Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
124-16 Britton, Donald & Barbara
Permit Class permit Number NEW 124-16 STATE OF NORTH CAROLINA Department of En aonmental Quality RECEIVED Coastal. Resources Coommission 0rrtDEC 01 2016 for DCM- MHD CITY X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 _ Excavation and/or filling pursuant to NCGS 113-229 Issued to Donald & Barbara Britton,'133 Gazebo Court, Wihnington, NC 28409 Authorizing development in New Hanover County at adi. to the AIW W,133 Gazebo Court, Wllmivam ; as requested. in the permittee's application dated 5/26/16. incl. attached workplan drawings (2), 1-2 of 2, both dated 5/26/16. This permit, issued on November 23, 2016 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be suoject to tines, imprisonment or civn action; or may cause the permit to be nun and void. Docking Facility 1) This permit authorizes only the addition of a boatlift and the replacement of the floating dock, jet ski dock, octagonal platform, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this reconfigured docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification: 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the reconfigured docking facility. Any sewage discharge at the reconfigured docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. r-byZ Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Donald c& Barbara Britton ADDITIONAL CONDITIONS Permit No.124-16 Page 2 of 3 3) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 3 formalized boat slips. 6) Should the adjacent property to the east be sold prior to the initiation of construction, the permittee shall be required to obtain a signed riparian corridor waiver from the new property owner prior to the placement of any structures within the 15 foot riparian corridor. 7) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 8) The authorized GcoWred platform shall be single story, and shall not be designed to allow for second story use. ``v 9) I fCm`ptt s�a made by the permittee to prevent the full and free use by the public of all navigable watert� 3acent tq "authorized work. M� MN� G General 10) This permit does not authorize any new impervious surfaces within 30 feet of the normal high water line. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 13) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations, undertaken by the United States in the public interest. 14) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit. NOTE: Future development of the pemuttee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water line. Donald & Barbara Britton Permit No.124-16 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of General Permit 197800056 (Action ID No. SAW-2016-01908), which was issued on 9/22/16. NOTE: An application processing fee of $250 was received by DCM for this project. RECEIVED DEC 01 2016 DCM- MHD CITY zi i Wow U � � U Coats, Heather From: Farrell, Sean C Sent: Monday, November 21, 2016 3:55 PM To: Coats, Heather; Wilson, Debra Subject: RE: Britton draft permit Thanks Heather. Apologies for overlooking that, the existing platform is Not covered. I will make sure that Trip is aware that no roofing is allowed within the 30' buffer. Thanksl Sean Farrell Field Representative Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7424 office Sean. Farrel l(a)ncdenr.gov 127 Cardinal Drive Ext Wilmington, NC 28405 WeNothing Compares.-�.,.. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. (2- WC f� LAe� RECEIVED DEC 01 2016 DCM- MHD CITY From: Coats, Heather Sent: Monday, November 21, 2016 2:57 PM To: Farrell, Sean C <Sean.Farrel l@ncdenr.gov>; Wilson, Debra <debra.wilson@ncdenr.gov> Subject: Britton draft permit Ready for your review. One thing I wasn't clear on was whether the existing octagonal platform is currently roofed, or if they are proposing a roof , as indicated on the label on the plan (but not shown on the side view). Do you recall whether or not it is currently roofed? If not, just make sure they know they can't build any new roofed area landward of the bulkhead in the 30' buffer. If existing, they can rebuild it as is. Heather Coats Assistant Major Permits Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather.coatsOncdenr.aov 127 Cardinal Drive Extension Wilmington, NC 28405 ---% Nothittg Compares--,—, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Donald and Barbara Britton PROJECT NAME: Britton Docking Facility COUNTY: New Hanover LOCATION OF PROJECT:133 Gazebo Ct, adjacent to Inlet Pt. Canal & Myrtle Grove Sound, in Wilmington DATE APPLICATION RECEIVED COMPLETE BY FIELD: 8-31-16 FIELD RECOMMENDATION: Attached: Yes CONSISTENCY DETERMINATION: Attached: No FIELD REPRESENTATIVE: Sean Farrell DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: 9-9-16 p-mi WKR06, V1111t, ADJ. RIP. PROP NOTICES REC D: M `1/bopv (&c) APPLICATION ASSIG D T Le C) 75 DAY DEADLINE: MAIL OUT DATE: 9-8-16 FEDERAL DUE DATE: To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE REC'D: $250/#3896 END OF NOTICE DATE: 9-30-16 DEED REC'D: ON: ISO DAY DEADLINE: STATE DUE DATE: 9-30-16 FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency 10 %& / Division of Community Assistance 9 s/I a / Land Quality Section (DEMLR) 61 17,h to Division of Water Resources (401) to L 1 C, 73 Storm Water Management (DEMLR) State Property Office Division of Archives & History Division of Environmental Health I (o I V Division of Highways Wildlife Resources Commission1(rLocal Permit Office Q (S (4HL Division of Marine Fisheries / DCM 9 z 1(o SEP 0 9 2016 Corps of Engineers Z(6��(6 5(,SRw-Z01(,-6lgO7 IcFqlTi ?W,S a1 q1(0 1 rv... .... Iv v.. ", e Recommendations for Britton September 7, 2016 The total square footage of platform and docks was calculated as follows: Shoreline length = 100 ft. x 8 = 800 sq. ft. allowable. Fixed Platform = 14 ft. x 14 ft. = 196 sq. ft. Walkway/Catwalk = 3 ft. x 12 ft. = 36 sq. ft. Floating Dock = 60 ft. x 6 ft. = 360 sq. ft. (not calculated in overall square footage due to alignment) Jet Docks = 10 ft. x 13 ft. = 130 sq. ft. Boatlift = 13 ft. by 13 ft. = 169 sq. ft. (incorporated but no calculated in overall square footage) Total = 722 sq. ft. (362 sq. ft. calculated toward allowable square footage) It appears that the project is CONSISTENT with the use standards set forth in NCAC 07H .0208(b)(6), including the 1/4 width rule and the eight square foot rule. The proposed structures would be located entirely over open water. The proposed docking facility would allow for a maximum of three (3) formalized slips. RECEIVED SEP 0 9 2916 DCM- MHD CITY ol, MEMORANDUM To: Heather Coats From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Applicati PnDonald and Barbara Britton, Wilmington, New Hanover County Date: October 27, 2016 This project is consistent with the 2006 Wilmington -New Hanover County Joint Land Use Plan Update. The applicant proposes to install a new boat lift and replace the existing fixed platform, floating dock and jet docks for an existing private docking facility. The project is located at 133 Gazebo Court adjacent to Inlet Point Canal and Myrtle Grove Sound in Wilmington, New Hanover County. Areas of Environmental Concern (AEC's) impacted by the proposal are EW and PT. Waters at the project site are classified as SA and are open to the harvesting of shellfish. The area is a Primary Nursery Area. I have reviewed this proposal for consistency with the 2006 Wilmington -New Hanover County CAMA Land Use Plan and offer the following comments. The general area of the project is classified as Resource Protection. In general, Wilmington -New Hanover County allows development in Resource Protection classified AECs, which is consistent with the State's minimum use standards. The Wilmington -New Hanover County Land Use Plan contains some policies, which exceed the State's minimum use standards, however none of these policies are applicable to this project. This project appears to be consistent with the 2006 Wilmington -New Hanover County Joint Land Use Plan Update. Cc: File Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Mark Zeigler Division of Community Assistance Wilmington Regional Office PAT MCCRORY Gowmor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Owwor FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heathercoats(a)-ncdenrclov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: X- This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED C O - I & RECEIVED I)CM WILMINGTON, NC SEPo62016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Exl., Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 SEP 0 jj LUiti PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director TO: Dan Sams District Manager-DEMLR Wilmington Regional Office FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a),ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct, adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED q /1 ] / i,o RECEIVED DCM WILMINGTO.N, NC SEP 12 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drwe Ex[., Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Chad Coburn 401 Wetlands DWR-WiRO PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director Water Q!.lality Regional Operations Section !7!intor! Regional Oiiice FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)ncdenrpov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATED RECEIVED SEP 2 8 2016 State of North Carolina I Environmental Quality I Coastal Manegement D C M- M H D CITY 127 Cardinal D.Ye Ext., Wilmington, NC 29405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 FRM: SUBJECT: Applicant: PAT MCCRORY Govern. DONALD R. VAN DER VAART Secmrary BRAXTON DAVIS Uireaor ECEIVE Georgette Scott SEP 0 8 2016 Stormwater Section BV:—�— DEMLR - WiRO r Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(c),ncdenroov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: 1/ This agency has no objection to the project as proposed. SIGNED,�;A,P'Dc This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATED n7 2 RECEIVED DCM WILMINGTON,NC Sp 15 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 MA Energy. Mineral & Land Resources ENVIRONMENTAL OUALITY September 28, 2016 Mr. and Mrs. Donald Britton 133 Gazebo Court Wilmington, NC 28409 Subject: EXEMPTION Stormwater Project No. SW8 160912 Britton Private Docking Facility New Hanover County Dear Mr. and Mrs. Britton: PAT McCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS Director On September 8, 2016, the Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of the CAMA Major Permit Application for the subject project. Staff review of the plans and specifications on September 12, 2016 has determined that the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this letter, we are informing you that this project will not require a stormwater management permit. If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed, whichever occurs first. If you have any questions or need additional information concerning this matter please contact Georgette Scott at (910) 796-7215, or via e-mail at georgette.scott@ncdenr.gov. Sincfrely, / ,Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources GDS/gds: \\\Stormwater\Permits & Projects\2016 \160912 Exemption\2016 09 peRECEtI V ED cc: Pippin Marine Construction New Hanover Building Inspections Shaun Simpson-DCMWIAO OCT 18 Z016 DCM Morehead City Wilmington Regional Office Stormwater File DCM- MHD CITY tl.rlr of Nan dl1!rvin,nmrnrd Qualify f nC,p.. 4linrral and Land Resoorre, Niiv.ruy!:n v, q,w.r ni 1, 127 i:ardinal Drivr Lntrnwm Wilminylon.W 28405 9107%.21'i 4, Coastal Management ENVIRONMENTAL OUALITY September 8, 2016 TO: Tim Walton Dept of Administration State Property Office RECEIVED SEP 13 2016 COA STATE PROPERTY OFFICE PAT MCCRORY Governor DONALD R. VAN DER VAART Secretory BRAXTON DAVIS I)tr,,I,r FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatscDncdenraov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. tY- This agency has no comment on the proposed project. Q This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED Wes- WWAa+6L) DATED g,ao apt(o RECEIVED DCM WILMINGTON, NC SEP 3 0 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 PAT MCCRORY Ua e r su 1 3 2016 Nt5?ORtCPRE E JATOtr' Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: FROM: SUBJECT. Applicant: Project Location: ALD R. VAN DGR VAART lecwar, BRAXTON DAVIS 1)1"~ Renee Gledhill -Early Dept. of Cultural Resources Archives & History l �d lJt�'� tb Heather Coats, Assistant Major Permits Coordinator q,?i" NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm , NC 28405 heather. coatsaa)ncdenroov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review Donald & Barbara Britton 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. �f V\ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described In the attached comments. SIGNED VIA"' f "' ' ��� r DATED j E< _ .1 V i= tom DCM WILMINGTON, NC Sr7P 2 2 2016 SEP 1 4 2016 Sw,, or North Cuotma l lnvitn ntal Qualil) Coastal Management 127 Canlinol DriYI, Fxt , N"ilmmgtmt. NC 29405 910-796-721? Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Shannon Jenkins NC DMF Shellfish Sanitation Section PAT MCCRORY Gnvemor DONALD R. VAN DER VAART .Secretary BRAXTON DAVIS Dimclor FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aD-ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. A✓This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNE DATED I Received -r162016 State of North Carolina I Environmental Quality I Coastal Management DC M 127 Cardinal Drive Ext., Wilmington, NC 28405 910496-7215 I Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Direcmr DISTRICT 3 SIEP 12 2016 TO: Ben Hughes RECEIVED NC Dept. of Transportation New Hanover County FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather coatsanncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. �is agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED /c�� `mody DATED n7 — 2- ( — " RECEIVED DCM WILt•AINGTON, NC SEP 2 3 2016 Slate of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive ExL, Wilmington, NC 28405 910-796-7215 \/ Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Maria Dunn NC Wildlife Resources Commission For WiRO PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Drreclor FROM: Heather Coats, Assistant Major Permits Coordinator°may NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(cDncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED 1-2- ZD 1 t RECEIVED DCM W ILPAINGTON, NC sg 2 6 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Exl., Wilmington, NC 28405 910-796-7215 ti Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: 4;1111111; SUBJECT: Applicant: � Of PAT MCCRORY Govemar DONALD R. VAN DER VAART se-ewy RECEMD BRAXTON DAVIS Dimaor SEP 1 5 2016 NZAHANOVR 8, Z NINGECOUNTY M ONING Ben Andres for, LPO', New Hanover County Heather -Coalds,-Assista'rit Malor Fiermits Coordinator NCDEQ — Division of -Coastal Management 1-27Zardinal-DrIvo. flm., NC 2W5 heathercoats(a)nodenr gov F": 395 3964(C#qfi L33 ) CAMA Application Review Donald & Barbara Britton Project Location: t 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, Iri WilMingtop, New Hanover County Proposed project: to instaffa new boat -, lift, . and replace: - the existing fixed platform; 11dau_ g,-_o_ck and jet—do.1bisfor Ia private docking facility' , REPLY- Ms dgdh6y has no objection to the pridiql6t as proposed. This agency has no comment on the proposed project. This agency approves of the project only I the recommended changes are 111c0pofated. S6e.-i.ftacfibd.. This agency -objects, to the project for reasons described In the attached comments, SIGNED6 /-- T I DATED. Received SEP 15 Z016 Stele aMmlhUrplioa 1EavboDmmtdQaaWy1CoaaW?Anagemm* DC 127CndindDd"EA,WflmiagWn,NC29405 910.7967215 e CoastalManagement ENVIRONMENTAL QUALITY September 8, 2016 TO: Gregg Bodnar Fisheries Resource Specialist DCM, Morehead City PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Direnor FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive_Ext., Wilm., NC 28405 heather. coats(a)ncdenc-go v Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install anew boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED 91 L3 /ib uCM WILMINGTON, NC �� f SEP 2 3 2016 SEP p9 2�16 State of North Carolina I Envirourantal Quality I Coastal Management ®vMe MH® vlf'y 127 Cardinal Drive Dat, Wilmington, NC 29405 �Y� 910-7967215 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 September 22, 2016 Regulatory Division Action ID No. SAW-2016-01908, General Permit No. 197800056 RECE"V,11 Mr. and Mrs. Donald and Barbara Britton SEP 2 6 Z016 133 Gazebo Court Wilmington, North Carolina 28409 DCNI- I. Dear Mr. Britton: Through coordination with the North Carolina Division of Coastal Management we have learned of your request to replace and expand an existing docking facility at 133 Gazebo Court along Myrtle Grove Sound in Wilmington, New Hanover County, North Carolina. Coordinates are: 34.0713 N,-77.8923 W. On January 1, 2011, we renewed general permit No. 197800056, (copy enclosed), that authorizes the maintenance, repair, construction and installation of piers, docks, boathouses and boat shelters, mooring piles, dolphins, jetties and breakwater structures in navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the Rivers and Harbors Act of 1899. Your work is authorized provided it is accomplished in strict accordance with your submitted plans, the enclosed general conditions, and the following special conditions: 1. All work authorized by this permit must be performed in strict compliance with the submitted plans received on 13 September 2016, which are a part of this permit. Please read the enclosed permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. -2- Thank you for your time and cooperation. If you have questions, please contact Tyler Crumbley, of the Wilmington Regulatory Field Office, telephone: (910) 251-4170. Sincen L Tyler Crumbley, Project Manager Wilmington Regulatory Field Office Enclosure: GP 56 conditions Copies Furnished (with enclosure): Mr. Trip Pippin Pippin Marine Construction Post Office Box 11291 Wilmington, North Carolina 28404 Copies Furnished (without enclosure): u M EMITSu. Division of Coastal Management North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Mr. Doug Huggett North Carolina Department of Environmental Quality Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557-3421 -3- Ms. Karen Higgins Division of Water Resources North Carolina Department of Environmental Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Chad Coburn Division of Water Resources North Carolina Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 REGF-, ® SEP 26 2"S DCI�I- V" ' , . :_ :` Y VN Coastal Management ENVIRONMENTAL QUALITY September 8, 2016 TO: Heidi Cox DEMLR Env. Engineer Public Water Supply-WiRO PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director ffto SFP ' �I v(vis- /7 Ot0 111[116 00141���c�p• /ic a. �• . Watersel FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatscD-ncdenraov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Donald & Barbara Britton Project Location: 133 Gazebo Ct., adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County Proposed Project: to install a new boat lift, and replace the existing fixed platform, floating dock and jet docks for a private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by September 30, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7424 when appropriate in-depth comments with supporting data is requested. REPLY: 7\ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED RECEIVED DCM` WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management J E P 0 9 2016 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 00- '15' ' 4' � U W `= o p N Lu U w W -� cc p o r6 h �s�d.a oci'c�oaal � i DCM WILMINGTON, NC AUU232016 M_ H a uyuyw}u —JowH % L,-" •1_ �S— fORMPALY HANN/G Z BuNNi IY (DB: 19ofALSS1�—zr'�' OB. "j,A*T Wo I I (RAI.a ao F68 F.T Alg Dff E40 M ) lS• •� h �1 � II 'i 0: U ❑a Id' , 6 I� Ipa -I s, NO ZN /pMtT� LY P BaOK !f( ® 4 .y ueie.: iA m x...uan aN uv =f . -2 n z a, �uRYEYOR6 QNT of 4WAY y O v/ t1:1.. I P 09 2016 R W �«asA~�V r T ~` AUG 2 3 2016 HD C� I N 6s, S%r �4/- ea���/ % Sii(�r�/j } ki _ /: c S ©/coo, lox 6 Ffisaf D tk 0 0 1,f a aarai l3� Gazebo Cr` T 1/ >- u\i U i �fli?GGIGx flff�Oh � � o'a _ y li � 133 64zc%v C'f W � g (zcsii� /s3 " 77, CEIVED _-)CM WILMINGTON, IJC A U G 3 y 2016 I_ hlbepf flra'�( d376'az�hv ', 133 6a2edo Gi, lJiirnin�tom, Ale, fog° DECEIVED DCM WILMINGTON, NC AUG 8_? 2016 ice' r /°/z C'wer 7'S�de� GUl Xc G"1� Dr�tr, 5y If ,f a 'Z6' DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Donald & Barbara Britton c/o Trip Pippin 2. LOCATION OF PROJECT SITE: Site is located at 133 Gazebo Court adjacent to Inlet Point Canal and Myrtle Grove Sound, in Wilmington, New Hanover County. Photo Index — 2006: 21-7379 J-5 2000: 21-259 J-5 1995: 21-241 J-7 State Plane Coordinates - X: 2335237 Y: 118496 Lat: 34°07'12.86" N Long: 77089'22.85" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — August 22, 2016 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — August 16, 2016, Complete August 31, 2016 Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan— New Hanover County Land Classification From LUP — Resource Protection (B) AEC(s) Involved: PT, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing- Municipal sewer Planned- N/A (F) Type of Structures: Existing- SFR with fixed platform, floating dock, and jet docks Planned- Install boat lift and replace existing fixed platform, floating dock, and jet docks. (G) Estimated Annual Rate of Erosion: N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (§404) 7 (B) Non -Vegetated Wetlands (Open sq. ft. Water) acement) F205 sq. ft. (new work) (C) Other - Highground disturbance (D) Total Area Disturbed: 891 square feet (.02 acres) (E) Primary Nursery Area: No (F) Water Classification: SA Open: Closed PROJECT SUMMARY: The applicant proposes to install a new boat lift and replIRfiefisfiffeii®d platform, floating dock, and jet docks for an existing private docking facility. SEP 0 9 2016 DCM•- MHD CITY Britton Page 2 09/07/2016 9. PROJECT DESCRIPTION The project site (property) is located at 133 Gazebo Court (off NC Hwy 421), off Inlet Point Canal which is adjacent to the AIWW/Myrtle Grove Sound, in Wilmington, New Hanover County. To locate the property from Market Street travel south on College Road (NC Hwy 132) and continue south for approximately 5 miles on Carolina Beach Rd. (NC Hwy 421). Make a U-turn, take the first right into the Inlet Point Subdivision onto Inlet Point Drive and keep right at the fork to continue on Inlet Point Drive for approximately 0.1 miles. Take a left on Gazebo Court and continue for approximately 0.2 miles. The project site will be located on the left side of the road. There is a gate at the entrance to the subdivision and the gate code is #4633. Existing structures on the project site include a single family residence and private docking facility. The project site is approximately 0.35 acres and is vegetated primarily with domestic grasses and ornamental landscaping. The project site has approximately 245' of shoreline frontage along Inlet Point Canal that has been stabilized by a fiberglass composite bulkhead. Approximately 140' of the property's shoreline frontage is deeded as a community docking easement for the Inlet Point HOA. No wedand vegetation is present water -ward of the existing bulkhead and normal high water (NHW) meets the bulkhead. The existing docking facility consists of an existing octagonal fixed platform measuring approximately 14' x 14' that extends from the northwest corner of the bulkhead. An access ramp leads from the platform onto a floating dock, which measures approximately 60' in length by 6' in width running parallel to the shoreline. Two (2) existing jet docks that together measure approximately 10' x 13' are located at the southeast end of the existing floating dock. The New Hanover County Land Use Plan classifies the adjacent waters as Conservation and the adjacent high ground portion as Developed. The waters of Inlet Point Canal and Myrtle Grove Sound are classified as SA, by the NC Division of Water Resources. These waters are designated as PNA by the NC Division of Marine Fisheries and are closed to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to install a new boat lift and replace the existing fixed platform, floating dock, and jet docks for an existing private docking facility. The applicant states that a boatlift measuring approximately 13' in length by 13' in width would be installed west of the existing octagonal fixed platform. The applicant is proposing to replace the octagonal fixed platform which measures approximately 14' in width by 14' in length. The proposal includes a new walkway measuring approximately 3' in width by 12' in length that would allow for access between the proposed boatlift and fixed platform. The proposal also includes replacement of the existing 6' in width by 60' in length floating dock as well as the replacement of the existing jet docks measuring approximately 10' in width by 13' in length. All of the existing structures would be replace within their existing footprint. The proposed docking facility expansion would provide docking space for up to three (3) vessels within existing water depths of approximately -5' at mean low water (MLW). The community maintains an active CAMA Major Permit (#160-05) for maintenance excavation. 10. ANTICIPATED IMPACTS The proposed new boatlift and walkway would incorporate an additional 205 sq. ft. of Estuarine Waters and Public Trust Area. The replacement of the existing fixed platform, floating dock, and jet docks in the same footprint would continue to incorporate approximately 686 sq. ft. of Estuarine waters and Public Trust Area. The proposed structures appear to conform to the 1/4 width rule and the established pier lengths within the man-made channel. The proposed structures would encroach into the eastward adjacent 15' Riparian Corridor Setback Area requirement with the proposed jet docks. The applicant has received a waiver from the property owner for this encroachment. The Inlet Point Harbor Architectural Review Committee has approved the proposal and the location of the proposed boatlift in regards to the adjacent community docking easement. This proposal would allow for a maximum of three (3) formalized slips. Minor turbidity increases should be expected during construction. RECEIVED Submitted by: Sean Farrell Date: September 7, 2016 Office: Wilmington SEP 0 9 2016 DCM- MHD CITY 1W W1 %V1, /PPLIDATI011 for Major Development Permit North Carolina DIVISION OF COASTAL MANAGEMENT f. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI 'J' Last Name yr,� Applicant 2: First Name r i6aPi. MI )0 Last Name /gri n If additional applicants, please attach an additional page(s) * M names listed. Mailing Address / 133 C zela eoas-t PO Box Cily .t �/�m/07 f;40 Statue / ZIP �S-IYsZ Country Phone No. 3aged. FAX No- Street Address (ddifferent from above) City State ZIP Email Z Agent/Contraiaor Information Business Name Agent/ Corrtrardor 1: First -Name MI Last Name Agentl Contractor 2: First Name MI Last Nam Mailing Address PO Box I&A71 City State /f. ZIP Phone No- 1 ?/6 � ao3t Phone No. 2 e t- FAX No. Im C270 _ 1Z fD Contractor# 13 Street Address (rt different from above) C ftu MpsltRQ State /1� 02 a y ,25'71 fj►o0 W r 140d, Email hi / ,vit, /vrGttni.+ e. cowl �. DC^' <Fonn continues on back> SEP 0 9 2016 252-808.2808 :: 1-888.4RCOAST :: vv vv coastal management.net Form DCM MP-1 (Page 2 of 4) APPUCAnON for Major Development Permit 3. Project Location County (can be multiple} Street Address ae6a 'ourf State Rd. # C'4•? �.fovC� t Subdivision Name le e' /'billf City JAI(IA-7r.a /4 State N Zp a2941,1401� Phone No. Lot No.(s) (if many, attach additional page with list) 6//6 -4(52- 36464t ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project C� e. -evA / C w c. is the water body identified in (b) above, natural or manmade? Manmade ❑Unknown d. Name the closest major water body to the proposed project site. A'em"? ❑Natural fG,l.(� j�/C e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed OYes VNo work falls )within. 4. Site Description a. Total length of shoreline on the tract (ft) b. Size of entire tract (sq.ft.) W y- - 35- 4u,e -/- — c. Size of individual lot(s) �,f QGFE` — d. Approximate elevation of tract above NHW (normal high water) or NWL (nomaal water level) r Of many lot s zMplease attach additional page with a list) f HW or ONWL S e. Vegetation on tract �A/laG�.rC2-�D�ecLl� 1�GC� f. Man-made features and uses now on tract resi q°e�ce g. identity and describe the exisung land uses adjacent to the proposed project sit. lie, :We. ,. 60 w/ `leas,° s h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? BZ/ r�s" _P�' (Attach zoning compliance certificate, if applicable) gas ONo ONA J. Is the proposed activity pad of an urban waterfront redevelopment proposal? Oyes o k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. OYes Wo DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a OYes o ONA National Register listed or eligible property? 4onn con inues on next r?9 9 2016 ECm- h11HD CITY 252-808-2808 :: t-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes o (II) Are there coastal wetlands on the site? []Yes Die (iii) If yes to either (I) or (i) above, has a delineation been conducted? ❑Yes ❑No (A#ach documentation, if avaidabfe) n. Describe existing wastewater treatment facilities. o. Describe existing drintdng water supply source. p. Describe existing storm water managemem or treamfrent systems. St1r �'!{C� ruvt n �T 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ❑PublicfGovemment ,AY'rivaWcommunity b. Give a brief desuwpfdao of prupasA use, and daily operations of the project when campfefe. �riv�e �o��"� ���l/•�Y c. Describe the proposed construction methodology, types of constmctdon equipment to be used during construction, the number of each type of equipment and where it is to be stored. )/410L�144� dock 64(lfe Y"vr �w iiRrj rh�/�i H'(3 Pv/ l/ 6e docked 'fl, "-o sect file d. List all development activities you propose. A/lo4,t F+n g t�tx�k (,areb� /3aa z e. Are the proposed activities mair#enance ofan existing proled neav w bath7 f. What is the approximatetotal ttoo�taldisturbed land area resulting from the proposed project? ❑Sq.Ft or ❑Acres r g. Will the proposed project encroach on any public easement, public aocessway or other area ❑Yes No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes No ❑NA If yes, will this discharged water be ofthe same salinity as the receiving water? ❑Yes No ❑NA j. Is there any mitigation proposed? J]Yes No ❑NA If yes, attach a mitigation proposal. <Focm continues 6JE1111e00 2016 ®ch11- h4un CITY 252-808-2808 :: 1-888.4RCOAST :- www.necoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for is Major Development Permit 6. Additional informadon must be submitted in orderfor the appication Soa form. (MP }) UrefoAowmgllams brdow Il$PP; In adtlltion to this completed apPlica are always applicable to any major development application. Please consult the application package to be complete. items (a) - (A llemsbeJa>d instrucL'tM boilMat on AM10 pmprdyPWM the fz�ed a. A project narrative. _ b. An acoarate, dated vrodr pbt (mahrdig Wan view and cross -sectional drawings) drams rly indicate on mapsIc- Please eplals, drawng to distinguish �po�lproject lsenypationakeadreomplate? tfprevfoustyauthodzedwodc, clearly between work completed and proposed, that is sutficienGry detailed to guide agency penonner urrfamikarwith the area to the site. c. A site or location map -_ W nano e e atradad monemes. d. A copy e. The approprran: ayWw��^ ^•^ Checkormoney order made payable to wners and signed return receipts as proof that such f. A red of the names and complete addresses of III adjacent eaterknnt (dpedan) landoowners must be advised that they have 30 days in owners have received a copy of the applICafion Wild plats by certified mall- Such land to the Division of Coastal Management which to submit comments on the Proposed project _ Phone No. Name . '41 4:-fi'*�o-,t . /.-.-�. /y - - Address �,3� [.7exe- $ C.iI M�f/Mgt� w%/• 7}�!�Phoo I? - - / Q Phone NO Name 2 e t? 74 AoC.e� fdEd !, 11Y0 Adds / -) /3 CV-16r04 Phone ilb:_ Name - - - — Address _ _ --r--- -- issued for work on the project tract- Include permit numbers. per iftes, and Issuing dates. g. A list of previous state or federal permi5 ;I; tantoragerdauuwbztwnform• 1. Welland delineation, if necessary_ oceanfront and irld areas. {Must be signed by property Omer) j. A signed AEC hazard notkx m forprojects - I project involves k ic A public funds compliance use f public le 14 attach a statement documenting compliance with the North Environmental Policy Act. 1 understand that any permit issued in response ro a aprmcouvn •.••• -• -..., - - -- - - The project Wit be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant, and do in fact gram permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project i further certify that the information provided in this application is tfW to the best of my knowledge. Date Print Name /p Af Signature Please indicate application attachments pertaining to your proposed Project pDCM II Excavation and Fill Information ODCM MI Bridges and Culverts �p!DCM MP-3 Upland Development .' C E I V E W ILP A!NGTGN, INCl� RECEIVED MP-4 8truotures tr formatirxr CM SEP 0 9 2016 252 808-2808 .. 1-886-4RCOAST -. www.nccoastatmanagement.net Form DCM MP-4 STRUCTURES (Construction vvithin Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit; Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable a. (i) Is the docking facility/marina: �( ❑Commercial ❑Public/Govemment �IPrivate/Community b. () Will the facility be open to the general public? ❑Yes XNo f a(I) Dock(s) and/or pier(s) d. () Are Finger Piers included? ❑Yas )No (ii) Number If yes; (III) Length G/O (ir) Number (iv) Width (w) Length (v) Floating Ves ❑No - (IV) Width (v) Floating ❑Yes ❑No e. (i) Are Platforms included? U?es ❑No L O Are Boatlift included? Yes ONO If yes: If yes: a Number (ii) Number (iii) Length / N (iii) Length L (iv) Width / q (iv) Width (v) Floating ❑Yes J(No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or _ (ii) Number of slips existing maintenance service - ❑ Dockage, fuel, and marine supplies v— ! r T L G �jL/ ❑ Dockage rwet slips/ only, number of slips: 7 X�Z JQ 6 ❑ Dry storage: number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please i. Check the proposed type of "Wq. 1. Describe the typical boats to be served .g, open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water; dredging for basin and/or channel ❑Open water, no dredging required ❑Other, please describe: ! ewsb, j 6c4,(,n k. Typical boat length:.2 ' 1. (q Will the ffacjjdy�ba open to the general public? m. (i) Will the facility have tie pilings? .„ i IIII����t�o ❑yes X40 •,J RECEIVED (ii) If yes number of tie pilings? DCM W I LM I hi GTO FI. F!f P ®'9 2016 AUG 16 ?Olfi DCM- MHO CITY 'r. _-9tsli•?it=;s :: i-388-4xl:OAS t .. www.nccoastarimanagement.tset revised. IZ1271016 0 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ipThis section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets 0 Toilets for patrons; Number. _; Location: 0 Showers 0 8oathotdfng tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of'No Sewage Discharge' signs proposed (ii) Give the location and number of'Pumpout Available' signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? In. Give the number of channel markers and'No Wake signs proposed. _ i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the manna policy on overnight and live aboard dockage? RUVF k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the ma ma ocking facility proposed within a primary or secondary nursery area? ❑Yes/o 1AZi;EIVED DCK4 VVILMINGTCN, NC AUG 16 ZOl 252-808-2808 1: 1-888.4RCOAST :: vi .nccoastalmanagsment.net revised: 12l27ioG V� Forth DCM MP-4 (Structures. Page 3 of 4) n. Is the me ma/docking facility proposed within or adjacent to any shellfish harvesting area? Dyes ma/docking o. Is the marinaldocking facility proposed within or adjacent to coastal wettandshnarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV 0S8 ❑WL gone `� p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes P 0 If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. �` 3. BOATHOUSE (including covered lifts) 's section not appfx:ab/e a. (i) Is the boathouse stnx ture(s): ❑Commercial ❑PublicJGovemment ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., woad, sheetpile, etc. ff a rock groin, use MP-Z Excavation and RIL) r ( This section not applicable a. n Number G� (it) Length (III) Width 5. BREAKWATER (e.g.. wood, sheetplle, etc.) Nn! section not applicable a. Length _ b. Average distance from NHW, NWL,'orwetlands c. Maximum distance beyond NHW, NWL or wetlands 5. MOORING PILINGS and BUOYS is section not applicable a. Is the sbucture(s): ❑Commercial ❑PubIlclGovemmerd ❑PrivatelCommunity C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number it Description of buoy (color, inscription, size, anchor, etc.) SEP 09 2016 DCM- MHD CITY 252.808-2808 :: 1.888.4RCOAST :: vrwrw.ncc4astaimanagemegt.net revised: 12127,06 M Form DCM MP-4 (Structures, Page 4 of 4' a. Proximity of structure(s) to adjacent riparian property lines �24 Note: For buoy or mooring piling, use arc of swing including length olvessel. c. Width of water body e. (i) Will navigational aids be required as a result of the project? 0Yes YJNo DNA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. d. Water depth at waterward end of structure NLW r NWL 'To S. OTHER ❑This section not applicable a. Give complete descrip0on: l / X /el G j ai! � 2 tP 6 eV / /`cYJ s1.Us/i6 Date Project Na�.m�er.--� � z4giez;V) Applicant Nam , Applicant Signatur RECENED SEP 0 9 2016 DCM- MHD CITY RECEIVFD DCM WILMINGTCN, NC 252-808-2808 :: i-888.4RCOAST :: www.nccoast.almanagement.net revised: 12127,106 e P.O. Box 11291 Wilmington, NC 28404 www.pippinmarine.com July 11, 2016 NCDENR 127 N. Cardinal Drive Wilmington, NC 28405 Office/Fax: 910-270-1290 Mobile: 910-471-2034 trip@plppinmarine.com The enclosed CAMA Major Permit application for Donald Britton, 133 Gazebo Ct., Wilmington, NC 28409 is to replace an existing 6 x 60 floating dock with a new 6 x 60 floating dock. The existing deck area is going to be replaced with a 14 x 14 octagon gazebo with a roof. There will also be a new boat lift. There will be 3 boat slips and a Jet Ski dock. This facility will be private and for family use only. Trip Pippin Pippin Marine Construction, LLC RECEIVED DCM WILMINGTON, NC SEP 09 2016 DCM- MHD UFf Y Piers • Pilings • Boat Lifts • Bulkheads • Floating Docks • Residential & Commercial Marine Construction Since 1984 el INLET POINT HARBOR OWNERS ASSOCIATION ARCHITECTURAL REVIEW COMMITTEE September 25, 2015 Butch Britton 133 Gazebo Ct Wilmington, NC 28409 Reference- IPH 133 Gazebo Court, dock; boat lift and -roof over -gazebo- -- — -- Dear Butch Britton, On behalf of the Architectural Review Committee for Inlet Point Harbor, this is to let you know that your application to replace your existing docks, add a boat lift, and put a roof over your gazebo, submitted on September 14, 2015, has been received and reviewed. After careful consideration, your request has been approved, provided it matches the description and specifications submitted in your application and it meets all New Hanover County ordinances / regulations, including CAMA. It is your responsibility to be in compliance with local ordinances and/or permits as required by your municipality, including CAMA. The ARC requests that you notify GOProperty Mgt. upon completion. The ARC will then conduct an inspection to ensure that the work has been completed to the scope and standards the ARC approved. Sincerely, Inlet Point Harbor Owners Association C/O GOProperty Mgt; by, �a'cf gram, Gary Owens RECENED SEP 09 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC GOPropeny Mgt. Ph 910.681.1360 Fax 910.681.1361 E-mail gary.owens@gopropertymA�J" 3 2016 NC Division of Coastal Management Major Permit Application Computer Sheet AEC: AI W W / Atlantic Ocean Fee: $250 #3896 CDAITS _ MHC cc Applicant: Donald & Barbara Britton Agent/Contractor: Pippin Marine Construction do Trip Pippin Project Site County: New Hanover Staff: Sean Farrell District: Wilmington Project Name: Britton Private Docking Facility Rover File: n/a iv Basin: Cape Fear Initial date of application submittal: B-16-16 Date application 'received as complete" in the Field office: I& W r ORW: ❑Yes o I PNA: Yes ❑No Photos Taken: Yes& NoEl Setback Required (riparian): gYes No Critical Habitat: ❑Yes ❑No of Sure 15 foot waiver obtained: ffVas MNo Hazard Notification Returned: ❑Yes gflo SAV: []Yes [RNo ❑Not Sure Shell Bottom: ❑Yes No Not Temporary Impacts: ❑Yes QNo Sure Sandbags: LjYes No ❑ Not Sure Did the land use classification come Mitigation Required (optional): from county LUP: ❑Yes RNo []Yes PLNo Moratorium Conditions: Environmfintal Assessment Done: Length of Shoreline: ❑Yes o ❑NA ❑YesNo ❑NA ^ a �Cj FT. Shellfisfi Area Designation: Project Description: (code) Development Area: (code) Open -or- lose $ S \ 0 , 6,1-CiCvr4 SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) El Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQW) 0 Outstanding Resource Waters (ORW) WETLANDSIMPACTED El (404) Corp. of Engineers (Jurisdictional El (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort (Salicomia sp.) wetlands) (CJ) Saw grass (Cladium jamaicense) (SA) Salt marsh cordgrass (Spartina (SY) Salt reed grass (Spartina altemiflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ ON) Cattail (fypha sp.) spiceta) sp.) ❑ (JR) Black needlerush (Juncus (SP) Salttmeadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 0 III(D) Priv. public or Comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 El III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ IL Public or commercial/no dredge RECEIVED $100 and/or fill - $400 I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 Britton, Donald $ Barbara DateB-16-16 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One - New Work Replace j 1 1 Maint �4 /"d Y ❑ N r 5 New Work Replace [ U Maint Y ❑ N New Work Replace C MaiMV �Y ❑ N I 1 /J New Work Replace i I Maint ❑ ❑ Y N New Work Replace�( C ?j l Maint ❑ ❑ Y 1N N (y. New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y [IN Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet TOTAL Sq. Ft FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts amount Dredge ❑ Fill ❑ Both ❑ Other IQ Y L Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ G.e\-4 W - �� Ep O9 tip\6 �`i 919-733-2293 :: 1-888-4RCOAST :: wwwmccoastalmananament.net 10/12/06 MAJOR PERMIT FEE SCHEDULE 133 Gazebo Court/ $650 ($250 for Major Permit, $400 for GP 67168D), CK #3896 /NH Co DCM % DWQ % Development Ta Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 11. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0%($0) III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, r D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $250 100% $250 0% ($0 III(B). Public or commercial development, if General Water Quality Certification No. 3490 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% $240 40% $160 III(D). If General Water Quality Certification No. 3490 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECE€V° SEP 0 9 2016 DCM- MHD CITY DENR CAMA Daily Check Loa for WIRO Date Rec~ Date Deposit d I Check From IName Name o/Permit Holder Vendor Cheek Numher Check amount Receipt of Permit Numb*rXomment Refund/Reallocated 6/16Y2016 IPi in Marine Conslrudion LLC Bessie HowaM Gre Wells F o Bank 38% $650.00 GP 677fieD ($a00) _ RM rct. 2632D_ _ Donaltl Brillon Ma or Pemat Fee 250 133 Gazebo CcurL NH IRM rct. 2632D a a F- LU U UJN Q� T 2 O C C LU cn +� /u►/i f.le Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Govemor DONALD R. VAN DER VAART se—Jary BRAXTON DAVIS Director September 7, 2016 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Re: Major Public Notice for New Hanover County CAMA projects: • Wrightsville Beach Yacht Club • Roger Mooney • Donald & Barbara Britton Kyle & Heather: Please publish the attached Notice in the Friday, September 9, 2016 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Tanya Wright, (Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. cc: Heather Coats - WiRO Doug Huggett - MHC Tyler Crumbley - USACE Sarah Young - DCM Sincerely, Shaun K. Simpson Permitting Support & Customer Assistance RECEIVE".) SEP 09 2016 State of North Carolina I Environmental Quality I Coastal Management DCM- MHD CITY 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 0 P"/ NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that the following applications were submitted for a development permits in Areas of Environmental Concern as designated under the CAMA in New Hanover County, adjacent to Myrtle Grove Sound. On August 8, 2016, Roger Mooney proposed to construct a private docking facility at 1013 Canal Drive, in Carolina Beach, and Donald & Barbara Britton proposed to replace and expand an existing docking facility at 133 Gazebo Ct, in Wilmington; and on September 2, 2016, Samuel Clary proposed a Major Modification to State Permit No. 173-00 for the replacement of floating structures and a dock house at the Wrightsville Yacht Club, 6 Marina St., adjacent to Molts Channel and the AIWW in Wrightsville Beach. Copies of the applications can be examined or copied at the offices of Tara MacPherson (Mooney), Sean Farrell (Britton), or Tara MacPherson (Wrightsville Yacht Club), N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7215) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City,,NC 28557-3421, prior to September 30, 2016 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECFV'-.-) SEP 0 9 2016 DCM- MHD CITY State of North Camlim I Environmental Quality I Coastal Management 127 Cardiml Drive Eat., Wilmington, NC 28405 910-796-7215 Environmental Quality September 7, 2016 Trip Pippin P.O. Box 11291 Wilmington, NC 28404 Dear Mr. Pippin: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS D rector The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Donald and Barbara Britton, for State approval for development of the property located at on 133 Gazebo Court within the Inlet Point Subdivision and adjacent to Inlet Point Canal in Wilmington, New Hanover County. It was received complete on August 31, 2016, and appears to be adequate for processing at this time. The projected deadline for making a decision is November 14, 2016. An additional 75- day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from August 31, 2016, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Sean Fafrell Field Representative Enclosures cc: Doug Huggett, DCM Heather Coats, DCM Debra Wilson, DCM Tyler Crumbley, ACOE Chad Coburn, DWR Ben Andrea, New Hanover County Donald and Barbara Britton, applicant RECEIVED SEP 0 9 2016 DCM- MHD C; i Y State of North Carolina 1 Enviromnamal Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-796-7215 T I ( 010 1 074 LAMA PERMIT APPLIED PROJ floats 133 C FOR at rove Sound, in Wilmington, New Hanover County COMMENTS ACCEPTED THROUGHSeptember 30, 2016 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Donald & Barbara Britton NC Div. of Coastal Management 133 Gazebo Court 127 Cardinal Dr. Extension Wilmington, NC 28409 Wilmington, NC 28405 Tara MacPherson, Field Specialist 910-796-7425 Agent: Trip Pippin (910) 471-2034 REBECCA P. SMITH REGISTER OF DEEDS, NEW HANOVER 216 NORTH SECOND STREET WILMINGTON, NC 28401 M�Rf �MfftM�l��1f1�1tf M}'f�f�i1HH1��1f��NM'Y�}�1YNM`YNM�1f���11 LY�fY�11I� I Filed For Registration: 06/19/2006 04:13:53 PM Book: RE 5039 Page: 875-877 Document No.: 2006034891 DEED 3 PGS $17.0( NC REAL ESTATE EXCISE TAX: $2,576.00 Recorder: NELSON, JACQUELINE State of North Carolina, County of New Hanover SEP 0 9 2016 0CM- MHD CITY YELLOW PROBATE SHEET IS A VITAL PART OF YOUR RECORDED DOCUMENT. PLEASE RETAIN WITH ORIGINAL DOCUMENT AND SUBMIT FOR RE-RECORDING. *2006034891 RECEIVED RECEIVED DCM WILFAINGTCN. NC IDCM 1VILPt11n1GTCN, NC JUN 2 4 2016 2006034891 /%!: , 6 iols q� 2006034891 FwPngPEGSTP P WIPc DED r .13:53 PA BK:5039 PG:M-677 PEE:S17.00 Nc REV STW 42,576,N ilia i NMI STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER REVENUE STAMPS: $ 2.576.00 G 389FAL IaBBi1TY DEED Tax Map # 8510-004-020-000 313107.58.4872.000 Mail After Recording To: Donald W. Britton 2828 Peachtree Rd. NW, Unit 3201 Atlanta, GA 30305 D1 BY: CAiD= i CALDia, 611 Princess Street, Wilmington, NC Brief Description: 25 INLET POINT HARBOR This deed, made and entered into this, the 19 day of J..ne , 2006, by and between David N. Great and wife, Tammy R. Greer, the GRANTOR herein; and, Donald W. Britton and wife, Barbara S. Britton, the GRANTEE herein. W I T N E S S E T E: That the Grantor, for and in the consideration of the sum of One Dollar and other valuable consideration, the receipt of which is hereby acknowledged, has and by these presents, does grant, bargain, sell and convey unto the Grantees in fee simple, that real estate located in the County of New Hanover, State of NORTH CAROLINA, more particularly described as follows: BEING All of Lot 25, Inlet Point Harbor Subdivision as the same is shown on a map recorded in Map Book 31 at Pages 134 through 139, of the New Hanover County Registry, reference to which is hereby made for a more particular description. TOGETHER WITH AND SUBJECT TO all of the rights covenants, easements, conditions and restrictions contained in Declaration recorded in Book R E C E IVE .y 1507 Page 1290 and following pages in said Registry, and all amendments and supplements thereto, and being the same lot described in Deed recorded in Book 1939 at Page SEP 0 9 20`.7 414 in the Registry of New Hanover County. . TOGETHER WITH an easement and right of way for ingress and egress to said lot over that 301 wide strip of land adjoini�/+aA� �I„{� CITY the lot on its southeast corner and running in C M southeastern direction to Gazebo Court, as shown on the above referenced maps. To have and to hold the aforesaid lot or parcel, together with all privileges and appurtenances thereto, heretofore belonging to the Grantee in fee simple. IIf11l CUM &CALUMATLGOM a &chi &A "'-"IVi=U Rt TacaDCM\RVILPAINGTCN NC i k 7pi() MW RECEIVED DCM WMAINGTCN, NC JUN 2 4 2016 0 The Grantor covenants with the Grantee that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that the title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: The provisions of all applicable zoning and land use ordinances, statutes and regulations; 2006 ad valorem taxes; and all applicable restrictive covenants and utility easements of record. I itness hands an seals 82hW OP NORTH CAROLINA , the Grantor(s) have hereunto set their i day and year first above written. P. I, 1J1fY FF J , a Notary Public of the County and State aforesaid, certify that David N. Gzaer and wlf*, TaUW P. Craaz personally appeared before me this day and acknowledged the execution of the foregoing instrument. Witne s my hand and official stamp or seal, this the �_ day of ��unp , 2006. NP TFZ �OTA9 p a �O. Notary Public w �suc 1 14 (]l �_ra My Commission Expires: RECEIVED DCM WILT%4INGTCN, NC 1 G 2016 SEP 0 �, .ij DCM- MH® CITY DCM RCEIVED WILE NGTON, NC JUN 2 4 2016 012 N.C. DIVISION OF COASTAL MANAGEMENT AGENT AUTHORIZATION FORM A Date�� '- Name of Property Owner Applying for Permit: Mailing Address: I certify that I have authorized (agent)to act on my behalf, for the purpose of applying for and obtaining all CA11A Permits necessary to --, ) - t 9 A /I , ,.ni install or construct (activity) at (my property located at) This certification is valid thru (date) Property Owner Signature RECEIVED DCM WILMINGTON, NO �, 16 1� 6'/016 W.c, . o2A'6 1 RECEIIf�'D SEP 09 _C16 MHD CITY Date RECEIVED DCM WILMINGI ON. NO JUN 2 4 2016 Name of Property Owner '%� r /I ! l[F ?-i=141d ' / Address of Pro e % 3 r' y e �U c T.1/V, %/ra Zq �fi�YGf PM._.— _...._ _.. (Lot or Street d, Street or Road, City & County) Agenf Name ft �it RdaiiirngRotiresa: CQ B AgenrsphoneV. 1 hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing -the development they are proposing. it i NeiibF dt3aitiit t:;yiikfi ii fii tYeotditfited v fFix[i0*bet- 4 I have no objections to this proposal. I have objections to this proposal. ifyou have objections to what is befrlg proposed, you must noMlhe DA4slon orCoasral Marragement (DCM) in writing within fe days or meellat of this notlee, Contact information for DCM offices is av�;;abfe at h'ip'/` viw nocoast»fmal�aaemeht.ner/weta'cm/staPi4istinq orby calling 1-86a-RCOAST. WAIVER SECTION I understand that a plot, dock, mooring pilings, boat ramp, breakwater, boathouse, or lift must be set bad* a minimum distance of I& from my area of riparian access unless waived by me. (if you wish to waive the setback, you must initisl the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the I5' setback requirement. G-G/ I e 11v G 1-1 Mailing Address "City/Sfafemp , - 5/UYrL'W6Y &!i A.✓.;filbrc.�/.r.�,,. Telephone Number/Emal Address r � Date 'd 919E 'ON SEP 0 9 Z016 DCM- MHD CITY (Riparian Propertyy Ovmer Information) Signature Print or Type �Name j S Address ess h e GL Marling rty/ware2ip 4 / h�-)�01 � TetephoneNumberfEma/,i &dress &L+r 44-e S/tja/r C6.r .pare (Revised Aug. 2014) M11:1 910Z '01'unf ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front If space permits. 1. Article Addressed to: GD Pr m5�t YKe I 1 y Y1cA hOY� 12-0). Cu•1brefl-% pr, W11min5Von K)(- aggos- X /U I Lo/ l� ❑ Agent of Delivery D. Is delivery address different from Rem 1?' 0 Yef If YES, enter delivery address below: ❑ No RECEIVcC DCrn WlLi-AINIGTC'J, INC 111111111Jill 111111111111111111111111111111111 ❑ ZZtS". - R o Mail Express@ Registeretl Mail'• El Adult Signature Restricted!Deliv ❑ R gteretl Mail Restrictetl 9590 9401 0033 5071 3732 65 0El Certified Mail® Delivery ❑ clarified Mail RasMctetl Delivery ❑ Return Receipt for _ ❑ Collect on Delivery Merchandise —• TanMy lrnm Sgryjpe /gbe/� ❑Collect on Delivery ResMcted Delivery Signature re Co onfirmation*"' y 5 d,rwE Mail ❑ Signature Confirmation 70 0640 0002 2840 8902 g x1 Mail Restricted! Delivery gestnctetl Delivery s5oo1 PS Form 3811, April 2015 PSN 7530.02-DOD-BOSS Domestic Return Receipt --------------------------'----- ---"--- yx'"r7-"'"-"-'-"-'+s - ---- ---11 tu W aJ 0 0 l Was $ In 9ItlZ/it/LI) 9£' pueeealsodI WI o 9£' Tf a6elsod D- r t m m ww�a a i Riaose mrtxiianleu65YmW❑ Ge,lnf»tl a,ml.uE,S NnPo❑ iaC]]tllrW�❑ 0 o rEF�aN � 2 "i 0 A _ I �u+n�Mltlf�❑ fNq�.ball.sllP'+.OKwM 6Ve g%�IN SyYj M1I 2 0o M 80 S1]yfj s 0£'£S ••-AIRwp.WuGO m J p� m v o ,E3 03 0 FAIR . . W1 Appendix C: Adjacent Riparian Landowner Notifications OCM wEMMGTON, NC AU617 NIS COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. A�O �l INLET POINT HARBOR ARCHITECTURAL REQUEST FORM The Inlet Point Harbor Governing Documents require that before making any changes to your lot, a request for architectural review must be submitted to the Board of Directors or its appointed Architectural Review Committee. This form must be submitted by the person making a request for a proposed change to his/her lot. He/she is responsible for providing all information necessary to render a decision on their particular request. Any and all incomplete forms and/or requests with insufficient information will be automatically denied. Any and all changes must be made in accordance with the plans and specifications submitted and approved and may not deviate from said changes without prior approval by the Board of Directors and/or Architectural Review Committee. The sanctioned time limit for request consideration shall not begin until all information necessary for the review of the architectural request have been submitted. This request shall be deemed active for a period of 10 days when the completed form and all necessary and relevant information is received and logged in at the office of GOProperty Management, Landfall Executive Suites, 1213 Culbreth Drive, Wilmington, NC 28405. Please complete the form below and attach any/all plans and specifications showing the nature, kind, shape, height, materials, and location of same: ;� p v r, Name y� l r n a /i/ i��zy / J Y / #0 +j Date .r IPH Address 7 7 &_tla t— r Lot No. S Telephone: Home: 9/ 0 JISa2 704 V obile: �S z a % % -?S,0"9'Work: E-mail address: 6U TG it— n B do X17 , 1. -s Contractor Name S.r Pr o e e-rf Desired Start Date 4eEg 0 Anticipated Completion Date of Changes: _ n r I certify that II havereadthe above Architectural Request Form and hereby agree that I will abide by same Signature: A9 /er/ —J /i Date: p/ f—// r— GOProperty Management: Date Received Date 30 days expire Date Mailed to the Inlet Point Harbor BOD/ARC iD G Approved _ Disapproved Reason: SEP 0 9 2016 rai t iRF—('tiVED DCM WILMINGTON, NC GOProperty Mgt. Ph 910,681.1360 Fax: 910.681.1361 E-mail gary.owens@gopropertAtbrfl 3 2016