Loading...
HomeMy WebLinkAbout64-17 Wall, BenClass' Permit Number 64-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission t. Vermft for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 to Ben Wall, 5416 Captains Lane, Wilmington, NC 28490 izing development in Carteret County at adi. to Bogue Sound at 108 North Courtin lai tic Beach as requested in the permittee's application dated 3/14/17 including attached this,permit, issued on May 23, 2017 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) , This permit authorizes only the pier extension, slip relocation to include existing tie piling removal, dock, and tie pilings, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 3) This permit only authorizes the relocation of the existing 2 slips, and does not authorize any additional formalized boat slips. (See attached sheet for Additional Conditions) `Tlns permit action may be appealed by the permince or other Signed by the authority of the Secretary of DEQ and the paflifred persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. maintenance work or project modification not covered ier requires further Division approval. work must cease when the permit expires on December 31, 2020 this permit, the State of North Carolina agrees that : is consistent with the North Carolina Coastal t Program. P- � �.,�. � - Braxf6nC. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature ofPermittee Permit No. 64-17 Page 2 of 2 ADDITIONAL CONDITIONS `=; The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work General -This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-00809). The N.C. Division of Water Resources assigned the project DWR Project No. 20017-0509. E: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. An application processing fee of $250 was received by DCM for this project. DCM Coordinator: 3� Permit #:_ G e�- / 7 DCM Field Offices Elizabeth City Morehead City Washington Wilmington US ACOE Offices: Washington: MAILING DISTRIBUTION SHEET_.._ ._ . //( /krnus ';'Irv/ RA (with revised work plan drawings) 1Xolekw-1 5u; le D e-,,,,,1C zP,53-1 Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffan (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Earley Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARD) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins , State Property: Tim Walton t, DEMLR/DWR: JKaren Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh401 Roger Thorpe-Stormwater Garey Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401 (Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) LPO: Fax Distribution: Permittee #: Agent# Coastal Management ENVIRONMENTAL QUALITY May 23, 2017 Ben Wall 5416 Captains Lane Wilmington, N.C. 28490 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN secretary BRAXT.ON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS I I3A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, vA Douglas V. Huge Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue. I Morehead City NC 28557 252 808 2808 CAMA Major Permit Application -Project Narrative Ben Wall -Property Owner 108 North Court, Atlantic Beach NC 28512 Bogue Banks Marine Construction, Inc. -Applicant Purpose: We are requesting authorization to extend existing 5' x 190' pier by 268' with a 12' x 26' platform at the end for a total length of 470', in order to reach a water depth of 4.5', which will enable property owner to dock and use his boat(s). We will also be adding a 6' x 20' floating dock and 6 mooring pilings. Existing Conditions: This privately owned lot is 0.4 acres and contains a 1376 SF single family dwelling. There are also indigenous plants, grasses and shrubs. The existing pier is 5' x 190' with a 10' x 20' 'T" at the end. Method: We will be floating materials in by barge and using an excavator with a vibratory hammer to drive the pilings. We will also be using various hand tools ( chain saw, circular saw, drills etc.) to complete this project. Equipment will be store on site until completion. We will be adhering to NC Building Codes for all aspects of this project. RECEIVED MAR 14 Z017 DCM- MHD CITY V'L4 0 %}7 men MF-1 APPLICATION for Major Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner htformadon Business Name Project Name (d applicable) Applicant 1: First Name Ben MI Last Name wall Applicant 2: First Name MI Last Name If additional appNcants, please attach an additional pege(s) with names listed. Mailing Address 5416 Captains Lane PO Box City Wilmington State NC ZIP 28490 Country USA Phone No. 910-520-3614 ext. FAX No. Street Address (d dr%arent from above) Same as above City State ZIP Email benwall@bellsouth.net 2. AgenvContraetor imconnation Business Name vogue Banks Marne Construction, Inc. Agentt Contractor 1: First Name MI Last Name Kimberly O'Hara AgeMt Contractor 2: First Name MI Last Name Mailing Address PC Box City State 111 Turner's Dairy Rd Suite D Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 725 - 3221 ext. 252 - 247 - 4428 ext. FAX No. Contractor e 252 247 4427 Street Address (if di%ren(from above) City State Same as above ZIP Email bbmc7l@hotmaii.com RECEIVED <Form continues on back> MAR 0 8 2017 DCM- MHD CITY 252-808.2808 .. 1-888.4RCOAST .. . www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 108 North Court Subdivision Name City i State zip Atlantic Beach 1 NC 28512 - Phone No. Lot No.(s) (if many, attach additional page with list) 910 — 520- - 3614 ext. I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak River Basin Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Bogue Sound/ Atlantic Ocean e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work We within. Town of Atlantic Beach 4. Site Description a. Total length of shoreline on the bad (ft.) b. Size of entire tract (sq.ft.) 9T 27,051 SF c. Size of individual lots) d. Approximate elevation of tract above NHW (normal high water) or 27051, 1 1 NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5' ®NHW or ❑NWL e. Vegetation on tract indigenous plants and shrubs f. Man-made features and uses now on tract Single family dwelling, 5' x 190' pier and 10' x 20' platform. g. IdenBy and describe the existing land uses adjacent to the proposed project site. Single Family Home h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA If yes, by whom? I. Is the proposed project Iodated in a National Registered Historic District or does n involve a ❑Yes ONO National Register listed or eligible property? C E I V E <Form continues on next pagll MAR 0 8 2017 DCM- MHD CITY 252-808-2808 :: 1-888.4RCOAST :: www.nc con sta lmanagement. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes ❑No (ili) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. existing septic system o. Describe existing drinking water supply source. Town of Atlantic Beach p. Describe existing storm water management or treatment systems. Existing Sheet flow 5. Activities and Impacts a. Will the project be for commercial, public, or private use ❑Commercial ❑Pub)irJGovemment SPnvate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. We propose to extend existing pier 268' ( total length will be 458' ) in order to reach a water depth that enables Mr Wall to use and dock his 2 boats. We will also be installing 6 tie pilings for this purpose. The floating dock will allow easy access to his boats. a Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. We will be using a push boat and barge with excavator on board. A vibratory hammer to install pilings and various hand tools. Equipment will be stored on site until completion. d. List en development activities you propose. Construct access addition with 1 fixed platform and 1 floating platform. e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? N/A ❑Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. N/A I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ®No ❑NA j. Is there any mitigation proposed? ❑Yes NNo ❑NA If yes, attach a mitigation proposal. <Form continues on back> MAR 0 8 2017 252-808-2808 :. 1-888-4RCOAST ;; www.nccoastaimanagement.net TY Forth DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit t3. Additionallnfonnation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application insNrctlon booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plot (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, Deady indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. TM eppmprieto application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certNfed mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name Town of Atlantic Beach/ David Walker Phone No. 262-726-4466 Address 125 West Fort Macon Rd Atlantic Beach, NC 28612 Nome Wiilfiam R Bizzeli Phone No. 252521-1306 Address 3423 Buena Vista Ct Kinston, NC 28504 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permihee, and issuing dates. GP 45264 issued 5.17-05 h. Signed consultant or agent authorization form, lt applicable. L Wetland delineation, if necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Mast be signed by properly owner) k. A ataternIII: t of cornpfiance wiN the N.C. I ill Iarlental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves exQenditure of public funds or use o€ public toilets, attach a statement documenting compliance with the North Carolina Environmental Policy Act. L c:ertmcatlon and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development descdbed in the application. The project will be subject to the conditions and restrictions contained in the pemtit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certifythatthe information provided in this application i '/ % 1 to the best of my kfIOWIC/d Print NamTgQE. Data _. e i� f Signature Please indicate application attachments pertaining to DDCM MP-2 Excavation and Fill Information DDCM MP-3 Upland Development ®DCM MI Structures Information sed project. ❑DCM I Bridges and Culverts RECEIVED MAR 14 2017 DCM- MHD CITY 1.888-4RCOAST ,. www.ecr.n ..,;;yraac}ammni.nos Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. In Is the docking facility/marina: []Commercial ❑PubliclGovernment ®Private/Community ❑This section not applicable b. (i) Will the facility be open to the general public? []Yes ®No a (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ❑Yes ®No (ii) Number 1 If yes: (iii) Length 268' (ii) Number _ (iv) Width 5' (iii) Length (v) Floating ❑Yes ®No (iv) Width _ (v) Floating ❑Yes ❑No e. (i) Are Platforms included? ®Yes ❑No f. (i) Are Boatlifts included? ❑Yes ®No If yes: If yes (ii) Number 2 (in Number (iii) Length 20_,_12' _ (iii) Length (iv) Width 6' 26' (iv) Width (v) Floating ®Yes ❑No _ Note: Roofed areas are calculated from dripline dimensions. g. (i) Nu�ber of slips proposed h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or (ii) Num..{Ib.,�e��r of slips existing .Q�. � ®� maintenance service M7 „�Q-,/vtrt,�C.QxR.(il+ ❑ Dockage, fuel, and marine supplies ❑ Dockage ('wet slips-) only, number of slips: _ ❑ Dry storage, number of boats: _ ❑ Boat ramp(s); number of boat ramps. _ ❑ Other, please describe. i. Check the proposed type of siting. j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). ❑Open water, dredging for basin and/or channel Open runabout ®Open water; no dredging required []Other; please describe: k. Typical boat length. 31' . 20' L (i) Will the facility be open to the general public? m. (i) Will the facility have tie pilings? ❑Yes ®No ®Yes ❑No (iRECEIVED i) If yes number of be pilings? MAR 0 8 2017 252-808-28o8 :: 1-888-4RCOAST :: www.nccoastalmanaoement net reviserle 9t a Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILI Y/NARINA OPERA77ONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ 8oatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of 'No Sewage Discharge' signs proposed. 00 Give the location and number of -Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and 'No Wake' signs proposed. _ I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. J. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin Bushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? DCrit IV D in. Is the marina/docking facility proposed within a primary or secondary nursery area? MAR 0 8 2017 ❑Yes ❑No DCM- MHD CITY <'.52-808-2808 :: t-888-4RCOAST :: wwwmccoastalmanagement net revised: 12/27/06 Form DCM MP-4 (structures, Page a of 4) n. Is the marma/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ ❑WL []None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s) []Commercial ❑Pubiic/Govemment ❑Private/Community (ii) Number _ (iii) Length _ (iv) Width _ Note: Roofed areas are calculated from driptine dimensions. 4. GROIN (e.g., wood, sheeloile, etc. If a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable] a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length _ c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NNW, NWL, or wetlands 6. MOORING PILINGS and BUOYS ®This sectim not applicable ❑Commercial ❑Publir/Govemment ❑Privatefcommunity c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, it present. e. Arc of the swing _ 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED MAR 0 8 2017 DCM- MHD CITY 252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanaaement net revised: 12/27/06 a. Proximity of sbwufe(s) to adjacentriparian property lines b. Proximity of structure(s) to adjacent docking facilities. 16-20' 20' Note: For buoy or mooring piling, use arc of swinq including length of vessel. c. Width of water body 7700 Ft e. (i) Will navigational aids be required as a result of the project? QYea ®No [jNA (il) If yes. explain what type and how they will be implemented. d. Water depth at watenvard end of structure at NLW or NWL 4V S. OTHER ` This section not applicable a. Give complete description: J',1 41%� Data RECEIVED MAR 14 2�17 pCM. MHp CITY ::`'c•at1e3-k8:3�} :€ t-88&-4RCCii:.!iT .: www»cc,:as4a4xn;.�rp�appnexsnr.nrr. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD APPLICANT: Ben Wall County: Carteret LOCATION OF PROJECT: 108 North Court, along the Bogue Sound, in the Town of Atlantic Beach. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 3/14/17 . FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: Yes FIELD REPRESENTATIVE: Heather Styron DISTRICT MANAGER REVIEW: Roy Brownlow B) DATE RECEIVED BY MAJOR PERMITS UNIT: PUBLIC NOTICE REC'D: Yes ADJ. RIP. PROP NOTICES REC'D: No APPLICATION ASSIGNED TO- Gregg Bodnar C) 75 DAY DEADLINE: V I�4 1 r) MAIL OUT DATE: 4/20/17 FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DENY DISTRICT OFFICE: Morehead City FEE REC'D: $250.00 END OF NOTICE DATE: 4/25/17 DEED REC'D: Yes ON: 4/20/17 150 - DAY DEADLINE: STATE DUE DATE: 540/1 FED COMMENTS REC'D: DRAFT ON AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO Coastal Management - Regional Representative 2 ( Coastal Management- LUP Consistency Detemdnation Division of Community Assistance 5�3 DENMR-Land Quality Section Division of Water Resources401 IQ., 17 X AQ DEMLR-Strom Water Management ,Ii� -{Z7 )c State Property Once Division of Archives & History (Cultural Resources) DMF-Shellfish Sanitation l( DWR-Public Water Supply x 1�7 11 Division of Highways Wildlife Resources Commission �� Sri Local Permit Office ,I DCM-Fisheries Resource Specialist Carps of Engineets11-I-1 x -iAv Zp 1-7 oo.e—o A-4 /1P—s Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM: TO: GREGG BODNAR FROM: HEATHER STYRON THRU: ROY BROWNLOW ROY COOPER 6"'emor MICHAEL S. REGAN secmary BRAXTON DAVIS Direclor April 3, 2017 SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT- BEN WALL, PIER EXT. AND SLIP RELOCATION PROJECT, ATLANTIC BEACH, CARTERET COUNTY The following are my comments and recommendations regarding the aforementioned proposal. The proposal is for a pier extension, slip relocation, mooring pilings, fixed platform and a floating platform. There is currently a 2 slip docking facility along Bogue Sound along the north side of this property. Per the applicant due to the shallow water depths as well as submerged aquatic vegetation they are proposing to add a pier extension with a fixed platform, add a floating platform for loading and unloading, relocate the two existing slips and add 6 mooring pilings. There would be a total of two slips (existing) that would be relocated north along this parcel. The proposed docking facility (includes existing pier and platform as well as new pier, pilings and platforms) would extend a maximum of 390' waterward of the edge of marsh and a maximum of approximately 425' from NHW. The water depths within the relocated slip areas and floating platform are -4' to —4.8' nlw. All portions of the development would be landward 10' of the historical channel and within the existing pier head length along this shoreline. The development conforms to the guidelines set forth under 15A NCAC 07H .0208. Assuming that state and federal agencies concur with the proposal, the District recommends the project be authorized as proposed, contingent upon the following conditions: • A total number of two slips only authorized by this permit. • All parts of the 2-slip docking facility shall be landward of the historical channel and not exceed a maximum distance of 390' from the edge of marsh. • The placement of the docking facility shall avoid SAV habitat to the maximum extent possible. State of North Carolina I Environmental Quality 1 Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 A RECEIVED cosrsrat.lktanaa�i�nY' ENYIaONMBNTAI gVALRY. APR 24 7017 OCM-Flsherles WARO April 20, 2017 MEMORANDUM: TO: Shane Staples Division of Coastal Management FROM: Gregg Bodnar Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: ' Ben Wall c/o Bogue Banks Marine Construction, Inc. R.OY' C-O'OPER' Governor MICHAEL S. tt6GAN. Setretoty BRAXTON C. DAVIS Utrador Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position. or viewpoint on the proposed project and return this form by Nlitiy 10, 2017..Ifyou have any questions regarding the proposed. project, please contact Heather Styron, Per`. officer at"(252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: /This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objec s to the project for reasons described in the attached comments. SIGNED DATE �G�7 State of North Carolina I EnYlronmetaai goahty1 Coasta(Managemern Morehead City. Offi e 1 400 CommerteAvenue I Morehead ory NC 28557 262,8082808 April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Local Permit Officer Town of Atlantic Beach Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808 When appropriate, in-depth comments with supporting data is requested. REPLY: VIThis agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are . incorporated. See attached. objects to the project for reasons described in the attached comments. DATE 2! MIPiNEUC SHAGve State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 _0 F Coastal Management ENVIRONMENTAL QUALITY April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ID) t G E V EII APR 2 12017 Shellfish Sanitation E Rec " W et Duality Secuonational Shannon Jenkins Shellfish Sanitation Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Direaor RECEIVED APR 26 2017 DCM- MHD CITY Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: / This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED / /1'.�A// �d� DATE L{/dy'1% fib'- <Shannan J" Kins State of North Carolina I Environmental Qualhy l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead Chy, NC 28557 2528082808 Coastal Management ENVIRONMENTAL QUALITY April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: RECEIVED APR 2 4 7017 DOA STATEPROPERTY OFFICE Tim Walton State Property Office Gregg Bodnar Major Permits Processing Coordinator ROY COOPER Governor MICHAEL S. REGAN secretary BRAXTON C. DAVIS Director CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency o ects to the project for reasons described in the attached comments. SIGNED DATE L RECEIVED MAY 01 2017 State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 DCM- MHD CITY .1 a x� Coastal Management ENVIRONMENTAL WALIW April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Roy COOPER Covemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Lee Padrick Division of Community Assistance Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This age, :has no objection to the project as proposed. L- Tl— s agency has no comment on the proposed project. This agency_ approves of the project only if the recommended changes are mcorporated.'See attached. This agency objects to the project for reasons described in the attached comments. r_ • SIGNED DATE StateofNor6C=1m DMronmentalQwhylC�OstdManagement MoreheadMYData 1,400Commwwmem, I Morehead Oly,NC 28557 m AnR2808 _... ROY COOPER Governor t;< MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Coastal Management Dimaor ENVIPONMENTAL QUALITY D' . 2 `� 0 1Sps� APR 2017 RECEIVED April 20, 2017 6CMNWdio NdM MEMORANDUM: �!/i� °b, TO: Maria Dunn NC Wildlife Resources Commission FROM: Gregg Bodnar Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Ben Wall c/o Bogue Banks Marine Construction, Inc. Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: /This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED M Z. lDATE 5-y*zia RE E I V E D MAY 0 4 2017 State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 DCM- MHD CITY e Coastal Management ENVIRONMENTAL OUALITV April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Rachel Love-Adrick Division of Coastal Management Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review - Ben Wall c/o Bogue Banks Marine Construction, Inc. Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. s Eii is to the project for reasons described in the attached comments. SIGNED DATE State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 Coastal Management ENVIRONMCNTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner tQp Division of Coastal Management ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director SUBJECT: Major Permit request by Ben Wall c/o Bogue Banks Marine Construction DATE: May 4, 2017 Consistency Determination: The request is consistent with/not in conflict with the 2008 Town of Atlantic Beach Core Land Use Plan certified by the CRC on July 24, 2008. Overview: The applicant is proposing to extend an existing pier with a fixed platform, relocate slips, a new floating platform and 6 mooring pilings at 108 North Court., Atlantic Beach Carteret County, North Carolina. Existing site improvements include a single-family residence, driveway, pier and platform, and an onsite septic system. The project is in Estuarine Waters (EW) and Public Trust Area (PTA) Areas of Environmental Concern (AEC). The waters of Bogue Sound at the site are classified as SA/HQW, are open to the taking of shellfish, and is not designated as a Primary Nursery Area. SAV is present at the project area, and the substrate is sand. There is a 97' x 56' section of Coastal Wetlands with scattered oysters along the 97' shoreline. Anticipated impacts resulting from this project are expected to include: the shading and incorporation of 1,235 ft2of shallow bottom SAV habitat, shade 537 ft2 and incorporate 1,585 ftZ of open water (non-SAV). Basis for Determination: The project site is in the Town of Atlantic Beach and is subject to the town's 2008 Land Use Plan. The Future Land Use Map (FLUM) designates the site as Single Family Residential and the subject AECs as "Conservation". Development within the designated AECs is limited by CAMA regulations and development guidelines. Land Use Policies: The following LUP policies may be applicable to this request. State of North Carolina I Fnvironmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557 2528082808 Policies - Conservation P.22 - The Town of Atlantic Beach supports 15A NCAC 71-1for the protection of all AECs. P.29 - The Town of Atlantic Beach supports the construction of all marinas, docks, and piers which minimize or eliminate adverse effects on coastal wetlands and subaquatic vegetation and comply with 15A NCAC 7H minimum use standards. Marina development standards are outlined on pages 73-76. P.33 - The Town of Atlantic Beach supports state and federal regulations for the preservation/protection of freshwater (404) and coastal wetlands. 1.34 (3) The construction of all marinas, docks and piers shall minimize or eliminate adverse effects on coastal wetlands and subaquatic vegetation.ond comply with 15A NCAC 7H minimum use standards (see page 73). Schedule: Continuing Activity. State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557 252 8082808 Coastal Management ENVIRONMENTAL QUALITY April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Heidi Cox Public Water Supply Gregg Bodnar Major Permits Processing Coordinator ROY COOPER Governor M►CHAEL S. REGAN Secretary BRAXTON C. DAVIS Director �IVI APR 2 y 2" W;R� P bwMerl?, Wa a SOppces CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: ✓ This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED tc. DATE 4 2717 dr RECEIVED State of North Carolina I Environmental Quality l Coastal Management MAY 10 2017 Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 D M— MHD CITY Coastal Management ENVIRONMENTAL QUALITY April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director tzCEF'� 1>P y -017 Dan Sams Division of Energy, Mineral & Land Resources Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. Carteret County, at 108 North Court along Bogue Sound, in the '['own of Atlantic Beach. Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE I 28 2-6 / 7 DECEIVED MAY 10 2017 state of North Carolina I Environmental Quality I Coastal Management Morehead City lNFlce 1 400 Commerce Avenue I Morehead Qty, NC 28557 DC M- M H D CITY 252:808 2808 Coastal Management ENVIRONMENTAL QUALITY April 20, 2017 Georgette Scott Division of Energy, Mineral, & Land Resources ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director ECEIVE APR 2 4 2ai? BY: - FM: ( Gregg Bodnar p Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Ben Wall c/o Bogue Banks Marine Construction, Inc. Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. RECEIVED This agency has no comment on the proposed project. MAY 10 2017 This agency approves of the project only if the recommended chair QTY incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED t�JL DATE AV-10 State of North Carona I Environmental Qualtty l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 11, I Coastal Monagem en t ENVIRONMENTAL QUALITY April 20, 2017 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: APR 282017 Renee Gledhill -Early NC Department of Cultural Resources Gregg Bodnar Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Ben Wall c/o Bogue Banks Marine Construction, Inc. ROY COOPER Cmernor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Carteret County, at 108 North Court along Bogue Sound, in the Town of Atlantic Beach. Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings. Please indicate below your agency's position or viewpoint on the proposed project and return this form by May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED _, C��.r DATE eS/ll�i J Stateol'North Carolina I Environmental Quality I Coastal Management Morehead City OfAce 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 MAY 092017 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS . 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 May 16, 2017 Regulatory Division Action ID No. SAW-2017-00809, General Permit No. 197800056 Mr. Ben Wall 5416 Captains Lane Wilmington, North Carolina 28409 Dear Mr. Wall: Through coordination with the North Carolina Division of Coastal Management we have learned of your request to expand an existing docking facility located at 108 North Court, along Bogue Sound in Atlantic Beach, Carteret County, North Carolina. Coordinates are: 34.7028 N, - 76.7759 W. On January 1, 2017, we renewed general permit No. 197800056, (copy enclosed), that authorizes the maintenance, repair, construction and installation of piers, docks, boathouses and boat shelters, pilings, mooring buoys, dolphins, jetties, groins and breakwater structures in navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the Rivers and Harbors Act of 1899. Your work is authorized provided it is accomplished in strict accordance with your submitted plans, the enclosed general conditions, and the following special conditions: 1. All work authorized by this permit must be performed in strict compliance with the submitted plans received on 25 April 2017, which are a part of this permit. Please read the enclosed permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. -2- Thank you for your time and cooperation. If you have questions, please contact Ms. Liz Hair, of the Wilmington Regulatory Field Office, telephone: (910) 2514049. Sincerely, 8--�141�(Li k Liz Hair, Project Manager Wilmington Regulatory Field Office Enclosure: GP 56 conditions Plans Copies Furnished (with enclosure): Electronic Copy Furnished (without enclosures): NCDEQ/DCM; Mr. Doug Huggett NCDEQ/DWR; Mr. Robb Mairs NCDEQ/DCM; Mr. Gregg Bodner NCDEQ/DCM; Mr. Ryan Davenport NCDEQ/DWR; Ms. Karen Higgins Bodnar, Gregg From: Mairs, Robb L Sent: Thursday, May 18, 2017 2:52 PM To: Bodnar, Gregg Subject: RE: Project comments Gregg, Wall will not require written concurrence (DWR # 20170509). As per the UNC IMS application, again we need to know how the Corps will issue their permit, but we do not see a water quality concern on our end. Thanks, RM From: Bodnar, Gregg Sent: Tuesday, May 16, 2017 3:39 PM To: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: Project comments Hey Robb, Hope all is well. Just checking in on a few with deadlines this month. Ben Wall UNC IMS (ASUs in Middle Marsh) USACE has it out for review Thanks again, G regg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg. Bodnar(d),ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 PC. -�-�>Nothing Compares. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Ben Wall c/o Bogue Banks Marine Construction, Inc. 2. LOCATION OF PROJECT SITE: 108 North Court along Bogue Sound, in Atlantic Beach, Carteret County. Photo Index - 2006: 41-8084 grids J, K and L-6 Longitude: 34°42'09.82 Latitude: 76°46'33.58 INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 4/4/17 Was Applicant Present —No Photos Taken — No PROCESSING PROCEDURE: Application Received: Officially Submitted: 3/8/17 Complete — 3/14/17 Office - MHC 6. SITE DESCRIPTION: (A) Local Land Use Plan —Atlantic Beach- Certified 7/24/2008 Land Classification from LUP — Single Family Residential/Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — Onsite Septic System Planned - None (F) Type of Structures: Existing — House, driveway, pier and platform, Planned -the addition of pier extension with fixed platform, slip relocation to the north, new floating platform and 6 mooring pilings along Bogue Sound. (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water (not over SAV) N/A N/A 537 ft2 Shaded 1,585ft2 Inc. (B) Open water (over SAV) N/A N/A 1,235 ft2 Shaded 1,235 ft2 Inc. (D) Total Area Disturbed 2,692 ft2 (E) Primary Nursery Area: No (F) Water Classification: HQW/SA Open: Yes 8. Proiect Summary: The proposed project is for a pier extension with fixed platform for the existing 2-slip docking facility, slip relocation, floating platform and six mooring pilings along Bogue Sound. Field Investigation Report Ben Wall 108 North Court Page 2 of 3 9. Narrative Description: The Ben Wall project is located at 108 North Court within Atlantic Beach, Carteret County. The site is found by following Highway 70 East (Arendell St.) to the Atlantic Beach Bridge ramp. Continue over the Atlantic Beach bring along the Atlantic Beach Causeway until you reach the 4-way stoplight. Turn left (west) at the light and continue for approximately 11,700' (2.2 miles) until you reach Lee Drive (Dollar General at the corner). Turn right onto lee Drive and continue until you reach Hoop Pole Creek Drive. Turn left and then immediately right onto North Court. The property is located at the end and along the east side of the existing cul-de-sac. The residential property is .62 acres (27,051 sf) in its entirety and 5' above nhw. Bogue Sound runs along the south side of the property. The upland vegetation mainly consists of lawn grasses, shrubs, and a few trees. There is a 97' x 56'section of coastal wetlands with scattered oysters along the 97'of shoreline on Bogue Sound. The waters of Bogue Sound have approximately 2.5'to 3' lunar tidal amplitude. The Division of Water Resources classifies this area as HQW/SA Waters. This area of Bogue Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The Town of Atlantic Beach Land Use Plan classifies this area as Single-family Residential with Conservation within the AECs. According to Google Earth spacial data, there is a historical channel approximately 419' from the marsh edge and would be located approximately 15' waterward (south) of the proposed pier, pier platform, slip relocation and mooring pilings. Water depths within this project location are-3.6'nlw/mlw to-4.8nlw/mlw, depending on location, with connecting water depths of -5' plus nlw/mlw. The bottom substrate is sand. Bogue Sound is approximately 7,700feet (1.46 miles) wide at this location. 10) Proposed Development: Due to the shallow water depths over SAV habitat and the location of the existing shorter pier the applicant wishes to add a pier extension with a fixed platform, relocate the existing slips to the south, add a floating platform and 6 mooring pilings. There is an existing pier and platform that the new development would extend from for a total of 390' from the marsh edge and 425' from normal high water. The total length of the existing components as well as the proposed development would not exceed a maximum of 470' from the existing high ground. Due to the shallow water depths and SAV habitat along the existing shorter pier, platform and slip areas, the applicant is asking for the construction of an additional 5' x 268' pier, a 12' x 26' fixed platform, a 6' x 20' floating platform, six mooring pilings (help delineate slip areas) as well as the relocation of the two existing slips to the south. This area has (from the edge of coastal wetlands) of approximately 247' of SAV habitat and deeper water depths (>-2'nlw) occurring at approximately 350' from the marsh edge. Field Investigation Report Ben Wall 108 North Court Page 3 of 3 In order to achieve the necessary depths to span this shallow SAV habitat, the pier, platforms, slips and mooring pilings would need to be located 470' from the high ground, 425' from normal high water and 390'from the marsh edge. The water depths from 400' to 500' would maintain the required rate of 1' of fall as well as the deeper water depths (>2' nlw) over the SAV habitat. The proposal is to add a 5' x 268' pier extension that would intersect a 12' x 26' fixed platform. There would be a total of six mooring pilings that would delineate the re -located two slips as well as a 6' x 20' floating platform along the northeast side of the proposed fixed platform. The most waterward portion of the platform and mooring pilings would not exceed a maximum distance of 390' from the edge of marsh. All parts of the docking facility would be landward 10' of the historic channel and a distance of 30' from the western riparian corridor and 12' from the eastern riparian corridor (waived). There would be a total of two wet slips with 6 mooring pilings (three for each slip). The water depths within the slip areas for the proposed dock addition are -3.7' + nlw/n lw with connecting water depths of -3' plus nlw/mlw. There are piers along the shoreline to the east and west of this property that extend farther offshore than this proposal. The proposed dock extension would remain within the existing pier head length. 11. Anticipated Impacts: The proposed dock would shade and incorporate 1,235 ftz of shallow bottom SAV habitat, shade 537sf and incorporate 1585 ftZ of open water (non-SAV). The development would not increase the total number of slips from 2 (existing but relocated). The proposed placement of the pier addition, platforms and mooring pilings would reduce the likelihood of prop scarring and incidental prop dredging of the existing SAV habitat. The deeper water depths (>-2'i lw) within the new pier location and the shorter distance that the applicants would need to traverse in order to reach the deeper water has the potential to help preserve and re-establish the SAV habitat closer inland. The increase in suspended sediment and turbidity levels from the pier placement would be temporary, occur while the pier placement is taking place and should be minimal given the bottom composition. The location of the proposed docking facility should not be a hindrance to navigation due to the fact all portions would be located landward of the historical channel (10') however it is recommended to add reflectors (meeting Coast Guard Standards) for safety due to the proposed length. Name: Heather M. Styron Date: 4/6/17 Office: Morehead City it Consideration: $10.00 & Gift Parcel ID No.: 13-39D-1-25 Melanie Arthur 2P CARTERET COUNTY MA Date 09/02/2005 Time 10:04:00 OR 1130263 Page r of 2 THIS DEED OF GIFT made and entered into this 19th day of July, 2005 by and between Dr. George H. WALL and Billie O. WALL, husband and wife, whose address is 3955 Winding Way Road, S.W., City of Roanoke, Virginia 24015, as Grantors, and Benjamin Evans WALL, whose address is 5416 Captains Lane, Wilmington, North Carolina, 29409, as Grantee; WITNESSETH: THAT FOR AND IN CONSIDERATION of Ten Dollars ($10.00) paid by the Grantee to the Grantors, natural love and affection, and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantors do hereby GIVE, GRANT and CONVEY, with General Warranty and Modem English Covenants of Title, unto Benjamin Evans Wall, all of the certain lot or parcel of land situate in the City of Morehead Township, Carteret County, North Carolina, and more particularly described as follows: BEING KNOWN and designated as all of Lot Twenty -Eight (28) of Coastal Shores Subdivision, as shown on that certain map recorded in Map Book 15, Page 23 of the Carteret County Registry. This conveyance is made and accepted subject to the Restrictive Covenants of record in Book 408, page 43, Carteret County Registry. BEING the same property conveyed to Dr. George Wall and Billie O. Wall, his wife, b� deed from Gloria F. Graham and Douglas A. Graham, her husband, dated the 16 day of July 1982 and recorded in Book 467, Page 466, Carteret County Registry. This deed is made subject to all easements, reservations, restrictions and conditions of record affecting the hereinabove described property. NONTN CAROLINA, CARTERET COUNTY The foregoing cortificate(s) of Notary Public(s) Wets certified to be correct. This instrunreM and this cerW cote are duty regis red at the date and ti* and in the Book and Pa shown on the f rstIRW hereof. RECEIVED MAR 0 S 2017 DCM- MHD CITY XIT[NESS the fol"-mg s: and seals (SEAL) George H. Wail 1,11.Qzt S. fa& (SEAL) Billie O. Wall COMMONWEALTH OF VIRGINIA ) To -wit: CITY OF ROANOKE ) / 5 ^ s� The foregoing instrument was acknowledged before me this of day of+,bjjT-2005 by George H. Wall and Billie O. Wall. My Commission Expires: Notary Public RECEIVED MAR 0 8 2017 DCM- MHD CITY2 �`3v 'This is a word processing form to be completed in Microsoft Word""" NC Division of Coastal Management Major Permit Application Computer Sheet (11/012012) Applicant: Ben Wall Date: 4/3/17 Project Site County Carteret Staff., HMS District: ❑Elizabeth City El Washington ®Morehead City [-]Wilmington Project Name: Wall pier extension Rover File: N/A Date of initial application submittal (EX1/8/2007) 3/8117 Date application received as complete" in the Field office (EX. 1/8/2007): 3114117 Permit Authorization: ®CAMA ❑Dredge & Fill ❑Both SITE DESCRIPTION/PERMIT INFORMATION PNA: []Yes ®No Photos Taken: Yes ❑ No❑ Setback Required (riparian): ®Yes ❑No Critical Habitat: []Yes ®No ❑Not Sure 15 foot waiver obtained. El Yes ®No Hazard Notification Returned: [-]Yes ®No SAV. ®Yes ❑No [-]Not Sun: Shell Bottom: ❑Yes ®No ❑ Not Sure Temporary Impacts: ®Yes ❑No Sandbags: ❑Yes ®No ❑ Not Sun: Did the land use classification come from countyLUP: ❑Yes ®No Mitigation Requited (optional): ❑Yes ®No Moratorium Conditions: ❑Yes ®No ❑NA Environmental Assessment Done: ❑Yes ®No ❑NA SECONDARY WATER CLASSIFICATION— OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW) M High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORM WETLANDS IMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Umonium sp.) ❑ (SS) Glasswort ( Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemiflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) , spicata) sp.) ❑ (JR) Black needlerush (Juncus ❑ (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/D&F up to 1 acre; 3490 ❑ 111(D) Priv. public orcomm w/D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CA MA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer- $100 ❑ 111(B) Public or commercial w/D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ ll. Public or commercial/no dredge $100 and/or fill - $400 ® 1. Private no dredge and/or rill - $250 ❑ III(C) Priv. public or comm w/D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 02/15110 IBC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: Ben Wall Date: 413117 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Pier exL 1 New Worts ® Replace 268' S' Maint El ❑Y.®N Platformfixed I New Work® Replace 26' 12' Maint ❑ ❑ Y ® N Platform 1 New Work El Replace 20' 10' floating Maint ❑ ❑ Y ❑ N boatslips 2 NewWork[] Replace 2 Maint ❑ ❑ Y ❑ N Mooring 6 New Work❑ Replace 6 piling Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint El ❑Y❑N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N - New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint [-I ❑Y❑N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work❑ Replace Maint ❑ ❑ Y ❑ N revised 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) 4 Applicant Ben Wall Date: 413117 Describe below the HABITAT disturbances for'the application. All values should match the name,'and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Shallow bottom Dredge ❑ Fill ❑ Both ❑ Other ® 2692 2692 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill,❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ - Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 252-808-28o8 :: 1-888-4RCOAST :: w .nccoastaimanagement.net revised: 02/15110 Wa.e v[ ;vvT 9g Coastal Management .ENVIRONMENTAL QUALITY Ben Wall C/o Bogue Banks Marine Construction, Inc. 111 Turner's Dairy Road Morehead City, NC 28557 Dear Mr. Wall: ROY COOPER Gr..rm"r MICHAEL S. REGAN Secreraip BRAXTON DAVIS Director 4/5/17 The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development at 108 North Court in Atlantic Beach, Carteret County. The complete package was received on 3/15/17. The projected deadline for making a decision is 5/29/17. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been.notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from 3/15/17, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify mein writing if you wish to receive a copy'of my field report and/or comments from reviewing agencies. S' cerely, Heather M.Styron Coastal Management Representative State of North Carolina I Enviro mental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 u ♦M►1/I♦M=�=1==I� 11 law L, I/177 i AGENT AUTHORIZATION FORM FOR PERMIT APPLICATIONS Name of Property Owner Applying for Permit: ��'� M\ n E— � & I I Mailing address: 5L` 1 (2 C a P tc-u o S L c1 ✓) e y\1 " 1 m\ ngC a 8 q 09 Telephone Number: q M 5 a 0 3 ts? I certify that I have authorized jo� tie any's mariR e-- (agenticontractor), to act on my behalf, for the purpose of applying and obtaining all CAMA permits necessary for the proposed development of L2� r nn at my property located at to( This certification is valid through 1 L I l I LU 1 t (date). (Property Owner Information) /lam /L U ` Signature Tint or Type Name Title, rrco. owner or trustee for property J/2� l// Date CM 5aD 3io►y Telephone Number benw A0 & Email Address RECEIVED MAR 0 8 2017 DCM- MHD CITY U 21 U63d 1i 71J1:7►� 17 ZaI1 c l'I�PiI`.I ��i �iril_ FYI I hereby certify that I own property adjacent to r✓� hi �t'1 �� «� 1 s property located at 1�� Nerfh Court ("t1pPm'geu)cb� 2 e (Address, Lot, I ck, Road, at�i on IJ�1 SOunJ in 9tlQYi jtC &IOC-h , N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. 1 have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback /�(,, G - il 5oo�t'1 Pju(oglType"Orr 1 MaCcm Kgr. Zo4(i� li l/adl-Fi'r 6�k xsja �nrraicier ap g tb 'Sao 3 (o �4 `'tea?� -5r� 7-25 - Telephone Number/email address Telephone Number/email address ganuaMom,�01q IDate Pr\\'\J l I C� he�lsv� �`(1� .✓1e �-Dat`f DECEIVED 'Valid for one calendar year after signature' (Revised Aug. 2011%R 0 S 2017 DCM- MHD CITY i hereby certifythat 1 own property adjacent to C-2e-ki) GVVY- ,-, \,,J G,L s (4qa a or Prone'v wne;) Property located at 101 N e C+h Ctuf �tt, 1) (kcid; see, Lot, ' l ck, R d, on I� cf 1{ - Sound in 1 lC1F 1 ii' !�i_GL01 N.C. �,^IU?rkr'aocr,✓z (C'ity1Town and/or County) The appiicantpagldescribed to me, as shown below, the development proposed at the above location. 1 have no objection to this proposal. 1 have objections to this proposal. DESCRIP11ON slt DIOR DRA,.WNG Or PROPOSED DeJ, CFhj T., (ilCLb7C'iia! prcpcWr.Lj' Ea er11 Pr; '1''eeCr7,�::Erz ,^,aiow or awaC : an Sic draw -frig,' I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, [hit, or groin must be set bac', a minimurn distance of 15' from my area of riparian access unless kivalved by me. (If you w' to tnraive the setback, you mu t initial the appropriate blank belo�y.) 1 do wish to waive the 15' setback requirement. I Qz, not wish to waive the 15' setback requirement Q'PJ)sfatcZpglO 5ay 3 �, 14 Telephone hfumbar/email address gt4luck ii�f 'awl Date 'Valid for one calendar year after signature i5d3acent Proms y ^vnfr_ar to Nae tress C- !7PS /3oG MAR 0 8 2017 DCM- MHD CITY r% i Styron, Heather M. From: Legals <legals@thenewstimes.com> Sent: Monday, April 03, 2017 1:32 PM To: Styron, Heather M. Subject: Re: Ben Wall Major Permit This ad is set and scheduled to run on April 5, 2017 in the amount of $ 44.99. Proof: NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEMELOPMEf4F PERMIT The Department of Environmental Duality hereby gives public notim as required by NCGS 113A.119(b) that appliralso bra development permit in an Area of Environmental Concern as designated under the CAMA vas received on 3lWl7. A=thg to Ne eppliwtw, Ben Wa0 applied bra permit for a pier extension, fixed platform, floating platform and 8 mooring pilings at 108 North CourtAtlantic Beady, Carteret County. A copy of the entire application maybe examined cr copied at the office of Heather Styron, NC Division of Coastal Management located at4g0 Commerce Avenue, Morehead City, NC, (252) 8062WB tludng normal business hours. Comments mailed to Braxton C.Davis,Director, Division of Coastal Management,400 Commerce Avenue, Morehead City, N.C. 28557, prior to 4 &17, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of pi decision Project moddicalmn may occur based on review and comment by the public and state and federal agendas. Notice of me permit decision In this matterwill be provided upon wnden request A5 On Apr 3, 2017, at 12:58 PM, Styron, Heather M. wrote: Legal Advertisement Section 4/3/17 Re: Public Notice — Ben Wall, 108 North Court, Atlantic Beach, Carteret County To Whom It May Concern: Please publish the attached Notice in the 4/5/17, issue of the Carteret News Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, {der&-c4pon Heather M. Styron Coastal Management Representative HMS NOTICE OF FILING OF A PPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on 3/14/17. According to the application, Ben Wall applied for a permit for a pier extension, fixed platform, floating platform and 6 mooring pilings at 108 North Court, Atlantic Beach, Carteret County. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 4/25/17, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: 4/5/17 Heather M. Styron Field Representative NC Divison of Coastal Managment NC Department of Environmental Quality 252 808 2808 ext.216 Office heather. m.stvron(a)ncdenr.gov Email 400 Commerce Ave. Morehead City, NC 28557 <image001.png> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 V+� xxxxxxxxxxxxxxxx Judy Allred Legal Assistant — Carteret County News -Times 4206 Bridges Street I Morehead City, NC 28557 Phone:262-726-7081 ext. 207 Fax: 252-726-2653 Legals(cDTheNewsTimes.com — www.CarolinaCoastOnline.com L Coastal Management ENVIRONMENTAL QUALITY Legal Advertisement Section Re: Public Notice — Ben Wall, 108 North Court, Atlantic Beach, Carteret County To Whom It May Concern: ROY COOPER (invamor MICHAEL S. REGAN seen,o. BRAXTON DAVIS tureens Please publish the attached Notice in the 4/5/17, issue of the Carteret News Times. 4/3/17 The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, fieAerl{ -eph Heather M. Styron Coastal Management Representative Swe ofNo th Carolina I Environmental Quality I Coastal Mmagement 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 NOTICE OF FILING OF A PPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on 3/14/17. According to the application, Ben Wall applied for a permit for a pier extension, fixed. platform, floating platform and 6 mooring pilings at 108 North Court, Atlantic Beach, Carteret County. A copy of the entire application may be examined or copied at the office of Heather Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC; (252) 808-2808 during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, N.C. 28557, prior to 4/25/17, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: 4/5/17 State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave I Morehead City, NC 28557 252 808 2808 X 266&101.3 0011152EDT Lanp: 704.1 AAak 3.0 X200M Y. 35M3 6 Y. 3SSW6.9 -100.0 0.0 imo 2004 Now 40D.0 590 600A 7WA 114.0 9WA 1000D 20 +z0 +1.0 NA OD OA to 14 20 2.0 30 3.0 4.0 4.0 5.0 5.0 6.0 60 7.0 7.0 &0 6.0 t0727016 DBL 200.0 Ft In 0013T NO 5.0 Ft In X:28=2 O&3_12DEOT LeNh 704.1 ABnWh: 3.0 X26011B.7 Y. 35431&9 Y:3&50230 AOU OA 1W.0 20H NU 400.0 500.0 600A 7WA 0.0 9WA 1000A 20 +z0 +14 0.0 10 0.0 El st,11 noes HiA, uiu un,ar0 a.m maeemno"191 1.0 IA 2.0 z0 30 3.0 4.0 a 4A 6.0 � 5,0 U &0 74 7.0 1U 6A ICQ7Y[016 OMWO.OFtN 003ST Dept 5A Ftln X 11W.1 Y:354316A -look OA +2A HA U W5_12WEDT LM*70LI A*4&3.0 X26664M Y. 354i9d IOU 2904 NU 40&0 MIMI IXOA 700A SI D 90DA IMU +20 0.0 0.0 to 1.0 2.0 z0 3.0 30 4.0 4.0 5.0 5.0 BA 6D 71) 7A IN &0 WSEDT DBL 2W.OFtIn NO 5A FLN X 26firt572 Y:3543212 400.0 0.0 411 +I.D 002.115UDT Lop: 704.1 Aalnu6c 3.0 X26M.7 Y. 355W4.3 IWO Y00.0 300.0 400A 5W0 6000 7WD III 9Wo 1000.0 40 AD 0D ob I'D 1.0 zD 2A 3.0 30 4A 4.0 54 _ 5.0 BA U 7A 7.0 Hill eo 101T016 =EDT oBL210.0Ftb NO 5A Ftt X 2SM7.1 Y: WIIA -1W0 0.0 40 +1.0 QO 004_12MEDT Lelpt: 704.1 Aas*3.0 X2WM43.1 Y:3550277 100.0 200A 300.0 400.0 5X0 OD01 7004 111 OWA 1 1 1 1 P 1 IMU +2A NA 0.0 1.0 1.0 2.0 zD 3.0 30 4.0 44 5.0 &0 &0 &0 7,0 71 1U &0 10.47Y4016 OOIEDT - DR 200.0FtIr Dept 30 Ftt X 2%WJD Y:3W13A -IOU 0.0 .2.D +to 02 ODB_1211KEDT LM9t: 704.1 ftiw :34 X266B513A Y: 355016.5 IOU 200A 300A 400.0 SODA ou 7Wo wu 900A 1000A z0 No 0.0 1.0 to 2.0 4 2.0 3.0 3.0 4.0 4.0 SA 5.0 6A 60 7A LO 1U &a lK7016 W6.EOT 061.2DOO Fdn D905A Ftb RECEIVED MAR 2017 DCM- M D CITY JJ ,I�' TT � of r l `astai Vertical Datum GOOVBISiO+ NAVD4M Dr. Ben Wall Atlantic Beach NC 28512 108 North Court, 9 Gra Graphic Seale , Nobs: 1. Horn"" Detan: NC State Plena-tore 320D 3. Deb mlDeiSed by Tl Coastal on SepbmEar B,M16 and raPiaamrt dib eaOna at Had 6me. 4. Aerial plgto Roan In 2012 ant! G IoalaC from NC OneMap. 1.E' MLW Beaufort Datum Hemwa.i s..w + . eo TiCoastal, PLLC en1.e..n.t tr.., enml"oton, NC 284" 910.821.1354 Dock Modification Permit Application DWG NAME: DockPemilDY90.dW E PLAN VIEW - Pro Proposed Dock Layout and Existing Bath met p y g y ry OM/G DATE: November 11, 2018 SORV" DATl.•sPpl E, zotE SCALE: 1-= So' axcET:2 of 2 CAMA Major Permit Application -Project Narrative Ben Wall -Property Owner 108 North Court, Atlantic Beach NC 28512 Bogue Banks Marine Construction, Inc: Applicant Purpose: We are requesting authorization to extend existing 5' x 190' pier by 268' in order to reach deep water which will enable property owner to dock and use his boat. We will also be adding a 26' x 12' platform and a 6' x 20' floating dock and 6 mooring pilings. Existing Conditions: This privately owned lot is 0.4 acres in size and contains a 1376 SF single family dwelling. There are also indigenous plants, grasses and shrubs. The existing pier is 5' x 190' and there is a 10' x 20' "T" at the end. Method: We will be floating materials in by barge and using an excav t i�vibratommer to drive thepilings. We will also be using various hand tpels ( hain drills etc. ) to complete the project. We will be following NC Building odes or all aspects of this project. D I �)�� -� o�-� -7 a7 AC�`°= RECEIVED MAR 0 8 2017 DCM- MHD CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional lnformadon In addition to this completed application form, (MP-1) the following Items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application Instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Town of Atlantic Beach/ David Walker Phone No. 252-725-4456 Address 125 West Fort Macon Rd Atlantic Beach, NC 28512 Name William R Bizzell Phone No. 252-521-1306 ' Address 3423 Buena Vista Ct Kinston, NC 28504 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tra . Include permit numbers, nmittee, and issuing dates. GP 45264 issued 5-17-05 h. Signed consultant or agent authorization form,' sppli ble. I. Welland delineation, If necessary. j. A signed AEC hazard notice for rojects in ceanfront knd inlet a a. (Must be signed by property owner) k. A statement of compliance with th .C. E vironmemal ohcy (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public Is , atta a statement dOMmenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in re nse to this application will allow only the development described in the application. The project will be subject to the conditio nd restrictions contained in the permit. I certify that I am authorized to grant, and in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts RECEIVED ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information MAR 0 8 2017 DCM- MHD CITY 252-808-2808 .. 1.888.4RCOAST .. www.nccoastaimanagement.net . C'. ,, i. i' �. �.o.. Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 15'-20' 20' Note: For buoy or mooring piling, use arc of swing including length ofvessel. C. Width of water body 7700 Ft e. (i) Will navigational aids be required as a result of the project? 0Yes ®No [JNA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 4'8" 8.OTHER ® This section not applicable a. Give complete description: Date Project Name =0 Applicant Name Applicant Signature RECEIVED MAR 0 8 2017 DCM- MHD CITY 252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement net revised: 12/27/06