Loading...
HomeMy WebLinkAbout29-16 Moorecoastal Investments LLC Oversized Planse 8 EXIST. ADJACENT DOCK 71 15ft Riparian Setback 0 > 3 I Existing Floating Docks & Gangways, I ZZ44 D' Set h e+k Ak E)disfing Frame Building 0 Story) JW7. "D an Floating Dock 1� E or 2120— U ffD ffn H Existing Fixed Town of Swansboro Public Pier Surveyor's Legend E.I.P. Existing Iron Pipe E.C.M. Existing Concrete Monument E.I.R. Existing Iron Rebar E-P.K.N. Existing P.K. Nail E.R.R.S_ Existing Railroad Spike E.M.N. Existing Magnetic Nail I.P.S. Iron Pipe Set C.M.S. Concrete Monument Set P-K.N.S. P.K. Nail Set M.N.S. Magnetic Nail Set R/W Right of Way R Radius A Arc M.B.L. Minimum Building Line M.B. Map Book D.B. Deed Book AEC Area of Environmental Concern C.P. Computed Point C/L Centerline E.I.S. te'n,-- Existing Iron Star, OHP Overhead Power Legend (Existing) Existing Boat Slip (D Existing Town Dock Existing Gangway Existing Platform & Dock 17771 LLJ Existing Restaurant Open Deck Area Existing Restaurant Covered Deck I Porch Area Existing Frame Building 0 Story) Existing 1st Level Covered Deck 0 0 I IrIronPod . OLL Set Existing D-1eck TIT IT F H 1� TT Iron Rod Set H.J. Webb DB. 221 Pg. 253 N 27000'00"W — 195.77' N/F Moore(xmstal investments LLC D,,& 2563 Pg. 411 1 LJ Existing Frame Building (I Story) lau UUOU Restaurant Existing I st Level Covered Existirg Deck 1st Level Open Dw* Concrete Existing Fixed Town of Swansboro Public Pier IIOTES: "his plan document is for CAMA permitting purposes. !",weer Wor Contractor responsible to insure all project construction is consistent with owner's intended uses. Owner Wor contractor responsibility for project compliance Mth all applicable codes, ordinances, manufacturer r3commendations and regulations including building codes, !,etbacks, et cetera. contractor responsibility to inspect site and identify field (.onditions and related project cost implications thereof. ',Iertical and related data shall be field verified by 11rofessional Land Surveyor Final structural design shall be provided by: , ountain Taylor, PE 0 Power Pole Muni Upper eLevel Existing Frame Level Deck I Porch II Building Conc. (2 Story) Walk Ali MOORE STREET (30- R/W) .110 44 4P 0 40 6 4>0 VICINITY MAP NOT TO SCALE Power Pole -AE 01HIE OH- OHE Wood wall X Iron Pipe Wood Fence Water Meters (3) Ln is ParcA Tract Area Block Wall i, -n (Coo ij. Method) X 0 z z Cf) C? EA-Sfing i ni, Concrete X Walks M M Power II % �\ODIIHE 01E E F J, Concrete UNA Nail Set 4(0 CMI[A Process Planning SURVEY / BASE MAP PROVIDED BY: and Permit Facilitation by; COASTAL PLANNING SERVICES, ITS BELL & PHILLIPS SURVEYING, PLLC REFERENCE: Kathy B. Alinson, -AICP 604E CEDAR PT. BLVD. Comp,-eh-vi-v Land P11—joing and 1XrmfqpwrrntAuis**rr CEDAR POINT, NC 28584 Deed Book 1136 Page 670 P.O. Bcm 827 Office 252-31-14 V16 (252) 393-6101 Onslow County Registry Morehead City NC 285_57 Fax,2512473� 7--*; � 9 J NOT FOR CONVEYANCES OR RECORDING RECEIVED OCT 2 8 2015 DCM- MHD CITY EXIST. ADJACENT DOCK H.J. Webb e Q.B. 221 Pg. 253 0 CL Iron Rod 71 set N 27"00'00"W —""- 195.77' N/F Moorecoastal Investments LLC D.B. 2563 Pg. 411 Ice House Restaurant �e t Covered EAstiog Deck ist Level Open Deck Domax►T"fl-I I M—H I IIY,,�( "� N V 1 ' 1 ;'-� �<,r,"V X « ' �` Existin Fixed Town of SWansboro Publ""ic Pier Legend (Existing) Existing Boat Slip Existing Town Dock r Existing Gangway Existing Platform$ Dock �� Existing Restaurant Open Deck Area Legend (Proposed) Proposed Ingress I Exgress Platform Piles (�} Proposed Ingress I Egress Platform Proposed 2nd Level Deck A Landing / Walk - Open Areas Proposed Building & Deck Structure Pile(s) (minimum embedment 12ft in river bottom, 0 verify w/ structural designer) Proposed 8" x 8"Timber Posts - bearing on new beams between new structural piles. Enclose within and reinforce existing exterior building walls. Extend to support new roof and proposed 2nd story decks (Verify construction w/ structural designer). 9 N 0 Covered k Upper Level `Deck / Porch II k � l N Manhole -� I U p u S 27'00'00'E —r•- 190.96' II (Total) ( ) 184.1V MOORE STREET (30° R/W) REVISIONS 3/28/2015 per CPSI 6/22/2015 per CPSI 7/07/2015 per CPSI 4 'th 7/09/2015 per CPSI 7/2112015 per CPSI 40 7/29/2015 per CPSI 7/30/2015 per CPSI 1`36' 8/21/2015 per CPSI �g 9110/2015 per CPSI Power Pole Power Po OiF . - - -- 0 H!E - - E 0qE OH-il lE Wood YNaI! Iron Pipe ---- Wood Pence Water Meters (3) T CL rL in �® .� � 0Q � Uj co a:2E®� v 0a b ®X U� z US <taz 0 in �Qm CD c c "> W ,-, z 0 o s M0QU) > r-, ¢ - r > �. tLl V) z -C3 6 O OX U V Pall -ell Tract Area10 N Ground (Coold. Method) BlodkWa! ,```o�oaNmCrirs�,,rjP Level s N s I Walk i 7C z Exes*Q rti �y,�RES Concaele Wallis r'j'j Extr m Stair Fxiis b 1stLevel Open Deck Pole\HE E Power 0 E OHE _.._- Cormkxete CO Nail Set 410;r� CO 0 �l ® W O CD Cd rn U 0 .4 CL Pr 11110--4 RECEIVE® OCT 28 2015 DCM- MHD CITY SCALE: 1" = 10° ccuwu r CAMA Permitting Only DATE: 2/12/2015 OT FOR CONSTRUCTION Approvals & Permits Required PROJECT: 14-035 DRAWN BY: JNC/JRE SHEET 2/4 APPROX. HIGI- EL. +3,1 MLW LJ APPROX. HIGH WATER EL +3.1 MLW — Existing South Elevation (From River) 1"=5' I REVISIONS _ 6/22/2015 per CPSI K_.w 7107/2015 per CPSI 7/29/2015 per CPSI 9110/2015 per CPSI Aa ■ ■ Y. 0 r� i.r W c CL V) C, z �. Ci h 0 0cax rn < z Uj 6 ab zswo 4-0 � � Ed�®�Uj 9 c > r; z - 0 �omZ) > n <C �- ca c �I �® -� Q z ..� � a a E, fi�ES.P'�� ,.- COko v Q Co 0 o C W CO cci 0 O CIS U ;.., P� Q) CO 0 0 SCALE: =" DATE: 2/12/2015 RECEIVED PROJECT: 1 N11 0 C T 2 8 2015 PAWN BY: 1 a roCl 'P F DCM- MHD CITY SHEET APPROX. HIGH WATER EL. +3.1 MLW Z APPROX. HIGH WATER EL. +3.1 MLW U ME Proposed South Elevation (From River) 1"-5" 1L — —i Note: Gap / Space exaggerated to n II I illustrate structural independence as II j required by DCM it LJ LJ II � II =II nI I II it LJ * Ib-) I n 0 LJ LA JLJ Proposed East Elevation I� 1w_5e. W IJ NO] e%^w r r� `� 0���Z44 h i I �5� F EXISTING II I GRADE j 11 rll �, i I I II II 1 1 i i LJ LJ LJ LJ M 35" REVISIONS 6/22/2015 per CPSI 7/07/2015 per CPSI 7121/2015 per CPSI 7/29/2015 per CPSI 8121/2015 per CPSI 9/10/2015 per CPSI �kj/ KH C;41 fl • ''` R0- y4' • , FRES,� 16' . . I € Ms to m A 1 0^�7 ML M ca CO dICd ENCLOSED Q) pr VESTIBULE 0 SCALE. 1 " 5' DATE: 2/12/2015 RECEIVED PROJECT. 14-036 OCT 28 2015 DRAWN BY; JNC/JRF DCM- MHD CITE SHEET 4/4