Loading...
HomeMy WebLinkAbout141-17 Minor Mod Town of VarnamtownPermit Class MODIFICATION/MINOR Permit Number 141-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Prmtt RECEIVED DEC 2 7 2018 DCM-mwn r1TV for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Town of Varnamtown,100 Varnamtown Road, Varnamtown, NC 28462 Authorizing development in Brunswick County adj. to the Lockwoods Folly River, at Fisherman Road, Varnamtown , as requested in the permittee's application letter dated 10/16/18 including attached workplan drawing (1) C-102 dated revised by email 12112/18. This permit, issued on December 19, 2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may )e subject to nnes, imprisonment or crvu action; or may cause me permit to oe nuu arm voia. 1) Unless specifically altered herein, this Minor Modification authorizes the reconstruction of the boat ramp including the filling of an approximately 5'x8' hole at the end of the ramp, all as expressly and specifically set forth in the attached letter and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910) 796-7215 for this determination. 2) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. D s, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Town of Varnamtown Permit No.141-17 Page 2 of 2 ADDITIONAL CONDITIONS 3) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 4) This Minor Modification shall be attached to the original of Permit 141-17, which was issued on 12/12/17 and amended on 1/23/18, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 5) All conditions and stipulations of the active permit remain in force under this Minor Modification unless specifically altered herein. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of General Permits 197800056 & 197800080 (Action ID No. SAW-2016-02407), which was issued on 10/24/17. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. 1993- 053lv3. NOTE: A minor modification application processing fee of $100 was received by DCM for this project. C Spears, Courtney From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, December 19, 2018 1:38 PM To: Spears, Courtney Subject: RE: [External] RE: Varnamtown Modification Request THE FLOATING DOCK IS COMPLETE, A NEW ONE WAS INSTALLED ALLTHIS IS, IS REPLACE CONCRETE A BOAT RAMP THANKYOU PAj(fis B W00(ard Office x6na9er TJ's MARINE CONSTRUCTION LLC PO Box 125 Pantego NC 27860 252-943-6677 252-943-3949 fax From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Tuesday, December 18, 2018 3:47 PM To: Toby Tetterton <tobin@gotricounty.com> Subject: RE: [External] RE: Varnamtown Modification Request Hi Mr. Tetterton, \'J On the drawing the pier and floating dock are proposed to be removed (attached -highlighted in pink). Will these structures be re -built or just removed entirely? Thank you, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtnev.spearsCa)ncdenr.gov RECEIVED DEC 2 7 2018 DCM-MHD CITY 1 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Toby Tetterton <tobin@eotricounty.com> Sent: Wednesday, December 12, 2018 8:23 AM To: Spears, Courtney <courtney.spears@ncdenr.gov> Subject: RE: [External] RE: Varnamtown Modification Request Great, Please keep me posted From: Spears, Courtney <courtney.spears@ncdenr.eov> Sent: Wednesday, December 12, 2018 8:03 AM To: Toby Tetterton <tobin@aotricounty.com> Subject: Re: [External] RE: Varnamtown Modification Request Thank you Mr. Tetterton, this is exactly what I need. I am hoping to get the permit out as soon as possible. I will contact you when it is ready. Kind regards, Courtney Spears From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, December 12, 2018 7:38:24 AM To: Spears, Courtney Subject: RE: [External] RE>Varnamtown Modification Request Ms. Spears The 68' knee wall will not be replaced. Also, please see attached drawing (PDF File) Tobin Tetterton TJ's MARINE CONSTRUCTION LLC PO Box 125 Pantego NC 27860 252-943-6677 252-943-3949 fax From: Spears, Courtney <courtney.spears@ncdenr.eov> Sent: Tuesday, December 11, 2018 10:S6 AM To: Toby Tetterton <tobin@gotricounty.com> Subject: RE: [External] RE: Varnamtown Modification Request Mr. Tetteron, So, you are no longer requesting to replace the knee wall as indicated in the letter dated 10/16/18 (attached)? I just need an email confirmation and I can remove that from your request. Can you identify about where on the drawing the hole is? Is it at the end of the ramp roughly in the center? I assume the hole is from boat props, but just want to make sure we are authorizing everything they need to do. Thank you, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtnev. spears(cancden r.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Toby Tetterton <tobin@Rotricounty.com> Sent: Tuesday, December 11, 201810:44 AM To: Spears, Courtney <courtnev.soears@ncdenr.gov> Subject: [External] RE: Varnamtown Modification Request Ms. Spears RECEIVED DEC 2 7 2018 DCM-MHD CITY They are not going to replace the 68' of knee wall As for the hole at the end of the Boat Ramp it is hard to equate the size, I estimate it at 5' deep and 8' wide and to be filled with stone. Toby From: Spears, Courtney <courtnev.spears@ncdenr.gov> Sent: Tuesday, December 11, 2018 8:36 AM To: tobin@eotricounty.com Subject: Varnamtown Modification Request Hi Mr. Tetterton, We are close to being ready to issue the modification for the Town of Varnamtown to do work at their boat ramp facility. I just need a little clarification on the drawing if you wouldn't mind helping with that. In the request you mention repairing some holes at the end of the ramp, could you identify on the drawing the approximate size and location of these holes? Also, I'm having trouble determining the location of the 68' knee wall they want to replace —could you show that on the drawing too? Please let me know if there are any questions. Thank you, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtnev. soears()ncdenr.00v 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. M Spears, Courtney From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, December 12, 2018 8:23 AM To: Spears, Courtney Subject: RE: [External] RE: Varnamtown Modification Request Great, Please keep me posted From: Spears, Courtney <courtney.spears@ncdenr.gov> Sent: Wednesday, December 12, 2018 8:03 AM To: Toby Tetterton <tobin@gotricounty.com> Subject: Re: [External] RE: Varnamtown Modification Request Thank you Mr. Tetterton, this is exactly what I need. I am hoping to get the permit out as soon as possible. I will contact you when it is ready. Kind regards, Courtney Spears From: Toby Tetterton <tobin@gotricounty.com> Sent: Wednesday, December 12, 2018 7:38:24 AM To: Spears, Courtney Subject: RE: [External] RE: Varnamtown Modification Request Ms. Spears The 68' knee wall will not be replaced. Also, please see attached drawing (PDF File) Tobin Tetterton TJ's MARINE CONSTRUCTION LLC PO Box 125 Pantego NC 27860 252-943-6677 252-943-3949 fax RECEIVED DEC 2 7 2018 1 DCM-MHD CITY From: Spears, Courtney <courtnev.spears@ncdenr.zov> Sent: Tuesday, December 11, 201810:56 AM To: Toby Tetterton <tobin@aotricountv.com> Subject: RE: [External] RE: Varnamtown Modification Request Mr. Tetteron, So, you are no longer requesting to replace the knee wall as indicated in the letter dated 10/16/18 (attached)? I just need an email confirmation and I can remove that from your request. Can you identify about where on the drawing the hole is? Is it at the end of the ramp roughly in the center? I assume the hole is from boat props, but just want to make sure we are authorizing everything they need to do. Thank you, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtnev. soearsCcilncdenr.aov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Toby Tetterton <tobin@Rotricounty.com> Sent: Tuesday, December 11, 2018 10:44 AM To: Spears, Courtney <courtney.spears@ncdenr.eov> Subject: [External] RE: Varnamtown Modification Request Ms. Spears They are not going to replace the 68' of knee wall 011 As for the hole at the end of the Boat Ramp it is hard to equate the size, I estimate it at 5' deep and 8' wide and to be filled with stone. Toby From: Spears, Courtney <courtnev.spears(@ncdenr.eov> Sent: Tuesday, December 11, 2018 8:36 AM To: tobin@aotricountv.com Subject: Varnamtown Modification Request Hi Mr. Tetterton, We are close to being ready to issue the modification for the Town of Varnamtown to do work at their boat ramp facility. I just need a little clarification on the drawing if you wouldn't mind helping with that. In the request you mention repairing some holes at the end of the ramp, could you identify on the drawing the approximate size and location of these holes? Also, I'm having trouble determining the location of the 68' knee wall they want to replace — could you show that on the drawing too? Please let me know if there are any questions. Thank you, Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtnev.soearsOmcdenrciov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. RECEIVED DEC 2 7 2018 DCM-MHD CITY Srre ,{ vu[ \ \4�ot �xd i p ` 40 NIX J ae ific ,ev-8� ` 7� \� . boo. O e® \ SNEET RECEIVED DEC 122M DCM WILMINGTON, NC RECEIVED DEC 2 7 2018 DCM-MHD CITY Spears, Courtney From: Hair, Sarah E CN CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Sent: Wednesday, November 28, 2018 2:30 PM To: Spears, Courtney Subject: [External] RE: 3 minor mods CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Courtney, Just heard back from Navigation on the Varnamtown boat ramp, they have no issue with the proposed work. We can modify by letter. Thanks, Liz -----Original Message ----- From: Spears, Courtney [mailto:courtney.spears@ncdenr.gov] Sent: Monday, November 26, 2018 2:42 PM To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.mil> Subject: [Non-DoD Source] 3 minor mods Hey Liz, Hope you had a nice Thanksgiving! I was going through some minor mods we have out there and noticed we have two that are just replacement of structures in existing footprints. 1. Town of Varnamtown, Bruns Co., (141-17, SAW-2016-02407) replacement of existing boat ramp (16'x68') in same footprint and replacement of 68 linear feet of existing knee wall. Sent out 11/1/18. 2. Masonboro Harbour HOA, NH Co., (23-01, SAW-2001-00324) replacement of existing floating docks in same footprint. Send out 11/9/18. RECEIVED Would these be easy to process on your end? I'm reaching for low -hanging fruit. DEC 2 i 2018 DCM-MHD CITY I also received a call from Greg Finch about some proposed mods at River Bluffs on the NE Cape Fear. They're proposing 1) two new living shorelines with riprap, fill, and planting; 2) two new three piling dolphins near the boat ramp at the northernmost end of the property; and 3) upland walkways and path. I understand you may not have gotten to this one as it was only sent out 10/31/18, but I told Greg I would check with all the commenting agencies. Thanks! II Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtney.spears@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public.Records Law and may be disclosed to third parties. 0A* Spears, Courtney From: Weychert, Curtis R Sent: Tuesday, November 06, 2018 9:42 AM To: Spears, Courtney Cc: Wilson, Debra Subject: Permit modification No. 141-17 I have no comment on the proposed changes in this project Curtis Weychert Fisheries Resource Specialist North Carolina Division of Marine Fisheries North Carolina Department of Environmental Quality 252-808-8050 Curt. Wevchert(cDncdenr.gov 3441 Arendell Street Morehead City, NC 28557 RECEIVED DEC 2 7 2018 DCM-MHD CITY N1N1' Spears, Courtney From: Coburn, Chad Sent: Wednesday, December 12, 2018 11:28 AM To: Spears, Courtney Subject: RE: [External] RE: 3 minor mods Yep, no written approval on this one. We had a scoping meeting on it and a site visit if I remember correctly. -----Original Message ----- From: Spears, Courtney Sent: Wednesday, December 12, 2018 11:12 AM To: Coburn, Chad <chad.coburn@ncdenr.gov> Subject: FW: [External] RE: 3 minor mods Hey Chad, There is a minor mod to replace the boat ramp at Varnamtown in the same footprint and fill a 5'x8' hole at the bottom. Liz said in the email below they will modify the existing approval (SAW-2016-02407) by letter. Will this require no written concurrence? Thanksl Courtney Spears Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 910 796 7426 office courtney.spears@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message---- RECEIVED From: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.army.miI> Sent: Wednesday, November 28, 2018 2:30 PM DEC 2 7 2018 To: Spears, Courtney <courtney.spears@ncdenr.gov> Subject: [External] RE:3 minor mods DCM-MHD CITY CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spa m.<mailto:report.spam@nc.gov> Courtney, Just heard back from Navigation on the Varnamtown boat ramp, they have no issue with the proposed work. We can modify by letter. Thanks, Liz -----Original Message ----- From: Spears, Courtney [mailto:courtney.spears@ncdenr.gov] Sent: Monday, November 26, 2018 2:42 PM To: Hair, Sarah E CIV CESAW CESAD (US) <Sarah.E.Hair@usace.a.rmy.mil> Subject: [Non-DoD Source] 3 minor mods Hey Liz, Hope you had a nice Thanksgiving! I was going through some minor mods we have out there and noticed we have two that are just replacement of structures in existing footprints. 1. -Town of Varnamtown, Bruns Co., (141-17, SAW-2016-02407) replacement of existing boat ramp (16'x68') in same footprint and replacement of 68 linear feet of existing knee wall. Sent out11/1/18. 2. Masonboro Harbour HOA, NH Co., (23-01, SAW-2001-00324) replacement of existing floating docks in same footprint. Send out 11/9/18. Would these be easy to process on your end? I'm reaching for low -hanging fruit. I also received a call from Greg Finch about some proposed mods at River Bluffs on the NE Cape Fear. They're proposing 1) two new living shorelines with r!prap, fill, and planting; 2) two new three piling dolphins near the boat ramp at the northernmost end of the property; and 3) upland walkways and path. I understand you may not have gotten to this one as it.was only sent out 10/31/18, but I told Greg I would check with all the commenting agencies. Thanks!!! ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director MEMORANDUM TO: Courtney Spears Permits SectioJn, FROM: Debra Wilson ('" NORTH CAROLINA Ebvlrmunitt l QuaBey District Manager, Wilmington DATE: November 1, 2018 SUBJECT: Permit Modification Request CAMA Major Permit No. 141-17 Town of Vamamtown, Brunswick County Mr. Toby Tetterton of T. J.'s Marine, acting as agent for the Town of Varnamtown, is requesting a modification of State Permit No. 141-17. State Permit No. 141-17 was issued to the Town of Varnamtown on December 12, 2017 and amended on January 23, 2018 for the renovation of an existing public boat ramp facility which included the installation of a new pier, floating platform and vinyl sheetpiles. The permit is set to expire on December 31, 2020. Mr. Tetterton is requesting that the permit be modified to replace the existing failing concrete boat ramp. The original permit also included maintenance to the smaller existing oyster shell ramp located on the southeast side of the 6' by 68' pier. No improvements were proposed for the existing concrete ramp. As proposed, the new ramp would measure approximately 16' in width by 68' in length below mean high water (MHW). The applicant states that the proposed replacement would be within the existing footprint. The request also states, that there are several large holes at the base of the ramp that they would like to fill with stone. The applicant is also requesting to replace 68 linear feet of the existing knee wall. RECEIVED DEC 2 7 2018 DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.796.7215 The applicant has submitted a check (ck. #10592) in the amount of $100.00 for the modification request. This office has no objection to the permit modification request By copy of this memo, DCM is requesting that the USAGE, DWR, DMF, and the LPO provide any comments that your agency may have on the proposed project to Courtney Spears of DCM's Wilmington office within 14 days of receipt of this memo. Enclosures cc: DCM-MHC Liz Hair, USACE - U�?fi(l0� wod 14f� Chad Coburn, DWR 12/2I(b— VW wyi"'t'v (;Uvj,lw.lt al-1-(- ,Curtis Weychert, DMF -11( k(19 -u v WvV1 ,/Connie Marlowe, LPO RECEIVED DEC 2 7 2018 D_EQ�� DCM-MHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 910.796.7215 ROY COOPER Governor WCHAEL S. REGAN Seoerory BRAXTON C. DAVIS Director MEMORANDUM TO: Courtney Spears Permits Section NORTH CAROLINA EnW/OnmenW Qunaty FROM: Debra Wilson 1 `v District Manager, Wilmington DATE: November 1, 2018 SUBJECT: Permit Modification Request CAMA Major Permit No. 141-17 Town of Vamamtown, Brunswick County Mr. Toby Tetterton of T. J.'s Marine, acting as agent for the Town of Varnamtown, is requesting a modification of State Permit No. 141-17. State Permit No. 141-17 was issued to the Town of Varnamtown on December 12, 2017 and amended on January 23, 2018 for the renovation of an existing public boat ramp facility which included the installation of a new pier, floating platform and vinyl sheetpiles. The permit is set to expire on December 31, 2020. Mr. Tetterton is requesting that the permit be modified to replace the existing failing concrete boat ramp. The original permit also included maintenance to the smaller existing oyster shell ramp located on the southeast side of the 6' by 68' pier. No improvements were proposed for the existing concrete ramp. As proposed, the new ramp would measure approximately 16' in width by 68' in length below mean high water (MHW). The applicant states that the proposed replacement would be within the existing footprint. The request also states, that there are several large holes at the base of the ramp that they would like to fill with stone. The applicant is also requesting to replace 68 linear feet of the existing knee wall. 10�KQ� North Carolina Depanment of Environmental Quailty I Division of Coastal Management Wilmington Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910.796.7215 RECEIVED NOV 0 7 2018 DCM-MHD CITY The applicant has submitted a check (ck. #10592) in the amount of $100.00 for the modification request. This office has no objection to the permit modification request By copy of this memo, DCM is requesting that the USACE, DWR, DMF, and the LPO provide any comments that your agency may have on the proposed project to Courtney Spears of DCM's Wilmington office within 14 days of receipt of this memo. Enclosures cc: DCM-MHC Liz Hair, USACE Chad Coburn, DWR Curtis Weychert, DMF Connie Marlowe, LPO RECEIVED NOV 0 7 2018 i Df � DCM-mHD CITY North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1 127 Cardinal Drive Extension I WilmtrWm North Carolina 28405 910.796.7215 T.J.'s Marine Construction LLC P. O. Box 125 Pantego, N.C. 27860 252-943-6677 Office 252-943-3949 Fax email: tobin@gotricounty.com October 16, 2018 Ms. Debbie Wilson NC Dept. of Environment & Natural Resources 127 Cardinal Drive Ext. Wilmington, NC 28405 Amendment to Major CAMA Permit 141-17 To replace existing concrete Boat Ramp 68' long by 16' wide It will be placed back in the original location There are large holes at the bottom of the ramp that we would fill with stone and replace 68' knee wall RECEIVED NOV 0 7 2018 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC r ,. 19 2018 Sep 26 18, 01:37p TJ's Marine Construction 2529433949 p.2 Authorized Agent Consent Agreement ��✓� �a� ,herby authorize Tobin Jay Tetterton of peAy ownvp) ) TJ's Marine Construction, LLC to art on my behalf In obtaining CAMA permits for the location listed below. PROPERTY ADDRESS: �` ::s�tl.�►,.g•� ,cam kl'�490P At Svc a PROPERTY OWNER'S MAII.ING//ADDRESS: / 0 0 CJAr2M�MT�d t�1�✓ �-/ Ncz- Phone No. ! i o — a 4 -Z—,S4 c1S PROPERTY OWNER'S AUTHORIZED AGENT DATE: '?— (-7 7 20 1 D W/Audlorimd Agent COMM AgroG RECEIVED NOV 0 7 2018 DCM-MHD CITY RECEIVED DCM WILMINGTON, NC , TO 35Vd NMDiWVNNVA E9669b00T6 bZ:60 8TOZ/LZ/60 w 10/83/2016 15:43 9108463353 VARNAMTOWN PAGE 01 Oct 01.18, 07:338 TA Marine Construction 2529433949 p2 Z! R1pAl2r6N Dennre ursllYi•re" I hereby ca►8€y that I owe property adiecant to IF - Property located at (Name of `openy Owner) s on L C oo cl F (Y .-tot, $lock Road, etc.) tvvaierbady)�� in (Ciarrrownand/or County) N.C. 1 rTt has described to me as shown below, the development proposed at Eire shove locationcation . F f/ 1 have'no objection to this Pro PosaE. 5rtcT f have objections to this proposal, D68CRIP770AI AND/OR DPAW<t� OF Pi,R) SEO DEVELOPIbtENT (brdividrralAMPOSin 4%vejVpM,,f+nus<fiJ/indoscr/ pft" bellow or aftach a site drawi P'lact-t, 1 understand that a pier, dock, moorin R SECTIO -: _ meet be set back a minimum di g pilings, boat ramp, breakwater, boathouee, Iif% or grin stance of 15 from my area of r scion a r s m� Of you wtsh tv waive the setback, ou p �s unless waived by t:a y �rrlst�«! the ePProPriaW blank below.) -�-1do h to waive the I" setback requirement, �.,1 da not wish to vvaive the 15, setback regcrirGMqnt iw 'Valid for one calendar year after Signature Owner tn►orm.Tuon) RECEIVE NQV 0 7 20 DQM-MHD C (RevisedAgg, 201,0 RECEIVED DCM WILMINGTON, NC OCT 19 2018 10/03/2018 15:36 9108463353 VARNAMTOWN PAGE 01 Od-0118,07:33a TJsMarine Construotion 2629433949 p,3 AP»>�ACENT 'hIPAR9AN PROPERTYOWMEp arareMENT I hereby certify that I awn property adjacent to --77- _Ls�J_e Property located at Er / n � _ L _ _ __ /9 �Vame or Property owner) on <_!r a j} ,' d / (Address, ,Lpt Block, Road, etc.) In (Water6odyj (City/Town and/or County) N. The applicant has described to me, as shown below, the development proposed at the above location. I have no objection to this proposal. I have objections to this proposal. G:t::c1s DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Indnddual proposing development must fill in description beloworattaoh a site draw/ng) Pep)aC� ex1'S wg' /L A of ciMxq rm;zrkl I understand that a pier, dock, moorinwA�ON must be set back a minimum distance of'158fromomy area of riparian access unless waiveor d by me. (IF you wish to wave the setback, you mcLst mml ial the appropriate blank below.) 1 I do wish to waive the 15' setback requirement, I do not wish to waive the 15' setback requirement (Properrij Owner Inffforntation) Owner Infonnatlon) NW Nalld for one calendar year after signature (Revlsed Aug 201.1) RECEIVED NOV 0 7 2018 RECEIVED DCM WILMINGTON, DCM-MHD CITY 1 .' ZUi3 ,. 2176M11 role vnnwo I ( 12, LLC) U1164 o, P9, zee U. b, Pg. e1 I �mm 45 wn ni . nnodnwn u vJt1Gn' 111 1- Tr�cl1 hy' E a f61728aBtl. Ft oaf p,YWgEwwnllnQ .1w oo'' "� - o�qo^ , aFi Ap{robnaM End / d Edd49 A-PW . % xav � Bwl Remy/ Mw Law WOW DCM WILAUWTON, NC OCT 19 2018 601 pFZ / r ec.1 a.md kv I I \ I v —0— — — — — — — — — \--J i n 'N � v Date Date Check From Name of Vendor Check Check Permit Rct. # Received Deposited Permit Holder Number amount Number/Comments 11/2/2018 TJ's Marine Town of First Bank 10592 $100.00 modification #141-17, Town of TP rct. 6995 Construction LLC Varnamtown Varnamtown, Fisherman Rd Boat Ramp, Supply BrCo } tr tJ.t N Q r U o W or z U r60 2.23'X 51TE VICINITY MAP NOT TO SCALE �e 0° Tract 1 1517.2 Sq. Ft. 8' 0.04 Acres (Including Easement) �t0 �e�g9O �a�Q 0° -02T volt eostIZA001 \ M5 Approximate End N Exisitng Asphalt Boat Ramp/ Elev. XMVt 1 73' \ / \ c -z4 -2.36' Meant. Water , proximate End �' ` Exisitng Concret8 X-T•W \\ Boat Ramp-' 6.46' 4# Q O�0 8.06' X G� 'O tigy 0 5 10 20 \ 5cale: I' = 10' RECEIVED NOV p y pot$ DCA4-A4HD CIrr U z• • C4 F� az� Sze vU<9 oar - �a w w z O F103 Z Z O O O� O ~ U a �? Y Q Lr O Z z U- Q >> U. O W O Y a.O ? `j� 0- O T m z a z O F- O LU W 0 SHEET C-102 SITE VICINITY MAP NOT TO SCALE PROPERTY INFO: PARCEL/: 217GA03101,217FAOOIOI SITE ADDRF55: FISHERMAN RD. VARNAMTOWN, NC OWNER: TOWN OF VARNAMTOWN 100 VARNAMTOWN RD SUPPLY, NC 284G2 USE: PUBLIC BOAT RAMP t DOCK ACREAGE: 0.05 GENERAL NOTES: I . SURVEY DATA PROVIDED BY BOBBY M. LONG SURVEYING, TITLED'NCDOT MAINTENANCE EA5EMENT 4 BOAT LANDING SURVEY FOR TOWN OF VARNAMTOWN' DATED SEPTEMBER 28. 2015. 2. NAVIGATION CHANNEL AND 5ETBACK FROM USACE WILMINGTON D15TRICT KMC FILE. 3. THIS PROJECT 15 INTENDED TO MODIFY THE EXISTING BOAT RAMP AND DOCKING FACILITIES TO IMPROVE THE CAPACITY FOR USE BY THE COMMUNITY. THE EXISTING FLOATING DOCK PROVIDE5 LIMITED USE, AND THE CONCRETE RAMP SECTION IS NARROW. THE PROPOSED PIER/DOCK AND CONCRETE RAMP EXTENSION ARE INTENDED TO MAKE THE USE OF THIS FACILITY MORE SAFE AND EFFICIENT. THE fM5TING NARROW PIER AND SMALL FLOATING DOCK ARE PROPOSED TO BE REMOVED. A WIDER PIER AND LARGER FLOATING DOCK ARE PROPOSED TO BE LOCATED TO THE EAST OF THE E05TING CONCRETE RAMP. THI5 RAMP 15 PROPOSED TO WIDEN ACROSS THE AREA OCCUPIED BY THE ORIGINAL PIER 4. IF CHANNEL DREDGING OF THE LOCKWOOD FOLLY RIVER BECOMES NECESSARY IN THE VICINITY OF THE PROPOSED STRUCTURE, THE TOWN WILL BE RESPONSIBLE FOR REMOVING THE PIUNG5 WITHIN THE SETBACK AND MOVING THE FLOATING DOCK OUT OF THE WAY WHILE DREDGE ACTIVITIES OCCUR. IT WILL THEN AI50 BE THE TOWN RESPONSIBILITY TO REPLACE THE DOCK AND PILES ONCE DREDGE ACTIVITIES CONCLUDE TO RE-ESTABU511 USE OF THE STRUCTURE. M Iz = 127VII& uwc s,p¢w �J S� 1.� foes' �a Y fiv alp SX / SEE SHEET C-102 Pamw fq.n7�.m1 I eraya:.aav— �nm...tzucl cae. o, vvI P' Mao . zee Me0 CaU 5. P¢ 91 I I T�2 ae \y � Twmofvm.m9.n eeaemeirc ."' Man caa W. pa as `y M.km 12, LLC ant Sn R 350311Z17 _g 0.010.01 T. sq5 Mao Gb.93 93, Fg. 39 aI.W [ Tm a ,arts sa R as pan �0� BASE ELEVATIONS UTILIZE NAVD'88 DATUM. P M.21wF S Y&1 V. (YSM, LLC) ssswrm-r�pau Mao Cab. 31. Pg. IN uaemmaep by w R a GAPMIM Map Cab. S. Pg a1 4 •r Xi 10 air \ ta1TS 4¢R ase r u.ius add Q/ ftrMrll rb .W spa aa% I I I I —J RECEIVED NOV 0 7 2018 DCM-MHD CITY U z a • yz w 6m"w y Z Z ° O Q Y 0cz: � Z U 2 �E Z Oal w a) o > LLO o Z j Y U a Of �U) m o^m� T w d zm z uiL2a [m�6mc —_ Z 0 H � 0 ` Z 0 10 20 �4Q 5cale: I' = 20 SHEET C-101