Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWatts, Carrd The Village of Bald Bead Island
x
a
0
sLA��• 3(0EHv�
May 16, 2005 MAY 1 7 2005 Exemption #BHI 2005-H
George Watts/Carr DIVISION OF
9 Cape Fear Trail COASTAL MANAGEMENT
Bald Head Island, NC 28461
RE: EXEMPTED PROJECT (MINOR) MAINTENANCE AND REPAIR
15A NCAC 07K .0103
PROJECT ADDRESS -9 CAPE FEAR TRAIL
AREA OF ENVIRONMENTAL CONCERN —OCEAN HAZARD
I have reviewed the information submitted to this office in your inquiry
concerning the necessary filing of an application for a minor development permit under
the Coastal Area Management Act. After making a site inspection on May 13, 2005. I
have determined that the activity you propose is exempt from needing a minor
development permit as long as it remains consistent with your site drawing and materials
list submitted on May 13, 2005and meets the conditions specified below. If your plans
should change and your project will no longer meet these conditions, please contact me
before proceeding.
MAINTENANCE AND REPAIR - (G.S. 113-103(5)(B)(5) and 7K.0209) - Structures
may be repaired in a similar manner, size and location as the original structure. No
expansions or additions are permissible. The repairs are limited to 50% of the physical
value of the existing structure and the following specific conditions.
1. The project consists of the repair of steps to a beach accessway as shown on the
attached drawing and materials list.
2. The accessway over the dunes must not exceed six feet in width and shall provide
only pedestrian access to the ocean beach. The accessway must be constructed so
as to make negligible alterations to the frontal dunes. This means that the
accessway must be constructed on raised posts or pilings of five feet or less in
depth, so that wherever possible only the posts or pilings touch the frontal dunes
without any alteration to the dunes. In no case shall the dune be altered so as to
significantly diminish its capacity as a protective barrier against flooding and
erosion.
3. All construction must conform to the N.C. Building Code requirements and all other
local, State and Federal regulations, applicable local ordinances and FEMA Flood
Regulations.
4. The accessway must not exceed past the toe of the frontal dune.
5. A final inspection by the LPO upon completion is required.
P.O. BOX 3009 • BALD HEAD ISLAND, NC 28461 • (910) 457-9700 • FAX (910) 457-6206
E-MAIL: villaeebhi@aoi.com • WFR8ITF hrt.,•(/wun,,,;tlnoobh; nro
This exemption to CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal or Local authorization and N.C. Building Permits.
This exemption expires 90 days from the date of the letter.
Cc: Ed Brooks, DCM Field Representative
Dan Loerzel, GKW & Assoc.
Sincerely,
2ferl'kr�ien
Village of Bald Head Island, LPO
(910) 457-9700
Mqy��
CpgS O/V/ N of
A� M
NgCFM�NT
910-845-5116 (Fax)
&Wl dfoerzOl@w.n cram
TO: George Watts/Garr
Date: May 9, 2005
REF: 9 Cape Fear Trail - BHY
Faro �° �'Q �
1356 Woodcreat Road '9S�,q� L/s/�
Southport NC 28461 z �'
PROPOSAL
91
• Remove and haul away approx. 12 feet of walk -way
• Furnish materials and build stairs with handrails at end orwalk-way
• Nails to be Stainless Steel and bolts to be Hot Dipped Galvanized
• All lumber to be treated
• All debris will be hauled away
• Total price including all labor, materials, transportation and Permits
Igiar_ks,
Dan
$2,178.00
TO 39vd 13Zd30_I NCQ 9LTSSD8016 9S:10 S006/Ll/S0
2
Few Tea.;
1E j'gvd -IV 4we
I t SG� Ci•�S I Lp JC 5�a.f A(9FC jft'G�
All larys or k-&'-T ":p he %S" )ioT G(`p �alva..�ur
Eris.
L)Xy
,�co
a PL;.
Zj
et
- pcs.
I - )It x
A&
- PC .
V6
'l"
d b *jkao — 1.) pds"
Ez) z
AL11
�Q
LL w
OQ
N
OQ
cog
C
Q
6XG �?eafe� aXb T-rrt+ed
a. B
,v4-kSatl(�`
o - �e ,
y t
MAYf32M
VILLAGE O� '
BALD HEAD'._ .,yn
Y�
�'i
t ;
.
;�
. ,
,.
..
.
•y
4.
�
�'�''," �4b;
.�
=�3.
'%��
i�'
.�^
\,
!t
u
..,`,"Yi
r,i
a,
,pf s� ..,
'
''' ..
i
� _}
_� c
`.;
�;,
� L
.<
<;
wi
r