HomeMy WebLinkAbout19-16 Duke Energy Progress LLCPermit Glass NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Duke Energy Progress, LLC, 400 S. Tryon St., Charlotte, NC 28201 Permit Number 19-16 Authorizing development in Brunswick County at adi. to the Atlantic Ocean, Parcel # 25lIA021, Caswell Beach Drive, Caswell Beach , as requested in the permittee's application dated 11/19/15 (MP-1), 10/01/15 incl. attached workplan drawings (3), as referenced in Condition #1 below. This permit, issued on February 12, 2016 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to tines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, all development shall be carried out in accordance with the attached workplan drawings (3), C2-C4, all dated 6/19/15, and AEC Hazard Notice dated 11/19/15. Ocean Hazard Development 2) Unless specifically altered herein, this permit authorizes the land disturbing activities associated with the development of the above referenced property, including the communications tower and fence extension, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910)796-7215 for this determination. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. rr- e- &d1Ar rcw, BraxtdAT. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Petmittee Duke Energy Progress, LLC ADDITIONAL CONDITIONS FemitNo. 19-16 e 2 of 3 3) All construction within the Ocean Hazard AEC shall comply with all applicable requirements of the N.C. Building Code and the local flood damage prevention ordinance as required by the National Flood Insurance Program. If any provisions of the building code or the flood damage prevention ordinance are inconsistent with any of the following AEC standards, the more restrictive standard shall apply. 4) The permittee shall, in coordination with the Division of Coastal Management, determine the static vegetation line and corresponding structural setback requirements. All authorized development shall be located landward of the appropriate setback lines. Construction shall begin within sixty days of this determination or the determinations shall be considered void, and new setback lines shall be re- established. In the case of a major shoreline change within that period, a new setback determination may be required before construction begins. 5) Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two (2) years of the time when it becomes imminently threatened, and in any case, upon its . collapse or subsidence. However, if natural shoreline recovery or beach re -nourishment takes place within two (2) years of the time the structure becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary protective measures allowed under CRC Rules. Sedimentation and Erosion Control 6) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). 7) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. General 8) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third parry without the written approval of the Division of Coastal Management. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including but not limited to a Stormwater Permit from the Division of Energy, Mineral and Land Resources. NOTE: Future development of the pemrittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. Duke Energy Progress, LLC Permit No.19-16 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The U.S. Army Corps of Engineers has assigned the proposed project Action ID No. SAW-2016- 00047. NOTE: An application processing fee of $400 was received by DCM for this project. HOW RFUCAII'N fOl Mehl 19WONNe1t F8M t (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary ApplicarW Landowner Information Business Name Duke Energy Progress, Llc Applicant 1: First Name I MI Kenneth D Applicant 2: First Name MI Project Name (N applicable) Caswell Beach Tower Replacement Last Name Brooks Last Name if additional appi", ts, please a8ach an add0wa/ paga(s) wfur names listed. PO Box C Mailing Address h Charlotte 400 south tryon st ZIP Country Phone No. 28201 u5 704-868-6302 ext. State Street Address (#diflereN hom above) City Email Dale.Brooks@duke-energy.com 2. Agerwcontrector information Business Name i.n. rnnhnr-Linn State NC FAX No. ZIP Agent/ Contractor 1: First Name MI Last Name Calderhead Mike Agent/Contractor2. First Name MI Last Name PO Box City State Mailing Address Concord NC 812 Biscayne Dr Phone No. 1 Phone No. 2 ZIP 704-720-7269 ert. - - ert. 28027 FAX No. Contractor # Street Address (d different from above) City State ZIP Emait <Forrn continues on t1a0iP =x - lvcv DCM WII_MINGTON, NC DEC 1 ld 2015 252.808-2608 :: 1.888.4RCOAST :: www.ncco asta lmanagement-net JAN 0 6 " "i Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit oject Location (can be multiple) Street Address 3tete Rd. M ick Caswell Beach Rd [Subdivision Name City SMe ZipCowell Beach NC 28465 -oneNo. Lot No.(s) (if many, attach additional page with list) ext. a. In which NC river basin is the project located? b. Name of body of water nearest o proposed project NA Cra Atlantic c. Is the water body identified in (b) slime, natural or manmade? d. Name the closest major water body to the proposed project $de. ®Natural ❑Manmade ❑Unknown Atlantic e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ONO work falls within. Casell Beach 4. Site Description a. Total length of shoreline on the tract (f.) b. Sae of entire tract (sq.ft 1000, 207 acres or 9015920 Sqft c. Sae of individual lot(s) d. Approximate elevation attract above NHW (normal high water) or NWL (normal water level) (Ifmany lot sizes, piease attach addi0onalpage with .list) 9' ®NHW or®NWL e. Vegetation on tract grass f. Men -made features and uses row on tract metal building and concrete foundation g. Identify and describe the existing land uses adjacent to the proposed project site. industrial pump station discharge for Brunswick Nuclear h. How does local government zone the tract? 1. Is the proposed project consistent with the applicable zoning? Industrial (Attach zoning compliance certificate, if applicable) ❑Yes ONO ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ®N ❑NA If yes, by whom? Tower Engineer Professionals I. Is the proposed project located in a National Registered Historic District or does d involve a ❑Yes ®No ❑NA National Register listed or eligible property! t-i- ECEIV._D <Fonncontinues onnext pagriCEIVED DCM WILMINGTON, NC JAN 0 6 2016 DEC 16 2015 252.808-2808 .. 1-888.4111!COAST ., www. nccoasta[man age meet.net DCM- MHD CITY APPLICATION for Form DCM MPA (Page 3 of 4) m. (1) Are there wetlands on the site? (ii) Are there coastal wetlands on the ste? (Ili) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) n. Describe existing wastewater treatment facilities. City of Caswell o. Describe existing drinking water supply source. Town of Caswell Beach p. Describe existing storm water management ortreatment systems. NA Major Development Perrnit ❑Yes ❑Yes ®No Oyes ONO 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑Publie/Govemmem ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. 80 foot Communications Tower for Brunswick Nuclear Microwave site Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type c. of equipment and where it is to be stored. t crane to be stored on site d. List all development activities you propose. na e. Are the proposed activities maintenance of an existing project, new work, or both? Construction of metal tower f. What is the approximate total tlstinbed Wnd ama resugsq from the proposed Project? 2000 sqn- ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ONO DNA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. none 1. Will wastewater or stomtva ter be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ®No DNA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Forrn continues on bast CEty ED RECEIVED F{tv v 252-808.2888 1-888-4RCOAST .. www.nc o a stalmanagement.net DCM. MHO CITY DEC 16 2015 ,NC APPLICATION for Form DCM MP-1 (Page 4 of 4) Major Development Permit 6. Additionallnfonnation In addition to this completed application form, (MP-1) the following items below. if applicable, must be submitted in order for the application package to be comPkrte. Items (a) — it) are always applicable to any major development application. Please consulf the application instruction booklet on how to property prepare tli required dens below. a. A project narrative. b. An accurate, dated work plat (hhcluding plan view and cross -sectional drawings) drawn to scale. Please give the preeem status of the proposed project. Is any portion already complete? If previously auahonzed work, clearly indicate on maps, plate, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the dead (with state application only) or other inebur bent under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Town of Caswell Beach Phone No. Address 1100 Casell Beach Rd, Caswell Beach, NC 28485 Name Guy R Deacaducci Phone No. Address 5505 Orchard Hill or Raleigh, INC 27613 Name Oceangreens HOA Phone No. Address PO Box 335 Oak Island, NC 28465 g. A list of previous state or federal pennas issued forwork on the project tract. Include permit numbers, permdtee, and issuing dates. NEPA, SHPO and THPO Not received Duke Energy Progress, LLC h. Signed consu@ant or agent authorization form, 9 applicable. i. Wetland delineation, If necessary. j. A signed AEC hazard notice for projects in oceanfront and Inlet areas. (Must be signed by property owner) k_ A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), ifnecessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge, Date 11-19-2015 Print Name Dale Brooks Signature Please indicate application attachments pertaining to your proposed project. []DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ❑DCM MP-4 Structures Information RECEIVED RECEIVED DCM WILMINGTON, NC JAN 06 2016 DEC 1 6 2015 252-808-2808 .. 1-888-4RCO AST .. w�r�kPc c.o �s }ietpa le ant -net VL •r;t Form DCM MP-3 UPLAND DEVELOPMENT (Construction andlar land disturbing act(vities) Altdch this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 1 c. Density (give the number of residential units and the units per acre). 0 e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ❑Yes ONO ®NA (ii) If yes, list the date submitted. g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. N i. Give the percentage of the entire tract to be covered by impervious and/or buih•upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 0001 j. Describe proposed method of sewage disposal. Town of Caswell I. Describe location and type of proposed discharges to waters of the state (e.g., surface mnoff, sanitary wastewater, industrial/ commercial effluent,'Wash down" and residential discharges). 0 b. Number of lots or parcels. 1 d. Sae of area to be graded, filled, or disturbed including roads, ditches, etc. 2000 sq It L List the materials (such as mad, paver stone, asphalt, or concrete) to be used for impervious surfaces. concrete h. Projects that require a CAMA Major Development Pert may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Dtality for review? ❑Yes ®No ❑NA 10If yes, list the date submitted: k. Have the facilities described in Rem (i) received state or local approval? ®Yes ONO ❑NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? ❑Yes ®No ❑NA If yes, attach appropriate documentation. RECEIVED RECEIVED JAN 0 6 2016 DCM WILMINGTON, NC DEC 1 6 2015 252.608.28082 :; 1.888.4RCOA3T :: www.ggcoastalman t vmen-.a t revised: 121`26106 Form 0CM NIP-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, community, public system, etc.) Public o. When was the lot(s) plettcd and recorded? Date 10-01-2015 Project Name Gawell Beach Tower Replacement Applicant Name Dale Brooks Applicant Signature n. (1) Will water be impounded? ❑Yes ®No ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be Installed for this upland development? ❑Yes []No ®NA RECEIVED JAN 06 2016 RECEIVED DCM WILMINGTON, NC DCM- NIND CITY OEC 16 2015 ::1-888.4RCOAST-manaaement�not revised: 12/26H1G OCEAN HAZARD AEC NOTICE 14— Project is in an: Property Owner: Property Address Ocean Erodible Area High Hazard Flood Area Inlet Hazard Area Date Lot Was Platted: 1 G This notice is intended to make you, the applicant, aware of the special risks and conditions associated with development in this area, which is subject to natural hazards such as storms, erosion and currents. The rules of the Coastal Resources Commission require that you receive an AEC Hazard Notice and acknowledge that notice in writing before a permit for development can be issued. The Commission's rules on building standards, oceanfront setbacks and dune alterations are designed to minimize, but not eliminate, property loss from hazards. By granting permits, the Coastal Resources Commission does not guarantee the safety of the development and assumes no liability for hmture damage to the development. Permits issued in the Ocean Hazard Area of Environmental Concern include the condition that structures be relocated or dismantled if they become imminently threatened by changes in shoreline configuration. The structure(s) must be relocated or dismantled within two (2) years of becoming imminently threatened, and in any case upon its collapse or subsidence. The best available information, as accepted by the Coastal Resources Commission, indicates that the annual long-term average ocean erosion rate for the area where your property is located is _2� feet per year. The rate was established by careful analysis of aerial photographs of the coastline taken over the past 50 years. Studies also indicate that the shoreline could move as much as Leet landward in a major storm. The flood waters in a major storm are predicted to be about __4-- feet deep in this area. Preferred oceanfront protection measures are beach nourishment and relocation of threatened structures. Hard erosion control structures such as bulkheads, seawalls, revehuents, groins, jetties and breakwaters are prohibited. Temporary sand bags may be authorized under certain conditions. SPECIAL NOTE: This hazard notice is required for development in areas subject to sudden and massive storms and erosion. Permits issued for development in this area expire on December 31 of the third year following the year in which the permit was issued. Shortly before work begins on the project site, the Local Peruut Officer must be contacted to determine the vegetation lice and setback distance at yout site. If theproperty has seen little change since the time of permit issuance, and the proposed development can still meet the setback requirement, the LPO will inform you that you may begin work. Substantial progress on the project must be made within 60 days of this setback determination, or the setback must be remeasured. Also, the occurrence of a major shoreline change as the result of a storm within the 60-day period wilt necessitate romeasuroment of the setback. It is important that you check with the LPO before the permit expires for official approval to continue the work after the permit has expired. Generally, if foundation pilings have been placed and substantial progress is continuing, permit renewal can be authorized. It is unlawful to continue work after permit expiration. For more informadon, concoct: Local Permit Officer iZ-7 Gh2dfnlAL- De. 11yt�M.1tJ6-MtJ-0C Z.C-4Us __- Address 1-ve- Tt�eTOm1JN Or K-A,wELL e=plc--tF Locality 11C -'7'1b 21-2'3 Phone Numbor RECEIVED The applicant must acknowledge this information and requirements by signing this notice in the space below. Without the epproper Qsignature, the application will not be complete. x� � Al // A Property Owner Signature Date JAN 0 6 2016 DCM- MHD CITY Rt_-.CEIVED DCM WILMINGTON, NO GEC 1 6 2015 Revised May 2010 Coastal Management ENVIRONMENTAL QUALITY February 15,2016 Duke Energy Progress, LLC 400 S. Tryon Street Charlotte, N.C. 28201 Dear Sir or Madam: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Y I/ 11V4— Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management �Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-2808 T DCM Coordinator:_ MAILING DISTRIB TION SHEET Permit #:. ICH�_ I DCM Field Offices Elizabeth City Morehead City Washington T_.-% US ACOE Offices: Washington: . Wilmington: Cultural Resources: Public Water Supply: DCM/ Fisheries Specialist NC DOT: DMF/ Shellfish Sanitation: State Property:. Water Resources: Washington: (with revised work plan drawings) Raleigh Bland William Westcott (NC DOT) Bill Biddlecome (NC DOT) y er Crum rz are e Gle' hill rPy ane illiams ) Joey White (WARD) Shane Staples gg Bo Patti Fowler Karen Higgins (Raleigh) John Hennessy (NC DOT) Anthony Searbraugh-401 Wilmington: Joanne Steenhuis — 401 Cob �= 40 DEMI,R Washington: Scott Vin water . Wilmington: G rgette co - Storm r Wildlife Resources: aria Dunn LPO: Fax Distribution: Permitee Agent #:. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Duke Energy Progress, LLC 2. LOCATION OF PROJECT SITE: Project site is located on Caswell Beach Road (Parcel No. 251IA021) in Caswell Beach, Brunswick County. Photo Index - 2006: 8-6170 Q-18 2000: 8-77 P-18 1998: 6-117 P-3 State Plane Coordinates - X: 2286853 Y: 55148 Lat:33°53'51.92"N Long: 781 03'16.90"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 12/3/15 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received—10/30/15 Complete - 12/16/15 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Caswell Beach Land Classification From LUP - Industrial (B) AEC(s) Involved: OH- OEA (C) Water Dependent: No (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - Municipal Planned - N/A (F) Type of Structures: Existing — Metal building, microwave tower and concrete foundation Planned - Install new communication tower (G) Estimated Rate of Erosion: 2 ft./yr. Source - LTAASCR 2011 Update 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands §404 wetlands (B) Non -Vegetated Wetlands Other — High ground 2,000 sq. ft. (D) Total Area Disturbed: 2,000 sq. ft. (0.05 acres) (E) Primary Nursery Area: n/a (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant proposes to construct an 80 ft. self-supporteR ECE IVED communication tower with associated concrete and fencing. Page Two 9. The project site is located on Caswell Beach Road (Parcel No. 251IA021)) in Caswell Beach, NC. The project area is located near the Atlantic Ocean, within the Town of Caswell Beach, in Brunswick County. To find the project site, travel south on US Highway 17 to NC Highway 133 South. Travel approximately 22 miles south on NC-133 to Dosher Cutoff SE/ NC-133.Tum onto Dosher Cutoff and then turn right at Southport -Supply Rd. SE/ NC-133. Travel approximately 0.8 mile and turn left onto NC-133. Travel on NC-133 to the Oak Island Island bridge and continue straight to Caswell Beach through the stoplight. Travel approximately 1.5 miles to the subject property which will be on the left. There is a locked gate at the entrance, contact Mr. Dale Brooks for access (704-868-6302). The lot has a total area of approximately 207 acres, but the project area is directly adjacent to Caswell Beach Road in the Ocean Erodible AEC. The project site area is vegetated primarily with domestic grasses and shrubs. The site is the Caswell Beach pumping station for Duke Energy Progress, LLC and consists of an Ocean Discharge Pump Structure, the Caswell Beach Power Electrical Switch gear and Control House and the Caswell Beach Substation. According to the applicant, the property has an approximate elevation of 9 feet above mean sea level. The static line is located approximately 335 ft. oceanward of the proposed tower location. The property has a perimeter fence around an existing metal building and meteorological equipment tower (MET) tower with concrete foundation. The long term erosion rate for this portion of Oak Island is 2 feet per year. The 100-year storm recession line for this area is 300 feet, creating a total Ocean Erodible AEC of 420 feet. The proposed communication tower is within the Ocean Erodible Area of Environmental Concern (AEC). Setbacks in this portion of Caswell beach are measured from a static or fixed vegetation line, unless the actual first line of stable, natural vegetation is more restrictive. This static vegetation line represents the first line of stable, natural vegetation that existed prior to the large-scale spoil deposition project. The vegetation line used for Oak Island is based on the 1998 vegetation line, as described in NCAC 07H .0305(ax6). The actual first line of stable, natural vegetation is located oceanward of the surveyed static vegetation line. The waters of the Atlantic Ocean in the vicinity of the project area are classified SB by the North Carolina Division of Water Resources. The area is not designated as a Primary Nursery area by the North Carolina Division of Marine Fisheries. PROPOSED PROJECT: The applicant proposes to construct an 80 ft. self -supported communication tower with associated concrete and fencing near the existing MET tower (see sheets C-1 — C-4). The total proposed impervious area is 200 sq. ft. According to the applicant, approximately 2000 sq. ft. of high ground will be disturbed for construction. The application states that the existing communication tower will remfREr GENV E collect data for the next year. JAN 0 6 2016 10. ANTICIPATED IMPACTS: The project would result in covering approximately 200 sq. ft. of high ground with iQGMsAWP C ITY and disturbing approximately 2,000 sq. ft. of high ground with grading and fill. According to the applicant, the development would result in .0001 % of built -upon area on the entire tract. The proposed development would be located within the Ocean Erodible AEC landward of the applicable development setback. Submitted by: Tara MacPherson Date: December 31, 2015 Office: Wilmington DUKE ENERGY, RECEIVED JAN 0 6 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC DEC 1 6 2015 Parcel Information from Brunswick County RECEIVED DCM WILMINGTON, NC 0 E C 16 2015 RECEIVE® JAN 0 6 2016 DC vl ; 4DUKE ENERGY,, Brunswick MW Tower Replacement Project Charter 1.0 Project Description Project Overview: Replacement of the existing microwave radio system between Brunswick Plant and Caswell Beach Pumping Station. This project will include a new microwave tower to be located near the existing BNP Met Tower. A new tower at Caswell Beach will be constructed and the existing tower taken down. The existing tower at the Brunswick Plant will continue to stand for one year after the construction of the new tower. The existing tower has metoralogicial equipment located on it that will continue to collect data for the next year. Background: The Caswell Beach Pumping Station consists of an Ocean Discharge Pump Structure, the Caswell Beach Power Electrical Switchgear and Control House and the Caswell Beach Substation. Communication to Caswell Beach consists of a microwave radio unit with equipment mounted on a tower at the pumping station and on a tower at the meteorological equipment tower (MET) station at the site. The receiver at the pumping station is connected to an analog channel bank multiplexor (MUX) from which a four wire circuit extends to the pump cabinets for supervisory control. The existing Microwave Radio System and Transport Equipment is obsolete. Some replacement parts are no longer available, and the prolonged exposure to salt air has resulted in significant corrosion for most of the radio equipment. The radio and tranport system needs to be replaced with the Duke system standard for microwave radio systems with digital MUX boxes. Both towers have been reviewed structurally and are considered overload. RECEIVED JAN 0 6 2016 1.1 Project Goals and Objectives Goals Objectives • Improve tower • Construct new 80' self support tower at Caswell Beach infastructure • Take down existing towers • Update radio system • Remove old radios at BNP and Caswell Beach and replace with the current Duke Energy system standard for microwave radio systems Replace existing dish antennas with the current Duke Energy system standard for microwave radio systems iTY RECEIVED DCM WILMINGTON, NIA` 0ECi62015 12/1/2015 1 Duke Energy Proprietary Page 3 of 6 • DUKE ENERGY Brunswick MW Tower Replacement Project Charter 1.2 Project Assumptions and Constraints — Assumptions • Existing MET tower will not be taken down as part of this project • Meterlogical equipment will not be moved from the exisiting MET tower as part of this project • Nuclear Engineering Change will be approved by BNP to start construction of new towers • Securing FAA/FCC approvals and other jurisdicational and environmental permit • Availability of resources to complete project. (Contractor, material and internal.) Constraints • Burnswick plant outage scheduled for 2/27/2016 — 3/23/2016 • 2.0 Project Scope JAN 0 6 2016 2.1 In Scope Design and Installation of a new 360' guy tower near the existing MET t1DQ%etmU5eC1TY Brunswick Nuclear Plant Design and Installation of a new 80' self support tower at the Caswell Beach pumping station. Design and Installation of a 9500 MPR radio system at both Caswell Beach and BNP locations Removal of old microwave equipment at both Caswell Beach and BNP locations Install new microwave dish antenna and associated cables and brackets at both Caswell UZ-0 iF31TO11117aw Configure, connect, trun up and test new microwave radio system Relocated other telecom antennas and associated equipment for the existing MET tower to the new 360' tower at BNP 2.2 Findings Tower Engineering Professionals (TEP) was contracted to perform this work and it resulted in the following: • Both Towers are overloaded • Caswell Beach is 118.8% overloaded but can be corrected by adding reinforcement • Brunswick MW is 198.8% overloaded and must be replaced • Contributing factors are the move to a solid dish design and a more stringent building code C:)ECEI'L/ I! D 12/1/2015 Duke Energy Proprietary DCM VNILMINGTC"q of 6 DEC1b2015 CDUKE CENERGY Brunswick MW Tower Replacement Project Charter 2.3 Systems BRUNSWICK TOWER RADIO SERVICE DESCRIPTIONS LINE RADIO SERVICE NOTES 1 MW — BNP to Caswell Beach Pumping Station 2 MW — BNP to Prospect Duke Corporate Voice & Data Network 3 900 MHz Trunked Radio System Wide Area - Dispatch Radio System 4 Siren Controller 450 Siren System 5 EP Repeater Voice communications for EP in and around plant 6 Paging VHF (Supports Plant) Paging of plant employees T Meteorological Hardware (NOT Weather - regulatory requirements RADIO SERVICE) 2.4 Alternatives Considered Alternative Considered Comments Upgrade towers instead of replacing Little documentation is on file regarding the foundations of the towers to make accurate upgrade recommendations 3.0 1 Milestone/Gate Schedule Milestone/Gate Date Comments Plan Stage 4/11/14 Analyze Stage 11/21/14 Design Stage 2/13/15 Build Stage 5/1/15 Test Stage 5/4/15 Deploy Stage 5/4/15 Close Stage 12/31/15 JAN 0 6 2016 RECEIVED DCM WILMINGTON, NC DCL3" gi� �L'TY DEC 16 2015 12/1/2015 Duke Energy Proprietary Page 5 of 6 ouKE ENERGY& Brunswick MW Tower Replacement Project Charter 12/1/2015 Duke Energy Proprietary Page 6 of 6 Environmental Quality December 31, 2015 Duke Energy Progress, LLC. c/o Kenneth Brooks 400 South Tryon Road Charlotte, NC 28201 Dear Mr. Brooks: PAT MCCRORY Govrmor DONALD R. VAN DER VAART smeary The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of the subject property located on Caswell Beach Road (Parcel No. 251IA021) in Caswell Beach, Brunswick County. It was received as complete on December 16,_Zp14 and appears to be adequate for processing at this time. The projected deadline for making a decision ch 2, 2W. An additional 75-day review period is provided by law when such time is necessary to complete e review. If you have not been notified of a fmal action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from December 16, 2015, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Tara MacPherson Field Specialist cc: Heather Coats, DCM Debra Wilson, DCM I)- "To, 14Hc- Tyler Crumbley, COE RECEIVE Town of Caswell Beach JAN 0 6 2016 -/'Nothing Compares"� DCM- %I H ^ r-TY State of North Carolina I Environmental Quality 1601 Mail Servke Center I Raleigh, North Carolina 27699-1601 919-707-8600 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Duke Energy Progress, LLC c%%nneth Brooks COUNTY: Brunswick PROJECT NAME: Caswell Beach Tower Replacement LOCATION OF PROJECT: Parcel No. 251L4021, Caswell Beach Rd, adjacent to the Atlantic Ocean, in Caswell Beach DATE APPLICATION RECEIVED COMPLETE BY FIELD:12-16-15 ./ FIELD RECOMMENDATION: Attached: Yes CONSISTENCY DETERMINATION: Attached: n/a FIELD REPRESENTATIVE: Tara MacPherson DISTRICT MANAGER REVIEW: .,v X B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: 1-7-16 ✓ fht O1N ADJ. RIP. PROP NOTICES REC'D: E 4,¢Aw u��I ✓ APPLICATION ASSIG TO: C) 75 DAY DEADLINE: �1 1-IL ° b10 To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE REC'D: $40 I4Z ItI ro END OF NOTICE DATE: 1-28-16 DEED REC'D: ON: o 150 DAY DEADLINE: MAIL OUT DATE:1-4-16 STATE DUE DATE: 1-28-16 FEDERAL DUE DATE: FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency l /Zq ✓ Division of Community Assistance Li! ��/ ✓ Land Quality Section (DEMLR) 1 (V Division of Water Resources (401) 1 28 (lp ✓ Storm Water Management (DEMLR) IbSW iState Property Office AJ, I t":d ✓ Division of Archives & History ° 1 (1 1 b ✓ Division of Environmental Health j 14 1b ✓ Division of Highways I/it IV x Wildlife Resources Commission 22 ✓ Local Permit Office 7 1 JAN 0 6 2016 Division of Marine Fisheries / DCM , , . ; , r..: Corps of Engineers 1 2I 1 V / No P24mAT 64,0,2ciC oc)cLi PkAiS 1/4I1, Recommendations for State Permit- Duke Energy Progress, LLC- Caswell Beach 12/31/15 It is the opinion of this office that the proposed work is consistent with the Use Standards for Ocean Hazard Areas, as set forth in NCAC 07H .0306 & .0308. In the absence of any concerns from the commenting agencies, it is recommended that a permit be issued subject to the following conditions: RECEIVED JAN 0 6 2016 DCM- MHD CITY Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM: TO: January 4, 2016 Mark Zeigler WiRO Division of Community Assistance Hr PAT MCCRORY Governor DONALD R. VAN DER VAART Secrelmy BRAXTON DAVIS Direclnr FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c/o Kenneth Brooks Project Location: Parcel No. 2511A021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: x This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED / r l rw` i e,, rn �� DATE Nothing Compares.` State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Dove Ext., Wilmington, NC 28405 910-796-7215 Received ]AN 0 4 1016 DCM IAv MEMO To: Heather Coats From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Applicat n, Duke Energy Progress, LLC, Caswell Beach, Brunswick County Date: January 29, 2016 This project appears to be'consistent with the Town of Caswell Beach Land Use Plan. The applicant proposes to construct an 80 ft. self -supported communication tower with associated concrete and fencing. The project is located at parcel number 251IA021 on Caswell Beach Road in Caswell Beach, Brunswick County. Areas of Environmental Concern (AEC's) impacted by the proposal are OH-OEA. Waters at the project site are classified as SB and are not open to the harvesting of shellfish. The area is a Primary Nursery Area. I have reviewed this proposal for consistency with the Town of Caswell Beach Land Use Plan and offer the following comments. The general area of the project is classified Developed, while the AECs impacted by the work are classified as Industrial. In general, the Town of Caswell Beach allows development in Industrial classified AECs which is consistent with the State's minimum use standards. The Town of Caswell Beach Land Use Plan contains some policies, which exceeds the State's minimum use standards. However, none of these standards appear to be applicable to this proposal. Provided all local, state and federal requirements can be met, this project appears to be consistent with the Town of Caswell Beach Land Use Plan. Cc: File Received JAN 2 9 2016 DCM { Coastal Management ENVIRONMENTAL QUALITY January 4, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART SecrelorY BRAXTON DAVIS Direnor 4 TO: Dan Sams District Manager DEMLR - WiRO e �. FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext.; Wilm. NC 28405 heather. coatsOncdenraov Fax: 395-3964 (aprsgt SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c/o Kenneth Brooks Project Location: Parcel No. 2591AO29, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and r giern phis> orrrr'4o 'e Q ner..L'o at the address above by January 28, 2095, If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE J4A) o 16 RECEIVED �Alothing Comparesf�-� DCM WILM NGTON, NC State of NorthCarelina I Environmental Quality I Coastal Management 127 Cardinal Drive ExL, Wilmington, NC 28405 S 910-796.7215 Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director RECEIVED/NCDENR/M January 4, 2016 MEMORANDUM: JAN 0 5 2016 TO: Chad Coburn Water Quality Regional 401 Wetlands Operations Section DWR - WiRO Wilmington Regional Office FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aDncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC C/o Kenneth Brooks Project Location: Parcel No. 2511A021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: !/ This agency has no objection to the pr Iect as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached SIGNED com ents. I• DATE Nothing Compares%« State of North Carolina I Environmental Qoaliry I Coastal Management 127 Cardinal Drive Et,, Wilmington, NC 28405 910-796-7215 RCEIVED DCM WILMWG ON, NC FEB 2 4 2016 9 Coats, Heather From: Coburn, Chad Sent: Thursday, January 28, 2016 1:40 PM To: Coats, Heather Subject: RE: Another check on Duke Permits I just looked it over and it will not require any approval from the DWR. I wouldn't think that Tyler or Liz will need to issue anything either since it's only high ground disturbance (according to the bio report anyways). Let me know if you hear anything different from the USACE. From: Coats, Heather Sent: Thursday, January 28, 2016 12:00 PM To: Coburn, Chad <chad.coburn@ncdenr.gov> Subject: FW: Another check on Duke Permits Hi Chad, Do you have comments yet on the Duke communications tower project down in Caswell Beach, by chance? Thanks! heather Heather Coats Assistant Major Permits. Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather.coats(a.ncdenr.gov 127 Cardinal Drive Extension Wilmington, NC 28405 .`. Nothing Compares ---,- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: MacPherson, Tara Sent: Thursday, January 28, 2016 11:34 AM To: Coats, Heather <heather.coats@ncdenr.eov> Subject: Another check on Duke Permits Hey girl, Email request to check on the status of the Duke Energy Caswell Beach Plant Permit. Any updates?? Thanks! Tara MacPherson Field Specialist NC Division of Coastal Management Department of Environmental Quality 910 796-7425 office 910 395-3964 fax tara. macpherson(a�ncdenr.00v 127 Cardinal Drive Ext Wilmington, NC 28405 Nothing Compares_-k_. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brooks, Dale [mailto:Dale.Brooks@duke-energv.com] Sent: Tuesday, January 19, 2016 10:39 AM To: MacPherson, Tara <tara.macpherson@ncdenr.gov> Subject: CAMA Permit Importance: Low Tara, any updates on the permit and the scheduledreturn date. Dale Dale Brooks Transaction Manager Land Services Dale Brooks C/O Duke Energy 1120 East Franklin Blvd Gastonia, NC 28054 Dale.Brooks@duke-energv.com 704.382.0913 (0) 704.868.6302 (C) Inter -office Mail Dale.Brooks@duke-energy.com 704.382.0913 (0) 704.868.6302 (C) DIKE ., 'ENERGY Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM: TO: 55 l t!1 January 4, 2016 Georgette Scott Stormwater Section DEMLR - WiRO PAT MCCRORY G.... ow DONALD R. VAN DER VAART S'ecrclary BRAXTON DAVIS Direalor ECEIVE JAN 0 5 20113 SY:_ 0 i FROM: y{l , Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(o),ncdencgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c/o Kenneth Brooks Project Location: Parcel No. 2510021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended Chan es are incorporated. See attached. *Tev jrp r SW pok..'n"T. This agency objects to the project for reasons described in the attached comments. SIGNED 4r 7DATE Nothing Compares RECEIVED DCM WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal (hive Ext., Wilmington, NC 28405 910-796-7215 JAN 2 0 2016 Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM: TO: RECEIVED JAN 06 2016 DOA STATE PROPERTY OP F! r - January 4, 2016 Tim Walton Dept of Administration State Property Office PAT MCCRORY Governor' DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Dlre(mr FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsCa),ncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c% Kenneth Brooks Project Location: Parcel No. 2511A021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REP This agency has no objection to the project as proposed. 0, >/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes o� c>., are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 60aIK�- A.t.� DATE I -11 - ZD t& DCM WILM NIGTON, NC Nothing Compares- State of North Carolina I Environmental Quality I Coastal Management JAN 2 6 2016 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 January 4j{ P'Ar MCCRORY .. g�aa CC ,i`� u ��b§ l6lt j. Mtri>�iGr R. YAN DER VART l •{ Tilt�'t�1.YNAi"ViS or lee GtetltlN Early ether Coats, Asst"stan#,�iatdr Pematt� CoordinatoY,. :. ; . QECt = dtvismn pf Co�stat'Mara�gement L`ardi iat Drove Exf , Wjif NC`2840ti hesthor cdearcout 39f:�964 fC'our7er"q„�fiFr,"33�,`'' . wlu MA Appltca#lort'ReVtsuu`, " ' ke Energy Pr'dga�eSs, LLC clv iCeonetfr .Brooks,::. i Nb 25�1Ad21,'Ca t2 �tf ch ROW! adjacent to the l�tfa tic, ean, i�.Caswell:�Eeach, �rtmstvrck,'Gounty' r- ' Plogosei Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM: TO: January 4, 2016 Shannon Jenkins NC DMF Shellfish Sanitation Section PAT MCCRORY Gowmor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(Dncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c/o Kenneth Brooks Project Location: Parcel No. 2511AO21, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. far SLdu✓oJ JC°NlC�✓5 J SIGNED DATE 4 7/ 1 Nothing Compares .` OCM RECEIVEDWILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management JAN 14 127 Cardinal Drive Exc, Wilmington, NC 29405 2016 910-796-7215 Coastal Management ENVIRONMENTAL OVALITY MEMORANDUM: DISTRICT 1 IJAN 06 2016 RECEIVED January 4, 2016 TO: Ben Hughes NC DOT Brunswick County N2 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS /Weclor' FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(Dncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c% Kenneth Brooks Project Location: Parcel No. 2510021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED (+ DATE r T zvl Cv RECEIVED Nothing Compares_ DCM WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management JAN 112016 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY e', 16- 01. C_. DI MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: January 4, 2016 Maria Dunn NCWRC For WiRO PAT MCCRORY Gavernnr DONALD R. VAN DER VAART Secrelary BRAXTON DAVIS __ Direclnr Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsCoDncdenrgov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review Duke Energy Progress, LLC c% Kenneth Brooks Parcel No. 2511A021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED L DATE )- I �// RECEIVED Nothing Compares- DCM WILMINGTON, NC State of Non6 Carolina I Environmental Quality I Coastal Management JAN 22 2016 127 Cardinal (hive Ext, Wilmington, NC 28405 910-796-7215 :4 . Coastal Management ENVIRONMENTAL QUALITY MEMO RAND `f January 4, 2016 Chad Hicks Town Administrator Caswell Beach PAT MCCRORY Governor DONALD R. VAN DER VAART Sccrelary BRAXTON DAVIS Direcior FROlk: Heather Coats,Assistant_ Major, Permits Coordinator NCDEQ — Division.of Coastal Management 127 Cardinal Dnve':Ext., Wilm., NC 28405heather. coatsaa)ncdenr.gov Fax. 395-3964 (dBj SUBJECT: LAMA Application Review Applicant: ®cafe Energy Progress, LLC c% Kenneth Brooks Project Location; Parcel No. 251IA029, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concreteand. fencing Please inclicaiebelowyour en�cy's position. or viewpoint on the. proposed project and s returrr�tiso�te9Aet�tae.�atat the address above by Jaroaea{r1r 28, 209: 1f you have any'questions: regarding the proposed project, contact Tara MacPtiersori;af (910)796 7425 when appropriate; in'.depth-comments with supporting data is requested. REPLY: 1/1� This agency has no objection to the project as proposed,; This agency has no comment on the proposed project: This agency approves of the project only if the recommended changes . are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED � 4f DATE -�Nothtng Compares DC;M VVILtAIhlGgfnOhl, NO State ofNmih Caroline I Environmental Quality I Coastal Management JAN 1 2016 127 Cardinal Drive Eat„ Wilmington, NC 28405 910.796-7215 Coastal Management ENVIRONMENTAL QUALITY January 4, 2016 MEMORANDUM: TO: Gregg Bodnar Fisheries Resource Specialist DCM, Morehead City diz PAT MCCRORY Grne„rn,- DONALD R. VAN DER VAART Se"'I"y BRAXTON DAVIS Duecto, FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(cDncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c/o Kenneth Brooks Project Location: Parcel No. 2511A021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. _X_ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached/ED comments. DCM WILMINGTON, NC SIGNED�ac` yr DATE Nothing Comparesn `(z-/iI, !AN 2 5 2016 RECEIVED JAN 0 6 1013 State or North Carolina I Environmental Qnality l Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 DCM- Nil ib CITY �i Coastal Management ENVIRONMENTAL QUALITY January 4, 2016 MEMORANDUM: i� PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director uuuUUU 'AN 0 4 2016 Ohd3lonWR0.P b0ceWe ers p�s FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatscDncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Duke Energy Progress, LLC c% Kenneth Brooks Heidi Cox Environmental Engineer Public Water Supply Project Location: Parcel No. 2510021, Caswell Beach Road, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County Proposed Project: construction of an 80 ft. self -supported communication tower with associated concrete and fencing Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by January 28, 2016. If you have any questions regarding the proposed project, contact Tara MacPherson at (910)796-7425 when appropriate, in-depth comments with supporting data is requested. REPLY: _&_ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached �a comments. SIGNED Yfe w� DATE Nothing Compares�- DCM WECEIVED ILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., W ilarmim n, NC 28405 910-796-7215 JAN 0 8 2016 tkc-- DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 89 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: January 8, 2016 Regulatory Division Action ID No. SAW-2016-00047 Duke Energy Progress, LLC Attn: Mr. Kenneth D. Brooks 40 South Tryon Street Charlotte, North Carolina 28201 Dear Mr. Brooks: In coordination with the NC Division of Coastal Management, we have received a copy of your December 16, 2015 proposal to construct an 80' self -supported communication tower with associated concrete and fencing on Caswell Beach Road (Parcel#25 1 -IA02 1), adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County, North Carolina. The coordinates are: 33.5351-N, and-78.0316-W. A review of your plans reveals that the proposed activity will not involve work in wetlands, waters of the United States or navigable waters of the United States. Therefore, no Department of the Army authorization is required for your work. Should your proposed scope of work change, please contact this office to discuss possible required authorization. Please be advised that this does not relieve you of the need to obtain all necessary authorizations, including a valid permit from NCDCM, prior to beginning work. Should you have any questions or comments you may call me at (910) 251-4170. Sincerel 4 I', , P r Tyler Cnunbley, Project Manager Wilmington Regulatory Field Office Copies Furnished: JDH Contracting Attn: Mike Calderhead 812 Biscayne Drive Concord, North Carolina 28027 RECEIVED DCM WILMINGTON, NC JAN 212016 -2- Thomas G. Walker, U. S. Attorney Eastern District of North Carolina 310 New Bern Avenue, Suite 800 Terry Sanford Federal Building & US Courthouse Raleigh, North Carolina 27601-1461 Ms. Molly Davis, Chief Wetlands Enforcement Section Water Protection Division Clean Water Enforcement Branch U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 Mr. Chad Coburn Division of Water Resources North Carolina Department of Environmental Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Ms. Heather Coats Division of Coastal Management North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RECEIVED DCM WILMINGTON, NC JAN 212016 v D Z NOTI(01$170A m GAMA PE MI T APPLIED ,PROJECT: AD-olicant orranoses to c fe adjacent to the Atlantic Vicean, in FOR (%gMf R(?6gkD THROUGH RO APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Duke Energy Progress, NC Div, of Coastal Management 127 Cardinal Dr. Ext. ^00 S Tryon Street Mmin8 on, NC 28405 Charlotte, NC 28201 Tara MacPherson, Field Specialist Agent: Mike Calderhead (704) 720-7269 910-796-7425 VIL Boor. 308 rbb( 950 saccade West 119.71 feet, South 73 degree. 19 minutes 02 secouds Wait 125.88 feet, South 74 degrees 01 minute 5E second. West 219.92 feet, North 75 degrees 04 minutes 17`� seconds West 171.72 feet, and South 80 degrees 18 minutes 52 second. West 103.99 feet to a point; and thence South 02 degrees 01 minute 11 second, gnat 266.43 feet to the _ point of BEGINNING, containing 207.294 acres, are or Is... as shown and described as the Harsh Area on Carolina Power a Light Company Drawing No. RW-D-1753, (dated December, 1970, Revised 2-16-71) Which is incorporated herein by reference. TO HAVE AND TO HOLD the above described tract or parcel of land, together with all privileges and appurtenances thereunto belonging, to the said CAROLINA POWER A LIGHT COWANI, GRANTER, it. successors and assigns, in fee simple forever. And the said GRANTORS for themselves, their heirs, executors and administrators do hereby covenant with the GRANTEE, its successors and assign, that they are seized of the above described tract or parcel of land in fee and have the right to convey the same in fee simple; that the .awe is free and clear from all lien. and encumbrances; and that they will warrant and forever defend the title thereto against the lawful claims of all persons whomsoever. IN MSTIHUNY WHEREOF, GRANTORS have hereunto set their bands and affixed their seals, the day and year first above written. 7 J %J 6 c'.LG^—'— (REAL) ._ DDDLEY W. BARREN G U !J 4 (REAL, G. V. BABBEE, JR. 6a-I eA- (SEAL) (REAL) J HR L. BARBEE (SEAL) CATHERINE W. BARBER (SEAL) J FAARRLIN P. BABHBE JAN. r Z016, pcnr ..., D CITY RECEIVED DCM WILMINGTON, NC RECFIVED o'EC 16 2015 so that we can Vn turn the cans to you. ■ Attach this card to the back of the marlpiece, or on the front K space permits. V 1. Article Addressed to: iow.1RSW_e'Qjo 1)Y1� C v>e1\ f3E4+iu( gtLiLv5 D. Is delivery address different from Rem,? ❑ Yee if YES, enter delivery address below: 11 No 3. IN Cerdned Mall 0 Egress Man ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.D.D. 4. Restrkted Delivery? (Fxha FW) 0 Yee 2. Article Number - lmsneerf ptsanacelaba) _ 7001 0360 0000 0611 2414i_ __ PS Form 3811. February 2004 Domestic Return Receipt ■ Complete items 1, 2, and 3. Also complete A item 4 if Restricted Delivery is desired. ❑Agent ■ Print your name and address on the reverse X ❑ Add.. so that we can retum the card to you. B. ty ( Name) ( C. Date of ry ■ Attach this card to the back of the mailpiece, or on the front if space permits. . isdamyad reesdHhrentfmmiteml? ❑Yes 1. Article Addressed to: If YEs, enter dewery address haloes: ❑ No Q. 1�) eci)OUC6 SS -US- ae s. Utertilm Man 0 igress Mail ❑ Registered ❑ Return Receipt for Merchandise 0 trued Man ❑ c o.D. 4. RestrkUd Degeal? Of Faq ❑ Yes 2. AracfeNrmrber �17001 0360 0000 0611 2407 (Banda, from serves few Ps Form 3811, February 2004 Domestic Rehm Receipt fozsssaarn-,sam ® Complete items t, 2, and 3. Also complete 'II item 4 If Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. a m Attach this card to the back of the mailpiece, or on the front if space permits. 1. Acide Addrossedto: a8`65` 3. al9mafere RECEIVED \ ❑ Agent �Arldressee Received by(prnkd Nam") C. Date otod'very H1Y ,J^Al 0 6 20 16 Is delWery addres.,dfterertkani it ml7 dyes If YES enter delivery address berov+ ❑No :MHD CITY DOM- l ❑ Registered ❑ Return Fteoeipt for Merchandrs ❑ Insuroq_Mail ❑ GO.D. _ ' ` �Restneiod-0clivery7 (Sarre Fez) � ❑ YG. 2. Ackle Numher (➢angler from servjea iahui 7001 0360 0000 0611 2421 ---- PS Form 3811 February 2004 Domestic Retem R.coipt } 102595-02 RECEIVED e "M WILMINGTON, NC DEC 1 6 2015 Ma I Coastal Management ENVIRONMENTAL QUALITY January 4, 2016 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 PAT MCCRORY Gm,emor DONALD R. VAN DER VAART Secreiary BRAXTON DAVIS Director Re: Major Public Notice for Duke Energy Progress, LLC / Brunswick County Kyle & Heather: Please publish the attached Notice in the Thursday, January 7, 2016 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Luke Skiera, Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. IDN Heather Coats - WiRO Doug Huggett -MHC Tyler Cmmbley - USACE Michele Walker- DCM Sincerely, ��vr� Shaun K. Simpson Permitting Support & Customer Assistance Nothing Compares�- RECEIVED BAN 0 6 2016 DCM- MHD CITY State of North Carolina I Environmental Quality I Coaaml Management 127 Cardinal Drive Eat., Wilmington, NC 29405 910-796-7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On December 16, 2015, Duke Energy Progress, LLC clo Kenneth Brooks proposed to construct a communication tower on Parcel No. 2511A021, Caswell Beach Rd, adjacent to the Atlantic Ocean, in Caswell Beach, Brunswick County. A copy of the application can be examined or copied at the office of Tara MacPherson, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-72425) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to January 28, 2016 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. Nothing Compares.` RECEIVED JAN 0 6 2016 DCM- MHD CTY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ent., Wilmington, NC 28405 910.796-7215 MAJOR PERMIT FEE SCHEDULE Duke Energy / Brunswick / $400 #xxx2791 DCM % DWQ % Development Ta Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% $0 III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if &B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $250 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% $240 40% $160 III(D). If General Water Quality Certification No. 3490 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECEIVED JAN 0 6 2016 DCM- MILD CITY Carl Fullerton ®® += DUKE ENERGY, Brunswick MW Tower Replacement Project Charter Table of Contents 1.0 Project Description ....................................... 1.1 Project Goals and Objectives .................. 1.2 Project Assumptions and Constraints — 2.0 Project Scope ................................................. 2.1 In Scope ..................................................... 2.2 Findings...................................................... 2.3 System Retirements ................................. 2.4 Alternatives Considered ........................... 3.0 Schedule......................................................... ....................................................................3 ...................................................4 ...................................................4 Error! Bookmark not defined. ...................................................5 ...................................................5 ...................................................5 RECEIVED JAN 0 6 2016 DCM- MHD CITY 12/1/2015 Duke Energy Proprietary Page 2 of 6 12/14/2015 UPS Campy Ship: SNpment Label UPS CampusShip: View/Print Label 1. Ensure there are no other shipping or tracking labels attached to your package. Select the Print button on the print dialog box that appears. Note: If your browser does not support this function select Print from the File menu to print the label. 2. Fold the printed label at the solid line below. Place the label in a UPS Shipping Pouch. If you do not have a pouch, affix the folded label using Gear plastic shipping tape over the entire label. 3. GETTING YOUR SHIPMENT TO UPS Customers with a Daily Pickup Your driver will pickup yourshipment(s) as usual. Customers without a Daily Pickup Take your package to any location of The UPS StoreA®, UPS Access Point(TM) location, UPS Drop Box, UPS Customer Center, UPS Alliances (Office DepotA® or StaplesA(M) or Authorized Shipping Outlet near you. Items sent via UPS Return Services(SM) (including via Ground) are also accepted at Drop Boxes. To find the location nearest you, please visit the Resources area of CampusShip and select UPS Locations. Schedule a same day or future day Pickup to have a UPS driver pickup all your CampusShip packages. Hand the packa%e to any UPS driver in your area. UPS Access Point UPS Access PointT0 UPS Access PointTm THE UPS STORE 1421 E FRANKLIN BLVD GASTONIA ,NC 28054 FOLD HERE ti w O RECEIVED DCM WILMING�qN, NC DEC �6 15 Ln Ln W C 00 N V E- W CA 0 0 y va0 p fLi O� o "toQZ I�ti+ z O�qa OF N'E- z� THE UPS STORE THE UPS STORE 2212 UNION RD 6428 W WILKINSON BLVD GASTONIA ,NC 28054 BELMONT ,NC 28012 V u Cl)10 �CD 0 rn 01 01 N ti EL N --4 N Z� z U z z U-, OW0 o wz to o U r4 W -t W 0 0 U 0 mo �a °" RECEIVED uv JAN 0 6 2016 V ,a DCM- MHLY CITY Z `] N m � m httpsJAvww.campusstup.ups.cam/cshiWueate?ActimOrigirPair-deWt_PrirtWirdmPag ey=labdWirdav&ype=html&lac=en US&instr=A&doFship... 1/1 PAT MCCRORY Ge wnr DONALD R. VAN DER VAART S'rcrrtnry Mitigation Services ENVINONMENTAI, QUALITY RECEIPT November 8, 2016 Karl Moser Duke Energy FO Box 10429 Souttiport, NC _28461 Project: Brunswick Nuclear Plant Comprehensive Maintenance Plan County: Brunswick WQ permit #: 16-0734 COE#: 2016-01643 CANIA#: 293dg DMS#: 24193 Amount Paid: $87,661.60 Check Number: 1000028259 The NCDEQ Division of Mitigation. Services: (DMS) has received a check as indicatedabove as payment for the compensatory mitigation requirements of the 401 Water Quality Certification(Section 404/CAMA Permit(s) issued for the above- referenced project. This receipt serves as notification that your compensatory mitigation requirements assigned to DMS associated with the authorized activity as specified below have been satisfied. You must also comply with all, other conditions of this certification and any other state, federal or local government permits or authorization associated with this activity including G.S. § 143-214.11. The DMS, by acceptance of this payment, acknowledges that the Division is responsible for the compensatory mitigation requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the DMS is nontransferable. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. River Basin HUG Stream Credits (linear feet) Wetland Credits (acres) Buffer 1& II (Sq. Ft) Sturgeon City Cold Cool I Warm Riparian Non -RI "arian ` 'Coastal Marsh Site 0 0 0' 0 0 0.48. 0 Refunds of payments made to NCDMS are only approved'; under certain conditions. All refund requests must be submitted in accordance with the Division's refund policy at www.nceep.net. If you have any questions or need additional information, please contact Kelly Williams at (919).707-8915. Sincerely, T Michae E lison Director cc: Tyler Crumbley, USAGE -Wilmington; Todd Tugwell,USACE-Raleigh RECEIVED Dana Lutheran, agent DCM WIILMINI{GTON, NG State orNorthCaralioa, I Envimnmental Quality I Mitigation Sarvrces NOV o 820t6 1652 Mail Service Center I Raleigh, NC 27699.1652 1 217 W. Janes StM4 Suite 3000 , 919 701$976 T A ti U.S, ARMY CORPS OF.ENGINEERS Wilmmgfon District Compensatory Mitieatton`Res pon-ibility Transfer Forin "f Permlttee: Duke Energy Progress, LLC / Karl Moser Action 10;;SAW 2016:01543 Project Name: DUKE ENERGY BSEPShoreline Stabilization' County:er)nswick;' Instructions to Permlttee:7he Permlttee must provide a copybf this form to the Mitigation Sponsor, either an approved `Mitigation Bank or the Notth Carolina Division -of `Mttlgation Services (NCDMS) who will'then sfgn the form to Verify the ' transfer of the mitigation responsibility. Once the -Sponsor has signed this form, it is the Permlttee s responsibility to a ensure that to the U.S. Army Corps of Engineers PMpct Manager Identified on paga two Is in receipt of P'lu ned copy of this form before conducting authorized impacts unless'btlierHise pedRa' 1:eiow. If mora fhan one mlfgallon s. Sponsor wllfbe used to provide the mitigaton assocfatedv tIf* petmnF or if Nie lmpacts and/ar tfie mltigatwrtwill'occur In :more thamone R-digi[Hydrologic Unit Code (HUC),:mulbple'forms wIK be attached to the permit, and the separate forms for each Sponeorand/or HUCmu`st tieprovided to the appropilaie mitigation Sponsors -- - Instructions to Sponsor The Sponsor must verify that the 4vPjIPble Pt the Identified site By signing beioW,nsor ,the Sport Is accepting fall responsibility for the identlRed' mitigation, regardless of whether or notthey have received payment from the.Permiq Once,the;fdrm is signed, the'Sponsor must update the the with all reporting requirementsestabllshed ih their authorizing inYtrumerit. Permitted rmit ed l moasland, om ensato Mittidn Reyul es asements._', P p �Y 6 , lrinaMitiaatten A-Avit thltSdnd Rahn• WIMfirin5. rang FearA'mar pl.d. Streatolmpacts(fine aifeet)'.We`tland-lm aRs(acres r. Warm Cool' Cold Riparian Rive"ride Riparian`NonRiverine' Nori-Riparian Coastal. 0.48 -ir more_man one mitt 'gation sponsor will be used tor the permit, only indude;fmpactsto tie mitigated by this sponsor. -COn1OPMsAnM Mrtivatinn RannWmPntc, R:mVit Nlir mnd Racine rhnnee th. R_Awt unr Stream Miti ation (credfts), Wetland Mitigation' credits) _.Warm _ _ Cool:. ; . Cold' Ri arson RiJerhe .Rlparlan;Noo Riverfre. Non -Riparian' . Coastal - _. - Mitigation Site Debited: NCDMS-Sturgeon City (List the name of the bank to be debited For umbrella banks, also list thepeofirsite. For NCDMS, list NCDMS. if t NCDMS acceptance letter Identifies a specific site, also list the specific site to be debited). Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactlons for the Mitlgatlori Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility.for providing the mitigation identified In this document (see the table above), assocleed withthe USAGE Permittee.and Action ID number shown. I also verify that released credits (and/or advance creditsfor NCDMS), as approved by the USAGE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure- complianceossociated with the:mItigation requirements. R EC E i Mitigation Sponsor Name of Authorized DCM WILMI NOV 0 NDy ;20llp Date of Signature Page I of 2. Form Updated 23 November, 2015 ED '0N, NC H6 USAGE Wilmington, District. Compensatory Mitigation RResporisThil�ty Tratisfer Form, Page 2-- Conditions for Transfer of Compensatory Once this document has been signer Permlitee s.no longer responsible 4 responsible for any other mitigatlonr • lGanstructipn within jtlrisdichonal.art after, the USACE.isln.receipt of a c • '51gned copies_ of d,,the USACE istln;recelptof the signed form,, the tilled in this form, though the Permitte, r_eroalns A •. if changes are proposed is the type,:amaunt, or Ipcatrantbfimltlgation after Shijs far,l as been slgnetl andreturried to :the USACE She Sponsor"must obtain case by case approval from the U,46, b'jeCt Manager and/ar tJbrtlS) Drina .Interagency. Review Team iNCIRTj 9f approvedi higher mifigailan.rattos may he applied, as per currentAlsfrict guidance and a new version of this form must be completed at d Indudd to ShetUSAC� administrative records forlaoth. the permit end3he:Bank/ILFlnstrumerit. a comments/Additional Conditions - - g Joss of waters r nt18Rttieo�ale rs out of HU�, but is In -Kind The wetlands being'compensated for are.man-induced:and1 ie i . The P P g - nent; t .. 3 Jhis form is not Valid unlesssigned beloly by the USACE Project, Manager and ;by the millgation Sponsor on Page`.1. Once ; signed, the Sponsor should provida`coples o%this form along wlth,on Updated bank t0dger tat-1J the Permfttee, 2),the: USAC&ProjectManager at -the address'belaui,and'3J. the 171/ilmington_Oistrlct h9itfgation OjJlce;; AEtn: Todd Tdpwell, 11465 Fogs of Neuse Road, Woke For¢s4'NC27587 (email, todd iugwell@usare.army.nitl); Questions regarding this form j.- Manager below. oranynf [hepermit conditions may be.ditected fb the USACE Project , USACE Project Manager: Tyler Crumbley USACE Field Office: Wilmington Regulatory Field Office Army Gtir"pF , US s of Engineers 69 Darlington Avenue Wilmington, NC 28403 Email:, tyler.crumhl'ey@usace.afmy:rnll October11, im USAC.,: ,....., ., e , .,., :-:c Date.ot5lgnature Current Wilmington District mitigation guidance„ including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at hfto://ribits usaLe arinv.mil. Page of 2 Tiie Wlirtsingtoh'District Is committed topnoviding the highest level of support to the public. To holp us ensure we continue to do so, please complete the customer Satisfaction survey located at our vrebsite at hltu•//reeulatory usactsuroevxom! to complete the survey online. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 89 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 October 19, 2016 Action ID No. SAW-2016-01643 Duke Energy Progress, LLC Attn: Mr. Karl Moser Post Office Box 10429 Southport, North Carolina 28461 Dear Mr. Moser: Reference your application for a Department of the Army permit to perform shoreline stabilization along the banks of the intake canal at the Brunswick Steam Electrical Plant. The project is located entirely within the intake canal of the Brunswick Steam Electric Plant, along the banks adjacent to the ISFSI Pad and adjacent to the Fish Return Sluiceway, located in Southport, Brunswick County, North Carolina. Coordinates in Decimal Degrees are: 33.960176 N and-78.005316 W. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, attached Federal special conditions, and the final approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2016, RECEIVED OCT 2 6 2016 DCM- MHD CITY Questions or comments may be addressed to Mr. Tyler Crumbley, Wilmington Field Office, Regulatory Branch, telephone 910-251-4170. Sinc/ere Tyler Crumbley Regulatory Project Manager Enclosures: Federal Special Conditions CAMA permit GP 291 conditions Compensatory Mitigation Responsibility Transfer Form Copy Furnished (with enclosures): Mr. Everett Pankuuk Andrew Consulting Engineers 3811 Peachtree Ave, Suite 300 Wilmington, North Carolina 28403 Copies Furnished (without enclosures): Dr. Pace Wilber National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Dr. Ken Riley National Marine Fisheries Service Habitat Conservation Service 0 Pivers Island W _� U Beaufort, North Carolina 28516 W 2 Mr. Doug Huggett U c� Division of Coastal Management W o North Carolina Department of () Environmental Quality 400 Commerce Avenue Morehead City, North Carolina 28557-3421 i 3- Ms. Debra Wilson Division of Coastal Management North Carolina Department of Environmental Quality 127 Cardinal Drive Wilmington, North Carolina 28405 Ms. Karen Higgins Division of Water Quality North Carolina Department of Environmental Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Todd Allen Bowers US EPA Region 4 Life Scientist Water Protection Division 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 BOSN3 Mr. Scott McAloon United States Coast Guard Sector North Carolina Waterways Management 2301 E. Fort Macon Rd Atlantic Beach, North Carolina 28512 Ms. Heather Coats Division of Coastal Management North Carolina Department of Environmental Quality 127 Cardinal Drive Wilmington, North Carolina 28405 Mr. Chad Coburn Division of Water Resources North Carolina Department of Environmental Quality 127 Cardinal Drive Wilmington, North Carolina 28405 RECEIVED OCT 2 6 2016 DCM- MHD CITY Special Conditions SAW-2016-01643 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. N 0 U W o N p T W U � W o ' U � p I 1 I / / COMPOUND DETAIL SCALE: N6" -- V-0" EXISTING TELCO x� X _ EXISTING FENCE X SECTION TO BE _ X _ y REMOVED — IEXISTING k SELF—SUPP TOWER "TI CONCRETE X �X— EXISTING FENCED COMPOUND STONE POSED ENSION EXISTING GRAVEL LOT EXISTING EDGE OF GRAVEL EXISTING BUILDING (TYP) RECEIVED DCM WILMINGTON, NC' DEC 1 6 2015 PLANS PREPARED FOR: (•� DUKE ENERGY. 299 FIRST AVENUE NORTH ST. PETERSBURG. FL 33701 Office: (727) 820-5396 CASWELL BEACH NC-1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED M:EIVEL) JAN 0 6 2016 .•`M- MHD Cli I ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661.6351 www.tepgroup.net N.C. SEAL: 1 liss% Nip a ¢ SEAL 2 OMWU34 a y� N J9m 19,201S 3 OG-19-15 001,15TRUCTION 2 05-1I-15 90% 1 04-22-I5 PREUMINAKY O 02-04-I5 FREUMINAKY REV DATE ISSUED FOR: DRAWN BY: JTC I CHECKED BY: JA5 11 SHEET TITLE: II COMPOUND DETAIL I SHEET NUMBER::: 0 4 8 SCALE IN FEET C2 CJ 318G2 90'-0" 3 T/UGH: NING ROD h 80'-0"t T OWER q/MW DISH 50'-0" t rL/FUTURE MW DISH ANTENNA/C MOUNTING LEG MANI HEIGHT (AZUMITH) (N so'—o" t C LIGF 80'-0"t A 0(30') RF! A 8'g -FUTURE LOADING (DASHED) NOTE: TOWER SHALL BE CONSTRUCTED OF C OR PAINTED PER APPLICABLE STANDI OR OTHER APPLICABLE FEDERAL OF a 0 r"•� 0'-0"f (REF.) :l +-+ ' T/CONCRETE r c rri L7 C C {� TOWER ELEVATION D 8 18 SCALE: 36" = V=0" SCALE IN FEET m _ n v v v A m 0 m r m r m m D D p D ] Z yy m D Q N �{MfNfq r m V D co)�i O b �� V mr ;( N = N � /r/'��jl z OT = m D ) / z ^. y90 % m Z r �' L � ril n !1 m � ]J W R10&lrm 0 g—. om y �v�P77Q0 m a m r� v W D m /� O O '"1Rl N 3—c�z" �/ xy of z F)Z Cam �n S 7 .a i '_ -.moo Si N p� G o 0 0 r c R1 m Q� - m tcy� -1d �Qrr :R.cb.�"S'om = a� ,= z�m Am .. I � m- A.. @ii+�`��� c D D W W m VJ• NOTE: FENCING MATERIAL AND INSTALLATION SHALL BE IN ACCORDANCE WITH BNP SPECIFICATION 064-001. STRETCHER BARS FULL HEIGHTQ NOT LESS THAN )is' z 14" MIN. CROSS SECTION ON ALL GATES AND POSTS 3" SCH40 PIPE CORNER & GATE POST 2'-0" FOR ALL POST IN ROCK MIN. 3'-6" FOR ALL POSTS IN SOIL OR 6" BELOW FROST LINE —WHICHEVER IS GREATER 1' j j' I �: I I; I I I 11 TYPICAL FENCE ELEVATION SCALE: N.T.S. CHAIN LINK FABRIC HINGE MAN GATE DETAIL SCALE: N.T.S. I I I I— VARIES GALV/ 3 STRANDS OF 12 GA. BARBED HARE OATH 4 POINT BARBS ® 3'-0" O.C. 10' 0' O.C. MAX. 11¢" BRACE SCH40 PIPE— \ 5'-0" O.C. MIN. .��>-vv,x� 1Y�" SCH40 BRACE M rjyc PIPE USED ON CORNERS V NOR- v vvv vvv WHERE� & FENCE IS 3 SPANS OR LESS Z' TENSION BAR v �" `(,,, 0 Mcx 3e" BRACE ROD L y m 2Ya" SCH40 PIPE vyx INTERMEDIATE POST •c,`SY�,`Cy� •Yrx `CY`<. 1%` GATE BRACING I I I —I I I —I; li�l I I=I I I 9 GA. 2".2' III —III I I;; III -III=1I1�.1 f JII [---::I_ I I FENCE FABRIC _IIF= h.1 i JII1—I II 1�j I r =I 1 I, I1. 4 .fI I r 1 1 I 6' L'_—J_ 2" SCH 40 GATE POST FINISHED GRADE =I I° I I ° Il�ll�llk ,• I IT, I I=11 I=1 I I=11 J le nl It I CONCRETE CONCRETE t_�-_J I� GATE STOP / KEEPER DETAIL SCALE: N.T.S. 1 —0" 6" CHAIN LINK FABRIC (GATE AND FENCE TO MATCH) 45' LATCH 7- 3—STRAND BARBED WIRE AT FENCE & GATE TOP RAIL CHAIN LINK FENCE FABRIC LINE POST 10' O.C. MAX. ,i METAL GATE DETENT EXTEND BARRIER & STONE 1'—O" BEYOND FENCE ON INSTALL W/ SLOT 2 I: ALL 4 SIDES PARALLEL TO FENCE GRADATION -°T• jj of FINISH GRADE lG I —III— I I �I I —III— GEOTEXTILE 3'-3' -III—III —III III=III: FABRIC I. 1=III=� III 1=III= pN.-,� DRILLED PIER 24" FILL MATERIALS J 3NCffpTj QoEff� DEPTH VARIES 6" t?Gltf 1�1!LMi>`dGTON, Nt 1z' 10" DEC 1 6 2015 GATE DETENT DETAIL SCALE: N.T.S. FENCE / BARBED WIRE ARM DETAIL SCALE: N.T.S. PLANS PREPARED FOR: EDlN1� Ye 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH NC-1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) E1VED AN 0 6 2016 ITY TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 www.tepgroup.net N.C. CFREUMMIINARYN 1 I 22 02 I --15 JA5 FENCE DETAILS SHEET NUMBER: REVISION: -4 3 CI TEP #: 318G2 i VICINITY MAP n.t.s. N NOTES: 1. This plan was prepared without the benefit of a report of title. 2. This plan does not represent on ALTA/ACSM Land Title survey. 3. The basis of the bearings and coordinates. for this plan is the North Carolina State Plane Coordinate System, North American Datum (NCSPCS/NAD 83) based on differential GPS observations performed on January 8, 2015 and tied to the National CORS system via the OPUS utility and expressed in US Survey Feet. 4. Vertical information shown, based on the North American Vertical Datum of 1988 (NAVE) '88) in US Survey Feet. 5. Property lines are drawn from monumentotion found at property corners and information found in Deed Book 308. Page 988, & Deed Book 348, Page 497 of the Brunswick County Register of Deeds records. 6. All distances are ground unless otherwise noted. 7. This property is located in flood zone "AE", areas determined to be inside 1% chance of annual flood. (FEMA Community Panel # 3720208500J, effective June 02, 20D6)_ 8. Property Information: Duke Energy Progress INC. Caswell Beach Road Caswell Beach, NC 28465 11 1A CERTIFICATE 11 LATITUDE: N 33' 53' 51.440" (NAD' 27) LONGITUDE: W 78" 03' 19.862" (NAD' 27) LATITUDE: N 33' 53' 52.067" (NAD'83) LONGITUDE: W 78° 03' 18.830" (NAD'83) I GROUND ELEV. (ANISL): 11.3'±(NAVD'88) SITE SURVEY SCALE: 1" = 200' LEGEND PROPERTY LINE ADJOINERS PROPERTY LINE (NOT SURVEYED) ram_: EXISTING UTIUTY POLE oT EXISTING TELCO PEDESTAL O IRF r IRON REBAR (FOUND) O IRS 14" IRON REBAR (SET) 01PF 1- IRON PIPE (FOUND) F GUY GUY (ANCHOR) ■ ECM EXISTING CONCRETE MONUMENT ® PROPERTY CORNER (CALCULATED) --7/3r— EDGE OF PAVEMENT --- MW--- OVERHEAD PARE ---R/W--- RIGHT-OF-WAY X— CHAIN LINK FENCE EXISTING TREE LINE I I IEXISTING UTILITY EASEMENT �I I N64.15'07"W _ MAGNETIC' DECLINATION 09,08, CURVE TABLE CURVE # LENGTH RADIUS DELTA CHORD BEARING C1 415.22' 1 1560.40' 015-14'47" 414.00' N71-09.01"W 0 0 0 ANGLE +0.32'43.05" ,CENTERLINE ROPOSED TOWER N= 55.158. 40'._ _- eA�E= 2,286,739.67 53 IEXIS71NV TOWERy` ,- i r 4 MISTING FENCE 3 N C � PROPOSED FENCE INSET A LINE TABLE LINE # BEARING DISTANCE L1 N1327'07'W 82.19' L2 NOB"40'01"W 16.93' L3 N77.58'12"W 67.16' L4 S1I*44.40"W 75.57' L5 S1I*44'40"W 15.00' L6(TIE) S7821'28"E 9.17' L7(TIE) S78'l 5'20"E 55.00' L8(TIE) S7815'20"E 110.00' NIF � \ \ STATE OF NORTH CAROLINA CASWELL BEACH COAST GUARD I STATION 1 AREA OF DEED PARCEL 251CA001 OVERLAP DB 916 PC 279 � OB 1422 PG 702 '& DB 308 PG 988 1 N/F TEE TOWN OF CASWELL BEACH PARCEL 25INA050 LID 1422 PC 702 i EXISTING BUILDING TYP.) NS£ _ 87520"W TOWN OF CASWELL BEACA R/W _ _ PARCEL 2511A02105 CASwELIL BEgCH ' 35.04' DB 2852 PC 1187 R/W 9 C60' PUBLROR W (NCSR T100) R/W _ �R/W� IRF SOUTH 11"44'40" WEST A DISTANCE OF 0.95 FT. FROM DEED CORNER DUKE ENERGY PROGRESS INC PARCEL 25IIA021 DB 3411 PC 478 OB 308 PC 988 EXISTING POND SEE INSET A \ N/F DUKE ENERGY I PROGRESS INC PARCEL 2511AOP10/ I OB 3411 PC 478 � I Lt 1j4Z., ��'J ri = M N RF 270.92' N ' N7875'20" RF LaF I _ W 17 18 1RF 0 200 400 SCALE IN FEET PREPARED FOR: (1.? DUKE ENERGY. 410 S. WILMINGTON STREET RALEIGH, NC 27601 (919) 546-4545 PROJECT INFORMATION: CASWELL BEACH NC-1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PREPARED BY: TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603-5263 (919) 661"6351 NC LICENSE NO. C-1794 SURVEYOR CERTIFICATE "I, CLIFFORD C. BYRD. CERTIFY THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, (DEED DESCRIPTION RECORDED IN BOOK 1422 AT PAGE 702; THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS BROKEN LINES, DRAWN FROM INFORMATION FOUND IN BOOK AND PAGE AS REFERENCED HEREIN; THAT RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1: 10.000 OR GREATER; THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600.)". THIS 6TH �DAYOF FFEEBRUARY• 2015. SEAL "'-fn C- 1> NORTH CAROLINA PLS # L-3782 CLIFFORD C. BYRD \IA CAROB/1/1 0. 9r: SEAL SEAL :9y L-3782 DCW&at6N, NC DEC 1 6 2015 SHEET TITLE: SITE SURM DATE: 2X12015 REVISION: O SHEET #: I OF I TEP #: 3186- SITE NAME: CASWELL BEACH NC-1014 PROJECT DESCRIPTION: PROPOSED WIRELESS TELECOMMUNICATIONS FACILITY TOWER TYPE: 80'SELFSUPPORT SITE ADDRESS: CASWELL BEACH RD� CASWELL BEACH, NC 28465 COUNTY) JURISDICTION: BRUNSWICK COUNTY DISTURBED AREA: N/A PRESENT TELECOMMUNICATIONS OCCUPANCY TYPE: FACILITY CURRENT ZONING: C-BC PIN #: 2511A021 DUKE ENERGY,(BRUNSWICK SITE NAME. CASWELL BEACH NC-1014 CASWELL BEACH RD CASWELL BEACH, NC 28465 PLANS PREPARED BY: RECEIVE � ♦l JAN 06 2016 ski CM- MHD C! TOWER ENGINEERING PROFESSIONALS 326TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 WWW.10Pjroup.net N.C. LICENSE # G1794 PROJECT INFORMATION 5 10-19-I5 CONSTRUCTION 4 07-IG-I5 C01,15TKUCTION LATITUDE N 33° 53' 52.067" LONGITUDE W 78° 03' 18.829" GROUND ELEV. (AMSL) = 9' ±" 3 OG-19-15 CONSTRUCTION 05-11-15 e0% 1 I IO- I G-15 PRELIM INAKY O 02-05-I5 PRELIMINARY REV DATE ISSUED FOR: TOWER COORDINATES DRAWN BY: ETC ECKED BY: SAS fg�y r�`As bye{t ` ,t�iQDA s #a'y 't .dAY 8 A s� - LOCATION MAP - nw SITE PROJECT MANAGER: ALL woRK AN MATERIALS SHALL BE PERFORMED AND wsraueD IN ACCORDANCE WITH THE CORRENT EDITIONS OF THE FOLLOWING CODES NAME: DUKE ENERGY PROGRESS INC. AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING IN THESE ADDRESS: 200 LUCENT LANE PLANS IS TO BE CONSTRUED TO PERMITWORK NOT CONFORMING TOTHE LATEST EDITIONS OF THE FOLLOWING: CITY, STATE, ZIP: WARY, NC ROBERTS,Cl CONTACT: WILL ERTS, P.E. 1. NORTH CAROLINA BUILDING CODE d. 2012 NCEC PHONE: (919)546-2679 (2012 EDITION) (NEC 2011&ADDENDUM) 2. NORTH CAROLINA CODE COUNCIL S. LOCAL BUILDING CODE 3. ANSIMA-=2-G-2-200s SITE APPLICANT: 6. cmICOUNTY ORDINANCES NAME DUKE ENERGY PROGRESS INC. ADDRESS: 200 LUCENT LANE CODE COMPLIANCE CITY, STATE, ZIP: CARY, INC 27518 CONTACT: WILL ROBERTS, P.E. PHONE: (919) 546-2679 SURVEYOR:�y4Fr„„a\ NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROAD CITY, STATE, ZIP: RALEIGH, NC 27603 CONTACT: CLIFFORD C. BYRD, P.L.S. PHONE: (919) 661-6351 CIVIL ENGINEER: NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROADCITY, STATE, ZIP: RALEIGH, NC 27603CONTACT: KIMBERLY S. MARTIN, P.E.PHONE: (919) 661-6351 ELECTRICAL ENGINEER: NAME: TOWER ENGINEERING PROFESSIONALS ADDRESS: 326 TRYON ROAD UTILITIES: CITY, STATE, ZIP: RALEIGH, NC 27603 POWER COMPANY: DUKE ENERGY//T�• CONTACT: MARKS. QUAKENBUSH, P.E. PHONE: (919) 661-6351 PHONE:CONTABOB9MAR318SE METER #NEAR SITE: UNKNOWN PROPERTY OWNER: NAME: DUKE ENERGY PROGRESS INC. TELEPHONE COMPANY: AT&T ADDRESS: 200 LUCENT LANE CONTACT: CUSTOMER SERVICE CITY, STATE, ZIP: CARY, NC 27518 PHONE: (888) 757-6500 CONTACT: WILL ROBERTS, P.E. PHONE # NEAR SITE: (910) 278-5644 PHONE: (910) 457-3318 PEDESTAL# NEAR SITE: UNKNOWN SHEET DESCRIPTION REd SEAL of s �\ I�7� �Q \\ p �I \\ �.� • / ��i 11! j •9 S •' Q {At 2 SEAL i = s 039734 i '7 •..•• Q \ Ti TITLE SHEET NI C2 C3 C4 GENERAL NOTES SITE PLAN COMPOUND DETAIL TOWER ELEVATION FENCE DETAILS : 4 5 3 3 3 Ei ELECTRICAL NOTES - - 3 E2 GROUNDING PLAN AND NOTES 3 E3 GROUNDING DETAILS I 3 E4 GROUNDING DETAILS II October l9, 2025 SEAL: mAt SEV. i 042109 :. �q • lC 4: ' ®�� /f�s••••••� � fj QuA��N %S1�ifl1� Octoberl9, 2015 -- - FROM RALEIGH, NC: TAKE 140E TOWARD LELAND. FOLLOW ROAD FOR -117 MILES. TAKE EXIT416A TOWARD TOPSAIL ISLAND. FOLLOW ROAD FOR-8 MILES. TAKE EXIT 14 FOR US-17S. FOLLOW ROAD FOR -6 MILES. TAKE EXIT FOR NC-133S TOWARD SOUTHPORT. TURN LEFT ONTO VILLAGE ROAD NE. FOLLOW ROAD FOR-23 MILES. DESTINATION WILL BE ON THE LEFT. SHEET NUMBER: T REVISION: 5 OF SHEETS DRIVING DIRECTIONS CONTACT INFORMATION INDEX TEP #: 31bG2 1. ALL REFERENCES MADE TO OWNER IN THESE DOCUMENTS SHALL BE CONSIDERED DUKE ENERGY OR IT'S DESIGNATED REPRESENTATIVE._ 2. ALL WORK PRESENTED ON THESE DRAWINGS MUST BE COMPLETED BY THE CONTRACTOR UNLESS NOTED OTHERWISE. THE CONTRACTOR MUST HAVE CONSIDERABLE EXPERIENCE IN PERFORMANCE OF WORK SIMILAR TO THAT DESCRIBED HEREIN. BY ACCEPTANCE OF THIS ASSIGNMENT, THE CONTRACTOR IS ATTESTING THAT HE DOES HAVE SUFFICIENT EXPERIENCE AND ABILITY, THAT HE IS KNOWLEDGEABLE OF THE WORK TO BE PERFORMED AND THAT HE IS PROPERLY LICENSED AND PROPERLY REGISTERED TO DO THIS WORK IN THE STATE OF NORTH CAROLINA. 3. THE STRUCTURE SHALL BE DESIGNED IN ACCORDANCE WITH ANSI/TIA-222—G-2-2009. THIS CONFORMS TO THE REQUIREMENTS OF THE NORTH CAROLINA BUILDING CODE, 2012 EDITION. 4. WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE NORTH CAROLINA BUILDING CODE, 2012 EDITION. 5. UNLESS SHOWN OR NOTED OTHERWISE ON THE CONTRACT DRAWINGS, OR IN THE SPECIFICATIONS, THE FOLLOWING NOTES SHALL APPLY TO THE MATERIALS LISTED HEREIN, AND TO THE PROCEDURES TO BE USED ON THIS PROJECT. 6. ALL HARDWARE ASSEMBLY MANUFACTURER'S INSTRUCTIONS SHALL BE FOLLOWED EXACTLY AND SHALL SUPERSEDE ANY CONFLICTING NOTES ENCLOSED HEREIN. 7. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE STRUCTURE AND IT'S COMPONENT PARTS DURING ERECTION AND/OR FIELD MODIFICATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF TEMPORARY BRACING, GUYS f1R TIF ❑OWNS THAT MAY RF NFf.FSSARY SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE 8. ALL DIMENSIONS, ELEVATIONS. AND EXISTING CONDITIONS SHOWN ON THE DRAWINGS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO BEGINNING ANY MATERIALS ORDERING, FABRICATION OR CONSTRUCTION WORK ON THIS PROJECT. CONTRACTOR SHALL NOT SCALE CONTRACT DRAWINGS IN LIEU OF FIELD VERIFICATION. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND THE OWNER'S ENGINEER. THE DISCREPANCIES MUST BE RESOLVED BEFORE THE CONTRACTOR IS TO PROCEED WITH THE WORK. THE CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY THE OWNER AND/OR THE ENGINEER SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE PROCEDURES. 9. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW AND OF GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANY AND ALL SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED IN WRITING BY THE OWNER AND ENGINEER PRIOR TO INSTALLATION. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND AND QUALITY OF THE MATERIALS AND EQUIPMENT BEING SUBSTITUTED. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT THIS PROJECT AND RELATED WORK COMPLIES WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. RENTAL CHARGES, SAFETY, PROTECTION AND MAINTENANCE OF RENTED EQUIPMENT SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 11. ACCESS TO THE PROPOSED WORK SITE MAY BE RESTRICTED. THE CONTRACTOR SHALL COORDINATE INTENDED CONSTRUCTION ACTIVITY, INCLUDING WORK SCHEDULE AND MATERIALS ACCESS, WITH THE CARRIER PROJECT MANAGER. 12. BILL OF MATERIALS AND PART NUMBERS LISTED ON CONSTRUCTION DRAWINGS ARE INTENDED TO AID CONTRACTOR/OWNER. CONTRACTOR/OWNER SHALL VERIFY PARTS AND QUANTITIES WITH MANUFACTURER PRIOR TO BIDDING AND/OR ORDERING MATERIALS. 13. ALL PERMITS THAT MUST BE OBTAINED ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS. 14. 24 HOURS PRIOR TO THE BEGINNING OF ANY CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE APPLICABLE JURISDICTIONAL (STATE, COUNTY OR CITY) ENGINEER. 15. EXCAVATION AND BACKFILL SHALL BE IN ACCORDANCE WITH MNT—NGGC-0024 AND OE&RC-0037 16. THE CONTRACTOR IS REQUIRED TO MAINTAIN ALL PIPES, DITCHES. AND OTHER DRAINAGE STRUCTURES FREE FROM OBSTRUCTION UNTIL WORK IS ACCEPTED BY THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED BY FAILURE TO MAINTAIN DRAINAGE STRUCTURE IN OPERABLE CONDITION. 17. THE OWNER SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHILE WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY GOVERNING AGENCY INSPECTORS. GENERAL NOTES 18. ANY BUILDINGS ON THIS SITE ARE INTENDED TO SHELTER EQUIPMENT WHICH WILL ONLY BE PERIODICALLY MAINTAINED AND ARE NOT INTENDED FOR HUMAN OCCUPANCY. 19. TEMPORARY FACILITIES FOR PROTECTION OF TOOLS AND EQUIPMENT SHALL CONFORM TO LOCAL REGULATIONS AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 20. THE CONTRACTOR AND ITS SUBCONTRACTORS SHALL CARRY LIABILITY INSURANCE IN THE AMOUNTS AND FORM IN ACCORDANCE WITH CARRIER SPECIFICATIONS. CERTIFICATES DEMONSTRATING PROOF OF COVERAGE SHALL BE PROVIDED TO CARRIER PRIOR TO THE START OF THE WORK ON THE PROJECT. 21. THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITY SERVICES TO VERIFY LOCATIONS OF EXISTING UTILITIES AND REQUIREMENTS FOR NEW UTILITY CONNECTIONS PRIOR TO EXCAVATING. 22. THE CONTRACTOR SHALL MAINTAIN THE JOB CLEAR OF TRASH AND DEBRIS. ALL WASTE MATERIALS SHALL BE REMOVED FROM THE SITE PRIOR TO SUBSTANTIAL COMPLETION AND PRIOR TO FINAL ACCEPTANCE. THE CONTRACTOR SHALL FURNISH ONE 55 GALLON BARREL, AND TRASH BAGS, AND SHALL REMOVE TRASH, DEBRIS, ETC., ON A DAILY BASIS. 23. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL CONDITIONS PRIOR TO SUBMITTING HIS PROPOSAL. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THESE DRAWINGS WITH THOSE AT THE SITE. ANY VARIATION WHICH REQUIRES PHYSICAL CHANGE SHALL BE BROUGHT TO THE ATTENTION OF THE DUKE ENERGY PROJECT ENGINEER FOR FACILITIES/CONSTRUCTION. 24, THE CONTRACTOR SHALL GUARANTEE THE WORK PERFORMED ON THE PROJECT BY THE CONTRACTOR AND ANY OR ALL OF THE SUBCONTRACTORS WHO PERFORMED WORK FOR THE CONTRACTOR ON THIS PROJECT. THE GUARANTEE SHALL BE FOR A FULL YEAR FOLLOWING ISSUANCE OF THE FINAL PAYMENT OF RETANNAGE. ALL MATERIALS AND WORKMANSHIP SHALL BE WARRANTED FOR ONE YEAR FROM ACCEPTANCE DATE. 25. TOWER SHALL BE CONSTRUCTED OF GALVANIZED STEEL OR PAINTED PER APPLICABLE STANDARDS OF THE FAA OR OTHER APPLICABLE FEDERAL OR STATE AGENCY. RF—Ct=IVED DCNI WILMINGTON, NC DEC 1 ; 2015 PLANS PREPARED FOR: (•� DUKE ENERGY. 299 FIRST AVENUE NORTH ST. PETERSBURG. FL 33701 Office: (727) 820-5396 PROJECT INFORMATION: CASWELL BEACH NC-1014 CASWELL BEACH ROAD CASWELL BEACH, INC 28465 (BRUNSWICK COUNTY) PLANS PREPARED RECEIVED 0 6 2016 M- CM14D Cl TOM ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661.6351 www.tepgroup.net N.C. L1914 # C-1794 SEAL: A-.044;*60*4111 f0 ♦�S $ i( SEAL r� 033734 a V"04 Rfy M. 4 07-13-I5 CONSTRUCTION 3 QG-19-15 CONSTRUCTION 2 05-II-I5 90% I 04-22-I5 PREUMINAKY REV DATE ISSUED FOR: JAS GENERAL NOTES SHEET NUMBER: REVISION: 4 Nml I TEP /: 31862 APPROXIMATE LOCATION OF ADJACENT PARCEL BOUNDARY N/F OCEANGREBNS HOMEOWNERS ASSO INC PARCEL 251RD00f0f OB 1101 PG 0370 i i I i `EXISTING UTILITY i EASEMENT N/F DUKE ENERGY PROGRESS INC PARCEL 2511AOZI DB 3411 PC 478 DB 308 PC 988 —EXISTING POND EXISTING GRAVEL ACCESS DRIVE DB 1422 PG 702 & /XX�N\/YX5� k N/F THE TOWN OF CASWELL BEACH PARCEL 251NA050 DB 1422 PC 702 PROPOSED 80' SELF-SUPPORT TOWER. SEE SHEET C-3 FOR EXISTING `b ----»►1 XFMR APPROXIMATE LOCATION "R/W_ _ OF EXISTING PAVEMENT '�* 7 ......... APPROXIMATE LOCATION OF R/W_,` STATIC VEGETATION LINE` --__ EXISTING COMPOUND WITH PROPOSED EXPANSION. SEE �� EXISTING LIGHT POLE (TYP) SHEET C-2 FOR DETAILS. EXISTING BUILDING (TYP) NOTES: 1. THE BASIS OF THE MERIDIANS AND COORDINATES FOR THIS PLAT IS THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM 1983 (NCSPCS NAD 83). BASED ON DIFFERENTIAL GPS OBSERVATIONS PERFORMED ON JANUARY 8. 2015. 2. VERTICAL INFORMATION SHOWN, BASED IN THE NORTH AMERICAN VERTICAL DATUM OF NAVD 1988 IN FEET. 3. ALL DISTANCES ARE GROUNDED UNLESS OTHERWISE NOTED. 4. THE TOWER IS LOCATED IN ZONE "AE", AREAS WHERE THE BASE FLOOD ELEVATION IS DETERMINED TO BE 14' ACCORDING TO FEMA COMMUNITY PANEL #372028500J, DATED JUNE 2. 2006. SITE PLAN SCALE: 1" =200• PLANS PREPARED LEGEND DUKE �� wFO`R: ///��� E, �� - EXIST. PROPERTY LINE V 299 FIRST AVENUE NORTH `'III EXIST. UTILITY POLE ST. PETERSBURG, FL 33701 Office: (727) 820-5396 ❑T EXIST. TELCO PEDESTAL PROJECT INFORMATION: o^ - w Q PROPERTY CORNER CASWELL BEACH ---200--- EXIST. CONTOUR LINE NC-1014 —�+— EDGE OF PAVEMENT CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) --- OHW--- OVERHEAD WIRE PLANS PREPARED BY: --- R/W--- - RIGHT-OF-WAY — X — CHAIN LINK FENCE / R EC EF Y D \^ EXISTING TREE LINE JAN 0 6 �Q N/F DI M_ MHD ITY STATE OF NORTH CAROLINA CASWELL BEACH COAST GUARD STATION PARCEL 251GA001 DB 9f6 PG 279 TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 NIF DECARLUCCI GUY R OFFICE: (919) 661.6351 BTUX IBANNIE C www.tepgroup.net PARCEL 2514AO0104 DB 3058 PC 0003 N.C. L # C-1794 NIF SEAL: ENERGY PROROG APPROXIMATELOCATION ,Nb '�CQ PARCBLINC OF (�� 251IA021T01 ADJACE O �y DB 3411 PG 478 PARCEL BOUNDARY CF •�� '� �� .y � Y �, SIM 04 Odo6e>19, 2015 I 5 10-19-I5 CON57RUCTION If 4 07-16-I5 CON5TRUCTION 3 OG-10-15 CON5TRDCTION CAS N/F WFLLe—� 2 05-11-15 90% REV DATE ISSUED FOR: TOWN E A HSIIBLL (so• PUBLIC R (SR I, - /w--_ PARCEL 2511A02105 DRAWN BY: RCL CHECKED BY: JA5 DB 2952 PG 1197 R E:{. EI Vt=If DC 'QVII.MI`NCTCN, NC DEC 1 6 2015 0 200 400 SCALE IN FEET SITE PLAN SHEET NUMBER: REVISION: CTEP #:c 318r2 ELECTRICAL NOTES: SCOPE: 1. SHALL INCLUDE ALL LABOR, MATERIALS AND APPLIANCES REQUIRED FOR THE FURNISHING, INSTALLING AND TESTING, COMPLETE AND READY FOR OPERATION OF ALL WORK SHOWN ON THE DRAWING AS SPECIFIED HEREIN: 1. ELECTRIC SERVICE 4. MISCELLANEOUS MATERIALS 2. CONDUIT AND RACEWAY 5. TELEPHONE CONDUITS 3. CONDUCTORS 6. LIGHTNING ARRESTING SYSTEM CODES 1. THE INSTALLATION SHALL COMPLY PATH ALL APPLICABLE LAWS AND CODES. THESE INCLUDE BUT ARE NOT LIMITED TO THE LATEST EDITIONS OF: A. THE NATIONAL ELECTRICAL SAFETY CODE D. LOCAL AND STATE AMENDMENTS B. THE NATIONAL ELECTRIC CODE - NFPA-70 E. REGULATIONS OF THE SERVING UTILITY COMPANY C. THE INTERNATIONAL ELECTRIC CODE - IEC F. NCEC 2. ALL PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR. 3. AFTER COMPLETION AND FINAL INSPECTION OF THE WORK, THE OWNER SHALL BE FURNISHED A CERTIFICATE OF COMPLETION AND APPROVAL. TESTING 1. UPON COMPLETION OF THE INSTALLATION, OPERATE AND ADJUST ALL EQUIPMENT AND SYSTEMS TO MEET SPECIFIED PERFORMANCE REQUIREMENTS. ALL TESTING SHALL BE DONE BY QUALIFIED PERSONNEL. GUARANTEE 1. IN ADDITION TO THE GUARANTEE OF THE EQUIPMENT BY THE MANUFACTURER, EACH PIECE OF EQUIPMENT SPECIFIED HEREIN SHALL ALSO BE GUARANTEED FOR DEFECTS OF MATERIAL OR WORKMANSHIP OCCURRING DURING A PERIOD OF ONE (1 YEAR FROM FINAL ACCEPTANCE OF THE WORK BY THE OWNER. WITHOUT EXPENSE TO THE OWNER ALL ARRANTEE CERTIFICATES & GUARANTEES FURNISHED BY THE MANUFACTURERS SHALL BE TURNED OVER TO THE OWNER. CO-ORDINATION: 1. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE POWER AND TELEPHONE COMPANIES AND SHALL COMPLY WITH ALL SERVICE REQUIREMENTS OF EACH UTILITY COMPANY. EXAMINATION OF SITE 1. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE SITE OF THE JOB AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS AFFECTING THE PROPOSED ELECTRICAL INSTALLATION AND SHALL MAKE PROVISIONS AS TO THE COST THEREOF. FAILURE TO COMPLY WITH THE INTENT OF THIS PARAGRAPH WILL IN NO WAY RELIEVE THE CONTRACTOR OF PERFORMING ALL WORK NECESSARY FOR A COMPLETE AND WORKING SYSTEM OR SYSTEMS. CUTTING, PATCHING AND EXCAVATION: 1. COORDINATION OF ALL SLEEVES, CHASES, ETC., WALL BE REQUIRED PRIOR TO THE CONSTRUCTION OF ANY PORTION OF THE WORK. ALL CUTTING AND PATCHING OF WALLS, PARTITIONS, FLOORS, AND CHASES IN CONCRETE, WOOD, STEEL OR MASONRY SHALL BE DONE AS PROVIDED ON THE DRAWINGS. 2. ALL NECESSARY EXCAVATIONS AND BACKFILLING INCIDENTAL TO THE WORK UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWING SHALL BE PROVIDED BY THIS CONTRACTOR. 3. SEAL ALL PENETRATION THROUGH WALL AND FLOORS WITH APPROVED GROUT. EXTERIOR CONDUIT: 1. ALL EXPOSED CONDUIT SHALL BE NEATLY INSTALLED AND RUN PARALLEL OR PERPENDICULAR TO STRUCTURAL ELEMENTS. SUPPORTS AND MOUNTING HARDWARE SHALL BE HOT DIPPED GALVANIZED STEEL. RACEWAYS 1. ALL CONDUCTORS SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT SHALL BE RIGID STEEL, EMT OR SCH40 PVC AS INDICATED ON THE, DRAWINGS. 2. WHERE INSTALLED ON EXTERIORS AND EXPOSED TO DAMAGE. ALL CONDUIT SHALL BE RIGID STEEL. ALUMINUM CONDUIT SHALL NOT BE ALLOWED. 3. CONCEALED CONDUIT IN WALLS OR INTERIOR SPACES ABOVE GRADE MAY BE EMT. 4. UNDERGROUND CONDUITS SHALL BE RIGID STEEL OR SCHEDULE 40 PVC AS INDICATED ON THE DRAWINGS. 5. ALL CONDUIT RUNS SHALL USE APPROVED COUPLINGS AND CONNECTORS. PROVIDE INSULATED BUSHING FOR ALL CONDUIT TERMINATIONS. ALL CONDUIT RUNS IN A WET LOCATION SHALL HAVE WATERPROOF FITTINGS. 6. PROVIDE SUPPORTS FOR ALL CONDUITS IN ACCORDANCE WITH NEC REQUIREMENTS. ALL CONDUITS SHALL BE SIZED AS REQUIRED BY NEC. 7. BURIAL DEPTH OF ALL CONDUITS SHALL BE AS REQUIRED BY CODE FOR EACH SPECIFIC CONDUIT TYPE AND APPLICATION. 8. CONDUIT ROUTES ARE SCHEMATIC. CONTRACTOR SHALL FIELD VERIFY BEFORE BID. COORDINATE ROUTE WITH WIRELESS CARRIER AND BUILDING OWNER. PLANS PREPARED FOR: EQUIPMENT: 1 1. ALL DISCONNECT SWITCHES SHALL BE SERVICE ENTRANCE RATED, HEAVY DUTY TYPE. 44/ � Yo 2. NEW CIRCUIT BREAKERS SHALL BE RATED TO WITHSTAND THE MAXIMUM AVAILABLE FAULT CURRENT AS 299 FIRST AVENUE NORTH DETERMINED BY THE LOCAL UTILITY. CONTRACTOR SHALL VERIFY MAXIMUM AVAILABLE FAULT CURRENT, ST. PETERSBURG, FL 33701 AND COORDINATE INSTALLATION WITH THE LOCAL UTILITY BEFORE STARTING WORK. Office: (727) 820-5396 3. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL/LISTED BY UL OR A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY. PROJECT INFORMATION: CONDUCTORS CASWELL BEACH 1 FURNISH AND INSTALL CALLED NTHE DRAWINGS. ALL CONDUCTORS SHALL HAVE TYPE THWN(MIN)(75C) INSULATION, RATED FOR 500VOLTS.NC-1014 2. ALL CONDUCTORS SHALL BE COPPER, THE USE OF ALUMINUM CONDUCTORS SHALL NOT BE ALLOWED. CASWELL BEACH ROAD ALL CONDUCTORS SHALL BE UL LISTED AND SHALL BE PROVIDED AND INSTALLED AS FOLLOWS: CASWELL BEACH, NC 28465 A. MINIMUM WARE SIZE SHALL BE p12 AWG. (BRUNSWICK COUNTY) B. ALL CONDUCTORS SIZE k8 AND LARGER SHALL BE STRANDED. CONDUCTORS SIZED #10 AND SMALLER PLANS PREPARED BY: MAY BE SOLID O&0 LADED. / RECENE C. CONNECTION FOR 10 AWG AND SMALLER SHALL BE BY TWISTING TIGHT AND INSTALLING INSULATED 1 PRESSURE OR WI ENUT CONNECTIONS. l'� D. CONNECTION FOR g8 AWG AND LARGER SHALL BE BY USE OF STEEL CRIMP -ON SLEEVES WITH AlJqN 0 6 2016 NYLON INSULATOR. .► 3. ALL CONDUCTORS SHALL BE COLOR CODED IN ACCORDANCE WITH NEC STANDARDS. 4. THE RACEWAY SYSTEM SHALL BE COMPLETE BEFORE INSTALLING CONDUCTORS L �;(�_ M H D t PENETRATIONS: 1. CONTRACTOR SHALL COMPLY WITH UL PENETRATION DETAILS FOR PENETRATIONS OF ALL RATED WALLS, ROOF, ETC. GROUNDING TOWER EN26TR PROFESSIONALS 326TRYONONROAD 1. ALL ELECTRICAL NEUTRALS, RACEWAYS AND NON -CURRENT CARRYING PARTS OF ELECTRICAL EQUIPMENT RALEIGH,NC 27603 AND ASSOCIATED ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE 'NTH NEC ARTICLE 250. THIS SHALL OFFICE: 919 661-6351 INCLUDE NEUTRAL CONDUCTORS, CONDUITS, SUPPORTS. CABINETS. BOXES, GROUND BUSSES, ETC. THE NEUTRAL CONDUCTOR FOR EACH SYSTEM SHALL BE GROUNDED BY ONE POINT ONLY. WWW.tepgroup.net 2. PROVIDE GROUND CONDUCTOR IN ALL RACEWAYS. 3. PROVIDE BONDING AND GROUND TO MEET NFPA 780 - LIGHTNING PROTECTION AS A MINIMUM. N.C. LICENSE# C-1 794 4. PROVIDE GROUNDING SYSTEM AS INDICATED ON THE DRAWINGS, AS REQUIRED BY THE NATIONAL ELECTRIC SEAL: CODE AND RADIO EQUIPMENT MANUFACTURER. 11 ABBREVIATIONS AND LEGEND II A - AMPERE PVC - SCH40 RIGID NON-METALLIC CONDUIT AFG - ABOVE FINISHED GRADE RGS - RIGID GALVANIZED STEEL CONDUIT ATS - AUTOMATIC TRANSFER SWITCH SW - SWITCH AWG - AMERICAN WIRE GAUGE TGB - TOWER GROUND BAR BCW - BARE COPPER WIRE UL - UNDERWRITERS LABORATORIES BFG - BELOW FINISHED GRADE V - VOLTAGE BKR - BREAKER W - WATTS C - CONDUIT XFMR - TRANSFORMER C �I,`�_; CKT - CIRCUIT XMTR - TRANSMITTER DISC - DISCONNECT JCM V+i I-MING701V EGR - EXTERNAL GROUND RING EMT - ELECTRIC METALLIC TUBING FSC - FLEXIBLE STEEL CONDUIT GEN - GENERATOR ____E---- UNDERGROUND ELECTRICAL CONDUIT CPS - GLOBAL POSITIONING SYSTEM GIRD - GROUND ----T---- UNDERGROUND TELEPHONE CONDUIT IGB - ISOLATED GROUND BAR 8 KILOWATT-HOUR METER IGR - INTERIOR GROUND RING (HALO) UNDERGROUND BONDING AND KW - KILOWATTS --------- GROUNDING CONDUCTOR. NEC - NATIONAL ELECTRIC CODE 0 GROUND ROD PCs - PERSONAL COMMUNICATION SYSTEM PH - PHASE • CADWELD PNL - PANEL ® GROUND ROD WITH INSPECTION WELL PNLBD - PANELBOARD g SEAL r J 042109 %t►¢ti1� iu+w SS 3 OG-19-15 CON5TRUCTION 2 05-11-15 90% NC 1 04-22-15 PRELIMINARY 0 02-04-15 PREUMINARY REV DATE ISSUED FOR: DRAWN BY: JTC CHECKED BY: SHEET TITLE: JA5 ELECTRICAL NOTES SHEET NUMBER: REVISION: 3 TEP Y: 31862 GROUNDING NOTES 1. GROUNDING ELECTRODES SHALL BE CONNECTED IN A RING USING R2 AWG BARE TINNED COPPER WARE. THE TOP OF THE GROUND RODS AND THE RING CONDUCTOR SHALL BE 2 FEET BELOW FINISHED GRADE. GROUNDING ELECTRODES SHALL BE DRIVEN ON 10'-0" CENTERS. (MIN. 15'-0- MAX) 2. BONDING OF THE GROUNDED CONDUCTOR (NEUTRAL) AND THE GROUNDING CONDUCTOR SHALL BE AT THE SERVICE DISCONNECTING MEANS/ BONDING JUMPER SHALL BE INSTALLED INSTALLED PER N.E.C. ARTICLE 250.30. 3. CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER WHEN THE GROUNDING SYSTEM IS COMPLETE. THE CONSTRUCTION MANAGER SHALL INSPECT THE GROUNDING SYSTEM PRIOR TO BACKFILLING. ------------ X X X X X DRAWING NOTES: O PROPOSED TOWER GROUND RING O RO BODING TO TOWER GROUND RING (TWEN TOYPP O INS TO WELL TR O GATE BONDING TO TOWER GROUND RING POTION NONNECTION 3O 3B" x 10' COPPER GROUND ROD (TYP) O7 EXISTING COMPUND GROUND RING. CONTRACTOR TO VERIFY LOCATION. 4O TOWER BONDING TO FENCE (TYP OF 2) TOWER GROUNDING PLAN SCALE: Ya" = 1'-0" 0 4 8 SCALE IN FEET FENCE END POST. CADWELD GROUND WIRE TO FENCE END POSTS MID).— )f" PVC PIPE / 6" BELOW GRAC FINISHED GRADE GROUND i GROUND ROD. —,-.I I \ L BURIED GROUND RING. CADWELD. FENCE GROUNDING DETAIL SCALE: N.T.S. GATE GATE FLEX JUMPER 5 W/ CADWELD TYPE �r------ OUTER GROUNG RING. p2 AWG TINNED SOLID COPPER WIRE. 10' x %" GROUND ROD. FENCE POST. CADWELD CONNECTION. CADWELD CONNECTION THEN COLD J I i p2 AWG TINNED SOLID COPPER WIRE. CADWELD TO EXTERIOR GROUND RING. Rtom ✓E i V E..D D C 1 201 TYPICAL GATE POST GROUNDING DETAIL SCALE: N.T.S. PLANS PREPARED FOR: �•� DUKE "ENERGY* 299 FIRST AVENUE NORTH ST. PETERSBURG, FL 33701 Office: (727) 820-5396 CASWELL BEACH NC-1014 CASWELL BEACH ROAD CASWELL BEACH, NC 28465 (BRUNSWICK COUNTY) PLANS PREPARED BY: `RECEIVED JAN 0 6 2016 M\� ClTlj TOWER ENGINEERING PROFESSIONALS 326 TRYON ROAD RALEIGH, NC 27603 OFFICE: (919) 661-6351 WWW.teMroup.net N.C. LICENSE # C-1794 SEAL: Jflf d� i :a SEAL r a421aa = ids' aft .,U'�� Jana 19, 2015 90% LCON5TKUCTION PRELIMINARY PREUMINARY ISSUED FOR: DRAWN BY: JFC CHECKED BY: JAS SHEET TITLE: TOWER & SHELTER GROUNDING PLAN SHEET NUMBER: REVISION: Em2 I TEP 318G2 NOTE: MINIMUM SPACING OF 12" BETWEEN ALL CADWELDS TOP VIEW SIDE VIEW CADWELD GROUNDING DETAIL SCALE: N.T.S. % - 11xi" H.H.C.S. BOLT, NEWTON INSTRUMENT CO. (CAT.# 3012-1) %- LOCKWASHER, NEWTON INSTRUMENT CO. (CAT.# 3015-8) COPPER GROUND BAR Ya"x4'x2O" MIN. NEWTON INSTRUMENT CO. CAT.# B-5142. HOLE CENTERS TO MATCH NEMA DOUBLE LUG CONFIGURATION STANDARD GROUND BAR DETAIL SCALE: N.T.S. GROUND WIRE (TYP) GROUND ROD CADWELD (TYP) PLANS PREPARED FOR: MALE SCREW COVER W/ TEFLON LUBRICANT ENERGY° B 299 FIRST AVENUE NORTH PVC COLLAR ST. PETERSBURG, FL 33701 #2 SOLID, BARE. - Office: (727) 820-5396 IFINISHED GRADE TINNED COPPER I GROUND RING .,__.-.._ ...-....... _..... CASWELL BEACH NC-1014 CASWELL BEACH, NC 28465 #2 SOLID, BARE. (BRUNSWICK COUNTY) r\ /� TINNED COPPER :r GROUNDING CONDUCTOR PLANS PREPARED BY: ti EXOTHERMIC WELD THERMOWELD RECEIVED OR APPROVED EQUIVALENT DIRECTLY TO TOP OF GROUND 1AN 0 6 201E ROD (2 PLACES) OP42) �01 8" x 42" PVC SLOTTED �` A p u D C. WELL BY i°fy1� �V1r1 �+ Ivncncnum Lmnurnvrcum 27" SLOT CUT SMOOTH FOR 46" x 10' COPPER CLAD GROUND RING. EXTEND NOTCH 326TRYONROAD STEEL GROUND ROD 2" ABOVE CONDUCTOR. RALEIGH,NC 27603 OFFICE: (919) 661.6351 11 www.tepgroup.net GROUND ROD WITH INSPECTION WELL I N.C. LICENSE# C-1 794 SCALE: N.T.S. SEAL: l f� d ' 0f�r. WALL MOUNTING BRACKET, 30,ifgk �. NEWTON INSTRUMENT CO. (CAT.# A-6056) pQ SEAL. �9 042109 INSULATORS. FINISHED GRADE NEWTON INSTRUMENT CO. \/ / 19 ' X / L'�-yrc (CAT.#3061-4) /�"•°"°"°' 1�\� CADWELD ,Wm 19,201S O O I/ 3 OG-19-15 CONSTRUCTION 0 0 V 2 OS -II -IS 90% O O O O 1 04-22-I5 PRELIMINARY O O O O 0 O GROUND RING REE DATE 0 S PRELIMINARY 0 0 0 0 0 V DATE ISSUED FOR: 0 ; #2 AWG BCW (TINNED) 0 DRAWN BY: JTC CHECKED BY: JA5 COPPER GROUND ROD SHEET TITLE:. 0 x 10•-0" LONG) NOTE:-�.�=-CF=;�/ED GROUNDING GROUND BAR SHALL BE SIZED TO REQUIRED PLUS ❑G°im W11-MINGTON. N DETAILS ALL GROUNDING CONNECTIONS REQUIRED PLUS PROVIDE 50% SPARE CAPACITY. DEC b SHEET NUMBER: REVISION: COPPER -CLAD STEEL GROUND ROD C �J Q 3 G SCALE: N.T.S. TEP #: 31862 - NOTE: PLANS PREPARED FOR: a T StOZ �30 DUKE THE CONTRACTOR SHALL UTILIZE AN INTERMEDIATE 40) N 'NOiONI A-11M V\1001 GROUND BAR FOR ANTENNA RAD CENTERS OVER 200% ENERGY. 03AID03 299 FIRST AVENUE NORTH WIRES FROM GROUND KITS ST. PETERSBURG, FL 33701 Ye"x4"x15" COPPER (NUMBER CORRESPONDS Office: (727) 820-5396 PROJECT INFORMATION: GROUND BAR BONDED WITH NUMBER OF COAXIAL CABLES). TO TOWER CASWELL BEACH CONNECT GROUND WIRES TO WIRES FROM GROUND KITS (NUMBER CORRESPONDS NC-1014 GROUND BAR WITH 2-HOLE LUGS. ALL SURFACES BE WITH NUMBER OF COAXIAL 0 0 o COATED WITH KOPR-SHIELD. CABLES). CASWELL BEACH ROAD CASWELL BEACH, 28465 9 CONNECT GROUND WIRES TO (BRUNSWICK COUNTY) U TY) 0 0 0 0 0 0 0 GROUND BAR WITH 2-HOLE PLANS PREP - 0 0 0 0 0 0 o LUGS. ALL SURFACES TO BE 0 0 o KOPR-SHIELD. COATED WITH 3'� p2 AWC TO GROUND BAR WITH CADWELD #2 AWG BARE TINNED SOLID COPPER GROUND O o 0 0 0�'. O O ° 0 0 0 0 0 0 0 0 0 ,�JAN062016 ` WIRE CADWELDED TO GROUND RING (7YP OF 2). M- MHD CITY END VIEW Y"xa"x1s" COPPER GROUND BAR BONDED TO TOWER. \� TOWER ENGINEERING PROFESSIONALS 326TRYON ROAD RALEIGH,NO 27603 LOWER GROUND BAR UPPER / INTERMEDIATE GROUND BAR OFFICE: (919) 661.6351 SCALE: N.T.S. SCALE: N.T.S. www.tepgroup.net N.C. LICENSE # C-1794 ESS SEAL: STEEL BOLT i� STAINLESS STEEL NUT STAINLESS STEEL BELLEVILLE WASHER GROUND LEADS TO NEW EQUIPMENT _ 'a SEAL r9 c — 042109 - - - - - - GROUND BAR LOCATED INSIDE TELCO CABINET - yt- ---- QUA,• COPPER Op Op 7�+�79, 2015 3 06-19-IS CONSTRUCTION STAINLESS STEEL RAT WASHER BUS BAR 2 05-II-IS 80% CONNECT GROUND WIRES TO I 04-22-15 PRELIMINARY GROUND BAR WITH 2-HOLE O 02-04-I5 PREUMINARV LUGS. ALL SURFACES TO BE REV DATE ISSUED FOR: COATED WITH KOPR-SHIELD. NOTES: GROUND LEAD 70 DRAWN BY: JTC CHECKED BY: JAS INSPECTION WELL AT SHEET TITLE: 1. ALL HARDWARE SHALL BE 18-8 STAINLESS STEEL, INCLUDING THE BELLEVILLE EQUIPMENT GROUND WASHERS. COAT ALL SURFACES WITH KOPR-SHIELD BEFORE MATING. RING 2- FOR GROUND BOND TO STEEL ONLY; INSERT A DRAGON TOOTH WASHER BETWEEN GROUNDING THE LUG AND STEEL. COAT ALL SURFACES WITH KOPR-SHIELD, DETAILS II SHEET NUMBER: VISION: LUG DETAIL GROUND BAR IN TELCO CABINET Caw 3 ;TE SCALE: N.T.S. SCALE: N.T,S. G 4 P 0 31862