HomeMy WebLinkAbout64-17 Wall, BenClass'
Permit Number
64-17
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
t.
Vermft
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
to Ben Wall, 5416 Captains Lane, Wilmington, NC 28490
izing development in Carteret County at adi. to Bogue Sound at 108 North Courtin
lai tic Beach as requested in the permittee's application dated 3/14/17 including attached
this,permit, issued on May 23, 2017 is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) , This permit authorizes only the pier extension, slip relocation to include existing tie piling removal,
dock, and tie pilings, and other structures and uses located in or over the water that are expressly and
specifically set forth in the permit application. No other structure, whether floating or stationary, shall
become a permanent part of this docking facility without permit modification. No non -water
dependent uses of structures shall be conducted on, in or over Public Trust waters without permit
modification.
3) This permit only authorizes the relocation of the existing 2 slips, and does not authorize any
additional formalized boat slips.
(See attached sheet for Additional Conditions)
`Tlns permit action may be appealed by the permince or other Signed by the authority of the Secretary of DEQ and the
paflifred persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
maintenance work or project modification not covered
ier requires further Division approval.
work must cease when the permit expires on
December 31, 2020
this permit, the State of North Carolina agrees that
: is consistent with the North Carolina Coastal
t Program.
P- � �.,�. � -
Braxf6nC. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature ofPermittee
Permit No. 64-17
Page 2 of 2
ADDITIONAL CONDITIONS
`=; The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work
General
-This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2017-00809).
The N.C. Division of Water Resources assigned the project DWR Project No. 20017-0509.
E: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal high water level.
An application processing fee of $250 was received by DCM for this project.
DCM Coordinator: 3� Permit #:_ G e�- / 7
DCM Field Offices
Elizabeth City
Morehead City
Washington
Wilmington
US ACOE Offices:
Washington:
MAILING DISTRIBUTION SHEET_.._ ._ .
//( /krnus ';'Irv/ RA
(with revised work plan drawings) 1Xolekw-1
5u; le D
e-,,,,,1C zP,53-1
Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffan (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington: Tyler Crumbley (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources: Renee Gledhill -Earley
Public Water Supply: Heidi Cox (WIRO)
Clif Whitfield (WARD)
Marine Fisheries: Shane Staples
Curt Weychert
NC DOT: David Harris
Shellfish Sanitation: Shannon Jenkins ,
State Property: Tim Walton t,
DEMLR/DWR: JKaren Higgins
Kristy Lynn Carpenter (NC DOT -All Projects)
Washington: Anthony Scarbraugh401
Roger Thorpe-Stormwater
Garey Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender, New Hanover)
Chad Coburn — 401 (Brunswick)
Georgette Scott - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources: Maria Dunn (WARD)
LPO:
Fax Distribution: Permittee #: Agent#
Coastal Management
ENVIRONMENTAL QUALITY
May 23, 2017
Ben Wall
5416 Captains Lane
Wilmington, N.C. 28490
Dear Sir or Madam:
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
BRAXT.ON C. DAVIS
Director
The enclosed permit constitutes authorization under the Coastal Area Management Act, and
where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The
original (buff -colored form) is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
described below.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS
I I3A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714,
(919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty (20) days.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work
must be carried out in accordance with your application. Modifications, time extensions, and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and
review all project plans, as approved. If you are having the work done by a contractor, it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time, Department personnel will visit the project site. To facilitate this review, we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions, environmental safeguards, or problem areas, you may
contact Department personnel at any time for assistance. By working in accordance with the permit, you
will be helping to protect our vitally important coastal resources.
Enclosure
Sincerely,
vA
Douglas V. Huge
Major Permits Manager
N.C. Division of Coastal Management
State of North Carolina I Environmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue. I Morehead City NC 28557
252 808 2808
CAMA Major Permit Application -Project Narrative
Ben Wall -Property Owner
108 North Court, Atlantic Beach NC 28512
Bogue Banks Marine Construction, Inc. -Applicant
Purpose:
We are requesting authorization to extend existing 5' x 190' pier by 268' with a 12' x 26'
platform at the end for a total length of 470', in order to reach a water depth of 4.5', which will
enable property owner to dock and use his boat(s). We will also be adding a 6' x 20' floating
dock and 6 mooring pilings.
Existing Conditions:
This privately owned lot is 0.4 acres and contains a 1376 SF single family dwelling. There are
also indigenous plants, grasses and shrubs. The existing pier is 5' x 190' with a 10' x 20' 'T" at
the end.
Method:
We will be floating materials in by barge and using an excavator with a vibratory hammer to
drive the pilings. We will also be using various hand tools ( chain saw, circular saw, drills etc.)
to complete this project. Equipment will be store on site until completion. We will be adhering
to NC Building Codes for all aspects of this project.
RECEIVED
MAR 14 Z017
DCM- MHD CITY
V'L4 0 %}7
men MF-1
APPLICATION for
Major Development Permit
(last revised 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner htformadon
Business Name
Project Name (d applicable)
Applicant 1: First Name
Ben
MI
Last Name
wall
Applicant 2: First Name
MI
Last Name
If additional appNcants, please attach an additional pege(s) with names listed.
Mailing Address
5416 Captains Lane
PO Box
City
Wilmington
State
NC
ZIP
28490
Country
USA
Phone No.
910-520-3614 ext.
FAX No.
Street Address (d dr%arent from above)
Same as above
City
State
ZIP
Email
benwall@bellsouth.net
2. AgenvContraetor imconnation
Business Name
vogue Banks Marne Construction, Inc.
Agentt Contractor 1: First Name
MI
Last Name
Kimberly
O'Hara
AgeMt Contractor 2: First Name
MI
Last Name
Mailing Address
PC Box
City
State
111 Turner's Dairy Rd Suite D
Morehead City
NC
ZIP
Phone No. 1
Phone No. 2
28557
252 - 725 - 3221
ext.
252 - 247 - 4428 ext.
FAX No.
Contractor e
252 247 4427
Street Address (if di%ren(from above)
City
State
Same as above
ZIP
Email
bbmc7l@hotmaii.com
RECEIVED
<Form continues on back>
MAR 0 8 2017
DCM- MHD CITY
252-808.2808 .. 1-888.4RCOAST .. . www.nccoastaimanagement.net
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address
State Rd. #
Carteret 108 North Court
Subdivision Name
City i
State
zip
Atlantic Beach 1
NC
28512 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
910 — 520- - 3614 ext.
I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak River Basin
Bogue Sound
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Bogue Sound/ Atlantic Ocean
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work We within.
Town of Atlantic Beach
4. Site Description
a. Total length of shoreline on the bad (ft.)
b. Size of entire tract (sq.ft.)
9T
27,051 SF
c. Size of individual lots)
d. Approximate elevation of tract above NHW (normal high water) or
27051, 1 1
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
5' ®NHW or ❑NWL
e. Vegetation on tract
indigenous plants and shrubs
f. Man-made features and uses now on tract
Single family dwelling, 5' x 190' pier and 10' x 20' platform.
g. IdenBy and describe the existing land uses adjacent to the proposed project site.
Single Family Home
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Residential
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA
If yes, by whom?
I. Is the proposed project Iodated in a National Registered Historic District or does n involve a ❑Yes ONO
National Register listed or eligible property?
C E I V E
<Form continues on next pagll MAR 0 8 2017
DCM- MHD CITY
252-808-2808 :: 1-888.4RCOAST :: www.nc con sta lmanagement. net
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (1) Are there wetlands on the site? ®Yes ❑No
(ii) Are there coastal wetlands on the site? ®Yes ❑No
(ili) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
existing septic system
o. Describe existing drinking water supply source.
Town of Atlantic Beach
p. Describe existing storm water management or treatment systems.
Existing Sheet flow
5. Activities and Impacts
a. Will the project be for commercial, public, or private use ❑Commercial ❑Pub)irJGovemment
SPnvate/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
We propose to extend existing pier 268' ( total length will be 458' ) in order to reach a water depth that enables Mr Wall to
use and dock his 2 boats. We will also be installing 6 tie pilings for this purpose. The floating dock will allow easy access to
his boats.
a Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
We will be using a push boat and barge with excavator on board. A vibratory hammer to install pilings and various hand
tools. Equipment will be stored on site until completion.
d. List en development activities you propose.
Construct access addition with 1 fixed platform and 1 floating platform.
e. Are the proposed activities maintenance of an existing project, new work, or both? New
f. What is the approximate total disturbed land area resulting from the proposed project? N/A ❑Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
N/A
I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ®No ❑NA
j. Is there any mitigation proposed? ❑Yes NNo ❑NA
If yes, attach a mitigation proposal.
<Form continues on back> MAR 0 8 2017
252-808-2808 :. 1-888-4RCOAST ;; www.nccoastaimanagement.net TY
Forth DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
t3. Additionallnfonnation
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
insNrctlon booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plot (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project Is any portion already complete? If previously authorized work, Deady indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. TM eppmprieto application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certNfed mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name Town of Atlantic Beach/ David Walker Phone No. 262-726-4466
Address 125 West Fort Macon Rd Atlantic Beach, NC 28612
Nome Wiilfiam R Bizzeli Phone No. 252521-1306
Address 3423 Buena Vista Ct Kinston, NC 28504
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permihee, and issuing dates.
GP 45264 issued 5.17-05
h. Signed consultant or agent authorization form, lt applicable.
L Wetland delineation, if necessary.
J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Mast be signed by properly owner)
k. A ataternIII: t of cornpfiance wiN the N.C. I ill Iarlental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves exQenditure
of public funds or use o€ public toilets, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
L c:ertmcatlon and Permission to Enter on Land I
I understand that any permit issued in response to this application will allow only the development descdbed in the application.
The project will be subject to the conditions and restrictions contained in the pemtit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certifythatthe information provided in this application i
'/ % 1 to the best of my kfIOWIC/d
Print NamTgQE.
Data _. e i� f
Signature
Please indicate application attachments pertaining to
DDCM MP-2 Excavation and Fill Information
DDCM MP-3 Upland Development
®DCM MI Structures Information
sed project.
❑DCM I Bridges and Culverts
RECEIVED
MAR 14 2017
DCM- MHD CITY
1.888-4RCOAST ,. www.ecr.n ..,;;yraac}ammni.nos
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. In Is the docking facility/marina:
[]Commercial ❑PubliclGovernment ®Private/Community
❑This section not applicable
b. (i) Will the facility be open to the general public?
[]Yes ®No
a (i) Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? ❑Yes ®No
(ii) Number 1
If yes:
(iii) Length 268'
(ii) Number _
(iv) Width 5'
(iii) Length
(v) Floating ❑Yes ®No
(iv) Width _
(v) Floating ❑Yes ❑No
e. (i) Are Platforms included? ®Yes ❑No
f. (i) Are Boatlifts included? ❑Yes ®No
If yes:
If yes
(ii) Number 2
(in Number
(iii) Length 20_,_12'
_
(iii) Length
(iv) Width 6' 26'
(iv) Width
(v) Floating ®Yes ❑No
_
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Nu�ber of slips proposed
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
(ii) Num..{Ib.,�e��r of slips existing .Q�. �
®�
maintenance service
M7 „�Q-,/vtrt,�C.QxR.(il+
❑ Dockage, fuel, and marine supplies
❑ Dockage ('wet slips-) only, number of slips: _
❑ Dry storage, number of boats: _
❑ Boat ramp(s); number of boat ramps. _
❑ Other, please describe.
i. Check the proposed type of siting. j. Describe the typical boats to be served (e.g., open runabout,
❑ Land cut and access channel charter boats, sail boats, mixed types).
❑Open water, dredging for basin and/or channel Open runabout
®Open water; no dredging required
[]Other; please describe:
k. Typical boat length. 31' . 20' L (i) Will the facility be open to the general public?
m. (i) Will the facility have tie pilings? ❑Yes ®No
®Yes ❑No (iRECEIVED
i) If yes number of be pilings?
MAR 0 8 2017
252-808-28o8 :: 1-888-4RCOAST :: www.nccoastalmanaoement net
reviserle 9t a
Form DCM MP-4 (Structures, Page 2 of 4)
2. DOCKING FACILI Y/NARINA OPERA77ONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: _; Location:
❑ Showers
❑ 8oatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
C. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of 'No Sewage Discharge' signs proposed.
00 Give the location and number of -Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h Give the number of channel markers and 'No Wake' signs proposed. _
I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
J. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin Bushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
DCrit IV D
in. Is the marina/docking facility proposed within a primary or secondary nursery area? MAR 0 8 2017
❑Yes ❑No
DCM- MHD CITY
<'.52-808-2808 :: t-888-4RCOAST :: wwwmccoastalmanagement net
revised: 12/27/06
Form DCM MP-4 (structures, Page a of 4)
n. Is the marma/docking facility proposed within or adjacent to any shellfish harvesting area?
[]Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB _
❑WL []None
p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s)
[]Commercial ❑Pubiic/Govemment ❑Private/Community
(ii) Number _
(iii) Length _
(iv) Width _
Note: Roofed areas are calculated from driptine dimensions.
4. GROIN (e.g., wood, sheeloile, etc. If a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable]
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length _
c. Maximum distance beyond NHW, NWL or wetlands
b. Average distance from NNW, NWL, or wetlands
6. MOORING PILINGS and BUOYS ®This sectim not applicable
❑Commercial ❑Publir/Govemment ❑Privatefcommunity
c. Distance to be placed beyond shoreline _
Note: This should be measured from marsh edge, it present.
e. Arc of the swing _
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
MAR 0 8 2017
DCM- MHD CITY
252-808-2808 :: 1.888-4RCOAST :: www.nccoastalmanaaement net
revised: 12/27/06
a. Proximity of sbwufe(s) to adjacentriparian property lines b. Proximity of structure(s) to adjacent docking facilities.
16-20' 20'
Note: For buoy or mooring piling, use arc of swinq including length
of vessel.
c. Width of water body
7700 Ft
e. (i) Will navigational aids be required as a result of the project?
QYea ®No [jNA
(il) If yes. explain what type and how they will be implemented.
d. Water depth at watenvard end of structure at NLW or NWL
4V
S. OTHER
` This section not applicable
a. Give complete description:
J',1 41%�
Data
RECEIVED
MAR 14 2�17
pCM. MHp CITY
::`'c•at1e3-k8:3�} :€ t-88&-4RCCii:.!iT .: www»cc,:as4a4xn;.�rp�appnexsnr.nrr.
DIVISION OF COASTAL MANAGEMENT
APPLICATION TRANSMITTAL AND PROCESSING RECORD
APPLICANT: Ben Wall County: Carteret
LOCATION OF PROJECT: 108 North Court, along the Bogue Sound, in the Town of Atlantic Beach.
DATE APPLICATION RECEIVED COMPLETE BY FIELD: 3/14/17 .
FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: No
CONSISTENCY DETERMINATION: Attached: No To Be Forwarded: Yes
FIELD REPRESENTATIVE: Heather Styron
DISTRICT MANAGER REVIEW: Roy Brownlow
B) DATE RECEIVED BY MAJOR PERMITS UNIT:
PUBLIC NOTICE REC'D: Yes
ADJ. RIP. PROP NOTICES REC'D: No
APPLICATION ASSIGNED TO- Gregg Bodnar
C) 75 DAY DEADLINE: V I�4 1 r)
MAIL OUT DATE: 4/20/17
FEDERAL DUE DATE:
PERMIT FINAL ACTION: ISSUE
DENY
DISTRICT OFFICE: Morehead City
FEE REC'D: $250.00
END OF NOTICE DATE: 4/25/17
DEED REC'D: Yes
ON: 4/20/17
150 - DAY DEADLINE: STATE DUE DATE: 540/1
FED COMMENTS REC'D:
DRAFT ON
AGENCY
DATE COMMENTS
OBJECTIONS:
NOTES
RETURNED
YES NO
Coastal Management - Regional Representative
2 (
Coastal Management- LUP Consistency Detemdnation
Division of Community Assistance
5�3
DENMR-Land Quality Section
Division of Water Resources401
IQ., 17
X
AQ
DEMLR-Strom Water Management
,Ii�
-{Z7
)c
State Property Once
Division of Archives & History (Cultural Resources)
DMF-Shellfish Sanitation
l(
DWR-Public Water Supply
x
1�7 11
Division of Highways
Wildlife Resources Commission
��
Sri
Local Permit Office
,I
DCM-Fisheries Resource Specialist
Carps of Engineets11-I-1
x
-iAv Zp 1-7 oo.e—o A-4 /1P—s
Coastal Management
ENVIRONMENTAL QUALITY
MEMORANDUM:
TO:
GREGG BODNAR
FROM:
HEATHER STYRON
THRU: ROY BROWNLOW
ROY COOPER
6"'emor
MICHAEL S. REGAN
secmary
BRAXTON DAVIS
Direclor
April 3, 2017
SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT- BEN WALL, PIER
EXT. AND SLIP RELOCATION PROJECT, ATLANTIC BEACH, CARTERET COUNTY
The following are my comments and recommendations regarding the aforementioned
proposal. The proposal is for a pier extension, slip relocation, mooring pilings, fixed platform
and a floating platform.
There is currently a 2 slip docking facility along Bogue Sound along the north side of this
property. Per the applicant due to the shallow water depths as well as submerged aquatic
vegetation they are proposing to add a pier extension with a fixed platform, add a floating
platform for loading and unloading, relocate the two existing slips and add 6 mooring pilings.
There would be a total of two slips (existing) that would be relocated north along this parcel.
The proposed docking facility (includes existing pier and platform as well as new pier, pilings
and platforms) would extend a maximum of 390' waterward of the edge of marsh and a
maximum of approximately 425' from NHW. The water depths within the relocated slip areas
and floating platform are -4' to —4.8' nlw. All portions of the development would be landward
10' of the historical channel and within the existing pier head length along this shoreline.
The development conforms to the guidelines set forth under 15A NCAC 07H .0208. Assuming
that state and federal agencies concur with the proposal, the District recommends the project
be authorized as proposed, contingent upon the following conditions:
• A total number of two slips only authorized by this permit.
• All parts of the 2-slip docking facility shall be landward of the historical channel
and not exceed a maximum distance of 390' from the edge of marsh.
• The placement of the docking facility shall avoid SAV habitat to the maximum
extent possible.
State of North Carolina I Environmental Quality 1 Coastal Management
400 Commerce Ave I Morehead City, NC 28557
252 808 2808
A RECEIVED
cosrsrat.lktanaa�i�nY'
ENYIaONMBNTAI gVALRY. APR 24 7017
OCM-Flsherles
WARO
April 20, 2017
MEMORANDUM:
TO: Shane Staples
Division of Coastal Management
FROM: Gregg Bodnar
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: ' Ben Wall c/o Bogue Banks Marine Construction, Inc.
R.OY' C-O'OPER'
Governor
MICHAEL S. tt6GAN.
Setretoty
BRAXTON C. DAVIS
Utrador
Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position. or viewpoint on the proposed project and return this form by
Nlitiy 10, 2017..Ifyou have any questions regarding the proposed. project, please contact Heather Styron,
Per`. officer at"(252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: /This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objec s to the project for reasons described in the attached comments.
SIGNED DATE �G�7
State of North Carolina I EnYlronmetaai goahty1 Coasta(Managemern
Morehead City. Offi e 1 400 CommerteAvenue I Morehead ory NC 28557
262,8082808
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Local Permit Officer
Town of Atlantic Beach
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808 When appropriate, in-depth comments with supporting data is requested.
REPLY: VIThis agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are .
incorporated. See attached.
objects to the project for reasons described in the attached comments.
DATE 2!
MIPiNEUC SHAGve
State of North Carolina I Environmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808
_0
F
Coastal Management
ENVIRONMENTAL QUALITY
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
ID) t G E V EII
APR 2 12017
Shellfish Sanitation E Rec "
W et Duality Secuonational
Shannon Jenkins
Shellfish Sanitation
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Direaor
RECEIVED
APR 26 2017
DCM- MHD CITY
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: / This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED / /1'.�A// �d� DATE L{/dy'1%
fib'- <Shannan J" Kins
State of North Carolina I Environmental Qualhy l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead Chy, NC 28557
2528082808
Coastal Management
ENVIRONMENTAL QUALITY
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
RECEIVED
APR 2 4 7017
DOA
STATEPROPERTY
OFFICE
Tim Walton
State Property Office
Gregg Bodnar
Major Permits Processing Coordinator
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
BRAXTON C. DAVIS
Director
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency o ects to the project for reasons described in the attached comments.
SIGNED DATE L
RECEIVED
MAY 01 2017
State of North Carolina I Environmental Quality I Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808 DCM- MHD CITY
.1
a
x�
Coastal Management
ENVIRONMENTAL WALIW
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Roy COOPER
Covemor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
Lee Padrick
Division of Community Assistance
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This age, :has no objection to the project as proposed.
L- Tl— s agency has no comment on the proposed project.
This agency_ approves of the project only if the recommended changes are
mcorporated.'See attached.
This agency objects to the project for reasons described in the attached comments.
r_ •
SIGNED DATE
StateofNor6C=1m DMronmentalQwhylC�OstdManagement
MoreheadMYData 1,400Commwwmem, I Morehead Oly,NC 28557
m AnR2808 _...
ROY COOPER
Governor
t;<
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Coastal Management Dimaor
ENVIPONMENTAL QUALITY
D' . 2 `� 0 1Sps�
APR 2017
RECEIVED
April 20, 2017 6CMNWdio
NdM
MEMORANDUM: �!/i� °b,
TO: Maria Dunn
NC Wildlife Resources Commission
FROM: Gregg Bodnar
Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Ben Wall c/o Bogue Banks Marine Construction, Inc.
Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: /This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED M Z. lDATE 5-y*zia RE E I V E D
MAY 0 4 2017
State of North Carolina I Environmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808 DCM- MHD CITY
e
Coastal Management
ENVIRONMENTAL OUALITV
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
Rachel Love-Adrick
Division of Coastal Management
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review -
Ben Wall c/o Bogue Banks Marine Construction, Inc.
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
s Eii is to the project for reasons described in the attached comments.
SIGNED DATE
State of North Carolina I Environmental Quality I Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
252 808 2808
Coastal Management
ENVIRONMCNTAL QUALITY
MEMORANDUM
TO: Gregg Bodnar, Major Permits Processing Coordinator
Division of Coastal Management
FROM: Rachel Love-Adrick, District Planner tQp
Division of Coastal Management
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
SUBJECT: Major Permit request by Ben Wall c/o Bogue Banks Marine Construction
DATE: May 4, 2017
Consistency Determination: The request is consistent with/not in conflict with the 2008 Town of
Atlantic Beach Core Land Use Plan certified by the CRC on July 24, 2008.
Overview: The applicant is proposing to extend an existing pier with a fixed platform, relocate
slips, a new floating platform and 6 mooring pilings at 108 North Court., Atlantic Beach Carteret
County, North Carolina. Existing site improvements include a single-family residence, driveway,
pier and platform, and an onsite septic system.
The project is in Estuarine Waters (EW) and Public Trust Area (PTA) Areas of Environmental
Concern (AEC). The waters of Bogue Sound at the site are classified as SA/HQW, are open to the
taking of shellfish, and is not designated as a Primary Nursery Area. SAV is present at the project
area, and the substrate is sand. There is a 97' x 56' section of Coastal Wetlands with scattered
oysters along the 97' shoreline.
Anticipated impacts resulting from this project are expected to include: the shading and
incorporation of 1,235 ft2of shallow bottom SAV habitat, shade 537 ft2 and incorporate 1,585 ftZ
of open water (non-SAV).
Basis for Determination:
The project site is in the Town of Atlantic Beach and is subject to the town's 2008 Land Use Plan.
The Future Land Use Map (FLUM) designates the site as Single Family Residential and the subject
AECs as "Conservation". Development within the designated AECs is limited by CAMA regulations
and development guidelines.
Land Use Policies: The following LUP policies may be applicable to this request.
State of North Carolina I Fnvironmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557
2528082808
Policies - Conservation
P.22 - The Town of Atlantic Beach supports 15A NCAC 71-1for the protection of all AECs.
P.29 - The Town of Atlantic Beach supports the construction of all marinas, docks, and
piers which minimize or eliminate adverse effects on coastal wetlands and subaquatic
vegetation and comply with 15A NCAC 7H minimum use standards. Marina development
standards are outlined on pages 73-76.
P.33 - The Town of Atlantic Beach supports state and federal regulations for the preservation/protection
of freshwater (404) and coastal wetlands.
1.34 (3) The construction of all marinas, docks and piers shall minimize or eliminate adverse effects on
coastal wetlands and subaquatic vegetation.ond comply with 15A NCAC 7H minimum use standards (see
page 73). Schedule: Continuing Activity.
State of North Carolina I Environmental Quality l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557
252 8082808
Coastal Management
ENVIRONMENTAL QUALITY
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
Heidi Cox
Public Water Supply
Gregg Bodnar
Major Permits Processing Coordinator
ROY COOPER
Governor
M►CHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
�IVI APR 2 y 2"
W;R� P bwMerl?,
Wa a SOppces
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: ✓ This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED tc. DATE 4 2717
dr RECEIVED
State of North Carolina I Environmental Quality l Coastal Management MAY 10 2017
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808 D M— MHD CITY
Coastal Management
ENVIRONMENTAL QUALITY
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
tzCEF'�
1>P y -017
Dan Sams
Division of Energy, Mineral & Land Resources
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
Carteret County, at 108 North Court along Bogue Sound, in the '['own of
Atlantic Beach.
Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE I 28 2-6 / 7
DECEIVED
MAY 10 2017
state of North Carolina I Environmental Quality I Coastal Management
Morehead City lNFlce 1 400 Commerce Avenue I Morehead Qty, NC 28557 DC M- M H D CITY
252:808 2808
Coastal Management
ENVIRONMENTAL QUALITY
April 20, 2017
Georgette Scott
Division of Energy, Mineral, & Land Resources
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
ECEIVE
APR 2 4 2ai?
BY: -
FM: ( Gregg Bodnar
p Major Permits Processing Coordinator
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Ben Wall c/o Bogue Banks Marine Construction, Inc.
Project Location: Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed. RECEIVED
This agency has no comment on the proposed project. MAY 10 2017
This agency approves of the project only if the recommended chair QTY
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED t�JL DATE AV-10
State of North Carona I Environmental Qualtty l Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557
2528082808
11,
I
Coastal Monagem en t
ENVIRONMENTAL QUALITY
April 20, 2017
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
APR 282017
Renee Gledhill -Early
NC Department of Cultural Resources
Gregg Bodnar
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Ben Wall c/o Bogue Banks Marine Construction, Inc.
ROY COOPER
Cmernor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
Carteret County, at 108 North Court along Bogue Sound, in the Town of
Atlantic Beach.
Proposed Project: Proposes pier extension with fixed platform for the existing 2-slip docking
facility, slip relocation, floating platform and six mooring pilings.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
May 10, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED _, C��.r DATE eS/ll�i J
Stateol'North Carolina I Environmental Quality I Coastal Management
Morehead City OfAce 1 400 Commerce Avenue I Morehead City, NC 28557
252 808 2808
MAY 092017
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
. 69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
May 16, 2017
Regulatory Division
Action ID No. SAW-2017-00809, General Permit No. 197800056
Mr. Ben Wall
5416 Captains Lane
Wilmington, North Carolina 28409
Dear Mr. Wall:
Through coordination with the North Carolina Division of Coastal Management we have
learned of your request to expand an existing docking facility located at 108 North Court, along
Bogue Sound in Atlantic Beach, Carteret County, North Carolina. Coordinates are: 34.7028 N, -
76.7759 W.
On January 1, 2017, we renewed general permit No. 197800056, (copy enclosed), that
authorizes the maintenance, repair, construction and installation of piers, docks, boathouses and
boat shelters, pilings, mooring buoys, dolphins, jetties, groins and breakwater structures in
navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the
Rivers and Harbors Act of 1899.
Your work is authorized provided it is accomplished in strict accordance with your
submitted plans, the enclosed general conditions, and the following special conditions:
1. All work authorized by this permit must be performed in strict compliance with the
submitted plans received on 25 April 2017, which are a part of this permit.
Please read the enclosed permit to prevent an unintentional violation of Federal law. As
this Department of the Army regional general permit does not relieve you of the responsibility to
obtain any other required approvals, you should contact appropriate State and local agencies
before beginning work.
-2-
Thank you for your time and cooperation. If you have questions, please contact Ms. Liz
Hair, of the Wilmington Regulatory Field Office, telephone: (910) 2514049.
Sincerely,
8--�141�(Li
k
Liz Hair, Project Manager
Wilmington Regulatory Field Office
Enclosure:
GP 56 conditions
Plans
Copies Furnished (with enclosure):
Electronic Copy Furnished (without enclosures):
NCDEQ/DCM; Mr. Doug Huggett
NCDEQ/DWR; Mr. Robb Mairs
NCDEQ/DCM; Mr. Gregg Bodner
NCDEQ/DCM; Mr. Ryan Davenport
NCDEQ/DWR; Ms. Karen Higgins
Bodnar, Gregg
From: Mairs, Robb L
Sent: Thursday, May 18, 2017 2:52 PM
To: Bodnar, Gregg
Subject: RE: Project comments
Gregg,
Wall will not require written concurrence (DWR # 20170509). As per the UNC IMS application, again we need to know
how the Corps will issue their permit, but we do not see a water quality concern on our end.
Thanks,
RM
From: Bodnar, Gregg
Sent: Tuesday, May 16, 2017 3:39 PM
To: Mairs, Robb L <robb.mairs@ncdenr.gov>
Subject: Project comments
Hey Robb,
Hope all is well. Just checking in on a few with deadlines this month.
Ben Wall
UNC IMS (ASUs in Middle Marsh) USACE has it out for review
Thanks again,
G regg
Gregg Bodnar
Assistant Major Permits Coordinator
Division of Coastal Management
Department of Environmental Quality
252 808 2808 ext 215 office
Gregg. Bodnar(d),ncdenr.gov
400 Commerce Ave
Morehead City, NC 28557
PC.
-�-�>Nothing Compares.
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Ben Wall c/o Bogue Banks Marine Construction, Inc.
2. LOCATION OF PROJECT SITE: 108 North Court along Bogue Sound, in Atlantic
Beach, Carteret County.
Photo Index - 2006: 41-8084 grids J, K and L-6
Longitude: 34°42'09.82 Latitude: 76°46'33.58
INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 4/4/17
Was Applicant Present —No
Photos Taken — No
PROCESSING PROCEDURE: Application Received:
Officially Submitted: 3/8/17
Complete — 3/14/17
Office - MHC
6. SITE DESCRIPTION:
(A) Local Land Use Plan —Atlantic Beach- Certified 7/24/2008
Land Classification from LUP — Single Family Residential/Conservation
(B) AEC(s) Involved: EW, PTA
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing — Onsite Septic System
Planned - None
(F) Type of Structures: Existing — House, driveway, pier and platform,
Planned -the addition of pier extension with fixed platform,
slip relocation to the north, new floating platform and 6
mooring pilings along Bogue Sound.
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Open Water (not over SAV)
N/A
N/A
537 ft2 Shaded
1,585ft2 Inc.
(B) Open water (over SAV)
N/A
N/A
1,235 ft2 Shaded
1,235 ft2 Inc.
(D) Total Area Disturbed 2,692 ft2
(E) Primary Nursery Area: No
(F) Water Classification: HQW/SA Open: Yes
8. Proiect Summary:
The proposed project is for a pier extension with fixed platform for the existing 2-slip
docking facility, slip relocation, floating platform and six mooring pilings along Bogue
Sound.
Field Investigation Report
Ben Wall
108 North Court
Page 2 of 3
9. Narrative Description:
The Ben Wall project is located at 108 North Court within Atlantic Beach, Carteret
County. The site is found by following Highway 70 East (Arendell St.) to the Atlantic
Beach Bridge ramp. Continue over the Atlantic Beach bring along the Atlantic Beach
Causeway until you reach the 4-way stoplight. Turn left (west) at the light and continue for
approximately 11,700' (2.2 miles) until you reach Lee Drive (Dollar General at the corner).
Turn right onto lee Drive and continue until you reach Hoop Pole Creek Drive. Turn left
and then immediately right onto North Court. The property is located at the end and along
the east side of the existing cul-de-sac.
The residential property is .62 acres (27,051 sf) in its entirety and 5' above nhw. Bogue Sound
runs along the south side of the property. The upland vegetation mainly consists of lawn
grasses, shrubs, and a few trees. There is a 97' x 56'section of coastal wetlands with scattered
oysters along the 97'of shoreline on Bogue Sound. The waters of Bogue Sound have
approximately 2.5'to 3' lunar tidal amplitude.
The Division of Water Resources classifies this area as HQW/SA Waters. This area of Bogue
Sound is not designated as a Primary Nursery Area and is open to the taking of shellfish. The
Town of Atlantic Beach Land Use Plan classifies this area as Single-family Residential with
Conservation within the AECs. According to Google Earth spacial data, there is a historical
channel approximately 419' from the marsh edge and would be located approximately 15'
waterward (south) of the proposed pier, pier platform, slip relocation and mooring pilings.
Water depths within this project location are-3.6'nlw/mlw to-4.8nlw/mlw, depending on
location, with connecting water depths of -5' plus nlw/mlw. The bottom substrate is sand.
Bogue Sound is approximately 7,700feet (1.46 miles) wide at this location.
10) Proposed Development:
Due to the shallow water depths over SAV habitat and the location of the existing shorter
pier the applicant wishes to add a pier extension with a fixed platform, relocate the existing
slips to the south, add a floating platform and 6 mooring pilings. There is an existing pier
and platform that the new development would extend from for a total of 390' from the
marsh edge and 425' from normal high water. The total length of the existing components
as well as the proposed development would not exceed a maximum of 470' from the
existing high ground. Due to the shallow water depths and SAV habitat along the existing
shorter pier, platform and slip areas, the applicant is asking for the construction of an
additional 5' x 268' pier, a 12' x 26' fixed platform, a 6' x 20' floating platform, six
mooring pilings (help delineate slip areas) as well as the relocation of the two existing slips
to the south. This area has (from the edge of coastal wetlands) of approximately 247' of
SAV habitat and deeper water depths (>-2'nlw) occurring at approximately 350' from the
marsh edge.
Field Investigation Report
Ben Wall
108 North Court
Page 3 of 3
In order to achieve the necessary depths to span this shallow SAV habitat, the pier,
platforms, slips and mooring pilings would need to be located 470' from the high ground,
425' from normal high water and 390'from the marsh edge. The water depths from 400' to
500' would maintain the required rate of 1' of fall as well as the deeper water depths (>2'
nlw) over the SAV habitat. The proposal is to add a 5' x 268' pier extension that would
intersect a 12' x 26' fixed platform. There would be a total of six mooring pilings that
would delineate the re -located two slips as well as a 6' x 20' floating platform along the
northeast side of the proposed fixed platform. The most waterward portion of the platform
and mooring pilings would not exceed a maximum distance of 390' from the edge of
marsh. All parts of the docking facility would be landward 10' of the historic channel and a
distance of 30' from the western riparian corridor and 12' from the eastern riparian
corridor (waived). There would be a total of two wet slips with 6 mooring pilings (three for
each slip). The water depths within the slip areas for the proposed dock addition are -3.7' +
nlw/n lw with connecting water depths of -3' plus nlw/mlw. There are piers along the
shoreline to the east and west of this property that extend farther offshore than this
proposal. The proposed dock extension would remain within the existing pier head length.
11. Anticipated Impacts:
The proposed dock would shade and incorporate 1,235 ftz of shallow bottom SAV habitat,
shade 537sf and incorporate 1585 ftZ of open water (non-SAV). The development would
not increase the total number of slips from 2 (existing but relocated). The proposed
placement of the pier addition, platforms and mooring pilings would reduce the likelihood
of prop scarring and incidental prop dredging of the existing SAV habitat. The deeper
water depths (>-2'i lw) within the new pier location and the shorter distance that the
applicants would need to traverse in order to reach the deeper water has the potential to
help preserve and re-establish the SAV habitat closer inland. The increase in suspended
sediment and turbidity levels from the pier placement would be temporary, occur while the
pier placement is taking place and should be minimal given the bottom composition. The
location of the proposed docking facility should not be a hindrance to navigation due to the
fact all portions would be located landward of the historical channel (10') however it is
recommended to add reflectors (meeting Coast Guard Standards) for safety due to the
proposed length.
Name: Heather M. Styron Date: 4/6/17 Office: Morehead City
it
Consideration: $10.00 & Gift
Parcel ID No.: 13-39D-1-25
Melanie Arthur 2P
CARTERET COUNTY
MA Date 09/02/2005 Time 10:04:00
OR 1130263 Page r of 2
THIS DEED OF GIFT made and entered into this 19th day of July, 2005 by and
between Dr. George H. WALL and Billie O. WALL, husband and wife, whose address is 3955
Winding Way Road, S.W., City of Roanoke, Virginia 24015, as Grantors, and Benjamin Evans
WALL, whose address is 5416 Captains Lane, Wilmington, North Carolina, 29409, as Grantee;
WITNESSETH:
THAT FOR AND IN CONSIDERATION of Ten Dollars ($10.00) paid by the Grantee
to the Grantors, natural love and affection, and other good and valuable consideration, the receipt
of which is hereby acknowledged, the Grantors do hereby GIVE, GRANT and CONVEY, with
General Warranty and Modem English Covenants of Title, unto Benjamin Evans Wall, all of the
certain lot or parcel of land situate in the City of Morehead Township, Carteret County, North
Carolina, and more particularly described as follows:
BEING KNOWN and designated as all of Lot Twenty -Eight (28) of Coastal
Shores Subdivision, as shown on that certain map recorded in Map Book 15, Page
23 of the Carteret County Registry.
This conveyance is made and accepted subject to the Restrictive Covenants of
record in Book 408, page 43, Carteret County Registry.
BEING the same property conveyed to Dr. George Wall and Billie O. Wall, his
wife, b� deed from Gloria F. Graham and Douglas A. Graham, her husband, dated
the 16 day of July 1982 and recorded in Book 467, Page 466, Carteret County
Registry.
This deed is made subject to all easements, reservations, restrictions and conditions of
record affecting the hereinabove described property.
NONTN CAROLINA, CARTERET COUNTY
The foregoing cortificate(s) of Notary Public(s) Wets
certified to be correct. This instrunreM and this cerW
cote are duty regis red at the date and ti* and in
the Book and Pa shown on the f rstIRW hereof.
RECEIVED
MAR 0 S 2017
DCM- MHD CITY
XIT[NESS the fol"-mg s: and seals
(SEAL)
George H. Wail
1,11.Qzt S. fa& (SEAL)
Billie O. Wall
COMMONWEALTH OF VIRGINIA )
To -wit:
CITY OF ROANOKE ) / 5
^ s�
The foregoing instrument was acknowledged before me this of day of+,bjjT-2005 by
George H. Wall and Billie O. Wall.
My Commission Expires:
Notary Public
RECEIVED
MAR 0 8 2017
DCM- MHD CITY2
�`3v
'This is a word processing form to be completed in Microsoft Word"""
NC Division of Coastal Management
Major Permit Application Computer Sheet
(11/012012)
Applicant: Ben Wall
Date: 4/3/17
Project Site County Carteret
Staff., HMS
District: ❑Elizabeth City El Washington
®Morehead City [-]Wilmington
Project Name: Wall pier extension
Rover File: N/A
Date of initial application submittal (EX1/8/2007) 3/8117
Date application received as complete" in the Field office (EX. 1/8/2007): 3114117
Permit Authorization: ®CAMA ❑Dredge & Fill ❑Both
SITE DESCRIPTION/PERMIT INFORMATION
PNA: []Yes ®No
Photos Taken: Yes ❑ No❑
Setback Required (riparian): ®Yes ❑No
Critical Habitat: []Yes ®No ❑Not Sure
15 foot waiver obtained. El Yes ®No
Hazard Notification Returned:
[-]Yes ®No
SAV. ®Yes ❑No [-]Not Sun:
Shell Bottom: ❑Yes ®No ❑ Not Sure
Temporary Impacts: ®Yes ❑No
Sandbags: ❑Yes ®No ❑ Not Sun:
Did the land use classification come from
countyLUP: ❑Yes ®No
Mitigation Requited (optional):
❑Yes ®No
Moratorium Conditions: ❑Yes ®No
❑NA
Environmental Assessment Done:
❑Yes ®No ❑NA
SECONDARY WATER CLASSIFICATION— OPTIONAL (choose MAX of 4)
❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW)
M High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORM
WETLANDS IMPACTED
❑ (404) Corp. of Engineers (Jurisdictional
❑ (LS) Sea lavender (Umonium sp.)
❑ (SS) Glasswort ( Salicomia sp.)
wetlands)
❑ (CJ) Saw grass (Cladium jamaicense)
❑ (SA) Salt marsh cordgrass (Spartina
❑ (SY) Salt reed grass (Spartina
altemiflora)
cynosuroides)
❑ (DS) Salt or spike grass (Distichlis
❑ (SC) Bullrush or three square (Scirpus
❑ (TY) Cattail (Typha sp.) ,
spicata)
sp.)
❑ (JR) Black needlerush (Juncus
❑ (SP) Salt/meadow grass (Spartina
roemerianus)
patens)
APPLICATION FEE
❑ No fee required - $0.00
❑ III(A) Private w/D&F up to 1 acre; 3490
❑ 111(D) Priv. public orcomm w/D&F to 1
can be applied - $250
acre; 3490 can't be applied - $400
❑ Minor Modification to a CAMA Major
❑ Major Modification to a CA MA Major
❑ IV Any development involving D&F of
permit - $100
permit - $250
more than 1 acre - $475
❑ Permit Transfer- $100
❑ 111(B) Public or commercial w/D&F to 1
❑ Express Permit - $2000
acre; 3490 can be applied - $400
❑ Major development extension request -
❑ ll. Public or commercial/no dredge
$100
and/or fill - $400
® 1. Private no dredge and/or rill - $250
❑ III(C) Priv. public or comm w/D&F to 1
acre; 3490 can be applied; DCM needs
DWQ agreement - $400
252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 02/15110
IBC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3)
Applicant: Ben Wall
Date: 413117
Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of
measurement found in your Activities code sheet.
TYPE
REPLACE
Activity Name
Number
Choose
Choose
Dimension 1
Dimension 2
Dimension 3
Dimension 4
One
One
Pier exL
1
New Worts ®
Replace
268'
S'
Maint El
❑Y.®N
Platformfixed
I
New Work®
Replace
26'
12'
Maint ❑
❑ Y ® N
Platform
1
New Work El
Replace
20'
10'
floating
Maint ❑
❑ Y ❑ N
boatslips
2
NewWork[]
Replace
2
Maint ❑
❑ Y ❑ N
Mooring
6
New Work❑
Replace
6
piling
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint El
❑Y❑N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
-
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work El
Replace
Maint ❑
❑ Y ❑ N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work
Replace
Maint [-I
❑Y❑N
New Work ❑
Replace
Maint ❑
❑ Y ❑ N
New Work❑
Replace
Maint ❑
❑ Y ❑ N
revised 02/15/10
NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3)
4
Applicant Ben Wall
Date: 413117
Describe below the HABITAT disturbances for'the application. All values should match the name,'and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
Shallow bottom
Dredge ❑ Fill ❑ Both ❑ Other ®
2692
2692
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill,❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
-
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-28o8 :: 1-888-4RCOAST :: w .nccoastaimanagement.net revised: 02/15110
Wa.e
v[ ;vvT
9g
Coastal Management
.ENVIRONMENTAL QUALITY
Ben Wall
C/o Bogue Banks Marine Construction, Inc.
111 Turner's Dairy Road
Morehead City, NC 28557
Dear Mr. Wall:
ROY COOPER
Gr..rm"r
MICHAEL S. REGAN
Secreraip
BRAXTON DAVIS
Director
4/5/17
The NC Division of Coastal Management hereby acknowledges receipt of your application for State
approval for development at 108 North Court in Atlantic Beach, Carteret County. The complete package
was received on 3/15/17. The projected deadline for making a decision is 5/29/17. An additional 75-day
review period is provided by law when such time is necessary to complete the review. If you have not
been.notified of a final action by the initial deadline stated above, you should consider the review period
extended. Under those circumstances, this letter will serve as your notice of an extended review.
However, an additional letter will be provided on or about the 75th day.
If this agency does not render a permit decision within 70 days from 3/15/17, you may request a meeting
with the Director of the Division of Coastal Management and permit staff to discuss the status of your
project. Such a meeting will be held within five working days from the receipt of your written request and
shall include the property owner, developer, and project designer/consultant.
NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed
development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the
property of your proposed development. You should post this notice at a conspicuous point along your
property where it can be observed from a public road. Some examples would be: Nailing the notice card
to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the
road right-of-way where a private road would lead one into your property. Failure to post this notice
could result in an incomplete application.
An onsite inspection will be made, and if additional information is required, you will be contacted by the
appropriate State or Federal agency. Please contact me if you have any questions and notify mein writing
if you wish to receive a copy'of my field report and/or comments from reviewing agencies.
S' cerely,
Heather M.Styron
Coastal Management Representative
State of North Carolina I Enviro mental Quality I Coastal Management
400 Commerce Ave I Morehead City, NC 28557
252 808 2808
u
♦M►1/I♦M=�=1==I�
11
law
L,
I/177 i
AGENT AUTHORIZATION FORM FOR PERMIT APPLICATIONS
Name of Property Owner Applying for Permit: ��'� M\ n E— � & I I
Mailing address: 5L` 1 (2 C a P tc-u o S L c1 ✓) e
y\1 " 1 m\ ngC a 8 q 09
Telephone Number: q M 5 a 0 3 ts?
I certify that I have authorized jo� tie any's mariR e-- (agenticontractor),
to act on my behalf, for the purpose of applying and obtaining all CAMA permits
necessary for the proposed development of L2� r nn
at my property located at to(
This certification is valid through 1 L I l I LU 1 t (date).
(Property Owner Information)
/lam /L
U ` Signature
Tint or Type Name
Title, rrco. owner or trustee for property
J/2� l//
Date
CM 5aD 3io►y
Telephone Number
benw A0 &
Email Address
RECEIVED
MAR 0 8 2017
DCM- MHD CITY
U 21 U63d 1i 71J1:7►� 17 ZaI1 c l'I�PiI`.I ��i �iril_ FYI
I hereby certify that I own property adjacent to r✓� hi �t'1 �� «� 1 s
property located at 1�� Nerfh Court ("t1pPm'geu)cb�
2 e (Address, Lot, I ck, Road, at�i
on IJ�1 SOunJ in 9tlQYi jtC &IOC-h , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
1 have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback
/�(,,
G - il 5oo�t'1 Pju(oglType"Orr 1 MaCcm Kgr.
Zo4(i� li l/adl-Fi'r 6�k xsja
�nrraicier ap g tb 'Sao 3 (o �4 `'tea?� -5r� 7-25 -
Telephone Number/email address Telephone Number/email address
ganuaMom,�01q
IDate
Pr\\'\J l I C� he�lsv� �`(1� .✓1e �-Dat`f DECEIVED
'Valid for one calendar year after signature'
(Revised Aug. 2011%R 0 S 2017
DCM- MHD CITY
i hereby certifythat 1 own property adjacent to C-2e-ki) GVVY- ,-, \,,J G,L s
(4qa a or Prone'v wne;)
Property located at 101 N e C+h Ctuf �tt,
1) (kcid; see, Lot, ' l ck, R d,
on I� cf 1{ - Sound in 1 lC1F 1 ii' !�i_GL01 N.C.
�,^IU?rkr'aocr,✓z (C'ity1Town and/or County)
The appiicantpagldescribed to me, as shown below, the development proposed at the above
location.
1 have no objection to this proposal.
1 have objections to this proposal.
DESCRIP11ON slt DIOR DRA,.WNG Or PROPOSED DeJ, CFhj T.,
(ilCLb7C'iia! prcpcWr.Lj' Ea er11 Pr; '1''eeCr7,�::Erz ,^,aiow or awaC : an Sic draw -frig,'
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, [hit, or groin
must be set bac', a minimurn distance of 15' from my area of riparian access unless kivalved by
me. (If you w' to tnraive the setback, you mu t initial the appropriate blank belo�y.)
1 do wish to waive the 15' setback requirement.
I Qz, not wish to waive the 15' setback requirement
Q'PJ)sfatcZpglO 5ay 3 �, 14
Telephone hfumbar/email address
gt4luck ii�f 'awl
Date
'Valid for one calendar year after signature
i5d3acent Proms y ^vnfr_ar
to Nae
tress
C-
!7PS /3oG
MAR 0 8 2017
DCM- MHD CITY
r% i
Styron, Heather M.
From: Legals <legals@thenewstimes.com>
Sent: Monday, April 03, 2017 1:32 PM
To: Styron, Heather M.
Subject: Re: Ben Wall Major Permit
This ad is set and scheduled to run on April 5, 2017
in the amount of $ 44.99.
Proof:
NOTICE OF FILING OF
APPLICATION FOR CAMA
MAJOR DEMELOPMEf4F PERMIT
The Department of Environmental Duality hereby gives public notim as required by NCGS 113A.119(b) that appliralso bra development permit in an Area of Environmental Concern as designated under the CAMA vas
received on 3lWl7. A=thg to Ne eppliwtw, Ben Wa0 applied bra permit for a pier extension, fixed platform, floating platform and 8 mooring pilings at 108 North CourtAtlantic Beady, Carteret County.
A copy of the entire application maybe examined cr copied at the office of Heather Styron, NC Division of Coastal Management located at4g0 Commerce Avenue, Morehead City, NC, (252) 8062WB tludng normal
business hours.
Comments mailed to Braxton C.Davis,Director, Division of Coastal Management,400 Commerce Avenue, Morehead City, N.C. 28557, prior to 4 &17, will be considered in making the permit decision. Later comments will
be accepted and considered up to the time of pi decision Project moddicalmn may occur based on review and comment by the public and state and federal agendas. Notice of me permit decision In this matterwill be
provided upon wnden request
A5
On Apr 3, 2017, at 12:58 PM, Styron, Heather M. wrote:
Legal Advertisement Section 4/3/17
Re: Public Notice — Ben Wall, 108 North Court, Atlantic Beach, Carteret County
To Whom It May Concern:
Please publish the attached Notice in the 4/5/17, issue of the Carteret News Times.
The State Office of Budget and Management requires an original Affidavit of Publication prior to payment
for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an
original invoice to Arthur Stadiem, NC Division of Coastal Management, 400 Commerce Avenue,
Morehead City, North Carolina 28557, Telephone (252) 808-2808.
Thank you for your assistance in this matter. If you should have any questions, please contact me at our
Morehead City office.
Sincerely,
{der&-c4pon
Heather M. Styron
Coastal Management Representative
HMS
NOTICE OF FILING OF
A PPLICATION FOR CAMA
MAJOR DEVELOPMENT PERMIT
The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-
119(b) that application for a development permit in an Area of Environmental Concern as designated
under the CAMA was received on 3/14/17. According to the application, Ben Wall applied for a permit for
a pier extension, fixed platform, floating platform and 6 mooring pilings at 108 North Court, Atlantic
Beach, Carteret County.
A copy of the entire application may be examined or copied at the office of Heather Styron, NC
Division of Coastal Management, located at 400 Commerce Avenue, Morehead City, NC, (252) 808-2808
during normal business hours.
Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce
Avenue, Morehead City, N.C. 28557, prior to 4/25/17, will be considered in making the permit decision.
Later comments will be accepted and considered up to the time of permit decision. Project modification
may occur based on review and comment by the public and state and federal agencies. Notice of the
permit decision in this matter will be provided upon written request.
PUBLISHED ON: 4/5/17
Heather M. Styron
Field Representative
NC Divison of Coastal Managment
NC Department of Environmental Quality
252 808 2808 ext.216 Office
heather. m.stvron(a)ncdenr.gov Email
400 Commerce Ave.
Morehead City, NC 28557
<image001.png>
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
V+�
xxxxxxxxxxxxxxxx
Judy Allred
Legal Assistant — Carteret County News -Times
4206 Bridges Street I Morehead City, NC 28557
Phone:262-726-7081 ext. 207 Fax: 252-726-2653
Legals(cDTheNewsTimes.com — www.CarolinaCoastOnline.com
L
Coastal Management
ENVIRONMENTAL QUALITY
Legal Advertisement Section
Re: Public Notice — Ben Wall, 108 North Court, Atlantic Beach, Carteret County
To Whom It May Concern:
ROY COOPER
(invamor
MICHAEL S. REGAN
seen,o.
BRAXTON DAVIS
tureens
Please publish the attached Notice in the 4/5/17, issue of the Carteret News Times.
4/3/17
The State Office of Budget and Management requires an original Affidavit of Publication prior to
payment for newspaper advertising. Please send the affidavit, an original copy of the published
notice, and an original invoice to Arthur Stadiem, NC Division of Coastal Management, 400
Commerce Avenue, Morehead City, North Carolina 28557, Telephone (252) 808-2808.
Thank you for your assistance in this matter. If you should have any questions, please contact
me at our Morehead City office.
Sincerely,
fieAerl{ -eph
Heather M. Styron
Coastal Management Representative
Swe ofNo th Carolina I Environmental Quality I Coastal Mmagement
400 Commerce Ave I Morehead City, NC 28557
252 808 2808
NOTICE OF FILING OF
A PPLICATION FOR CAMA
MAJOR DEVELOPMENT PERMIT
The Department of Environmental Quality hereby gives public notice as required by NCGS
113A-119(b) that application for a development permit in an Area of Environmental Concern as
designated under the CAMA was received on 3/14/17. According to the application, Ben Wall
applied for a permit for a pier extension, fixed. platform, floating platform and 6 mooring pilings
at 108 North Court, Atlantic Beach, Carteret County.
A copy of the entire application may be examined or copied at the office of Heather
Styron, NC Division of Coastal Management, located at 400 Commerce Avenue, Morehead City,
NC; (252) 808-2808 during normal business hours.
Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400
Commerce Avenue, Morehead City, N.C. 28557, prior to 4/25/17, will be considered in making
the permit decision. Later comments will be accepted and considered up to the time of permit
decision. Project modification may occur based on review and comment by the public and state
and federal agencies. Notice of the permit decision in this matter will be provided upon written
request.
PUBLISHED ON: 4/5/17
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Ave I Morehead City, NC 28557
252 808 2808
X 266&101.3 0011152EDT Lanp: 704.1 AAak 3.0 X200M
Y. 35M3 6 Y. 3SSW6.9
-100.0 0.0 imo 2004 Now 40D.0 590 600A 7WA 114.0 9WA 1000D
20 +z0
+1.0 NA
OD
OA
to
14
20
2.0
30
3.0
4.0
4.0
5.0
5.0
6.0
60
7.0
7.0
&0
6.0
t0727016 DBL 200.0 Ft In
0013T NO 5.0 Ft In
X:28=2 O&3_12DEOT LeNh 704.1 ABnWh: 3.0 X26011B.7
Y. 35431&9 Y:3&50230
AOU OA 1W.0 20H NU 400.0 500.0 600A 7WA 0.0 9WA 1000A
20 +z0
+14
0.0
10
0.0
El st,11 noes HiA, uiu un,ar0 a.m maeemno"191
1.0
IA
2.0
z0
30
3.0
4.0
a
4A
6.0
�
5,0
U
&0
74
7.0
1U
6A
ICQ7Y[016 OMWO.OFtN
003ST Dept 5A Ftln
X 11W.1
Y:354316A
-look OA
+2A
HA
U
W5_12WEDT LM*70LI A*4&3.0 X26664M
Y. 354i9d
IOU 2904 NU 40&0 MIMI IXOA 700A SI D 90DA
IMU
+20
0.0
0.0
to
1.0
2.0
z0
3.0
30
4.0
4.0
5.0
5.0
BA
6D
71)
7A
IN
&0
WSEDT
DBL 2W.OFtIn
NO 5A FLN
X 26firt572
Y:3543212
400.0 0.0
411
+I.D
002.115UDT Lop: 704.1 Aalnu6c 3.0 X26M.7
Y. 355W4.3
IWO Y00.0 300.0 400A 5W0 6000 7WD III 9Wo
1000.0
40
AD
0D
ob
I'D
1.0
zD
2A
3.0
30
4A
4.0
54
_
5.0
BA
U
7A
7.0
Hill
eo
101T016
=EDT
oBL210.0Ftb
NO 5A Ftt
X 2SM7.1
Y: WIIA
-1W0 0.0
40
+1.0
QO
004_12MEDT Lelpt: 704.1 Aas*3.0 X2WM43.1
Y:3550277
100.0 200A 300.0 400.0 5X0 OD01 7004 111 OWA
1 1 1 1 P 1
IMU
+2A
NA
0.0
1.0
1.0
2.0
zD
3.0
30
4.0
44
5.0
&0
&0
&0
7,0
71
1U
&0
10.47Y4016
OOIEDT
- DR 200.0FtIr
Dept 30 Ftt
X 2%WJD
Y:3W13A
-IOU 0.0
.2.D
+to
02
ODB_1211KEDT LM9t: 704.1 ftiw :34 X266B513A
Y: 355016.5
IOU 200A 300A 400.0 SODA ou 7Wo wu 900A
1000A
z0
No
0.0
1.0
to
2.0
4
2.0
3.0
3.0
4.0
4.0
SA
5.0
6A
60
7A
LO
1U
&a
lK7016
W6.EOT
061.2DOO Fdn
D905A Ftb
RECEIVED
MAR 2017
DCM- M D CITY
JJ
,I�'
TT � of r
l `astai
Vertical Datum
GOOVBISiO+
NAVD4M
Dr. Ben Wall
Atlantic Beach NC 28512
108 North Court, 9
Gra
Graphic Seale
,
Nobs:
1. Horn"" Detan: NC State Plena-tore 320D
3. Deb mlDeiSed by Tl Coastal on SepbmEar B,M16 and raPiaamrt
dib
eaOna at Had 6me.
4. Aerial plgto Roan In 2012 ant! G IoalaC from NC OneMap.
1.E'
MLW
Beaufort Datum
Hemwa.i s..w + . eo
TiCoastal, PLLC
en1.e..n.t tr..,
enml"oton, NC 284"
910.821.1354
Dock Modification Permit Application
DWG NAME: DockPemilDY90.dW E
PLAN VIEW - Pro Proposed Dock Layout and Existing Bath met
p y g y ry
OM/G DATE: November 11, 2018
SORV" DATl.•sPpl E, zotE
SCALE: 1-= So'
axcET:2 of 2
CAMA Major Permit Application -Project Narrative
Ben Wall -Property Owner
108 North Court, Atlantic Beach NC 28512
Bogue Banks Marine Construction, Inc: Applicant
Purpose:
We are requesting authorization to extend existing 5' x 190' pier by 268' in order to reach deep
water which will enable property owner to dock and use his boat. We will also be adding a 26' x
12' platform and a 6' x 20' floating dock and 6 mooring pilings.
Existing Conditions:
This privately owned lot is 0.4 acres in size and contains a 1376 SF single family dwelling. There
are also indigenous plants, grasses and shrubs. The existing pier is 5' x 190' and there is a 10' x
20' "T" at the end.
Method:
We will be floating materials in by barge and using an excav t i�vibratommer to
drive thepilings. We will also be using various hand tpels ( hain drills etc. )
to complete the project. We will be following NC Building odes or all aspects of this project.
D I
�)�� -� o�-� -7 a7
AC�`°=
RECEIVED
MAR 0 8 2017
DCM- MHD CITY
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional lnformadon
In addition to this completed application form, (MP-1) the following Items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
Instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Town of Atlantic Beach/ David Walker Phone No. 252-725-4456
Address 125 West Fort Macon Rd Atlantic Beach, NC 28512
Name William R Bizzell Phone No. 252-521-1306
' Address 3423 Buena Vista Ct Kinston, NC 28504
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tra . Include permit numbers, nmittee, and issuing dates.
GP 45264 issued 5-17-05
h. Signed consultant or agent authorization form,' sppli ble.
I. Welland delineation, If necessary.
j. A signed AEC hazard notice for rojects in ceanfront
knd inlet a a. (Must be signed by property owner)
k. A statement of compliance with th .C. E vironmemal ohcy (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public Is , atta a statement dOMmenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in re nse to this application will allow only the development described in the application.
The project will be subject to the conditio nd restrictions contained in the permit.
I certify that I am authorized to grant, and in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date
Print Name
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts RECEIVED
❑DCM MP-3 Upland Development
®DCM MP-4 Structures Information
MAR 0 8 2017
DCM- MHD CITY
252-808-2808 .. 1.888.4RCOAST .. www.nccoastaimanagement.net
. C'. ,, i. i' �. �.o..
Form DCM MP-4 (Structures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
15'-20' 20'
Note: For buoy or mooring piling, use arc of swing including length
ofvessel.
C. Width of water body
7700 Ft
e. (i) Will navigational aids be required as a result of the project?
0Yes ®No [JNA
(ii) If yes, explain what type and how they will be implemented.
d. Water depth at waterward end of structure at NLW or NWL
4'8"
8.OTHER
® This section not applicable
a. Give complete description:
Date
Project Name
=0
Applicant Name
Applicant Signature
RECEIVED
MAR 0 8 2017
DCM- MHD CITY
252.808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement net revised: 12/27/06