Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
67-16 Nixon, Nicholas
Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and . Coastal Resources Commission V er mit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 67-16 Issued to Nicholas Nixon, I1I,111 Brookhaven Trail, Leland, NC 28451 Authorizing development in New Hanover County adj. to Masonboro Sound, at 115 & 125 Hollis Lane. Wilmington , as requested in the permittee's application dated 3/29/16 (MP-1, MP-2 & MP-3), and 2/13/16 (MP-4), incl. attached workplan drawing (1), 2 of 5 dated 3/23/16. This permit, issued on .Tune 17, 2016 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) The proposed docking facility exceeds the pier length allowance described in 15A NCAC 07H .0208(b)(6)(G)(iii). Accordingly, the proposed docking facility is not authorized by this permit. Upland Development 2) Unless specifically altered herein, this permit authorizes the land disturbing activities associated with the development of the above referenced property, including the single-family residence, driveway, & garage, all as expressly and specifically set forth in the attached permit application and workplan drawing. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910)796-7215 for this determination. R EC E N E D (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal ResS@t-9= D C 5TY IL44 17 -vj2_ BraxtoffC. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Nicholas Nixon, III Permit No. 67-16 Page 2 of 3 ADDITIONAL CONDITIONS 3) Any development or land disturbing activity that is considered non -water dependent is not authorized within 30 feet of the normal high water level unless specifically exempted by Coastal Resource Commission (CRC) regulations in place at the time of such development. 4) Any building constructed shall comply with the North Carolina Building Code and the local flood damage prevention ordinance as required by the National Flood Insurance Program. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environmental Quality, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. 5) In order to protect water quality, runoff from the construction shall not visibly increase the amount of suspended sediments in adjacent waters. 6) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). Stormwater Management 7) A stormwater management permit from the Division of Energy, Mineral and Land Resources will be required for the authorized project. A copy of the stormwater management approval shall be obtained and a copy provided to the Division of Coastal Management prior to the initiation of any development activities authorized by this permit. General 8) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 9) No fill material shall be placed at any time in any vegetated wetlands outside of t 13frJ11 area indicated on the workplan drawing: JUN 2.2 2016 10) No open water areas shall be excavated or filled. DCM- MHD CITY' 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. Nicholas Nixon, III Permit No. 67-16 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of General Permit 197800056 and Nationwide Permit 14 (Action ID No. SAW-2016-00987), which was issued on 6/3/16. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 16-0367. RECOVED JUN 2.2 2016 DCM- MHD CITY Application Processing Notes Applica Type: (check all that apply) New Major Mod_ Permit#_ Minor Mod_ Renewal_ Transfer_ Permit Coordinator: COS �x FieldRepresentative A( S� j Date Time Message (tvi-ewI-Al+Kt �(U 1(\V(,CI,M/) rtpo(l) i�.VVOIs �llsco✓ev6 ex+W tiZ�S' I lb -hu �v.(��c�r�iod�j �s Qro(�ose.e0� dot 2i5`i �s v��o✓+eci. - �J to Jl Goorr�i�c �. �erm�l' (✓undi 'ons wJ VV, �w �ho�l ci w�� I ' II DCM MP-1 APPLICATION for Major Development (last revised 12/27/06) Permit North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) 115 and 125 Hollis Lane Applicant 1: First Name Nicholas MI Last Name Nixon III Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 111 Brookhaven Trail PO Box City Leland State NC ZIP 28451 Country USA Phone No. 843-457-1974 ext. FAX No. Street Address (d different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Land Management Group Inc. Agent/ Contractor 1: First Name MI Last Name AN 13 2016 Kim C Williams Agent/ Contractor 2: First Name MI Last Name hh p C ✓i - f� j HD CITY Mailing Address PO Box city State 3805 Wrightsville Avenue; Suite 15 Wilmington NC ZIP Phone No.1 Phone No. 2 28403 910 - 452 - 0001 ext. ext. FAX No. Contractor # 910 452 0060 Street Address (if different from above) city State ZIP Email kwilliams@lmgroup.net REGEIVEU DCM WILMINGTON, NO <Form continues on back> MAR 3 0 2016 252-808.2808 :: 1.888.4RCOAST :: www.necoastaimanagement.net -�t- Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address Slate Rd. # New Hanover 115 and 125 Hollis Lane Subdivision Name City State Zip Wilmington NC Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I I , a. In which river basin is the project located? b. Name of body of water nearest to proposed project 'N'C1 W )n•kt Oak Masonboro Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. SNatural ❑Manmade ❑Unknown Masonboro Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed SYes ❑No work falls within. New Hanover County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 184 138,539 c. Size of individual toils) d. Approximate elevation of tract above NHW (normal high water) or 99,930 sf, 38,609 sf, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5-10' ®NHW or ❑NWL e. Vegetation on tract Freshwater Wetlands: Nyssa sylvatica, Magnolia virginiana, Pinus leads, Morelia cerifera Uplands: Quercus viriginiana, Pinus leads, Morelia centers, Ilex vomitoria f. Man-made features and uses now on trail r, �, vI features t— ED Undeveloped and vegetated; No manmade APR 13 2016 g. Identify and describe the existing land uses adjacent to the proposed project site. Undeveloped or residential D %C M - i'! it D CITY h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes SNo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes SNo ❑NA National Register listed or eligible property? RECEIVED <Form continues on next page> DCM WILMINGTON, NC MAR 3 0 2016 252-808-2808 :: 1.888.4RCOAST :: www. nccoa sta l management. net Form DCM MP-1 (Page 3 of 4) APPLICATION for V_ Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. No existing wastewater treatment facilities on site. o. Describe existing drinking water supply source. None p. Describe existing stone water management or treatment systems. No existing stonmwater treatment systems. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliclGovemment ®PrivatelCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The applicant plans to construct one single family home, driveway, septic field, pier with a floating dock and two boat lifts. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Driveway will be constructed first to provide access to site. Then fill material will be brought into site and grading activities will occur. Pilings will be installed; house will be constructed. Pier and dock construction will occur once access is in place and permits have been obtained. Standard marine construction equipment and methods will be used. Equipment to be stored on upland portion of property during construction. d. List all development activities you propose. To construct one single-family house, septic field, driveway, garage, and pier with a floating dock and two boat lifts. APR 13 2016 e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? — 0.42 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The applicant proposes to fill a total of 436 sf of freshwater wetlands for the construction of a driveway. Stormwater runoff will be treated per County requirements. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? []Yes ®NO ❑NA If yes, attach a mitigation proposal. RECEIVED <Form continues on back> DCM WILMINGTON, NC MAR 3 0 2016 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional h►fonnadon In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Robert Joseph Hollis Etal Phone No. Address 126 Hollis Lane; Wilmington, NC 28409 Name Mildred Parker Bobbitt Phone No. Address 354 Friendly Lane; Wilmington, NC 28409 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NIA h. Signed consultant or agent authorization forth, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), N necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 3I La I Zo 16 Print Name VVvvv� IW�iN &- a f Signature Y, v LA•Xh rr,A- W66tii OiAm f2,&,r, Iric. Please indicate application attachments pertaining to your proposed project. EDCM MP-2 Excavation and Fill Information ❑DC MP-5 Bridges and Culverts EDCM MP-3 Upland Development EDCM MP-4 Structures Information APR 13 201 RECEIVED DCM WILMINGTON, NO MAR 3 0 2016 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length 17' Width 25' Avg. Existing NA NA +B' above Depth NHW Final Project NA NA +B.5' above Depth NHW 11. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in cubic yards. c. (i) Does the area to be excavated include coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (i) Do you claim title to disposal area? ❑Yes []No ❑NA (ii) If no, attach a letter granting permission from the owner b. Type of material to be excavated. d. High -ground excavation in cubic yards. ®This section not applicable area. d. (i) Will a disposal area be available for future maintenance? ❑Yes []No ❑NA III) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? []Yes []No ❑NA (ii) If yes, how much water area is affected? R2-C rVF' � APR 13 2016 RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 252-808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: []Bulkhead ❑Riprap ❑Breakwater/Sill []Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other i. Source of fill material. b. Length: Width: d. Maximum distance waterward of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brouaht to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW). If yes, (n) Amount of material to be placed in the water None (iii) Dimensions of fill area Home pad: 2,450 st Driveway: 10,380 sf: (iv) Purpose of fill To level the site in order to construct a single-family home and driveway. 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Silt fencing will be used during construction. c. (i) Will navigational aids be required as a result of the project? []Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ®WL 436 []None (ii) Describe the purpose of the fill in these areas: To construct a driveway. b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? Pile driver; other standard construction equipment d. (i) Will wetlands be crossed in transporting equipment to project site? ®Yes ❑No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Wetland crossing included in proposed impacts above. 3'Zrt 11616 Nicholas Nixon Date Applicant Name 115 and 125 Hollis Lane Project Name Appli nt Signature APR 13 2016 RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 252-808-2808 :: 1.888.4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. q One single-family house on pilings, garage, driveway, and septic field c. Density (give the number of residential units and the units per acre). one unit per 3.2 acres e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes ❑No ®NA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 11% i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 10% j. Describe proposed method of sewage disposal. On -site wastewater treatment system I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrialf commercial effluent, "wash down' and residential discharges). 436 sf of 404 wetland impacts; stormwater runoff will be treated per New Hanover County requirements. d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. — 18,000 sf f. List the materials (such as mart, paver stone, asphalt, or concrete) to be used for impervious surfaces. Rock and concrete for the driveway; concrete for house pad; asphalt shingles for roof. h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes ®No ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? []Yes ®No ❑NA If yes, attach appropriate documentation. RECEotj APR 13 2016 RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 252-808-28082 :: 1-888.4RCOAST :: wvvw.nccoastalmanagement.net revised: 12/26/06 Form LZCM MP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) New Hanover County water supply o. When was the lot(s) platted and recorded? rlHly Ige�l 3/zq'20l (. Date 115 and 125 Hollis Lane Project Name Nicholas Nixon III Applicant Name 1�— I,- k -- - LI+1 Cr e ri— Applicant Signature n. (i) Will water be impounded? ❑Yes ®No []NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes []No ®NA APR 13 2016 RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 252-808-2808 :: 1-888-4RCOA8T :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS § �fii` ❑This section not applicable a. (i) Is the docking facility/marina: b. O Will the facility be open to the general public? ❑Commercial ❑Pubiic/Government XPrivate/Community ❑Yes ErNo c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? []Yes )8No (ii) Number I If yes: (iii) Length ,3 T5 (ii) Number _ (iv) Width 1 (iii) Length (v) Floating []Yes �gNo (iv) Width _ (v) Floating []Yes []No e. (i) Are Platforms included? Wes []No f. (i) Are Boatlifts included? �res [-]No If yes: I If yes: I / (ii) Number _ _ (iii) Length 3Ya (ii) Number (iii) Length (iv) Width / (iv) Width I / 1 r (v) Floating []Yes yZNo / Note: Roofed areas are calculated from dripline dimensions. g. (!)Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or III) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ❑ Dockage ('Wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: - ❑ Other, please describe: -L2-�,a 113vl Jay, I. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑open water; dredging for basin and/or channel O,v w� c �u „�.�5 Qbpen water; no dredging required []Other; please describe: APR 1 3 2016 i. k. Typical boat length: J_L I. (i) Will the facility be open to the general public? ❑Yes JKNo m. (i) Will the facility have tie pilings? (Yes QNo (ii) If yes number of tie pilings? RECEIVED DCM WILMINGTON, NO MAR 3 0 2016 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27106 Forma DCM MP-4 (Structures, Page 2 of A) tom, 2. DOCKING FACILITY/MARINA OPERATIONS Reis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location. ),4 ❑ Showers Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. IN 9 c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. I. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? In Give the number of channel markers and "No Wake" signs proposed. 104. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? NIq I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? APR 13 2016 M-Yes ❑No q 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmana,__gement.net revised: 12/27/06 1: Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? 01'es ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. jgcw D ❑SAV ❑Se OWL _ []None p. Is the proposed marinaldocking facility located within or within dose proximity to any shellfish leases? ❑Yes (MNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ; " 123hiS section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovemment ❑Privata/Community (ii) Number (III) Length _ (iv) Width Note: Roofed areas are calculated from ddpline dimensions. `4. GROIN (e.g., wood, sheelpile,etc. If a rock groin, use MP-2, Excavation and Fill.) 07his section not applicable a. (i) Number (it) Length (iii) Width $ BREAKWATER e.g., wood sheetpile etc.J &hissecdonnot applicable < a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILCNGS and BUOYS EfThis section not applicable s9"h a. Is the structure(s): ❑Commercial ❑PublidGovemment L3]; rivate/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) MAR 3 0 2016 "Al 262.808-2808 :: 1-888.4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (structures, Page 4 of 4) 11 a. Proximity of structure(s) to adjacent riparian property lines Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body ,l . $ . e. (i) Will navigational aids be required as a result of the project? ❑Yes )$No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. ] / 1©Sf aov !00' �- e�tnN,��lp;�fgs, d. Water depth at waterward end of structure at NLW or NWL el 8. OTHER El This, section not applicable a. Give complete description: , sal?yam as.{ Ar' -a f-d zs k�% r`/Rr4°t eaa,,.. 'r�T Date !. Project Name Applicant Name r _ Applicant Signature - l i.eV,s. APR 13 2016 i.-r C. r: RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 252-808.2808 :: 1-888-4RCOAST :: www.nccoastal_management.net revised: 12/27/06 1 i I I I l i Proposed Garage Proposed Septic Feld / I / 575' AEC 1 1 I I 30' Coastal Shoreline Buffer 7 CJIVW / Normal High Water Line I / APR 13 21,16 PRELIMINARY; NOT FOR CONSTRUCTION FOR ENVIRONMENTAL PERMITTING ONLY 5 Legend — Property Line 30' Buffer Project: D. Coastal Wetland Line 575' AEC Line 115 and 125 Hollis Lane 404 Wetland 0 Sc NHW Line rue: Dn Normal High Water Line JoInt4O4/Coestal Wetlands Proposed Pier 404 Wet ands Coastal Wetlands SURVEY INFORMATION FROM: vamcN ewerow uxo sumxrwo 91Pry1-1SW DESIGN INFORMATION FROM: uW A.wbmn-tl arlenm eu N.9w x 'ra•+ar.. acawr lvm mwosa R 3 0 2016 Revislon Data: 312;16 NA 1"=60' 1 40-15-241 Site Plan 2 If Coastal Management ENVIRONMENTAL QUALITY June 13, 2016 Mr. Nicholas Nixon, III 111 Brookhaven Drive Leland, NC 28451 Dear Mr. Nixon: PAT MCCRORY GOWMV DONALD R. VAN DER VAART tirrn.�,� BRAXTON DAVIS DUaGw This letter is with reference to your application for a Coastal Area Management Act Major Development permit to undertake development activities at property adjacent to Masonboro Sound, at 115 & 125 Hollis Drive, in Wilmington, New Hanover County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S.113A-122(c) which would make August 27, 2016, the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact me by phone (910) 796-7302 or e-mail at: heather.coats@ncdenr.gov. cc: Wilmington/MHC Files Sincerely, Heather Coats Assistant Major Permits Coordinator RECEIVED JUN 2 2 2016 DCM- MHD CITY Nothing Compares;? � State of North Carolina I Environmental Quality I Coastal Mma.mmt 127 Cardinal Driw Ext., Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY June 21, 2016 Mr. Nicholas Nixon III 111 Brookhaven Trail Leland, NC 28451 Dear Mr. Nixon: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Direcror The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the gold original and the white copy and return the white copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150E with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you plan to have the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the yellow Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas,•you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sinccer'eelly,- Douglas V. Huggett Major Permits and Consistency Manager N.C. Division of Coastal Management Enclosure/cc: WiRO Kim Williams, Agent State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wdmington, NC 29405 919 796 7215 RECEIVED JUN 2 2 2016 DCM- MHD CITY Coastal Management ENVIRONMENTAL QUALITY Mr. Nicholas Nixon, III 111 Brookhaven Drive Leland, NC 28451 Dear Mr. Nixon: fab PAT MCCRORY Gowmor DONALD R. VAN DER VAART June 13, 2016 RECEIVED JUN 16 2016 DCM- MHD CITY Seadary BRAXTON DAVIS Director This letter is with reference to your application for a Coastal Area Management Act Major Development permit to undertake development activities at property adjacent to Masonboro Sound, at 115 & 125 Hollis Drive, in Wilmington, New Hanover County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S.113A-122(c) which would make August 27, 2016, the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact me by phone (910) 796-7302 or e-mail at: heather.coats@ncdenr.gov. cc: Wilmington/MHC Files Sincerely, Heather Coats Assistant Major Permits Coordinator -/'Nothing Compares! ., state of North Carolina I Environmental Quality I Coadial Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-796-7215 DIVISION OF COASTAL MANAGEMENT i APPLICATION TRANSMITTAL AND PROCESSING RECORD / 1) APPLICANT: Nicholas Nixon III COUNTY: New Hanover PROJECT NAME: Nixon SFR w/docking facility LOCATION OF PROJECT: IIS & 125 Hollis Ln., adjacent the the AIWW & Masonboro Sound, in Wilmington, New Hanover County DATE APPLICATION RECEIVED COMPLETE BY FIELD: 3-30-16 FIELD RECOMMENDATION: Attached: Yes CONSISTENCY DETERMINATION: Attached: n/a FIELD REPRESENTATIVE: Robb Mairs DISTRICT MANAGER REVIEW: V , ,7� B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: 4-15-16 f ADJ. RIP. PROP NOTICES REC'D: APPLICATION ASSIGNED TO: S C) 75 DAY DEADLINE: ( Of MAIL OUT DATE: 4-12-16 FEDERAL DUE DATE: To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE REC'D: $400/#4462 (9gL(o END OF NOTICE DATE: 5-6-16 ✓ DEED REC'D: ON: q I A 150 DAY DEADLINE: STATE DUE DATE: 5 -16 FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Incox i 1 A Coastal Management - LUP Consistency Division of Community Assistancett / Land Quality Section (DEMLR) Division of Water Resources (401) Storm Water Management (DEMLR) 3%[b Y t 1LCd$ GA f State Property Office I(� Division of Archives & History 4�27�I1. Division of Environmental Health Division of Highways Wildlife Resources Commission DC M— M H D i✓ 0 T Y Local Permit Office �Sjl 60pK ^'ta-^'" r Division of Marine Fisheries / DCM �t�i�A` if ,Kd OS Corps of Engineers S� FW S 40 0 Recommendations for Nicholas Nixon III 04/12/2016 The total area of platform and floating dock were calculated as follows: Shoreline length = 184 ft. x 8 sq. ft. = 1,472 sq. ft. allowable. Platform = 19' x 14'= 266 sq. ft. Roof dripline = 32' x 3'= 96 sq. ft. Floatina dock = 25' x 8' =200 4. ft. Total = 562 sq. ft. The construction would provide docking space for the total up to three (3) vessels. The proposed floating dock, platform, and boatlifts would be located entirely over open water; however, it appears the docking facility would be INCONSISTENT with NCAC 07H .0208(bx6XG)(iii) (1/4 distance rule). If the applicant revises the proposed docldng facility to conform to the % width distance, this office has no objections to the proposed work. It is the staffs recommendation that the proposed upland development appears to be CONSISTENT with the Rules of 15A NCAC 07H .0209 COASTAL SHORELINES (d). This office has no objection to the proposed work, provided it is consistent with state and federal permitting requirements regarding the fill of §404 wetlands. If the project is determined to be consistent with 15A NCAC 07H .0209 COASTAL SHORELINES (d) and built in accordance with NCAC 07H .0208(b)(6)(iii), this office has no objection to the proposed work, provided it is consistent with all other state and federal permitting requirements. Any permit issued should include standard conditions for upland and private docking facilities. RECEA17.7 - APR 13 2016 DCM- MHD' %L " Y PAT MCCRORY Unvemar ?,a Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 MEMORANDUM: TO: Mark Zeigler WiRO Division of Community Assistance DONALD R. VAN DER VAART Secretory BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a),ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on theeproposed project and return this form to Heather Coats at the address above by May&, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects( to the project for reasons described in the attached comments. SIGNED M W,4 Z Q�, 1� DATE tf I j q ll r Nothing Compares.` State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-7%-7215 Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 MEMORANDUM: TO: Dan Sams District Manager DEMLR - WiRO PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director -%.kC71 i 4PR 1 z 2016E FROM: Heather Coats, Assistant Major Permits Coordinator- NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(Dncdenrpov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by May6 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE AP2L � rJ� Zol b Nothing Compares RECEIVED DCM WILMINGTON, NC APR 18 MIS Suite of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-7964215 MEMORANDUM To: Heather Coats From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Application, — Nicholas Nixon III - New Hanover County Date: June 13, 2016 This project is consistent and not in conflict with the 2006 Wilmington -New Hanover County Joint Land Use Plan Update: The applicant proposes to construct a single-family residence with associated 404 wetlands impact and a private docking facility. The project is located at 115 and 125 Hollis Lane, adjacent to the AIWW and Masonboro Sound in New Hanover County. Areas of Environmental Concern (AEC's) impacted by the proposal are PT, ORW, EW and PT. Waters at the project site are classified as SA-ORW and are not open to the harvesting of shellfish. The area is a Primary Nursery Area. I have reviewed this proposal for consistency with the 2006 Wilmington -New Hanover County Joint Land Use Plan and offer the following comments. The general area of the project is classified as Resource Protection. In general, Wilmington -New Hanover County allows development in Resource Protection classified AECs, which is consistent with the State's minimum use standards. The 2006 Wilmington -New Hanover County Joint Land Use Plan contains some policies, which exceed the State's minimum use standards, including those for dredging. However, none of these standards appear to be applicable to this proposal. This project is consistent with the 2006 Wilmington -New Hanover County Joint Land Use Plan. Cc: File r 0 U.S. ARMY CORPS OF ENGINEERS Wilmington District Action Id. SAW-201&00987 County: New Hanover USGS Quad: Hampstead GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERMCATION Property Owner: Nicholas Nixon III I I I Brookhaven Trail Leland, NC 28451 Agent: Land Management Group, Inc. attn: Kim Williams 3805 Wriehtsville Ave. Suite IS Wilmington, NC 28403 Size and location of property (water body, road name/number, town, etc.): The project is located at 115 and 125 Hollis Lane in Wilmington, New Hanover County, North Carolina. Description of projects area and activit) : This Nationwide Permit 14 and General Permit 56 authorizes the discharee of fill material into 0.01 acres (426 square feet) of jurisdictional wetlands for the purpose of constructing a driveway to a single family home and tha cmef - " :a docking facility. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ® Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: 56 Nationwide Permit Number: 14 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and vour submitted plans received April 15, 2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by - case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management . This Department of the Army verification does not relieve the perminee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Emily Hughes at (910) 251 6 5. Corps Regulatory Official Date: 6/3/16 Expiration Date of Verification for NWP: 3/17/2017 Expiration Date of Verification for GP: 12/31/16 The Wilmington District is committed to providing the highest level of support to the public. To help us ensue we continue to do so, please complete the Customer Satisfaction Survey located at our website at hW:/r rgplatory 4a�^Sri.urn` X come to complete the survey online. ?-� E C ° -- ; IV E i DCM WILM!NGTON, NC Page 1 of 4 JUN 1 0 2016 Determination of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference33 CFR Part 331). B. ® There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404.of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ® There are waters of the US and/or wetlandsmithin the above described project area subject to the permit requirements of Section 404 of the CleanWater Act (CWA)(33 USC § 1344). Unless there is'a change inure law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued. Action 113% E. Attention USDA Program Participants This delineation(determination has been conducted to identify the Iimits'of Corps' Clean Water Act jurisdiction for the. particular,site identified in.ihis request _ The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work K Appeals•Information (This information applies only to approved jurisdictional determinations as indicated in B and C above)., This correspondence constitutes an approved jurisdictional determination for the above described site. Ifyou object to this determination,;you may request an administrative appeal under Corps regulations at33 CFR Pad 331. Enclosed you will find 'a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form: If you request to appeal this determination you must submit a completed RFA form to tlf 'Mowing address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review. Officer 60 Forsyth Street SW,' Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137' In order for an RFA to.be,accepted by the Corps, the:Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.. Should' you decide to submit an RFA form, it must be received at the above address by August 1. 2016. •'It is not necessary to subs correspondence;** Corps Regulatory Official: Date of JD: June 3.2016 in this Page 2 of 4 Action ID Number: SAW-2016-00987 T County:New Hanover Permittee: Nicholas Nixon II Date Verification Issued: 613116 Project Manager: Tyler Crumblev Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT WILMINGTON REGULATORY FIELD OFFICE 69 DARLINGTON AVE. WILMINGTON, NORTH CAROLINA 28463-1343 Please note that your permitted activity is subject.to a compliance inspection bya U. S. Army Corps, of Engineers representative. If you fail to comply with this permit you aresubject.to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance'with the terms and condition of the said permit, and required mitigation was. completed in accordance with the permit conditions. Signature of Permittee Page 3 of 4 Date Applicant'. Nicholas Nixon Tn File Number. SAW$Ol 87 Date: Jane 3 2016 Attached is: See Section below 01 INITIAL. PROFFERED. PERMIT Standard Permit or Letter of emission A. El PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C D APPROVED JURISDICTIONAL DETERMINATION PRELIMINARY.JURISDICTIONAL DETERMINATION E SL OI7I' `The foll wing'<identifies your rights and options regarding aaadminissh�ia ive a' �ppeall -ih'eTabov°"e decision. Additional informa'on maybe ound at htto:lhw.w.usace.army:milrnet/functionsicw/cecwo/reg or Co re lations at 3B C P. 331. A: INITIAL: PROFFERED PERMIT: You may accept or object to the permit. •' ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter ofPermission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in -its entirety, and waive all rights to.appeal the permit; including its terms and conditions, and approved jurisdictional determinations associated with the permit.. OBJECT: If you objectto the permit -(Standard or LOP). because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Yourobjections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all ofyour concerns, (b) modify the permit to address some of your objections, or(c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you.a proffered permit for your reconsideration„as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit.document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in.its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps ofEngineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. Page 4 of 4 r D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept.the approved JD. in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. CT(ON 4 ESQ F,ORAP,P,EAL or OB " . tIO S T,O tS . IN1q FAI P,ROFF.ERED1 ,ERM17 REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the derision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review, officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. IP0l1NTUOF GONTAC TtFORT WEST3ONSLOR INFORJvIA LION If you only have questions regarding the appeal process you may also contact: US Arty Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303.8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to'conduct investigations of the project site during, the course of the appeal process. You will be provided a 15 day notice of any site investiation and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal OfHeer, CESAD-PD0,,60•Forsyth Street, Room 10M15, Atlanta, Georgia 30303-NOI Phone: (404) 562-5137 Page 5 of 4 Coats, Heather From: Scott, Georgette Sent: Monday, June 13, 2018 9AC AM To: Coats, Heather Subject. RE: Nicholas Nixon project Just condition the permit that a stormwater permit is needed prior to construction. Thanks Georgette From: Coats, Heather Sent: Friday, June 10, 2016 2:53 PM To: Scott, Georgette <georgette.scott@ncdenr.gov> Subject: Nicholas Nixon project Hi Georgette, I received your comments on the Nixon project that it will require a stormwater permit. He said he had spoken to you and is working on it. I wanted to check back in because you indicated you objected, rather than approving based on receipt of a stormwater permit. Does it look. like he's going to have to modify his plan to gain stormwater approval or are there any other issues, or can we just condition the permit that a stormwater permit is needed prior to construction? Thanks in advance for clarification. I hope you're doing well and happy Friday! Heather Heather Coats Assistant Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heathencoatsC ncdenrgov 127 Cardinal Drive Extension Wilmington, NC 28405 t: -�Nothing Compares.-.—_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. PAT MCCRORY Gio,ernar Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 MEMORANDUM: TO: Georgette Scott Stormwater Section DEMLR - WiRO DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director EGEIVE APR 12 2016 BY:—__�— F 14 f _ 6 Heather Coats, Assistant Major Permits Coordinator // {j) NCDEQ - Division of Coastal Management 'I 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by May d, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. X-1- � it of y� AAVjr This agency has no comment on the proposed project. c*W-4- l�s A,,, 6-w This agency approves of the project only if the recommended changes are incorporated. See attached. S`'> This agency objects to the project for reasons described in the attached comments. SIGNED /,C l�lptt (DATE_�- RECEIVED DCM WILMINGTON, NO Nothing Compares-, . MAY 0 3 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 4�v PAT MCCRORY Go mor DONALD R. VAN DER VAART Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Seorerary TRACY DAVIS Director May 2, 2016 Nicholas Nixon III I I I Brookhaven Trail Leland, NC 28451 Subject: Request for State Stormwater Management Permit Application 115 and 125 Hollis Lane New Hanover County Dear Mr. Nixon: On April 12, 2016, the Wilmington Regional Office received notification that the subject proposed project has triggered a review for the applicability of the stormwater rules under one of the following: 1. The project will contain more than 10,000 square feet of new built -upon area; 2. The project is part of a larger common plan of development; 3. The protect requires approval of a Sediment and Erosion Control Plan; or, 4. The project requires a CAMA Major Permit. The North Carolina Administrative Code requires any project that proposes more than 10,000 square feet of new built -upon area, or is part of a larger common plan of development, or that must receive Sedimentation and Erosion Control Plan approval for the disturbance of more than 1 acre, or that must receive a CAMA Major permit, to apply for and receive a Stormwater Management Permit from the Division of Energy, Mineral and Land Resources. Please understand that the NPDES 010000 Federal Construction Stormwater Permit that is issued with the Erosion Control Plan approval letter is NOT the same as a Coastal Stormwater Management Permit. Any construction on the subject site, prior to receipt of the required Coastal Stormwater permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Therefore, please submit either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date, to this Office no later than July 2, 2016. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. If the project is located within the jurisdiction of any local government holding an NPDES post -construction stormwater permit issued by the Division of Energy, Mineral and Land Resources, please contact that unit of local government for information on submitfing the stormwater application to them. If you have any questions, please call Christine Hall at (910)-796-7335. RECEIVED Sincerely, / sMAY 31 2016 �``z MHD CITY 1p�Tracy Davis, P.E�., Director DCM- Division of Energy, Mineral and Land Resources GDS/can: G:1WQ1SharedlStormwaterlPermits & ProjectslStormSubs12016 05 stormsub_NH 115 & 125 Hollis Lane oc: Kim Williams; Land Manegement Group, Inc. / RECFIVED New Hanover County Building Inspections J ll f DCi\i VVILiA1NGTC'4 ;JC New HanoverCounty Engineering Department / Division of Coastal anagement / / MAY 10 2016 Wilmington Regional Office Stormwater File State of North Caroline I Emvormeahl Quality Energy, Mmm and Land ReIiourma 127 Cardinal hive Extemion I Wilmi4AM NC 2W5 910 796 7215 T 1 9103502004 F I hno'//corral ncdenr oru/mhdi/ a Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Gores, DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Utrector April 12, 2016 RECEIVED MEMORANDUM: APR 14 2016 TO: Tim Walton DOA Dept of Administration STATE PROPERTY State Property Office OFFICE FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats@ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the,Proposed project and return this form to Heather Coats at the address above by May!% 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. �nr/t7 L- Sf0 This agency approves of the project only if the recommended changes are incorporated. See attached. This agency object to the project for reasons described in the attached comments. SIGNED n�;q DATE 7 RECEIVED DCM WILMINGTON, NC Nothing Compares IAPR 2 5 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 PAT MCCRORY �! ttiK'{eN,f '? DONALD R. VAN DLR VAART BRAXTON DAVIS Coastal Management nixes , E VINnNMENTXL OU441TY t� April 12, 2016 MEMORANDUM: TO: Renee Gledhili-Earlyit Dept. of Cultural Resources Archives & History FROM., Heather Coats, Assistant Major Permits Coordinator NCDEQ— Division of Coastal Management 127 Cardinal Drive Fact., Wilm., NC 28405 heather, coats@ncdenr.goy Fax: 395-3964 (Courier 04-16-33) tt tt J susiEcr CAMA I Dredge & Fill Application Review Applicant: Nicholas Nixon /it Project Location; 115 & 125 Hollis Ln., adjacent to the AIWW and Masonbora Sound, in Wilmington, New Hanover County Proposed Projects to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the roposed project and return this form to Heather Coats at the address above by May 2016. If you have any questions regarding the proposed project, contact Robb Mairs at(910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached, This agency objects to the project for reasons described in the attached comments. SIGNED r"' -W'�L," DATE -5P^Noth1ng Compamsn . 51do a N01k CamUD4 I MV'I 3-'tAWQ TIQ a32i M.'lnsVC=1 },qp q ry qc li7 Gud,ml numJlxt.. WSminam. NC2M '0IN"t ns N K`rf Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 MEMORANDUM: TO: Shannon Jenkins NC DMF Shellfish Sanitation Section PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(5)ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on theproposed project and return this form to Heather Coats at the address above by May Or 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. )' This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Foe AAldy/Ha�tiri SIGNED DATE 4-1 RECEIVED APR 21 2016 Nothing Compares D C M - M H C1 CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 rtZ- Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director RECEIVED April 12, 2016 APR 14 Z016 MEMORANDUM: NCDOT TO: Ben Hughes DISTRICT 3 NC DOT New Hanover County FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsCaD-ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the,proposed project and return this fonn to Heather Coats at the address above by May6, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: 1�, This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal (hive Ext., Wilmington, NC 28405 910-796-7215 RBOeiveD )DCM VAL1MfWGTCtjl,t AN 19 2016. PAT MCCRORY Governor DONALD R. VAN DER VAART .reremry - BRAXTON DAVIS Coastal Management Director ENVIRONMENTAL QUALITY 141516�ji April 12, 2016 �O Coo' APR 2016 MEMORANDUM: RECEIVED v TO: Maria Dunn How w NCWRC �!n_ For WiRO n FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatscDncdenr.pov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on the�proposed project and return this form to Heather Coats at the address above by May6, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. VThis agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED A,� I��• DATE F 2 23 ` "?a I co RECEIVED DCM WILMINGTON, NO Nothing Compares�,� MAY 0 2 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext , Wilmington, NC 28405 910-796-7215 [� ft PATDONALD R. VAbjD CoastalManagement BRA 'to ENVIRONMENTAL QUALITY Aprilf12, 2016 MEMORANDUM: TO: Patricia Roberts LPO New Hanover Co. FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heathercoats(ftcdennoov Fax: 395-3964 (Courier 04-16-33) tis SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon Ill Coxmm VAART seadwy Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands. impact, and a private docking facility DAVIS Dlmcmr Please indicate below your agency's position or viewpoint on theproposed project and return this fort to Heather Can at the address above by May d, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed.r-��v p p+ts This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons describedd in the attached c{ornmentts. SIGNED DATE No c-I-� t�� L-. �'f( r, v F 1=— OV ton � p2 A9 N-C Ftov 1 Wi L�, ,y11I k.D �-�D ® to -eu n Y26u% rpm W. (din twrvnl © edLencw C-0- U)I+tA- AiV, 4k ivldud.e. U�,I� setom'[ or lt7a44e s8t:tx VL)d otlilrtg Cornpares� 8moe0fNmthQnU= I EdViM==WQ=1ay I CmlmlMmegemmt 127 Cadind Ddw Ert, WIl®uRIm4NC2M 910496d215 W Coastal Management EMIRONMENTALOUAUN April 12, 2016 TO: Gregg Bodnar Fisheries Resource Specialist DCM, Morehead City PAT MCCRORY Govemor DONALD R. VAN DER VAART secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext.,1MIm_LNC 28405 heather. coatsanncdenr.00v Fax: 395-3964 (CoprieFdli4 6-- SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on theproposed project and Ireturn this form to Heather Coats at the address above by May 6, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed.`" 'fS iclttElj`iecji`� Qykbte&,17 KThis agency has. no comment on the proposed project. Q(e.b� 4eh ived, lyfh 04m)vno 1 ttview o4aG be This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 1 DATE SIZI 9 ►ECENE® APR 131'2016 -i "'Nothing Compares CC M- M H D CITY State of North Camlma I Envh=antal Quality i Coastal Managamant 127 CardOul Drive Fat., Wilmington, NC 29405 910-796.7215 P Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Govemor DONALD R. VAN DER VAART seeremry BRAXTON DAVIS Direnar April 12, 2016 V, MEMORANDUM: U/„ul APR 12 TO: Heidi Cox Ok'isipn ?0(6 Environmental Engineer WJRO' ubWaie Respur Public Water Supply at, j ces FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aD-ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Nicholas Nixon 111 Project Location: 115 & 125 Hollis Ln., adjacent to the AIWW and Masonboro Sound, in Wilmington, New Hanover County Proposed Project: to construct a SFR with associated §404 Wetlands impact, and a private docking facility Please indicate below your agency's position or viewpoint on theyroposed project and return this form to Heather Coats at the address above by May 6, 2016. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423 when appropriate, in-depth comments with supporting data is requested. REPLY: ✓This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED Ci ✓T DATE DECEIVED Nothing Compares- MAY 31 2016 State of North Carolina I Environmental Quality I Coastal Management D C M - M H D CITY 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 i� V Water Resources ENVIRONMENTAL QUALITY June 3, 2016 Mr. Nicholas Nixon III 111 Brookhaven Trail Leland NC 28451 Subject Property: 115 & 125 Hollis Lane — Wilmington PAT MCCRORY G ...(.mar DONALD R. VAN DER VAART ste,rlar' S. JAY ZIMMERMAN New Hanover County DWR Project: 16-0367 Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Nixon, Am,for You have our approval, in accordance with the attached conditions and those listed below, to impact 0.01 acres (436.square feet) of 404 wetlands in order to construct a.single family residence as described within your application received by the Division on April 12, 2016. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 3900 (GC 3900). You should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This Certification can also be found on line at: http://I)oilal.nedenr.org/web/wq/swi)/ws/401/certsaiidpermits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property s o1d3 the neQv okvner7i ti9t-be given a copy of this approval letter and General Certificat kOrt�=ia4&�ig responsible of goruplying with all conditions. Any new owner must notify the Division and request the Certification be by y�^ E1 M I? ' . I'. . . e 'Dt W11E A G70N, iVC State of North Carolina I Environmental Quality I Water Resources 1611 Mail service Center I Raleigh, North Carolina 27699-1611 ,� U N 0 7 2016 9197079000 Nixon 115 & 125 Hollis Lane (' New Hanover County 2016-0367 t issued in their name { 15A NCAC 021-1.0501 and .0502}. Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 021-1.0502 (b) and 15A NCAC 02H .0506 (4)] The applicant shall require his contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity issues arise at 910.796.7215 This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. The permittee shall require its contractors and/or agents to comply with the terms of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 6 Continuing Compliance: The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification. [15A NCAC 02H .0507(d)] RECEIVED DCM WILMINGTON, NC r`" RECEIVED JUN 0 7 2016 0CM WILMINGTON, NC AINn7--- Nixon 115 &�25 Hollis Lane New Hanow; County 2016-0367 ` ' All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional Office at 910.796.7215 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A]. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)]. This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours 15A NCAC 02H.0502(e). 10 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The certification of completion is available at: http://i)ortal.ncdenr.oriz/web/wq/swp/ws/401 /certsandpennits/apply/forms). Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at ham://www.ncoab.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holiday# RECEIVED DCM WILMINGTON, NC JUN 07 2016 Nixon 115 & 125 Hollis Lane New Hanover County 2016-0367 M The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam M. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Jennifer Burdette in the Central Office in Raleigh at 919.807.6364 or Jennifer.Burdettenncdenngov or Chad Cobum in the DWR Wilmington Regional Office at 910.796.7379 or Chad. Cobumgncdenr.Kov. Sincerely, Q-9� Ji egson, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosure: GC 3900 cc: Kim Williams - Land Management Group, Inc., 3805 Wrightsville Avenue, Suite 15, Wilmington, NC 28403 Tyler Crumbley - USACE Wilmington Regulatory Field Office Heather Coats - DCM Wilmington WiRO T T Fr,r RECEIVED DCM WILTAINGTOK NC ti i Water Resources ENVIRONMENTAL QUALITY DWR Project No: Applicant: Project Name: PAT MCCRORY Gowmnr DONALD R. VAN DER VAART S. JAY ZIMMERMAN A& -,for 401 Water Quality Certification Issued Date: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. .„;.; Signature: RFrFNEp Dater DCM WILMING� NO JUN 0 7 Z916 a , m4 tea -� dyR R 7 State of North Carolina I Environmental Quality I Water Resources 1611 Mail service Center I Raleigh, North Carolina 27699-1611 919 707 9000 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Nicholas Nixon III c/o Land Management Group, Inc. 2. LOCATION OF PROJECT SITE: 115 and 125 Hollis Lane, adjacent to the AIW W and Masonboro Sound, New Hanover County. Photo Index —2006: 21-7384, 6, Q-S 2000: 21-264, 5, Q-S 1995: 21-247, 11, P-R State Plane Coordinates - X: 2344576 Y: 146294 Latitude:34*08'47.45"N Longitude: 77°5P41.21"W 3. INVESTIGATION TYPE: CAMA & D & F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 03/15/2016 Was Applicant Present — Yes (agent) 5. PROCESSING PROCEDURE: Application Received — 03/30/16 (Completed) Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - New Hanover County Land Classification From LUP - Resource Protection (B) AEC(s) Involved: PT, EW, CW, ORW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing —None Planned — Septic System (F) Type of Structures: Existing - Vacant lots Planned - New residential dwelling, driveway and private docking facility (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (§ 404 wetlands and 436 sq. ft. 1,080 sq. ft. coastal wetlands) (§ 404) (shading) (B) Non -Vegetated Wetlands 1,828 sq. ft. (Open water (C) Other (High Ground Disturbance) 18,000 sq. ft. (D) Total Area Disturbed: 21,341 sq. ft. (0.48 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA-ORW Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a single-family residence with associated § 404 Wetlands impact and a private docking facility. REG APR 13 2016 WI - Nicholas Nixon III Page 2 9. PROJECT DESCRIPTION: The applicant's properties are located at 115 and 125 Hollis Lane in New Hanover County. The proposed project is adjacent to the AIWW and Masonboro Sound. To find the properties one would travel south from Wilmington on South College Road (NC 132) to the intersection of South College, Carolina Beach Road (NC 421) and Piner Road. This intersection is known locally as Monkey Junction. Turn left onto Piner Road and travel approximately 0.75 miles and veer to the left onto Grissom Road. Continue heading north until Grissom Road merges into Masonboro Loop Road. Continue to head north on Masonboro Loop Road until you reach Hollis Lane, which will be on the right. Turn onto Hollis Lane and continue down the unimproved road until your reach the properties on the left. The properties are contiguous residential lots approximately 3.2 acres combined. The lots are relatively flat and has an average elevation ranging approximately 5'-10' above normal high water (NHW). Located within the central portion of the project site and eastern end are areas of §404 Wetlands. There are no existing structures on the applicant's lots. The waterfront lot has approximately 184' of frontage along the AIW W and Masonboro Sound. The application states this section of the waterway measures approximately 918' across the waterbody; however, based on a recent site visit and review of updated aerial photography, it appears the distance of the waterbody is approximately 890'. Along the applicant's shoreline is a border of coastal wetlands averaging approximately 180' in width. The upper portion of the coastal wetlands border, as it transitions from highground, is vegetated primarily with, Salt -meadow Grass (Spartina patens), and several shrub species, including: Southern Wax Myrtle (Myrica cerifera) and Yaupon Holly (Ilex vomitoria). Beyond is an approximately 150' wide border of Smooth Cordgrass (Spartina alterniflora) adjacent to open water. There are existing private piers located to the south of the applicant's property along the same shoreline. The property directly to the south of the applicant's property, which currently has a private docking facility (R. Hollis) was authorized under CAMA General Permit No. 59107-D on December 16, 2011. The residential properties to the north off Friendly Lane, have a shared boat basin and an access channel to the AIW W with associated pilings as channel markers. The Joint City of Wilmington and New Hanover County Land Use Plan classifies the adjacent waters as Conservation, and the adjacent high ground portion of the project area as Resource Protection. In the project area, the waters of Masonboro Sound are classified as SA-ORW by the NC Division of Water Resources, and they are CLOSED to the harvest of shellfish. These waters are designated as a Primary Nursery Area (PNA),Iby the NC Division pf Marine Fisheries. ff s 4� . _6,L.J PROPOSED PROJECT: APR 13 2016 The applicant proposes to construct a single-family residence with associated §4F4 Wetlands impact and a private docking facility. High ground development on the tract includes the construction of a single-family residence with a footprint of-100' in length by 35' in width with associated 14' in width concrete driveway. The application states that the two-story home would be constructed on pilings and the total floor area would be approximately 2,450 sq. ft. The application states that the wastewater would be treated through a proposed septic system located on the most western end of the project site. The application states the proposed driveway would incorporate an area of 436 sq. ft. of jurisdictional §404 wetlands. All proposed upland development, outside the septic system would be located within the 575' Area of Environmental Concern (AEC). According to the application package, approximately 12,900 sq. ft. (I 1 %) of impervious surface would cover the property. All proposed upland development would be located landward of the Coastal Shoreline 30' Buffer. The applicant is also proposing to construct a private docking facility into Masonboro Sound/AIW W. An access pier, measuring approximately 385' in length by 6' in width would extend towards the east into Masonboro Sound. The access pier would lead onto a partially fixed covered platform, measuring approximately 14' in length by 19' in width, which would be oriented towards the north creating an "L-shape" configuration. Portions of the drip -line of the roof cover would extend approximately 2' outside the footprint of fixed platform. Nicholas Nixon III Op — Page 3 An access ramp would then lead onto a floating dock, measuring approximately 25' in length by 8' in width, which would extend in the same alignment as the access pier. A boatlift, measuring approximately 13' in length by 13' in width would be located on the southern side of the floating dock. Another boatlift, measuring approximately 12' in length by 12' in width would be located on the southern side of the most waterward end of the access pier. The applicant states that the proposed docking facility would provide mooring for up to three (3) vessels within existing water depths in the vicinity ranging from approximately -2.5' to -4.0' @ NLW. As proposed and per the riparian survey, the proposed docking facility would be located within the established pier length, within the applicant's area of riparian access and would not encroach into the adjacent 15' riparian corridor setback area requirement. However, it appears the docking facility would exceed the current 1/4 distance rule where the existing water depths are approximately -1.0' to -1.5' @ NLW; however, the structures would not exceed the 1/3 of the distance of the waterbody. 10. ANTICIPATED IMPACTS: The proposed upland development activities would result in the disturbance of approximately 18,000 sq. ft. of high ground and approximately 436 sq. ft. of § 404 wetlands (0.01 acres) for the construction of the single-family residence and associated driveway. All proposed upland development would be located landward of the Coastal Shoreline 30' Buffer. According to the application package, approximately 12,900 sq. ft. (11 %) of impervious surface would cover the property within the 575' AEC. The proposed access pier would shade approximately 1,080 sq. ft. of coastal wetlands would incorporate approximately 1,828 sq. ft. of Public Trust Area and Estuarine Waters. As proposed, the applicant's proposal would not encroach into the 80' federal setback requirement from the AIWW channel. Based on the provided riparian survey, the proposed structures would not encroach into the adjacent 15' riparian corridor setback area requirement. The proposed structures would allow the facility to accommodate up to three (3) vessels in water depths of approximately -2.5' to -4.0' @ NLW. The proposed structures would extend approximately 215' into a waterbody, which measures approximately 890' across. As proposed, the docking facility appears to exceed the 1 /4 width rule where the existing water depths are approximately -1.0' to -1.5' @ NLW; however, it does not appear to exceed the 1/3 distance and the established pier length, aforementioned. Minor increases in turbidity should be expected during construction; however, no long term impacts are anticipated. RECE, APR 13 2016 DCNI- MHD Cg T Y Submitted by: Robb L. Mairs Date: 04/12/2016 Office: Wilmington tfr CAMA MAJOR PERMIT APPLICATION Project Narrative Nicholas Nixon III 115 & 125 Hollis Lane Wilmington, NC (New Hanover County) Nicholas Nixon III proposes to construct a single-family home on pilings, driveway, and a pier with a floating dock and two boat lifts within a project area located at 115 and 125 Hollis Lane in Wilmington, NC (New Hanover County). The site abuts Masonboro Sound and is located within an Area of Environmental Concern. Existing Conditions The project area is 3.2 acres in size and consists of two tracts (R07200-008-041-002 & R07200- 008-041-004) located at 115 and 125 Hollis Lane in Wilmington, NC. The site is adjacent to Masonboro Sound, which is classified as SA and ORW. This waterbody is also a Primary Nursery Area (PNA). The site is located within the VE flood zone (VE-15, VE-16, and VE-17) and is within the White Oak River Basin (HUC 03030007). Wetlands within the site were delineated by Land Management Group, Inc. Freshwater and coastal wetlands are located adjacent to Masonboro Sound on the eastern part of the site. Freshwater wetlands contain Nyssa sylvatica, Magnolia virginiana, Pinus taeda, Morelia cerifera, and Juncus effusus. Coastal wetlands support Iva frutescens, Sportina alterniflora, and Distichlis spicata. Uplands within the site support Pinus toedo, Quercus virginiono, Ilex vomitoria, Morelia cerifera, and Quercus faicata. The 404 wetland line was approved by Mr. John Policarpo the US Army Corps of Engineers and the coastal wetland line was approved by Mr. Robb Mairs of the Division of Coastal Management on January 28", 2016. The normal high water line was established by Ms. Patricia Roberts with New Hanover County. The existing land use map in the CAMA Land Use Plan for the City of Wilmington (2006) classifies this site as Conservation Area since it is adjacent to Masonboro Sound, a waterbody classified as Outstanding Resource Waters (ORW). The lot is zoned R-15 by New Hanover County. The R-15 Residential District is established as a district in which the principal use of land is for residential purposes and to insure that residential development not having access to public water and dependent upon septic tanks for sewage disposal will occur at sufficiently low densities to insure a healthful environment. RELEY . RECEIVED APR 13 2016 DCM WILMINGTON, NC MAR 3 0 2016 DCP%"- � ' - -Y Proposed Project The applicant proposes to construct a single-family home, driveway, detached garage/shed, septic field, and pier with a floating dock and two boat lifts within the project area. The two-story home will be constructed on pilings and the total floor area will be 2,450 sf. The total area of disturbance within the site will be approximately 18,000 square feet (-12,900 sf in AEC) and the overall impervious area will be 13,700 square feet (-12,900 sf in AEC). The applicant proposes to fill a total of 0.01 acre (436 sf) of freshwater wetlands in order to construct a driveway. The applicant will utilize an on -site wastewater treatment system for septic and a well for water supply. Standard construction methods will be used during construction. The proposed pier will span approximately 385 feet into the water and will be 6' in width. Two platforms and three slips are proposed at the end of the structure. Two boatlifts are also proposed, both of which will be 13' x 12'. The proposed pier length exceeds the''/< -width of the water body in this location and is needed to obtain adequate water depths. Water depths at the 1/4 width are approximately 1 to 1.5 feet. Water depths at the proposed terminus (approximately 1/3 the width of the water body) average 4'. The proposed pier will extend out to the neighbor's existing dock to the south and inshore of the channel mark pilings to the north. It appears that the land on the other side of Masonboro Sound is owned by the State of North Carolina and is unlikely to be developed. Extending the pier out to this location will also prevent scouring of the substrate during boat use. APR 13 2016 DC10- MHD CITY DCM WILM NIGTON, NO 2 MAR 3 0 2016 APR 13 2016 Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 Ms. Kim C. Williams c/o Land Management Group, Inc. 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Dear Ms. Williams: W PAT MCCRORY Gowvftor DONALD R. VAN DER VAART secrewy BRAXTON DAVIS Director The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Mr. Nicholas Nixon III for the proposed development located at 115 and 125 Hollis Lane, adjacent to Masonboro Sound/AIWW, near Wilmington, in New Hanover County. It was received as complete on March 30, 2016 and appears to,be adequate for processing at this time. The projected deadline for making a decision is June 13, 2016. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from March 30, 2016 you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. A field report has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. i� Robb L. Mairs Field Representative Wilmington District Office N.C. Division of Coastal Management cc: Doug Huggett, DCM-MHC, Heather Coats, DCM-WiRD -�� t — Tyler Crumbley, USACE Patricia Roberts, NH Co. APR 13 2016 Nicholas Nixon, Applicant Nothing Compares�.� State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 X NOTI(01017i CAMA PERMIT APPLIED FOR PROJECT: fated -404 n u Masonaoro Jouna, in *�• County COMMENTS ACCEPTED THROUGH _ Mav 6, 2016 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: NiaholasNmYon III NC Div. of Coastal Management 111 Brookhaven Trail 127 Cardinal Dr. Extension —Leland7NC 2A451 Wilmington, NC 28405 Robb Mairs, Field Represen a lve 910-796-7423 Agent: Kim Williams / LMG (M) 452-0001 L 14*4��LMG LAND MANAGEMENT GROUP imc. Environmental Consultants April 8, 2016 TO: Ms. Mildred Parker Bobbitt 354 Friendly Lane Wilmington, NC 28409 RE: Required Notification 115 & 125 Hollis Lane; Wilmington (New Hanover County), NC CAMA Major Permit Application Dear Ms. Bobbitt: This letter serves to notify you of a proposed project at 115 and 125 Hollis Lane in Wilmington, NC. Mr. Nicholas Nixon has submitted a CAMA Major Permit application to the NC Division of Coastal Management (DCM) requesting authorization to construct a single-family home on pilings, driveway, and a pier with a floating dock and two boat lifts within the above -referenced project area. As an adjacent riparian property owner to the project, you are required by the permit application process to be notified. A copy of the CAMA permit application (narrative, application forms, and figures) as it has been submitted to NC DCM is enclosed. If you have no objections to the project, please indicate on the enclosed form and return to Mr. Robb Mairs, NC DCM, 127 Cardinal Drive Ext., Wilmington, NC, 28405. Any written objections can also be directed to Mr. Mairs, NC DCM, 127 Cardinal Drive Ext., Wilmington, NC, 28405. No comment within 30 days of receipt of this package indicates no objection. I am happy to answer any questions you may have regarding the enclosed materials and can be reached at 910-452-0001. Sincerely, Kim Williams Land Management Group, Inc. (agent) Encl. cc: Robb Mairs, NC DCM RECENED APR 13 2016 �'CEfVED ACM WILMINGTON, NC APR 12 2016 www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, INC 28403 Oc_ t4ff LMG LAND MANAGEMENT GROUP nxa Environmental Consultants April 8, 2016 TO: Robert Joseph Hollis Etal 126 Hollis Lane Wilmington, NC 28409 RE: Required Notification 115 & 125 Hollis Lane; Wilmington (New Hanover County), NC CAMA Major Permit Application Dear Mr. Hollis: This letter serves to notify you of a proposed project at 115 and 125 Hollis Lane in Wilmington, NC. Mr. Nicholas Nixon has submitted a CAMA Major Permit application to the NC Division of Coastal Management (DCM) requesting authorization to construct a single-family home on pilings, driveway, and a pier with a floating dock and two boat lifts within the above -referenced project area. As an adjacent riparian property owner to the project, you are required by the permit application process to be notified. A copy of the CAMA permit application (narrative, application forms, and figures) as it has been submitted to NC DCM is enclosed. If you have no objections to the project, please indicate on the enclosed form and return to Mr. Robb Mairs, NC DCM, 127 Cardinal Drive Ext., Wilmington, NC, 28405. Any written objections can also be directed to Mr. Mairs, NC DCM, 127 Cardinal Drive Ext., Wilmington, NC, 28405. No comment within 30 days of receipt of this package indicates no objection. I am happy to answer any questions you may have regarding the enclosed materials and can be reached at 910-452-0001. Sincerely, Kim Williams Land Management Group, Inc. (agent) Encl. cc: Robb Mairs, NC DCM RECEIVED DCM WILMINGTON, NC APR 12 2016 www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 a� 7005 2570 0000 5704 1645 -- s - Ilk Ig 2g 3 m O fl Id 1� AIM �P O M O K M O O L�i O a oarP 7005 2570 0000 5703 9802 APB 113 2u16 RECEIVED DCM WILMINGTON, NC APR 12 2016 Coastal Management ENVIRONMENTAL OVALITY PAT MCCRORY (wwmfm Se, l emry BRAXTON DAVIS AGENTAUTHORIZATION FORM Date: is (Co Name of Property Owner Applying for Permit: Name of Authorized Agent for this project: Owner's Mailing Address: Phone Number ( Agent's MallingrAddress: Phone Number (41{})g52,000t_ I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct the following (activity): One single-family home with driveway and se0c field: floating dock structure This certification is valid thru (date) Fro OwnerSlgnature Date RECEIVED DCM WILMINGTON, NC APR 13 2G16 MAR 3 0 2016 �a s Y® N.C. DIVISION OF COASTAL MANAGEMENT NOTIFICATION OF COASTAL WETLAND DETERMINATION Pursuant to NCGS 113-229(n)(3),, and 15A NCAC 07H.0205(a) Property Owner: Nb(m Mailing Address Site Address: lrwd 061 N° 00805 ABCO Project Location: County Nbw f fo'✓/J US/NC/SR # 6* 5K l y f Z River Basin t% Adj. Water Body JGs--:. ram ► 5�<r�aN , Indicate Which of the Followina Apply: Coastal Wetlands have been identified on the above described property. The project (as currently proposed) may impact these wetlands but no official delineation was performed. The Division of Coastal Management suggests that you request a formal delineation by this Division to evaluate potential impacts to Coastal etlands and project design alternatives. Coastal Wetlands have been identified on the above described property. At your request, an official Coastal Wetland delineation was performed by the Division of Coastal Management. The Division of Coastal Management suggests that you have the delineation surveyed. The Division will verify the surveyed line, which will then remain valid for a period not to exceed 12 months from the delineation. Coastal Wetlands species identified on -site: Spartina alterniflora Distichlis spp. Cladium jamaicense _Spartina cynosuroides V Juncus roemerianus _Salicornia spp. __,ZLimonium spp. APR 13 2016 —Scirpus spp. _Typha spp. ✓Spartina patens Check any fi d indicators that apply to establish regular or occasional flooding: _tidal water observed on -site (do not check if during or following Tropical Storm/Hurricane) crabs/holes ✓ wrack lines 1"staining V"00"'tidal water connection periwinkle V"'e^levation changes _other (please describe) DCM Official Date Title % i'e�"V In the event YQQ w11sh to appeal this jurisdictional call, you may request a second pinion. DV. contacting my supervisor, (DCM District Manager) at QQ/o>�,, L✓��5t'.y / �r�' Visit our website at www.nccoastalmanagement.com FIVE DCM WILMINGTON, NC MAR 3 0 2016 i } LU �_ U I I > �. (((((yyyyyV ■ Complete items 1, 2, and 3. A. Signet a W o c ■ Print your name and address on the reverse x O spent O so that we can return the card to you. 13 Adtaawas U z ' • Attach this card to the back of the malipwxh or on the front If S• C. Of V W � l c G spnc_ a permit-, _ - / Q yf S / Q � 1. Article Addressed to: \I U� D. NdeYwryeddaee dlasrenl Mara lterttlT MYW entard address below: 13No U Q t 1117 1L, K+ CU S 1 �aI-, Jill 111111111111 IIIIIIIIIIHI I II 11111 Type 6iertre 3❑ ❑ Mail aA11111111 O R.Ostered Md^ MseunrySice enature Restricted DelivsrY ❑ Do very Mel Rae4NIM very 9590 9409 0119 5077 8253 21 0 Gerd b Mal Restricted Delivery ❑ RDeOum for p Artirin Number nhar elbr e0m service lahe0 ❑ Collect on Delivery Merctfendlee ❑ Collect on DeP"' Reaelcted DNtvary ❑ $IeneWre ccnlmatlWn 7005 2570 0000 5704 1645 ed Mel ed�uwRerrwt«to.rvery ❑ sgnswre celivery n R«Irict.do.lNery PS Form 3811, April 2016 PSN 7630-024W.W 9 Domestic Return Recelpt li Nothing Compares--.k� State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-796-7215 LMG LAND MANAGEMENT GROUP iNc. Environmental Consultants March 29, 2016 Mr. Robb Mairs Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: LAMA Major Permit Application 115 & 125 Hollis Lane; Wilmington (New Hanover County), NC Nicholas Nixon III, Applicant Dear Robb: On behalf of Nicholas Nixon III, LLC, please find enclosed the application materials for a CAMA Major Permit. The applicant proposes to construct a single-family home on pilings, driveway, and a pier with a floating dock and two boat lifts within the above -referenced project area. For purposes of review and permit processing, please find the attached information: 1. Project Narrative 2. Forms DCM MP-1, 2, 3, and 4 3. Sheet 1: Vicinity Map 4. Sheet 2: Site plan showing proposed development landward of NHWL S. Sheets 3-4: Plan view and cross section of proposed development waterward of NHWL 6. Sheet 5: Survey of property showing AIWW Channel line and setbacks 7. Permit Fee check in the amount of $400.00 8. Signed Agent Authorization 9. Property Deed Please note that the MP-4 form and Sheets 3-5 were prepared by Mr. Jimmy North. Adjacent riparian notifications, including copies of Items 1-6 listed above, will be mailed via USPS as soon as I receive confirmation from you that the application is complete. Thank you for your assistance with this project, please contact me if you have any questions. Sincerely, Kim Williams Environmental Scientist Yc y APR 13 ZC16 Enclosures ° RECEIVED Cc: Nicholas Nixon III °j ' DCM WILMINGTON, NC MAR 3 0 2016 www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 VC.- BK: Re ee36 P010-11{9-1172 2p16036911 12-04-2NEW NANOVER COUNTY. NO aEN¢fD Y AM qs 12 46 24PM n1NNv niEufGR BFAat¢r Mw[.¢aGanrF RY NiDR¢AGI(f.SNill. RERISiER OF bEEni ¢Sx 1NrfW rYNi6f W i No Title Certllleadea Or Tax Advice Requested of or Provided by Dranxman STATE OF NORTH CAROLINA REVENUE STAMPS: $1,850.00 GENERAL WA.RRALT'r 'Y DEF-D PARCEL k: R07200-008-041-002 do R07200-009-041-004 DRAWN BY: BOYLES LAW FIRM, PLLC/ HS 319 North 4* Street, Wilmington, NC 29401 RETURN TO: BOYLES LAW FIRM, PLLC STA 201504890 GRANTOR MAILING ADDRESS: $102 N. Creek Drive, Wilmington, NC 2e409 PROPERTY ADDRESS: 1 IS do 123 Hollis I ane_ W ilmineton- NC 23409 GRANTOR PRIMARY RESIDENCE: Yee -2L_ No (Property conveyed) GRANTEE'S MAILING ADDRESS: I I Brookhaven Trail. Leland. NC 28451 Brief Legal: Tract 1: (2.56 ACRES) ADJ WM HOLLIS & Trutt 2: LOT 3 Katherine Figueroa SLAP This deed made and entered into this 3rd day of December, 2015, by and between BARBAR-% JACKSON, unremarried widow, Grantor(s), and NICHOLAS FOY NIXON, III and wife, CATHERINE ELIZABETH CONNELL, Grantec(s). WIINESSETH, that the Grantor for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these present does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land located in the county of NEW HANOVER State of NORTH CAROLWA, more particularly described as follows: SEE ATTACHED EXHIBIT A To have and to hold the aforesaid lot or parcel, together with all privileges and appurtenances thereto. heretofore belonging to the Grantor in fee simple. The Grantor covenants with the Grantee, that the Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that the title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomever except fw the exceptions hetcinatter stated. Title to the property hereinabove described is subject to the following exceptions: The provisions of all applicable zoning and land ordinances, statutes and regul>u>ons' 2015 ad valorem taxes; and all applicable restrictive covenants and utility easements of record. In witness whereof the Grantors) has hereunto set their hand and seal, or if corporate, instrument to be signed in its corporate name by its duly authorized officers end its scat affixed by authority of its Board of Directors, the day and year first above writ' ` RECEIVED DCM WILMINGTON, NO APR 13 2016 has caused this to be hereunto � %. MAR 3 0 2016 EAL) STATE OF QcC COUNTY OF hxAJ M r)ecd tag l certify that the following person(s) BARBARA JACKSON, personally appeared bctbrc me this da'%. acknowledging to me that hetshclthey voluntarily sighed the foregoing document for the purp..�sr a_�rcd therein and in the capacity indicated: GRANTOR(S). (Check Oncl -(i) 1 have personal knowledge of the identity of the principal(s): or 00 I have seen satisfactory evidence of the principal's identity by a current state or federal identification, with the principal's photograph, in the form of NC 4>t- ```itttyt�tgr tMrrprrrr� Date: I�fC. Cr+�''** „y- 3_�� , 2015 (Of7 icial Seal ai,.�T,yZt11��'1'ub'1 he+Si'�'.) r tJ = NO c qQp46rc G 2= 1 My Commission Expires: 1 — a.o i y 'a,J APR 13 2016 RECEIVED DCM WILMINGTON, NC MAR 3 0 2016 k � i New .Hanover County a; Register of Deeds 216 NORTH SECOND STREET h 14ILMINGTION, NORTH CAROLINA 28401 \ Telephone 910-798.45M t Fax 910-798-7751 m a ititt}i}aii}iYYi}Httaaiaiaifl f'#flait Yfaat Ya eeaiiitiiaiH if as HaY HtNaii iiaii Yaaa tiY qaa:aa iYH4af aYahfxN W State of North Carolina, County of New MOVER Filed For Registration: 12/04/2015 12:48:24 PM Book: RB 5935 Page: 1169-1172 4 PGS $1,816.00 Real Property $26.00 Excise Tax $1,850.00 Recorder; ANDREA.CRESWELL Document No: 2015036911 ♦#Hill! MtH iN lilt Miiii Wiitiii#i itii Ra}M aaYfy tfw fli#iH ii#tt#ti i#f lilt 4ttt}tliii44aiff44i#t#ffii#th#i###i DO NOT REMOVE! This cortificatim shear is a vital part of your recorded docusent. Please retain with original dasaeent and *Ubsit Than re-recording. RECEIVED DCM WILiONGTCN, NC MAR 3 0 2016 NC Division of Coastal Management Major Permit Application Computer Sheet AEC: Masonboro Sound Cdaits _ Fee: $400 #24462 Applicant: Nicholas Nixon 111. Agent/Contractor: LING, clo ura ich Project Site County: New Hanover Staff: Robb Mairs District: Wilmington Project Name: Nixon SFR & Docking Facility Rover File: n/a River Basin: Cape Fear Initial date of application submittal: 3-30.16 Date application "received as complete" in the Field office: 3 d SITE DES5PPTION/PERMIT INF0 ATION ORW: ^ Yes ❑No PNA: EijYes ❑No Photos Taken: Yes 62r No❑ Setback Required (riparian): ❑Yes o Critical Habitat: []Yes No ONot Sure 15 foot waiver obtained: ❑Yes o Hazard NotifiReturned: []Yes []N6 SAV: ❑Yes o ❑Not Sure Shell Bottom: ❑Yes o ❑ Not Temporary Impacts: ❑Yes Lsdflo Sure Sandbags: 0Yes o ❑ Not Sure clas: Did the land use ' lion come Mitigation Reegwred (optional): from county LUPes ❑No []Yes 100- Moratorium Condit' s: Environmental A sment Done: Length of Shoreline: ❑Yes ❑No NA ❑Yes []No A en l FT. Shellfish Area Desi nation: Project Descriptio (code) Development Area: (code) Open -or Closed SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) El Nutrient Sensitive Waters (NSW) El Swamp Waters (SW) ❑ High Quality Waters (HQW) ❑ Outstanding Resource Waters (OR" WE;NDSIMPACTED (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) SA) Salt marsh cordgrass (Spartina El (SY) Salt reed grass (Spartina al erniflora) Rim cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) Sp.) ❑ (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 per ' - $250 more than 1 acre - $475 Permit Transfer - $100 III(B) Public or commercial wl D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - II. Public or commercial/no dredge $100 and/or fill - $400 ;o ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400°0 Lp-�.�r Nixon lll, Nicholas Date: 3-30-16 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One �! New Work Replace Maint ❑ ❑ Y New Work Replace &14� Maint El El Y I New Work Replace ; Yto G (/ Maint ❑ ❑ Y N L ' New Work Lgr Replace Maint ❑ ❑ Y EJ N UIP 20 TIP,y� New Work Replace ` j Maint ❑ ❑ Y a p ✓ r EF New Work Maint ❑ Replace ❑ Y 3'N S New Work Maint ❑ ElReplace_,! Y Ld ry Z,$I New Work Maint El Replace Y [�]'N 3 %3 t%2 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact impacts) impact amount tempimpacts) amount ,r �A / L. � Dredge Fill t3oth Other ElI ❑ & El y3 G 96 Dredge ❑ Fill ❑ Both ❑ Other pp3 ©tsy%/U' �(f I Dredge Fill Both Other ❑ El gU / (Q p V VV Dredge ❑ Fill ❑ Both ❑ Other J� Dredge ❑ Fill ❑ Both ❑ -Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919.733-2293 :: 1.888.4RCOAST :: www.nccoastalmananement.net revised: 10/12/06 ot- Coastal Management ENVIRONMENTAL QUALITY April 12, 2016 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice Combo: • Walters / Brunswick Co. • Nixon III / New Hanover Co. PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Dimcror Kyle & Heather. Please publish the attached Notice in the Friday, April 15, 2016 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Luke Skiera, (Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. cc: Heather Coats - WiRO Doug Huggett -MHC Tyler Crumbley — USACE Michele Walker- DCM Sincerely, in Shaun K. Simpson Permitting Support & Customer ssistance Nothing Compares. RECEIVED APR 13 2016 DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 Eat NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that the following applications were submitted for development permits in Areas of Environmental Concern as designated under the CAMA: On March 23, 2016, Charles E. Walters Jr. proposed to construct a private docking facility at 9197 Schuyler Dr., adjacent to the AIWW, in Calabash, Brunswick County, and on March 30, 2016, Nicholas Nixon III proposed to construct a single-family dwelling with a private docking facility at 115 & 125 Hollis Ln., adjacent to Masonboro Sound and the AIWW, in Wilmington, New Hanover County. The applications can be examined or copied at the offices of Sean Farrell (Walters) or Robb Mairs (Nixon), N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7215) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to May 6, 2016 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECEMI- APR 13 2016 Nothing Compares,, DC M- M H D C-p TY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Em., Wilmington, NC 28405 910-796-7215 MAJOR PERMIT FEE SCHEDULE N. Nixon 111 / $400 #4462 / New Hanover Co. IN DCM % DWQ % Development Te Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% $0 III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if &B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $250 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 1 60% $240 40% $160 III(D). If General Water Quality Certification No. 3490 see attached cannot be applied: $400 60% $240 40% $160 i IV. Development that involves the filling and/or��. excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECEIV7D APR 13 2M DCM- MHD C-', Y Daft Deposhe Check Rece/vetl dgilds" Check From Nameo/RarmNNoltiv Vendw Check Number amount Permh NumbeMCO mane uerren - _ o i Mann Cmelrudion LLC r yn Gary LYnch iarEaon same Edl Hal _ Turner r same Louise Mengel - Jr. same Itmdaa Inc Richadl 6 Laur itradaslnc Dennis Farrell _ mattes Inc - Dennis Fan_all_ Beath same Builders Inc _ Ma Arty >ann7 same bon Inc Ed Ball _ moup Into _ Ed Hill same r9/2016 Rock Solid Construdion i9/2016_Adam KniemnfMarkl LLC 29/2016 Adam Knien"Mamech LLC i9/2016 Brandon Grimes/ aria M016. Jerry Ennett/Arilmon Construction Inc Jimmy NorthlCcadal Manne Piers Bulkheads LLC Mark ClementsiClem_ ants Mane Construction --- Nicholas Nvon III -- Ages Kenan Walk 8 Shore Line HOA 3894' _ 4741 5025 _ 6740403431 t026__ $2W 00 $2(k W GP %391D $2DD.W GP W2980 S400.W GP %393D GP 66392D Receiptor mmMib Re/unNRealrocated 4c Rd. HamP N JD rd. 1746D _ _ RM lost- 1482D 6F hat. 16260 JD rd. 1745D if hill 0m JD rd. 1747D SF rd. 1625D Calabash BrOo SF rd. 16280 _ RM rat- 1483D RM rd. 1483D -- — RM mL 14630 -RM of 14B4D One JD hall 1749D --- JD rcl. 1748D - - - -- — JD rat. 175/D Hampstead PIN -JD At. SF nx. 1631D SF rd. 16290 _ JD out. 1750D _ _HS mt. 1521D _ SF rcL 1030 NHCo Qf408 RM n 1485D NHCo QMW RM nY 1485D JD mt 1576D JD rat, 1756D _ RM ri 1486D WB NHCo RMft 14870 a, Wbn NHCo RM rd, 1489D t�- N.C. PL5 No. L4148 I, PATRICK C. BRISTOW, CERTIFY THAT THI5 PROPERTY WAS SURVEYED AND MAP DRAWN UNDER MY 5UPM15ION: DESCRIPTION AS SHOWN ON THE FACE OF THIS PLAT; RATIO OF PRECISION AS CALCULATED BY COMPUTER 15 1:10.000+; THAT THE BOUNDARIE; No ( SURVEYED ARE SHOWN BY BROKEN LINES PLOTTED FROM INFORMATION REFERENCED; THAT THI5 PLAT WAS PREPARED IN ACCORDANCE WITH THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA' (21 WK 5G. I G04); WITNESS MY ORIGINAL 5IGNATURE, UCENSURE NUMBER AND SEAL THI5 I4TH DAY OF DMWBER A.D. 2015, c- c0:.NQ C" PATRICK C. BRISTOW ``p1111CA Illif RO % 2: dr 10L1' SEAL, / 2. / c N/F NEWTON DB 5314 PG 1559 — — — — — — - N/F MILDRED P. B055ITT DB 253G PG 445 570°04'56"E 1 2 570004'53"E DITCH ALONG LINE UPLAND LOT (UNIMPROVED) I ACCE55 EASEMENT (DEED BOOK 5414 PAGE 191 39 CAMAS ` BUFFER i 51 1 °25V9"W IGG.7G' (TIE) o b t fIV1V LL I�VJ1tJ------------------ - --i-N70° 19'00"W = 30' PRIVATE ACCESS EASEMENT 32.92' MB 57 PG 139 s 4FE'� I f LOCATION MAP NOT TO SCALE 5URVEY REFERENCE \ DEED BOOK 5414 PAGE 191.195 BL _ I ,=_U MAP BOOK 23 PAGE 73 \ ChgN I I I CHANNELCAQ MAP BOOK 57 PAGE 139 \ \ \ qg pFRChgN(TFII MARKER FOAek �MSCO I I N I } \ \\` q�F I I B a I C\ J 1 I U z i NORMAL HIGH WATER \ \ �1 I Cl lu REVIEWED BY NHC CAMA OFFICIAL I PATRICIA ROBERTS i I 3 11 - - - - �- - - - _, _ 566024'3 I "E \ �I I m 3 I EDGE OF MARSH - - - - - 15' 5B- - - - - - -'- - - - I _ _ a I (FROM AERIAL PHOTO) - - - - - - i - -1' - - - - 925.76_(TOTAL) p ) ONE-(;ZUARTER POINT I 90 DEGREES CENTER AXIS - - - - - - - - - - - - - S6_6°24'3 I "E (_ I OF CORRIDOR _ 229.5' 120.58' < 302.59, -�--- I _. �, - - - - 80. - -t 90.00' k� - - - -�_ _9 18 CfOT_AL) m F— L6 I i 445.47'- _ -- — --15-5B _ - -�--- 1 1 972.54' EDGE OF MARSH (FROM AERIAL PHOTO) uj z MA50NB0R0 50UND RECEIVED Apn 1 3 z \ J = (ATUNIICINTRACAA5TP1WAtERIVA'0 DCM WILMINGTON, NC HIGH WATER LINE TABLE LINE LENGTH BEARING I I °I ' I. I ° :2 ° " I 51 15. I G 555*04'5 L8 1 9.72' 1 559°06-1 3"W NORMAL HIGH WATERLINE REVIEWED AND APPROVED 11J U r z I I APR 12 20 BY PATR)CIA RWI OBERTS TH NEW HANOVER COUNTY CAMA. = EBB FLOOD 1 I I 04 dl I 1 PWJCCT5\1 15 HOLL15 LANC DECEMBER 14, 2015 I INCH = 100 FEET PATRJCK C. BRISTOW LAND 5LnWMNG. PC DECEMBER 2015 RIPARIAN SURVEY FOR NICHOLAS FOY NIXON, III � CATHERINE ELIZABETH CONNE PARCEL ID # R07200-008-041-002 (1 15 hOLL15 LANE) MA50NBOKO TOWN5HIP NEW HANOVER COUNTY, N.C. PATRICK C. BRISTC LAND SURVEYING, PC 4113-A OLEANDER DRWE WII.MINGTON, N.0 2.8403 (910) 791-ISW (PIO (910) 791-1504 (FAX) E-MAIL: pat@briwowxureyiog. FIRM UCENSURE NO. C-3071 G16 RA I I %1 I I �l Proposed Garage i � I I i I � I i I W1= I WIW ZO W NIN w W <I N I > > W I Proposed If Septic Field 575' AEC l/ i I \ /)14'-Mde Proposed Driveway - 404 Wetlands • Wetland Impact: �. 0.01 ac I � 1 N1N I I I '1 1 2121-0N Proposed House 39 Coastal Shoreline Buffer Tidally miluenced Ditch f _ ! (Coastal Wetlands) - -' o I( M T' — -`' Existing CuKwy _ _ _ _ _ __ _ ___ __— _ _ _--_ _ _---_— _--_ — — — �, / 1 _---� — — — — — — — — — — — -- — f —_— _— _ _ _ —_—_ _ _ —_ --_ _ _ _ _ _ ---_ _ _ _—_ _---_—_-- Caeslal I / / Wetlands \ PRELIMINARY; NOT FOR CONSTRUCTION FOR ENVIRONMENTAL PERMITTING ONLY Legend Property Line 30' Buffer Coastal Wetland Line 575' AEC Line 404 Wetland NHW Line TOTAL PROPOSED AREA OF DISTURBANCE WITHIN AEC: — 12,900 SF I�tl(•�Ltl . � L LMG LAND MANAGP2IENT GROUP Iw< 5Wrignmenrv/ enuelmnu IS Wrightsville Mlle Avenue: Suite Imingtoh, North 52-Carolina 28403 Telephone: 91"0d52-0001 I Normal High Water Line I 1 Joint 404/Coaslal 1 Wetlands i ,i , I' It Proposed Pler t , t APR 13 2C16 115 and 125 Hollis Lane Site Plan Wetlands e Coastal Wetlands SURVEY INFORMATION FROM: vATAcx aemaw uxo suNvenxc .'MINGT ,, .n wILMINGTON, W 2W3 916AI,Sf9 DESIGN INFORMATION FROM: llW YcxNMun.M O..Ipry IK .. sl. hrl�191 �619JS3 ImnNuerdallFfII IS NOT n ?016 Revision Date: 3/23/16 NA 40-15-241 Sheet Number. 2 of