Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
85266_Joe A Barkley_20220728
itwz41 4.f 1CAMA DREDGE & FILL S No 85266 A B C D ; GENERAL PERMIT - fl # 27 to Date previo s permit issued ['New fl Modification Li Complete Reissue n Partial Reissue As authorized by the State ofJNorth Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: .�1 I 5A NCAC 0 Rules attached. n General Permit Rules available at the following link:vwvw.deq.nc.gpv/CAMArules Applicant Name Authorized Agent Address Project Location(County): City State ZIP Street Address/State Road/Lot#(s) 3"..04.Ck1 v1 ��/l Phone#(_) J Email Subdivision City ZIP Affected ❑CW EW I 1 PTA ❑ES ❑PTS Adj.Wtr.Body (nat/man/unk) AEC(s): 0 OEA n IHA fl UW n SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length Access Length 1_ - I t ...... ._..._ — Pier(dock)length 1 i 1 j 1 Fixed Platform(s) - , f Floating Platform(s) ! 1 1 it Finger pier(s) ( i, I I . . _ —+ I i Total Platform area ; AA Groin length/# 1 i" f 11 .----i Bulkhead/Riprap length _ i — . Avg distance offshore Breakwater/Sill l • Max distance/length _ j - Basin,channel I I , 1 Cubic yards _ ;t Boat ramp — —____--,-_- — Y i Boathouse/Boatlift # i ' Beach Bulldozing i i , /.' I. 'I` Other 1 / _ 4 .., Gam. L 1. r . --4 r j $ -- ---,----1—r— SAV observed: yes no ., Moratorium: n/a yes no j I Site Photos: yes no } . i ,, i ' ~ Riparian Waiver Attached: yes no i i/, i A building permit/zoning permit may be required by: El Permit Conditions TAR/PAM/NEUSE/BUFFER(circle one) ElSee note on back regarding River Basin rules 0 See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) .. Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature**Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ar Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax:910-395-3964 (Serves: Bertie, Camden,Chowan,Currituck, Dare,Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 4v31 ` t.f CAMA _ DREDGE & FILL 11—' ' � 85266 ABC D GENERAL PERMIT _7. v : # 1 "7 7 Previous permit Date previous permit issued New Modification Complete Reissue I I Partial Reissue As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: 15A NCAC 7 Rules attached. [ I General Permit Rules available at the following link:www.deq.nc.gov/CAMArules Applicant Name - Authorized Agent Address Project Location(County): � City State ZIP Street Address/State Road/Lot#(s) � ...,c, � /‘ 1-.v-1 Phone#( ) Email Subdivision City ZIP Affected n CW n EW n PTA ES PTS Adj.Wtr.Body (nat/man/unk) AEC(s): ! IDEA IHA I I UW I I SPIMA PWS Closest Maj.Wtr.Body ORW:yes/no PNA:yes/no Type of Project/Activity (Scale: ) Shoreline Length j % I I Access Length ! ! 1 I K Pier(dock)length Fixed Platform(s) i Floating Platform(s) } 1 , Finger pier(s) ! ) I ((( I Total Platform area , Groin length/# I Int � Bulkhead/Riprap length 1 I I ` . II L—_ Avg distance offshore I- - -- ---F - .-.i - — Breakwater/Sill I I Max distance/length Basin,channel { Cubic yards Boat ramp i Boathouse/Boatlift 1 Beach Bulldozing ' • • I'y— Other i �t _,_ ____ SAV observed: yes no -�-, , _. .----�_____ - 1__._�— _ .-__t___-- .. --." , . Moratorium: n/a yes no I ' - Site Photos: yes no Riparian Waiver Attached: yes no - A building permit/zoning permit may be required by: Permit Conditions I 1 TAR/PAM/NEUSE/BUFFER(circle one) See note on back regarding River Basin rules See additional notes/conditions on back I AM AWARE OF STATUTES,CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Permit Officer's PRINTED Name Signature"Please read compliance statement on back of permit** Signature Application Fee(s) Check#/Money Order Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar - Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave Morehead City, NC 28557 943 Washington Square Mall Washington, NC 27889 252-808-2808/1-888-4RCOAST Fax: 252-247-3330 252-946-6481 (Serves: Carteret, Craven—south of the Neuse River, Onslow Fax: 252-948-0478 Counties) (Serves: Beaufort,Craven—north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Elizabeth City District Wilmington District 401 S. Griffin St. Ste. 300 127 Cardinal Drive Ext.Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 (Serves: Bertie, Camden, Chowan,Currituck, Dare, Gates, Hertford, (Serves: Brunswick, New Hanover and Pender Counties) Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 ROY COOPER ' Governor MICHAEL S. REGAN Secretary Coastal Management- BRAXTON DAVIS ENVIRONMENTAL auAIRY Director • BUFFER AUTHORIZATION CERTIFICATE FOR SHOREUNE STABILIZATION A riparian buffer authorization Is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR)regulations15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR)has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities mitered by your Coastal Area Management Act(CAMA)permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor)performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and • . filling In the buffer is a violation of the riparian buffer rules. • 2. Clearing&Grading:Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet landward)is allowed provided that it is re-vegetated immediately and Zone 1 Is not compromised,which includes maintaining diffused(non-channelized)flow of storm water runoff through the buffer. a. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects,but they must be • satisfactorily restored as described in condition 5 below. 4. Potential Overtnfash:For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization:Immediately post-construction,bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation.Restoration must be completed by the first subsequent planting season(November 1 through March 30)after completion of the bulkhead. • Pre-project site conditions: 10.a. ! "s- - L. I'L I k. 4i • 7. Project Drawing:The drawing on the CAMA General Permit Is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above �listed �conditions and verify t at all • Information is complete/ / and accurate. �tite •-1/ram nt or nt Printed Name Permit titer's Signature rti �. =� e" Ag nt or Appli ant Signature /i /' Iss a Da CAMA GENERAL PERMIT R: X 52(96 -4 • State of North Carolina I Environmental Quality I Coast Management Washington Office 1943 Washington Square Mall Washington.NC27889 1252-946-6481 Wilmington Office 1 127 Cardinal Drive Ext.W8mington.NC 28405-38451 9:D-795-72M Morehead City Office 1400 CommerceAvenue Morehead CIty.NC Z85S1 1252-808-2808 AVE NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor James H.Gregson, Director William G.Ross Jr.,Secretary Date f"C% - 7--c-'L 2-- Name of Property Owner Applying for Permit: �1-‘ /biz Ale i- A(//n-C c, i " . /3/i/e/l/e Mailing Address:��] 3bCP / /! C ici4Is e A4ri V/e?_ 2z c /�-�U Iv C 2.7 5 "7 • --�v h N store I certify that I have authorized (agent) JQ/j,1J / - ,t'o9y behalf,for the purpose of applying for and obtaining all CAMA Permits necessary to i install or construct(activity) .1.5c., /A' h ea r-i�li e i- at(my property located at) `t S T3 JC kL if,) /.i1W e fh-/,4c.- (ye-,41) /ik This certification is valid thru (date) /a-3 / - Zczz_ . ' i� N /i / 2_/©-Z Z- 'r perty Owner Signa Date i_ 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Acbon Employer--50%Recycled 1 10%Post Consumer Paper p10'"fi v6 441% isit%ssN4sL%tssisoissioNlii‘,----- i - loi:F‘Q- - --- , 911 . -{ h f .. 1 I r A-90r --.., 7 / /-44°":41 e,S rie_, 1 . t' h �''' V ' / '71 ,/ y�'.9 ' , J ip M . t 4F o 'C., -7 ,5y/ 0 }1�JJ/1Vi..ili f\ff /'fi vli'fi! • ifY. �i�. 'Y"""�• CERTIFIED MAIL • RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) • 1 1 Name of Property Owner:_ ?r�Z- P, r312 Kb / phi IJ/ i rjl fr Address of Property: '/J �� i• • /VC_ 7e Malting Address of Owner: ,34!o / gey te/.v S C k a Pe--f . , 2t'13./ ui C GeIf" - owner's f of fr? 2 O /.f�/ ySq'-7 Owner's email:t�.e lr�l�i � X+'u• s Phone#: Agent's Name: Agent Phone#: Agent's Email: -_ .. tea•li,. '--- -r. r= s-amm.n.,.s,..iwONn ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (Bottom portion to be completed by the Adiacent Property Owner) I hereby certify that I own property adjacent to the above referenced property.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing. A description or drawing,with dimensions,must be provided with this letter. ✓I DO NOT have objections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you rnn'sf notify the N.C. Division of Coastal Management(DCM) in writing within 1D days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mali, Washington, NC 278$. 0CM representatives can also ha contacted at(252)946-6481. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that any proposed pier,dock,mooring pilings,boat ramp, breakwater, boathouse,sift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or riprap revetments). (If you wish to waive the setback,you must Can the appropriate blank below.) DO wish to waive some/all of the 15'setback Signature of Adjacent Riparian Property Owner -OR- i do not wish to waive the 15'setback requirement(initial the blank', / -- Signature of Adjacent Riparian Property Owner: - u4''•; Typed1Printed name of ARPO: t i.i14Is CriC Mdreirn,-,cis Cr c-k re-- ` .cc Rd. f Sanborn i ' .s l'C. z. 3 e 7/st`rin e. iflatlin3c+dress of A€2©O: la0 {I t / r,c rr,c own iRPO's email: r 1 C 2, stone#: (9 I O 2-Ci- I O CO '�rc4 k e i 5ca t) `q S PP ) tr Is ilid for u to;� e year parr► !_r?a uffe Date:_Le �1��7_.Z, Revised July 2021 N.4. UIVtAIUN UT- 41,../MJ I MI-IMMNHVCIvtC 17I ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM CERTIFIED MAIL ' RETURN RECEIPT REQUESTED or HAND DELIVERY (Top portion to be completed by owner or their agent) Name of Property Owner: Lf r, l�, 1�(_�'c / tt=ii' Address of Property: 47/ J /�C b,,/ /; fill P/ ( ��'�112 u['l+.' NC Mailing Address of Owner: .3L•/: I l K/(ti S L .4 cf Pe-t i-t, 2C1 u/cii /L' C. r uZ t7 rc Owner's email:[!C i' 1I/, 62 6f 11.tru- Owner's Phoned t (j L ri 112 !-5 7 5 i -7 Agent's Name: Agent Phone#: Agent's Email.__ �. ---- ---- ADJACENT RIPARIAN PROPERTY OWNER'S CERTIFICATION (t3ottom portion to be completed by the Adjacent Property Owner) I hereby certify that I own property adjacent to the above referenced propert/.The individual applying for this permit has described to me, as shown on the attached drawing, the development they are proposing A description or drawing,with dimensions,must be provided with this letter. V I DO NOT have cbjections to this proposal. I DO have objections to this proposal. If you have objections to what is being proposed, you must notify the N.C. Division of Coastal Management(DCM)in writing within 10 days of receipt of this notice. Correspondence should be mailed to 943 Washington Square Mall, Washington, NC 27889. DCM representatives can also be contacted at(252)946-6481.No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION urderstand that any proposed pier,dock, mooring pilings,boat ramp,breakwater,boa house,lift,or groin must be set back a minimum distance of 15'from my area of riparian access unless waived by me (this does not apply to bulkheads or nprap revetments).(If you wish to waive the setback,you must sign the appropriate blank below.) i DO wish to waive somelall of the 15'setback • Signature of Adjacent Rip is Prot oily Owner - J ' -OR- I do not wish to waive the 15'setback requirement(initial the blank) Signature of Adjacent Riparian Property Owner: Typed/Printed name of ARPO: Meiling Address of ARPO: ARPO's email: ARPO's Phone*: Date: 'waiver is valid for up to one year from ARPO's Signature' Revised July 2021