HomeMy WebLinkAboutSC_05-24_FloydPea& eYeuOusIY fit I wA-6- SIld9�.
Surf City/Penmen D 'dry,
Local Government �l
DEC o 7 20 CAMA
DIVISION OAR DEVELOPMENT
COASTAL MANAG
PERMIT
as authorized by the State of North Carolina, Department of Environment,
Health, and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management'
SC 05/24
Permit Number
Issued to Frank Floyd , authorizing development in Ocean Hazard AEC at 812 S. Shore Dr.
as requested in the permittee's application, dated 10/27/04 . This permit, issued on
11 /15/04 , is subject to compliance with the application and site drawing (where consistent with the
permit), all applicable regulations and special conditions and notes set forth below. Any violation of these
terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and
void.
I- The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 4445, 2000
Residential Building Code, and the Local Flood Damage Prevention Ordinance as required by the National Flood Insurance Program. If any
provisions of the building code or a flocd damage prevention ordinance is inconsistent with any of the following AEC standards, the more
restrictive provision shall control.
2- The structure must set back 60 feet from the first line of stable natural vegetation.
3- The structure most be located entirely off of the frontal time, and if a primary dune is present, behind the crest of the primary dune.
4- The structure most he elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structural member most meet the 100-year
flood level elevation of determined for this lot.
5- All pilings shall have a tip penetration of 16 feet below existing grade or 5 feet below mean sea level whichever is less. For those structures so
located on the primary time or nearer to the ocean, the pilings most extend to five feet below mean sea level.
6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced
disturbed areas will be immediately stabilized.
7- This permit may be renewed for one year if requested before the expiration date.
8- The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which
will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the determination or the measurement
is void and must be redone.
9- Sand used to strengthen dunes most be brought in fmm an outside source and most be of the same nature as the sand in the area in which it is to be
placed. No sand is to be removed from the lot.
to- Sand held in storage in any dune, other than frontal or primary dunes may be moved laterally in order to strengthen existing primary or frontal
dunes if the work would enhance the protection to the proposed development activity and the sand is immediately stabilized.
11- All development most be consistent with all -applicable, Federal, State, and Local standards.
12- Any structure authorized by this pennit shall be relocated or dismantled when it becomes imminently threatened by changes in the shoreline
configuration. The structure shall be relocated or dismantled within two years of the time when it becomes imminently threatened, and in any case,
upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two years of the time the
structure becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at
that time. This condition shall not affect the permit holder's fight to seek authorization of temporary protective measures allowed under CRC
Rules.
13- All construction will be landward of the vegetation line.
14- Pursuant to I SA NCAC, Subchapter 7J.0406(b), this permit may not be assigned, transferred, sold or otherwise disposed of to a third -party.
This permit action may be appealed by the permitlee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is ag eed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may nol be transferred to another party without the
written approval of the Division of Coastal Management.
(signature)
Steve Padgett
P 0 Box 2475
Surf City NC 2 7
5
Permittee
(signature required if special conditions above apply to permit)
W
Surf City/Pender F 0 SC 05/24
Local Government Permit Number
Nov 17 2004 A
MI��O ITT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
Health, and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statues, "Coastal Area Management'
Issued to Frank Floyd , authorizing development in Ocean Hazard AEC at 812 S. Shore Dr.
as requested in the permittee's application, dated 10/27/04 . This permit, issued on
11 /15/04 , is subject to compliance with the application and site drawing (where consistent with the
permit), all applicable regulations and special conditions and notes set forth below. Any violation of these
terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and
void.
PERMIT TO BUILD A DUPLEX DWELLING WITH LANDSCAPING AND DRIVEWAY PER SUBMITTED PLAT
1- The structure shall comply with the NC Building Code, including the Coastal and Flood Plain Construction Standards, Chapter 44A5, 2000
Residential Building Code, and the Local Flood Damage Prevention Ordinance as required by the National Flood Insurance Program. If any
provisions of the building code or a flood damage prevention ordinance is inconsistent with any of the following AEC standards, the more
restrictive provision shall control.
2- The structure must set back 60 feet fmm the first line of stable natural vegetation.
3- The structure must be located entirely off of the frontal dune, and if a primary done is present, behind the crest of the primary dune.
4- The structure most be elevated on pilings with a diameter of at least 8 inches and the lowest horizontal structural member must meet the 100-year
Flood level elevation of determined for this lot.
5- All pilings shall have a tip penetration of 16 feet below existing grade or 5 feet below mean sea level whichever is less. For those structures so
located on the primary done or nearer to the ocean, the pilings must extend to five feet below mean sea level.
6- Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced
disturbed areas will be immediately stabilized.
7- This permit may be renewed for one year if requested before the expiration date.
8- The permittee is required to contact the Local Permit Officer shortly before he plans to begin construction to arrange a setback measurement which
will be effective for sixty days barring a major shoreline change. Construction must begin within 60 days of the determination or the measurement
is void and must be redone.
9- Sand used to strengthen dunes must be brought in from an outside source and must be of the same nature as the sand in the area in which it is to be
placed. No sand is to be removed fmm the lot.
to- Sand held in storage in any dune, other than frontal or primary dunes may be moved laterally in order to strengthen existing primary or frontal
dunes if the work would enhance the protection to the proposed development activity and the sand is immediately stabilized.
11- All development must be consistent with all -applicable, Federal, State, and Local standards.
12- Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in the shoreline
configuration. The structure shall be relocated or dismantled within two years of the time when it becomes imminently threatened, and in any case,
upon its collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two years of the time the
stricture becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not he relocated or dismantled at
that time. This condition shall not affect the permit holder's right to seek authorization of temporary protective measures allowed under CRC
Rules.
13- All construction will be landward of the vegetation line.
14- Pursuant to 15A NCAC, Subchapter 7.1.0406(b), this permit may not be assigned, transferred, sold or otherwise disposed of to a third -party.
This permit action may be appealed by the penniftee or other
qualified persons within twenty (20) days of the issuing date. From
the date of an appeal, any work conducted under this permit must
cease until the appeal is resolved.
This permit must be on the project site and accessible to the permit
officer when the project is inspected for compliance.
Any maintenance work or project modification not covered under
this permit, require further written permit approval.
All work must cease when this permit expires on December 31,
2007
In issuing this permit it is agreed that this project is consistent with
the local Land Use Plan and all applicable ordinances.
This permit may not be transferred to another party without the
written approval of the Division of Coastal Management.
Local Permit 0Li'bf (signature)
Steve Padgett
P 0 Box 2475
Surf City NC 28445
Permidee
(signature required if special conditions above apply to permit)
'Locality (w r, 1�P ✓ Permit Number
.'
•
Ocean Hazard Estuarine Shoreline _ORW Shoreline _Public Trust Shoreline
< , (For official use only)
GENERAL INFORMATION
LAND OWNER
h
Address V.O LSOa' I Sdn
City P State n/C _ Zip a Phone
AUTHORIZED AGENT
Address
40`
'Y'19e/r
City _5a r'i C , 4- z State IV C . Zip a Y 9 9 i Phone TO — 3 Ae - 0 3 / /
LOCATION OF PROJECT: (Address, street name and/or directions to site. If not oceanfront, what is the name of
the adjacent
DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.) D )PC15 L S PIC
C. I n]in
SIZE OF LOT/PARCEL: % / square feet' acres
PROPOSED USE: Residential (Single-family K Multi- amily _) Commerical/Industrial _
Other 4�
TOTAL ENCLOSED FLOOR AREA OF A BUILDING IN THE OCEAN HAZARD AREA OF ENVI-
RONMENTAL CONCERN (AEC): g0Q0 square feet (includes all floors and roof -covered decks)
SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT -UPON SURFACES IN
THE COASTAL SHORELINE AREA OF ENVIRONMENTAL CONCERN (AEC): —44!!� sq. &
(Calculations include the area of the roof/drip line of all buildings, driveways, covered decks, concrete or masonry patios,
etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
Choose the AEC area that applies to your property:
(1) within 75 feet of Normal High Water for the Estuarine Shoreline AEC
(2) within 575 feet of Normal High Water for the Estuarine Shoreline AEC, adjacent to Outstanding
Resource Waters
(3) within 30 feet of the Public Trust Shoreline AEC
(Contact your Local Permit Officer if you are not sure which AEC applies to your property.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a
State Stormwater Mana ment Permit issued by the N.C. Division of Water Quality?
YES_ NO
If yes, list the total built -upon area/impervious surface allowed for your lot or parcel. _AZA square feet.
OTHER PEMMTS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA minor
development permit. As a service we have compiled a list of the kinds of permits that might be required. We suggest you check over the list
with your LPO to determine if any of these apply to your project: Zoning, Drinking Water Well, Septic Tank (or other sanitary wart
treatment system), Building, Electrical, plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA Certi n,
Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway, Connection, and others.
STATEMENT OF OWNERSHIP: .
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of pro O� itfttyAlti�r a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certi%tkte person
listed as landowner on this application has a significant interest in the real property described therein. This inttq be
described as: (check one) 9„ ?�
_an owner or record title. Title is vested in , see Deed Book
page in the County Registry of Deeds.
_an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
_*� if other interest, such as written contract or lease, explain below or use a separate sheet and attach to this application.
°z
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(Name) (Address)
(I) Ald-dirt, r%. DC
(2)
(3) .f i 2 / /�r DS!/;�� .r ✓�Z
(4) d
FOR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
I acknowledge that the land owner is aware that the proposed development is planned for an area which may be susceptible to 1� '
erosion and/or flooding. I acknowledge that the local permit officer has explained to me the particular hazard problems associ-
ated with this lot. This explanation was accompanied by recommendations concerning stabilization and floodproofing tech- f
niques. C
PERMISSION TO ENTER ON LAND:
I furthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer and his agents to
enter on the aforementioned lands in connection with evaluating information related to this permit application.
This application includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the AEC hazard notice where necessary, a check for $100.00 made payable to the locality, and any infor-
mation as may be provided orally by the applicant. The details of the application as described by these sources are incorporated
without reference in any permit which may be issued. Deviation from these details will constitute a violation of any permit. Any
person developing in an AEC without permit is subject to civil, criminal and administrative action. C
This the da of 20
Landowner or person authorized to act as his agent for purpose of filing a CAMA permit application.
AEC HAZARD NOTICE
Project Is In An: 'X— Ocean Erodible Area
Date Lot Was Platted:
This notice is intended to make you, the applicant, aware
of the special risks and conditions associated with
development in this area, which is subject to natural
hazards such as storms, erosion and currents. The rules of
the Coastal Resources Commission require that you
receive an AEC Hazard Notice and acknowledge that
notice in writing before a permit for development can be
issued.
The Commission's rules on building standards, oceanfront
setbacks and dune alteration are designed to minimize,but
not eliminate, property loss from hazards. By granting
permits, the Coastal Resources Commission does not
guarantee the safety of the development and assumes no
liability for future damage to the development.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
2 feet per year.
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies aIs dicate that the shoreline could move as
much as feet landward in a major storm.
The oodwatersinamajorstormarepredictedtobeabout
feet deep in this area.
Preferred oceanfront protection measures are beach
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads,
seawalls, revetments, groins, jetties and breakwaters are
prohibited. Temporary devices, including sand bags, may
be allowed under certain conditions.
This structure shall be relocated or dismantled within two
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
Applicant's Sigrlature - (�
/o��7
Date
High Hazard Flood Area _ Inlet Hazard Area
SPECIAL NOTE: This hazard notice is required for
development in areas subject to sudden and massive
storms and erosion. Permits issued for development inthis
area expire on December 31 of the third year following the
year in which the permit was issued. Shortly before work
begins on the project site, the Local Permit Officer will
determine the vegetation line and setback distance at your
site. If the property has seen little change and the proposed
development can still meet the setback requirement, the
LPO will inform you that you may begin work. Itis impor-
tant that you check with the LPO before the permit expires
for official approval to continue the work after the permit
has expired. Generally, if foundation pilings have been
placed and substantial progress is continuing, permit
renewal may not be necessary. If substantial progress has
not been made, the permit must be renewed and a new
setback line established. It is unlawful to continue work
after permit expiration without this approval.
For more information, contact:
�e 04 It -41 764
Local Permit Officer
J90agv s-
Address '
Locality
f/0 - 3zX - y/.7/
Phone
Revised 11193
U.S. Postal Servicer.
CERTIFIED MAIL..,
RECEIPT
(Domestic Mall Only;
No Insurance Coverage
Provided)
For delivery Information
visit our webslte at www.usps.comy
.
.
i
r
11
Ell(Domestic
c;tHTIFIED MAIL,, RECEIPT
Mail Only; No insurance
Coverage Provided)
For delivery information visit our webslte
i
at www.usps.com..
o
0,9�9�iGi�L
F�
CAMA I
NOTICE OF FILING OF APPLICATION FOR CAMA MINOR DEVELOPMENT PERMIT
Pursuant to NCGS 113-119(b), Town of Surf City, a locality authorized to issue CAMA permits
in Areas of Environmental Concern hereby gives NOTICE that on 10-27-04 Frank Floyd
applied for a CAMA permit to erect a duplex family dwelling in the Ocean Hazard AEC at 812
South Shore Dr. The application may be inspected at the address below. Public comments
received by 11-03-04 will be considered. Later comments will be accepted and considered up to
the time of permit decision. Project modifications may occur based on further review and
comments. Notice of the permit decision in this matter will be provided upon written request.
Steve Padgett
Town of Surf City
PO Box 2475
214 North New River Dr.
Surf City, NC 28445
(910)-328-4131
Please publish on 11-03-04
stal
Service,m
E�D
MAIL.... RECEIPT
IFIED
Mail
Only;
No Insurance Coverage Provided)
c
....m.matinn
visit our website at www.usps.com-
t7
0
a
rL
Rl
O
C7
0
0
L,
m
a
0
0
r`
U.S. Postal Service,,.,
CERTIFIED
MAIL.., RECEIPT
(Domestic Mail Only;
No Insurance coverage
Provided)
For delivery Information
visit our website
a
at www.usps.com-_
WOOD WALL(
m Kj
All
LOT 30
f YOW- POISON -MOORE-CORBETT
SUB -DIVISION
y M.B. 5, P. 4
EIP
�I
'O?q �9
UTILITY q"'�
�I A
To
IA
FLOOD ZONEVE'
(ELEVATION 15')
I
PORTION
18189
CAMA 0.418
4 SRP' SRr !
OAMA
/SRP O4 II /
I Y
95
FLOOD ZONE*VE'
(ELEVATION 16')
ly
a
Iff
z
> FLOOD ZO.
If (ELEVATIL
PORTION OF LOT 2
YOW- POISON -MOORE-CORBETT
ATLANTIC OCEAN
MEN WA��
z
mo
N Er.
Ia >
O
s`
APPROXIMATE ROOD UNE
N
0 L, N
O (f) Q �`
Zol00
Oct
F-Doo
o-
a
I
r
W
m
0
O
U
LLJ
otlBi3S 3ani�n !2� 0 0 5 n:
TTVRs vvry
toy OR 25
Jzo�m
V)U�
b
a
3
y o�
)Otl1303A ltltlfLLtlN 3TBtl15
!0 3Nn 1SWA vvivD
R/W —
z
OS
0
w w.
APPROXIMATE ROOD LINE
0 :•:dO
: •.::: \\,P.\
_ r
25' MBL
:T
r
Ja
APPROXIMATE I
FLW,
(ELF
N57-28'00".E 61.94' \Fn
v:—EDGE OF'ASPHALT 4