Loading...
HomeMy WebLinkAbout88095B - Whitehurst, Ed 1 ,,,,°“`°"mi`N CAMA ,‘`DREDGE & FILL 1:2 S No. 88095 A I C D GENERAL PERMIT IDTt - IOgS Previous permit /�<< Date previous permit issued A 1 n New I Modification (�Complete Reissue n Partial Reissue ).f As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I 5A NCAC -`'- - �'=,f ❑ Rules attached. n General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent . ,•, , Address Project Location(County): , '' City State ZIP -. Street Address/State Road/Lot#(s) Phone#( ) ;/ ,k-.,.,j . ,-_J 7) Email Subdivision • S City " ZIP ?, Affected I 1 CW n EW n PTA ES I 1 PTS Adj.Wtr.Body • (nat/man/unk) AEC(s): n OEA n IHA n UW SPIMA I I PWS Closest Maj.Wtr.Body r ORW:yes/no PNA:yes/no Type of Project/Activity • (Scale: �cY Shoreline Length Access Length • , - Pier(dock)length _rC' Fixed Platform(s) -_ �/ [ P ' -- Floating Platform(s) Finger pier(s) ( I _. 11 Total Platform area - i_ 1- - -_ - -,:,' "' ``* i Groin length/# { Bulkhead/Riprap length '- L Avg distance offshore Breakwater/Sill - . -- - Max distance/length -. �' Basin,channel Cubic yards -,, 1 : }—._ _ 1_ Boat ramp , 0 a � __ Boathouse/Boatlift �° _ I Beach Bulldozing 1 t l` ._ — l-iT " OtherI —r S SAV observed: yes no i d ' t T''t Moratorium: n/a yes no , -! i — : j Site Photos: yes no --- t-�' -- — ' Ss� =.---- , Riparian Waiver Attached: yes no _ • '' ' �" ''A `1 1 ''1 + I ki A building permit/zoning permit may be requires by: --" Permit Conditions " piTAR/PAM/NEUSE/BUFFER(circle one) 1 I - s 0 See note on back regarding River Basin rules nSee additional notes/conditions on back 7 ( \Y I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) I' Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature - 4. Z. Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions, Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret,Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ilI ICAMA , I DREDGE & FILL " ' N� 88095 A B C D GENERAL PERMIT r r) 4-1- t 0 Previous permit Date previous permit issued New I I Modification I Complete Reissue n Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: I5A NCAC I Rules attached. I I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) Phone#( ) Email Subdivision City ZIP Affected I I CW EW I I PTA ES I PTS Adj.Wtr.Body (nat/man/unk) AEC(s): I I OEA IHA UW SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length L 1- --1 ,_ --- j Pier(dock)length ( I f r• f�t f��� Fixed Platform(s) I I f f ' t I I 4 7Floating Platform(s) s ; • Finger pier(s) i , _ f I , , 4 Total Platform area , ( • i A N , _ `,�}•�,.- f+a . Si , c."' *\ 1 Groin length/tt I . -_ I Bulkhead/Riprap length -- .---- t I _ — , Avg distance offshore - '--- I --i--- I ! — -- 4-- I --_..--i Breakwater/Sill I ) Max distance/length i +( s 1' - - 1 . S 1 -I :)t L 1 Basin,channel '11,• ' ' "' Cubic yards �_...__. I —• _ .---._., ,rt ti Boat ramp I: i *-- - `' -+ •--- Boathouse/Boatlift _ '1 I 1 a I Beach Bulldozing a il Other • 4 I -- -1-- SAV observed: yes no Si II I I ` ' Moratorium: n/a yes no r I Site Photos: yes no q=- � + -' __} 4, i— . - Riparian Waiver Attached: yes no '"� ';,_ H. ( „.l i- `A building permit/zoning permit may be required by: R Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one) See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check tt/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River,Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort, Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie,Camden,Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 n ROY COOPER Governor 1 MICHAEL S. REGAN Secretory Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALFTV Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all ofthe conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees)unl ess otherwise approved by DCM.The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shal I be limited to six(6) feet. 4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facilityand any requested access way.This drawing will be used to aid in compliance and monitoring efforts. • Pre-project site conditions: ` 6f I'S '' XI:s+"1—' t'''^ (j -Qr`'I ''--C By your signature below you agree to be held responsible for meeting all of the conditions listed abov n verify that all • fo mation provided is complete and accurate. CGS►-lye. Age t or ' a Printed Name it icer's Signature /3 a z Agent or Applicant Signature I ue D e CAMA GENERAL PERMIT#: C6S 17-i State of North Carolina I Environmental Quality I Coastal.Managernern Washington Office 1443 Washington Square Mall Washington.NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Ext.Wilmington,NC 28405-3845 140-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 . , _. . , . . ... . ... • PEF?mtl...6PPtICAJI.SIN A....,g_f_tL_T ALITI„,ictifipft_ciALVIA____..= - /.> Name of ProPErtY Owner Roqutsting Permit totalling Addres$: 4 9 2 CAA)A.P ?Le '. -/411..C?_1.-:-.(1(4" ri)- .._..._ _._._. .... ....._............_ __— Email Address: ed kik i -teic(A. r--5 -1", CI kaii.a.C24rOM I certify that a have authorized Avnt i corttaftv.4.1 to act on my behalf, for the purpose of applying for and obtaining oil CAVA perrnitZ necessary for the following proposed deveiopment: ... _______ 2 - '•. . - e.._ ... . .. - . . . . at my property located at -I CPS'a- A1111)4( (-44litt/a. V-P:in • , . . . , . • I furthermore certio,, that I am n authorized to grant, and do in tarot grant penes,, to . ''' . si• the Local Permit Officer and their agents to enler Division of Coastal Management staff • on he aforementioned lands in conneohoii with evaluating inkinni -neateri to-this • ' ' - . ',Iambi app,ication • - .- , , .- .. . . . b' Property Owner information: . . _ .. . . . . . . , .._/,... ...„. ...__...L_I . . . . . ,• ... ,.... . . , ,... .., . • ... ..., ...._, ..,• ,', .., .,. . ,. - , • ' ''' ... .e. ,.•,.. ., , ., , , , . , , . , . ., ., - . . , - . • ,- -., , . •,, - . ., . .. . , . . . • . ,. . ., , , .. . - . .. „ . ,, . . . , ,, • ,,e .. , .. • r , - ' -. , . ., . . . . . .. ' -• . . Si itature • -- • - - •:.., 5.:-•,---,-, --. :•••,,g,,,,,,...-,-,-,.•is,',.-•,,, ,-,-,-,---.;.,•-,--,?,-,.-z•.;. .. -.,:' -.,-,...-... - - t-b. ) '-- 14_11.. .i-iu 1 e _i-- . ,...-:.,,,:,-,,,,..,,ii,-,4•,,,,;:,...4,..,44„,-..,,,,c-,,,,„,,,, ,,,,,,,,,„ „_ ,.,.,:_:.=.,,.2:.-,-;,.,..,,,...:.,:,,,..,,,,, ,7'-.. :• .••'''• ,.:•'•. '-'? tP4j*4.i.`;?§44%;•4'''.•;: .',::::,'.::.::d.‘:5:::;% .::'i'S:'•'' '''k'''7 r.1:-/ -'• :...........,,,,,....,, , . . .,:,:,:;•.,;V:k1;t.' •" : ,f, ,,,ii,.4+''`..41:i; 1.*,-. ./ii-.`.'s+.,..0.-'..I.4,,,-,..?t^si,4.::°''-.):47• ••-•.-•'''...., Ptlfli 01 rype Marne .- -.,•-•.:.k`rt-,'-'--' 's• . ..--'47 ,,,,-. .;,.. -3:,13,A.:1,;-,:.'!...,,z-.•;.,.,?‘‘:::-.._ , . - -.. .,: ,y, .;et;.:',, '.4,, . •-•,,,v ,., -.. - -1,,,-.3:-.,-„,3,4,.,...;,-,:-.....:-•,---,.--,:..,t,-,--..,:,•-: -,,,,-,-, • . - ' , -....---,--.N.`;k.;i•••"4 •••'•?J&i,,.,:4--.4.,"4. ;.::.-.41,..-44.....: .i:4:,;... .`'V•'••* ',;;;,,,•:•`4.i?'?.+...-."•5; .• I .....C;'...,,;...:','.1,r..q4;,..,.t•;;;44,..j7;'1.!•,1"!*,..,....,...4. !,.1.0_,R:::.?•,'.4Wt0...1_%:;-,;;...'''. '',,.:".;.i.-:':•.::..7,•.!"-:'"....... , rtne ,• , • . . .•- .- ..,,,,-...,,,,,,,,,,,,, ,,,•e•,-1,,-1-•;::-.$'...,„iik:4 -.,,,w,i,,t-,e,15'ifri.,•'---=x'-',:;•;:••r1:44,f•t;•.., ,-.:- . . • : ........-.' i'i;,:pi,--:::),$.-'-'',•(•.'-,4:4•`,".-:-. .--.-,-..--4,...','!...,,,,- • - •;•,..--_..., .....44, ...* . 4,41-1.Let A''..--k1:..i.4 ;,,-4:'';',.e4;;;.:;. '1."•.'',..,'". :,,-1:!'"--.6::Vt-ie-.-',In?'-;:'4g...'i..4.-. ,. l•k_.),::::•,.-*.i3,..,ka.::::,,tigl'''.f.,,,,;77;.1,:: ' . ',: , . br:te • .. . . 7 .. ... . . , • 4,..'.... i." - , ^'W.V. •-ii: .-,tiii-il,..„,,,. , .,,,,..,,t,,A...,,.....,..1 ,.,,.... ,,..,. -%,,,,,."t,_, CA,'2,,,. ,,.'4,,11.4.:.'?.:,...v,,A.,-.7.,:::/:,r,r, ,,,„,...°4t...1 .1.ANi ,.. 0..„ ,,Nt:.t",.tf.1, . " „ ...•,:. :'.' .. ..'"t':''''t. .•t..k.:A..n....,A.t.,,I.,,,.;„*.r7.:.:., ,Fr,,,,.•,.ovt„....t.,,,,,,,,,„4„...,,,,,...,„.„ :4,3,,-.1...,..)i , . .....,:;,,,,,,i,....:,:,:,.. ...1.,,,..;,,, i4§4.41/44t.:?b,K-.1.,,,.. „2,- ,,if..1, .4:.-...:, ,.i...A4.4f.4 .. .4. ytitiAtl-,.. .11.4,c.Erlifik-atico 05 valid thirOil9l).. - . . -•:`;'•'-l' .'il'I'" '1. - -,,,v,-.14 ,::-..x.c...t.,,,1„::vt:ziiil,,,,,,, ,.,,4,,,,*r, L . . ,..,.... . , .........7••••.,,..'....",.if;t:,,• 1-44(4.1.!1'A;...^.4%.;,•••^,,..::..i.....'-'• ,:4.'''',.'i."\•.••°:C."'"..i; '4:4' t-:-.• ',,,<-.,:s,"P-•..-.4,h : . . '''''...:-.".:',1....ij.j?.'''Atk'u.,1.,-;-':4::-':'',44ti;- ''4,'-':',V1:;.. ..:4,:t''',.4:•.-:,.;:;-..,'[.:„:(:,‘•,,-i,....!,.-.: '..!:1-i.A;1_-.,,,::1.•P•':1"2,1''-......,!-'•'%•,...1r,'..,•;:A N.C. DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL • RETURN RECEIPT RE UESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Re6e_4 qi e ee„dAll Address of Property: 19 I C anti d L Flu.o.« Tel Fa b Mailing Address of Owner. I q kI ('d.,Qd. Owner's email* IZen-d Mq-1 • Owners Phone#; 1 i 9 y O to _-I 190 Agent's Name: "r' Agent Phone* Agent's Email: ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed b the Adjacent a .. I hereby certify that I ownproperty - - • "" "" owner e above permit has described to me, a hown e on the attached drawing,the development they arel propo for sing A property. applying descri ion or drawin with dimensions must be rovided with this letter. I DO NOT have objections to this proposal. I DO have objections to this proposal. !f you have objections to what is being proposed, you must notify the N.C. Division of Coastal AV in writingwithin 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be. contacted at(252)948-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any groin must be set back a minimumedistance of 15'from my areatof rampavan access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback, you must sign the appropriate blank below.) I DO wish to waive some/all of the 15'setback OR- Signature of Adjacent Riparian Property Owner I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner Typed/printed name of ARPO: Mailing Address of ARPO: ARPO's email: ARPO's Phone#: Date: *waiver is valid for up to one year from ARPO's Signature* Revised July 2021 To Wh m It May Concern, I,Juds n T.Whitehurst,give Robert A.Kendall permission to build a boat lift within his boat slip(Boat Slip 1) ithin the Canady Landing Community. hi-l--- 7- / - 2_2_ X + Date: Judson T hitehurst I, Ed A J Whitehurst Jr.,give Robert A. Kendall permission to build a boat lift within his boat slip(Boat Slip 1)withjin the Canady Landing Community. X Date: / ....--- 2---07 Ed A.Whitehurst Jr. i 1 i t Grandy, Ashley From: Bob <poledriver2@hotmail.com> Sent: Friday,July 8, 2022 12:50 PM To: Grandy,Ashley Subject: [External] Fwd: estimate on dock and lift CAUTION:External email.Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Report Spam. Sent from my iPhone Begin forwarded message: From: Rob Kendall<rkenda110717@gmail.com> Date:July 8, 2022 at 12:30:54 PM EDT To: bob carlyle<poledriver2@hotmail.com> Cc: Konnie<k.noorda7@gmail.com> Subject: Re:estimate on dock and lift Bob, I hope all is well. I give you permission to install a boat lift at my address at 1981 Canady Landing Rd, Aurora, NC 27806. Please let me know if you need anything else. Thanks, Robert Kendall 719-466-7190 On Sat,Jul 2, 2022, 08:42 Rob Kendall <rkenda110717@gmail.com>wrote: Bob, Attached is the deed describing my ownership of the boat slip where the lift will be installed. Please let me know if you have any questions or concerns. Thanks, Rob On Sat,Jul 2, 2022 at 7:12 AM Rob Kendall <rkenda110717c gmail.com>wrote: Bob, Attached is the signed agreement from Judson and Ed. 1 On Fri,Jul 1, 2022,09:05 Rob Kendall <rkenda110717@gmail.com>wrote: Bob, Sounds good; lets move forward. Did you say that the 7k is faster than the 10k?Or vise versa? On Fri,Jul 1, 2022,07:32 bob carlyle<poledriver2@Jhotmail.com>wrote: Total 7k with auto stop and walk board with ladder and permit$12,900 Complete Sent from Mail for Windows From: Rob Kendall Sent: Friday,July 1, 2022 7:01 AM To: Bob Subject: Re: estimate on dock and lift Bob, Thanks for the clarification.You did mention when you were here that you can do just the boat lift and then there was an attachment that you put on the boat lift that allows you to walk to the boat (think you said it was a few hundred dollars more). It sounded like with this option I wouldn't need a dock. Thanks, Rob On Fri,Jul 1, 2022,06:56 Bob<poledriver2@hotmail.com>wrote: I got those in wrong place the 7 and 10 2 The 10 is 500 more than 7 Poles on dock will not be in correct placement for lift Sent from my iPhone On Jun 30, 2022, at 10:47 PM, Rob Kendall<rkenda110717@gmail.com>wrote: Bob, Thanks for the quotes.All seem reasonable to me. There was another option that we discussed where we put in a boat lift with the attachable walkway. How much would that cost? Also,why is the 10k boat lift cheaper? Haha Thanks, Rob On Thu,Jun 30, 2022, 14:38 bob carlyle<poledriver2@hotmail.com>wrote: Sorry it has taken so long Internet has been out since last Thursday playing catch up Ok here we go For a floating dock 4x40 ft long installed $10,259 This will be a aluminum dock with flow tru top and 2 dock hooks on side 3 To do same dock but stationary cement top handy cap$9800 Add boat lift 7k boat lift with auto stop and remote not wired to lift to shore power$12,200 Or 10 k boat lift with auto stop and remote not wire to shore power$11,700 These prices are if we do at same time and I did give you a 5%off for military's service thank you again wife and yourself We would need a permit of$200 to do job I think I gave you paperwork to get permits Let me know Sent from Mail for Windows 4