HomeMy WebLinkAboutTB_11-07_Town of Topsail BeachIssued By WiRO TB 11-07
Town of Topsail Permit Number
Beach
CAMA
MINOR DEVELOPMENT --�
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management''
Issued to the Town of Topsail Beach, authorizing development in the Ocean Hazard (AEC) at 817 and 819 S. Anderson
Boulevard, in Topsail Beach, Pender County, as requested in the permittee's application, dated May 31, 2011. This
permit, issued on April 25, 2011, is subject to compliance with the application and site drawing (where consistent with
the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: the construction of a gravel parking lot.
(1) All proposed development and associated construction must be done in accordance with the permitted work plat
drawings(s) dated received on May 31, 2011.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations,
applicable local ordinances and FEMA Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.
(4) A copy of this permit shall be posted or available on site. Contact this office at 910-796-7221 for a final inspection at
completion of work.
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the permittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted under this permit must cease until the appeal is resolved. This
permit must be on the project site and accessible to the permit officer when the
project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on:
September 7, 2015
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
Iley Snider
CAMA LOCAL PERMIT OFFICIAL
127 Cardinal Drive Extension
Wilmington, NC 28405
PERMITTEE
(Signature required if conditions above apply to permit)
Name: Town of Topsail Beach
Minor Permit # TB 11.07
Date: April 25, 2011
Page 2
(5) The permittee is required to contact the Local Permit Officer 910-796-7221, shortly before he plans to begin
construction to arrange a setback measurement that will be effective for sixty (60) days barring a major shoreline
change. Construction must begin within sixty (60) days of the determination or the measurement is void and must
be redone.
(6)Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is
not weakened or reduced. Disturbed dune areas will be immediately stabilized.
(7)AII unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Disturbed areas shall be vegetatatively stabilized (planted and
mulched) within 14 days of construction completion.
(8)Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time
when it becomes imminently threatened and in any case upon its collapse or subsidence. However, if natural
shoreline recovery or beach renourishment takes place within two years of the time the structure becomes
imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary
protective measures allowed under CRC rules.
SIGNATURE:
PERMITTEE