Loading...
HomeMy WebLinkAbout87867_Bill Strickland_20220825 0d't°�`4` nCAMA DREDGE & FILL �� Na 87867 A B ' C D �� }� 1' Previous permit a GENERAL PERMIT Tl Date previous permit issued 0 New n Modification n Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC n Rules attached. n General Permit Rules available at the following link:www.degnc.gov/CAMArvies Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected n CW n EW n PTA ❑ES I I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): n OEA n IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length _ �7 Access Length • ] :.k/- I Pier(dock)length ! Vs.i Fixed Platform(s) T Floating Platform(s) r __._ • . t — -i-T 4 Finger pier(s) } 4 + { t:•) , — Total Platform area Groin length/tt Bulkhead/Riprap length 1 �' _ _ —.--•--- Avg distance offshore 1_ Breakwater/Sill ! Max distance/length Basin,channel I Cubic yards i Az Boat ramp ► Boathouse/Boatlift _v I l'"'ram t Beach Bulldozing _ r r� l Other SAV observed: yes no i -.� ^ ^/ ' ` , i Moratorium: n/a yes no — _ — i Site Photos: yes no -- J _ I Riparian Waiver Attached: yes no A building permit/zoning permit may be required by: Li Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one) nSee note on back regarding River Basin rules nSee additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) • Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie, Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 �°� y`'''',r,l CAMA DREDGE & FILL �`� N� 87867 A B c D GENERAL PERMIT TD # 1� J'1 Previous permit Date previous permit issued , 1 New Modification Complete Reissue Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC Rules attached. General Permit Rules available at the following link:www.degnc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected CW I EW PTA ES I I PT5 Adj.Wtr.Body (nat/man/unk) AEC(s): _OEA IHA I I UW SPIMA u PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length k '- ; ■WINIMIN= 111■1111 . Pier(dock)length I -■ 11■11■1.— V j Fixed Platform(s) 1II ■ I :::::: orm(s) l IIIIM r(s) .�■��� i 1 j 6 Total Platform area 1■110.11.■ ME Groin length/# ■EN.IIIIIIII■■■■■■- _� Bulkhead/Riprap length i I 111.1 :, " i _11I Avg distance offshore L 11111 I I — Breakwater/Sill 11■■■■_■ ■111■■■■■■■ 1 Max distance/length ■�� —�:: Basin,channel �:: Cubic yards • ;._.__._.-...-_...._-.l ---i IIIMMImmium■■■■11 t Boat ramp { f( _— MI Boathouse/Boatlift ■ _■ .■�■,rn= ■. Beach Bulldozing MI F Other ■■ i II ■ SAV observed: ■ MIN Moratorium: n/a yes no �S� ■■ !�_ —• Site Photos: yes no ���� I Riparian Waiver Attached: yes no ■•UU ' I i i i A building permit/zoning permit may be required by: TAR/PAM/NEUSE/BUFFER(circle one) Permit Conditions JSee note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules 171 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves:Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden,Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ' r • N.C. DIVISION OF COASTAL MANAGEMENT AI)JAt:I NT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM t I I l 1 II II_I►MAL HI..I VJJJ'IECEIPT REQUESTED or HAND DELIVERY (fop portion to be completed by owner or their agent) N,I H•„I I'II q,rr,Iy lw►Mn 1 Bin/1}� 5j,rit.i t1 A,h 1.'.'..it Properly' --tJ O 1 r f OOV'(i rj G 1 e& I1') Al.iihn,i A,, kkesa nt Owner Irt C At i44 c �. Caw t rW 11rq nittnll 4 �JC 1 P)J/feo bwner•s Phone*: 7/4?_ZZZ 6,3a7 Ar1rrl,t'.Name I I ' r► t /�'15z r,/1- Agent Monet 2 5)- -`• ifs - z yssr Arp•ni I nu111 ! f� , 1�Inl r! ♦ _ �1�Q1��7 � (NGttf7�.�� c ye7 __.. ADJAcr-N t RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bvlto portion to be completed by the Adjacent Property Owner) I hereby certify that I own property ddl.x,erit to the above referenced property. The individual applying for this pelmet has described to me, an shown on the attached drawing,the deve4opment they are proposing. A dmaxgo „Lvr spy wLdxnonsian must be Drovrdgd with tb etter. I DO NO I have objections to this r —1:-- �� proposal. I DO have objections to this proposal. if you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252) 946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION t understand that any proposed pier,dock,mooring pilings, unit r;nnp, breakwater, txktlfiouse, lift, or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or nprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below. 1 t)C)wre,to wawa se010/.11 rA itr` t S setback Signature of Adjacent Riparian Property Owner I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: ��/ Typed/Printed name of ARPO: �G trF t9Gs1 Soy ^_ g Mailing Address of ARPO, G' /' I e e me' Cgee,—V+eie wear1 ,, 1-r AR Z85S-6 ARPO's email: ARPO's PhoneN: Date: 'waiver is valid for up to uno year t ARPt)',. Signature f'i'OVISttll Jtflir ?tt2 1 I N C. DIVISION OF COASTAL MANAGEMENT ADJAC$J4TRIPARIAN PROPERTY OWNER NOTIFICATIONAVAryER FORM CERTIFI D MAIJ. RETURN RECEIPT R EST p or t-1,ND OEfj V t (Top portion tot be completed by owner or their agent) Namy Ownerr of F'r�pe !l �f /t 1 j(� Address of Property I (' ...P'vv'' t r Y(i ]l/n Mailing Address of Owner .-<",pE II. A` C Owner's email. ,gi4�,dt.Calms _ Owner's Phone*: 9i'q-0-2 Z—630 7 Agent's Name: -� 1� f Y�, .i Agent Phonety:�51 3 )t Agent's Email r)1 .11 e , ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion t be comoIete / d by the Adiacent Pr000rtv Owner� I hereby certify that I own property adjacent to the above referenced r j permit has described to me, as shown on the a properly.The individual i pe has or scribe attached drawing,the developmentapplying for this ---_.�pwith dimensions muses pr�b with this letter. they are proposing 9 I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is bejn f Coastal Management(OCM)in writing within 10 daysMall, Washington,of receipt of this notice. Correspondence orr Cponde ce should be mailed t o at Washington 9 nt.No re ashington, NC 27889. DCM representatives can also be notified by Certified Mail response!s considered the same as no objection if you have been I understand Ihaf any proposed pier,dock,mooringWAIVER SECTION pilings,boat ramp,breakwater. groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap �� Se•lift.or the appropriate blank below.) (If you wish to waive the setback,you must t sion I DO wish to waive somefall of the 15'setback OR- Signature of Adjacent Riparian Property Owner I do not wish to waive the 15'setback requirement(initial the blank) .2,a`ure of Adjacent Riparian Properly Owner- Typed/Printed name of ARPO: o � Mailing Address of ARPO: it 3 5e N,/ ^� ARPp`BartraU;L1{�f/L'L' /Q0y4jRP0's-40--, ��S/� Date: 'waiveris valid for up to one year from ARPO's Signature* evlsed July 2Q21 11 A'7'10A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management 6rwrty Fave%Porlue Gowmn, James H.Gregson,Director ' fronmrm (late Name of Property Owner Applying for Permit: 13 ail Mailing Address: 1 G' d/COVX, 6-ree k In __ l ,., /f ✓ji'L 2454 1 certif} that I have authori,ed(agent) T Proms 61— to set on ay behalf, for the purpose of applying for and obtaining all('AMMA Permits necessary tr, install or construct(activit)) Q L at(my property located at) � 0frvt C e/ 1n This certification is valid thru(date) 87 z/ z a roperty Owner Signature Date 400 Commerce Avenue, Morehead City, North Carolina 2855- Phone: 252-808-2808 FAX 252-247-3330 Internet www.nccoastalmanagement ne: An Equal Opportunity 1 AHrrmatve Acton Employer-50%Recycled l 10%Post Consumer Pao?, ROY COOPER s•a Governor MICHAEL S. REGAN Secretory Coastal Management BRAXTON DAVIS ENVIRONMENTAL oUAurr Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River f{L basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. ' t. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. z Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order•to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. s. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November/1,,th/rough March 30)after co pletion of e bulkhead. a Pre-project site conditions: 106 %55 I" 4cch 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed c nditions an that all infor..- ion is co�..f to and accurate. 2/rint Name ermrt ffice tire �: �?q ':ent d rt t�:f" "'��! 1Ssa ate / O CAMA GENERAL PsPERMIT6 7 Slane of North Carolina I Environmental Quality I CoastaiManagement Washington Office 1943 Washington Square Mall Washington.NC 27839152-94o-6481 Wilmington Office 1 I27Cardinal Oii,e En.Wanang.c.l,NC 23405-3845! 9..,79S-721 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28537 1 252-808-2808