HomeMy WebLinkAbout35-96Minor Mod Coral Bay Club (2)Permit Class
MODIFICATION/MINOR
STATE OF NORTH=CAROLINA
Department of Environmemt 314ealilr& Natural Resources
_ ',".• and=... ,'�.,'�.
Coastal Resources Commission
Prri it,
Major Development, in an Area.of Envirorimental Concern
pursuant to NCGS 113A=1'18'."
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
35-96
Issued to Coral Bay Club P. O Box 112,Atlantic Beach, NC 28512
authorizing development in Carteret County at Hoop Hole Creek at Coral Bay Club dock facility
, as requested in the permittee's application datedLetter dated 8/26/96 including attached
workplan drawing dated 8/26/96.
This permit, issued on "--k — �_ to — °\ to , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This permit modification authorizes the construction of a launch ramp service dock or "catwalk"
as described in the attached workplan drawing.
2) This modification must be attached to the original of permit No. 35-96 issued on 3/8/96 and the
subsequent modification of 5/29/96 and all pertinent documents must be readily available on site
when a Division representative inspects the project for compliance.
3) All conditions and stipulations of the original permit and the first modification remain in force
under this modification unless altered herein.
This permiLaction may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
Roger N. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Permit Class
Permit Number
MODIFICATION8IINOR
STATE OF NORTH-CAROLINA
Department of Environment, Health & Natural Resources
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
35-96
Issued to Coral Bay Club P. O Box 112 Atlantic Beach NC 28512
authorizing development in Carteret County at Hoop Hole Creek at Coral Bay Club dock facility
, as requested in the permittee's application datedLetter dated 8/26/96 including attached
workplan drawing dated 8/26/96.
This permit, issued on �— --�to —O) to —, is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This permit modification authorizes the construction of a launch ramp service dock or "catwalk"
as described in the attached workplan drawing.
2) This modification must be attached to the original of permit No. 35-96 issued on 3/8/96 and the
subsequent modification of 5/29/96 and all pertinent documents must be readily available on site
when a Division representative inspects the project for compliance.
3) All conditions and stipulations of the original permit and the first modification remain in force
under this modification unless altered herein.
This permiLaction may be appealed by the pemrittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31,1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
e Roger N. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
State of North Carolina
Department of Environment,
,Health and Natural Resources
Division of Coastal Management
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
Roger N. Schecter, Director
September 27, 1996
Coral Bay Club
P.O. Box 112
Atlantic Beach, NC 28512
Dear Sir
WWV
1t •
IDEHNFR
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,
the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is
retained by you and it must be available on site when the project is inspected for compliance. Please sign both the
original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding
means you have waived your right of appeal described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1
or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of
Administrative Hearings, P.O. Drawer 11666, Raleigh, NC 27611, (919) 733-2698 within twenty (20) days of this
decision on your permit. You should also be aware that if another qualified party submits a valid objection to the
issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal
Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved.
If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all
permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we request that
you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning
permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for
assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal
resources.
Very sincerely,
Job . Parker, Jr.
Major Permits Processing Coordinator
JRP:jr/amw
Enclosure
P.O. Box 27687, I� 19-733-1495
V�� An E FAX 9 Affirmative
Raleigh, North Carolina 27611-7687 1 Equal Opportunity/Affirmative Action Employer
Voice 919-733-2293 wyIRPWMWI1 50% recycled/10% post -consumer paper
Division of Coastal Management
6
Application Processing Notes
ems`
R _i —9 L
Applicant: (' �" .sue r— 5 — `� L
�o
Deadline:,
5-96 for the Coral Bay Club
Date/Time: Message:
N
I the $50 check for CAMA
4' o p
Q`
poses to construct a small 3'
.11ed boat ramp. The project
A L.
?iers. Therefore, I have no
ease contact me.
i
T. O. EURE CONSTRUCTION CO., INC.
T D EURE POST OFFICE BOX 650
IL ANIREHEAD CITY, JW MOREHEAD CITY. NORTH CAROLINA 28557
NC PHONE 919-728-4191
August 26, 1996
Mr. Ted Tyndall
Division of Coastal Management
P.O. Box 769
Morehead City, NC 28557
Re: Permit 35-96
Coral Bay Club
Dear Mr. Tyndall:
As agent for the Coral Bay Club, we would like to modify the referenced
permit to allow for construction of a 3' x 20' catwalk parallel to the boat ramp on
the east side. This modification will provide for safer operation in the process of
launching and recovering boats.
Your consideration of this request is appreciated.
Sincerely,
T. D. Eure Construction Co., Inc.
C. B. Bissette. Jr.
'�— �c '--;,
`�•�1N1 IT pF_
�� 1v
\I/
6
i
PQOco.6az 001.94 S K 13 TS
ki
• E
2 - IrE A
I
MAASH 6
IMSS I%
o
n
_
ATE t.1�lE• —
' To 2 Dace Pno voa,�w7 441K�Fa14-*�
12.
f1260G
/okoPosr� Dock
Co2AL 3A%/ CLUB
ATG AN-rle- d ENfH, N4
SCALE
/Z:YY a,75- LAC l : SNEf T
Permit Class
MODIFICATION/MINOR
X
X
STATE OF NORTH:CAROLINA
Department of Environmedt;_Health Bc Natural Resources
and
Coastal Resources Commission
_Prnt
Major Developinent'in'an Area of Environmental Concern
pursuant to NCGS 1f3A-118 '....
vo
Excavation and/or filling pursuant to NCGS 113-229
Permit Number
35-96
authorizing development in Carteret County at Hoop Hole Creek at Coral Bay Club dock facility
, as requested in the permittee's application datedLetter dated 8/26/96 including attached
workplan drawing dated 8/26/96.
This permit, issued on '�=k — -ab — 0� S. , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to a fine, imprisonment or civil action; or may cause the permit to be null and void.
1) This permit modification authorizes the construction of a launch ramp service dock or "catwalk"
as described in the attached workplan drawing.
2) This modification must be attached to the original of permit No. 35-96 issued on 3/8/96 and the
subsequent modification of 5/29/96 and all pertinent documents must be readily available on site
when a Division representative inspects the project for compliance.
3) All conditions and stipulations of the original permit and the first modification remain in force
under this modification unless altered herein.
This permiLaction may be appealed by the permittee or
other qualified persons within twenty (20) days of the
issuing date. An appeal requires resolution prior to work
initiation or continuance, as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not
covered hereunder requires further Departmental approval.
All work must cease when the permit expires on
December 31, 1999
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina
Coastal Management Program.
Signed by the authority of the Secretary of DEHNR and the
Chairman of the Coastal Resources Commission.
Roger N. Schecter, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
I
8 P.QOpDs,E-ry P/,W2 $ K 13 TY t
_I
_
A C o
"
6
ry
H i
ATe7 Z L 1 nl
2
rn h IS' WIN
t jz�G
/oQono-uv> Dock
CORAL B,,y CLVS
ATEAArte. G' c'1GN M,G
SCALE
/GY cor r S/aE£ r
T