Loading...
HomeMy WebLinkAbout129-16 Minor Mod 2018 Dare County Inlet DredgingPermit Class MODIFICATION/MINOR Permit Number 129-16 STATE OF NORTH CAROLINA Department of Environmental Quality and . Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Dare County, 954 Marshall C. Collins Drive, Manteo, NC 27954 Authorizing development in Hyde/Dare County at Pamlico Sound &c Hatteras Inlet complex adj. to the NE tip of Ocracoke Island as requested in the permittee's letter dated 2/9/18 and addendum dated 3/5/18, including attached workplan drawings (6) CS-1, PV-1, PV-2, XS-1 dated 2/9/18, Hydrographic Survey dated 2/15/18, Fig 1 dated 3/2/18. This permit, issued on March 14, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. , 1) All conditions and stipulations of the active permit No. 129-16, issued 12/20/16, remain in force unless specifically altered herein, 2) In order to protect threatened and endangered species and to minimize adverse impacts to offshore, nearshore, and intertidal resources, no excavation activities, including mobilization and demobilization, shall occur form April 1 to September 30 of any year without prior approval form the Division of Coastal Management in consultation with appropriate resource agencies. (See attached sheet for additional conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Br tton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Dare County ADDITIONAL CONDITIONS Permit No.129-16 Page 2 of 2 3) Unless specifically altered herein, this Minor Modification authorizes expansion of the connector channel to a width of 200 feet, and the expansion of the project area, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional development activities may require a modification of this permit. 4) This permit modification authorizes the one time use of an in -water temporary disposal site as depicted in the attached email correspondence dated 2/28/18 and workplan drawing dated 2/15/18. This one time in -water temporary disposal is authorized for amaximum volume of 500cy. Spoil must be transported to the authorized offshore disposal site once the shoal is to an acceptable depth for safe dredge operation. Cultural Resource Protection 5) If substantial archaeological resources are encountered for any dredging event, the'permittee shall immediately stop work and notify the NC Division of Coastal Management at (252) 946-6481. General 6) The permittee shall obtain any necessary authorizations or approvals from the US Army Corps of Engineers and North Carolina Division of Water Resources prior to initiation of any permitted activity. Unless altered by a specific Condition of this Permit, the permittee shall adhere to all conditions on these additional approvals. 7) This Minor Modification shall be attached to the original Permit No. 129-16, which was issued on 12/20/16, and copies of both documents must be readily available on site when Division personnel inspect the project for compliance. NOTE: The Division of Water Resources assigned the proposed project DWR Project No. 13-1279 V3. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of Individual Permit (SAW Action Id. No. 2016-02140) which was re -issued on 3/5/2018. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. Coastal Management ENVIRONMENTAL QUALITY March 14, 2018 Dare Co. 954 Marshall C. Collins Dr. Manteo, NC 27954 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, 71/ "� Do las V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 _ F\ S\ .. . r, �, h' b ..--..a �4 y Q �` •_ � ✓ Ken Willson Program Manager Aptim Coastal Planning & Engineering of North Carolina, Inc. APTIM March 5, 2018 Steve Trowell Division of Coastal Management North Carolina Department of Environmental Quality 943 Washington Square Mall Washington, NC 27889 Subject: Dare County Hatteras Inlet Channel Maintenance Project: Modification #lA Dear Mr. Trowell; 4038 Masonboro Loop Road Wilmington, North Carolina Tel: +1 910-791-9494 Ken.Willson@aptim.com In 2016, Dare County sought permission to conduct maintenance dredging of the Hatteras Inlet Connector Channel as needed on a year-round basis, in the same manner that the USACE maintains Rollinson Channel, the Hatteras to Hatteras Inlet Connector Channel, and the other federally authorized navigation channels throughout the state. A Major CAMA Permit (#129-16) was subsequently issued by the State of North Carolina Division of Coastal Management (DCM) to Dare County in December 2016 for the maintenance of the connector channel. This permit prohibits maintenance activities from April 1 to September 30 without prior approval from the DCM in consultation with appropriate resource agencies. A DOA permit (SAW-2016-02140) was also subsequently issued to Dare County for the proposed action in March 2017. The DOA permit included a special condition under the heading "ESA" prohibiting maintenance of the channel from April I to September 30 without notification to the Corps of Engineers Regulatory Division in coordination with the appropriate resource agencies. Since the permits were issued, Dare County has coordinated with the DCM and US Army Corps of Engineers (USACE) twice to obtain relief from the dredge window, which allowed for dredge operations in May and September of 2017, respectively. The County is currently coordinating additional events scheduled to occur in March 2018. APTIM, on behalf of Dare County, previously submitted a permit modification request to allow for a widening of the authorized channel from 100 ft to 200 ft. in order to minimize the possibility that dredging will be required during the moratorium established by federal and state permits. Through recent conversations with USACE Navigation Branch staff, we've been made aware that the condition of the proposed channel as of January 25t", was such that in order to complete the dredging of the channel in the time budgeted, the USACE has requested the use of a temporary disposal site located approximately 500 ft west of the proposed channel. This will allow the dredge and crew to efficiently excavate a pilot channel across the shoal. The proposed plan is to dredge on the south side of the channel during the initial days of dredging and temporarily dump approximately 500 cubic yards in the temporary disposal site indicated on the attached map. The attached drawing illustrates the proposed channel as well as the proposed temporary disposal site. The USACE has stated that within 4 to 5 days of commencing dredging, they expect to be able to dredge material dropped in the disposal site and transport it to the permitted offshore disposal site. / The USACE is prcygsing12 hour operations for the dredge due to current staffing. This requires the ship to return to dock each evening. If the dredge were to work on the north side of the shoal and dredge south to open a channel across the shoal, the vessel would likely be trapped in the channel for several days while they opened the pilot channel. Therefore dredging from north to south across the shoal is not feasible. All other activities and conditions as specified in the existing permits and the previously requested permit modifications dated February 9, 2018, would persist. As specified in the existing permits, the channel position would not be maintained within a "fixed" location, but rather it would follow deep water at the time maintenance is required. In addition, maintenance activities would continue to utilize the USACE dredges (sidecast and special purpose) to conduct Connector Channel maintenance. Dredging activities would be performed by USACE-owned dredge plants and limited to the area within Connector Channel Corridor domain, as depicted in the original permit drawings (and attached here). The purpose of this request is to minirnize the number of requests for relief to dredge within the dredge moratorium (April lthroguh September 30). In doing so, the proposed modification is expected to ultimately result in positive impacts to the natural resources otherwise at risk during dredging events taking place outside of the environmental window. Please contact me anytime should you have any questions or need anything in addition. Sincerely, APTIM CO TAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. Kenneth Willson Agent, APTIM Enclosures: Engineering drawings: MARCH 2O18 EVENT HATTERAS INLET MAINTENANCE PROJECT DARE COUNTY, NORTH CAROLINA APPROXIMATE TEMPORARY DISPOSAL AREA. �E UP 8- t �r. •/ •6 Y� pT� rx. _s r S�� jJ Aw y 4 .PROPOSED,ALIGNM ENT OF,CONNECTOR r CHANNEL / UTH FERRY CHANNEL ' ` - THEM -AkCW2018,EVENTr ' a 4� FA j LIMBS -OF CULTURAL ' SURVEYrAREA ., ,?RESOURCE APTIM February 9, 2018 Steve Trowell Brad Rosov Senior Scientist Aptim Coastal Planning & Engineering ojNorth Carolina, Inc. 4038 Masonboro Loop Road Wilmington, North Carolina Tel: +1 910-791-9494 Brad.Rosov@aptim.com RECEIVED FEB 2 2 2018 Division of Coastal Management North Carolina Department of Environmental Quality DCM- NIHD CITY 943 Washington Square Mall Washington, NC 27889 Subject. Dare County Hatteras Inlet Channel Maintenance Project: Modification #1 Dear Mr. Trowell: In 2016, Dare County sought permission to conduct maintenance dredging of the Hatteras Inlet Connector Channel as needed on a year-round basis, in the same manner that the USACE maintains Rollinson Channel and the Hatteras to Hatteras Inlet Connector Channel, as well as other federally authorized navigation channels throughout the state. A Major CAMA Permit (#129-16) was subsequently issued by the State of North Carolina Division of Coastal Management (DCM) to Dare County in December 2016 for the maintenance of the connector channel. This permit prohibits maintenance activities from April 1 to September 30 without prior approval from the DCM in consultation with appropriate resource agencies. A DOA permit (SAW-2016-02140) was also subsequently issued to Dare County for the proposed action in March 2017. The DOA permit included a special condition under the heading "FSA" prohibiting maintenance of the channel from April 1 to September 30 without notification to the Corps of Engineers Regulatory Division in coordination with the appropriate resource agencies. Since the permits were issued, Dare County has coordinated with the DCM and US Army Corps of Engineers (USACE) twice to obtain relief from the dredge window, which allowed for dredge operations in May and September of 2017, respectively. The County is currently coordinating additional events scheduled to occur between now and early spring. In order to conduct advanced maintenance dredging of the connector channel and minimive the need to request relief from the USACE and DCM for future maintenance events conducted between April 1 and September 30, Dare County is requesting the modification of both the DOA Permit (SAW-2016-02140) and Major CAMA. Permit (#129- 16) to increase the allowable width of the channel from 100' to 200'. This modification is expected to allow the County in cooperation with the NC Division of Water Resources and the USACE to conduct advanced maintenance dredging as time and financial resources permit This is the only modification being requested at this time and the County is not requesting a change to the permitted depth of -12.0 ft. MLW. Since the initial design of the proposed channel, the inlet gorge appears to be migrating to the east (toward Hatteras Island). In laying out the proposed channel locations for recent dredging events, it appears that the eastern end of the channel is approaching the eastern boundary of the Connector Channel Corridor. Dare County is also requesting that the Connector Channel Corridor be expanded so as to include the location of the inlet gorge and ensure that maintenance of the proposed channel is confined within the approved corridor. As required in Condition #8 of the Major CAMA Permit #129-16 and Condition #7 of the DOA permit SAW-2016-02140, an underwater archeological survey vWbe conducted by a qualified archeologist prior to the dredging of any previously "un-dredged areas" identified by the Division of Coastal Management. All other activities and conditions as specified in the existing permits would persist. As specified in the existing permits, the channel position would not be maintained within a "fixed" location, but rather it would follow deep water at the time maintenance is required. In addition, maintenance activities would continue to utilize the USACE dredges (sidecast and special purpose) to conduct Connector Channel maintenance. Dredging activities would be performed by USACE- owned dredge plants and limited to the area within Connector Channel Corridor domain, as depicted in the original permit drawings (and attached here). Material excavated by the special purpose dredge would be disposed in a previously authorized nearshore disposal site in the Atlantic Ocean just south of Ocracoke Island (Appendix A). During the October 2017 maintenance event, approximately 47,000 cubic yards of material was excavated by the dredge. In light of the proposed increase in channel width from 100' to 200', future dredge events within the same location would entail dredging approximately 100,000 cubic yards of material. Again, it is not possible to determine the volume of material required for future dredge events due to the fact that the deep water may meander from its current location. The nearshore disposal site will remain located approximately 1500 in from the north end of the island, in approximately - 10 ft. MLW. This depth is considered well within the active littoral system and within the depth of closure. As stated above, the purpose of the request is to minimize the number of requests for relief to dredge within the dredge moratorium (April 1 throguh September 30). In doing so, the proposed modification should ultimately result in positive impacts to the natural resources otherwise at risk during dredging events taking place outside of the environmental window. Attached are draft engineering drawings showing the previously permitted channel (100-foot width) and the proposed widened channel (200-foot width). Also shown on the drawings is the footprint of the proposed expansion of the Connector Channel Corridor. Please contact me anytime should you have any questions or need anything in addition. Sincerely, APTIM COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. Brad Rosov Agent, APTIM OQk 422018 Np C�Ty Enclosures: Draft engineering drawings: Hatteras Inlet Maintenance Project Dare County, North Carolina, Permit Modification #1, dated February 9, 2018. Coastal Nlanaaemer- EI' RONMEN aL DATE: 15 February 2018 To: Lance Winslow, NC DOT Ferry Division Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager S tti SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER MICHAEL S. REGAN BRAXTON C. DAVIS RRCEI�ED FEB 2 2 2018 DCA4, MHD c,T Y By copy of this memo, DCM is requesting that the NC DOT Ferry Division provide any comment you may have on the proposed project to Gregg Bodnar, Asst. Major Pennits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide'connecto( channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box" is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging' and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge'Meritt'. Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 1 00'to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -17 MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. S¢ o:\orth Cads - Frei. v Mal Qu.lW Cm�ol\h�asea� 943WUhM=Sq=+2113il Wagwaj NC27889 2529466481 Coastal Management ENVIRONMENTAL QUALITY DATE: 15 February 2018 To: Maria Dunn, NC WRC Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER -nsmv„r MICHAEL S. REGAN SanUmy BRAXTON C. DAVIS Director iEH2922018 MHD CITY By copy of this memo, DCM is requesting that the NC WRC provide any comment you may have on the proposed project to Gregg Bodnar, Asst. Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 1 00'wide "connector" channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box" is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 100' to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. �Nothtnq Compare' I ON alNa!CwJm Ev�.=.]QnaWI Ca WYule K3Wahm)t1"a3 q. VAE I%Iks�NC I7W 2329466491 Coastal Management ENVIRONMENTAL QUALITY DATE: 15 February 2018 To: Anthony Scarbraugh, NC DWR Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER t/nsemor MICHAEL S. REGAN Srcretm) BRAXTON C. DAVIS Director By copy of this memo, DCM is requesting that the NC DWR provide any comment you may have on the proposed project to Gregg Bodnar, Asst. Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide "connector' channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box' is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017, This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 100' to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. �Nothinq Compares . S we ofNonh Cuaiv, IFni " Qniliy I Cm,NI Nbmgemml 943 Nah'ngt=Sgmro Mill I %%Id in6mgNC 27989 2529466431 Coastal Management IENVIRONNENTA OUAUTY DATE: 15 February 2018 To: Renee Gledhill -Early, NC SHPO Cc: Gregg Bodnar, Asst, Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER MICHAEL S. REGAN 1,m,lwl BRAXTON C. DAVIS Dire, tor RF `7-1VED �`-9,22018 - MHD CITY By copy of this memo, DCM is requesting that the NC SHPO provide any comment you may have on the proposed project to Gregg Bodnar, Asst. Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide "connector" channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box" is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for °no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 100' to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. -5>^Nothinq Compares�� _ tr«e arc=.e.1e.:M==ddQ..-b iemwuumx� 90wadirvnlgqwalv ttcn& szasset K--1 r.-o_ Coastal Management ENVIRONMENTAL QUALITY DATE:15 February 2018 To: Josh Pelletier, USACOE Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER ioremnr MICHAEL S. REGAN Seurefan BRAXTON C. DAVIS Director R!7-- VED a, 2 2018 DCIV'f_. MHD CITY By copy of this memo, DCM is requesting that the USACOE provide any comment you may have on the proposed project to Gregg Bodnar, Asst Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide "connector" channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box' is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 1 00'to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. �''Nothinq Compares`- - ShootNartlaCardiva FniiummaRal QualityCmul Vaw4tvma"c 943WwhuVemSgo .\lA1l Wa.hagko NC:'S® '52 9466491 Coast?((an agemenr 3NVIRONMENTAL OUAUTV DATE: 15 February 2018 To: Shane Staples, NC DCM Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM ROY COOPER h"!„", MICHAEL S. REGAN 1,,M1 n BRAXTON C. DAVIS OPector RECEIVED FEB 2 2 2018 THROUGH: Jonathan Howell, District Manager DCM- MHD CITY SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance By copy of this memo, DCM is requesting that the NC DCM Fishery Habitat Specialist provide any comment you may have on the proposed project to Gregg Bodnar, Asst. Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide "connector' channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box" is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 100' to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. -5�'-'Nothinq Compares`% 3mofNa&Cmdi.. En.i Wa1Q9aWtCmtWNlaoax.t 943 Wnhigm S qm NIa3 I Wadmee4 YC 27339 2529"6431 Coastal Management ENVIRONMENTAL QUALITY DATE: 15 February 2018 To: Lance Winslow, NC DOT Ferry Division Cc: Gregg Bodnar, Asst. Major Permits Coordinator FROM: Steve Trowell, DCM THROUGH: Jonathan Howell, District Manager SUBJECT: STATE PERMIT NO. 129-16 MINOR MODIFICATION Dare County Hatteras Inlet Connector Channel Maintenance ROY COOPER i lnn•n,,,r MICHAEL S. REGAN BRAXTON C. DAVIS Director RECEIVED FEB 2 2 2018 DCM- MHD CITY By copy of this memo, DCM is requesting that the NC DOT Ferry Division provide any comment you may have on the proposed project to Gregg Bodnar, Asst, Major Permits Coordinator for DCM. Please send any comments your agency may have to Gregg Bodnar at the DCM Morehead City Headquarters office within 14 days of the receipt of this memo. Please find enclosed correspondence dated 9 February 2018 from Brad Rosov, Agent, APTIM, for Dare County, requesting a permit modification. State Permit No. 129-16 was issued on 20 December 2016 for the maintenance dredging of a 100' wide "connector' channel to the Hatteras inlet gorge within a prescribed box to follow the deepest channel at the time of the dredging event. The "dredge box' is located on the Hyde County side of Hatteras inlet. To date, there are two different channels that have experienced a maintenance dredge event since issuance of the permit. These dredge events were conducted last year in the dredge box authorized by this permit. The first dredge event was undertaken in May and required relief from the 1 April to September 30 dredge moratorium dates. This dredge event took place in the channel on the north side of the dredge box and was completed on 15 May 2017. This channel quickly shoaled in which necessitated a second dredge event in a different location. The second dredge event took place in the channel on the south side of the dredge box and also required moratorium relief. The moratorium relief granted for the second dredge event was for "no more than 10 consecutive days of dredging" and was undertaken in September 2017. Both dredge events utilized the USACOE sidecast dredge "Merritt". Dare County is currently requesting to modify the permit to widen the width of the authorized channel from 100' to 200' and to expand Connector Channel Corridor on the eastern end to include the location of the inlet gorge. The stated purpose and need for the wider channel is to lessen the frequency of maintenance excavation events and to reduce or eliminate dredge moratorium relief requests. The proposed methodology and permitted depth of -12' MLW remains unchanged. Please contact Gregg Bodnar at the Morehead City District office ((252) 808-2808) if you have any questions. !'-^Nothinq Compares_ SmofNa&Caohaa EnM�tWQw6ty1Ca.01MR=,S t 943 Wahn=Sq. Nhn I Wk hmpoq NC 27939 2529466481 9ceived From: — ermit No... ---j .ppiicant's Name: )roject Address: r- NC Divisjon of Coastal Management Cashier's official Receipt r l 5238 ASt n Date:_ ' 20 6a $ �W Check No-: County: t for your records as pro Payment for permit issued. Please retain recelp _ Date: ------ �� DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office 2407 West 5' Street Washington, North Carolina 27889 IN REPLY REFER TO March 5, 2018 Regulatory Division Action ID No. SAW-2016-02140 Mr. Robert Outten Dare County Manager 954 Marshall C Collins Drive Manteo, North Carolina 27954 Dear Mr. Outten: Please reference the Department of the Army permit issued to you on March 1, 2017, and your written request of February 9, 2018, for permit modification to increase the allowable dredge width of the channel from 100 feet to 200 feet wide and to extend the Connector Channel corridor to include the location of the inlet gorge located within Hatteras Inlet, North Carolina. The permit is hereby modified to include the work as shown on the enclosed plan. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. FOR THE COMMANDER, David M. Lekson, PWS Chief, Washington Regulatory Field Office RECEIVED MAR 0 7 2018 DCM-. MHD CITY Enclosure Copies Furnished with enclosure: Chief, Source Data Unit NOAA/National Ocean Service 1315 East-West Hwy, Room 7316 Silver Spring, Maryland 20910-3282 Mr. Todd Bowers Permit Review Specialist Wetlands Regulatory Section USEPA — Region 4 Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Atlanta, Georgia 30303-8960 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Fritz Rhode Fishery Biologist Habitat Conservation Division -Atlantic Branch 101 Pivers Island Road Beaufort, North Carolina 28516-9722 Mr. Doug Huggett CAMA Major Permits Coordinator NC Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557 RECEIVED MAR 0 7 2018 DCM- MHD CITY 3` HATTERAS INLET MAINTENANCE PROJECT DARE COUNTY, NORTH CAROLINA w w PAMLICO SOUND SHEET INDEX `6 ;- PROJECT AREA i 1 COVER SHEET z I 2 PROJECT OVERVIEW ZZ 3 CONNECTOR CHANNEL PLAN VIEW I i HATTERAS I 4 CONNECTOR CHANNEL CROSS SECTIONS LL i �¢g r 0 HATTERAS GENERAL NOTES: C7 u g= O KE INLET ISLANDE Z : ISLAND 1. COORDINATES ARE IN FEET BASED ON NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN i KK DATUMONS REREFE 6r Ss 2. ELEVATIONS ARE REFERENCED 3. DATE OF AERIAL PHOTOGRAPHY:: MARCH 2O16. A. SURVEY DATA COLLECTED BY USACE. ]ANUARYATI 2018. S S. JATHYMETRIC CONTOURS AND AIDS TO NAVIGATION REPRESENT THE PURPOSES. OF THE CHANNEL ON i 1( . EAN ]ANUARY 25, 2018 AND SHOULD NOT BE RELIED ON FOR NAVIGATION PURPOSES. a ,g LEGEND 9° 9 B 0o i GRAPHIC 6GlF IN FL — • • — • • — MEAN LOW WATER LINE MEAN HIGH WATER LINE CROSS SECTION LINE �y�`.I Q MAT-03—V-I8 HATTERAS INLET BORINGS 2003 AND ID f f f `/`' RALEIGH 3TAP 7 , NEARSHORE DISPOSAL AREA �u % ®R CHARLOTTE �AQ CAPE HATTERAS , [ e Np0.� PR03ECT LOCATION �c SUBMERGED AQUATIC VEGETATION AND 100FT. BUFFET aR 6A IA F� 1 ]ACKSONNLLf • OREHEAD CITY i ill ! CAVE LO03(OUT ASBUILT EXISTING CABLE ROUTECABLE (CALDWELL BLE VENTURES) EXISTING CABLE ROUTE(UTLITY ELECTRICAL CONSULTANTS, PC) N.T.S. CAPE FEAR ASBUILT NEW CABLE ROUTE �a ATLANTIC USCG AIDS TO NAVIGATION ff' OCEAN Of LOCAL POLLY BALL MARKERS e�ffi � ;:z w :g _ k$ NOT FOR CONSTRUCTION m f FOR REGULATORY REVIEW ONLY 1 D ,.r a..c Z ` , Ci Co M �, v CONNECTOR CHANNEL CORRIDOR \ J r, �A 'A \ r , PAMLICO SOUND - (� HAT-03-V-7J O m �p 4 HAT-03-V-90 0 Ij u mg` HAT-03-V-8 E T Z H �. :s ' CULTURAL RESOURCE HAT-03-V-10 \ \ _ SURVEY AREA 0 HATTERAS" IO HAT-03-V-16 \ 0 HAT-03-V-11 1\� \ HAT-03-V-IJ 0 GHAT-03-V-12 \ 0 HAT-03-V-14I HAT-03-V-13 .. ,� HAT-03-V-15 HAT-03-V-18 11 e' HAT-o3-v-1e � �, _- /, NATI'ES ter' A 3j _ INLET v OCRACKOKE \ �`V PROPOSED CONNECTOR —/ ISLAND CHANNEL (SEE NOTE) 7 PROPOSED CONNECTOR `? CHANNEL CORRIDOR ". ODIFICATION br NEARSHORE DISPOSAL LOCATION NOT FOR CONSTRUMON FOR REGULATORY REVIEW ONLY CULTURAL RESOURCE SURVEY AREA COORDINATE TABLE POINT ID I NORTH EAST 1 540929.7 2965280.1 2 540117.1 2968802.2 3 538852.9 2968364.9 4 539634.2 2%5025.1 PV-1 BIOZ L 0 do a3ni333bi I FOR REGULATORY REVIEW ONLY CROSS SECTION A -A' B-B' C-C' 5 MHW EL +0.42' ' 5 0 _ MLW EL +0 00 r JANUARY 25, 2018 J — D ExISTING GRADE LU -.,: Y a S ''qF z° 1L_ �=x 4 '3 `,i :cl EL10 3. w .15 . .. .. ... MAXIMUM AD EL CONNECTORCHANNEt..=NDS 11 -75 W -SZ.O'MLW TO EQUAL DSTRE AIT ,) •20 _ ..... .. TIME OF CONUMONN ...(. ... .. -20 DISTANCE ALONG SECTION (FEET) CROSS SECTION C-C' A -A 5 5 CROSS SECTION B-B' IANUARr u, 20ia I; E A -A' MHW EL +0_42' E%IsnNG GRADE 5 5 0 , ._... __... .. _ ... = 0 MLW EL +0.00' -. t MHW EL+0.42' p W 1 pa w MLW EL+0.00'- n 3 W I 1ANUARY 25, 2018 EX=NG GRADE -5 -5 40 .... .9 G. o -12.0' MLW I'J1 �.I L�EL G 10 15 EL. -12.0' MLW > CHANNEL W lo0''—"1 w -15---YnOTH .h` ..... -15 -20 ... .20 �< MAXIMUM AD EL. MAXIMUM AD EL. -12.0' MLW _ -12.0' MLW tag.-. 207 -257 m 0 -500 5 0 7 0-20 -SOD 5 0 7 0-25 090 DISTANCE ALONG SECTION (FEET) DISTANCE ALONG SECTION (FEET) o �=8-B Q 5 1,0 0 ! �5020 VERTICAL GRAPHIC �SCALE IN FF HORIZONTAL GRAPHIC SCALE IN FT XS-1 1 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Banos, Administrator Governor Roy Cooper Secretary Susi H. Hamilton March 13, 2018 ul uSt.N- u Office of Archives and History Deputy Secretary Kevin Cherry TO: Gregg Bodnar Major Permits Processing Section Division of Coastal Management FROM: Ramona M. Bartos R&,XU6.0- µ•1Ob SUBJECT: Minor Modification of State Permit Number 129-16, Dredging of Connector Channel Area within Hatteras Inlet, SAW-2016-02140, Dare and Hyde County, ER 16-2031, We received a memorandum from Steve Trowell of your Washington office regarding the above application for minor pemut modification and would like to take this opportunity to comment. The proposed increase of allowable channel width from 100' to 200' and the eastward expansion of the connector channel to maintain access to the deeper water of Hatteras inlet gorge is within the area surveyed by Tidewater Atlantic Research, Inc. in September 2017. As the proposed permit expansion area has been previously surveyed and cleared for potentially significant cultural resources and the applicant states there is no requested change to Condition #8 of the pemlit requiring that "prior to the initiation of dredging activities ... outside of previously dredged areas, a comprehensive underwater archaeological survey shall be carried out for the entire project area," our office has no objection to the modifications as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or environmental.reviewna ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. cc: Brad Rosov, Aptim CP&-E of NC, Inc. Steve Trowell, Division of Coastal Management I.ocation, 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephum/Fax: (919) 807-6570/807-6599 Bodnar, Gregg From: Sent: To: Cc: Subject: Gregg, Scarbraugh, Anthony Wednesday, February 28, 2018 7:21 AM Bodnar, Gregg Pelletier, Josh R SAW (Josh.R.Pelletier@usace.army.mil); Trowell, Steve; Howell, Jonathan Dare County Hatteras Inlet Connector Channel Maintenance DWR will issue a modification to DWR # 13-1279 V2. w CCC le V Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources —Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Vie' CQ« C.-PI/ 21A10 7 Bodnar, Gregg From: Scarbraugh, Anthony Sent: Friday, February 16, 2018 10:52 AM To: Pelletier, Josh R SAW (Josh.R.Pelletier@usace.army.mil) Cc: Bodnar, Gregg Subject: Mod to Dare County Hatteras Inlet Connecter Channel Maintenance (DWR Project # 13-1279 V2) Josh, As of follow up to my voicemail, I just received the mod request from DCM to widen the previously permitted channel from the authorized width of 150 feet wide to 200 feet. How does ACE intend on proposing the modification to the individual permit? f ( �Alill c�G�ti� s�ta� �wa./ Thanks, ! I Anthony Scarbraugh J Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations ( a Department of Environmental Quality i'LO ?lJw 61 4- eel -It Y14.t 252 948 3924 office anthony.scarbraugh@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. w/ a6ofeC usi4� l� 165w a01c(0'— e)9s i i Bodnar Gregg From: Winslow, Lancelot D Sent: Monday, March 05, 2018 3:13 PM To: Bodnar, Gregg Subject: RE: Hatteras Inlet Dredge CAMA permit modification #129-16 Hey Gregg, Sorry I've been extremely busy. I've looked over the permit application package for State Permit No. 129-16. Based on the dredge box in the plans I received, the Ferry Division has no objections to the proposed work. Please let me know if you need anything else. Thanks. From: Bodnar, Gregg Sent: Friday, March 02, 2018 9:45 AM To: Winslow, Lancelot D <Iwinslow@ncdot.gov> Subject: Hatteras Inlet Dredge CAMA permit modification #129-16 Morning Mr. Winslow, I apologize in advance for asking about comments for a project that technically our deadline request for comments have not expired, but as you probably know Dare Co. is very interested in a resolution to the issues with the connector channel. So I wanted to contact you to see if there was anything you may need from my office to help in your comment decision process. Please let me know if there is anything I can do. Thank you again for your time, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg Bodnar(a)ncdenr.00v 400 Commerce Ave Morehead City, NC 28557 -^""Nothing Compares --,—,— Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Staples, Shane Sent: Monday, February 19, 2018 4:33 PM To: Bodnar, Gregg Cc: Trowell, Steve; Howell, Jonathan Subject: State Permit No. 129-16 Minor Modification, Hatteras Connector Widening Gregg, I have no objections to the proposal to modify permit 129-16 to allow for the widening of the Hatteras Connector Channel from 100' to 200' providing all previous conditions are adhered to. Hopefully this will reduce the need for frequency of dredging during the biological moratorium. Thanks Shane Shane F. Staples Fisheries Resource Specialist Division of Coastal Management Department of Environmental Quality 252 948 3950 office shane. staples(ancden r.00v 943 Washington Square Mall Washington, NC 27817 !/ Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Bodnar, Gregg From: Dunn, Maria T. Sent: Wednesday, February 21, 2018 3:59 PM To: Bodnar, Gregg Subject: Dare County Hatteras Inlet Connector, 129-16 modification Gregg, NCWRC has reviewed and considered the request to widen the allowable dredge channel from 100' to 200'. This request is presented by the county in attempt to remove enough material to keep the channel open longer and minimize the need to dredge within the dredge moratorium of April 1—September 30. After review, we do not believe the project will have significant impacts to wildlife resources and do not object to the modification as long as all other permit conditions remain. Thank you for the opportunity to comment on this modification. If I can be of further assistance, please to not hesitate to call. Maria Maria T. Dunn Coastal Coordinator NC Wildlife Resources Commission 943 Washington Sq. Mall Washington, NC 27889 office: 252-948-3916 fax: 252-975-3716 www. ncwild life.oro Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Application Review Checklist Applicant Entered into Spreadsheet? Agent Field Rep. Si�Cve Physical Address AECs Habitat Designations Riparian Notification? Green Card? Signed Form? No Obj Waive 15' Raparian rights? Water Deed? Dependent PH or 1/4 width? Developme Buffer Navigation/_ - Channel Proximity - — FT calculations PTA Incorporated? Residential Commercial 8ft2or27ft2 N/A .2 CGi{� CDh %�o7— wrr(( 4 C( 6&ra k - :j�ce,, 0,1-A 1i% (co' 7� 2CO 50( ,—12/a/,w Development Type w/ Rule Reference on Back ju; e Major Development Excavation/Fill Applicant Address 95�i %fAr County Physical Location i iclu ing Waterbody Description MP Forms k4- Dates .6 Permit Checklist Permit# I%g-/'(p Wt;w— MP1 I MP2 I MP3 I MP4 MPS eh&ro1e_ ems, JL --#Total-Drawings -- - ---- --- — - -- - - Drawings Dates of Drawings Development Types Co„� "cam �iGrA ,, �fz,/ Including Conditions and Notes l�o� �o�ci�✓Nd/iio. N �J� pd_<. �� '' //�r tc �y °^5 su e a II / �t v �k M94 %SSuec( ;� nS I L�y�/1Ca � (oa(�e'}pn �4'$ � CJc�ia�r�ecl dr�c(� Corv,cror 1W tujtPodS of 15yl e,tor+S wY Ite Glc7,e Fu,-f�i Wu Ss 12 4-/(,� r'ssm.( iL/�6l r��ra�;� ,� 4w_ 2cc>�Tr OA oN-' f�e_ pp'ec+ ( � DWR 401 Certification # 13 —1L7q qg USACE SAW # ,? Permit Fee Additional Comments On Back / N i l 0l7�r Bodnar, Gregg From: Trowell, Steve Sent: Wednesday, February 28, 2018 3:43 PM To: Huggett, Doug; Howell, Jonathan Cc: Bodnar, Gregg Subject: FW: [External] RE: Hatteras Inlet Connector Channel Importance: High Correction of previous email from Ken Wilson concerning the cubic yardage to be "side dumped" from 5,000 to 500 cubic yards. From: Willson, Kenneth [mailto:Kenneth.Willson@aptim.com] Sent: Tuesday, February 27, 2018 9:45 AM To: Trowell, Steve <steve.trowell@ncdenr.gov> Cc: Rosov, Brad <Brad.Rosov@aptim.com> Subject: [External] RE: Hatteras Inlet Connector Channel Importance: High Steve, I was just sending a similar email to Josh P. at the USACE and noticed I wrote 5,000 instead of 500. The USACE has asked for permission to temporarily dump 500 cy. NOT 5,000. /, APTIM Ken Willson Client Program Manager Tel: + 1910 7919494 Cell: + 1910 443 4471 Kenneth. W illson@APTI M.com PLEASE NOTE NEW EMAIL ADDRESS APTI M 4038 Masonboro Loop Road Wilmington, NC 28409 From: Willson, Kenneth Sent: Tuesday, February 27, 2018 8:44 AM To: 'Trowell, Steve' <steve.trowell@ncdenr.gov> Cc: Rosov, Brad <Brad.Rosov@aptim.com> Subject: Hatteras Inlet Connector Channel Steve, As we discussed attached is a chart developed by the USACE that shows their proposed channel. Note that they have limited this channel to 100 ft. wide in the interest of time that they have to conduct the work. They may try to widen the turn which is why we need the permit mod to widen to 200 ft. before they start March 14th. Also on the chart, you will see a red line to the west of the channel with a note on the map that reads "Temporary disposal site. Approximately 5000 cy. This are will only be used until the dredge has enough depth to get acreoss the shoal. We will return and pick up the material and take it to the near shore disposal." This is the temporary dump area we discussed on the phone. The USACE has asked for the temporary disposal area to maximize dredge efficiency. If they are not allowed to do this, they would have to wait for high tide only and dredge partial loads to make it over the shallowest part of the channel to sail out to the offshore disposal site. Please let me know if you need anything more on my end to make a decision on this request. I believe that is going to be one of the first places they want to dredge so we will want to have a decision by March 14th or earlier if possible. Kind Regards, ,, APTIM Ken Willson Client Program Manager Tel: + 1910 7919494 Cell: + 1910 443 4471 Kenneth. W iIIson @APTIM.com PLEASE NOTE NEW EMAIL ADDRESS APTI M 4038 Masonboro Loop Road Wilmington, NC 28409 DCM Coordinator: . J.� Permit y MAH.ING DiS2RI•BUT3:ON Permitee• OW— Agents: DCMFlield Offices. Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) " Josh Metier (BA*e, Currituck, Dare, Gates; Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort; Carteret, Craven, Pamlico) Bill Biddlecome (NGDOT-Remainder ECitylWashington District) Wilmington: Tyler Cnunbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Gledhill -Barley _Public Water Supply: Heidi Cox (WlRO) Clif Whitfield (WARO) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton DFAURIDWR: Karen Higgins Kristy'Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasgwtank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs - 401(Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401(Brunswick) Georgette Scott : Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD l�T Z m4o►�/ WIk512!! r n po f <o✓ Fax Distribution: Permittee #: Agent# r' WaterResources Environmental Quality March 7, 2018 ROY COOPER Govel'nor MICHAEL S. REGAN Seen'Menv LINDA CULPEPPER Inlet'im Direvor DWR #'20131279 v3. Dare and Hyde Counties Dare County RECEIVED Attn: Mr. Robert Outten 954 Marshal CCollins Drive manteo,NC27954 MAR 1 2 2018 Subject: Approval of Individual 401 Water Quality Certification — Modification Dare County Hatteras. Inlet Connecter Channel Widening Project MP SECTION MH® Dear Mr. Outten, Attached hereto is a copy of Certification No. 4081 issued to Dare County, dated March 2, 2018. This Certification' replaces the Certification issued on December 16, 2016'to include additional impacts for connector r'channel widening for Dare County. Please note that you should get -any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in General Statute 150E by filing a written petition foi.an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty{60) calendar days A petition form may be obtained from the OAH at htto://www.ncoah:com/ or by calling -the OAH clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original.and one (1) copy along with any applicable OAH, filing fee is 'received in the OAH during normal office hours; (Monday through Friday between.8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy ofthe petition along -with any,applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address.for-the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office .ofAdministrative Hearings Office -of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh; NC 27609-6285 Sfate of North Carolina I Environmental Quality 450 W. Hanes Mill Road, Suite,300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX* 336.776-9797 DARE COUNTY DWRff 13-1279 VS Individual Certification"g4081 Page 2'of 7 One (lj copy of the petition must also be served to DEQ: William F. Lane, Genera( Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, INC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding.. This certification completes the review of the Division under section 461 of the Clean Water Act and 15A NCAC 02H .0500. Contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraueh@ncdenr.sov if you have any:questions or concerns. Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Gregg Bodnar, DCM Morehead City (via email: ereae.bodnar@ncdenr.gov) Jonathan Howell, DCM WARP (via a 'mail: ionathan.howell@ncdenr.gov) Josh Pelletier,.USACE.Washington Regulatory Field Office (via email: josh.r.pelletier@usace.armv.mil) Samir Dumpor, DEMLR WaRO (via email: samir.dumpor@ncdenr.Rov) Kenneth Willson,. Coastal Planning& Engineering of North Carolina;. Inc. (via email: kenneth.willson@cbi.com) Anthony Scarbraugh, WaRO (via email: anthony.scarbrauah@ncdehr.zovj DWR 401 & Buffer Permitting. Branch file Filename: 131279v3HatteraslnletConnecterChannelMaintenanceProject(DareHyde)_401 IC Mod RECEIVED E® MAR 1 2 2018 MP SECTION MH® DARECOUNTY D W Rtf 13-1279V3 Individual Certification p4081 Page 3 of 7 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION N4081 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject;to. North Carolina's.Regulations in 15:NCAC 02H .0500, to Dare County who have authorization for the impacts listed below, as;descrilied within your application received by the N.C. Division of Water Resources (Division) on February 16, 2018 and subsequent information on March 2, 2018. The State of North Carolina certifies that this activity,will not violate the applicable portions of;Secfions: 301, 302, 303 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted, in accordance with the application, the supporting documentation,.and conditions hereinafter set forth., This approval requires you to follow the cohditions;listed in the certification below. Conditions of Certification: 1. The.following impacts are hereby approved'provided that all of the other specific:and general conditions of the Certification are met. No'other impacts are approved, including incidentai impacts. [15ANCACO28`:.0506(b)(c] Type of Impact Amount Approved (units) Permanent Amount Reduced (units) Temporary Open Water 0W1(Previous Dredging Event) 19.5 (acres) 0 (acres) OW2'(Connector Canal Widening Dredge) 11.5 (acres) 0 (acres) 2. This,approval is for the purpose and design described,in your application and as described in the Public Notice. The plans and specifications- for this project are ;incorporated by reference and are an ,enforceable part. of the Certification. Any modifications to the project require notification to DWR and may require an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502] Oue to the potential for impacts from sedimentation and/or turbidity on submerged aquatic vegetation (SAV) beds and other marine habitat; when practical, the applicant shall use, a hopper dredge plant with minimum 100-foot buffer between the historically mapped SAV beds and the proposed dredge channel widening, utilizing the previously authorized nearshore disposal site in the Atlantic Ocean just south of Ocracoke Island. If the;100-foot buffer cannot be maintained, the DWR Washington Regional Office (252-946-6481) must be notified. [15A NCAC 02B .0221] 4. If a sidecast dredge is utilized: a. When practical, a minimum 100-foot buffer shall be maintained between the historically mapped SAV beds and the proposed dredge channel; and b. When practical, the sue of a sidecast dredge shall be limited to the out -going tide. If the 100- foot buffer cannot be maintained, or the use of the sidecast; dredge cannot be limited to the out -going tide, the DWR Washington Regional Office (252-946-6481), mus Iad.�® NCAC,028 :0221] MAR 1 2 2018 MP SECTION MH® DARE COUNTY DWR# 13-1279 V3 Individual Certification #4081 Page 4 of 7 5. When practical, the applicant shall limit dredging with the Dredge Moratorium (April 1 to September 30) only to events associated with storm or shoaling that creates navigational hazards or commercial and recreational vessels: If dredging must occur during the Dredge Moratorium; the DWR Washington Regional 0ffice (252-946-6481) must be notified. (15A NCAC 02B .0221] 6. All mechanized equipment operated near surface waters or wetlands shall be regularly, inspected and maintained regularly to prevent contamination of surface waters and -wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a hydrocarbon or chemical spill; the permittee/contractor shall immediately contact the Division of Water Resources, between the hours of8 am to 5 pm at the Washington Regional Office,at (252) 946-6481 and after hours and on weekends call ($QO) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Waste Control Act. (15A NCAC 02H .0506(b)(3) and (c)(3); 15A'NCAC 029 .0200 (3(f), and G.S. 143 Article'21A] The Permittee shall adhere to Title 15A NCAC 02B .0221 Tidal' Salt Water.Quality for SA Waters and thewater quality standards applicable to Class SC and SB waters as described in Rule..220 and Rule A222 including but not limited to: (g) pH: shall be normal waters for the waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3'if it is the result of natural conditions; [15A NCAC 02B .0220(g)] (1) Turbidity: the turbidity in the receiving waters shall not exceed 25 NTU; if turbidity exceeds this level due. to natural background conditions, the existing turbidity level shall not be increased. Compliance with this turbidity standard ,can be met when land management activities'employ Best Management Practices (BMPs) (as defined by Rule .0202 of this Section). BMPs must be In full compliance with all,specifications governing the proper design, installation, operation and maintenance of such BMPs; 115A NCAC 02B .0220(1)] 8. D.are County shall conduct construction activities in a manner consistent with State water'quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any otherappropriate requirements of'State•andFederal law. [15A NCAC 02B,.02001 If the Division determines, that such standards or laws. are not being met (including the failure to, sustain a' designated,or achieved use) or that State or federal law is being violated,.or that further conditions are neeessary'to assure compliance, the 'Division may reevaluate and modify, this Certification. Before modifying the Certification, the Division shall notify Dare County and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15.A,NCAC 02H .0504. Any new•or revised conditions.shall be provided to. Dare County in writing, shall,be provided tothe.U.S. Army Corps of Engineers for reference in any Permit issued pursuant.to Section 404 of the Clean Water Act; and shall also become conditions of the,404. Permit for the project. 9. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR -401 & Buffer Permitting ,Unit within ten days of project completion ;(available at: http://aortal ncdenr ore/web/wo/swp/ws/401/certsandpermits/apply/forms.) (15A NCAC 02H .0502(f)] RECEIVED MAR 1 2 2018 MP SECTION WD DARE COUNTY D W R#:13-1279 V3 Individual Certification,#4081 Page S of.7 10. No Impacts Beyond those Authorized No Waste; spoil;;solids, or fill of any kind shall occur in wetlands,waters; or riparian areas.beyond the footprint of the impacts depicted in the application; as authorized in this approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment erosion control Best Management Practices shall be performed so that no violations of state water quality standards„statutes, or rules occur. Approved plans and specifications for this project are incorporated by references and are'enforce6ble parts of this certification. [15A NCAC 02H .0501 and .0502] 11. Erosion and sediment control practices.must'be in full, compliance with all specifications governing the Proper design, installation and operation and maintenance of such Best Management Practices and if applicable, comply with the specific condition's and requirements of the NPDES Construction Stormwater Permit issued to the site 115A NCAC 02H .0506 (b)(3) and (c)(3),and 15A NCAC 02B .0200): 12. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that 'they equal or exceed the requirements'specified in the most recentversion'of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including_ contractor -owned or leased borrow pits associated with the ^project. 13. For borrow pit sites, the erosion and sediment control 'measures must be designed, installed; operated, and maintained in accordance with the most recentversion'of the North Carolina Surface Mining Manual. 14. Reclamation measures and, implementation mustcomply with the reclamation in accordance with the requirements of the Sedimentation Pollution.Control Act and the Mining.Act of 1971. 15. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall: be on site at all times. 16. If the projectoccurs in waters orwatersheds classified as Primary Nursery Areas (PNAS), SA, WS-I, WS- II, High Quality (HQW), or Outstanding Resource (ORW) waters,. then the sedimentation and erosion control designs must comply withthe'.requiremonts set forth in 15A NCAC 04B,.0124, Design Standards in Sensitive Watersheds. 17: Sedimentand erosion.control.measures shall not be placed in wetlands orwaters. Exceptions to this condition require -application submittal to and written' approval by the Division. If placement of. .sediment and erosion control devices in wetlands and waters is unavoidable„ then design and placement of temporary erosion control measuresshall notbe conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or -banks; adjacent to or upstream and downstream'of the above structures. AII'sediment and 'erosion control devices shall be removed and the natural grade restored within two, (2) months of the date that'the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project., [15A NCAC 02H .0501 and .0502) RECEIVED MAR 1 2 2018 RPIP SECTION MHD DARE COUNTY DWRM.13-1279 V3 Individual Certification #4081 Page.6 of 18. An NPDES Construction Stormwater Permit'is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during, land .distur6ing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit,, full compliance: With permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG010000), inspection log sheets, and other information may be found at htto://Portal.ncdene.org/web/wo/ws/su/nbdessw#tab-w. [15A ;NCAC 02H .0506(b)(5) and (c)(5)] 19. Activities located in protected riparian areas (whetherjurisdictional wetlands.or not); within the Neuse, Tar -Pamlico, oeCatawbaRiver Basins or in the Randleman, Jordan, or Goose Creek Watersheds (or any°,other basin or watershed with buffer rules) shall be limited to "uses" identified within and constructed in accordance with Title 15A NCAC 02B .0233, .0259, .0243, .0250, .0267 and..0605, and shall be located, designed, constructed and maintained.to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All buffer rule requirements, including diffuse flow requirements, must be met. [15A NCACO2B .0200] 20. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between_uncured or curing concrete and waters of the state'. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/ fish kills. [15A NCAC:028.0200] 21. If an environmental document Is required under the:State Environmental Policy Act (SEPA), then this Certification is not valid until a Finding of No<SignificanUmpact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse. If,an environmental document is.required under'the; National Environmental Policy Act (NEPA); then this Certification is not valid until ,the Final Environmental Assessment (EA) or Environmental Impact Statement (EIS) is published by the.lead agency. [15ANCAC 01C .0107(a)] 22. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal; State, or Local approvals. 23. The a ' licant pp /permdtee and.tfieirauthorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use; or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify thi&Water Quality Certification. 115A NCAC 02H .0507(d)) 24.'Upon completion of all impacts included within this approval and any subsequent modifications, the applicant.shall be required to returnthe:certificate of completion attached to the approval..One copy of the certificate shall be sent to the DWR Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC, 27699-1650. [15A NCAC 02H .0502(f)] REC EnI ®E® MAR 1 2 201E MP SECTION I! HD DARECOuNTY DWR# 13-1279 V3 Individual Certification#4081 Page 7 of 7 25. Additional site -specific conditions, including monitoring and/or modeling requirements, may be added tothe written approval letter for projects proposed_ under this Water Qua lity;Certification in order to ensure compliance with all applicable waterquality and effluent standards. [15A NCAC 02H .0507,(c)] 26. This certification grants permission to the director, an authorized representativeof the Director,. or DENR staff, upon the presentation of'proper credentials, to.enter the property during normal business hours. [15A NCAC 02H .0502(e)] 27. This approval to proceed with your,proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions.in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification._[15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506] 28. Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal acid/or civil penalties. KAH/ads 4081 This the 7th day of March 2018 Karen Higgins, Supervisor 401 & Buffer Permitting Branch RECEIVED E® MAR 1 2 2018 NIP SECTION MHD Bodnar, Gregg From: Gledhill-earley, Renee Sent: Monday, March 12, 2018 3:14 PM To: Mintz, John Cc: Bodnar, Gregg Subject: FIN: Hatteras ER 16-2031 John: Once your folks are done with this review, which you seem to think will be soon and will positive for DCM/USACE/etc please let Greg know so he can move forward knowing that we will get what he needs in writing to him asap. Please copy me. Thanks, Renee Gledhill -Earley Environmental Review Coordinator State Historic Preservation Office 109 E Jones St MSC 4617 Raleigh, NC 27699 919 807 6579 office OWENS m0ru® NC DEPARTMENT OF 211111 monnn NATURAL AND CULTURAL RESOURCES ■t2®leIII Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please Note: Requests for project review or responses to our review comments should be sent to our Environmental Review emailbox at environmental.review@ncdcr.gov Otherwise, I will have to return your request and ask that you send it to the proper mailbox. This will cause delays in your project. Information on email project submittal is at: http://www.hpo.ncdcr.gov/er/er—emall—submittal.html From: Bodnar, Gregg Sent: Monday, March 12, 2018 2:51 PM To: Gledhill-earley, Renee <renee.gledhill-earley@ncdcr.gov> Subject: Hatteras ER 16-2031 Afternoon Renee, I wanted to call directly but am slammed with interviews this week. So I apologize for asking via email. But I wanted to ask if you've been able to make any headway. I had a great conversation with your group on Friday trying to help them with the background. Unfortunately I didn't get a phone number to contact them. Thanks so much for all the help, Gregg Gregg Bodnar A' Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Greoo.Bodnar(7a ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 t:.. -5:. Nothing Compares.,-..... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ]5°4]O-W a x 2666516 V WI% W 35. 11' W.WY N Gm ]5.45 5t$IM Y r N le N e 4 a x 2986161 s a z 1w135°111124N 6=.., `�� NFE' Iu1V T5'd558243'W X29E653] 1 ) �a'.{•1_ y� x28fi l LM 3Y IT 716N Y&MM7 Lap ]5"0.5'51.656'E 35' 11'23474'N p N. . l �+� N lup ]5' 45' S5551• W E� 1• ` J{ 1N���` � a t " � 1 Ttt �4 p c �. ,�"'� �' �K} L� may,'?} +r.1w 1 e •.. o > :._ a Ocryacoke 00 4 0 100 200 00 600 &10 N - -��� LEGEND Aids to Navigation i G1®n wNl Depth M FNNt i. 1yt.3 lrM,�, 1 8 Cii ISY LWit _S-. t• f \ Nm � GaBn �Mecu1 S ] - "F. ?. �♦ rr t IbN OW —n -IN.e y ..M i t`� `�. ! G'°a`UWeL BIOf O Wn0c 39n M12. 10 • A [ \ �,A �'� 1 F FFERENCE SURFACE TNS USED FOR EsnNATEO OUMTTr C. CUIATIO-NCL", Ptl WNNSN 11.1z Osc eFT_n]P_nN -1ser,a4 GtmY �"S -A 0 rw Gnee OSc_lapr_TEMP_TIN S An<MMRW yO1.• j ¢ t; ^,:� N'T i 1�sAw1E]AIPTSHAiEtNNVv9UNEY&INnEpAS\OCMCONE_srATE_cRMM1E12N1QO1_4_C&1MNNTMES —MNme� "TI WTED NATERML IN 1N INT DREDGE BOXES AS OF.MNIMNY 3E. 2010 11LJ CY a JFT ,"MCI .'O .X CUT x M6]5<S Y MGM lx 35' 1,' n.69O' N T ElkvxTxlxsxBE Ix FEETANO REFEF roxMvs iFsapreO MENM LOM£R LOW WATEp (MWY)RElATNETOME tNNI MI1 TDKEPOCN. 2 PROJECTSUBVEYEOWI VISTMCTSUFI VES6EL'POTTER USING FT GPb IgPo2pITK PoSITIOMNG EOUIMENT INO JW q S NNG EWIPMEM D.IOW2IXITH DATUM NAO 1561. rERTICK DFTUM M1LW. 1. TICEAGE LOGTEOAT RONA GUM.E IMT] WCOOM GJMO UEE OF TIMY S FOR nES GiFf.E IIFM RESTRICTED TO WN ASSURANCE PURPOSES FORWRNM MINOFRR{TgES. n1EWILMNGTONpRTMCTM ONLYUSEST1FF WGETJ LVKLESFORFlMLLaM WAMOIMNNTTGLCWATM:NSIFRMGPSISUN- AVMI.VLEATTMETNEOFSNRVEY 5.1MINFONM DNNFACTEOONTMSSM YM REPfIEGFNR3nEIESOLTSGFSU YS MANEMW GATES ATC TDAND TWOEO IN'T`Om EO AB NOIunMOnRGExERAL CONgnONs EWsnNGAr TNAM rI£ff CONanOA WSMYE RMIOCM E NEro TONFROVIXD .AMNIFMMMNNERsRo11Lp NOTR¢r ENGLIISNFlr aMT1E INFOpNAnoN PpDMp6o MERE. REouRED er v cm 2M.Y. sLRJEY CpOU. Sr US.y CORPS IYRIC486C11g1 irW LNe LLI 7 ai 3 U a _ 0) C p u o 0 0 V L U o O S TYPICALsecnoH X 236R51a Y SW114 w will 38.Bf 4 2t art. ""aa X �66151 Y 5398I7 = 1 Itl 35°11'39.3R3'N - `jl- •..+ 'o • lmq )s' 45' S8243' W X 261;6537 Y 54a0D1 Y' S` +;'.••1 X2855T11 L61 X'11'2718FN Y 539]8) Imo 75° 45' 51 656•W .6F W35.11't3614•N Lap TS'45•SS.ssrw 1.4 4 F - a�Ocracoke3lsland ° 3 'b , ` �, .. '� •°' N1y Po e 0 100 200 400 CAO SDO •� i l 4 ?F' if Y ' LEGEND Aida to Navigation 1 Gam UEm Depth ID F1v1 S t y y I "t • MG-4 8lelbber - ♦ Nn ■ Gmn �Geaeon eS _ d -". n r. . ' Gann DyNm Bow ` Q Dapt'Sen 12. 10 y ±� AIR !L M� : ♦ " REFERENCE BVIFACE 11N8 USED FIXI E6TIMTED QUANTITY GLC1AATgN51XLL1XIE: • � u "IY ate' a R•O LIiMa16,N' ibh®N 15. 11 {. O5C_WT_TEAS, lIX _ 'SC_IDGL_IEMP TIN E 4vYm 1NW 0 TW GWe -uWluw Z• 4 4 . + .F ft Y, aSAW-NETAFPZ,SINIEgNAVSUINEYSUNTTEMSOCWCd(E_STATE_CAHIELLLO1Bb1_25_LSgUAMITIES FETWl01 WRIWL W 1ELFi pEpOE BOXES RS OF MMMAt43H6 Rlv CT� aFT 1LS51 OYO.IaEr TIW euT Y 53BB25 IaF 35'11'M.6 N X z88]5L9 Y 539730 M.1112 .w T5.45' 36 5 NoiE6: 1. E1EMTpN INFEETANDREFERWNGA'6WPMMD MEAX LOWFA LGIY WATER {Ml1W1RFLeTNE i0 iME 1113AJ1 TIDK EPoLX. 2 PROJECT6URJEYFD 1MT MMCTSU EVVESWL' 17ER UBNGR1T,. NOWZWTKPDSIFIONNG EOUIPMEW MD MO NN25CONDNG EWIR.IFM 1 HORIZONTAL WTUM ]MD 16W. VERTILK WTDM M L.LW. l TF]E OAOE LOCATIEDAT MOM GAGE MITERAS COASTGUARD USEC TIMV SFOR THIS GAGE APE RESTRICTED TO OUM1Y ASSURANCE PURFOSES FOR VEMFlGTON OF RIK TLL1F3. TXE WLYIXGION d61PoCT VMLOIIY VBE STAFF GGE TIULL VALUES TIRE OF GLCUNTpN61F RIKGP615 UN AT THE TIREOF BIRNEY S. THEINFORWTON O TEO ON TMB SURVEY MAP REPRESENTS TINE RESULTS W SURVEYS MADE ON THE GTES IN TFDMD CW ONLY BE WNNDEREDA NEFDADNG THE GENERK DUE M0N6 NGEAEATTNAPINUD TIE6ECONpTONBARE &181ECL1D yelp CW.NF;E INF TOSNOAUHG IDED AFRUOEMWRNEP M200 WTRELY EIICLLLSNELY pITME INFOR WTON FAOW[EO HERE. REOUREO BY ii LFR 106.1t5 7N4VI MMMLO nDN NSMI SUWEYV W6 ACWWCY•I.SMETERS. •3U COFDUCT USNAIYLWPSC£ENGINEERSMI(MINOTQUOSTNCT NORTH w N C U U) a C C C3 Y O ?Y \ PERMITTED LIMIT OF THE z Pa z as CONNECTOR CHANNEL CORRIDOR W W z n W 0�-- 20�0 400 I' _ GRAPHIC SCALE APPROXIMATE LOCATION OF TEMPORARY z DISPOSAL SITE. USACE IS PROPOSING TO I TEMPORARILY PLACE APPROXIMATELY 500 I C.Y. IN THIS AREA. THE AREA WILL ONLY PROPOSED MODIFICATION TO THE a s °a BE USED UNTIL THE DREDGE HAS ENOUGH I CONNECTOR CHANNEL CORRIDOR o : o; DEPTH TO GET ACROSS THE SHOAL. THE AS SHOWN IN PERMIT DRAWINGS V z= s E r 00 e DREDGE WILL THEN RETURN AND PICK UP I DATED 2-9-18" t �o o THE MATERIAL AND "TAKE IT TO THE NEAR z o3 I ' SHORE DISPOSAL SITE. I a 6 6_5 I 4 6 ' _5 W 0 7 11 SO 6 e .. B•S �6cp ;Y �2 s HATTERA ' gg f INLET low / c �= w \ o M 'g go a� a izgwa � ww�ao3 PROPOSED ALIGNMENT OF CONNECTOR LLI0 ryQwox"> \ \ CHANNEL / SOUTH FERRY CHANNEL / z 0£=a�g \ FOR THE MARCH 2O18 EVENT / — c\, ® <�'a�� f-8 W L) 6 w UJ NOT FOR CONSTRUCTION LIMITS OF CULTURAL FOR REGULATORY REVIEW ONLY RESOURCE SURVEY AREA \ \ [FIG1 \ / Name DACE 1@T av 1 \ my u \ mm PERMITTED LIMIT OF THE = a < CONNECTOR CHANNEL CORRIDOR cc W W Z l7 W It0 200 400 = GRAPHIC APPROXIMATE LOCATION OF TEMPORARY g DISPOSAL SITE. USACE IS PROPOSING TO I, TEMPORARILY PLACE APPROXIMATELY 500 I ! Cc p C.Y. IN THIS AREA. THE AREA WILL ONLY PROPOSED MODIFICATION TO THE a 81 BE USED UNTIL THE DREDGE HAS ENOUGH I CONNECTOR CHANNEL CORRIDOR o E �u z DEPTH TO GET ACROSS THE SHOAL. THE DREDGE WILL THEN RETURN AND PICK UP AS SHOWN IN PERMIT DRAWINGS `p' �� " E Yoa DATED 2-9-18" :. o THE MATERIAL AND TAKE IT TO THE NEAR Q W $3 SHORE DISPOSAL SITE. I 1 I I -6 6 I -5 y pEy a g upi •9 `6 � 6 I ' s 5 11, -10 a > .. e7 S •� Oz 675 oV' on S6 ��Q a � � N �Y [ O • Q Ile v I? o HATTERA E 3 INLET \ for \ Gz a < W K a `z UZ6 \\ wa wwrao3 PROPOSED ALIGNMENT OF CONNECTOR W oo ozoxW5 oz CHANNEL / SOUTH FERRY CHANNEL \ / o Z �£ � 5 ia�g FOR THE MARCH 2O18 EVENT / c� ® �r�a¢n `fagao L> V w� f r \ W Q Lu ag _ NOT FOR CONSTRUCTION LIMITS OF CULTURAL FOR REGULATORY REVIEW ONLY RESOURCE SURVEY AREA \ / FIG 1 Name DATE \ PERMITTED LIMIT OF THE $ CONNECTOR CHANNEL CORRIDOR W W 2 I 2 W °° 0 200 400 I4 z GRAPHIC APPROXIMATE LOCATION OF TEMPORARY DISPOSAL SITE. USACE IS PROPOSING TO I g TEMPORARILY PLACE APPROXIMATELY 500 p I' C.Y. IN THIS AREA. THE AREA WILL ONLY PROPOSED MODIFICATION TO THE + om e E o^ BE USED UNTIL THE DREDGE HAS ENOUGH I CONNECTOR CHANNEL CORRIDOR DEPTH TO GET ACROSS THE SHOAL. THE AS SHOWN IN PERMIT DRAWINGS V on O= s r N, a DREDGE WILL THEN RETURN AND PICK UP DATED 2-9-18" THE MATERIAL AND l-AKE IT TO THE NEAR R e3 SHORE DISPOSAL SITE. I I I ` c _6 �6 _5 I H a y a s Yry 1 _6 p� 6 1 a ji m _.S a � -10 -7 ��S _5 1z. D.o ry By der HATTERA r� ' INLET / G W ® 6 J W K Q ==sw< \ � _ PROPOSED ALIGNMENT OF CONNECTOR ui m�0 W> oZ \ \ CHANNEL/SOUTH FERRY CHANNEL o Z ,o -oz £za&5 \ FOR THE MARCH 2O18 EVENT / _ �., _0 _ f 8ao \ U wp w k a \ Lij E� a W = NOT FOR CONSTRUCTION LIMITS OF CULTURAL FOR REGULATORY REVIEW ONLY RESOURCE SURVEY AREA rIG NerveDATE1