HomeMy WebLinkAboutOIB_11-16_Splash Kingdom LLCOcean Isle Beach 01B 11-16
Local Government Permit Number
CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management"
Issued to Splash Kingdom, LLC, authorizing development in the Ocean Hazard (AEC) at 50 East First Street, Lot 17 & 1/2
of 18, Block 1, Section C, in Ocean Isle Beach, as requested in the permittee's application, dated March 28, 2011. This
permit, issued on April 11, 2011, is subject to compliance with the application and site drawing (where consistent with
the permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: The addition of open decking on the ocean side, as shown on the site plan.
(1) All proposed development and associated construction must be done in accordance with the permitted work plat
drawings(s) dated received on March 28, 2011.
(2) All construction must conform to the N.C. Building Code requirements and all other local, State and Federal regulations,
applicable local ordinances and FEMA Flood Regulations.
(3) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.
(4) A copy of this permit shall be posted or available on site. Contact this office at 910-579-3469 for a final inspection at
completion of work.
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the pernittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted under this permit must cease until the appeal is resolved. This ���
permit must be on the project site and accessible to the permit officer when the T t -
project is inspected for compliance. Any maintenance work or project Justin W. Whiteside
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on: CAMA LOCAL PERMIT OFFICIAL
3 West Third Street
September 21, 2015 RECEIVED = NC 28469
In issuing this permit it is agreed that this project is consistent with the local land
Use Plan and all applicable ordinances. This permit may not be written transfered�p
another party without the tten approval of the Division of Coo tSt R 2 7 2011 PERMITTEE
Management.
aCM WILMINGTON,(Signaturerequiredifconditionsatwveapplytopermit)
Name: Splash Kingdom, LLC
Minor Permit # OIB 11-16
Date: April 11, 2011
Page 2
(5) The permittee is required to contact the Local Permit Officer 910-579.3469, shortly before he plans to begin
construction to arrange a setback measurement that will be effective for sixty (60) days barring a major shoreline
change. Construction must begin within sixty (60) days of the determination or the measurement is void and must
be redone.
(6) All buildings constructed within the ocean hazard area shall comply with the NC Building Code, including the
Coastal and Flood Plain Construction Standards of the N. C. Building Code, and the Local Flood Damage
Prevention Ordinance as required by the National Flood Insurance Program. If any provisions of the building code
or a flood damage prevention ordinance are inconsistent with any of the following AEC standards, the more
restrictive provision shall control.
(7) All pilings shall have a tip penetration greater than eight feet below the lowest ground elevation under the structure.
(8) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Disturbed areas shall be vegetatatively stabilized (planted and
mulched) within 14 days of construction completion.
(9) Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time
when it becomes imminently threatened, and in any case upon its collapse or subsidence. However, if natural
shoreline recovery or beach renourishment takes place within two years of the time the structure becomes
imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary
protective measures allowed under CRC rules.
The expiration date of this permit has been extended in accordance with Session
Law 2010-177.
SIGNATUR DATE: �1
PERMITTE
LAND OWNER
Name � Pp 'As III,
MAR 2 8 2011
Address PLANh`iFIGxIP!SPECI'IONS
City ��oy State Y�� Zipa\Q3J Phone 4 V —
Email C�_o� r2� f-(�nna O� ' Gzrr
AUTHORIZED AGENT
Name
Address c� \�s e ova r ✓� _
City oc ep�\' (J"I' State Y\iC, Zip old' 69 Phone
Email
LOCATION OF PROJECT: (Address, street name and/or directions to site. If not oceanfront, what is the name of the
adjacentwaterbody.) LO i I �, 1,�l Lo' )� �l�r 9� �, sev( C, 0)!S P13) I-79 -( I -?9A
DESCRIPTION OF PROJECT: (List all proposed construction and land disturbance.) C)cL+ .rid "s
0�" oco"(.wc,rrr' _� - S A'J 'e ocer+-k of- -q-e �ru��c l r(vne o
SIZE OF LOT/PARCEL: _ '760o square feet acres
PROPOSED USE: Residential ®(Single-family ff Multi -family ) Commercial/Industrial n Other
COMPLETE EITHER (1) OR (2) BELOW (Contact your Local Permit Officer if you are not sure which AEC applies
to your property):
(1) OCEAN HAZARD AECs: TOTAL FLOOR AREA OF PROPOSED STRUCTURE: O square feet (includes
air conditioned living space, parking elevated above ground level, non -conditioned space elevated above ground level but
excluding non -load -bearing attic space)
(2) COASTAL SHORELINE AECs: SIZE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR BUILT
UPON SURFACES: 0 square feet (includes the area of the roof/drip line of all buildings, driveways, covered decks,
concrete or masonry patios, etc. that are within the applicable AEC. Attach your calculations with the project drawing.)
STATE STORMWATER MANAGEMENT PERMIT: Is the project located in an area subject to a State Stormwater
Management Permit issued by the NC Division of Water Quality?
YES 1O
If yes, list the total built upon area/impervious surface allowed for your lot or parcel:
0
square feet.
RECEIVED
DCM WILMINGTON, NO
APR " _1 ,'.I1
OTHER PERMITS MAY BE REQUIRED: The activity you are planning may require permits other than the CAMA
minor development permit, including, but not limited to: Drinking Water Well, Septic Tank (or other sanitary waste
treatment system), Building, Electrical, Plumbing, Heating and Air Conditioning, Insulation and Energy Conservation, FIA
Certification, Sand Dune, Sediment Control, Subdivision Approval, Mobile Home Park Approval, Highway Connection, and
others. Check with your Local Permit Officer for more information.
STATEMENT OF OWNERSHIP:
I, the undersigned, an applicant for a CAMA minor development permit, being either the owner of property in an AEC or a
person authorized to act as an agent for purposes of applying for a CAMA minor development permit, certify that the person
listed as landowner on this application has a significant interest in the real property described therein. This interest can be
descriibbed as: (check one)
V an owner or record title, Title is vested in Sgs t " �,LLU C, see Deed Book ),Yy 0
page 10)� in the r , ; �K County Registry of Deeds. D
_an owner by virtue of inheritance. Applicant is an heir to the estate of LS In S L LS R
probate was in County. i MAR 2 S 2011 I
I
_if other interest, such as written contract or lease, explain below or use a separate sh qoftoblis.gpplibation,
I_,.. PLANN!""
NOTIFICATION OF ADJACENT PROPERTY OWNERS:
I furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I have given
ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for a CAMA permit.
(Name) (Address)
(1) N\v Pr�\s L m �) tPeirAra�h'p 5:;H -) «iI--�A ��iyc ock i�1\ SL �' 173a
(2) N C_�—
(3)
(4)
ACKNOWLEDGEMENTS:
1, the undersigned, acknowledge that the land owner is aware that the proposed development is planned for an area which
may be susceptible to erosion and/or flooding. I acknowledge that the Local Permit Officer has explained to me the particu-
lar hazard problems associated with this lot. This explanation was accompanied by recommendations concerning stabiliza-
tion and floodproofing techniques.
I furthermore certify that I am authorized to grant, and do in fact grant, permission to Division of Coastal Management staff,
the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information
related to this permit application.
This the Q0, day of f�rd— 20 L
Landowner or person authorized to act as his/her agent for purpose of filing a CAMA permit application
This application Includes: general information (this form), a site drawing as described on the back of this application, the
ownership statement, the Ocean Hazard AEC Notice where necessary, a check for $100.00 made payable to the locality, and
any information as may be provided orally by the applicant. The details of the application as described by these sources are
incorporated without reference in any permit which may be issued. Deviation from these details will constitute a violation of
any permit. Any person developing in an AEC without permit is subject to civil, criminal and administrative action.
RECEIVED
DCM tnm RAINGTON. NC
APR 4 `J11
AtG HALARU NOTICE
Project is In An: Ocean Erodible Area
✓ High Hazard Flood Area
Property Owner: � P� G1 S k K n �m
Property
Date Lot Was Platted: MalcAm 5, 195c1
This notice is intended to make you, the applicant, aware of the
special risks and conditions associated with development in this
area, which is subject to natural hazards such as storms, erosion
and currents. The rules of the Coastal Resources Commission
require that you receive an AI#C Hazard Notice and acknowledge
that notice in writing before a permit for development can be
issued.
The Commission's rules on building standards, oceanfront
setbacks and dune alterations are designed to minimize, but not
eliminate, property loss from hazards. By granting permits, the
Coastal Resources Commission does not guarantee the safety of
the development and assumes no liability for future damage to
the development. Permits issued in the Ocean Hazard Area of
Environmental Concern include the condition that structures be
relocated or dismantled ifthey become imminently threatened by
changes in shoreline configuration. The structure(s) must be
relocated or dismantled within two (2) years of becoming
imminently threatened, and in any case upon its collapse or
subsidence.
The best available information, as accepted by the Coastal
Resources Commission, indicates that the annual long-term
average ocean erosion rate for the area where your property is
located is 2 feet per year.
The rate was established by careful analysis of aerial photographs
of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as much as
_feet landward in a major storm.
The flood waters in a major storm are predicted to be about
VF /Meet deep in this area.
Preferred oceanfront protection measures are beach nourishment
and relocation of threatened structures. Hard erosion control
structures such as bulkheads, seawalls, revetments, groins, jetties
and breakwaters are prohibited. Temporary sand bags may be
authorized under certain conditions.
The applicantmust acknowledge this information and requirements
by signing this notice in the space below. Without the proper
signature, the application,4ill not be complete.
Inlet Hazard Area
SPECIAL NOTE: This hazard notice is required for development
in areas subject to sudden and massive storms and erosion. Permits
issued for development in this area expire on December 31 of the
third year following the year in which the permit was issued.
Shortly before work begins on the project site, the Local Permit
Officer must be contacted to determine the vegetation line and
setback distance at your site. If the property has seen little change
since the time ofpermit issuance, and the proposed development
can still meet the setback requirement, the LPO will inform you
that you may begin work. Substantial progress on the project
must be made within 60 days of this setback determination, or
the setback must be remeasured. Also, the occurrence of a major
shoreline change as the result of a storm within the 60-day period
will necessitate remeasurement of the setback. It is important
that you check with the LPO before the permit expires for official
approval to continue the work after the permit has expired.
Generally, if foundation pilings have been placed and substantial
progress is continuing, permit renewal can be authorized. It is
unlawful to continue work after permit expiration.
For more information, contact.
Local Permit OB/oer
Address
(ern .r51e-3egc�
Locality
�f/o-5�9�3�L9
Phone Number RECEIVED
DCM WILMINGTON, NC
M,M 2 8 2011 )
Applicant Signature l / ) Date
Revised 2107
z
R,
I' 19 q-
j1b ai�"4d}y
QNnc�ti
-�� n4 -A234 h;o
-7(-n4 -qv1W2d ao In 14 3y} U3d.)x4 a+
wJA 11a5a 5-4 -a-4a (4vaK3
"V5
IW
m
..
0
M
°`Oyu F11C
! A L
U S. E
m
D—
$C:44
C470
171
Postage
$
m
Certified Fee
$2.80
10
Rd
Postmark
p
Return Receipt Fee
$2.30
Hem
p
(Endorsement Required)
O
Restricted Delhrery Fee
$0.00
O
(Enrlom mew Required)
Total Posro-- ^^---
f5,54
C r28/2011
Iq
sen"' Al's Pals Limited Partnership
Ir
0;�� 2437 Shiland Drive
---
0
``
,5767 eie; Rock Hill, SC
29732
---
C3
.. -
r,
C3'101-
�+
B' Q
'-A. L
m
.,
Er
t`
Postage
$
m
u
Certified Fee
ru
p
Retum Receipt Fee
Postmark
C3
(Endorsement Required)
Hera
G
Restdcled Delivery Fea
-
(EndoreementRequired)
C3-
CID
.
0' N/2'011
_a
Total Postage ^ -- --
m
"`r° StephenT.Byrd
13
�M 1200 Blenheim Drive
o
(`
cry sea,"ai Raleigh, NC 27612
RECEIVED
DCM WILMINGTON, NC
APR 0 4 2011
CAMA PERMIT NOTICE
Pursuant to NCGS 113-119(B) municipality of Ocean Isle Beach gives
notice that on March 28, 2011, applicant Splash Kingdom, LLC applied for a
CAMA minor development permit to extend existing ground floor deck
oceanward five feet to the tow of the frontal dune at 50 East First Street, Lot
17 & Y2 of 18, Block 1, Section C. The application may be inspected at the
below address. Public comments received by April 8, 2011.
Justin Whiteside
CAMA Local Permit Officer
Three West Third Street
Ocean Isle Beach, NC 28469
910-579-3469
Please publish this notice in the March 31, 2011 edition of the Brunswick
Beacon.
RECEIVED
DCM WILMINGTON, NC
APR 0 4 2011
Simpson, Shaun
From: Simpson, Shaun
Sent: Friday, May 06, 2011 10:46 AM
To: Simpson, Shaun
Subject: RE: OIB 11-11 & 11-16
Hey Justin,
Just talked to Debbie about another application/permit 11-16. She agrees that the drawing needs to show the setback
and AEC lines.
Thanks, and have a nice weekend,
Shaun
From: Simpson, Shaun
Sent: WednesdayApril 27, 2011 3:21 PM
To- Justin Reside
Subj . OIEI 1
Even though I've had this for a while, I can't find where I asked you for the signed AEC Hazard Notice, so here goes:
Can you please send the signed AEC Hazard Notice for this Kinlaw application?
O,
Shaun
Shaun Simpson
Environmental Technician
NC Dept of Environment E Natural Resources
NC Division of Coastal Management
127 Cardinal Drive Ext
Wilmington, NC 28405
Phone: (910)796-7226, Fax: (910)395-3964
Shoun.5imosonOncdenr.gov
1 `\ 1
E-mail correspondence to and from this address
may be subject to the North Carolina Public
Records Caw and may be disclosed to third parties.
`'A Be Green - Don't print this e-mail unless required.
CAMA PERMIT NOTICE
Pursuant to NCGS 113-119(B) mu-
nicipality of Ocean Isle Beach gives
notice that on March 28, 2011, appli-
cant Splash Kingdom, LLC applied for
a CAMA minor development permit
to extend existing ground floor deck
oceanward five feet to the tow of the
frontal dune at 50 East First Street,
Lot 17 & V. of 18, Block 1, Section C.
The application may be inspected at
the below address. Public comments
received by April 8, 2011.
Justin Whiteside
CAMA Local Permit Officer
Three West Third Street
Ocean Isle Beach, NC 23469
910-5793469
Mat 31
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK
AFFIDAVIT OF PUBLICATION
Before the undersigned, a Notary Public of said County and State,
duly commissioned, qualified, and authorized by law to administer
oaths, personally appeared
Scott R. Harrell
who, being first duly sworn, deposes and says: that he is
Publisher
(Owner, partner, publisher, or other officer or employee
authorized to make this affidavit)
of The Brunswick Beacon, a newspaper published, issued, and en-
tered as periodical mail in the Town of Shallotte in the said County
and State; that he is authorized to make this affidavit and sworn state-
ment that the notice or other legal advertisement, a true copy of
which is attached hereto, was published in The Brunswick Beacon
on the following date(s):
March 31, 2011
and that the said newspaper in which such notice, paper document
or legal advertisement was published, was at the time of each and
every such publication, a newspaper meeting all the requirements
and qualifications of Section 1-597 of the General Statutes of North
Carolina and was a qualified newspaper within the meaning of Sec-
tion 1-597 of the General Statutes of North Carolina.
This the 31 St day of March, 2011.
(Sig Xature person making affidavit)
Sworn to and subscribed before me this 31St day of March,
2011.
(Notary Public)
My commission expires: December 29, 2014. RECEIVED
APR 2 7 2011
')CM WILMINGTON, NC