Loading...
HomeMy WebLinkAboutTB_11-07_Town of Topsail BeachIssued By WiRO TB 11-07 Town of Topsail Permit Number Beach CAMA MINOR DEVELOPMENT --� PERMIT as authorized by the State of North Carolina, Department of Environment, and Natural Resources and the Coastal Resources Commission for development in an area of environment concern pursuant to Section 113A-118 of the General Statutes, "Coastal Area Management'' Issued to the Town of Topsail Beach, authorizing development in the Ocean Hazard (AEC) at 817 and 819 S. Anderson Boulevard, in Topsail Beach, Pender County, as requested in the permittee's application, dated May 31, 2011. This permit, issued on April 25, 2011, is subject to compliance with the application and site drawing (where consistent with the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void. This permit authorizes: the construction of a gravel parking lot. (1) All proposed development and associated construction must be done in accordance with the permitted work plat drawings(s) dated received on May 31, 2011. (2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations, applicable local ordinances and FEMA Flood Regulations. (3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and modification of this permit. (4) A copy of this permit shall be posted or available on site. Contact this office at 910-796-7221 for a final inspection at completion of work. (Additional Permit Conditions on Page 2) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. From the date of an appeal, any work conducted under this permit must cease until the appeal is resolved. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. Any maintenance work or project modification not covered under this permit, require further written permit approval. All work must cease when this permit expires on: September 7, 2015 In issuing this permit it is agreed that this project is consistent with the local Land Use Plan and all applicable ordinances. This permit may not be transferred to another party without the written approval of the Division of Coastal Management. Iley Snider CAMA LOCAL PERMIT OFFICIAL 127 Cardinal Drive Extension Wilmington, NC 28405 PERMITTEE (Signature required if conditions above apply to permit) Name: Town of Topsail Beach Minor Permit # TB 11.07 Date: April 25, 2011 Page 2 (5) The permittee is required to contact the Local Permit Officer 910-796-7221, shortly before he plans to begin construction to arrange a setback measurement that will be effective for sixty (60) days barring a major shoreline change. Construction must begin within sixty (60) days of the determination or the measurement is void and must be redone. (6)Dune disturbances will be allowed only to the extent necessary for development and if the dune's protective value is not weakened or reduced. Disturbed dune areas will be immediately stabilized. (7)AII unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective sedimentation and erosion control measures. Disturbed areas shall be vegetatatively stabilized (planted and mulched) within 14 days of construction completion. (8)Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time when it becomes imminently threatened and in any case upon its collapse or subsidence. However, if natural shoreline recovery or beach renourishment takes place within two years of the time the structure becomes imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary protective measures allowed under CRC rules. SIGNATURE: PERMITTEE DATE: