HomeMy WebLinkAbout53-17 Renewal 2021 Quail Woods Village LTD... _. _. ..........._-
Permit Class Permit Number
RENEWAL 53-17
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
�ern�it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Quail Woods Village LTD., 131 Quail Woods Drive, New Bern. NC 28560
Authorizing development in Craven County at adi. to Broad Creek, a tributary of the Neuse
River as requested in the permittee's application dated letter dated
"Received MP Section MHD 2/18/21 ".
This permit, issued on - February 18, 2021 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
ce subject to rmes, imprisonment or civil action; or may cause the permit to be null and void.
1) This Renewal shall be attached to Permit No. 53-17, which was issued to the permittee on 4/28/17, as
well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in,force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
2011-0207 v2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2017-00455.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
iuIs permn acnon may oe appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Z_//4-�1
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
DCM Coordinator: �l)�ll � Permit #: 5-3 -11 o4twa
MAILING DISTRIBUTION SHEET
Permittee: Qi /4)mj c 4 1/ j� r� l�cxo f / ( .a. Y f1 s Dl�
Agents:
DCM Field Offices
Elizabeth City J Washington (with revised work plan drawings)
Morehead City EY.-i Wilmington (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington: Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources: Renee Gledhill -Earley at Environmental.Review@ncder.gov
Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARD)
Marine Fisheries: Kim Harding Jimmy Harrison
NC DOT: David Harris
Shellfish Sanitation: Shannon Jenkins / Sharon Gupton
State Property: Tim Walton / Mike Moser
DEMLR/DWR: Sheri Montalvo / Shelton Sullivan
Washington: Chris Pullinger-401
Tina Martin - 401
k Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Robb Mairs —401 (Brunswick, New Hanover)
Holley Snider-401 (Carteret, Onslow, Pender)
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources: Maria Dunn (WARD) (NCDOT) Travis Wilson
Natural Heritage Program Rodney Butler
LPO:
Please extend our Boat Ramp for Quail Woods Village LTD. due to COVID , and delaying the constr
. We had to fix the road going to the ramp and run water for a fire hydrant for safety, Also please
change the address to;
131 Quail Woods Drive
New Bern, N.C. 28560
Thank You very much,
Rose Anderson - Pres. Quail Woods Village LTD.
RIZCsE'iVE®
FEB 1 S "21
MP SECTION MHD
LAMA Major Permit Renewal Request
District Morehead City Major Permit Staf Gregg Bodaar
Applicant
s ,�� �D
(�`�� a\\ W � equest Date:
Name: � �.•
- Last First
Received in Office:
Project ` , 1
Address: , \yy� (1 IS
SmdAddreaa Dry /� ZyIP Code
CAMA Permit oC �ayment $ W
No.: �� Permit Expiration Date: "
Name:
District Manager/Field Rep Approve? (Initial E
Appropriate Box)
DWR
Project No:
Has substantial
development occurred?
If Yes,
YES No Explain
❑ ❑
USACE Action
ID No.:
YES NO I 3�
Recommend to Renew? ❑ ❑ l tt^x I
If Not Approved,
provide Justification:
NO � lh��
11
Staff / (r
Signature: Q t4 Data
RECEIVED
FEB 1 0 2021
LIP SECTION VE0
NC Division of Coastal Management
Cashier's Official Receipt
int'e Names- tXV D&A V`TocI S V1AW, V l V
12622 A B C D
Dat 3�� 20
1 V�/r L/tJ
Check No.: C-1 O
County:
Please retain receipt for your records as proof of payment for permit issued.
of Agent or Applicant:
of Feld Representative:
Date: \ `
Date: \Q ` `-0
�v
dLU
y�
Quail Woods Village LTD.
Permit No. 53-17
Page 2 of 3
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) This permit authorizes a maximum of 7 formalized boat slips.
7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to
the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat
does not result from the construction and/or operation of the authorized facilities. Therefore, no
formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV
impacts.
8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
9) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State.
10) Excavation and fill below the normal water line associated with the placement of the boat ramp shall be
limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in
size that specified in the attached permit application and workplan drawings.
11) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
Sediment and Erosion Control
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes.
Stormwater Management
NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water
permit No. SW7140304
RECEWED
F E B 1 8 2021
DECEIVED
DEC 312020
DCM-MHD CITY
I
I
mm,
n
pt�':plryvnusc,£11epiescatahs{'¶�',1c9e8M0C1493.
Crec CounL7.Com9 saione� 1978-1980LU
O
..
N
1aloveawFed: -
n��rzc2uLULU
co
_ I®
LLI
rmae= 1 n�F )enai 1 tlrnVena & IleiclaP rnt Pi,
®
ly p
[�MM�' •( 52) 6'33 145fr _> FA71: (22e2)'OZ 145 .
�.
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: Morehead City Major Permit Staff: Gregg Bodnar
Applicant Information
Applicant I1 ,1 �S \ I \�\ a� l D
Name: ���a��yV OO �J equest Date:_
Last First
Received in Office:
Address:
Sneer Address - City ZIP Code
CAMA Permit
No.: Permit Expiration Date: 1� � �ayment $
Agent's
Name: ?6,pEk kcpnoxuvv
District Manager/Field Rep Approve? (Initial YES No cSN
Appropriate Box) ❑ ❑
Other Information
DWR
Project No:
If Yes,
Has substantial YES NO Explain
development occurred? ❑ ❑
YES NO
Recommend to Renew? ❑ ❑
If Not Approved,
provide Justification:
Staff
Signature:
USACE Action
ID No.:
Date:
Please extend our Boat Ramp for Quail Woods Village LTD. due to COVID , and delaying the construction
. We had to fix the road going to the ramp and run water for a fire hydrant for safety, Also please
change the address to;
131 Quail Woods Drive
New Bern. N.C. 28560
Thank You very much,
Rose Anderson - Pres. Quail Woods Village LTD.
NC Division of Coastal Management
Cashier's Official Receipt
Received From:1 N ex ��✓'e-► `�`o �' \I V�.zy ..A:►
Permit No.: � %v j — 11 (—I
Applicant's Name:
Project Address: �L11 N i'
12622 A s C D
rN
Dated 3 l 20 4 A
$ Iwo �` M
1
Check No.: O
County:
Please retain receipt for your records as proof of payment for permit issued.
Signature of Agent or Applicant:
Signature of Field Representative:
Date: '�']�
Date: Na � w
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
Permit Number
53-17
RECEIVED
DEC 312020
DCM-MHD CITY
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Quail Woods Village LTD., 211 Wilson Point Rd., New Bern, NC 28562
Authorizing development in Craven County at adi. to Broad Creek, a tributary of the
Neuse River , as requested in the permittee's application dated 2/10/17, including attached
workplan drawing (1), dated revised 12/15/16.
This permit, issued on April 28, 2017 is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
n u,wc Mu„a u,ay uc oUUJV .a w ■uMa, uuyriauwucui ur crvu auivu, ut 111ay caubc ulu ycuuu w uc uuu auu vulu.
Boat Rama Facility
This permit authorizes only the boat ramp, piers, and uses located in or over the water that are
expressly and specifically set forth in the permit application. No other structure, whether floating or
stationary, shall become a permanent part of this boat ramp facility without permit modification. No
non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without
permit modification.
2) Any portion of the permitted access pier built over coastal wetlands shall not exceed six feet in width
and shall be elevated a minimum of three feet over the wetland substrate as measured from the
bottom of the decking.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2020
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
V-
Braxtont.bavis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Quail Woods Village LTD.
ADDITIONAL CONDITIONS
Permit No. 53-17
Page 2 of 3
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) This permit authorizes a maximum of 7 formalized boat slips.
7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to
the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat
does not result from the construction and/or operation of the authorized facilities. Therefore, no
formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV
impacts.
8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
9) The boat rump shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State.
10) Excavation and fill below the normal water line associated with the placement of the boat rump shall be
limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in
size that specified in the attached permit application and workplan drawings.
11) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
Sediment and Erosion Control
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes.
Stormwater Management
NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water
permit No. SW7140304
sa
Quail Woods Village LTD.
ADDITIONAL CONDITIONS
Permit No. 53-17
Page 2 of 3
5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
6) This permit authorizes a maximum of 7 formalized boat slips.
7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to
the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat
does not result from the construction and/or operation of the authorized facilities. Therefore, no
formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV
impacts.
8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
9) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State.
10) Excavation and fill below the normal water line associated with the placement of the boat ramp shall be
limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in
size that specified in the attached permit application and workplan drawings.
11) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
Sediment and Erosion Control
12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property.
13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes.
Stormwater Mana¢ement
NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water
permit No. SW7140304
RECEIVED
DEC 312020
DCM-MHD CITY
y
All work must cease when the permit expires on
; Member 31, 2020
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
,,,.J the
r n.... n.
-..... 1SS t.. V iJ, LlreClor
t_.
va.aeawa vt \.vuawl 1r1wii%ciI1CRi
aad .. coalitions are hereby accepted.
Signature ofPernittee
Quail Woods Village LTD.
ADDITIONAL CONDITIONS
Permit No. 53-17
Page 3 of 3
General
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2017-00455).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 3900 and assigned the project DWR Project No. 2011-0207 V2.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination.
NOTE: The permittee is advised that many land disturbing activities are not authorized within 50 feet of
the normal water level unless specifically exempted by Environmental Management
Commission's (EMC) Neuse River buffer regulations in place at the time of such development.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.
RECEIVED
DEC 31 2020
DCM-MHD CITY
cwi,r n CouCom'niaavoper 1978-1980
N��Cnnllouae oI¶¶RePtcsenfafive¶a 1990-1993
131 Q,>eijIlV D. . .
' 1�Teor,l3om,'1�TC'26560. ..
'(252) 636-7652,..
bcr, "rimbcrlend: ,Farmland & lievclopmenf hroperky
; HOME: (252) 633-1456 � .. ��: (262).633-1456