HomeMy WebLinkAbout21-16 Renewal 2020 Crystal HoldingsPermit Class RENEWAL Permit Number 21-16 STATE OF NORTH CAROLINA Department of Environmental Quality C�pY and Coastal Resources Commission ,permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 —X— Excavation and/or filling pursuant to NCGS 113-229 Issued to - Crystal Holdings LLC PO Boa 7, Atlantic Beach, NC 28512 Authorizing development in Carteret County at adjacent to Morgan Creek, 100 Olde Towne Yacht Club Rd., in Beaufort as requested in the permittee's application dated Letter dated 11/26/19. This permit, issued on February 17, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to tines, imprisonment or civil action; or may cause me permit to be nwr ana vora. 1) This renewal shall be attached to the Permit No. 21-16, which was issued to the permittee on 2/11/16, as well as all subsequent modifications and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2008 1740 V2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2008-03241 NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. r Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee DCM Coordinator: WM-kG,K Permit #: 2�1 MAILING DISTRIBUTION SHEET Permittee: 17 DCM Field Offices Elizabeth City Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh P Ile 'er (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) me Beaufort, Carteret, Craven, Pamlico) it BiddlecoDOT-Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Anne Deaton David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARD) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources Natural Heritage Program LPO: Robb Mairs - 401 (Carteret, Onslow, Pender, Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARD) Rodney Butler (NCDOT) Travis Wilson NC Division of Coastal Management CAMA Major Permit Renewal Request District: Morehead City Major Permit Staff: Gregg Bodnar -J, — `A licantZ'nformation Applicant n. • HDI /o• D. Last I First 1.) Project Address: Sneer Address CAMA Permit bZl-�1aN�M **rr T Agent's Name: Mt U ■ � City YES NO District Manager/Field Rep Approve? (Initial Appropriate Box) ❑ ❑ ' V Other Information DWR Project No: Has substantial YES NO If Yes, development occurred? ❑ ❑ Explain: VSD O Recommend to Renew?❑ If Denied, provide Justification: USACE Action ID No.: r Staff Signature: Date: North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 278891 252.946.6481 Wilmington Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 1 910.796.nl5 Morehead City Office 1400 Commerce Avenue I Morehead Clty. North Carolina 285571 252.808.2808 .W Doug Brady Crystal Holdings LLC 805 Front St Beaufort, NC 28516 2522412780 Dbradydev#gmail.com November 26, 2019 Heather Styron CAMA 400 Commerce Ave Morehead City, NC 28557 Dear Heather, � I would like to request the renewal of the CAMA permit 16 for Oceanside Yacht Club. I have included the $100 fee. We have excavated a large portion of the basin and preparing to start installing the seawall. Please contact me with any questions. Thanks, as always, for your assistance. Regards, Doug Brady Crystal Holdings LLC RECE,vIED oEC � 21p19 OcM"MND c`�`( I ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director March 3, 2020 NORTH CAROLINA EnWonmantal Quality Crystal Holdings, LLC Attn: James H.P. Bailey Jr., Managing Member P.O. Box 7 Atlantic Beach, NC, 28512 Subject: State Stormwater Management Permit No. SW8 080952 Oceanside Yacht Club High Density Project Carteret County Dear Mr. Bailey The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on January 13, 2020. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 as amended by Session Law (SL) 2008-211. We are hereby forwarding modified Permit No. SW8 080952 dated March 3, 2020, for the construction of the built -upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. Please note that the modified, updated, and re -issued permit does not impose new or different terms; it merely restates and clarifies some of the previous terms to provide you with a better understanding of your obligations under the permit. This permit shall be effective from the date of issuance until April 27, 2024 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance Problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please refer to Attachment C for a detailed description of the current proposed major modification and a list of all the past modifications approved during the effective period of the permit. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. Please add the attached plans to the previously approved plan set. Please replace the previous application (SWU-101) and supplement with the attached modified versions. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Ted Triantis in the Wilmington Regional Office, at (910) 796-7215 or ted.triantis@ncdeur.gov. RECEIVED Sincerely, t'--c• DEC 16 2020 .-X-. Brian Wre c ng Director Division of Energy, Mineral and Land Resources DCM-MHD CITY D_E Q�� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.795.7215 State Stormwater Permit No. SW8 080952 Page 2 of 2 Enclosures: Attachment C— Permitting History Application Documents DES/tjt: \\\Stomnwater\Permits & Projects\2008\080952 HD\2020 03 permit 080952 cc: Ginger Y. Turner, PE The Cullipher Group, PA Town of Beaufort Building Inspections Division of Coastal Management Wilmington Regional Office Stonnwater File State Stormwater Management Systems Permit No. SW8 080952 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Crystal Holdings, LLC Oceanside Yacht Club 100 Old Towne Yacht Club Road, Morehead City, Carteret County FOR THE construction, operation and maintenance of four (4) areas of permeable pavement that are designed to infiltrate runoff on a site that discharges to Class SA waters, in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until April 27, 2024, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 and 1.9 of this permit. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control measures. The stormwater controls labeled Drainage Areas 1, 2, 3, and 4 have been designed to handle the runoff from 95,169, 15,597, 905, and 1,010 square feet of built -upon area, respectively, which includes the available permeable pavement credits. 3. Per Session Law 2015-149: The project is proposing 8,200 square feet of #57 stone laid at least four inches thick over a geotextile fabric as a pervious surface for providing access to the storage units. The underlying soil must not be mechanically compacted prior to installation. If, in the future, this pervious surface is found to no longer meet SL 2015-149, a plan revision or modification will be required. Any future areas of #57 stone proposed within this development will need prior approval from the Division in order to demonstrate that the improvements are still considered pervious under the latest definition of built -upon area. 4. The maximum built -upon area allowed for the entire project is 112,681 square feet. Page 1 of 8 State Stormwater Management Systems Permit No. SW8 080952 5. The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2 and 1.9 of this permit, and per approved plans. This permit does not provide any allocation of built -upon area for future development. 6. Per Section .1008(h) of the stormwater rules, this alternative design provides equal or better protection because the permeable pavement has been designed to handle and infiltrate both the 1-year, 24-hour storm and 10-year, 24-hour storm event without discharging using an Infiltration rate of one-half of the expected infiltration rate provided in the soils report. 7. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 8. Vegetated buffers are not required for the following activities: a. urban waterfronts that meet the requirements of 15A NCAC 07H.0209(g) b. new urban waterfronts that meet the requirements of Session Law 2004-117 C. activities listed in 15A NCAC 07H .0209(d)(10)(A) through 15A NCAC 07H .0209(d)(10)(H) d. upland marinas that have received or will be required to secure a CAMA Major Development Permit. 9. The following design criteria have been permitted for the permeable pavement and it must be provided and maintained at the design condition: Area 1 Area 2 Area 3 Area 4 a.ITVpe of Permeable Pavement (PP): PICP PICP I PTRG PTRG b. PP desi n type: Infiltration Hydrologic soil group of subgrade: A A A A d. BUA Credit: 75% 75% 75% 75% Drainage Area, ft2: 174,558 25,535 10,310 4,040 Total Impervious Area Before PP Credit, ft2: Total PP Surface Area, ft2: Treated as Pervious (7591a), ft2: Treated as Impervious (2551o), ft2: Adjacent Impervious Area directed to PP, ft2: 174,558 105,853 79,389 26,464 68,705 25,535 13,251 9,938 3,313 12.284 3,620 3,620 2,715 905 1 0 4,040 4,040 3,030 1,010 0 g. Total Impervious Area After PP Credit, ft2: 95,169 15,597 905 1,010 Design Storm, inches: 3.66 3.66 3.66 3.66 i. Top of aggregate base layer elevation, FMSL: 7.55 1 8.00 1 7.33 7.08 L Bypass / Overflow elevation, FMSL: No desi nated overflow provided k. Bottom elevation at the Subgrade, FMSL: 6.55 7.00 1 6.83 6.58 I. Provided aggregate depth, inches: 12.0 12.0 6.0 6.0 m. SHWT elevation, FMSL: 4.0 4.0 4.0 4.0 n. Underdrain Diameter, inches: n/a n/a n/a n/a Expected Infiltration Rate, in/hr: 3.0 3.0 3.0 3.0 Time to Drawdown, days: 0.4 0.5 0.3 0.3 Receiving Stream / River Basin: UT to Newport River / White Oak r. Stream Index Number: 21 17 Classification of Water Body: SA, HQW Page 2 of 8 State Stormwater Management Systems Permit No. SW8 080952 II. SCHEDULE OF COMPLIANCE 1. The permeable pavement must be installed by a qualified individual, certified in the specific construction techniques required for permeable pavements. 2. During the installation of the permeable pavement, special care must be taken to avoid compaction of the underlying subgrade soils. A direct measurement of the soil's infiltration rate must be taken immediately after excavation and before the aggregate is placed. Infiltration rate testing shall be conducted by an appropriately -qualified professional. The results of the testing shall be given to the designer of record for review. If the soil test shows that infiltration rate(s) that are lower than the rate(s) used in the final design, then the designer shall check the calculations and may need to adjust the design. 3. The permeable pavement must be protected during site construction such that no sediment -laden runoff is directed across the permeable pavement surface. Areas upslope of the permeable pavement must be stabilized with a substantial stand of permanent grass cover prior to construction of the permeable pavement. 4. The proposed stormwater runoff conveyance and collection system and the built -upon areas must be constructed and maintained at the dimensions, elevations and grades as shown on the approved plans. 5. For each section or terrace of permeable pavement, at least one observation well shall be provided. 6. Permeable Pavement signage must be clearly and permanently posted to prevent use by inappropriate vehicles as well as the deposition and storage of particulate matter. 7. Trees overhanging the permeable pavement should be avoided. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 12. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 080952 13. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited I those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. b. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. C. Redesign or addition to the approved amount of BUA or to the drainage area. d. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. e. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. f. The construction of any allocated future BUA. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 14. All stormwater collection and treatment systems must be located in either public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 15. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules, is subject to enforcement action as set forth in NCGS 143, Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080952 4. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 5. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14- 05 or NCGS 57D-6-07 and 08; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; Current Permittee Name or Address Changes: The permittee shall submit a completed 'Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee; 7. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. Approved plans, calculations, supplement forms, operation and maintenance agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 10. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080952 Permit modified, updated, and re -issued this the 3'd day of March, 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .X', Brian vvrenn, Acting irec ar- ` Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 080952 Page 6 of 8. State Stormwater Management Systems Permit No. SW8 080952 Oceanside Yacht Club Stormwater Permit No. SW8 080952 Carteret County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080952 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. . 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Town of Morehead City Building Inspections Page 8 of 8 Attachment C-Permitting History Oceanside Yacht Club Permit No. SN8080952 Approval permit Action BIMS Description of the Changes Date Version Construction of 3 infiltration basins and 3 underground infiltration 3/27/2000 Original (HD) 1.0 chambers under 15A NCAC 2H .1000 rules (1995). (DA-1, 2, 3, 4, 5 and 6) 10/23/2015 Transfer 1.1 Transfer of permit owner and name change. Construction of 4 areas of permeable pavement to handle runoff in 4/27/2016 Modification 1.2 compliance with the provisions of 15A NCAC 21-1.1000 and Session Law 2008-21 l rules (2008). (DA-1, 2, 3 and 4) *DA 1 - decreasing both the BUA and size of the permeable 3/3/2020 Major 13 pavement Modification *DA 4 - increasing both the BUA and size of the permeable pavement DEMLR USE ONLY Da Re eived Fee Paid Permit Number I. aoaD 0 C �1�8 0go 5a Applicable Ru es: 1 ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph H - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M t Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Oceanside Yacht Club 2. Location of Project (street address): 100 Olde Towne Yacht Club Road City: Beaufort County: Carteret Zip:28516 3. Directions to project (from nearest major intersection): From the intersection of Hwy 70 and Hwy 58 take Hwy 70 towards Beaufort approximately 3 miles to Radio Island Road take right on Radio Island Road follow to Marine Road on left and travel approximately 1000 feet to Olde Town Yacht Club Drive. 4. Latitude:34* 42' 60" N Lon9itude:-76* 40' 49" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modification tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW8 080952 , its issue date (if known) 4/27/16 and the status of construction: ®Not Started ❑Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ®LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 11.2 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Major CAMA 21-16, Erosion Control CARTE-2016-004 5. Is the project located within 5 miles of a public airport? UNo LC]Ye; If yes, see S.L. 2012-200, Part VI.- htto•//portal redenr orglweb/Ir/rules-and eg ilations Fonn SWU-101 Version Oct. 31, 2013 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the nroiect): Applicant/Organization: Crystal Holdings LLC Signing Official & Title: Tames H. P. Bailey Jr.,Managing Member b. Contact information for person listed in item la above: Street Address: 517 E. Fort Macon Road City:Atlantic Beach State: NC Zip: 28512 Mailing Address (if applicable): P.O. Box 7 City:Atlantic Beach Phone: (252 ) 241-1200 Email: iimbailey1946@gmail.com State: NC Zip: 28512 Fax: ( ) c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Signing Official & b. Contact information for person listed in item 2a above: Street Address: State: Mailing Address (if Zip: Phone: ( 1 Fax: 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing City:_ Phone: Fax: 4. Local jurisdiction for building permits: Town of Morehead Cites Point of Contact: Phone #: ( 252 ) 726 6848 � 1-7" 17- t�s Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The parking and drives will be constructed of permeable pavement and will infiltrate runoff from all 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area:12.02 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 2.79 (upland basin)acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 9.23 acres Total project area shall 6e calculated to exclude the following: the normal p001 of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (Nfi[N) line or Mean High Water (A4W line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (B LIA). Non -coastal wetlands landward of the NHW (or MHfM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 27.92 % 9. How many drainage areas does the project have?4 (For high density, count 1 for each proposed engineered stormwater BMP. For law density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Newport River Newport River Newport River Newport River Stream Class * SA;HQW SA;HQW SA;HQW SA;HQW Stream Index Number * 21-(17) 21-(17) 21-(17) 21-(17) Total Drainage Area (sf) 174,558 25,535 10,310 4,040 On -site Drainage Area (at) 174,558 25,535 10,310 4,040 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area** s 95,169 15,597 905 1,010 % Impervious Area** total 54.52% 61.08% 25% 25% Impervious" Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (sf) 65,200 On -site Streets (so On -site Parking (sf) 26,464 3,313 On -site Sidewalks (so 3,505 Other on -site (sf) 905 1,010 Future (sf) Off -site (sf) Existing BUA*** (so 12,284 Total sf): 95,169 15,597 1 905 1,010 " Stream Class and Index Number can be determined at: Iran://nortnl.ncAznr.v %nehii;; /�s/ su/dnriFcntions Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "*Report only that amount o existing BUA that will remain after development. Do not """� J f 8 ft op epic dnyexts3ing•BAthat'i is to be removed and which will be replaced by new BUA. iI q ,r _) i, Forth SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DEMLR Central Office staffto check iflhe project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15,4 NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromliW?://portni.iiccleiiy.orgILveb/w,c4/ws/sti/bmD-niaiival. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hW2:It/portal.ncdem.orc/web/svq/tvs/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office maybe found by locating project on the interactive online map at h=://Rortal.ncdenr.oa/web/wq/ws/su/mans.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions foreachsubmittedapplicationpackagefromhtt ://oortal.ncdenr.org/web/wq/ws/su/stntesw/forms_docs. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) y 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M )' agreement(s) for each BMP. _ 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hgp://www.envhelp.org/pazes/onestopexpress.htnl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. „ 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within;/2 mile of the site boundary, include the V2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded ? , structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. /r ' `; >."rr>•; i. Dimensioned property/project boundary with bearings & distances. Existiite with all BUA and ng contours, proposed cout ontours, ured s k. elevations, finished floor elevations. 71;/ 1. Details of roads, drainage features, collection systems, and stormwater control measures. 'I;(. Wetlands delineated, the that be delineated by in. or a note on plans none exist. (Must a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"41" copy of the NRCS County Soils map with the 1, project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verifij the SHWT prior to submittal, (910) 796-7378.)L ' f ? c'v;a > j 10. A copy of the most current property deed. Deed book: 1431 Page No: 296 4, t z 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC o C t`7 Secretary of State or other official documentation, which supports the titles and positions held 1 1_ r `Z (l ,( by the persons listed in Contact Information, item Is, 2a, and/ or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h=://www/ secreWstatencus/Corporations/CSearchasR VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from li'tp://iportal.nccieiir.org/oveb/Ir/state-stormwiter- forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Ginger Y. Turner PE Consulting Firm: The Cullipher Group PA Mailing Address: 151-A Hwy 24 City: Morehead City State: NC Zip: 28557 Phone:( 252 ) 773-0090 Fax: Email: ginger®tcgpa.com IX PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system- ry� , Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item la) lames H. P. Bailey, Jr.Managing Member certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater niAs under 15AJNCAC 2H .1000 and any other applicable state stormwater requirements. Signature: ''' Date: � I, i lvp n p . H-Ys` ec o tip_ a Notary Public for the State of NC County of ��?Ye do hereby certify that 1`Q,YYI `o �� � l� 1IPJ l t�1 personally appeared before me this 5 day of l Af111Q 2v and ac nowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, t t 1 r Q. Q7(`,I a l W aw®,N%s gL 6 08t� Qy i i TARy O o� rt- :.� PUBIIG SEAL My commission expires � l 120I ozoy JA l BY! Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 Permit N,Su go g oq (to be provided by DWry oaf YIAlFy L a STORMWATER MANAGEMENT PERMIT APPLICATION FORM o� NCDENR 401 CERTIFICATION APPLICATION FORM PERMEABLE PAVEMENT SUPPLEMENT This form must be completely filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. .PROJECT. INFORMATION, n.� s Project Name Crystal Holdings, LLC Contact Person James H. P. Bailey. Jr. Phone Number Date Drainage Area 1-POROUS CONCRETE If:'_DESION»INF012MkTION s Solis Report Summary Hydrologicsoll group (HSG) of subgrade A Infiltration rate 3.00 In/hr Pavement Design Summary Permeable Pavement (PP) design type SA of PP being proposed (Ap) Resulting BUA counted as Impervious for main application form Adjacent BUA directed to PP (AJ Ratio of Ar to A. Flow from pervious surfaces is directed away from PP? Design rainfall depth Permeable pavement surface course type Layer 1- Washed aggregate size (ex. No. 57) Layer 1-Aggregate porosity (n) Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 -Aggregate porosity (n) Minimum total aggregate depth for design rainfall (D„y) Drawdown/infiltration time for D.A How is 10-yr, 24-hr storm handled? Aggregate depth to infiltrate 10-yr, 24-hr storm (Drc) Drawdown/Infiltration time of 10-yr, 24-hr storm Actual provided total aggregate depth Top of aggregate base layer elevation Storage elevation of design rainfall depth Overflow elevation Bottom elevation at subgrade SHWT elevation Underdrain diameter Infltratian - HSG A/B 105,853 ft2 26,463 ft' 68.705 it, 0.65 (unitless) Yes lyr,24hr post -pre In PC No. 57 0.40 (unitless) (unitless) 15.1 In 0.4 days infiltrated -3.1 in 0.80 days 12.0 in 7.50 fmsl 6.50 fmsl Does not overflow fmsl 6.50 fmsl 4.00 fmsl N/A in BUA Credit for Permeable Pavement Footprint: 75% SUA Credit OK OK 03 OK Too shallow, must be at least the Dwq ;4;{"_ojvtcc.lzDZSi;bi 'JREFI �� 'T4 l�t •, � r .JAN Form SW401-Permeable Pavement-Rev,4-October 16. 2012 PP Supplement Form, Page 1 of 3 Detention Systems (skip for Infiltration systems) Diameter of orifice Coefficient of discharge (Co) Driving head (H.) Storage volume discharge rate (through discharge orifice) Storage volume drawdown time Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak Row Additional Information Slope of soil subgrade at bottom of permeable pavement Slope of the permeable pavement surface Construction sequence minimizes compaction to soils? Subsoil preparation specified (must select one) Meets Industry standards for structural requirements? Washed stone is specified for the aggregate? Required signage specified on plans? Number of observation wells provided Distance to structure Distance to surface waters Distance to water supply well(s) (unitless) ft fta/sec days fts/sec fta/sec 0.50 % 5.00 % Yes sarified Yes Yes Yes i 0.00 ft 36.00 it N/A ft Permit No. fto be provided by DWQ) OK OK OK OK OK OK OK OK for non -SA waters OK Form SW401-Permeable Pavement-RevA-October 16, 2012 PP Supplement Form, Page 2 of 3 Permit No. (to be provided by DWQ) ill.: RERUlREW EIMCKCKI.1ST ;a .'� 7 'SV. Please Indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project. Initial In the space provided to Indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Location of permeable pavement, - Roof and other surface Row directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: - All layers (Including details about the surface course), and . -SHWT 3. A detail of what the permeable pavement sign. 4. A site specific soils report that is based upon an actual field Investigation, soil borings, and Infiltration tests within the footprint of the proposed permeable pavement The soils Investigation shall state the infiltatlon rate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils Information. (Projects in the WiRO -The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils invpctipatinn mnupO fnrm I S. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area Is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Intllals. Pagel Plan Sheet No. Sheets 1, 4 & 5 Sheet 9 L 4": Sheet9 Is i- Attached as previously submitted /( I Sheets i Attached - j :. N/A Previously submitted N/A !: I I�1 �r111 i r '(li�j i i Form SW401-Permeable Pavement-Rev.4-October is. 2012 PP Supplement Form, Page 3 of 3 Permit No. +(to be provided by DWQ) aa��.�o'OIvl r pq AMNY ' STORMWATER MANAGEMENT PERMIT APPLICATION FORM of a NCDENR 401 CERTIFICATION APPLICATION FORM PERMEABLE PAVEMENT SUPPLEMENT This farm must be completely rifled out, printed and submitted. The Required Items Checklist (Pail 111) must be printed, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Date Drainage Area Soils Report Summary Hydrologic soll group (HSG) of subgrade Infiltration rate Pavement Design Summary Permeable Pavement (PP) design type SA of PP being proposed (Ao) Resulting BUA counted as impervious for main application farm Adjacent BUA directed to PP (AJ Ratio of A, to Ap Flow from pervious surfaces Is directed away from PP? Design rainfall depth Permeable pavement surface course type Layer 1- Washed aggregate size (ex. No. 57) Layer 1-Aggregate porosity (n) Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) Minimum total aggregate depth for design rainfall (ILJ Drawdown/infiltration time for D. How Is 30-yr, 24-hr storm handled? Aggregate depth to infiltrate 10-yr, 24-hr storm (Dra) Drawdown/infiltration time of 10-yr, 24-hr storm Actual provided total aggregate depth Top of aggregate base layer elevation Storage elevation of design rainfall depth Overflow elevation Bottom elevation at subgrade SH WT elevation Underdraln diameter A 3.00 in/hr Infiltration - HSG AIR 13,251 Rz 3,313 fir 12,294 ftz 0.93 (unitless) Yes OK OK BUA Credit for Permeable Pavement Footprint: 75% BUA Credit 1yr,24hr post -pre In -- 3 Ov .a•� PICP " No. 57 0:40 (unitless) OK No. 3 0.40 (unitless) OK 17.7 in '-0.5 days OK Infiltrated -2.9 in 0.92 days '12.0 - In Too shallow, must be at least the Owq 8.00 fmsl %S -Amust L, rn CA\YAi.. C.(Lo :'y' 7.50 fmsl ! Doesnotoverflaw fmsl 7.00 fmsl 4.00 fmsl N/A In #REFI C!{� z) I j. is/�16 Form SW401-Penneabla Pavement-Rev.4-October 16. 2012 PP Supplement Form. Page 1 of 3 Detention Systems (skip forinfflfrafion systems) Diameter of orifice in Coefficient of discharge (Co) (unitless) Driving head (Ho) ft Storage volume discharge rate (through discharge orifice) ft"/sec Storage volume drawdown time days Pre -development 1-yr, 24-hr peak flow ft'/sec Past -development 1-yr, 24-hr peak flow fe/sec Additional Information Slope of soil subgrade at bottom of permeable pavement 0.50 % OK Slope of the permeable pavement surface L00 % OK Construction sequence minimizes compaction to soils? OK Subsoil preparation specified (must select one) :'scarified Meets industry standards for structural requirements? .:Yes OK Washed stone is specified for the aggregate? Yes OK Required signage specified on plans? 'Yes- - OK Number of observation wells provided 1 OK Distance to structure . '21.00 ft Distance to surface waters 225.00 ft OK Distance to water supply well(s) N/A ft OK Form SW401-Penneable Pavement-Rev.4-October 16, 2012 Permit No. (to be pmvfded by DWQ) i PP Supplement Fonn, Page 2 of 3 Permit No. (to be provided by DM) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below. if a requirement has not been met, attach justification. (tials 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, -off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Location of permeable pavement, - Roof and other surface flow directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: -All layers (Including details about the surface course), and -SHWT 3. A detail of what the permeable pavement sign 4. A site specific soils report that is based upon an actual geld investigation, soil borings, and Infiltration tests within the footprint of the proposed permeable pavement. The soils investigation shall state the In0ltation rate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils information. (Projects in the WiRO - The results of the sells report must be verified in the field by DWCL by completing & submitting the soils investigation request form.) S. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Paget Plan Sheet No. S'Wj`[1S A+1ztz'V�e.iA SO t� A-Vizi.cLA L t ju �.ol 1])Y'..... -------- Form SW401-Permeable Pavement-Rev.4-October 16, 2012 PP Supplement Form, Page 3 of 3 Permit No. "J4S�L.�tt4J.. (lo be provided by DWQ) oFwarEy 5�p {91N Mly _ _ STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM PERMEABLE PAVEMENT SUPPLEMENT This form must be completely filled out, printed and submitted. The Required Items Checklist (Part IIQ must be printed, rifled out and submitted along with all of the required information. Project Name " E' nO1°S'; "" contact Person James.H.R Bailey,'Jr. Phone Number 252-241.1200 : : Date 812512o15 Revised 1/25/2016, 312112016 Drainage Area 3 II. DESIGN:WFORMATION' Soils Report Summary Hydrologic soil group (HSG) of subgrade A Infiltration rate 3.00 In/hr Pavement Design Summary Permeable Pavement (PP) design type SA of PP being proposed (Ae) Resulting BUA counted as Impervious for main application form Adjacent 9UA directed to PP (A J Ratio of A. to Ae Flow from pervious surfaces is directed away from PP7 Design rainfall depth Permeable pavement surface course type Layer 1- Washed aggregate size (ex. No. 57) Layer 1-Aggregate porosity (n) Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) Minimum total aggregate depth for design rainfall (D„a) Drawdown/infiltration time for R.a How is 10-yr, 24-hr storm handled? Aggregate depth to infiltrate 10-yr, 24-hr storm (Dip) Drawdown/Infiltration time of 10-yr, 24-hr storm Actual provided total aggregate depth Top of aggregate base layer elevation Storage elevation of design rainfall depth Overflow elevation Bottom elevation at subgrade SHWT elevation Underdrain diameter BUA Credit for Permeable Pavement Footprint: Infiltration- HSG A/B 75% BUA Credit 3,620 ltz 905 ft' 0 ff' OK 0.o0 (unitless) No.. Pervious areas shall be graded away from PP 1yr,24hr post -pre In 7:(04 in PTRG No. 57 0.40 (unitless) OK (unitless) 9.2 in 0.3 days Infiltrated -18.8 in 0.48 days 6.0 In 7.33 fmsl N/A fmsl Does not overflow fmsl 6.83 fmsl 4.00 I'MI N/A in OK Too shallow, nnmust be at least the Dwq #REFI Form SW401-Permeable Pavement-Rev.4-October 16. 2012 PP Supplement Form, Page i of 3 Detention Systems (skip for infiltration systems) Diameter of orifice in Coefficient of discharge (('o) (unitless) Driving head (Ho) ft Storage volume discharge rate (through discharge orifice) fta/sec Storage volume drawdown time Pre -development 1-yr, 24-hr peak Row Post -development 1-yr, 24-hr peak flow Additional Information Slope of soil subgrade at bottom of permeable pavement Slope of the permeable pavement surface Construction sequence minimizes compaction to soils? Subsoil preparation specified (must select one) Meets industry standards for structural requirements? Washed stone Is specified for the aggregate? Required slgnage specified on plans? Number of observation wells provided Distance to structure Distance to surface waters Distance to water supply well(s) days fta/sec fe/sec 0.50 % OK 2.00 % OK Yes OK scarified Yes . OK Yes OK yes. — OK i OK A0.00 it 289.00 ft OK N/A ft OK Permit No. (to be provided by DWQ) Form SW401-Permeable Pavement-Rev.4-October 16, 2012 PP Supplement Form, Page 2 of 3 Permit No. (lobe provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project. Initial In the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attachjuslification. 1. Plans (1" = 50' or larger) of the entire site showing: nitials - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Location of permeable pavement, - Roof and other surface flow directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: - All layers (including details about the surface course), and HVVT 3.Adtail of what the permeable pavement sign. e 3.Ad 4. A site specific soils report that Is based upon an actual field r_evr v investigation, sail borings, and infiltration tests within the J footprint of the proposed permeable pavement. The soils investigation shall state the Infiltation rate, SHWr elevation, and Information about any confining layers. County soil maps are not an acceptable source of soils Information. (Projects in the WIRO -The results of the soils report must be verified in the field by DWO, by completing & submitting the soils Investigation request form.) 5. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance ,�,//�� (0&M) agreement. S. A copy of the deed restrictions (if required). Pagel Plan Sheet No. 94} )(A 4s S 41�t S�- Ajjv.CWJ S� I�)VfrLGV�C s�1 J ry �J Forth SW401-Permeable Pavement-Rev.4-October 16, 2012 PP Supplement Form. Page 3 of 3 NCDENR AC Project Name Contact Person Phone Number Date Drainage Area Permit No. (to be provided byDWQ) Uf VIArf4 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM PERMEABLE PAVEMENT SUPPLEMENT This farm must be completely filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. Hydrologic soil group (HSG) of subgrade Infiltration rate Pavement Design Summary Permeable Pavement (PP) design type SA of PP being proposed (A,) Resulting BUA counted as impervious for main application form Adjacent BUA directed to PP (A,) Ratio of k to A. Flow from pervious surfaces is directed away from PP? Design rainfall depth Permeable pavement surface course type Layer 1- Washed aggregate size (ex. No. 57) Layer 1- Aggregate porosity (n) Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) Minimum total aggregate depth for design rainfall (D,) Drawdown/infiltration time for DV,a How Is 10-yr, 24-hr storm handled? Aggregate depth to infiltrate 10-yr, 24-hr storm (Dao) Drawdown/infiltration time of 10-yr, 24-hr storm Actual provided total aggregate depth Top of aggregate base layer elevation Storage elevation of design rainfall depth Overflow elevation Bottom elevation at subgrade SHWTelevation Underdrain diameter A 3.00 In/hr BUA Credit far Permeable Pavement Footodnt: Infiltration - HSG A/B 75% BUA Credit 4,040 ft, 1,010 ft' 0 ft, OK 0.00 (unitless) No Pervious areas shall be graded away from PP lyr,24hrpost-pre in PIRG No. 57 0.40 (unitless) OK (unitless) 9.2 in 0.3 days OK infiltrated -18.8 in 0.48 days 6.0 In Too shallow, must be at least the Dwq 7.08 fmsl N/A fmsl .-i Does not overflow fmsl 6.58 fmsl #REF! 4.00 fmsl N/A In I i ; ;AN j if ,,.IItJ 1 Form SW401-Permeable Pavement-Rev.4-October 16, 2012 PP Supplement Form, Page 1 of 3 Permit No. (to ba provided by DWQ) Detention Systems (skip forinfritration systems) Diameter of orifice in Coefficient of discharge (Co) (unitless) Driving head (Ho) R Storage volume discharge rate (through discharge orifice) felsec Storage volume drawdown time days Pre -development 1-yr, 24-hr peak flow fta/sec Post -development 1-yr, 24-hr peak flow ft°/sec Additional Information Slope of soil subgrade at bottom of permeable pavement 0.50 % OK Slope of the permeable pavement surface 3.00 % OK Construction sequence minimizes compaction to soils? Yes OK Subsoil preparation specified (must select one) scarified Meets industry standards for structural requirements? Yes OK Washed stone is specified for the aggregate? Yes OK Required signage specified an plans? Yes OK Number of observation wells provided 1 OK Distance to structure 0.00 ft Distance to surface waters 55.00 ft OK Distance to water supply well(s) N/A ft OK Form SW401-Permeable Pavement-Rev.4-October 16, 2012 PP Supplement Form, Page 2 of 3 Permit No. (to be provided by DWQ) N: $EQUIREt WEMS €HECKLI$T3 s Please Indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result In a request for additional Information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may Initial below. If a requirement has not been met, attach justification. Initials 1. Plans (1" =50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (If applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Location of permeable pavement, - Roof and other surface Row directed away from permeable pavement, - Location of the permeable pavement slgn(s). 2. Section view of the permeable pavement (1" = 20' or larger)-= showing: - All layers (Including details about the surface course), and -SHWT 3. A detail of what the permeable pavement sign. 4. A site specific sails report that Is based upon an actual field j - investigation, soil borings, and infiltration tests within the footprint of the proposed permeable pavement. The soils Investigation shall state the Infiltation ate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils information. (Projects In the WIRO-The results of the soils report must be verified In the field by DWO, by completing & submitting the sails inupOlontinn rpm.pst form 1 S. A construction sequence that shows how the permeablenr .i pavementwill be protected from sediment until the entire drainage area Is stabilized. I 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. :.,. 8. A copy of the deed restrictions (if required). Page/ Plan Sheet No. Sheets 1, 4 & 5 Sheet9 Sheet9 Attached as previously submitted Sheet 5 Attached N/A Previously submitted N/A ft MJ; I I d 11 S'j J Form SW401-Permeable Pavement-Rev.4-Oclober 16, 2012 PP Supplement Form, Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area / Lot Number: Permeable Pavement Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. At all times, the pavement shall be kept free of: — Debris and particulate matter through frequent blowing that removes such debris, particularly during the fall and spring.` — Piles of soil, sand, mulch, building materials or other materials tF3at du1t1 iepsi particulates on the pavement.` 1 — Piles of snow and ice. — Chemicals of all kinds, including deicers. ------------..-_-_ The permeable pavement will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How to remediate the problem: The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to permeable pavement erosive gullies remove the gully, then plant ground cover and water until established. A vegetated area drains toward the pavement. Regrade the area so that it drains away from the pavement, then plant ground cover and water until established. The surface of the Trash/debris present j Remove the trash/debris. permeable pavement Weeds Do not pull the weeds (may pull out media as well). Spray them with a systemic herbicide such as glyphosate and then return within the week to remove them by hand. (Another option is to pour boiling water on them or steam them. Sediment Vacuum sweep the pavement. Rutting, cracking or slumping Consult an appropriate professional or damaged structure Observation well Water present more than five Clean out clogged underdrain pipes. j days after a storm event Consult an appropriate professional Educational sign Missin or is damaged. for clogged soil subgrade. Re lace the sign. Form SW401-Permeable Pavement O&M-Rev.4 10/03/2012 Page I of 2 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Crystal Holdings LLC BMP drainage area or lot number: , .:... I A , 1.a , 2 43 Print name: James H. P. Bailey Jr. Phone: 252-241-1200 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1 IYff. iYShPe ObX a Notary Public for the State of MO County of (' (U i P (t? � do hereby certify that A y�)/. personally appeared before me this 2� day of, and acknowledge the due execution of the forgoing permeable pavement maintenance requirements. Witness my hand and official seal, 4 .- n A—, I, .t / �j NpTARy o; PUBLIC My commission expires 11- lb - 2019 Form S W401-Permeable Pavement O&M-Rev.4 10/03/2012 Page 2 of 2