Loading...
HomeMy WebLinkAbout15-16 Renewal 2021 Island Marina EnterprisesPermit Class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission er.Mtt for. _2L Major Development in an Area of Environmental Concern pursuant to NCGS I I IA-11'8 X Excavation and/or filing pursuant to NCGS 113-229 Permit Number 1546 Issued to Island )<Iarina Enterprises, LLC, 620 St. Joseph Street, Carolina Beach NC 28428 Authorizing development in New Hanover County at adi. to Myrtle Grove Sound, 620 St. Joseph Street. Carolina Beach -,as requested in the permittee's application dated letter dated 101112021. This permit, issued on November 29.2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Ac violation of these terms may c suoJect to noes, tmprsontuent or ctv uacuon; or may cause me permit to ne nuu ane vote I) This renewal shall be attached to Permit No. 15-16. which was issued to the permimee on 1/27/16, as well as all subsequent modifications, refinements. and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2} All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 07-1617 v2. NOTE: The U.S. Army Corps of'Engineers has assigned the proposed project SAW Action Id. No. SAW-2016-00124. NOTE: A permit renewal application processing fee of S100 was received by DCNI for this project. This permit action may be appealed by the permrttee or other qualified persons within twenty (20) days of the issuing date. This pennit must be acemi6le en -site to Department personnel when the project is inspected for compliance. ' Any maintenance work or project modification net covered hereunder requires further Division approval: All work must cease when the pemtit expires on December 31, 2023 Ia issuing this pennit. the State of North Carolina agrees that your projectisconsistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis. Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Penninee DCM Coordinator: Luck, Permit#: 1 S"1G MAILING DISTRIBUTION SHEET Permittee: ) 5 )ckyj fn aayyc, �r0 st 3.k,4, 5i,.ot /o,ceiN Re -al m rsq zg Agents: Ve_W+9i3 DCM Field Offices Elizabeth City Washington (with revised work plan drawings) Morehead City g . Ma U (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Washington: Renee Gledhill -Earley at Environmental.Review@ncdcr.gov Heidi Cox (WIRO) Kim Harding David Hams Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser Sheri Montalvo / Shelton Sullivan Chris Pullinger — 401 Tina Martin - 401 Clif Whitfield (WARD) Jimmy Harrison Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: airs — 401 (Brunswick, New Hanover) 3. Holley Snider-401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) Natural Heritage Program Rodney Butler LPO: (NCDOT) Travis Wilson NC Division of Coastal Management CAMA Major Permit Renewal Request District: bl- - - w Major Permit Staff: t„ Applicant Information Applicant (� y�/ Name: ki" I , lfiril'%.*, ��v�Q{�6 � Request Date: La�9 First Received in Office: L 1 Project Address: rn?��w1 Street Address _ City ZIP Code Permit No.: %xQ No.: Permit Expiration Date: � 2p � Payment $ Agent's Name: District Manager/Field Rep Approve? (Initial Appropriate Box) {. y ❑ InformationOther DWR Project --77 -t USACE Action No: pLJQ %TAa 1 T t/ 7— ID No.: (a Has substantial YES NO If Yes, r+ development occurred? )A El Explain: r® 2Ce YFA NO Recommend to Renevv? YJ ❑ If Not Approved, provide Justification: ,� Staff Signature: RECEIVED NOY z. 9 202, MP SECTION RCM - MHD CITY Date: 11 -&-� f-;n NOV 2,W707t MP SECTION DCM - MHD CITY October 1, 2021 To: Brian Hall Division of Coastal Management North Carolina Department of Environmental Quality Reference: Island Marina (CAMA/D&F Permit 15-16) Our CAMA/D&F permit is due to expire December 31, 2019. I am the permittee and am requesting a 2 year extension on the existing permit to allow Maintenance Dredging and installation of 16 boatlifts yet to be installed. The existing permit allows for the installation of 28 boatlifts and due to the capital investment for boatlifts, I have only been installing 2 boatlifts per year. At this rate it will take an additional 8 years to complete installation of all 16 boatlifts if, economic demand allows. Also, I am requesting a minor permit to install boat lifts in existing slips 34 and 35, that were not covered in the original permit As far as Maintenance Dredging, due to sediment deposits, Maintenance Dredging is required approximately every 4 years, and scheduling dredgers very difficult. To date all work on Permit 15-16 has been completed except for the 16 additional boatlifts and the periodic Maintenance Dredging. 15ANCAC 071.0404 DEVELOPMENT PERIOD EXTENSION Part 1-5 is addressed as follows: Statement addressing Part 1 & 2: 10 Boat lifts (slips 3-6 and slips16-21) have been installed in the past 5 years (10 Boatlifts X $12,000/boatlift = $120,000.00). Additional Capital investment of approximately $192,000.00 (16 Boatlifts X $12,000/boatlift) is more reasonag�&\ � recover investment when spread out over an additional 8-10 years. RECEIK; ; NOY toMP a r9 DCM �71Ura, N0V 1. 61021 ,pCM %^M1NGT0W1 NC Maintenance Dredging is an ongoing need and dredgers availability is the problem in completing Maintenance Dredging. I feel it is largely due to the small scope of my project of around 30 cubic yards of dredge material. Statement addressing Part 3: There has been no change of plans since the issuance of the original permit. Statement addressing Part 4: There has been no change of ownership of the property. Statement addressing Part 5: The project for is in compliance with all conditions of the current permit 15-16. Also, please find enclosed the $100.00 check required for a Major CAMA Permit extension. If there are any questions or concerns not addressed in the information above please fell free to contact me at any time. ,, Regards, I)X. T'e "i-- ,J Dennis T. Barbour Island Marina 626 Saint Joseph St. Carolina Beach, NC 28428 910-470-5041 RECEIVED NOV 2'9 2021 MP SECTION DCM - MMD CITY �tscsly n ®CM "L►Vi1NCT®N, NC Date Date Check From Name of Vendor Check Check Permit Rct. # Received Deposited Permit Holder Number amount Number/Comments 11/22/2021 Island Marina same First Bank 2211 $100.00 major renewal #15-16, NHCo BH rct. Enterprises, LLC 15977 e m n �rn _ N , m o� o z ,, 0