HomeMy WebLinkAbout87870B - Charles Batcher °'t°"5741 I ICAMA DREDGE & FILL N9 87870 A BP' C D
ii
GENERAL PERMIT T�-}4 1 ) 335 Dateous revoruT rmit issued�'-'�l •
P Pe
New ]Modification Complete Reissue Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC T".7'"''', • n Rules attached. 'General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s) �re.. j
Phone#(_)
Email Subdivision
City ZIP
Affected n CW n EW n PTA IT ES V 171 PTS Adj.Wtr.Body • (nat/man/unk)
AEC(s): n OEA n IHA n UW n SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale:7:6)
Shoreline Length
Access Length - ; • - - - -.- ., --_
Pier(dock)length •
- -
Fixed Platform(s) .__ ,-� ?
Floating Platform(s) —
I .
---
Finger pier(s) _-___--i _ 1_
Total Platform area i ••
Groin length/if ,1 ':. : i !_I f E f`, � 1-
Bulkhead/Riprap length I I r_
-
Avg distance offshore
Breakwater/Sill .., - t vf� —~ i i--- j
I j
Max distance/length
Y -Basin,
channel 1I )
-Cubic yards .. _ _.�I{
• - T r
Boat ramp • t
Boathouse/Boatlift i I ( y
t
Beach Bulldozing 1- *1-)'i`t r ^ - r':
�� — r t r
r
Other Cr'Y t J
Hilll
r
h
r - -j—-; 1
SAV observed: yes no i j 1 i i i j I I
Moratorium: n/a yes no ,
Site Photos: yes no -- ' :_..z_____,_ __T__
Riparian Waiver Attached: yes no
A building permit/zoning permit may be required by:
Permit Conditions n TAR/PAM/NEUSE/BUFFER(circle one)
?"- 1:1See note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) 'N..., (` ,i
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature"Please read compliance statement on back of permit** Signature ,
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St.Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax:910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
r�'C0u'"4,�I ICAMA DREDGE & FILL N9 87870 ABCD
1 GENERAL PERMIT
I Previous permit
Date previous permit issued
I1 New Modification Complete Reissue I I Partial Reissue
As authorized by the State of North Carolina.Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
15A NCAC I I Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City_ ZIP
Affected U CW I I EW PTA C ES I I PTS Adj.Wtr. Body (nat/man/unk)
AEC(s): OEA ❑IHA UW SPIMA PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
• (Scale:/• 4
Shoreline Length
Access Length
Pier(dock)length . MI_MEM
Fixed Platform(s) ' I
t— 111Mill ) . I
Floating Platform(s) I i I I i:._ 1=111
Finger pier(s) • m ==!E=
Total Platform area 11./.11M1 _
Groin length/# IIIEMENIN1 - _
Bulkhead/Riprap length VI _
Avg distance offshore illimi... PMIMIIMIEMMEIRMAINSIZI—.--- I
I
Breakwater/Sill .—
��ir11111111®1�11' .ISlM
Max distance/length M =1 �—�
Basin,channel IMIIMMEMIEIII=1".I.IIIIIIR6111.11111111
Cubic yards "�"�Boat ramp ■�--_ =
Boathouse/Boatlift ■ -- ■--IIIIIIIIIIIIIIIIIII---w, 1
Beach Bulldozing , .r 'IX .. 11...111111111 i '! I
Other RNEEMININ . I I : i .
l I
_11111_I : I ���_1111 -= 1
SAV observed: yes no ■
Moratorium: n/a yes no .
Site Photos: yes no --�■� I —
Riparian Waiver Attached: yes no i I I —�
A building permit/zoning permit may be required by:
TAR/PAM/NEUSE/BUFFER(circle one)
Permit Conditions
See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215),
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River, Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
y ROY COOPER
�.a Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL.QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned •
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
normal water line(NWL)or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and •
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability. •
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
•
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. •
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stern density of 260 stems per acre. •
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
Pre project site conditions: 2.—o1 1S T �, .9° 1_...,4.�v` ,
Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditi s and verify that all •
infojmation is complete and accurate.
,,r--dd 17arr;S
Agent or loll ant Printed Name Permit Office Signature •
�/ � 2 vim-
, 2
Ag '6r Alsplicant Signature Issues 'e
CAMA GENERAL PERMIT 4: ;, t/a� a 7v
State of North Carolina i Environmental 0ualhv I Coastal Management
Washington Office 1443 Washington Square Mall;Washington.NC 278891 B2-946-5481
WVilminaton Office I InCardinal 0,-we Gvt.m.irlmgrcn NC 25405-3845! .i0-7 4_.7215
Morehead City Office 400 Commerce Avenue Morehead City.VC 28557 : 52-808-2808
' a t
• t ! qtlioOnji Wien Si uogeatppki.
a,eO
re o e oc. ,
e1
aturw edit.o+WO
A*Pc:1 vj d'rrAVTD
4, ieu6s
r .77"7d
:uognsuo�u,�:u R,,,atkild
situ o+pvtefeu uouv uqm Buena simo upgaauuoo u<spurl peuopuawa.oje ayj uo
Jatup of swe6e 41047 pue lepyyp Payed teJ07 A41!MS weeua8euenr fetseQJ jo uaysuuQ
DI doessruueo wad t>ej or op puv ?uw W pazuoifine rue t Imp Awe°ax CW4$t ynj I
+Gun03 p 7,1vuit U
•
,e peteJo,A iodoxf Jew le
iU UJdO ewep t>:rsoao.d Buu opoy ew tiessaoau
*Imbed yrily0 ge Ouggs 4o pug.ot 6u141de jo asod.nd atp.ot'ttgyaq Aw uo pia at
niass&co)Wow
-."✓ -'W H
".-7/ •-f,c pozuotane awe,teta.441063
ippv petug
:.aawnu auayd
4158 "aN ao -19.A �
S9+fpav Nowt
iruuod eL4,®a„8ea AWN().ctodnd w a+igN
r+o
N.C.DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL-RETURN RECEIPT REQUESTED or HAND OEt.IVERV
(Top portion to be completed by owner or their agent)
Name of Property Owner S 1, Fu.Yi'
Address of Property. i�Q ip2 zne,yo Pil. y 4"1.1Y-tk DP .� R Sl C
f� S} ` a 7&ter)
AAarhng Address of Owner AP 0&a5i-�`i! '+",--..±2 ¢-f
Owners email:
Owners Phone. ,1i.. 3 9-tD1a0
Agent's Name'aL rr 41e...�MN �.._ Agent Phone.._. 6,1.17/-Y/f.4 ..__
Agent s F.marl �, T )• _.____ - -----_._.----_.... ..__
Q .r.er+ck._be `
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
1^erehy certify that I own property adjacent to the above referenced property The individual aoply'nq for this
permit has described to me. as shown on the attached drawing, the development they are proposing A
description or dr-awina,with dimensions,must be provided wtthjhns letter
V I DO NOT have objections to this proposal I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252)946-6481. No response is considered the same as no objection it you have been
notified by Certified Mail.
WAIVER SECTION
I understand!hal any proposed pier.dock,mooring pilings.boat ramo,breakwater.boathouse.lift.or
groin must oe set back a minimum distance of 15'from my area of ripanan access unless waived by me
(this does rot apply to bulkheads or riprap revetments).(It you wish to waive the setback.you must sign
the appropriate blank below)
I
I DO wish!o waive someiall of the 15'setback
Signat.r djacent iparian roper/y Owner
7R-
io not wish to waive the 15'setback requirement(initial the blank)
irature of Adjacent Riparian Property Owner
Jed/Printed name of ARPO:
hng Address of ARPO:
'O's email: ARPO's Phone#:
________'waiver is valid for up to one year from ARPO's Signature'
Revised May 2021
Alir
ay -
:.try yr
N.C.DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
LE_RflFIED MAIL RETU1tN RI rt tQT REIIt. T�
Sgor�_�--. --
(Top portion tO be completed by owner or their agent)
h, t —.- ' -----
Name of Properly
Owner �t L'. C�(C
pr. A f,t,�
Andress of Property ' -}Malting Address of Owner &tfl ..-- -- - 491�
Owners email: -_ .Owners Phone/. oZ Sr _5
Agent Phones_.47.5',-'11 try --
Agent- Name-13.7/0MM1 M1 AN6--
AgenlsErnad k✓..1t 1,0r, --- —.
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed bg the Adjacent ProPerty Owrt�r;
I hereby certify that t own omnerty adjacent to the above referenced Rrnperty The md,vijuat at';ptying for this
permit has described to me. es shown on the attached drawing.�heetdeve F
nl opment they are progoging
description or drawa,with dent;ns.Ons,.must be p vid�4__
ter
VI DO NOT have objections to this proprnal. I DO have objections to this ur..;gosal.
/you have objections to what Is being proposed, you must notify the N.C. Division of Coasti
Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should b
nailed to 943 Washington Square Mall, Washington. NC 27889. DCM representatives cart 3iS0 b
ccntacted at(252)946-6481. No response is considered me same as no objection it you have bee
rotifred by Certified Mal.
WAIVER SECT1OM
•,mnerstari t that any uropose0 peer.dock,mooring pilings,boat ramp breakwater,boathouse,lift.Or
7roin must be set back a nri;ienum distance of 1S'(rum my area of riparian access unless waived by me
:his does rot apply to butkheacs or riprap revetments) (If you wish to waive the setback,you most slot
he appropriate blank below I
I UO wish to wane some/all o`the 15'setback
Signature of Adjacent Rioalrian Property Owner
JR- .,
90 not wish to waive the 15'setback requirement(initial the blank)
grature of Adjacent Riparian Property Owner
ped/Printed name of ARPO:
tiling Address of ARPO:
'PO's email: __ ARPO's Phone*
te: -_ 'waiver Is valid for up to one year from ARPO's Signature'
Revised May