Loading...
HomeMy WebLinkAbout145-17 Ovresized PlansEASTERN 4 MH CONFERENCF- CENTER. PIER & DOCK S I TRUCTURt N.C. State Un'iversit SCHEDULE OF DRAWINGS COV COVER SHEET C-1.01c SITE PLAN (CAMA PERMIT DRAWING) A-2.01 PIER EL V T ONS / SECTIONS / DETAILS STRUCTURAL • E .T north LOCATION MAP II NO SCALE I VICINITY MAP ALBEMARI.,E & ASSOCIATES, Ltd. 115 West St. Clair Street Kill Devil Hills, NC 27948 252.441.2113 north NO SCALE Civil / Str ct r l CONSULTA!"7S XX COLUMN _INE X # PLAN EQUIPMENT SYMBOL X QXX X INTERIOR ELEVATION SEE CHAPTER 100 DRAWINGS SEE CHAPTER 400 DRAWINGS X 7-0 TOILET ACCESSORY NOTE SEE CHAPTER 200 DRAWINGS 'D## ROOF DETAIL REFERENCE X### ROOM NUMBER SEE CHAPTER 300 DRAWNGS SEE CHAPTER 600 DRAWINGS FOR ROOK! FINISH SCHEDULE xoOtX DOOR NUMBER XX BUILDING ELEVATION Ax.xx , SEE CHAPTER 600 DRAWINGS FOR DOOR SEE CHAPTER 400 DRAWINGS SCHEDULE HM-# HOLLOW METAL FRAME NUMBER I SEE CHAPTER 600 DRAWINGS X X Ax.xx A..xx BUILDING SECTION SEE CHAPTER 000 DRAWINGS XX ALUMINUM FRAME NUMBER SEE CHAPTER 600 DRAWINGS 000.00 ELEVATION X WALL SECTION Y Ax.xx SEE CHAPTER100 DRAWINGS +E0.E FFE FINISH FLOOR ELEVATION A7,OX CASEWORK ELEVATION SPOT ELEVATION SEE CHAPTER 700 DRAWINGSC0.00 SYMBOL KEY \ pC� Wa son+st W rt architects, p.a. 16 i 2 mason road durharc I, north carciina 27712 (t) 9 i. 9.908.6980 (e; BarryS@SandSarchitects.corrl 23 AUGUST 2017 NEW WOOD PIER 4 mula BE REBUILT i D I I EXISTTNG CONCRETE TO BE REPAIRED 0 � D I R9 o� L� 144� 'J 1�- I xN W I D I o I R l NC GRID NAD 83 +, J 1 T\R + + NEW 8"0 + + MOORING PILES (TYP. 2) O 0 182'-6' WOOD BENCHES NEW PERGOLA ROOF LINE + d + 0 —13= T FFE = 5.8' I �h 0 i Ilk 21'-3„ �M n 0 + ,M"?' BULL BAY + R + 45 —7� r NEW PERGOLA r� m�' ROOF LINE ----- i 's +.. I I I II + '0 + ,MOB + + I �� R� �4 ,M + + + + W PIER PLAN north �AP.i -0"--' LE GEND 4 -- — SHORELINE -------- - -- ELEVATION CONTOUR -- - - - - -- FLOOD ZONE LINE \R^ SPOT ELEVATION LIGHT POLE EXISTING CONCRETE EXISTING RIP RAP or LU _ L Um,pom- 2 � � a 4 g =. W - i +zi ' a OWL ,° ,M POE + a LLS + brow= ML �S Mom - y��� to PRINCIPAL: FBS v • R PROJECT ARCHITECT: FBS k DESIGNED BY: FBS I DRAWN BY: KE^, A CHECKED BY: JMB PROJECT NUMBER: 1701E4H A ON �,,ATES, LTD. SI T E f CAM A PLAN Engineering - Environmental -Land Plannm 115 West Saint Clair St. Phone: (252) 441-2113 P.O. Box 3989 Fax: 2� Kill Devil Hills, NC 27948 www.AlbemarleAs � r f; a Certificate of Licensure No. C-1027 A C B 1'-10Y?" P.T.'D 6x6 WOOD POST (TYPICAL) THRU—BOLT @ 6x6 POSTS SEE STRUCTURAL DRAWINGS FOR PIER CONSTRUCTION PIER BENCH 0 TYPICAL RAILI� EL VATI UPPE IEaA SCALE: 1 =1 —0 07 08 I I I I I NOT U D I' SCALE: — — — 04 NORTH ELEVATION I I I I K i I I M"i 5'-0 2x2 WOOD PICKETS (14" x 142" ACTUAL) @ 5-Y2" O.C. 10'-0" V 5'-0„ INTERMEDIATE 6x6 WOOD POST (TYP.) l o l o I ° l I o I I SCALE: 3/4"=1'-0" 0 10 I I SCALE: 3/16-1 `-0' 0 N I I 7'-0„ U5-0„ 7'-1" 5Y2" EASE TOP RAIL EDGES 5Y2" WITH %" RADIUS CHAMFER (CONT. ALL EDGES) I P.T. D WOOD GUARDRAIL I' CONSISTING OF: • 6x6 WOOD POSTS • 2x8 TOP RAILS • 2x4 BOTTOM RAIL i • 2x2 VERT. PICKETS SPACED @ 5 Y2" O.C. 6 SEE A-2.01 /06 FOR TYPICAL RAILING DETAILS. � I I I � I TYPICAL SECTION @ UPPER PIER PAST ELEVATION — CONTINUED I I I EAST ELEVATION — BASE BID LAYOUT A SCALD: 3/4"-1, m-o" 0 i I SCALE: 3 1 —00„ , t( 5 SCALE: v/ 1 6"—l'-0" 01g I I 'o cV ® c ®� a g cN O U p U (n rn E r 04 im m t8 t 7 in PON .. CL mv go A-V SD/®D DOCUMENTS NCSU PROJECT : 201720045 SCO PROJECT : TBa L& Uj uj Z-- fe* Ul Row P-- .# . i° jk _ 0 U W Z Z I L Ul LLI PRINCIPAL: F BS PROJECT ARCHITECT: FIBS DESIGNED BY: FBS DRAWN BY: FBS CHECKED BY: FBS PROJECT NUMBER: 37O1E4N PIER ELEVATIONS _. 23 AUGUST 2017 STRWTURAL 6077,45�' 1. WHERE A DETAIL IS SHOWN ON STRUCTURAL_ DRAWINGS FOR ONE CONDITION, IT SHALL APPLY rO ALL SIMILAR OR LIKE CONDITIONS UNLESS NOTED OR SHOWN OTHERWISE ON PLANS. 2. ALL ITEMS SHALL BE TIGHTLY ANCHORED OR ATTACHED SQUARE, PLUMB AND TRUE, OR IN OTHER PLANES AND SHAPES AS SHOWN ON THE DRAWINGS. JOINTS SHALL BE TIGHT, EVEN AND FREE OF OFFSETS, NO FIELD ALTERING 0-7 ANY MEMBERS WILL BE ALLOWED THAT WILL CAUSE THEM NOT TO BE IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS WITHOUT WRI17EN APPROVAL OF THE PROJECT ENGINEER. 3. IF THE CONTRACTOR FINDS A DIFFERENCE BETWEEN THESE DRAWINGS AND EXISTING ELEVATIONS OR OTHER CONDITIONS THAT PROHIBIT EXECUTION OF THE WORK AS DIRECTED IN THESE DRAWINGS, THE CONTACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 4. TIMBER PILES SHALL BE A MINIMUM OF 2.5 CCA UC5B AND SHALL MEET OR EXCEED AWPA STANDARDS (C-18) FOR PRESERVATION TREATMENT AS APPLICABLE. PILES SHALL ACHIEVE A MINIMUM OF 12' PENFRAT ION INTO S.JITABLE SUBSURFACE MATERIAL, DRIVEN TO AN 8 TON CAPACITY. 5. STRUCTURAL FRAMING BE #2 SYP, TREATMENT AS SHOVIN, AND SHALL MEET OR EXCEED AWPA STANDARDS (UC4C) FOR PRESERVATION TREATMENT AS APPLICABLE. 6. DECKING AND GAZEBO ROOF SHEATHING SHALL BE #1 SYP, TREATMENT AS SHOWN, AND SHALL MEET OR EXCEED AWPA STANDARDS (UC4B) FOR PRESERVATION TREATMENT AS APPLICABLE. 7. ALL CROSS BRACING SHALL BE #2 GRADE MATERIAL WITH A MINIMUM OF 2.5 CCA UC5B (MOISTURE CONTENTS <19%) AND SECURED WITH (2) 1 "0 HDG BOLTS IN PRE —DRILLED HOLES. 8. ALL FASTENERS SHALL BE HIP —DIP ZINC COATED IN ACCORDANCE WITH ASTM A 153, TRIM 2x12 FLUSH W/ DECKING 2x6 DECKING --\ 200 JOISTS FIBER REINFORCED CONCRETE SLAB 12 }, SREAXWANOiE 1. MATERIALS: PILES: 8"0 X 12' ST (2.5 CCA AWPA C18) WALERS: 6x6 ST SYP (2.5 CCA AWPA C2/C9) DECKING: 2x8 ST SYP (2.5 CCA AWPA C2/C9) ANCHORS: 3/4"0 ALL THREAD HDG OR ELECTROPLATED BOLTS: 3/4"0 HDG 2. PILES ARE Tip BE DRIVEN TO 8 TON RESISTANCE WITH A MINIMUM TIP PENETRATIO'� OF 8' INTO SOLID BOTTOM. 3. ALL CAP Mk-E-RIAL TO BE NO. 2 GRADE MATERIAL (MOISTURE CONTENT <19%) AND SECURED W/ 3" HDG SCREWS IN PRE —DRILLED HOLES. 4. CONTRACTOR IS ADVISED THAT SOME UNDERWATER DEBRIS MAY BE PRESENT IN THE PROJECT SITE THAT MAY NEED TO BE REMOVED PRIOR TO PILE PLACEMENT. TOP _. _ .._._.. 6" 8"0 • 6"x6" WALERS — 1 f 2' A DE 8' M PENE I V V.V. KWA TER ftAN VIEW NTS BFAS"A Dk7AL NTS 2" WIDE CUTS IN 6x6 POST EXTEND TO BOTTOM OF GIRDERS AT BENTS ONLY TERMINATE MID SPAN POSTS AT BOTTOM OF JOISTS 2x8 TOP CAP #1 ROUTED; CONT. 45' CHAMFER 4.1(C)(6)—RAMP HANDRAILS AT TOP OF PILE SHALL BE 1 j" TO 14" IN. ® ' i- i DIAMETER WITH THE OUTSIDE 6" FACE OF THE HANDRAIL A MAXIMUM 3" FROM THE WALL ! OR BUILDING FACE 6" GRIP RAIL — 34" MIN, TO 38" MAX TO FINISHED RAMP WALKING SURFACE ALL SURFACES ON HANDRAIL TO BE ROUTED AND SANDED T 2x6 DECKING FAS'ENED WITH 3" STAINLESS STEEL SCREWS (2 AT EACH STRINGER) BLOCK SOLID AT MID RAIL SUPPORTS >o I ONLY (2) 4"00" GIRDERS 1 EA. SIDE 10"0 PILE (2) 1 " HDG MARINE BOLTS (12' MIN. PENETRATION) HAAIARAL ANC COVER 112�7M D&MkC NTS NORMA CATER LEV=_ -_ 2' WIDE CU \1 24" VINYL S T PILES =EGIN SLOT FROM TOP 202 BAND Y2}} H ".ARiNE BOLTS WOOD BENCHES (NOT SHOWN) �.•� u I (2) 1" HDG MARINE BOLTS 6x6 HAUCH BRACES UC5B (1) 1" HDG MARINE BOLT 14" 6x6 LEDGER W/ (3) 1 " HDG MARINE BOLTS 2x4x20 ® EACH JOIST/GIRDER CONNICTION W/8 10d NAILS PER CONNECTION 4 IN JOISTS/4 IN GIRDER PROVIDE SOLID 2x10 BLOCKING BETWEEN �— 3 JOIST BAYS ® ALL RAIL POST LOCATIONS (EACH SIDE) 16'-0" 2"x6" #1 DECKING SCREWED W/3" STAINLESS STEEL DECK SCREWS (2/JOISTS) :D EACH _ �Dt- -_ 'ON W/a .=LS -'v N ECTION STS/4 IN —F ALL PILES TO BE TREATED TO 2.5 CCA UC58 PER NO BUILDING CODE PRESCRIPTION north 11 SCALE: = SHOWN j Q}—�9I • SEE ELECTRIC SERVICE CONDUIT il. I 7'-D„ �� 2"x6" #1 DECKING UC4B SCREWED W/3" STAINLESS STEEL DECK SCREWS (2/JOISTS) 6 ,.4 2"x10" JOISTS g 12" O.C. UC4B ' Y5}-4" (2) 4"x10" GIRDERS UC4B I TWO ON EACH SIDE OF PILING W/ (2) 1" HDG MARINE i i BOLTS EACH PILING (SEE DETAIL) NORMAL WATER LEVEL 0,.3' q _2, 30'-10"0 TIP CLASS 8 TIMBER PILING (18' MIN. PENES RATION) , " e e 3 5 q s k a F g G� € 5 o \A\� � k ICT 0 9 2101 �ied KED! . . . . . . . . . . . . . . . . a, 11& ASSOC-_ATE-S, LTD_ r ineerinc - E nv r�7n?erta - La Planning 115 West Saint Clair St. Phone: (252) +41-211 P.O. Box 3989 Eax: (252 t41-096o t Kill Devil Hills, NC 27943 wwvv.AicemarieAssoct•ites.com e Certificate of Lice?sure Nc. C-1027 - mS' �h 2 6� j! c 0 ® � z cri U) cr; cc CL P 1LM4;5� ME z� :(( Vail mu L� SfDD NCSU PROJECT : 2U1 120045 ACC PROJECT : T1 3 D a A v od ff r U 0 C M-11 cn ICY-, 0 1 Ole, 2 MIT X I 3 4 F3 I � L � 9 s 4*m �_. _ x m 8 2 - _ a Lu E dpm 07 a PRINCIPAL: -- FBS PROJECT ARCHITECT: FBS IGNED BY: FBA u AWN BY: FBS CHECKED BY: FBS PROJECT NUMBER: 1701E4 PIER PLAN S A pg a am t pw, a lkw ems, p _37 NEW PIER DETAILS 30 .AUGUST 9017