Loading...
HomeMy WebLinkAbout14-22_Minor Permit_20220801' Brunswick County Planning and Community Development P.O. Box 249 75 Courthouse Drive N.E., Bldg I Bolivia INC 28422 01-Aug-22 Steve and Jamey Motter 489 Deep Water Drive SE Bolivia INC 28422 RE: CAMA MINOR PERMIT— BC22.15 PROJECT ADDRESSILOCATION —489 Deep Water Drive SE, Bolivia NC 28422 Dear Mr. & Mrs. Motter: The enclosed permit constitutes authorization under the Coastal Area Management Act for you to proceed with your project proposal. Please sign both the original (buff -colored form) and the "white copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff -colored form), as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113- 229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, staff will visit the site to monitor the project. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact me at any time for assistance at 910.253.2034. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. cSincerely, //.. fint-- -- .... n— . M"Vvl�- Connie Marlowe, LPO Brunswick County PO Box 249 Bolivia NC 28422 cc: Brendan Brock, Wilmington Office Firetti Builders Inc (Joseph Firetti), Agent TELEPHONE (910) 253.2025 • (800) 621.0609 • FAX (910) 253.2437 Brunswick County Local Government CAMA MINOR DEVELOPMENT PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management" BC22.14 Permit Number NORTH CAROLINA Environmental Quality Issued to Steve and Jamey Molter authorizing development in the Estuarine Shore Area of Environmental Concern (AEC) at 489 Deep Water Drive SE in Bolivia NC 28422 as requested in the permittee's application package, dated 11-Jul-22, and received complete 20-Jul-22. This permit, issued on 01-Auq-22, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: 10' Retaining Wal, Dry River Bed, 5' Fence, and Fill Material. (2) (3) (4) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) dated received on 20-Jul-22. All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. A copy of this permit shall be posted or available on site. Contact this office at (910) 253.2034 for a final inspection at completion of work. (Additional Permit Conditions on Page 2) This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on: December 31, 2025 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Connie Marlowe CAMA LOCAL PERMIT OFFICIAL PO Box 249 Bolivia, NC 28422 PERMITTEE (Signature required if conditions above apply to permit) Name: Steve and Jamey Motter Minor Permit # BC22-15 Date: 01-Aug-22 Page 2 (5) The amount of impervious service shall not exceed 30% of the lot area within 75 feet of Normal High Water (Estuarine Shoreline Area of Environmental Concern), in this case 671 square feet is authorized. (6) Unless specifically allowed in 15A NCAC 07H-0209(d)(10), and shown on the permitted plan drawing, all development/construction shall be located a distance of 30 feet landward of Normal High Water. No portion of the roof overhang shall encroach into the 30 foot buffer. (7) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. Prior to any land -disturbing activities, a barrier line of filter cloth must be installed between the land disturbing activity and the adjacent marsh or water areas, until such time as the area has been properly stabilized with a vegetative cover. (8) Any proposed for grading within the 30' buffer from the Normal High Water level must be contoured to prevent additional stormwater runoff to the adjacent marsh. This area shall be immediately vegetatively stabilized and must remain in a vegetated state. (9) All other disturbed areas shall be vegetatively stabilized (planted and mulched) within 14 days of construction completion. SIGNATURE: PERMITTEE UL\9:I