HomeMy WebLinkAbout15-16 Renewal 2021 Island Marina EnterprisesPermit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
er.Mtt
for.
_2L Major Development in an Area of Environmental Concern
pursuant to NCGS I I IA-11'8
X Excavation and/or filing pursuant to NCGS 113-229
Permit Number
1546
Issued to Island )<Iarina Enterprises, LLC, 620 St. Joseph Street, Carolina Beach NC 28428
Authorizing development in New Hanover County at adi. to Myrtle Grove Sound, 620 St. Joseph
Street. Carolina Beach -,as requested in the permittee's application dated letter
dated 101112021.
This permit, issued on November 29.2021 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Ac violation of these terms may
c suoJect to noes, tmprsontuent or ctv uacuon; or may cause me permit to ne nuu ane vote
I) This renewal shall be attached to Permit No. 15-16. which was issued to the permimee on 1/27/16, as
well as all subsequent modifications, refinements. and renewals, and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2} All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
07-1617 v2.
NOTE: The U.S. Army Corps of'Engineers has assigned the proposed project SAW Action Id. No.
SAW-2016-00124.
NOTE: A permit renewal application processing fee of S100 was received by DCNI for this project.
This permit action may be appealed by the permrttee or
other qualified persons within twenty (20) days of the issuing
date.
This pennit must be acemi6le en -site to Department
personnel when the project is inspected for compliance.
' Any maintenance work or project modification net covered
hereunder requires further Division approval:
All work must cease when the pemtit expires on
December 31, 2023
Ia issuing this pennit. the State of North Carolina agrees
that your projectisconsistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Braxton C. Davis. Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Penninee
DCM Coordinator: Luck, Permit#: 1 S"1G
MAILING DISTRIBUTION SHEET
Permittee: ) 5 )ckyj fn aayyc, �r0 st 3.k,4, 5i,.ot /o,ceiN Re -al m rsq zg
Agents: Ve_W+9i3
DCM Field Offices
Elizabeth City Washington (with revised work plan drawings)
Morehead City g . Ma U (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington: Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property:
DEMLR/DWR:
Washington:
Renee Gledhill -Earley at Environmental.Review@ncdcr.gov
Heidi Cox (WIRO)
Kim Harding
David Hams
Shannon Jenkins / Sharon Gupton
Tim Walton / Mike Moser
Sheri Montalvo / Shelton Sullivan
Chris Pullinger — 401
Tina Martin - 401
Clif Whitfield (WARD)
Jimmy Harrison
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: airs — 401 (Brunswick, New Hanover) 3.
Holley Snider-401 (Carteret, Onslow, Pender)
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources: Maria Dunn (WARD)
Natural Heritage Program Rodney Butler
LPO:
(NCDOT) Travis Wilson
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: bl- - - w Major Permit Staff: t„
Applicant Information
Applicant (� y�/
Name: ki" I , lfiril'%.*, ��v�Q{�6 � Request Date:
La�9 First
Received in Office: L 1
Project
Address: rn?��w1
Street Address _ City ZIP Code
Permit No.: %xQ
No.: Permit Expiration Date: � 2p � Payment $
Agent's Name:
District Manager/Field Rep Approve? (Initial Appropriate Box) {. y ❑
InformationOther
DWR Project --77 -t USACE Action
No: pLJQ %TAa 1 T t/ 7— ID No.: (a
Has substantial YES NO If Yes, r+
development occurred? )A El Explain: r® 2Ce
YFA NO
Recommend to Renevv? YJ ❑
If Not Approved, provide
Justification: ,�
Staff
Signature:
RECEIVED
NOY z. 9 202,
MP SECTION
RCM - MHD CITY
Date: 11 -&-� f-;n
NOV 2,W707t
MP SECTION
DCM - MHD CITY
October 1, 2021
To: Brian Hall
Division of Coastal Management
North Carolina Department of Environmental Quality
Reference: Island Marina (CAMA/D&F Permit 15-16)
Our CAMA/D&F permit is due to expire December 31, 2019. I am the permittee and
am requesting a 2 year extension on the existing permit to allow Maintenance
Dredging and installation of 16 boatlifts yet to be installed. The existing permit
allows for the installation of 28 boatlifts and due to the capital investment for
boatlifts, I have only been installing 2 boatlifts per year. At this rate it will take an
additional 8 years to complete installation of all 16 boatlifts if, economic demand
allows.
Also, I am requesting a minor permit to install boat lifts in existing slips 34 and 35,
that were not covered in the original permit
As far as Maintenance Dredging, due to sediment deposits, Maintenance Dredging is
required approximately every 4 years, and scheduling dredgers very difficult.
To date all work on Permit 15-16 has been completed except for the 16 additional
boatlifts and the periodic Maintenance Dredging.
15ANCAC 071.0404 DEVELOPMENT PERIOD EXTENSION Part 1-5 is addressed
as follows:
Statement addressing Part 1 & 2:
10 Boat lifts (slips 3-6 and slips16-21) have been installed in the past 5 years (10
Boatlifts X $12,000/boatlift = $120,000.00). Additional Capital investment of
approximately $192,000.00 (16 Boatlifts X $12,000/boatlift) is more reasonag�&\ �
recover investment when spread out over an additional 8-10 years.
RECEIK; ;
NOY toMP a r9
DCM �71Ura,
N0V 1. 61021
,pCM %^M1NGT0W1 NC
Maintenance Dredging is an ongoing need and dredgers availability is the problem
in completing Maintenance Dredging. I feel it is largely due to the small scope of my
project of around 30 cubic yards of dredge material.
Statement addressing Part 3:
There has been no change of plans since the issuance of the original permit.
Statement addressing Part 4:
There has been no change of ownership of the property.
Statement addressing Part 5:
The project for is in compliance with all conditions of the current permit 15-16.
Also, please find enclosed the $100.00 check required for a Major CAMA Permit
extension.
If there are any questions or concerns not addressed in the information above
please fell free to contact me at any time.
,,
Regards,
I)X. T'e "i-- ,J
Dennis T. Barbour
Island Marina
626 Saint Joseph St.
Carolina Beach, NC 28428
910-470-5041
RECEIVED
NOV 2'9 2021
MP SECTION
DCM - MMD CITY
�tscsly n
®CM "L►Vi1NCT®N, NC
Date
Date
Check From
Name of
Vendor
Check
Check
Permit
Rct. #
Received
Deposited
Permit Holder
Number
amount
Number/Comments
11/22/2021
Island Marina
same
First Bank
2211
$100.00
major renewal #15-16, NHCo
BH rct.
Enterprises, LLC
15977
e
m
n
�rn
_
N
,
m
o�
o
z
,,
0