Loading...
HomeMy WebLinkAbout57-16 Minor Mod City of Elizabeth CityPermit Class MODIFICATION/NIINOR Permit Number 57-16 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ,permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to City of Elizabeth City, 200 E. Ward Street Elizabeth City, NC 27909 Authorizing development in Pasquotank County adjacent to Pass uotank River, 708 Riverside Ave., in Elizabeth City as requested in the permittee's letter dated 6/27/19, including the attached workplan drawings (12) all dated 6/25/19. This permit, issued on August 5, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to tines, imprisonment or crvu action; or may cause me permit to oe nmt ana voia. Docking Facility Reconfiguration 1) This minor modification authorizes only the fishing pier, kayak launch, and floating dock, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility reconfiguration without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes the removal of the 10 previously authorized formalized boat slips. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director ,l/ Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee City. of Elizabeth City Permit No. 57-16 Page 2 of 2 ADDITIONAL CONDITIONS Shoreline Stabilization — Bulkhead Extension 3) The bulkhead extension shall be constructed in accordance with the alignment depicted on the attached workplan drawings. Upland Development Reconfrauration 4) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the modified parking lot alignment and concrete sidewalk alignment, all as expressly and specifically set forth in the attached permit application and workplan drawings. General 5) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 6) This Minor Modification shall be attached to the original Permit No. 57-16, which was issued on 6/2/16, as well as all subsequent modifications, refinements, and renewals, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 7) All conditions and stipulations of the active permit remain in force unless specifically altered herein. NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW- 2016-00868. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 16-0336 V2. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Coastal Management ENVIRONMENTAL QUALITY City of Elizabeth City 200 E. Ward Street Elizabeth City, NC 27909 Attn: Sean Robey Dear Mr. Robey: August 5, 2019 ROY COOPER Covernor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Aincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 n '�EAST�RN _ CARO.:TNA ENGIINEERIN(i, P.C. June 27, 2019 - Revised Ms. Lynn Mathis NO Division of Coastal Management 1367 US 17 South Elizabeth City, NO 27909 Subject: CAMA Major Permit — Minor Modification Coast Guard Park 708 Riverside Avenue Elizabeth City, NO Dear Ms. Mathis, Please accept this for a minor modification to the previously approved CAMA Major Permit 57- 16 as approved on June 2, 2016. Attached is a check from Eastern Carolina Engineering, PC in the amount of $100 as the permit modification fee. This minor modification is being requested on behalf of the City of Elizabeth City to align the. previously approved major permit with the current desired project scope: The modifications are separated into the following scopes of work: Floating dock/scull launch, kayak/canoe launch, fishing pier, steel sheet pile bulkhead, and change in site Improvements. FLOATING DOCK / SCULL LAUNCH The floating dock is requested to be changed from 6' wide x 50' long to 6' wide x 62' long to accommodate rowing sculls. This is an increase in 72 SF. KAYAK/CANOE LAUNCH The kayak/canoe launch is requested to be changed from 12' wide x 22' long to 12' wide x 25' long. This is an increase of 36 SF. FISHING PIER The fishing pier is requested to be changed from an 8' wide x 78' long pier (624 SF) to an 8' wide x 30' long pier with a 16' x 16' square platform at the end (494 SF). This represents a decrease of 130 SF, which more than compensates for the increase in the floating dock/scull launch and the kayak/canoe launch. BULKHEAD We are requesting that the bulkhead be extended from the original permitted length of 132 LF to the new length of 166 LF. (Plans show 165 LF, we are asking for 1 additional foot for construction tolerance.) This additional length is requested so the floating dock may be tied to a solid shoreline instead of the existing bulkhead. At this time the proposed boat dock is not being constructed due to funding. The boat dock as proposed was 1705 SF. Additionally the W�v� VED Eastern Carolina Engineering, PC O Box 128 Camden. North Carolina 27921 JUL 0 2 !,19 (252) 335-18881icen5e C-4162 www easterncarolinaengineeringcom_ --- —.— -- '' DOD -MHO CITY Coast Guard Park Ms. Lynn Mathis June 27, 2019 - Revised Page 2 boardwalk from Point A to Point B to Point C is no longer a portion of the project. This results in a reduction of 921 SF of coverage. SITE IMPROVEMENTS Per the original permit several building were demolished on -site totaling 4097 SF with 424 SF being in the 30' AEC. 3714 SF of the building demolition was located within the 75' AEC. We are requesting a change in the concrete sidewalk within the 30' AEC. This change is requested to maintain adequate ADA slopes and turning platforms. The previous design was non- ADA conforming. We also added concrete landing pads for the boardwalk accesses at the step locations. The original amount of sidewalk and parking within the 30' AEC was 404 SF. The requested amount of sidewalk within the AEC is 423 SF. This is approximately the same as the existing buildings (424 SF) that were removed from the property as mentioned in the original major permit application. The original plan reflected a pre -permit existing impervious area of 8989 SF and a new impervious area of 10,132 SF (including the building). The original plan reflected 5638 SF of new asphalt and 382 SF of new concrete for a total of 6320 SF. The total original permit coverage within the 75' AEC is 9967 SF. This modification request is for 3723 SF of new asphalt, 3001 SF of new porous pavement, 1477 SF of new concrete sidewalk resulting in 8201 SF of new impervious. Of the 8201 SF only 4509 SF is within the 75' AEC. Including the existing building, the total coverage in the 75' AEC is 8321 SF, resulting in a reduction of 1646 SF of coverage within the 75' AEC. STORMWATER RUNOFF Stormwater routing is maintained In accordance with the original engineered plan. Stormwater is routed to an underground piped drainage system in Roanoke Avenue. If you have any questions, please do not hesitate to contact me at (252) 335-1888. \,o�aprtlH CAR��/ Sincerely, `,� 61ra6ra •.:y Sean C. Robey, PE .....uINEG;; ,,qNC. HOYF'. Eastern Carolina Engineering, PC P 0 Box 128 Camden, North Carolina 27921 (252) 335.1888 License C•4162 anew easterncarolinaengineering corn RECF1VED JUL 0 d Z019 DCM-I�HD CITY n -!LE AS TECAERN ENGINEERING. P.C. June 27. 2019 - Revised Ms. Lynn Mathis NC Division of Coastal Management 1367 US 17 South Elizabeth City, NC 27909 Subject: CAMA Major Permit — Minor Modification Coast Guard Park 708 Riverside Avenue Elizabeth City, NC Dear Ms. Mathis, Please accept this for a minor modification to the previously approved CAMA Major Permit 57- 16 as approved on June 2, 2016. Attached is a check from Eastern Carolina Engineering, PC in the amount of $100 as the permit modification fee. This minor modification is being requested on behalf of the City of Elizabeth City to align the previously approved major permit with the current desired project scope. The modifications are separated into the following scopes of work: Floating dock/scull launch, kayak/canoe launch, fishing pier, steel sheet pile bulkhead, and change in site Improvements. FLOATING DOCK / SCULL LAUNCH The floating dock is requested to be changed from 6' wide x 50' long to 6' wide x 62' long to accommodate rowing sculls. This is an increase in 72 SF. KAYAK/CANOE LAUNCH The kayak/canoe launch is requested to be changed from 12' wide x 22' long to 12' wide x 25' long. This is an increase of 36 SF. FISHING PIER The fishing pier is requested to be changed from an 8' wide x 78' long pier (624 SF) to an 8' wide x 30' long pier with a 16' x 16' square platform at the end (494 SF). This represents a decrease of 130 SF, which more than compensates for the increase in the floating dock/scull launch and the kayak/canoe launch. BULKHEAD We are requesting that the bulkhead be extended from the original permitted length of 132 LF to the new length of 166 LF. (Plans show 165 LF, we are asking for 1 additional foot for construction tolerance.) This additional length is requested so the floating dock may be tied to a solid shoreline instead of the existing bulkhead. At this time the proposed boat dock Is not being constructed due to funding. The boat dock as proposed was 1705 SF. Additionally the mid Eastern Carolina Engineering, PC JUL �I II 0 I�,Jn P O Box 128 Camden. North Carolina 27921 v (252) 335-1886 License C-4162 wxv, eastemrarolmaengineering.corn DCM-hAHD CITY DCM Coordinator: 'goo /'Q_ Permit #• 5-7-167 d D DCM Field Offices Elizabeth City Morehead City Washington Wilmington US ACOE Offices: Washington: Wilmington: Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: MAILING DISTRIBUTION SHEET 20r7 old; (with revised work plan drawings) (f Zl9oy RaleighFland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, T� n ell) Josh Pelletier (Bettie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Renee Gledhill -Earley at Enviroamental.Review@ncdcr.gov Heidi Cox (WIRO) David Hams Shannon Jenkins / Sharon Gupton Tim Walton / Mike Moser st,tlj.'..- Clif Whitfield (WARO) Curt Weychert Washington: Anthony Scarbraugh-401 a Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Wildlife Resources: Natural Heritage Program LPO: Robb Mairs — 401 (Carteret, Onslow, Pender) Chad Coburn — 401 (Brunswick, New Hanover) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Rodney Butler Fax Distribution: Permittee #: Agent# (NCDOT) Travis Wilson ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director July 2, 2019 NORTH CAROLINA Environmental Quality TO: Raleigh Bland, USACOE �` CAnthony Scarbraugh, DWR-Water Quality VGII, V6r4A^A Shane Staples, Fisheries Resource Specialist, DCM A& Marie Tripp Dunn, NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Minor Modification Request to Major Permit N57-16 Applicant: City of Elizabeth City Project Location: 708 Riverside Avenue in the Elizabeth City Proposed Project: Increase the size of the Floating dock, kayak launch, reduce the length ofthe fishing pier, change the wooden accesses to the walkway to concrete, add 34' of bulkhead and other changes noted in letter of request Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 07/23/19 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by fax: 252-331-2951 or email. If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE RECEIVED North Carolina Department of EnNronmental Quality I Division of Coastal Management Elizabeth City Office 1 401 South Griffin Street. Suite 300 1 Elizabeth City, North Carolina 27909 DCM-MHD 2522643901 CITY ROY COOPER cove or MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director July 2, 2019 MEMORANDUM NORTH CAROLINA Environmental Quality TO: Raleigh Bland, USACOE Anthony Scarbraugh, DWR-Water Quality Shane Staples, Fisheries Resource Specialist, DCM Marie Tripp Dunn, NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: LAMA Minor Modification Request to Major Permit #57-16 Applicant: City of Elizabeth City Project Location: 708 Riverside Avenue in the Elizabeth City Proposed Project: Increase the size of the floating dock, kayak launch, reduce the length of the fishing pier, change the wooden accesses to the walkway to concrete, add 34' of bulkhead and other changes noted in letter of request Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 07/23/19 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send Your comments by fax: 252-331-2951 or email. If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: X This agency has no objection to the project as proposed. DWR Project No. 16-0336 V2 This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 07/23/19 RECEIVED JUL 2 3 2019 nlzabethhhCittyy o6keD1 401SouthmerA crrimnvn SttR t,�3oo 1 �m n�naniy,N Im � SECTION MHD M26eJ901 ROY COOPER fioranor MICHAEL S. REGAN seeaetary BRAXTON C. DAVIS Director July 2, 2019 TO: Raleigh Bland, USACOE Anthony Scarbraugh, DWR-Water Quality Shane Staples, Fisheries Resource Specialist, DCM Marie Tripp Dunn, NC Wildlife Resources Commission FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Minor Modification Request to Major Permit #57-16 Applicant: City of Elizabeth City Project Location: 708 Riverside Avenue in the Elizabeth City Proposed Project: Increase the size of the floating dock, kayak launch, reduce the length of the fishing pier, change the wooden accesses to the walkway to concrete, add 34' of bulkhead and other changes noted in letter of request Please indicate below your agency's position or viewpoint on the proposed project modification and return this form by 07/23/19 to 400 Commerce Avenue, Morehead City, NC 28557. You may also send your comments by fax: 252-331-2951 or email. If you have any questions regarding the proposed project, Please contact Lynn Mathis at (252) 264-3901, ext. 234. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. pre 40r , "N e,6 !s - J� To This agency approves of the project only if the recommended changes are incorporated. See attached. 'Phis agertcy oN is to the project for reasons described in the attached comments. SIGNED �c3 DATE /! d Q� RECEIVED JUL 1 2 2019 North Caro tnanepartnxeu of riwlrontnentd Quilay I Dhdaronof Casual Mutag~n1 Mobeth City Office 1 401 South Oman Street Suite 300 1 EkabethC%y, tlwsh CaraSna 2M9 ' "MI &11 ,P SECTION MHD ROY;COOPER -:GOYPl1fGr� -.. - ;NAOHAELSREGAN` :Seacrary'i_ _ BRAXfON"G. DAVIS- oraau ( 1%-D--.o5,nl lirly<2;,20'19 >NIEMORANI)iJM TO. FROM'z ;SUBJECT:' Applicant:; Project 1?osatgn; Proposed Project:: Please indicate Anthony Sca `braugh; DWR Water Quality - Shane St ;1:, Fishefles Resource Specialistj)CM Maria Tripp Dunn,'NC Wildlife Resources,Commisstom Ave nne m the:Elizabeth 0ity Increase thes*g pfthefloating dock, kayak tauneu, re pier, change the wooden accesses to the Iwalkway to_c and other changes.noted:in letter ofiequest. sitppoiting data:are:repuested, REPLY:: V This: This agency. SIGNED: AA-T-�-- rou have any questions tegardin -Jhe ro osea_ project, P .P ezt. 234, Wheu appropriate, in-depth comments with, as no objection to the projecq'asproposed. as no comment orb the proposed. project.. approves of the project only. if the recommended changes are See attaohed. bjects to the project for reasons 'described in the attached; comments. t D_EQ JUL 8 tots o ,meat ofrn�laai,ikntalQualttYlnlyWonol Coastal Managemen @pJ� SECTION '...ti resat c,.w.�.time3 1 F7lydb i9QEv:NorLi Cardma �7EC t �t ROY COOPER (iormor rp_ MICHAEL S. REGAN Sln,VIary Coastal Management BRAXTON C. DAVIS ENVIRONMENTAL OUAIITY Director MEMORANDUM TO Greg Bodnar, Assistant Major Permits Coordinator, Division of Coastal Management, Morehead City CC: Shane Staples, Fisheries Resource Specialist, NC DMF, WaRO Raleigh Bland, US Army Corps of Engineers, Washington Anthony Scarbraugh, DWR - Water Quality - 401, WaRO Maria Tripp Dunn, NC Wildlife Resources Commission, WaRO FROM Lynn Mathis, Environmental Specialist II, NE District, DCM THROUGH Ron Renaldi, District Manager, NE District, DCM R.Pt•1, DATE: July 1, 2019 SUBJECT Request for Minor Modification of Major Permit #57-16 issued to: City of Elizabeth City REFERENCE (a) Letter from consultant Sean Roby (received June 27, 2019) requesting a Minor Modification (b) 15A NCAC 07J.0405, Permit Modification (c) DWR Project#16-0336 (d) USACOE Action #SAW-2016-00868 The City of Elizabeth City was issued CAMA Major Permit #57-16 on June 2, 2016, and expires on December 31, 2019. The original permit authorized the following development: a. Parking lot and concrete: Construction of an asphalt parking lot and drive, and a concrete walkway accessing the existing building and boardwalk ramp from a mandatory handicap parking space. The total area of impervious surface on the property is 10,132sf (including an existing 3,812sf metal building). b. Light voles: A total of four light poles are proposed, three within the 30' buffer and one within the 75' AEC, The pedestal for each is approximately 1' x 1'. c. Elevated wooden boardwalk: Elevated wooden boardwalk along 328' of shoreline, and will include two stairs and a ramp. Total area of high ground shading proposed = 2,026sf. d. Ten slip dock with finger piers and a "T" head platform: The total area of open water shading proposed = 1,710sf. ^� Nothing Compares — , RECEIVED JUL 0 2 'L'N State of Noah Carolina 113nvlronmental Quality I Coaswl Mana9cment �.�/ 401 S. Gdffo St.. Ste MO I tLubeth City, INC 27909 DCM_MHD CITY 252-264-39011252-331-2951 If.] North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 2 of 2 e. Floating Dock: Located on the north side of the property adjacent to an existing metal building. A 6' x 50' floating dock for a canoe and small sailboat launching area, Total area of open water shading proposed = 300sf. I. Kayak Launch: A 12' x 22' Kayak launch and access ramp from the proposed boardwalk. Total area of open water shading proposed = 264sf g. Fishing Pier: To be located on the northeast side of the shoreline is a proposed 8' x 78' public fishing pier. Total area of open water shading proposed = 624sf. h. RtM: Place riprap along two sections of shoreline for a total of 100' for an average distance water ward of 5.5' (Max. 8'). Total area of shallow bottom fill proposed = 550sf i. Bulkhead: Construct 132' of bulkhead an average of 3.63' waterward of NWL (Max.12'). Total area of shallow bottom fill = 480sf 2. The current request to modify the permit includes: a. Increase the size of the floating dock (noted in e. above) from 6' x 50' to 6' x 62' for an increase of 72sf. b. Increase the size of the kayak launch (noted in f. above) from 12' x 22' to 12' x 25' for an increase of 36sf. c. Reduce the length if the fishing pier (noted in g. above) from 8' x 78' (624sf) to 8' x 30' with a 16' x 16' platform (464sf), resulting in a decrease in area by 130sf. d. Change the wooden accesses to the walkway (noted on the previous page under c.) at two locations from wood to concrete for ADA conforming access. This will increase impervious lot cover within the 75' AEC by 23sf. e. Add 34' of bulkhead (noted in I. above) 3' waterward of NWL. This will increase fill of the water bottom by 102sf. I. Impervious Cover (walkways and parking): Changes to location of parking and concrete walkways (noted'in a. on the previous page) will result in a reduction of 1,646sf of impervious cover. Engineered stormwater plan submitted with plans to meet the intent of the 30% lot cover requirement within the 75' AEC. g. Other changes noted in the Modification letter include: Not constructing the approved 10 slip docking facility and finger piers (1,705sf), not constructing —153' of wooden walkway for a reduction of 921sf of high ground coverage. 3. The required fee of $100, was received by the Elizabeth City District Office on June 26,2019, from Eastern Carolina Engineering, P. C., Check No. 34727. 4. A copy of the Minor Modification Request dated 06/25/19 is attached, as well as a work plan drawing showing the proposed changes, also dated 06/25/19. 5. 1 conducted a site visit with the applicant on June 25, 2019, and have determined that the request meets the requirements contained in 15A NCAC 07H .0208 and .0209(g) USE STANDARDS 6. It is recommended that the Minor Modification request be granted, provided all Permit CRAI AVRa original permit and subsequent modification remain in effect. JUL 0 2 '19 DCM•MHD CITY AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Richard Olson -City of Elizabeth City Mailing Address: Phone Number: Email Address: P.O. Box 347 Elizabeth City, NC 27907 252-337-6864 rolson@cityofec.com I certify that I have authorized Sean C. Robey, PE - Eastern Carolina Engineering, PC Agent / Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Coast Guard Park at my property located at 708 Riverside Avenue, Elizabeth City. NC in Pasquotank —County. Y I furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Pr rty Owner rma 'on: Received Signature Richard Olson Print or Type Name City Manager Title I 6 I L Date UCMIC RECEIVED This certification is valid through 07 /31 /2019 JUL U 2 1 111 19 ac"Ho CITY 061 Received Permit No.: Applicant' Project Ac NC Division of Coastal Management Cashier's Official Receipt 8 6 5 7 (PC D Date: —�`--` 204 $ /DO•D J Check No.: 3 7 7d 7 Please retain receipt for your records as proof of payment for permit Issued. Signature of Agent or Applicant: Signature of Field Representative: Date: Date: RECEIVED JUL 0 2 A19 DCM-MHD CITY DATE: July 11, 2019 _, NAME:' Ms.:Alic6kedding ADDRESS: 914 Riverside Avenue CITY: Elizabeth City ST North Carolina ZIP 27909 RE: - Coast Guard Park — CAMA Malor Permit — Minor Modification —_{PROJECT NAME} To Whom It May Concern: This correspondence is to notify you as a riparian property owner that City of Elizabeth City is applying for {nsert.propefty owner"_hams or company} a CAMA Major permit Kavak/6anoe-launch.`fishiing pier: steel.sheet.wile-bulkhead,and change=in site.imorovenients,perattached lettedolans: _ on property located which is adjacent to your property. A _copy _of the application and_project drawing(s) is enclosed fo_r, your review: If you have no objections to the proposed activity, please mark the appropriate statement below and return to: as soon as possible. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252-337-6864 {jnsert;Pfione number} or the Division of Coastal Management at 252-264-3901. Since sly, Richard Olson, City Manager V- . I have no objection to the project as described. R h C e m. I\f d rn G l LC(,t' l?/" . yCerQeQa r�r� Print Name ignature of Adjacent Property Owner 00 redd,t A4Ql CLp l , e O n-) Mailing Address and/or mail Address I have objection(s) to the project as described., 7- / / --J 2 . Date 45a-a67-4/4 7 Ph 'CLIVE® JUL 1 6 2019 MP SECTION QI HD DATE: July 11, 2019 NAME: College of the Albemarle ADDRESS: PO Box 2327 CITY: - Elizabeth City ST North Carolina ZIP. 27909 RE: Coast Guard Park — CAMA Maior Permit — Minor Modification _ {PROJECT NAME} To Whom It May Concern: This correspondence is to notify you as a riparian property owner that City of Elizabeth City _ ,is applying for [nsert.propertyLoowner name a company} a CAMA Major permit Kayakkanoe launch fishing pier, steel sheet pile bulkhead and change in site improvements per attached letter/plans on property located which is adjacent to your property. A copy of tfie application and project drawing(s)_ ise nclosed for your review. If you have no objections to the proposed activity, please mark the appropriate statement below and return to: as soon as possible. If you have objections or comments, please mark the appropriate statement below and send your correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you have questions about the project, please do not hesitate to contact me at 252-337-6864 [hsert phbne,number.} or the Division of Coastal Management at 252-264-3901. Sine fy Richard Olson, City Manager .-- I have no objection - to the project as described. Print Name Signature of Adjacent PrWerty Owner W Address and/or Email I have objection(s) to the project as described: Date Phon ribtr EIVED JUL 1 6 2019 MP SECTION MHD COAST GUARD PARK ELIZABETH CITY, NC +'! DECEMBER 21, 2018 - REVISED JUNE 25, 2019 FOR CAMA PERMIT MODIFICATION NC PARTF GRANT NO. 2019-889 NCDEQ DWR WRD GRANT NO. TBD NCDCM ACCESS GRANT NO. TBD VICINITY MAP AREA MAP ants I INUtA T001 COVER SHEET C100 EXISTING CONDITIONS & DEMO PLAN C200 SITE PLAN WITH AERIAL C201 SITE PLAN C300 GRADING, DRAINAGE, UTILITY PLAN C301 EROSION CONTROL PLAN C900 SITE DETAILS C901 EROSION CONTROL DETAILS C902 FISHING PIER DETAILS C903 FLOATING KAYAK LAUNCH DETAILS C904 FLOATING KAYAK LAUNCH DETAILS C905 FLOATING DOCK DETAILS S1.0 BULKHEAD DESIGN OWNER CITY OF ELIZABETH CITY, NC o APPLICANT ELIZABETH CITY/PASOUOTANK COUNTY PARKS AND RECREATION b a «F{ gY RECEIVED tam ww O JUL 022019 >LU o ' 0 rn w~ Keowwharsbelow. w CITY Call before you dig. DCM_MHD DEMOLITION NOTES 1, ANY EXISTING ITEM SHOWN THAT DOES NOT HAVE A NOTE SPECIFICALLY IDENTIFYNG IT AS AN ITEM TO REMOVE OR RELOCATE. SHALL REMAIN AND BE PROTECTED WRING CONSTRUCTION, 2, CONTRACTOR MAY AT HIS DISCRETION. WORK ATH THE CITY TO TEMPORARILY REMOW NE EXISTING UGHT POES THAT IRE TO REMAIN IN ORDER TO FACILITATE CRANE OPERADONS. POLE BASES AND FQUNDADONS SHALL BE PROTECTED. POLES ME TO BE STORED BY THE CITY OF ELIZABETH CITY. 3. THE PROPERTY OWNED BY ALICE REDOING. ADDRESS 7% RIVERSIDE APE. IS A NO TRESPASSAO CONSTRUCTION ZONE. THE CITY HAS NO PERMISSION TO USE THIS PROPERTY DURING CONSTRUCTION. CONTRACTOR MAY NEGOTIATE WITH PROPERTY OWNER DIRECTLY FOR STORAGE AND LAYDOWN AREA IF CONTRACTOR USES THIS PROPERTY IN ANY MANNER. A RETAINER AMOUNT OF 15000 WILL BE MTHHEID UNTIL PROPERTY IS RE-ESTABLISHED TO THAT OWNER'S SATISFACTION. 6 REMOVE EXISTING RIPRAP AND CONCRETE DEBRIS FROM THESE AREAS PRIM TO INSTALLATION OF STEEL SHEET PILE BULKHEADING AND BOARDWALK CONSTRUCTION. CONTRACTOR. AT HIS DISCRETION, MAY RE -USE CLEAN MATER14. NO STEEL OR REBAR MAY BE EXPOSED FROM CONCRETE. AND NO ASPHALT IS TO BE USED UNDER MY CIRCUMSTANCE. CONSTRUCTION NOTES: 1, ELEVATIONS OF SITE ARE CLOSE TO SEA LEVEL. SITE IS PRONE TO FLOODING DURING HEAVY WHO TIDE AND TROPICAL STORM EVENTS, NO ADDITIONAL MONETARY COMPENSATION WILL BE MADE FOR MOBILIZATION OR DEMOsUZADOI OF EQUIPMENT AND MATERIALS DUE TO SUCH EVENTS. SEE GEN TRACT DOCUMENTS FOR TIME EXTENSOiS DUE TO WEATHER 2. CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH 5TE PRIOR TO BIDDING SITE ACCESSIBIUTY SHALL BE THE SOLE RESPOaSBILITY OF THE CONTRACTOR. 1 CONTRACTOR SHALL BE NOTIFIED THAT THE WZABETH CITY PUBLIC UTILITIES DEPARTMENT MAY RELOCATE THE EXISTING WATER SERNCE FROM ITS CURRENT LOCATION TO A NEW LOCATION UNDER THE PROPOSED PAVEMENT FOR THIS PROJECT. �zri= .. n x�M=� n - �OJ LF�I fr A E n - 's I Z a n .Z' e a II E I 5 m I -e T LOW RNER '; E. sue+` f En H,R e m rwW YY }t PRSGUOT PNK -. ut ` r•. I., AW LEGEND J. r 2 Fm1N4 a . ra' RI, u sIN ul Mal MI u aN,wDW row'.t LsIPAIW man am Q Lmnro mwwvmas ,v. In mar R E.zWD uW. W .wE W IzaWD u[ X, 4.w (rW. M, W l Ijl A. W zn EmWc so, uc u*I m uw ND= z [m iF (( Laa xaF' H MS ® [mIM tlA War _ - we. .rt u [ml.c ww.¢„wra[ mt Am EmWD Do NET if {f I no. II fal mW[-nT u 9T ID' ,DS ns i4 ' 1 r4'I°c v eDM gF ,I EmrM IIWP pa/wyli 1 aa- ------- A,^;,�.I n r' a as�Dm,a..�.,rtr now / \ I I I WWun eavP..r A.MXNUMXflr.s-��h.� _ Lon.me m V9Ta [mmw Buvc I I ww.rt a eO.e /N�/ I v. DRWm rDDw 1 ��. L.L \\\ \ e #. -. .W ^ _____ IL.L Z O LU su�iuWAND l r-- KM7 o.Dr. I ° ��l I� e Q z r — — — — — — — _ � rt — x n . n F w � 0 1 W\lyL,t, [mmc ow°rt.D PAcmc mrmDWwNA.w c0 a I I 1 I ----- I —I Q p o w •0 I - - J Lxm., LU AdrN AXW.e,[WP on.: > z .x / I' romu 1: I % Is¢ mnmcm, ro al zMa. m iwars A No, NN La WQQ 1 v n _ �t • .sYPW1r4 PI.Wt I COr� 1 aPC ®(0�ia4-IN ..r e. on E.:' X nl W�c AAA SELF sWi.m W V' g Rw W, .T W mmWD �a W W. Z94d .r m,W.[IPFa [.PR _ I 1 MRDWn.D.aW �.1no WILL. 1 PaWi,W� p In RAY �� on WFa10 RrDU OaIF / W — 3 ----— — — — — — — — — RECEN ° - 68 CITY Y w� 0. x1n M,Nm.p EMY MAY.GW.O � 8m���n" dr.-D. "" a a L. L, YY$¢$¢ �W G 111 Si vi 5 •T— GRAPHIC SCALE Z C) ga �. z ��0 �� K F- I ImIA `Xm'n KDOW what's below. = W 0 0 i Call before you dig. A 0 We STEEL BULKHEAD DRIVING NOTES: I. 1HEeUN0 REPRESENT STARTING AND ENDING PANTS OF EflWAIEF INVESTIGATp! CONDUCTED BY CROFTON DING CORPp1ATON ON DEC. Z. 2015 ON BEHALF OF THE CITY OF ELIZABETH OTT. REFER TO CONTRACT DOCUMENTS FOR THE RESULTS OF THAT INVESTIGATION. Z. NO UNDERWATER INIjyE.S1J{� TION WAS PERFORMED BETWEEN PANTS L EE 3. UPON REVIEW CF OID AERIAL IMA MTVF55 ACCRIHTS, CONDITIONS BETWEEN D kA(g ARE EXPECTED ,NBbSIMILAR TO THOS ENCOUNTERED BETWEEN A 0 W. CONTRACTOR IS EXPECTED TO UTILIZE A PUNCH, SACRIFICIAL PILE SECTION, OR OTHER MEANS TO CLEAR OR OPEN A LOCATION FOR DRIVING THE NEW STEEL SHEETS 5. IN THE EVENT THE PUNCH CANNOT PROVIDE PENETiATON OR SHEETS CANNOT BE DRIVEN TO FULL DEPTH. THE CONTRACTOR SHALL CEASE WORK AND Nonn THE OWNER. 6. OWNER SHALL BE 0v 14 A CREDIT FOR ANY PILES UNABLE TO BE DRIVEN TO FULL DEPTH. ]. ALL SHEETS SHALL BE DRIVEN SQUARE AND PLUMB. NEW BULKHEAD CONSTRUCTION: BASE BID NEW SEES ET PILE BULKHEAD CONSTRUCTION BETWEEN PpnTS L k E . 2 165 LF / /' P\VEft510E PVE 14D.50'vn•,._ .1 F NAW, WAN II I i H LEGEND .TN 0 IR XE PRENC ..IKAs ws..c �aT w wTE m PKI eosNK nw +.n ® nztnc mHIH¢ WHwa[ o W WXT pRET [WSH, wT IRA EAI AKRA WMHT ® EID 44A WHIM.[ Y NARA WHIP Fz PKIRK,, NT1 0 — — D_ 111 Y .oPrnI.a wW Q T whH a M 0 Q Q Z - mHHKI. a cwD /1� LL• w 0 J U _ _.._.._ IAFAK Ta a en. Lm,.c W.�WW.o -----__ Q 0 7 as V) U wzr�.�Pae .R.HLT I_ V Q' a C _ U m/Art 1, 1 W C _ 3 wStwL W.WT > U z om♦s Eww:a U) W 0 .w�AmoWrt PWW Q ED 0 �a�F p ED W Y� E% �P� IVED a!,E RECE of i JUL 0 2 2019 CITY €s DCM-MHD ♦ � x$y3 E�Ssia J zg GRAPHIC SCALE Q ofO WW Jw e(mnv ig O 9 ~� CN � la KnowwhatSbelow. m DO 1 ImG - m M1 C211 before you dig. STEEL BULKHEAD DRMNG NOTES: 1.�(D1 REPRESENT STARTING AND ENDING POINTS OF i U ERWATER INVESTIGATION CONDUCTED BY CROFTON DMNG CORPORATION ON DEC. Z, 2015 ON BEHALF OF THE OTY OF ELIZABETH QTY. REFER TO CONTRACT DOCUMENTS FOR THE RESULTS OF THAT INYESTIGAnON. ]. NO UNDERWATER IrSa5ATICN WAS PERFORMED BETWEEN POINTS O W E S. UPON REVIEW OF 0.p AERIAL IMAG A "THE55 ACCOUNTS. CONDITIONS 94EM D R E ARE EXPECTED Jp VIMILAR TO THOS EX NTEREO BETWEEN A p ♦. CONTRACTOR IS EXPECTED TO UTILIZE A PUNCH, SACRIFICIAL PILE SECTION. OR OTHER MEANS TO CLEAR W OPEN A LOCATION FOR ORINNG THE NEW STEEL SHEETS 5. IN THE EVENT THE PUNCH CANNOT PRONDE PENETRATION OR SHEETS CANNOT BE DRIVEN TO FULL DEPTH, THE CONTRACTOR SHALL CEASE WORK AND NOTIFY THE OWNER. 6 OWNER SHALL BE OWN A CREDIT FOR ANY PILES UNABLE TO BE DRIVEN TO FULL DEPTH ). ALL SHEETS SHALL BE DRIVEN SQUARE AND PLUMB. NEW BULKHEAD CONSTRUCTION: BAv BID NEW STEb SI ET PILE BUU[HEAD CONSTRUCTION BETWEEN POINTSC Q E . x 165 Lf O— PBWDTPR K RNER p .¢ P,'prR.NK Ro[.-ixl inwosn n' . a' Na,xc - ro ,o.IW.N. � - r sv ro eorwrw c.Kan.rr w.�w MM(/O R Mf(w(rm xRr upgEANIr :9R M1MryM1 py 3py� nC —I # _ _ C Q y I II r-------------- 'w-w°ioo1A F— 1 ¢ WJW1[ S 4:a4 1 1s'R nW�nuiMm�n imL.Fo I�,Iw W91�) 9 J N �, I a. [ �®1a.wN wW<sI � i it 4 1 I I / R�R� 1 I I Illr N I I I II I I I I I I I II I 0 IA p'S Rey � �I vleJ H [pG oN <aM£ ! MnNnary a xl I.s..-� I [mmc uerM I I I I I I I I - I I I I I I I I I I I I I i 1 -„w — — .— — — — — — — — — — — — — - - T — — — — L J r S w "' LEGEND 0 WPP PW. ([ wr a ru mnR WT ® r o r VIANA Wm r[LI w p1j cxsrwc ..m vyW LL Z Q Z o — .T, uW a w U �T� Rraxr.11 UN ¢sews rta Y <Z U 0 a o U _ (L Uj [ MMK ¢MAWL > U Z n I.,..i<axortrt awns //1 N F 0 wFco� cvwo[rt < oc) 4_1 a W .RW O o J a � � U W GRAPHIC SCALE IK Pon I Ilan - . N RECEIVED 136 JUL 0 2 2M DCM-MHD CITY€ m o �g SM1^ �gm»xss_' w 0 63s�s� Z w0 a f N LU wU Know what's DBIOW. Tn Call before you dig. W " sum aHW-ma t ao inr 03AI333U A M es �� n I ,I _�. aE www �asv ` •o 'e (L. ue nmosw aars o. 8.. l _e e `rfi� s'tc ewr✓wrlem.Swl. ' �Z a la RW,xF 2N/D RSx cariN.w �YwT pSv �Orti °suwv vx I M'. Sm Rq � I # ------- -------- f I I; r ' I I I 1 � I -- - - - - - - - - -- LNOYU a.w MESNveias' .avaoa�sr/�wc. I _ I lax —, e I m .n Nn.R� sE� ol.»a. I I I ® Exnxc saw a.E.�oiE I J I I °®< ate: "eaesana, f I si aaa � roe•. / I w wapw w�c xix� "—,. I I 1 rewnn eamou. xE w,aa , ,...E Iz.s ,oa -- - Easme anal.. E.a s� — s Exwx w.an .„E Fa U I C _ � are ,yyy �.,. p< un � wnarn/a�v2rt °Eems �L M �T T au W. w e Ew nawn e°. w,» ua* �°i. W. 0� wwn�Ea W awL¢xl RXa➢ Eit SiOY SMKNE. CWa r� f I.YF'OR61aE5'°m1CnE e•Ov.rt AEl I sz w.oE rnaaa nle. waw _—a _ a �.MM rt m.�Ecaa Exw� °n E � .. ' °.a ' I I ra mac �'siwS. &m Y w z Q Z o a_ W > Z Q Q Fz W o0, O Q o a< of a ul > z co E W m O o U w a � w Na i eviAm a— m SS Z W GRAPHIC SCALE Z Q 0 d w o ¢zr 2CM ' 0 a J w V lie m l R KIIOW what's bOIOW. i p F i Call before you dig. 5 y. p ' 77 - a v es s a m o. d� s am cf a e MEET TITI£'. REV191CM9. Pmpe1X'. 180023 NUM. DATE EROSION CONTROL CnMnpX 1^BpWp PLAN �m :CR epPm..a: acR SHEET NUMBER. DR.W.✓'"' C301 S.1. °' SaM'. 1'=30' Ili `Y]N' 4-o (b oo,,C .. 4 ry �T I OEKFOPTION COAST GUARD PARK 708 RIVERSIDE AVENUE ELIZABETH CITY PASQUOTANK COUNTY NORTH CAROLINA T ENGINEERING, PC EnPmenlne - S.—", connmoaon M.nM/mem ww e.emmrtcpn.enpmeeang mm PM1om: C-.163 S. U3 Hw313. E.rt. C.mJ.n. HC]HI1 IT vw -.T. mnu'.- m.s: o:1.. nV4AOJuciwe�` In AT POROUS FLEXIBLE PAVEMENT DETAIL .' . .T .6x is ... n.®� OF I LIGHT DUTY ASPHALT PAVEMENT sw; ,T� .. P. s. ..,.... ,rN RESERVED ��RP ��'(((A(((]RING �'��' PE�M .;uTv f35U smu ucs ACCESSIBLE PARKING & WALKWAY DETAILS nR J dv a v 4 a �m «< �T e SIDEWALK EXPANSION JOINT /\ .. \\�\\m\ji\a/ / oo_ `i`iiAll Rd A' rttle M 9A�.0 .L T ems .wY x W AYE T. .. , ,1l PALMING OFI INFATION LINE r 4' sassessas OIRGONAI IINE 1r ®T PAVEMENT MARKINGS LINE TYPES �1 1 TO. wo w� E .. OTTE YE PLANS CULVERT T' STANDARD 2' x T DROP INLET xR 1-Y P.-ew PRECAST PARKING BLOCK e o aT A; GRATE DETAIL anw.arcw.m iw.Lo �� PVC DROP INLET DETAIL ...oL.R. L,w M.I It' . . cw -1 . IT ON111.CTP VSr MS M15 i.MORD.. ,n k RECEIVED , JUL 0 2 `D'9 FRAME DETAIL ITY Q' W z Q O � W Y � Q Q ¢ rz w °0 Q o as cf) U � a F W > °z co F Q CC) m p o w is 0 .. w O J w0 ITT �Lu =Uw Know what's below. Call before you dig. "TO YE PLANS CULVERT T' STANDARD 2' x T DROP INLET xR 1-Y P.-ew PRECAST PARKING BLOCK e o aT A; GRATE DETAIL anw.arcw.m iw.Lo �� PVC DROP INLET DETAIL ...oL.R. L,w M.I It' . . cw -1 . IT ON111.CTP VSr MS M15 i.MORD.. ,n k RECEIVED , JUL 0 2 `D'9 FRAME DETAIL ITY Q' W z Q O � W Y � Q Q ¢ rz w °0 Q o as cf) U � a F W > °z co F Q CC) m p o w is 0 .. w O J w0 ITT �Lu =Uw Know what's below. Call before you dig. "TO �.a 1e romW'ao' mars v D I zs saw I1211�YN. 'P SECTION A I �j Y w¢ n9uc wr W.6'W i, awOp� 4' 5 0 —5 —10 a .omu'i 5 —20 —25 —30 —35 r.r SECTION E - BOARDWALK CROSS-SECTION r.r F. a .. r a a s O FISHING PIER PILE PLAN HORIZONTAL SCALE: 1" = 10' VERTICAL SCALE: 1" = 10' SECTION C 2 %off Kra, .mw�w ET. 5 0 —5 —10 —15 20 __............ —25 —30 —35 Milli mii�iimjjjjjjm MwPJ o� x➢ arse JOIST CROSS -BRACING r-r ALL FISHING PIER PILINGS ARE TO BE PAID FOR BY THE UNIT PRICE. 1Rµ xnl CY ALL BOARDWALK PILINGS SHALL BE PART OF THE BASE BID. SECTION D - ADA FISHING SECTION r-r .., I V "LJ JUL 0 2 9 M—miHD CITY w Q z O W Y > zQ c) Q F LLI O Q 0 O K aQ Na Of >a> F W F K = az U) Of w Q OO m BOLT LENGTHS ARE PROVIDED AS ESTIMATES ONLY CONTRACTOR SHALL VERIFY ALL NOMINAL BOLT LENGTHS AGAINST DIMENSIONS OF MATERIALS USED. CONSTRUCTION NOTES $ 1. RUNDE, MSTS. ORDERS. AND CROSS -BRACES 52 SHALL BE TREATED IN ACCORDANCE WTX ANPA i UC5B. 2, DECK BOARDS. RNUNG POSTS. AND RAILING SNALL BE TREATED IN ACCORDANCE NTH ANPA UC3B. t7 O 4 3. ALL LUMBER SHALL BE SOUT ERN YELLOW PINE "' m 'ao00' GRADE 2 OR BETTER. m�mmm�a= C SEE WECIFICATORS FOR MORE INFORMATION. m E oe Lu�p` a � N w Q zW _ =V Know what's belOW. Call before you dig. ti E Y s LLI a TM a uR uKUK w.0 x�r sx �8 DOCK BUILDERS STANDARD DOCK FLOTATION SIZE RECEIVED JUL 0 2 2019 DCM-MHD CITY w z Q z o W Y i Z Q Q ~ z W =0, O Q o aQ Z) U) U W a F W H > mz w to O O g U W c� o QY = .• s € k-%, 0 MA BOLT LENGTHS ARE PROVIDED AS ESTIMATES ONLY. (� co CONTRACTOR SHALL VERIFY ALL NOMINAL BOLT Z U d w o LENGTHS AGAINST DIMENSIONS OF MATERIALS USED. w Q}Z< P°�SWZ( Know what's below. w v_ Cell before you dig. " BEEII WANDS A'. A, EroT EortT'Az`TR) .1 WAS E MANDAN aoRAu .t RIPRAP SHORE STABILIZATION NEED .- A Ar N.E mrs CONSMUCnCN AND DOMINATE' SESTAI IINSTATIM NO BE MAY SEAT, 1, SATISFY UAM— T. 1. 'AEAA .1 MAY NYSE ITTATETTES AN ENDS ME TON OF AND EXACT FAMETSI THE NAME RETNIOTTACWEN� NEN TIE IMITATE— "I SAYS . SO ATTEND . SEMI NOTE, MATE EST NIT IS EYE STASULD A, ... A, STAND MENAME, AUMS THE . LINE OF POSTS ANTS ASESSE 1. THE � z ¢mawo- wN.cnw a DE uar.L IS STATION. TO BUT NEEIa wD EN AANN�Nµ REAAN M ;m D.a B �b SILT FENCE DETAIL TETI TIEa D� 4 A ASSENT. M� T w DE E� To MY SEEDED UNE. BE . AREASIASAMI TO�TMsT. �.� AN SOL IS FASTEN OR EXTREMELY MET ANTE ill ANY U. ,s V/AND OMNM .1 UNAL W6NE Wa ML sGrtD 1. TESTS 01 A 154S) AND ..../xOE 'EADMI ANAUST A,AY :UA E R ,�.. a ..I�,E. OF ANOT.. ST.,.aE axeAMONOM 'ETANK .1 MAYS, rs ua Mi.w �D-o--RMAN--' AD" AS aLVD ANDS, A rs d,U. — .w°R UEONE Eu EEMAY a4E6 RPI42 AND NAOE DwKLD MF/5 a�Os..h 1 SEEDING & MULCHING A ND%IT DATE . STONE aINL K USED TEENS SETTLE BE INSTATTLED .T T' ANNUMMUM DEATH B. PEADAIL AIDED CMINIMEfENEWEESEMs OF BE WIN. N BEAM. WINsx.0 x ME Ol MINIMUM w Nu NDm m c. TLEMI FTTaUs aTUDENT TO FCIYYMEDATE VRq RYCxs TO BE NIOXCE➢. n ENTYANCE(s) SETTLE BE LDUSD TO FADMIE FEN NA01.V UnuTY BY I.LL CONSTRUCTION .E.UELE, E .TONIIPFCRN NANDI TOPEASSOMI MMTM BETTIE 1 ei NCCESy BD CB DIRECT TINY R MUD . AFTER ETTCE TAINFIu EL£xT. INSPECT AND CIEw AS NECESSARY G ANY MATEWk WEIGH IS MRCxED ONTO ALyWENT MAND BEALL BE NENONED IMMEDIATELY, CNN, �•) 10 eN° � y e iD� TEMPORARY GRAVEL CONSTRUCTION ENTRANCE TEST i., I E CCATNEAL LA � a° n )ANDE RE) IAI SEMI DE, % ' B.nxz. N.nx....Ex-1IT ITTATTEASESS ITE.1 1. A -I NEDET, M I DA �° ND A� EROSION CONTROL MEASURES EVEOS TO t. M TY A N AT ANN 9 BEE BEFTEUT OAT BAY am4l MORE SE LEI I ON PO a x[LT DAMNED B w u/.R. s , AUD10auSmMAMUSTwETER/ADE N N.., .RAMA /DEEYE DD DI a (aAM. s TABLE� s TNLEAST T SIT ME, E_a, D, SEEDING SCHEDULE TANT, TUATTEMAN, SAI STANS. ANAMANDS MMEN. )ASE rc,tt) ANI P Ca11F4 DEx3T AT SEE aYwM¢ NAMES N A¢q1, SET ITT T0UNKNV 1. E. MADE. w."N )� ERE w "III I ON E nM .'OREMEW AN ME M WGM Tq. A: ET SEA OEE Y. SAYSA,E SETTEES IE.avRYEN RME[RRS AR4� ED(T). AND . M, TEFFAn nl r D I uN BY. MNE ED IN STEAMED A rAlAMENTEN -WA (TATNm.MY ON ASENENT' ONSAYS FOR TUBES E. NEW - CE �°s =oET EUA MOES�, AND STRANNATEN DIME A'ENBxT6. RTdET w0 aflEs•rte MM) E AND T ALED waNDE cwEw EE.NAET A ON. .'AN. Is 1. . nE CwExn mas CONSTRUCTION SEQUENCING .1 MENES ru RBY , I Mez SAN a SUIT UPON ANS EMEE IMME R I WAYEEI E,cm SAMALL EST I.B.SONEI BE —1THE r�F' n[Aumr u� NNEDY, "'M xN ER .1 }ALE ME """NEW � .DOES E"'�'�D w BY. A Nw.A BE ED•TE AND TME vt ASTANN a IfsiP.Y Off FOR u5E AT E%RLNC CURD MtEi TIE DAYEAMENTS DEAL xNMODa MENTED +LEE. ED MEN, AcnNI.. o-.1 NAM ENT. 11 NT, TIE ME MOOT AND BE— — ITATTES NEW A SO ISSUE. EE E roe xcwww MANT BY GEOTEXTILE FABRIC INLET PROTECTION STES .E1 ENTE 1. OF TIE STEAM UNTAN BY SUPPER' ED pnEEIEN. 0..IFG 1 - TO ST-WEET IN KXSxBE ON END rt/ 6 M BLOCK ON A 11 RW.Of F6 OW N,LTTW ANAT BASSO A, BUTTED. rsm , N FAN VIEW `TO BE.w.: U,' T� EE aa. NO aENTER Y MY A."m°, R q Ai /Tro/ Ob =I I=I I I 1 I MI 11=1 'j��iTi��1=i ao w[, wlx ENALB RECEIVED 4UL0 ? 'T9 DCM-MHq CITY Y w Q Z o a- w , Y ❑ Q F Z w °o Q o aQ w H > _ °z U) Q CC) m p o U w sErnoN new FOR u5E NAM PROPOSED DROP INLETS BLOCK AND GRAVEL INLET PROTECTION 1 `,«.n M ova n� .xwin w+x (.l �K rxrw� uw.2 m.rs �av�¢. ro a« sows ww u� no au nwza sw as .w u« eo.m a( na a+a swwas am. z+sw'az (Tn) FT FE �sf _ :ow , , ,o —, e i TM m no an zr..us zna iao+n-izwunorto �wr _._ I" I („ RECEIVED JUL 0 2 2019 DCM-MHD CITY T IN INSET A ROLLER MILE WIDE Ri5 E Y W � Q z a Z. Y > zQ 0 Q �z W �o Q � O W a W H > _ °z f- w 4m4 O O N U w it Na e Y s` € l s, d�3o`` _ cM z 0 a z�='�` OKnow what's DBmW. w w U Call before you dig. e SECTION A —A' <rn� lrwJ o0 RECEIVED a e JUL 0 DCM-MHD CITY w z c��■1ll�lil�l®�■�ii -- -i__. �®le�■i..._ I I ■ ■ulll�llll®I■�■1•I■�I�i MEI ■■■■■■Iwl ®■ _ I■�I■w■I��I�,I I® �,II�111�1111•IV■I•■�II��II■w■■�I III®II�11111I ■1• ■III■®II■N 1■®ICI■�I®u■I®�I I® u Q p Z o d w Y C Q ZQZ ~ w 0o Q A0: (n GL U --• rs-r .{ s-a .{ s-s a F (Ij Uj v w PILE LOCATION GUIDE > U Z H O 00 m �a M� U o - DOCK BUILDERS STANDARD DOCK o FLOTATION SIZE 3 az ya 0 ss = a � ouBo�A BOLT LENGTHS ARE PROVIDED AS ESTIMATES ONLY. Z Y LO J CONTRACTOR SHALL VERIFY ALL NOMINAL BOLT � r U Q w � LENGTHS AGAINST DIMENSIONS OF MATERIALS USED. QO Q W w Jac)Know what's below. i LL Call before you dig.