Loading...
HomeMy WebLinkAboutNH_16-49_DJM-NC LLCNEW HANOVER COUNTY 16.49 Local Government Permit Number CAMA MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, North Carolina Department of Environmental Quality and the Coastal Resources Commission for development In an area of amrlronment concern pursuant to section 113A-118 of the General Statutes,'Coastai Area Managemene Issued DdM-NC, LLC, authorizing development in the Estuarine Shoreline - ORW (AEC) at 8704 Bald Eagle Lane, in Wilmington, INC, as requested in the permittee's application, dated November 1, 2016, This permit, issued on November 14, 2016, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: Demolition of existing single family residence (1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) dated received on November 3, 2016. (2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modifxation of this permit. (4) A copy of this permit shall be posted or available on site. Contact this office at 910.798-7118 for a final inspection at completion of worn. DCM WILMINGTON, NC (Additional Permit Conditions on Pape 2) NOV 1 7 2016 This permit action may be appealed by the permhtee or other qualified parsons within twenty (20) days of the Issuing date, This permit must be on the project site and accessible to the pert opicer when the project is inspected for compliance, My maintenance work or project modification not covered under this perm t, require further written permit approval. All work rntat cease when tine permit expires on: DECEMBER 31, 2019 fr. issuing this permit it is agrees that this projea is consistent with the local Land Use Plan and all appiraNe ordinances. This pemrt may not be transferred to another party without the written approval of the Division of Coastal Management. Christlne� CAMA LOCAL PERMIT OFFICIAL 230 Government Center Drive, Sulte 110 Wilmington, NC 28403 PERMITTEE (SIgnaltireffi*eciffooncli risabove apply to permit) SitamotlrEPasfed .Five! Llspxtion ,.SNalntpeotions FOR STAFF USE 'I=Recelvtd — DamofAetiouiismed —_ Exempted .Denied ..Appeal Dan&=(20 days frompermitaotion) Locality/�)L TI✓iwfi— `- +. Peanut Nombw - —Eshmim Shorotino_ ORWShon:bne_Public Trust Manville; Other_ (PoroSicial un only)' GENERAL iNRORMATION LAND OWNER - MAILING ADDRESS Noun, JM A[e— I.LG chy/Jri/�/pef - Stetc/6rfr Z WIQ Phune.:/49?W--fOr Bsml'&WmOL,.f 4/iD 2 r /,oM AUTHORIZEDAGENT -Emma c/6A ld/91-3/L1s9ol/e. CO. f! Aveo.l ow. we LOCATION OF PROJECT:(Addmss, sued time dellor directions in site; nerve oththhe injected watubody) P—relAW6gle G��. sue,/T 'i Ali zgf/// ,42-CN -DESCRIPTION OF PROJECT: (List all proposed construction and lead distubssce.) Amite �RMOFLODPA9CEL: "A&2- squaiefsd +94 cares i� PROPOSED USE: Rcaklca� (Single-family 0 Malfi-family ❑ ) CommerciaUfndusniat 0 Other ❑ ��41 RECEIVED- NOV 3 2916 NEW HANOVEi COUNTY PLANNING & ZONING OCMFwm1]111952- 2013Bwis.d COMPLETE EITHER (1)OR(2)BELOW (CeamcryourLocal Permit O irer, gyms are nor sun whichAECrWIM myaurproperry)1 (1) OCEAN HAZARD AECs: TOTAL FLOOR AREA OF PROPOSED STRUCTURE: —square fbet Cmoludes air conditioned living space, praising elevated above ground level, noamoditiored space elevated above Sound level but excludingnon-load-bearing attic space) (2) COASTAL SHORELINE AECC SIZE OF BUILDING FOOTPRINTAND 01BEIL IWERVIOUS ORBUILT UPON SURFACES: , square feet (includes the ereaofthe foundation of all buldiogs, driveways, covered dales, Muaeta or masonry Fetus, etc. than me within the applicable AEC. Attach you calculations with the project drawing.) STATE SMP31WATLFR MANAGEMENTPFJiMITrIs the project located in an mess subject to a State Sti mwe2rhimaganentPemdtisvuad by the NC Division ofFinagy, Moment and fend Resource(DEMR)7 VAS NO aurfece'a0owedforyoulotwp=eL• squmefot The activity you ma plandoS my require permits other than the CAMA united to: Drhd ft Water Well, Septic Tank (or othmsenility waste arg, Hearing and Air Conditioning, Insulation and Energy Conservation, FH andivisiortApproval, MoWe Home Park Approval, Highway Connecticut, and others. STATEMENT OF OWNERSHIP: L She undersigned, an applicant for a CAMA minor development permit, being either the aware of property in an AEC can person authorized to air as an agent Art Purposes; ofapplying for a CAMA minor development permit, certify that the person limed as landowner anthis application her aa(gaificaut interest in the real property described therein. This Winner cam be described as: (check one) I/ _anovmer rare red tide, Tite fa vested Nname of in%t—o a C e C see Deal Hook �rQ// page - mg"4&,M�4WJ9! 1- Conty RcgmtryofDmda _an rwnaby vitro of inheritance. Applicant is anhekm the cause of pmhatewasin - County. _ifother interest, such w wririrnoodded or )ease, explain below muse a 9epmem sheet& attach to this application NOTIFICATION OF ADTACENTRIPARLIN PROPERTY OWNERS: I furthermore oar* than the PoSowing Famous am owners; of properties adjoining this property. i afErm that I have given .ACTUAL NOTICE to each offlx+neonoaning my intent to develop thin property and to apply fro a LAMA permit Q„mml (nddrm) l .�®:.:6 A C r: e1`e,v�r tt�1 ,�<.r� :�d�c ,� •fir`, ��rrr.>�;�r ,Pic r,�rs/�r° vhtUae J L 1Jw*v. $7'ib 00/AB/9/E ce? Amo"YIyA/yG "V// MNOWLEOGEMENTS: the undLn;, paL acAwwkxlgc lhat lb,, land owm:r is owme that lhv pmpoxd dc�doµnm is phnmd for an am which ay b, sosecplible to aceion aadhr flo0"g. I admmvl.AS-tM the Lml Remit OffieM has e<pbdned to me t4 utiwlar hard probkms asro WTM with duc lot. This nplmirbori w;is = mtp owd by nxomraendatlonls ca,aminl• abifinuon and floodproofrnl, Rshnigoes. 'Wben aro cwrtify Mal I mn omhorimd to fr;mt, and do in fact(pat, permission to rims on orcoasul ManaDoxan marl; u Iacul plmpil Offrtcr and their mms to MWT on the af=mrntiamsi bads in cmm=Om with cv;duarbbl bdmmatim lath b this perm it application. / Tbis tla _ T _day o/_uJ- —•xf.b pldDwnlrapvsox auhvbN bad ae lnslttcr apatl iwpuptae of fitiq.,aChAL\µman applicbtoa -- 4ir opp6cMeon ine6ler. �Tmml mfnrmorwn OW fermi), a sac draww,, as c&ssnbedon Ilrbaot ufthma p ,,xvW, Nu swraligi.ga(cxrrw, Ibr lhaw+Navn/AkY;.N'wIa• w7mre navxsmn, a sinckjor �I170.(A7nlwk /xryuh!c w Jm !ucadrry, d mry nsb'rrmrnrcx u<muy &• pn,r+drd oAdiIy by I& upplrman. 77wdrwd< of ibe gyAisvwn u, dc•.senhOd by Jaar ,wm,miypmmrt wbrdr mov&•cvwd. 7X�ovfrom dwv deivdv wdl con,lo r. wrHunwr ufwy puran+. /Irry jxrson drsvbyx+l! m mr:1hY: anlMd prumn rs mh/ta N crvrl, uirxnm! rmdriimmvrnurw• ltoiL RECEIVED NOV 3 2016 NEW HANOVER COUNTY PLANNING & ZONING REC iVED DCM WILMINGTON, NC NOV 0 7 2016 ,re, *1�41 Letter of agent I njm -N t . ,_ L-L(, have retained Mark Clements DBA, Clements Marine Construction Inc, to make application for any and all permits needed to start construction on the work requested for our property or properties. By allowing Mr. Clements to make such applications I do understand that this will in no way relieve me of any obligations to perform all work according to the building codes of North Carolina, CAMA, DWQ or any other state and or county ordinances. RECEDED NOV 3 2016 NEW HANOVER COL)N"Y pLANN1NG & ZONING RECIJVED DCM WILMINGTON. NC N 0 V 0 7 2016 RECEIPI rr Ir WILMNOUNr WC n4iI Er poe 30 r-9 A cenw� Fea 50.00 a pop neM d O ¢ta Reblm RecelPl Fee so DQ h o O (gWooementRWuirad) 2 co H \() pReauk9a0 Oel;very Fee -- (EneonemeetRetµaretl) i -..... E3 Sl 11/Ol/2016 S Nry poeuye 6 Faes r_ Nr1_ ti an_ ---- -- .... s�- - acmiir .i n/r2 — ,or aj ant S WIl11INGTONr WC 23411 � Po ® pD rq r-1 cwvoaa Fee 50.00 Pb O ReWm ReoevI F 10.00 �R Q(ERyo .%Reeuh d) Q C3 Rmtrl W DM"ty Fee S 2q (Endo�OM Required) o Sl 1 S Toiel P.Mg. 6 Feea .n '� Sent ro •,./ N fJ----Or.. nit�er7 -._. l u� o wvoearNo. $7v0 �iaCG✓ Ea�----•------_.._ ry try sme� �Y s