Loading...
HomeMy WebLinkAbout131-83 Renewal 1991 Lowe, G.E.Permit Class Permit Number 4th Renewal Issued authorizing development in STATE Department of Env t-. W.� Resources r r X Major Development;in an Area`of Environmental Concern pursuant to NCGS 113A='118 X Excavation and/or filling pursuant to NCGS 113-229 New Hanover r .. . Whiske ed in the #1 of This permit, issued on March_ 6, 1991 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void. This renewal must be attached to the permit issued on February 15, 1988, and subsequent renewals and be available on site when Division personnel inspect the project for compliance. All conditions and stipulations of permit #131-83 apply tc the project under this renewal. as applicable. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on March 31. 1992 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEHNR and the Chairman of the Coastal Resources Commission. Roger N checter, Director Division of C astal Management This permit and its conditions are hereby accepted. Signature of Permittee APPLICATION PROCESSING NOTES Applicant Deadline Datelfime Messaae -z7-qr C,ct ,lam � ► (�.,�,ti� � Lid At SONBORO BOAT YARD AND MARINA, fNC. GD9 TRAMS END RQAD.WRJAWUMN.N. C 28 o. A)( a -/ &7 lf� 609 TRAILS END ROAD, WILMINGTON, N.C. 28403 February 19, 1991 Mr. John R. Parker, Jr., Chief Major Permits Processing Section State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street Raleigh, North Carolina 27611 RE: State Permit No. 131-83 Dear Mr. Parker: 4: FEB _ vim. a�r•;.1 COASTAL RESOURCES COMM. M MARINA, INC. • Phone (919) 791-1893 Thank you for taking time to talk with me today about our permit. I would like to request a renewal of the permit and have enclosed a check for $25.00 to cover the cost of this. During the past year we had a modification approved by James Herstine to add a fork lift ramp, floating dock and exchange a 3-story pole build for permission to build a dry stack storage area. I have enclosed a copy of this aurhorization. As we discussed, I will go through the permit and write to you with an update of the work left to do. We appreciate your working with us. Sincerely yours, MASONBORO BOAT YARD & MARINA, INC. usie Brigman 0 Office Manager Enclosure: YFEB State of North Carolina COASTAL RESOURCES COMM. Department of Environment, Health, and Natural Resources Division of Coastal Management James G. Martin, Governor Roger N. Schecter William W. Cobey, Jr., Secretary Director November 26, 1990 Ms. L. B. Brigman Masonboro Boat Yard and Marina, Inc. 609 Trails End Road Wilmington, North Carolina 28403 Re: Request to Modify State Permit No. 131-83 Dear Ms. Brigman: J) I have reviewed request to modify State t 1!25' fork lift ' rat #131-83 by adding a 12' x ramp x 50' floating dock, and6' x 35' floating dock, by changing the appr, rov 3-story open pole building to a dry stack storage area with a roof and enclosed ends, and b dding a new office building. I find your request consistent with existing State rules and guidelines and in keeping with the intended use and practice of the project. I hereby submit this letter of refinement authorizing the requested changes as shown on your sketches dated September 27, 1990 with the following stipulations: 1. The dry stack storage area must be restricted to the same dimension as the originally approved building and the stormwater must be collected and directed by gutters to a subsurface area. 2. Before construction of the proposed new office building you must provide this office documentation that the necessary calculations were performed to determine that the new structure does not cause the project impervious area to exceed the 30% coverage regulation. if the 30% coverage regulation will be exceeded, you must provide evidence that an innovative stormwater collection system has been designed for the project which will meet the 30% coverage regulation. This authorization is contingent upon approval by the U. S. Army Corps of Engineers. Please contact Bob Stroud if you have any questions. incerely, James H. Herstine District Manager Enclosures cc: John Parker, DCM Preston Pate, Dcm Wayne Wright, COE 7225 Wrightsville Avenue • Wilmington, North Carolina 29403 w Telephone (919) 256-4161 An Equal Opportunity Affirmative Action Employer State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 Nortli Salisbury Street • Raleigh, Norrh Carolina 27611 James G. Martin, Governor WIllian W. Cobey, Jr,, Secretary Roger N. Schecter, Director March 17, 1992 Mr. C. E. Lowe for Masonboro Boat Yard & Marina, Inc. 609 Trails End Road Wilmington, NC 28403 Dear Mr. Lowe: The enclosed permit constitutes authorization under the Coastal Area Management Pc, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff colored form) is retained by you and it must be available on -site when the project is inspected for carpliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the pernlit or arty of the conditions, you ray request a hearing pursuant'to wm 113*121.1 or 113-229. Your petition for a hearing must be filed in accordance with N,C.G.S. Chapter 150E with the Office of Administrative Hearings, P. 0. Drawer 11666, Raleigh, hC 27611 (919) 733-2698 within 20 days of this decision on your permit. You should also be aware that if anotlier qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter rust be resolved prior to work initiation. The Coastal Resources Camdssion makes the final decision on arty appeal. The project plan is subject to those conditions appearing on the permit .form. Otherwise,' all work must be carried out in accordance with your application. Modifications, time extensions and future maintenance require additional approval. Please read your permit carefully .prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. - Fran time to time, Department personnel will visit the project site. To facilitate this review, to request that you carplete and mail the enclosed hbtice Card just prior to Cork initiation. Hanauer, if questions arise concerning. permit conditions, environmental safeguards, or problgn areas, you -may contact Depam-tent personnel at any time for assistance. By Corking in accordance with the permit, You will be helping to protect our vitally i7portant coastal resources. Very sincerely, h R. Parker, Jr., Chief Major Pemlits Processing Section JRP:jr/aw P.O. Boa'27687. Raleigh, Nonh Grolina 27611-7687 Tclryhonc 919-733.2293 Enclosure