HomeMy WebLinkAbout133-17 Renewal 2020 Roberts, AndyPermit Class
RENEWAL
Permit Number
133-17
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Andy Roberts 1392 Hickory Fork Rd., Walnut Cover, NC 27052
Authorizing development in Beaufort County at adi. to Pamlico River, on Lot 1 of Tradewinds
S/D off Old Pamlico Beach Rd., near Belhaven , as requested in the permittee's application dated letter dated
This permit, issued on December 31, 2020 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
De subject to tines, imprisonment or ctvu acuon; or may cause me permit, io De nuu auu WILL.
1) This renewal shall be attached to Permit No. 133-17, which was issued to the permittee on 11/22/17,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
2016-0643 v2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2017-02153.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
9�
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: WaRO Major Permit Staff: Gregg Bodnar
Applicant
Name:
Last
Project
Address: Lot I Chambers Point Rd
Street Address
Roberts
First
Request Date:12/21/2020
Belhaven 27808
City ZIP Code
CAMA Permit Permit Expiration Payment
No.: 133-17 Date: 1 12/31/2020 $ 100.00 # 9099
Agent's
Name:
District Manager/Field Rep Approve? (Initial YES NO
Appropriate Box) P-- ❑
D WR USACE Action
Project No: 2016-0643 V2 ID No.: SAW-201502280 SAW-2017-02153
If Yes,
Has substantial YES NOX Explain
development occurred? x ❑ ❑ . Has hauled 50 load of sand to till approved .06 of an acre
Recommend to Renew?
If Not Approved,
provide Justification:
raarjara�ua�..
YES NO
X2, ❑
Date:
RvECEIVE
DEC 2 9 2020
0
ANDY ROBERTS
;r $ > r � f �,j (yc ❑[� �s � /� 7 � f�(gtatvy�' 9 �yy''UFr{t7 i rA �q a i .. § t ¢ v'
12/14/2020
Mr. Shane F. Staples
943 Washington Square Mall
Washington, NC 27889
RE: Lot #1 Chambers Point Road
Dear Mr. Staples:
133-0
I am requesting an extension on Permit # 1;6-f7 as discussed in our conversation on 12/4/20.
Gerald Selby of Selby Land Concepts is helping with the construction of this project. Mr. Selby
has been diagnosed with COVID-19 and is unable to complete his part of the project.
To date we have hauled in and placed 50 loads of sand to fill in the approved .06 of an acre.
We have also cleared, graded and put in the construction entrance all the way to the river.
Enclosed you will find the $100 check for the extension fee.
Should you have any questions please contact me at 336-362-5500.
And H. Roberts
CND
DEC 2 9 2020
[yglP SE C T 10 H W"1HL)
RECEIVED
DEC 21. ZOZO
DCM-WAFT®
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
U X
Braxton C. Davis, Director
Division of Coastal Management
RW-blilii nd its oc nditions are hereby accepted.
DEC 2 9 2020
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for .
AL Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
133-17
Issued to Andy Roberts 1392 Hickory Fork Rd Walnut Cover NC 27052
Authorizing development in Beaufort County at ad!. Pamlico River, on lot 1 ofTradewinds S/D off
Old Pamlico Beach Rd., near Belhaven , as requested in the permittee's application dated 9/14117, Incl. sit. workpkn drawings
(4). Survey DID "Rec. 9/29/1711, Pier/Shoreline Stabil, Plan View DTD 9/14/17, Shoreline Stabil. Profile DTD 9/14/17. e: Pier Prnfile nTn on All 7
Iius permit, issued on November 22, 2017 is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
�..... �� ,v,ur„uay uu suuVut co lines, Imprisonment or civil action; or may cause the permit to be null and void.
Upland Development
1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing
activities associated with the development of the above referenced property, including the homesite,
driveway, and other associated infrastructure, all as expressly and specifically set forth in the
attached permit application and workplan drawings.
(See attached sheets for Additional Conditions)
....a Pcia.u. ¢uuuu uray oe appealea oy me perromee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees that
Your project is consistent with the North Carolina Coastal
Management Program.
P SECT ION W11-In Signature ofPermittee
Roberts
ADDITIONAL CONDITIONS
Permit No.133-17
Page 3 of 3
The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's riparian access corridor.
General
No vegetated wetlands or open water areas shall be excavated or filled, even temporarily, outside of the
approved alignments.
i This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The pemiittce is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
I'E: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
rE: The U.S. Army Corps of Engineers authorized the project by way of Nationwide Permit 18
(Action ID SAW-2015-02280) and Programmatic General Permit 198000291(Action ID SAW-
2017-02153).
The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4097 and assigned the project DWR Project No. 2016-0643 V2.
Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946-6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many land disturbing
activities are not authorized within 50 feet of the normal water level unless specifically exempted
by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations
in place at the time of such development.
An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
RECEI M
DEC 2 g 2020
PIP SECTION RU-IND
DCM Coordinator: Permit #: cwcl
Permittee:
MAILING DISTRIBUTION SHEET
a. t%4k
Z705L
DCM Field Offices
Elizabeth City 15 Washington �(�� (with revised work plan drawings)
Morehead City Wilmington (OBJECTIONS )
US ACOE Offices: s/
Washington: Raleigh Blan'eaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecwme (NC DOT -Remainder ECity/Washington District)
Wilmington: Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property:
DEMLR/DWR:
Renee Gledhill -Earley. at Environmental.Review@ucdcr.gov
Heidi Cox (WIRO)
Kim Harding
David Harris
Shannon Jenkins / Sharon Gupton
Tim Walton / Mike Moser
"'Sheri Montalvo / Shelton Sull' an J
Washington: Chris Pullinger - 40.
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Clif Whitfield (WARD)
Jimmy Harrison
Wilmington: Robb Mairs — 401 (Brunswick, New Hanover)
Holley Snider-401 (Carteret, Onslow, Pender)
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources:
Natural Heritage Program
LPO:
Maria Dunn (WARD)
Rodney Butler
(NCDOT) Travis Wilson