HomeMy WebLinkAbout11-16 Minor Mod 2018 Stevens Towing Companyr Permit Class MODIFICATIONARNOR Permit Number 11-16 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission V rr* mtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Stevens Towing Co., 401 East Church Street, Edenton, NC 27932 Authorizing development in Chowan County adjacent to Chowan River, end of SR 1220, at 125 Dye Plant Rd. as requested in the permittee's letter dated 2/9/18, including the attached w6rkolan drawing (1). Sheet 1 of 1 dated "Revised 3/6/18". This permit, issued on April 5, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to tines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this Minor Modification authorizes the boat lift, finger pier, and bulkhead addition, all as expressly and specifically set forth in the attached letter and workplan drawing. Any additional development activities may require a modification of this permit. Shoreline Stabilization — Bulkhead Addition 2) The bulkhead alignment shall not exceed the alignment of the toe of rip rap, as authorized in the Minor Modification issued 6/16/17. (See attached sheets for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. EVis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Stevens Towing Co. ADDITIONAL CONDITIONS Permit No.11-16 Page 2 of 3 3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal. Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum -of 30 days prior to the new expected start of construction. 4) In consultation with the resource agencies, the bulkhead addition as depicted in attached workplans dated "Revised 3/6/18" may be constructed within the in -water work moratorium previously conditioned in the active permit dated 1/28/16. All other authorized development restricted to work outside this moratorium remains in force unless prior approval of the Division of Coastal 'Management, in consultation with appropriate agencies, has been granted. 5) The bulkhead shall be constructed prior to any backfilling activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of baekfill materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 9) - A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading, on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Barge Landing Facility 10) This modification authorizes a maximum of 1 formalized boat slip. All other docking structures are associated with the mooring of commercial barges and the barge maintenance facility. General 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to initiation of the development activities authorized by this Minor Modification. 12) This Minor Modification shall be attached to the original Permit No. 11-16, which was issued on 1/28/16, and all subsequent modifications and refinements, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 13) All conditions and stipulations of the active permit remain in force unless specifically altered herein. . , -- - ..............I ............. _._. ms Towing Co. Permit No.11-16 Page 3 of 3 ADDITIONAL CONDITIONS E: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2015-02613. E: The Division of Water Resources assigned the proposed project DWR Project No. 2015-1280. E: A minor modification application processing fee of $100 was received by DCM for this.project. N,-C� Coastal Management ENVIRONMENTAL DUALITY April 9, 2018 Stevens Towing Co. 401 East Church St. Edenton, NC 27932 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Qualay I Coastal.Mauayement Morehead City Office 1 400 Commerce Avenue I Morehead Oty, NC 28557 252808 2808 Quible Quible & Associates, P.C. P.O. D,o w870 W ty tbwk NC 27949 ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING Ph, :252-491-0147 SINCE 1969 FOR: 252491-8146 web: quble.cam Lynn Mathis NC Division of Coastal Management 1367 US 17 South i Elizabeth City, NC 27909 February 9, 2019 tit" RE: Minor Modification to CAMA Major 11-16 Steven Towing, Co. Ms. Mathis, The purpose of this correspondence is to request a CAMA Minor Modification to the existing CAMA Major Permit 11-16 to include the following: Item 1: A single boat lift near the end of the existing pier. This is proposed to be a 13 ft x 13 ft lift for a small work boat lift to be located immediately to the east of the existing platform. The lift/slip will be accessed by a 24 ft x 3 ft wood catwalk dock that will extend off of the existing platform. Item 2: A new section (50') of bulkheading along the shoreline near the pier. There is a section near the existing pier that we have permitted shoreline stabilization rip rap protection Oust to the north of the main bulkhead and wingwall that is already built). As the contractor has completed near shore mechanical dredging in this area, it has become evident that a section of additional bulkhead would be more appropriate since there is a relatively steep dredge slope and loose sands. This new bulkhead would be a low wall (2-3 ft lower than the existing main wall) and we would want to reserve that ability to keep rock behind the low wall as already permitted. This is shown on the plan. Both of these items are colored in red on the five copies of the plan enclosed, dated 1/26/2018. Letters have been sent to the adjacent riparian owners (see attached copies) and we have included the required $100 processing fee check. Once we receive the green card receipts (or any letters) from the adjacent riparian owners, I will forward those to you. I appreciate your assistance with this request. Please let me know if you will need anything else. Sincerely, Quible & Associates, P.C. Brian D. Rubino CC: Simon Rich RECEIVED MAR 19 2018 DCM- MHD CITY DCM Coordinator: permit m �(o _._ MARMG DISTRIBUTION Agents: &bw Qu6;.4a — DCMFieldOffices Mlizabeth City, tyxK # Fiv-4 (with revised work plan drawings) —M orehegd City Washington h3 Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bertie, Currituck, Dare, Gates; Pamlico, Pasquotank, Washington) Tom Steffam (NC DOT- Beaufort; Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder BCitylWasbingtm District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Ponder) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Barley .Public Water Supply: Heidi Cox (WiRO) Clif Whitfield (WARO) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton DEMLR/DWR, Karen Higgins ;► KristyLynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimam, Tyrrell, Washington) Wilmington: Robb Mairs — 401(Carteret, Ouslow, Ponder, New Hanover) Chad Coburn —401(Brunswick) Georgette Scott : Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARO) LPO: Fax Distribution: Permittee #: Agent# Bodnar, Gregg From: Scarbraugh, Anthony Sent: Monday, April 02, 2018 1:40 PM To: Bodnar, Gregg Cc: Simon Rich M; Edgerton, Thom; Brian Rubino; Mathis, Lynn Subject: RE: [External] Fwd: P15055 Steven's Towing NCG190000 N.01 Attachments: Comments for Stevens Towing Inc Minor Mod Request.pdf Mr. Bodnar, This Office has received the requested information and will remove the hold on the minor modification request. The subject minor modification will be considered deemed permitted. Regards, Anthony Scarbraugh Zg0 Environmental Senior Specialist 2ols- j Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthonv. scarbraughCrilncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brian Rubino [mailto:brubino@quible.com] Sent: Monday, April 2, 2018 11:04 AM To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Cc: Simon Rich III <simon@ebarge.net>; Edgerton, Thom <thom.edgerton@ncdenr.gov> Subject: [External] Fwd: P15055 Steven's Towing NCG190000 N.0.1 Anthony and Thom, Please see the attached .pdf of our NCG190000 package for Stevens Towing. The original with the check along with full sized plans are going in the mail to Raleigh as I discussed with Thom Edgerton. I had previously thought that our SW exemption letters from DEMLR covered that 401 cert condition since I was not familiar with NCG190000. Please let me know if this is sufficient for you to recommend authorization of the CAMA minor modification for bulk -heading and a boat lift at the end of the existing pier. Thanks, Brian Rubino Quible & Assoc. Sent from my Phone Begin forwarded message: From: "Troy Murphy" <tmurphy@quible.com> To: "Brian Rubino" <brubino@quible.com> Subject: P15055 Steven's Towing NCG190000 N.O.I Brian, Attached is a PDF of the NCG190000 N.O.I application package for Steven's Towing. Thanks Troy Murphy Environmental Scientist Quible & Associates, P.C. 8466 Caratoke Hwy, Bldg 400 Powells Point, NC 27966 PO Drawer 870 Kitty Hawk, NC 27949 t 252.491-8147 f 252.491-8146 www.guible.com Bodnar, Gregg From: Scarbraugh, Anthony Sent: Thursday, March 29, 2018 3:54 PM To: Bodnar, Gregg Cc: Mathis, Lynn; Tankard, Robert; May, David Subject: Minor Mod Request for Stevens Towing, Inc. Gregg, I will be placing the request on hold pending the initiation of applying for an NCG19000 as required by the 401 authorization with additional conditions issued on January 6, 2016 under DWR 15-1280. Regards, Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anth onv. scarbraug h Ancdenr. oov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Huggett, Doug Sent: Wednesday, March 21, 2018 5:21 PM To: Bodnar, Gregg Subject: FW: Stevens Towing, Minor Mod #11-16, Chowan County From: Dunn, Maria T. _ Sent: Wednesday, March 21, 2018 4:59 PM To: Huggett, Doug <doug.huggett@ncdenr.gov> Cc: Mathis, Lynn <lynn.mathis@ncdenr.gov>; Staples, Shane <shane.staples@ncdenr.gov> Subject: Stevens Towing, Minor Mod #11-16, Chowan County Huggett, I have reviewed the request to modify Permit #11-16 with an extension of the north end bulkhead alignment by 50' and construction of a 13' by 13' boat lift accessed by a 24' by 3' dock. Neither of these impacts would significantly change the scope of the project or have significant impacts to aquatic resources. We request that all permit conditions for Permit #11-16 remain. Thank you for the opportunity to comment on this permit modification. If there are any additional comments or questions, please do not hesitate to call or email. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 fax: 252-975-3716 www. ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and maybe disclosed to third parties. 1 Bodnar, Gregg From: Dunn, Maria T. Sent: Thursday, March 22, 2018 1:28 PM To: Mathis, Lynn; Huggett, Doug Cc: Staples, Shane; Bodnar, Gregg; Jennings, Frank Subject: RE: Stevens Towing, Minor Mod #11-16, Chowan County I believe installing the bulkhead should be fine Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 fax: 252-975-3716 www.ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Mathis, Lynn Sent: Thursday, March 22, 2018 8:56 AM To: Dunn, Maria T. <maria.dunn@ncwildlife.org>; Huggett, Doug <doug.huggett@ncdenr.gov> Cc: Staples, Shane <shane.stapies@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Jennings, Frank <frank.jen nings@ ncdenr.gov> Subject: RE: Stevens Towing, Minor Mod #11-16, Chowan County Just a quick question: Would Condition #2. of the permit prevent Simon from being able to install the 50' of bulkhead at this time. The need is rather urgent. There was a failure in the high bank, and he is concerned that a big storm could cause a catastrophic failure. Lynn W. Mathis Field Specialist NC Department of Environmental Quality NC Division of Coastal Management Elizabeth City District Office 401 S. Griffin Street Suite 300 Elizabeth City, North Carolina 27909 (252) 264-3901 (Ext. 234) FAX, (252) 331-2951 I�I 5> Nothing Compares.-.... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dunn, Maria T. Sent: Wednesday, March 21, 2018 4:59 PM To: Huggett, Doug <doue.huggett ncdenr.eov> Cc: Mathis, Lynn <Iynn.math is@ncdenr.aov>; Staples, Shane <shane.staples@ncdenr.aov> Subject: Stevens Towing, Minor Mod #11-16, Chowan County Huggett, I have reviewed the request to modify Permit #11-16 with an extension of the north end bulkhead alignment by 50' and construction of a 13' by 13' boat lift accessed by a 24' by 3' dock. Neither of these impacts would significantly change the scope of the project or have significant impacts to aquatic resources. We request that all permit conditions for Permit #11-16 remain. Thank you for the opportunity to comment on this permit modification. If there are any additional comments or questions, please do not hesitate to call or email. Maria Maria T. Dunn Coastal Coordinator INC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 fax: 252-975-3716 www.ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. lqf CEIVED Coastal Management MAR go 2018 ENVIRONMENTAL OUALITY I)CM-Fisheries March 15, 2018 WARO MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secrelary BRAXTON C. DAVIS Director TO: Raleigh Bland, USACOE Anthony Scarbraugh, DWR-Water Quality Shane Staples, Fisheries Resource Specialist, DCM Marie Tripp Dunn, NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Minor Modification Request to Major Permit #11-16 Applicant: Stevens Towing, Inc. Project Location: 125 Dye Plant Road, Chowan County Proposed Project: 13'xl3' boat lift addition accessed by a proposed 24'x3' "catwalk" dock and a 50' section of bulkhead to extend from the north end of the existing bulkhead alignment Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 04/05/18 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by fax: 252-247-3330 or email. If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on /the proposed project. tor'o v, a /�`I l This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED SIGNED�DATE JAI0/J49 ^Nothing Compares.,, State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 300 1 Elizabeth City, NC 27909 -- - 252-264-3901 1 252-331-2951[fax] Bodnar, Gregg From: Staples, Shane Sent: Thursday, March 22, 2018 1:30 PM To: Mathis, Lynn; Dunn, Maria T.; Huggett, Doug Cc: Bodnar, Gregg; Jennings, Frank Subject: RE: Stevens Towing, Minor Mod #11-16, Chowan County Lynn and Gregg, This is a relatively small area of impact and is unlikely to have an impact to fisheries. I would not hold this part of the project to the moratorium restriction. Thanks Shane Shane F. Staples Fisheries Resource Specialist Division of Coastal Management Department of Environmental Quality 252 948 3950 office shane.staples( ncdenr.00v 943 Washington Square Mall Washington, NC 27817 `''Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mathis, Lynn Sent: Thursday, March 22, 2018 8:56 AM To: Dunn, Maria T. <maria.dunn@ncwildlife.org>; Huggett, Doug <doug.huggett@ncdenr.gov> Cc: Staples, Shane <shane.staples@ncdenr.gov>; Bodnar, Gregg <gregg.bodnar@ncdenr.gov>; Jennings, Frank <fra nk.jennings@ncdenr.gov> Subject: RE: Stevens Towing, Minor Mod #11-16, Chowan County Just a quick question: Would Condition #2. of the permit prevent Simon from being able to install the 50' of bulkhead at this time. The need is rather urgent. There was a failure in the high bank, and he is concerned that a big storm could cause a catastrophic failure. Lynn W. Mathis Field Specialist NC Department of Environmental Quality VfALj' . NC Division of Coastal Management Elizabeth City District Office 401 S. Griffin Street Suite 300 Elizabeth City, North Carolina 27909 (252) 264-3901 (Ext. 234) FAX, (252) 331-2951 'w. c,..-'./'Nothing Compares..-..._ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Dunn, Maria T. Sent: Wednesday, March 21, 2018 4:59 PM To: Huggett, Doug <doue.hueaett@ncdenr.aov> Cc: Mathis, Lynn <Iynn.mathis@ncdenr.eov>; Staples, Shane <shane.staples@ncdenr.Eov> Subject: Stevens Towing, Minor Mod #11-16, Chowan County Huggett, I have reviewed the request to modify Permit #11-16 with an extension of the north end bulkhead alignment by 50' and construction of a 13' by 13' boat lift accessed by a 24' by 3' dock. Neither of these impacts would significantly change the scope of the project or have significant impacts to aquatic resources. We request that all permit conditions for Permit #11-16 remain. Thank you for the opportunity to comment on this permit modification. If there are any additional comments or questions, please do not hesitate to call or email. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 fax: 252-975-3716 www.ncwildlife.org Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Greg Bodnar, Assistant Major Permits Coordinator, Division of Coastal Management, Morehead City ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Direcior CC: Shane Staples, Fisheries Resource Specialist, NC DCM, WaRO Raleigh Bland, US Army Corps of Engineers, Washington Anthony Scarbraugh, DWR - Water Quality - 401, WaRO Maria Tripp Dunn, NC Wildlife Resources Commission, WaRO FROM: Lynn Mathis, Field Specialist, NE District, DCM THROUGH Frank Jennings, District Manager, NE District, DCM 'ZT DATE: March 13, 2018 SUBJECT: Request for Minor Modification of Major Permit #11-16 issued to: Stevens Towing, Inc. REFERENCE: (a) Letter from Brian Rubino (received March 7, 2018) requesting a Minor Modification (b) 15A NCAC 07J.0405, Permit Modification (c) DWR Project #15-1280 (d) USACOE Action #2015-02613 RECEIVED MAR 19 2018 DCM- MHD CITY Stevens Towing was issued CAMA Major Permit #11-16 on October 28, 2016, and expires on December 31, 2019. The original permit authorized the development of a barge mooring and maintenance facility that included the dredging of 8.69 acres of water bottom, the construction of 300' of steel sheet pile bulkheading, a 40' x 300' concrete loading dock, a gravel drive accessing the loading dock, a 205' x 80' barge ramp, 60' x 30' of riprap at the south end of the ramp, and nine steel monopile tie pilings adjacent to an existing 800' pier to tie off barges. 2. The permit received a Minor Modified on June 16, 2017, that included widening the ramp from 80' to 116', extending the bulkhead an additional 40' to accommodate the modified ramp, the construction of the ramp bulkhead 12' below normal water level to allow access by barges onto the ramp where they will be pulled into the maintenance bay, relocation of the maintenance bay further landward, the reconfigure of the barge maintenance area and vehicular access to the loading dock, the extension of bulkheading 40' in a southerly direction with a 30' return/wing wall and riprap, the placement of —80' of riprap from the north end of the bulkhead to an existing derelict pump house, and the construction of two 4' x 8' gangways to access barges from the existing pier. "Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951 [fax] North Carolina Department of Environmental Quality Division of Coastal Management 3. The current request to modify the permit includes: MEMORANDUM Page 2 of 2 a. The addition of a 13' x 13' boat lift for a small work boat to be located near the waterward end of the existing pier on the east side of an existing platform, and accessed by a proposed 24' x 3' "catwalk" dock extending from the platform. b. A 50' section of bulkhead to extend from the north end of the existing bulkhead alignment. The alignment was approved in the June modification to receive riprap along 80' of shoreline, and extend to a derelict pumphouse. The request to install a bulkhead is the result of a collapse along -50' of the shoreline escarpment. The placement of riprap in this area would not be stable. The bulkhead will be lower than the adjacent bulkhead with a return wall. The remaining shoreline would be riprapped as previously approved as original approved. 4. 1 conducted a site visit with the applicant on March 5, 2018, and have determined that the request meets the requirements contained in 15A NCAC 07H .0208 USE STANDARDS. 5. The required fee of $100, was received by the Elizabeth City District Office on March 5, 2018, from Quible & Associates, P. A., Check No. 4723. 6. It is recommended that the Minor Modification request be granted, provided all Permit Conditions of the original permit and subsequent modification remain in effect. A copy of the Minor Modification Request is attached, as well as a work plan drawing showing the proposed changes dated 03/06/18 and a work plan drawing dated 06/16/17 showing modifications landward of the 75' AEC authorized by DEMLR's Land Quality Section. Landward changes included the relocation of a large storage tank, concrete and the construction of a large berm between the barge facility and adjacent residential properties. Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PINNING • SURVEYING SINCE 1959 February 8, 2018 Barbara Lennon and Mary Frisina 1519 Eagle Ave. Norfolk, VA 23518 RE: CAMA Major Permitting Minor Modification Chowan County, North Carolina Dear Ms. Lennon and Ms. Frisina, i ")7 ,w1` P.O. Drawer= My Ncwk NC 27949 Phone: 252-491-8147 For. 252,491�9146 web: quble.e As adjacent riparian property owner to the property currently owned by Stevens Towing, it is a requirement by NCDEQ, Division of Coastal Management to notify you of the proposed Minor Modification to the existing CAMA Major Permit. The current modifications to what is already permitted include: • A single boat lift near the end of the existing pier • A new section (50') of bulkheading along the shoreline near the pier Both of these items are colored in red on the attached master plan for your information. Everything else already permitted or existing is in black. If you have no objections, please check the "I have no objection to this proposal box" at the top of the accompanying form and sign the bottom section and complete the Adjacent Property Owner information. it is not necessary to check anything in the Waiver Section in association with this modification. Please mail this back to me in the pre -posted envelope. You can reach me at (252) 261-3300 B you have any questions. Additionally, please feel free to contact Simon Rich, III with Stevens Towing Company if you wish to discuss future use or anything pertaining to this project. Mr. Rich can be reached at 252-482-1011. Sincerely, Quible and Associates, P.C. i 201 Brian Rubino RECEIVED MAR 19 2018 DCM- MHQ CfTY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 9-teVen s To wdnn Co. 's (Name of roperty Owner) property located atl25 la,e PIAiF 2d, (Address, Lot, Block, Road, etc.) on G(�owa� (Ewer in EdeAfo^ c!�y Noc )'alawa�Co„ N.C. (Waterbody) (City/Town and/or -County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Intlyidual proposing glevefopment must fill in description below or attach a s/te;alrawing) C(( S 3&cJ I;f+ of the e^c1 Cz, 5(> fit 04 ✓)ev (J't..IKHeAc of the e x+s 1,n'J p ie r Gla.,j J6red%; •tc rlPc - ?i,er Received MAY u 6.1011 WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, 0 must be set back a minimum distance of 15' from my area of riparian access unless wai me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) `/ adti SW' nature ���¢ens�f brictn U. t2inh„nc, (tiiub(e APSJae- jo C Print or Type Name p.p.ora� $moo Mailing Address tdcw K 4 N f_ Z-44 K9 City/state/Zip 2 92--2L1 3300 Telephone Number/email address 21A 20, 8 Date (Adjacent Property Owner Information) 6414 CZ1z &03AP--it L6Nntbn! Print or Type Name Mailing Address A"'e City/StatP/Zip / yt Ile". � J s s—1 Telephone Number/em tl address Date* w Iq 0 (Revised Aug. 2014) *Valid for one calendar year after signature' Quible Quible & Associates, P.C. ENC9EERNG - ENwiOM.ENTAL SCIENCES - PLANNING - 91MYING SNCE 1959 February 8, 2018 Raymond Bunch 3201 Rocky Hock Rd. Edenton, NC 27932 RE: CAMA Major Permitting Minor Modification Chowan County, North Carolina Dear Mr. Bunch, ro.Dm aro aMv HM& NC 27949 Phase: 252-491-8747 Pm: 252-491-8146 web: gWble.c As adjacent riparian property owner to the property currently owned by Stevens Towing, it is a requirement by NCDEQ, Division of Coastal Management to notify you of the proposed Minor Modification to the existing CAMA Major Permit. The current modifications to what is already permitted include: • A single boat lift near the end of the existing pier • A new section (50') of bulkheading along the shoreline near the pier Both of these items are colored in red on the attached master plan for your information. Everything else already permitted or existing is in black. If you have no objections, please check the "I have no objection to this proposal box" at the top of the accompanying form and sign the bottom section and complete the Adjacent Property Owner information. It is not necessary to check anything in the Waiver Section in association with this modification. Please mail this back to me in the pre -posted envelope. You can reach me at (252) 261-3300 if you have any questions. Additionally, please feel free to contact Simon Rich, III with Stevens Towing Company if you wish to discuss future use or anything pertaining to this project. Mr. Rich can be reached at 252-482-1011. Sincerely, Quible and Associates, P.C. +III WW— Brian Rubino RECEIVED MAR 19 2018 DCM- MHD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 5-kv2n3 Towing Co. 's (Name of Property Owner) property located at 125 Dye Plg.,t (Zd. (Address, Lot, Block, Road, etc.) on Chowan River in Fslonta» 1ZOCl l Hoeft),Chowtin Co., N.C. (Waterbody) (Cltylrown andror County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach'a site drawing) (I) 13oq( Lift a+ the m-( o✓ the 2Xi3 er (y) 5o ff- of vie(., low bNlkhego( odono sl^orellAe near pier -Se2 4-Rc.cl-N*A P(Gc. Received u 6 2018 WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adjacent Property Owner Information) or 61-330 6 Number/email address 'Valid for one calendar year after signature' Signature* Print or Type Name Mailing Address City/Stat&Wp Telephone Number/email address Date* (Revised Aug. 2014) �� 11 N v v CD CD C. m 0. ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1f(..�Article Addressed to: LLF Ab,r No�?FoL►< U'0 a3s")£- IIIIIIII111111IIIII11111 II 1111 III II111111II III 9590-9402 2876 7069 0960 19 7007 2680 0002 5929 8803 PS Form 9811, July 2015 PSN 7530-02-000-9053 ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: p i� IO moo) (50 .il�bLP-mjv N', a as illlllll111111l111111111 II 1111 Ill ll11111111111 9590 940Z 2676p7 2. Article Number Qlansferfrom service /eW- 7007 2680 0002 5929 8797 PS- F6rm389TJu1y2015PSN7521Yo2-00 053 -- ❑ Agent X n adore by(Pdrdeci Name) C. Da Delivery 0,Ai,n\nhJ Z D. Is delivery address diflarind from Item 1? E.I Ye: If YES, enter delivery address below, U No 3. Service Type ❑ PriorityMall Express® ❑ Adult Signature ❑ Registered Mail'r^ ❑ Adult Signature Restricted Delivery D Registered Mail Restricted - GlDergfledMail® Delivery ❑ Certified Mal Rasirlcted Dewery ❑ Return Recelptfor ❑ Collecton Delivery Merchandise ❑ Collect on Delivery Restricted Delivery ❑ Signature Confirmation TM ❑ Insured Mall ❑ Signature Confirmation ❑ Insured Mail Restricted Delivery Restricted Delivery (ovar$500) Domestic Return Receipt , B. Reff ived by (Printed Narr* C. of Delivery V D* of r D. Is delivery, address different from item 1? O Yes If YES, enter delivery address below: ❑ No 3. Service Type ❑ Priority Mall Express® ❑ Adult Signature ❑ Registered Mail- l ❑ uR Signature ResMcted Delivery ❑ Registered Mail Restricted� ediffed Mail® Delivery Certified Mail Restricted Delivery ❑ i l"ptfor ❑ Collect on Delivery Meurn ❑ Collect on Delivery Restricted Delivery ❑ Signature Confimiation^e ❑ Insured Mal 13 Signature Confirmation Insured Mail Restricted Delivery Restricted Delivery 'ver$500) Domestic Return Receipt ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to S� ven s To wing Co. 's (Name of roperty Owner) property located at f25 b.,e Pla,cf Rd, (Address, Lot, Block, Road, etc.) on C[�owwn fiver in Urn+" koc!!�J FfocKlo—^Co„ N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. 1 have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual piopoik- development must lit in description belowor attach a site drawing) C( 3 %oct iif+ at the fed CZ` So Ft O4 ✓),eu Jb lickeA4 Le- akkr-CYO, J fkcw% of the e x's k-Ij Pier` c,ld. j J6re-IAhc hpa� ?,er Received MAR u S 2818 ®CM -EC WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) `/ *- Telephone Number/email address Date (Adjacent Property Owner Information) Signature* Print or Type Name Mailing Address City/State/Zip Telephone Number/ email address Date* (Revised Aug. 2014) *Valid for one calendar year after signature Coastal Management ENVIRONMENTAL QUALITY March 15, 2018 MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Raleigh Bland, USACOE Anthony Scarbraugh, DWR-Water Quality Shane Staples, Fisheries Resource Specialist, DCM Mane Tripp Dunn, NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Minor Modification Request to Major Permit 411-16 Applicant: Stevens Towing, Inc. Project Location: 125 Dye Plant Road, Chowan County Proposed Project: 13'x13' boat lift addition accessed by a proposed 24'x3' "catwalk" dock and a 50' section of bulkhead to extend from the north end of the existing bulkhead alignment Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 04/05/18 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by fax: 252-247-3330 or email. If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE R En E iV ED —' � Nothing Compares State of North Carolina I Environmental quality I Coastal Management MAR 19 2M 401 S. Griffin St., Ste 300 1 Elizabeth City, NC 27909 252-264-3901 1 252-331-2951(fax) ;irci- IVIHD CITY