HomeMy WebLinkAbout131-83 Minor Mod 2010 Masonboro Boatworks LLCPermit Class
MODIFICATION/NHNOR
Permit Number
131-83
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
,pPrtnit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Masonboro I3oatworlcs, LLC, 609 Trails End. Road, Wilmington, NC 28409
Authorizing development in New Hanover County adi. Whiskey Creek
as requested in the permittee's letter dated _1./12/10.'including the
attached workplan drawin s (1), dated 1/8/10
This permit, issued on_ March 16. 2010_ _ is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set fortli below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) Unless specifically altered herein, this minor modification authorizes the construction of approximately
1.40 linear feet of bulkhrad, all as expressly and specifically set forth in the attached work plan drawing.
2) This modification shall be attached to the original of Permit No. 131-83, which was issued on 9/13/83,
and transferred to the permitter on 4/5/07, as well as all subsequent renewals, modifications, and
refinements, and copies of all documents shall be readily available on site when Division personnel
inspect the project for compliance.
3) All conditions and stipulations of the active permit remain in force under this minor modification unless
specifically altered herein.
(See attached sheet for additional conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
April 30, 2016
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
I'//
James I regson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permitter
Masonboro Boatworks, LLC
ADDITIONAL CONDITIONS
Shoreline Stabilization
Permit #131-83
Page 2 of 2
4) The alignment of the permitted bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start of
construction. Upon verification by the Division of Coastal Management, the approved bulkhead
aligmnent shall be surveyed prior to construction. Failure to survey approved alignment and initiate
construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the
alignment to be re -verified by DCM and surveyed within a maximum of 30 days prior to the new
expected start of construction
5) The alignment of the authorized. bulkhead shall be at or above the Normal High Water Line at the time
of construction.
6) The bulkhead shall be constructed prior to any backfilling activities.
1) The bulkhead shall be. structurally tight so as to prevent seepage of backfill materials through the
structure.
8) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles,
or other suitable materials approved by Division personnel.
9) All backfill material shall be clean and free of any pollutants except in trace quantities.
10) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
11) No backfill material is to be placed within 30 feet of the normal high water line, except that which will
be used to backfill the area behind the permitted bulkhead.
12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not
authorized.
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days on all disturbed
areas.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NLr�!LI�"GDI3TRIB7=0`iSETEF
13(-83
Permitee: IVIDL.Sa.bot`o Qocc�works, L«
Agentl
DCM Field Offices
Eiizabeth City
Morehead Cit j
Washin on
i
US ACOE Offices:
I YvL 111 rGY LJI�U W VLL jA 141E UL4W♦rl6')
Washington: Raleigh Bland
Tracey Wheeler
William Westcott (NC DOT)
Bill Biddlecome (NC DOT)
Wilmington: Dave Timpy
Cultural Resources: Renee Gledhill -Early
Public Water Supply: Debra Benoy (WIRO)
Joey White (WARD)
Marine Fisheries: Anne Deaton
NC DOT: Ken Pace
Shellfish Sanitation: Patti Fowler
State Property: June Michaux
Water Quality: Cyndi Karoly (Raleigh)
John Hennessy (NC DOT)
Washington: Vivian Christy
Al Hodge
Kyle Barnes
Wilmington:
Kelly Johnson - Stormwa
Wildlife Resources: Maria Dunn (WARD)
Molly Ellwood (WIRO)
LPO:
Fax Distribution: Permitee
Agent#: C_e104, ,mc...,. 0116- 6S6- g666
TM
ECS CAROLINAS, LLP "Setting the Standard for Service"
CAKOLUMAS ® Geotechnical • Construction Materials • Environmental • Facilities
January 12, 2010
Ms. Holley Snider
Field Representative
N.C. Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
Reference:
Masonboro Yacht Club Minor Modification and Permit Extension Request
CAMA Major Development Permit No. 131-83
609 Trails End Road
Wilmington, North Carolina, 28409
910.791.1893
ECS Project No. 22-15391
Dear Ms. Snider,
On behalf of Masonboro Yacht Club ECS Carolinas, LLP (ECS) is pleased to provide a Minor
Modification request to existing CAMA Major Development Permit No. 131-83 for a new bulkhead
located between an existing dry -stack structure and an existing floating dock "C' Dock, which are
associated with the existing Masonboro Yacht Club Marina facility. As per our previous discussion
on this request, the new bulkhead will be 140 linear feet in length and will follow the normal high
water (NHW) boundary in the area where existing rip -rap material is located. The new bulkhead
within this location is need to stabilize the eroding shoreline between an existing dry -stack
structure and its associated foundation components, and the existing floating dock (C-Dock) that
is located just waterward of the shoreline. The bulkhead is also proposed to address the
sediment deposited into the marina basin and under C-Dock due to the erosion of the shoreline
(Sheet 1 of 1 and On -site Photographs).
State Permit No. 131-83 was originally issued on September 13, 1983 to Mr. Ed Lowe for
Masonboro Boat Yard & Marina, Inc., authorizing the development of a marina facility with
associated dry -stack facility, clubhouse and parking. State Permit No. 131-83 was transferred
from Mr. Lowe for Masonboro Boat Yard & Marina, Inc. to Masonboro Boatworks, LLC on June 7,
2005. State Permit No. 131-83 was modified to allow additional upland development, which
included new dry -stack storage and parking areas on the western and southern portion of the site
on February 27, 2006. State Permit No. 131-83 was last renewed on June 13, 2006 and expired
on April 30, 2008. On June 24, 2008, Masonboro Boatworks, LLC submitted a renewal request
and a modification request to relocate the designated spoil location for maintenance of the marina
basin and access channel to the Atlantic Intracoastal Waterway (AIWW); however, during a file
review at the Wilmington Regional Office (WiRO) and Masonboro Yacht Club, ECS was unable to
locate the modification and renewal of State Permit No. 131-83 under this June 24, 2008 request.
Masonboro Yacht Club also requests a copy of the renewal and modification of State Permit No.
131-83 under the June 24, 2008 request.
RECEIVE®
JAN 12 2010
DCM WILMINGTON, NC
7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T. 910-686-9114 F: 910-686-9666 www.ecslimited.com
ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP
Masonboro Yacht Club Minor Modification and Renewal Request
New Hanover County, North Carolina
ECS Project No. 22-15391
January 12, 2010
Should you have any questions or require additional information, please contact the
undersigned at your convenience at (910) 686-9114.
Respectfully Submitted
ECS CAROLINAS, LLP
b L. Mairs
enior Environmental Project Manager
CAMA Services
f(AWA1.SD6�_ L le,
Walid M. Sobh, P.E.
Principal Engineer
Attachments: Sheet 1 of 1 Existing Site Conditions and Proposed Bulkhead Location
On -site Photographs
cc: Mr. David Christopher, Masonboro Yacht Club Manager
RECEIVED
JAN 12 2010
DCM WILMINGTON, NC
MCENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue
Governor
Masonboro Boatworks, LLC
609 Trails End Road
Wilmington NC 28409
Dear Sir or Madam:
James H. Gregson
Director
March 16, 2010
Dee Freeman
Secretary
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the
State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff -colored
form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and
proceeding means you have waived your right of appeal described below. Please retain the original (buff -colored
form), as it must be available on site when the proj ect is inspected for compliance.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or
113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days
of this. decision on your permit. You should also be aware that if another qualified party submits a valid objection to the
issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried
out in accordance with your application. Modifications, time extensions, and future maintenance require additional
approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are
having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements.
From time to time, Department personnel will visit the project site. However, if questions arise concerning permit
conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance.
By working in accordance with the permit, you will be helping to protect our vitally important coastal resources.
Sincerely,
Dough ett
Major Permits and Consistency Manager
Enclosure
400 Commerce Ave., Morehead City, NC 28557
Phone: 252-808-28081 FAX: 252-247-3330 Internet: wymnccoastalmanagement.net
%n Equal Opportunity 1 Rtfinmobve Aden Employer
One .
NorfliCarohna
�1?atirr�tll
Applicant:
Division of Coastal Management
Application Processing Notes
I s -V
Type: (check all that apply) (%
NEW MAJOR MOD_ MINOR MOD RENEWAL_ TRANSFER_
Permit Coordinator:
Field Representative:
Date/Tinie
Message
Any
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson
Governor Director
MEMORANDUM j��.c(I Z/23 Iv
TO: Doug Huggett, '"
DCM Major Permit Coordinator, Morehead City
FROM: Holley Snider iZ
DCM Field Representative, Wilmington
THRU: Steven H. Everhart, Ph.D. J�'
DCM District Manager, Wilmington
DATE:
February 18, 2010
SUBJECT: Minor Modification Request
Permit No 131-83
Masonboro Boatworks, LLC (formally Masonboro Boat Yard)
New Hanover County
Dee Freeman
Secretary
RECEIVED
FEB 2 3 2010
Morehead City DCM
Robb Mairs, of ECS Carolinas, LLP, acting agent for Masonboro Boatworks, LLC, has
submitted a request to modify State Permit No. 131-83. Permit No 131-83 was originally
issued on September 13, 1983 to Ed Lowe for Masonboro Boat Yard & Marina, Inc.,
authorizing the development of a marina facility with associated dry -stack facility,
clubhouse and parking. State Permit No. 131-83 was transferred from Ed Lowe for
Masonboro Boat Yard & Marina, Inc. to Masonboro Boatworks, LLC on June 7, 2005. State
Permit No. 131-83 was modified to allow for upland development, which included new
dry -stack storage buildings and parking on February 27, 2006. State Permit No. 131-83
was modified to relocate the spoil disposal and renewed for maintenance dredging on
February 8, 2010. State Permit No. 131-83 is due to expire on April 30, 2016.
At this time Masonboro Boatworks, LLC is requesting a modification to State Permit
No. 131-83 to construct 140 linear feet of new bulkhead along the Normal High Water
(NHW) boundary in the area where existing riprap material is located. The new bulkhead
would be located adjacent to the existing dry -stack storage, would stabilize the eroding
shoreline, and prevent sediment run-off to the adjacent waters.
The agent, ECS Carolinas LLP., has submitted a check (check No. 2689) in the
amount of $100 for the modification request. This office has no objections to the
proposed modification with the recommended conditions:
127 Cardinal Drive Ext, Wilmington, NC 28405
Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Afirma6ve Acdon Employer
NorthCarolina
Naturally
Masonboro Boatworks, LLC
Page 2
[ 1] The bulkhead alignment will approximate the normal high water level at the
time of construction.
[ 21 The alignment of the proposed bulkhead must be staked by a representative
of the Division of Coastal Management (DCM) within a maximum of thirty (30) days
prior to the start of construction. Failure to initiate construction within thirty (30)
days, or erosion of the shoreline by adverse weather conditions, will require the
alignment to be re -staked by DCM within a maximum of thirty (30) days prior to the
new expected start of construction.
[ 31 The bulkhead must be constructed prior to any backfilling activities.
[ 4] The bulkhead must be structurally tight'so as to prevent seepage of backfill
materials through the structure.
[ 5] The bulkhead must be solid and constructed of treated wood, concrete slabs,
metal sheet piles, or other suitable materials approved by Department personnel.
No excavation is permitted, except for that which may be required for the
construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not
authorize any excavation waterward of the approved alignment.
[ 6] The fill material will be clean and free of any pollutants, except in trace
quantities. Metal products, organic materials, or unsightly debris will not be used.
[ 7] All backfill material will be obtained from a highground source and confined
behind the permitted bulkhead.
Enclosures
cc: Wilmington files
CAR01 INAG
ECS CAROLINAS, LLP
Geotechnical . Construction Materials • Environmental
7211 Ogden Business Park Suite 201
Wilmington, North Carolina 28411
Telephone 910-686-9114 Fax 910-686-9666
To:
Ms. Holley Snider
NC DCM Field Representative
127 Cardinal Drive Extension
Wilmington, North Carolina 28405
We are sending you the following items via: Hand Delivered
LETTER OF TRANSMITTAL
Date: 1/12/10 Project No. 15391
COPIES
DATED
IDESCRIPTION
1
1/12/10
Masonboro Yacht Club CAMA Major Development Permit No. 131-183 Minor Modification
and renewal request.
These are transmitted as checked below:
Check Number in the amount of $100.00 for modification request.
Please contact me with questions regarding this project. Thanks again for your
COPY TO: File
RECEIVED
JAN 11 2010
DCM WILMINGTON, NC
Masonboro Yacht Club
CAMA Minor Modification Request
609 Trails End Road
New Hanover County, North Carolina
ECS Project 22-15391
m ...... 0111
—LLP
'CARIOLa11JA1 0
Photograph 1� A
View of proposed bulkhead location along the NHW boundary located between an existing
floating dock (C-Dock) and an existing dry -stack structure on the northern portion of marina
facility, facing east.
RECEIVED
JAN 12 2010
DCM WILhMNGTON, NC
erco Lon mroaosen ew
um mrtus� insw a rnrn
xom xmr axrrcr mms Lraura
C+
z
z
c)
SOIII. R �. NI11'
ON'NOLE7t•11'e'611i�^. MOU
Date/Time
Fax Number
Fax Name
Model Name
No. Name/Number
571 919106869666
Fax Send Report
MAR-17-2010 11:32AM WED
DCM MHDCTY
SCx-5x30 Series
StartTime Time Mode
03-1711:31AM 00e36 ECM
Pwmit Claaa
Permit Number
MO➢IFICATIONIM NOR
1J1-flJ
S
WEE OF NORTH CAROLINA
Departmen[
afEnamomnent and Natural Resource.,
and.
Coastal Resomco Commission
Vermit
for
%Mai
rDcvelopmvsl in an Arco of Envsronmcaml Concern
Per'sYI
I[o NCGR 113A-II1
_ IT'sOon
and/ur filling parstmnl to NCGS I13-229
IssnGl to MM--b-- ltoatwereas LLC
609'frails End Road, Wilmington, NC 28409
AUNorizingdwelopmeot in Nry
6t ._County adi.RTiskov Crrek
In, re quested in the pmminer's letter dated _ 1/1 VI(I jndthILnn" chat
ahrd kI drfLl, dotal ll/gItl
This pennil, iasuetl on MAM 6,1010
_ is subjmt to emnpliance w10i N4 applicmiun (wince consistent
wiw the Wmil), x0 applicable rcb Iatiens,
PpG:ml mndidom and notes ser forth below. Arty violation of dm..e arms mny
be aYbjeIX IV Imo imp1190nmCilr n1 oivll aGIOn�
pr nLty Wit a NC mm,i[ m hlraall mid VOid.
1) UnIcsssin,dileally.hcredleavir.II,,•b
l6 mltmr IDOd GLlml allthar19R9111e COn,naetlOn Of rtpproSimalely
140 liucar feet ofbulkhead, all as
xprosaly umi spccilically act forth w theaitaehrd work plan dr,lwiag.
2) Thlsomifreadonsladlhea[tached
ro.lhc osiginel of Permit No. 131-gJ, which waz 7ssuG1 on 9/l3/53,
and tmnvfened ro the permincc on
415107, as well as W subsequent renewals, modifteeions, and
rtfmcesents. mad copies of all dom{meet$
shall be readily available on site when Division
inspect the prej for compliance
pemoosel
3) All conditions and stipulations of
tine native permit remain is force under this minor modification unless
specifPAOy:dmred hwein
(See attached
sheet for additional conditions)
This rmmd onion may ba appcated by te
.0a, outiGA saran innin tweury(2o) dap
pent ec at, Silal by dm earhorlry of Ge se rw.y of DENR and rha
ofma issuing araiemen afthe Casul strasnes Commission
dare nn npaalrw�ma-"[rmlmwn odmmwof
imaaaanG
cofmanrca a maaee m y ba.
'
Thl, pe me mane M neauibte omdm e
nm D,parm
,reenral wAen the Pmjmt iz huPmmd forcom
(�
Aq'meimenanx .k oc Pr^jmi mo4Sntion
aosoo.med
James egson, Directorem
Aaedrrryaineshadier Dnoloas appmal.
I Division of Co as Management
All wank mazy.. when Ne'arn"Ina,
a This Prmtit aml as mnditiom are hembyattxpW.
Apol J0, 2016
cat
Amu
is bsa rit sah PGmi4 the Sum of Ronh C
rhmyoPmb m iem minea eid, the NOM Cdotinaa
C call - -
MnnagneetReP/vm
I Sigtutumanomiuee
Page Result
O.K
V
EXISTING
DRY -STACK FACILITY /
EXISTING RIP -RAP MATERIAL
EXISTING
MARINA
APPROXIMATE NHW LINE AND PROPOSED BULKHEAD LOCATION
144
CRUISE A E.-riligaMm.
WWHISKEY C
DOCIC
/ .�.... .• 'tack p°spc�+c�av n-O+nMo p�
Masonboro Yacht Club
3 Story' 1
....:
Clubhouse
SCALE: V=30' Sheet 1 of 1- EXSITING SITE CONDITIONS AND PROPOSED BULKHEAD LOCATION
Source: Masonboro Yacht Club
masonnoro Yacht Glub
CAMA Major Development Permit No. 131-83
Minor Modification Request EF
New Hanover County, North Carolina LLP
Drawing Modified By R. Mairs �MAM®ILJN14fta
LINE TYPE t:L.c., V `L,
Approximate Normal High Water (NHWXN 12 2010
Proposed New Bulkhead Location
CM WILMINGTON, NC
ECS PROJECT NO. 22-15391