Loading...
HomeMy WebLinkAbout118-16 Renewal Owens, RobertPermit Class RENEWAL Permit Number 118-16 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Robert V. Owens III 301 W. Fresh Pond Drive Unit 1, Kill Devil Hills, NC 27948 Authorizing development in Dare County at adjacent to Roanoke Sound, at 361 Mother Vineyard Road, in Manteo I , as requested in the permittee's application dated letter dated This permit, issued on August 18, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may De suojeci to tines, imprisonment or crvu action; or may cause me PVr1J11L w uc uuu auu vuiu. 1) This renewal shall be attached to Permit No. 118-16, which was issued to the permittee on 11/14/16, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2016-01005. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2016-002168. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee. DCMCoordinator: 600j_ Permit#: ✓�—�� Q3LA- &.4.t5 DCM Field Offices Elizabeth City Morehead City US ACOE Offices: Washington: 20.1 04 MAILING DISTRIBUTION SHEET 77740 Washington (with revised work plan drawings) Wilmington (OBJECTIONS ) Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Harris Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Clif Whitfield (WARD) Jimmy Harrison Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Natural Heritage Program LPO: Robb Mairs — 401 (Brunswick, New Hanover) Holley Snider-401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Maria Dunn (WARD) Rodney Butler (NCDOT) Travis Wilson n L NC Division of Coastal Management CAMA Major Permit Renewal Request District: Elizabeth City Major Permit Staff: Gregg Bodnar u111[41111�IOIn Y11N111g1 Applicant Name: Owens, III Robert V _ Request Date:0722120 Last First Received in Office: Project Address: 361 Mother Vineyard Road Mantes 27954 SlreefAddress Crry ZIP Code CAMA Permit No.: Agent's Name: 118-16 Permit Expiration Date:12/3V19 Payment S 100.00 District M er Field Re A rove? YK It NO a p pp (Initial Appropriate Box) ❑ DWR Project USACE Action 1 No: 201601005 ID No.: SAW 2016.002168 Has substantial YES NO If Yes, ` development occurred? 10 ❑ Explain: �rrn�S.Ci b✓11Gt.teel �J+.+pla:t� n..el YES NO At (rPtAll T. S fGk4� it YGJ &J60JI" 4k%% .hw. f...w iI• (Y% V Recommend to Renew? W ❑ e v ra d c .t *1-- Attiif wtL w 4t6 p rwI &% i?. If Not Approved, provide Justification: Staff Signature: Date: WV.-X0A0 RECEIVED AUG 0 5 2020 DCM-MHD CITY Received July 22, 2020 Ron Renaldi, District Manager Division of Coastal Managment 401 S. Griffin St. Suite 300 Elizabeth City, NC 27909 Dear Ron: AUL7.1- 2020 DCM-EC This letter shall serve as a request for an extension to CAMA permit MP#118-16 for my property located at 361 Mother Vineyard Road on Roanoke Island in Dare County. The permit authorized the installation of a soundside bulkhead, canalside bulkhead and four boat slips. The soundside bulkhead has been completed as permitted. The canalside bulkhead and boat slips have not been completed. I plan to continue work once the extension of MP#118-16 is granted and complete the project as originally permitted. It is my understanding an extension of the permit can be granted since substantial development has begun and work continues. I have enclosed a check for $100 with this request. Please let me know if addtional information is needed. Sincerely, CVO-� RV Owens RECEIVED AUG 0 5 2020 DCM-MHD CITY NC Division of Coastal Management 110 5 7 n Cashier's Official Receipt Data: dj-- 2f11 `1 Recelvad From: Ju11e- in« -#'ems $ UO. on r II8-I%r�.c SSOGP RNo.: Check No.: Applicant's Name: 446,A V, County: ba rL Project Address: Oft 3 6 ( Mo illwt V �Y arcl 12 d . M4 n ��O Please retain receipt for your records as proof of payment for permit Issued. Signature of Agent or Applicant uti r^ P P 11 Y-11. Signature of Field Representative: Date: Date: RECEIVED AUG 0 5 2020 DCM-MHD CITY ' tl Permit Class Permit Number NEW 118-16 STATE OF NORTH CAROLINA Department of Environmental Quality. and 1 Coastal Resources Commission F Vern't for X Major Development in an Area of Environmental Concern pursuant to NCGS l 13A-118 r" X Excavation and/or filling pursuant to NCGS 113-229 to Robert V. Owens 11I, 301 W. Fresh Pond Drive, Unit 1, Kill Devil Hills, NC 27948 development in Dare County at adjacent to Roanoke Sound, at 361 Mother gad, in Manteo, as requested in the permittee's application dated 9/1/16, including attached workplan permit, issued on November 14, 2016 , is subject to compliance with the application (where consistent the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may abject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes the construction a shore parallel pier, tie pilings, and a boat lift, and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this dokcing facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the d persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. This permit must be accessible ou-site to Department etsonnel when the project is inspected for compliance. Any maintenance work or project modification not covered ereunder requires further Division approval. work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that our project is consistent with the North Carolina Coastal lanagement Program. Br on C. Davis, Director ivision of Coastal Management RECEIVED This permit and its conditions are hereby accepted. AUG 0 5 DCM-MHD Signature of Permittee rt V. Owens III ADDITIONAL CONDITIONS this permit authorizes a maximum of four (4) formalized boat slips. Permit No.118-16 Page 2 of 3 Should either adjacent lot be sold prior to the initiation of construction of the docking facility, the permittee shall obtain a written agreement from the new owner(s) waiving the 15-foot riparian corridor setback and submit it to the Division of Coastal Management prior to initiating construction of the docking facility. The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structures in order to make it more visible during hours of darkness or inclement weather. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Shoreline Stabilization The alignment of the permitted bulkheads shall be verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. The bulkheads shall be constructed in accordance with the alignment on the attached workplan drawings. The bulkheads shall be constructed prior to any backfilling activities. The temporary placement or double handling of fill materials within water or vegetated wetlands is not authorized. The bulkheads shall be structurally tight so as to prevent seepage of backfill materials through the structures. All backfill material shall be clean and free of any pollutants except in trace quantities. All backfill material shall be obtained from a high ground source and confined behind the permitted bulkheads. The bulkheads shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. RECEIVED AUG 0 5 Robert V. Owens III Permit No.118-16 Page 3 of 3 ADDITIONAL. CONDITIONS Upland Development 16) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 264-3901. Sedimentation and Erosion Control 17) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 18) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 19) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 20) No excavation or filling of any vegetated wetlands is authorized by this permit. 21) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 22) This permit does not authorize the interference with any existing or proposed Federal project, and the pemrittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project and assigned SAW 2016- 002168. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 3900 and assigned the project DWR Project No. 201601005. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The pemtittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. RECEII NOTE: An application processing fee of $250 was received by DCM for this project. AUG 0 5 DCM-MHD CITY