HomeMy WebLinkAbout87808_John Ambery_20220707 ' 'A DCAMA fl DREDGE & FILL '72165 No 87808 ABCD
A 1 GENERAL PERMIT =D# 1'1088' Previous permit
Date previous permit issued
l New Ti Modification n Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
I5A NCAC n Rules attached. General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name -• Authorized Agent
Address Project Location(County):
City State ZIP Street Address/State Road/Lot#(s)
Phone#(_)
Email Subdivision
City ZIP
Affected n CW n EW n PTA n ES n PTS Adj.Wtr.Body (nat/man/unk)
AEC(s): n IDEA n IHA n UW IT SPIMA n PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: //0)
Shoreline Length
Pier(dock)length ' • �...._
iFixed Platform(s)
Floating Platform(s) , I. - i _
, - , ,
�� — i
1 1
Finger pier(s) ,
Total Platform area j 4
Groin length/# _ 177/^ �._.� t
Bulkhead/Riprap length i •�- i
.
Avg distance offshore I 1 _• F rt 1 I�
Breakwater/Sill ? 1 i f
f i i
Max distance/length
Basin,channel II { Y {
Cubic yards 11 I jt i —� T ' �
r +�
1 ! u- '
Boat ramp
Boathouse/Boatlift ICE ' — I 1
Beach Bulldozing i r j
I
Other ( ;
__j
SAV observed: yes no !_..-`--_—_l-- I— 1_
a LC
Moratorium: n/a yes no 1
Site Photos: yes no ; j (7 i,./, .. . r 912
Riparian Waiver Attached: yes no ' • _,. ..
A building permit/zoning permit may be required by: -
n TAR/PAM/NEUSEJBUFFER(circle one)
Permit Conditions
nSee note on back regarding River Basin rules
nSee additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
1/,
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S.Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie,Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
e'" ' , r_'CAMA DREDGE & FILL N9 87808 ABC D
23
GENERAL PERMIT T r� ► ��R ss Previous permit
: Date previous permit issued
New Modification 'Complete Reissue n Partial Reissue
As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to:
ISA NCAC - Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules
Applicant Name Authorized Agent
Address - Project Location(County):
City State ZIP - Street Address/State Road/Lot#(s)
Phone#( )
Email Subdivision
City ZIP
Affected I I CW n EW n PTA n ES PT5 Adj.Wtr. Body (nat/man/unk)
AEC(s): [ I OEA I 1 IHA UW n SPIMA I I PWS Closest Maj.Wtr.Body
ORW:yes/no PNA:yes/no
Type of Project/Activity
(Scale: li. )
Shoreline Length y
Access Length I i f I- I i - `Qt �'
I i -r- i i\J
Pier(dock)length . • -
Fixed Platform(s) I-.. L__.L..- r-_-
- 1 - -
Floating Platform(s)
! 1 --r-H------__ -t- I
Finger pier(s) +
-
J
! I _- �__. .. .
Total Platform area I I
t ) n
Groin length/# I—. -,_. j'� C�
— r �t i( .
Bulkhead/Riprap length .1-t - - 4-- I / —_��
Avg distance offshore {t j f �� I # ' r I . jt �p�
Breakwater/Sill _ - A .� ` ; : _• '
s .
Max distance/length ,
Basin,channel - 1 tt
Cubic yards li .____ ilf 1. .1 _. ...._.._._ .. z t_ —
; 1
Boat ramp ��I 1 �' j ‘.'
Boathouse/Boatlift ;+ ,) r
Beach Bulldozing 1 1
Other
- j \ ,.
.
SAV observed: yes no �:;• I I "`-- j I � r '
rMoratorium: n/a yes no �I a )�,�,, Y + __ _ _ �, _4 ^_� .. . lllj ,� .•
/ yesi.\.
Riparian Waiver Attached: yes no I j 1 1,11 ' .$
A building permit/zoning permit may be required by:
Permit Conditions I I TAR/PAM/NEUSE/BUFFER(circle one)
II See note on back regarding River Basin rules
See additional notes/conditions on back
I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial)
Agent or Applicant PRINTED Name Permit Officer's PRINTED Name
Signature**Please read compliance statement on back of permit** Signature
Application Fee(s) Check#/Money Order Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application and permit conditions. Any violation of these terms may
subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for
compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this
permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the
local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s)
has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules
for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the
NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the
Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215).
Notes/Additional Permit Conditions:
Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized
project area and disposed of in an appropriate upland location.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889
252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481
(Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478
Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico,
Tyrrell and Washington Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
(Serves: Bertie, Camden,Chowan, Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties)
Pasquotank and Perquimans Counties)
http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021
ROY COOPER
4a Governor
MICHAEL S. REGAN
secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTALOUALT•
O recor
-
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
t. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHW L)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. tearing&Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,,the first ten (10)feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November//1 through March 30)after completion of the bulkhead.
a Pre-project site conditions: �T - 1.1 4'ie ✓t-4.V 4 L t - a-)/ So-..R -'TRIC
2. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditio and verify that all
information is co plete and accurate.
�
�nN_ ,. n� C � vv._'bzr7
Agen 40,p.0;, ant Pfi{ited me Permit Office? ignature •i -
�� i___
7/7 / ZZ
Agen �Apgnlisant Signature Iss a ate
LAMA GENERAL PERMIT# D7
State of North Carolina I Environmental Quality I CoasfalNfamtgemenr
Washington Office 1943 Washington Square Mall Washington.NC 278891 32-94a-6481
Wtlmirwton Office 117.r Cardinal QrNe FUT.Wilmington.NC 23405_3845 131 0-79e-772.5
Morehead City Office I,400 Commerce Avenue Morehead City.NC 28537 152-808-2808
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property Owner. "C0 A vA.b e-rD`�
Address of Property: /&o O y `t S-f-c*-- j c A v\4 gc • f /U C 2 SSA
Mailing Address of Owner: c. IpoV`e-J
Owner's email: . a 0. 2.0.e yck'o ner's Phone#: ea i-51 I- S�16a
Agent's Name: J j.}( Agent Phone#: Nl A
Agent's Email: p(fl
•
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the-Adjacent Property Owner)
I hereby certify that I own property adjacent to the above referenced',property.The individual applying for this
permit has described to.me, as shown on the attached drawing, the development they are.proposing. A
description or drawing;:with dimensions, must be provided with this letter.,.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
•
' If you have objections'to what is being proposed, you must notify the N.C. Division of Coastal
Management,(DCM)'in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946;6481. No response is considered the same as no,objection if you have been
notified by Certified Mail.
•
•
WAIVER SECTION
I understand that any proposed pier, dock, mooring pilings; boat ramp, breakwater, boathouse„lift, or
groin must be'set back a minimum distance of 15'from Thy area of riparian access unless waived by me
(this does not applyto bulkheads or riprap revetments). (If you wish to waive the setback,you must skin
the appropriate blank below.)
I DO wish to waive some/all of the 15'setback
Signature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initial
the blank)
Signature-of Adjacent Riparian Property Owner. a- 6—e_i-4—�e Typed/Printed.name ofARPO: YI�i�J-Lei `9 - go
�ler
Mailing Address of ARPO: I L 9.N .�/ta5tI-4 re. ./�o:4 6I p-t�(•4' y-(p
AA
ARPO's email: ji -Q- �0L,/ p h.(V�4'RPID's bon go
7(Q'i r d 903
Date: G` 3'(J- 20 *waiver is valid for up to one year from ARPO's Signature
Revised July 2021 '
1
•
•
;Jo .
-t, 5 )j"0
1, I
p
J _ ` ,�7`r�� • ,of 1 I
x 'Vv V
a- ��;
•
<wixx) `:4 a i.5 0.1" _
q dbJ �y.l,,ii S b S)1b61 -F�S-,pI 10 5)) b -J i9 .
at i s 7v�. 9a'7a 1 d � 1,nb,/. Co 3. p _,a�.u-a'?y l4
-
•
N.C. DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY
(Top portion to be completed by owner or their agent)
Name of Property 'Owner Jc vti✓� A L, j b-e ,--....:
Address of Property: /49 C� L; �'�. r'`, '
i
Mailing Address of Owner: c:4tl 4--� Z S
Owner's email: `j-�c, a .e. < yst4c Owner's Phone# c 2. - 5 `r/— 6 C)
(
Agent's Name: A)/4- Agent Phone#: ,t/y:4
agent's Email: ij(A-
ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION
(Bottom portion to be completed by the Adjacent Property Owner)
i hereby certify that I own property adjacent to the above referenced property.The individual applying for this
permit described to me, as shown on the attached drawing, the development they are proposing. A
descri on or drawing,with dimensions,must be provided with this letter.
I DO NOT have objections to this proposal. I DO have objections to this proposal.
If you have objections to what is being proposed, you must notify the N.C. Division of Coastal
Management(DCM) in writing within 10 days of receipt of this notice. Correspondence should be
mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be
contacted at(252) 946-6481. No response is considered the same as no objection if you have been
notified by Certified Mali.
WAIVER SECTION
I understand that any proposed pier,dock, mooring pilings,boat ramp, breakwater, boathouse, lift, or
groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me
(this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must sign
the appropriate blank below.l
I DO wish to waive some/all of the 15'setback
S.ionature of Adjacent Riparian Property Owner
-OR-
I do not wish to waive the 15'setback requirement(initi I the blank)
Signature of Adjacent Riparian Property Owner: J/%�1t�'
Cat.
�r1 �
Typed/Printed name of ARPO: 4� I rri0,
Mailing Address of ARPO: Wk:-7 60z.f,co-r*-c \k It \ L Lj�( ��I
e(no. /
ARPO's email:f'�iwieSL�cw,ic,.i . t1c l�tiI'ARPO's Phone#: I ,
Date: 17I 3))----a— *waiver is valid for up to one year from ARPO's Signature*
Revised July 2021