a CAMA permit application. CAMAI NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits in Areas of Environmental Concern hereby gives NOTICE that on 12-08-03, MUR Partnership applied for a CAMA permit to build a Single Family Dwelling with landscaping and grading in the Ocean Hazard AEC at 2021 N. Shore Drive. The application may be inspected at the address below. Public comments received by 12-18-03 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request. Steve Padgett Town of Surf City PO Box 2475 214 North New River Dr. Surf City, NC 28445 (910)-328-4131 Please publish on 12-10-03 Project Is In An Date Lot Was Platted: AEC HAZARD NOTICE Ocean Erodible Area X High Hazard Flood Area inlet Hazard Area This notice is intended to make you, the applicant, aware of the special risks and conditions associated with development in this area, which is subject to natural hazards such as storms, erosion and currents. The rules of the Coastal Resources Commission require that you receive an AEC Hazard Notice and acknowledge that notice in writing before a permit for development can be issued. The Commission's rules onbuildingstandards, oceanfront setbacks and dune alteration are designed to minimize, but not eliminate, property loss from hazards. By granting permits, the Coastal Resources Commission does not fuarantee the safety of the development and assumes no Inability for future damage to the development. The best available information, as accepted by the Coastal Resources Commission, indicates that the annual ocean erosion rate for the area where your property is located is —,2— feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies also indicate that the shoreline could move as much as V-rfeet landward in a major storm. The flood waters in a major storm are predicted to be about feet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. Hard erosion control structures such as bulkheads, seawalls, revetments, groins, jetties and breakwaters are prohibited. Temporary devices, including sand bags, may be allowed under certain conditions. This structure shall be relocated or dismantled within two years of becoming imminently threatened. The applicant must acknowledge this information and requirements by signing this notice in the below space. Without the proper signature, the application will not be complete. plicant's Signature Date SPECIAL NOTE: This hazard notice is required for development in areas subject to sudden and massive storms and erosion. Permits issued for development in this 999vegetation December 31 of the third year following the the permit was issued. Shortly before work project site, the Local Permit Officer will line and setback distance at your site. If the property has seen little change and the proposed development can still meet the setback requirement, the LPO will inform you that you may begin work. It is impor- tant that you check with the LPO before the permit expires for official approval to continue the work after the permit has expired. Generally, if foundation pilings have been placed and substantial progress is continuing, permit renewal may not be necessary. If substantial progress has not been made, the permit must be renewed and a new setback line established. It is unlawful to continue work after permit expiration without this approval. For more information, contact: Local Permit Officer ,Ue< Z q 7f Address � G tics Locality Phone Revised 11193 Y/C/N/TY,fIAP nv.sr�e� r LOT/a SLOwY25 M L'7AW 4 OW 5E7TLEfl5LF4CH OWOWC12 RAM MAPdx7Y9PgGE7/ LOT W - 1 p .100050, FT. /O-//4BAC O 2O.?1At rY-9,U9FaWW ti AMR BMW 9C?PA6E/5B OCSLOW CQAFZZ PSdt9. /Q10' H d LOTS" � P1gOatSE00M£ZLbw"' I n� 5531je4u"W 50.00' NOTE: TNFPAq�EATY.ShE7/NVHEREgV/SICit�O F-5: ado, PtAo 0 NORTH SHOREDR/iiE 60'RZW 00'Q4M.4 647E QrZI F /Yyfa)frn a 11 0I All Postal CERTIFIED MAIL,,, RECEIPT (Domegfic Mail Only, No insurance Coverage Provided) OFFICIAL USE p Postage $ �� CerWied Fee 13 a ,•� �(�P�`+ p Realm%t (Endorsement.tFee Req quired) n F �, N 4 p Resirictetl DBIWery Fee J } '• i -0 (Endorsement RequyIF" r9 Total Postage & Fees `•lam._. %--'" ,g m p sam o 1 `� p ------- tiL9L L _4i7 ._ �t _tom--•---- 1 m .a FFICIAL USE 0 Postage $ Caditied Fee p C3 Retum Reclept Fee ^5� (Emtomment Requlmd) 7 p � ResMcted Delivery Fee (En doreenrent Required) t7 rrq -lbtal Postage & Fees $ 2 m 'Il o_ __ M1 Saee4 APL No.; As ---------