No preview available
HomeMy WebLinkAboutBrawner�.OF. � a The Village of Bald Head Island m Development Services a 0 \sLAJ � June 17, 2016 Joe Brawner PO Box 3060 Bald Head Island NC 28409 Exemption Number — 2016-G RE: EXEMPTED PROJECT - MAINTENANCE AND REPAIR of STRUCTURES CONSISTENT WITH CURRENT RULES [15A NCAC 07K .0209(c)] PROJECT ADDRESS — 6 Pintail Court AREA OF ENVIRONMENTAL CONCERN — Estaurine Shoreline Dear Mr. Brawner: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on June 17, 2016, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on June 17, 2016, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [15A NCAC 7K .0209(c)] - Any structure, or part thereof, consistent with current CRC rules may be maintained, repaired or replaced in a similar manner, size and location as the existing structure without requiring a permit, unless the repair or replacement would be in violation of the criteria set out below. This exemption applies to those projects that are not within the exclusion for maintenance and repairs as set out in G.S. 11 3A-1 03(5)b.5., Rule .0103 of this Subchapter and Rule 07J .0210. 1. the development must not disturb a land area of greater than 200 square feet on a slope of greater than 10 percent; 2. the development must not involve removal, damage, or destruction of threatened or endangered animal or plant species; 3. the development must not alter naturally or artificially created surface drainage channels; 4. the development must not alter the land form or vegetation of a frontal dune, 5 the development must not be within 30 feet of normal water level or normal high water level; and, P.O. Bov 3009 BALD HEAD ISLAND, NC 28461 (910) 457-6255 FAX (91019k7'��/ED E-41AIL: sbopett@villageblri.org IVEBSITE ktlp://www.vil/age 4MILMINGTON, NC JUN 1 7 2016 { 6. development must be consistent withral(applicable use,standards and local - land use plan's in effect'af the.time the exemption is granted: Structures may be repaired in a similar manner; s¢e and location as the original structure. Nd expansions or additions`are`pertnissible and the following`specfic ;•. conditions apply: 1. The project consists of the repair of repair of floating dock as shown on the 1 attached drawing and materials list. B 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or, Local authorization and N.C. Building Permits,_ This exemption expires 90 days from the date of the letter. Sincerely, Stephen _ oyett, LPO Bald Head Island PO Box 3009 Bald Head Island NC 28409 Cc: Holly Snider 3 a i rt ; "P Ur Bn.0 3009 BALD HEAD ISLAND, NC 28461 (910) 457-6255 FAX (910) 457-6206 -'10 li,�,i {,lt,;_,;.. %!;'E-A,fAIL: sboyen@villageblrl.argIFEBSITE hitp://wrvrv.villagebhi.org July 13, 2016 To: Stephen Boyett, VBHI Building InspecEor From: Joe Brawner Subject: Maintenance Repairs to Dock at 6 Pintail Court (CAMAPermit Requestj Stephen: My floating dock and walkway on Bald Head Creek are approaching 20 years of age and are in need of some maintenance attention. Following isa recent photo of the dock: I do not wish to expand the dock and the existing surface area.will be maintained. Issues to be addressed include the following: 1. Replace pilings: The existing pilings are rotting as a result of inadequate chemical treatment; one piling has already failed and others show signs of deterioration (see attached photo) 2. Replace some deck boards in floating dock and in walkway: A few deck boards are broken and/or warped and are unsafe and need to be replaced with new, treated lumber 3. Replace portions of hand rails: A few of the 2'X 4 pieces of lumber in the handrails leading down to the floating dock are in need of repair and possible replacement Island Contracting will do this work and a few changes are requested: • Replace 4 existing 8 inch square pilings with longer lasting round pilings • Replace the two square piling holes within the floating dock with metal and ceramic rings that will be attached to the side of the floating dock similar to the metal rings that are presently used to anchor the ends of the dock (see attached photo) • Cover the existing piling holes in the surface of the floating dock with deck boards . 1 _ .s �c..7 r•f i �'{ �,QFi-ts' "LLY i�w �� tr i a" •i� yes(" V_ si t" � Yf� '> / t �oy1t � �i All, •{ � [+R� :,`t .,�+1����nV•-,t+{�+n. Split deck board on walkway to be replaced (only a Few "problem" dick boards will'be' replaced) Thank you, Stephen foe your assistance in this matter, your positive willingness to help in this matter is genuinely appreciated. Should you need additional information orwish to take a lookat the dock please do not hesitate to call'. Again, thank you, Joe Brawner 6 Pintall Court Bald Head Island 454-9103