Loading...
HomeMy WebLinkAbout53-17 Renewal 2021 Quail Woods Village LTD... _. _. ..........._- Permit Class Permit Number RENEWAL 53-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission �ern�it for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Quail Woods Village LTD., 131 Quail Woods Drive, New Bern. NC 28560 Authorizing development in Craven County at adi. to Broad Creek, a tributary of the Neuse River as requested in the permittee's application dated letter dated "Received MP Section MHD 2/18/21 ". This permit, issued on - February 18, 2021 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ce subject to rmes, imprisonment or civil action; or may cause the permit to be null and void. 1) This Renewal shall be attached to Permit No. 53-17, which was issued to the permittee on 4/28/17, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in,force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 2011-0207 v2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2017-00455. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. iuIs permn acnon may oe appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Z_//4-�1 Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee DCM Coordinator: �l)�ll � Permit #: 5-3 -11 o4twa MAILING DISTRIBUTION SHEET Permittee: Qi /4)mj c 4 1/ j� r� l�cxo f / ( .a. Y f1 s Dl� Agents: DCM Field Offices Elizabeth City J Washington (with revised work plan drawings) Morehead City EY.-i Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Greg Curry (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill -Earley at Environmental.Review@ncder.gov Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARD) Marine Fisheries: Kim Harding Jimmy Harrison NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins / Sharon Gupton State Property: Tim Walton / Mike Moser DEMLR/DWR: Sheri Montalvo / Shelton Sullivan Washington: Chris Pullinger-401 Tina Martin - 401 k Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs —401 (Brunswick, New Hanover) Holley Snider-401 (Carteret, Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARD) (NCDOT) Travis Wilson Natural Heritage Program Rodney Butler LPO: Please extend our Boat Ramp for Quail Woods Village LTD. due to COVID , and delaying the constr . We had to fix the road going to the ramp and run water for a fire hydrant for safety, Also please change the address to; 131 Quail Woods Drive New Bern, N.C. 28560 Thank You very much, Rose Anderson - Pres. Quail Woods Village LTD. RIZCsE'iVE® FEB 1 S "21 MP SECTION MHD LAMA Major Permit Renewal Request District Morehead City Major Permit Staf Gregg Bodaar Applicant s ,�� �D (�`�� a\\ W � equest Date: Name: � �.• - Last First Received in Office: Project ` , 1 Address: , \yy� (1 IS SmdAddreaa Dry /� ZyIP Code CAMA Permit oC �ayment $ W No.: �� Permit Expiration Date: " Name: District Manager/Field Rep Approve? (Initial E Appropriate Box) DWR Project No: Has substantial development occurred? If Yes, YES No Explain ❑ ❑ USACE Action ID No.: YES NO I 3� Recommend to Renew? ❑ ❑ l tt^x I If Not Approved, provide Justification: NO � lh�� 11 Staff / (r Signature: Q t4 Data RECEIVED FEB 1 0 2021 LIP SECTION VE0 NC Division of Coastal Management Cashier's Official Receipt int'e Names- tXV D&A V`TocI S V1AW, V l V 12622 A B C D Dat 3�� 20 1 V�/r L/tJ Check No.: C-1 O County: Please retain receipt for your records as proof of payment for permit issued. of Agent or Applicant: of Feld Representative: Date: \ ` Date: \Q ` `-0 �v dLU y� Quail Woods Village LTD. Permit No. 53-17 Page 2 of 3 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) This permit authorizes a maximum of 7 formalized boat slips. 7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized facilities. Therefore, no formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV impacts. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 10) Excavation and fill below the normal water line associated with the placement of the boat ramp shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached permit application and workplan drawings. 11) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Sediment and Erosion Control 12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property. 13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. Stormwater Management NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water permit No. SW7140304 RECEWED F E B 1 8 2021 DECEIVED DEC 312020 DCM-MHD CITY I I mm, n pt�':plryvnusc,£11epiescatahs{'¶�',1c9e8M0C1493. Crec CounL7.Com9 saione� 1978-1980LU O .. N 1aloveawFed: - n��rzc2uLULU co _ I® LLI rmae= 1 n�F )enai 1 tlrnVena & IleiclaP rnt Pi, ® ly p [�MM�' •( 52) 6'33 145fr _> FA71: (22e2)'OZ 145 . �. NC Division of Coastal Management CAMA Major Permit Renewal Request District: Morehead City Major Permit Staff: Gregg Bodnar Applicant Information Applicant I1 ,1 �S \ I \�\ a� l D Name: ���a��yV OO �J equest Date:_ Last First Received in Office: Address: Sneer Address - City ZIP Code CAMA Permit No.: Permit Expiration Date: 1� � �ayment $ Agent's Name: ?6,pEk kcpnoxuvv District Manager/Field Rep Approve? (Initial YES No cSN Appropriate Box) ❑ ❑ Other Information DWR Project No: If Yes, Has substantial YES NO Explain development occurred? ❑ ❑ YES NO Recommend to Renew? ❑ ❑ If Not Approved, provide Justification: Staff Signature: USACE Action ID No.: Date: Please extend our Boat Ramp for Quail Woods Village LTD. due to COVID , and delaying the construction . We had to fix the road going to the ramp and run water for a fire hydrant for safety, Also please change the address to; 131 Quail Woods Drive New Bern. N.C. 28560 Thank You very much, Rose Anderson - Pres. Quail Woods Village LTD. NC Division of Coastal Management Cashier's Official Receipt Received From:1 N ex ��✓'e-► `�`o �' \I V�.zy ..A:► Permit No.: � %v j — 11 (—I Applicant's Name: Project Address: �L11 N i' 12622 A s C D rN Dated 3 l 20 4 A $ Iwo �` M 1 Check No.: O County: Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: Signature of Field Representative: Date: '�']� Date: Na � w Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for Permit Number 53-17 RECEIVED DEC 312020 DCM-MHD CITY X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Quail Woods Village LTD., 211 Wilson Point Rd., New Bern, NC 28562 Authorizing development in Craven County at adi. to Broad Creek, a tributary of the Neuse River , as requested in the permittee's application dated 2/10/17, including attached workplan drawing (1), dated revised 12/15/16. This permit, issued on April 28, 2017 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation n u,wc Mu„a u,ay uc oUUJV .a w ■uMa, uuyriauwucui ur crvu auivu, ut 111ay caubc ulu ycuuu w uc uuu auu vulu. Boat Rama Facility This permit authorizes only the boat ramp, piers, and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this boat ramp facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) Any portion of the permitted access pier built over coastal wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. V- Braxtont.bavis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Quail Woods Village LTD. ADDITIONAL CONDITIONS Permit No. 53-17 Page 2 of 3 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) This permit authorizes a maximum of 7 formalized boat slips. 7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized facilities. Therefore, no formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV impacts. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The boat rump shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 10) Excavation and fill below the normal water line associated with the placement of the boat rump shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached permit application and workplan drawings. 11) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Sediment and Erosion Control 12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property. 13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. Stormwater Management NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water permit No. SW7140304 sa Quail Woods Village LTD. ADDITIONAL CONDITIONS Permit No. 53-17 Page 2 of 3 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) This permit authorizes a maximum of 7 formalized boat slips. 7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized facilities. Therefore, no formalized docking space shall be provided on the landward side of the docks as to avoid potential SAV impacts. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 9) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. 10) Excavation and fill below the normal water line associated with the placement of the boat ramp shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size that specified in the attached permit application and workplan drawings. 11) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Sediment and Erosion Control 12) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property. 13) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. Stormwater Mana¢ement NOTE: The Division of Energy, Mineral and Land Resources has approved the project under storm water permit No. SW7140304 RECEIVED DEC 312020 DCM-MHD CITY y All work must cease when the permit expires on ; Member 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. ,,,.J the r n.... n. -..... 1SS t.. V iJ, LlreClor t_. va.aeawa vt \.vuawl 1r1wii%ciI1CRi aad .. coalitions are hereby accepted. Signature ofPernittee Quail Woods Village LTD. ADDITIONAL CONDITIONS Permit No. 53-17 Page 3 of 3 General 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-00455). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 3900 and assigned the project DWR Project No. 2011-0207 V2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. NOTE: The permittee is advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Neuse River buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVED DEC 31 2020 DCM-MHD CITY cwi,r n CouCom'niaavoper 1978-1980 N��Cnnllouae oI¶¶RePtcsenfafive¶a 1990-1993 131 Q,>eijIlV D. . . ' 1�Teor,l3om,'1�TC'26560. .. '(252) 636-7652,.. bcr, "rimbcrlend: ,Farmland & lievclopmenf hroperky ; HOME: (252) 633-1456 � .. ��: (262).633-1456