HomeMy WebLinkAboutBC 22-18_Minor Permit_20220812+ Brunswick County Planning and
UZa Community Development
P.O. Box 249
I, 75Courthouse Drive N.E., Bldg I
Bolivia INC 28422
12-Aug-22
Crystal Babson
3116 Cedar Creek Lane
Carolina Shores NC 28467
RE: CAMAMINOR PERMIT —BC22.18
PROJECT ADDRESS&OCATION — 2028 Camelot Drive SW, Supply NC 28462
Dear Ms. Babson:
The enclosed permit constitutes authorization under the Coastal Area Management Act for you to proceed with your
project proposal. Please sign both the original (buff -colored form) and the "white copy". Return the copy to this office
in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described
below. Please retain the original (buff -colored form), as it must be available on site when the project is inspected for
compliance.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-
229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20)
days of this decision on your permit. You should also be aware that if another qualified party submits a valid
objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation.
The Coastal Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out
in accordance with your application. Modifications, time extensions, and future maintenance require additional
approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are
having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements.
From time to time, staff will visit the site to monitor the project. However, if questions arise concerning permit
conditions, environmental safeguards, or problem areas, you may contact me at any time for assistance at
910.253.2034. By working in accordance with the permit, you will be helping to protect our vitally important coastal
resources.
Sincerely,
•
Connie Madowe, LPO
Brunswick County
PO Box 249
Bolivia NC 28422
cc: Brendan Brock, Wilmington Office
Kelly Hewett (Long Bay Builders, Inc.), Agent
TELEPHONE (910) 253.2025 - (800) 621.0609 - FAX (910) 253.2437
Brunswick County
Local Government
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environmental Quality and
the Coastal Resources Commission for development in an area of environment concern
pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management"
BC22-18
Permit Number
NORTH CAROLINA
Environmental Quality
Issued to Crystal Babson authorizing development in the Estuarine Shore Area of Environmental Concern (AEC) at 2028
Camelot Drive SW in Supply NC 28462 as requested in the permittee's application package, dated 07-Jul-22, and
received complete 01-Aug-22. This permit, issued on 12-Aug-22, is subject to compliance with the application and site
drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any
violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and
void.
This permit authorizes: Single Family Residence and Landscaping.
(1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s)
dated received on 01-Aug-22.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations,
applicable local ordinances and FEMA Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.
(4) A copy of this permit shall be posted or available on site. Contact this office at (910) 253.2034 for a final inspection at
completion of work.
(Additional Permit Conditions on Page 2)
This permit must be on the project site and accessible to the permit officer when
the project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on:
December 31, 2025
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
G-4�
Connie Marlowe
CAMA LOCAL PERMIT OFFICIAL
PO Box 249
Bolivia, NC 28422
PERMITTEE
(Signature required if conditions above apply to permit)
Name: Crystal Babson
Minor Permit # BC22.18
Date: 12-Aug-22
Page 2
(5) The amount of impervious service shall not exceed 30% of the lot area within 75 feet of Normal High Water
(Estuarine Shoreline Area of Environmental Concern), in this case 1,579 square feet is authorized.
(6) Unless specifically allowed in 15A NCAC 07H-0209(d)(10), and shown on the permitted plan drawing, all
development/construction shall be located a distance of 30 feet landward of Normal High Water. No portion of the
roof overhang shall encroach into the 30 foot buffer.
(7) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must
be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area
has been properly stabilized with a vegetative cover.
(8) Any proposed for grading within the 30' buffer from the Normal High Water level must be contoured to prevent
additional stormwater runoff to the adjacent marsh. This area shall be immediately vegetatively stabilized and must
remain in a vegetated state.
(9) All other disturbed areas shall be vegetatively stabilized (planted and mulched) within 14 days of construction
completion.
SIGNATURE:
PERMITTEE
DATE: