Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
128-17 Pungo River Farms LLC
Permit Number 128-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Pungo River Farms LLC. 601 St. Mary's St., Raleigh, NC 27605 ing development in Beaufort County at adi. to Linear Bay off the Pungo River, on Pamlico Beach Rd., near Belhaven, as requested in the permittee's application dated 8/3/17, incl. attached I awings (6), Fig 2 dated 7/27/17, Fig 3 dated "Rec 9/11/17", Cross Sections for Segment 14 dated 10/12/17. ?T' his"permit, issued on November 22, 2017 is subject to compliance with the application (where , conststent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these'terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization — Rip Rap Revetment The alignment of the authorized rip rap shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by DCM within a maximum of 30 days prior to the new expected start of construction. The alignment of the toe of rip rap shall not exceed the alignment as depicted in the attached permit application and workplan drawings. (See attached sheets for Additional Conditions) irmit action may be appealed by the permittee or other persons within twenty (20) days of the issuing date. =it must be accessible on -site to Department When the project is inspected for compliance. maintenance work or project modification not covered ier requires further Division approval. must cease when the permit expires on December 31, 2020 this permit, the State of North Carolina agrees that is consistent with the North Carolina Coastal Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. , Br ton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee .-...................... Farms LLC. Permit No.128-17 Page 2 of 3 ADDITIONAL CONDITIONS Shoreline Stabilization - Breakwater The breakwater shall be constructed as depicted in the attached project narrative, permit application and workplan drawings. breakwater alignment shall not exceed the alignment as depicted in the attached permit application workplan drawings. height of the permitted breakwater shall not exceed 1.5 feet above normal water level and have -nsions and slope as depicted in the attached project narrative, permit application and workplan cfill of the breakwater or any other filling of wetlands, estuarine waters, public trust areas or high is authorized by this permit. General he temporary placement or double handling of rip rap or fill materials within waters or vegetated etlands is not authorized. rip rap material shall consist of clean rock or masonry materials *such as, but not limited to, granite, , or broken concrete. It shall be of a size sufficient to prevent its movement from the approved anent by wave or current action. 'If the crossing of wetlands with mechanized construction equipment is necessary, temporary construction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed Immediately upon completion of construction. This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third parry without the written approval of the Division of Coastal Management. In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management prior to the initiation of any dredging or mobilization activities. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-01997). The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4097 and assigned the project DWR Project No. 17-1143. A Pungo River Farms LLC. Permit No.128-17 Page 3 of 3 ADDITIONAL CONDITIONS NOTE': The permittee is advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations in place at the time of such development. `NOTE: An application processing fee of $400 was received by DCM for this project. DIVISION OF COASTAL MANAGEMENT Application Processing Notes Applica Type: (check all that apply) New Major Mod_ Permit# Permit Coordinator: Field Representative =cr_;el I Minor Mod_ Renewal_ Transfer_ C Date Time Message S�Cvt �Ibll� �oRC add �l%. r,0:1( pm,i"-LJ aid h.-% r bop— -- Mirk/ irowk waos-�r,n�aord�d w� . i414.+o6F�6/al t "W 75-c6y el-16Q4 «I7(,, . " io/51'1T vwtk�OwS "pa. 1olg,, low- herGJJeg io ytr (2F?),6 ra?. 1%rpf?60S crv% Ser`e 5 M1-4 �r1 2fR/111(w/17 �a�' �O� vCv�cw G 1 1 SI4 Coastal Management ENVIRONMENTAL QUALITY November 27, 2017 Pungo River Farms, LLC 601 St. Mary Street Raleigh, N.C. 27605 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure Sincerely, Douglas V. Huggett Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City. NC 28557 2528082808 Permit Number 128-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Pungo River Farms LLC. 601 St. Mary's St., Raleigh, NC 27605 ing development in Beaufort County at adj. to Linear Bay off the Pungo River, on Beach Rd., near 2 dated 7/27/1 as requested in the permittee's application dated 8/3/17, incl. attached 3 dated "Rec 9/11/17", Cross Sections for Segment 1-4 dated 10/12/17. This permit, issued on November 22, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of se, terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization — Rip Rap Revetment The alignment of the authorized rip rap shall be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by DCM within a maximum of 30 days prior to the new expected start of construction. The alignment of the toe of rip rap shall not exceed the alignment as depicted in the attached permit application and workplan drawings. (See attached sheets for Additional Conditions) ermit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the I persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. must be accessible on -site to Department the project is inspected for compliance. e work or project modification not covered further Division approval. -k must cease when the permit expires on December 31, 2020 this permit, the State of North Carolina agrees that t is consistent with the North Carolina Coastal t Program. Mon C. Davis, Director of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee River Farms LLC. Permit No.128-11 Page 2 of 3 ADDITIONAL CONDITIONS Shoreline Stabilization - Breakwater breakwater shall be constructed as depicted in the attached project narrative, permit application and cplan drawings. ie breakwater alignment shall not exceed the alignment as depicted in the attached permit application d workplan drawings. e height of the permitted breakwater shall not exceed 1.5 feet above normal water level and have pensions and slope as depicted in the attached project narrative, permit application and workplan cfill of the breakwater or any other filling of wetlands, estuarine waters, public trust areas or high is authorized by this permit. General temporary placement or double handling of rip rap or fill materials within waters or vegetated ands is not authorized. Phe rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite, earl, or broken concrete. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. the crossing of wetlands with mechanized construction equipment is necessary, temporary instruction mats shall be utilized for the areas to be crossed. The temporary mats shall be removed unediately upon completion of construction. permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the en approval of the Division of Coastal Management. order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall iedule a pre -construction conference with the Division of Coastal Management prior to the initiation any dredging or mobilization activities. This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-01997). The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4097 and assigned the project DWR Project No. 17-1143. Farms LLC. Permit No.128-17 Page 3 of 3 ADDITIONAL CONDITIONS ['E: The permittee is advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations in place at the time of such development. FE. An application processing fee of $400 was received by DCM for this project. KK, Wescott Environmental Services, Inc. (252) 402-9662 wescottenvironmental services Pgmail.com 91 October 12, 2017 Mr. Robert Tankard, Assistant Regional Supervisor RECEIVED Water Quality Regional Operation Section OCT 13 2017 Division of Water Resources, NCDEQ DCM- MHD CITY The Pungo River Farms LLC. shoreline protection project is divided into four sections. Section 1 is 335 linear feet of shoreline. All riprap will be placed landward of the normal water level (NWL). The riprap will impact between 4,020 to 5,025 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 2 is 1,222 linear feet of shoreline. The unvegetated beach is narrower therefore approximately half of the riprap will be landward of the NWL. The riprap will impact between 6,110 to 9,776 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 3 is 193 linear feet of shoreline. Riprap will be placed to form a free-standing breakwater with a base width of 10 feet. Half of the structure will be landward of the NWL. The structure will impact approximately 965 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 4 is 658 linear feet of shoreline. The shoreline has a 2 to 3-foot-high escarpment and no beach. A 20-foot wide construction corridor will be needed along the shoreline. Riprap will impact between 3,290 to 5,264 sq. ft. of Zone 1 of the buffer. Any part of the construction corridor not impacted by riprap will be allowed to revegetated from the existing undisturbed root mat. The long-term cumulative buffer impacts due to riprap placement for sections 1, 2 and 3 will be between 11,095 to 15,766 sq. ft. of unvegetated beach in Zone 1. Once the shoreline is protected by riprap any unvegetated beach not impacted by riprap is expected to be colonized by Spartina patens. The existing roads will provide access to the shoreline in sections 1, 2 and 3. Equipment will work along the existing beach which minimizes impacts to the vegetated parts of the buffer. Wescott Environmental Services, The long-term buffer impacts for section 4 will be between 3,290 to 5,264 sq. ft. to Zone 1. Any debris removed from the construction zone will be placed on uplands outside of the buffer. The intent of the proposed design is to minimize impacts to buffers. If you have any additional questions I can be reached by email or phone. Thank You, t/ v IKSGu� V V Q`�N✓V William Wescott, PWS (252) 402-9662 wescottenvironmentalservicesOgmail.com Page 2 Wescott Environmental (252) 402-9662 wescottenvironmentalservicesPgmail.com In 8/3/2017 This property was previously owned by a company that planned to develop a 400-lot subdivision with an associated marina. The development never materialized and the current owners purchased the property for recreational enjoyment for themselves and their families. The property will continue to be a managed pine plantation. Shoreline erosion is occurring at an annual rate of 5 to 6 feet per year and has resulted in the loss of three sections of the existing timber road. The owner relocated two sections of the road away from the shoreline and beyond the 75-foot CAMA AEC. In an effort to prevent future loss of shoreline and road infrastructure the owner is proposing to stabilize a section of shoreline along the Pungo River. This proposal is the most practical long-term approach instead of rebuilding roads again in just a few years. The previous owner had obtained a CAMA Major permit for 2,311 linear feet of vertical breakwater but only 1,100 linear feet were constructed. The current owner prefers to use a more permanent approach to shoreline stabilization and is proposing to place riprap along 2,408 linear feet of shoreline. This shoreline project will start where the previous shoreline project stopped. After meeting with NCDCM and USACE representatives, the project was redesigned to further minimize impacts to public waters. The proposed project will place 12,245 square feet of riprap below the NWL and 20,909 square feet of riprap above the NWL. No wetlands will be filled. Trees and shrubs will be cut within a 20-foot wide corridor for the purpose of equipment access during construction. Only the above ground vegetation will be removed but the stumps and root mat will remain in place. Temporary mats will be used to access segment three of this project. Any fallen trees currently in within the footprint of this project will be placed landward of the riprap. The temporary access corridor will re�EIVED naturally after construction. Thank you for considering this request. SEP 112017 Sincerely, DCM- MHD CITY 'i1ni1 j� V OC DCM Q AUG 17 2017 William Wescott, PWS a Wescott Environmental Services, Inc. W ARO ism UP-1 APPLICATION for Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Pdmary Applicant/ Landowner Information Business Name Pungo River Farms Uc. Project Name (if applicable) Pungo River Farms shoreline protection Applicant 1: First Name John MI Last Name Chiavetta Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Meiling Address 601 St. Mary's Street PO Box City Raleigh State NC ZIP 27605 Country USA Phone No. ext. FAX No. - Street Address (if different from above) City State ZIP Email johnchiavetta@yahoo.com 2. Agent/Contrector Information Business Name Wescott Environmental Services, Inc. t)c V � }0 � Agent/ Contractor 1: First Name William MI G Last Name Wescott pUG 1 5 2�17 Agent/ Contractor 2: First Name MI Last Name ARo Mailing Address 859 Manson Drewry Road PO Box Cily Manson State NC ZIP 27553 Phone No. 1 252 - 402 - 9662 ext. Phone No. 2 ext. FAX No. Contractor# Street Address (if different from above) City State ZIP Email wescoffenvironmentalservices@gmaii.com p C (d ^ ^ E IV� I1gmail.com <Form continues on back> SEP 112017 DCM- MHD CITY 252.808.2808 .. 1-888.4RCOAST .. www.nccoastafmanagement.net Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort PIN 15004807, off SR 1725, near Belhaven, NC 1725 Subdivision Name City State Zip Belhaven NC 27810 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar -Pamlico Pungo River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Pungo River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 31,152 ft (5.9 miles) 960 acres c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4 to 5 feet ❑NHW or ®NWL e. Vegetation on tract DUVA Managed pine plantation, coastal wetlands along creeks AUG 15 2017 f. Man-made features and uses now on tract Q timber management roads, silviculture ditches, site managed for timber production, pier with boa�i j�1190'll r feet of sheet pile breakwater g. Identify and describe the existing land uses adlacent to the proposed project site. managed pine plantation h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? NA (Attach zoning compliance certificate, it applicable) ❑Yes []No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does lt involve a []Yes ®No ❑NA National Register listed or eligible properW �r <Form continues on next page> SEP 1 1 2017 DCM- BALM 252.808-2808 .. 1.888.4RCOAST .. www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (I) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes []No (tit) If yes to either (1) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, ffavailable) n. Describe existing wastewater treatment facilities. none o. Describe existing drinking water supply source. none p. Describe existing stone water management or treatment systems. none 5. Activities and Impacts a. Will the project be for commercial, public, or private use? []Commercial ❑Public Government ®PrivatelCommunity, b. Give a brief description of purpose, use, and daily operations of the project when complete. The Pungo River shoreline at the project site is actively eroding. The erosion has caused the loss of logging roads and access to parts of the property. New logging roads have been recently constructed but shoreline stabilization is needed to prevent the loss of these roads again. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The proposed project will riprap 2,408 linear feet of shoreline. The contractor will use dump trucks, excavator, frontend loader, rock box and mats. When not in use, the equipment will be stored on existing logging roads or on uplands. d. List all development activities you propose. Riprap along the shoreline. AUG 15 2017 e. Are the proposed activities maintenance of an existing project, new work, or both? new f. What is the approximate total disturbed land area resulting from the proposed project? 1.78 (0.76 acres with riprap and 1.02 acres with temporary access corridor) ❑Sq.Ft or Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The project proposes the placement of riprap along 2,408 feet of eroding shoreline. The shoreline is divided into four segments. Segment 1 will have no discharge into waters. Segment 2 will have a maximum of 7,332 square feet of riprap below NWL. Segment 3 will have 965 square feet of riprap below NWL. Segment 4 will have a maximum of 3,948 square feet below NWL. i. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No G IV j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. S EP 11 201L DCA4- A,rr_,m. 252.808.2808 :: 1.888-4RCOAST :: www.nccoastaimanagement.net Form bCM MP-1 (Page 4 of 5) APPLICATION for <Form continues on back> Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (g are always applicable to any major development application. Please consult the application Instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. a. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Ronald Craft Phone No. Address 279 Hideaway Road, Belhaven, NC 27810 Name Oliva Carter and John Wallace Phone No. Address 205-12 109'"Avenue, St. Albans, NY 11412 Name Phone No. Address g. A list of previous stale or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Major 104-09, issued 7242009 to previous owner, Liniar Bay Subdivision for 2,311 linear feet of shoreline stabilization using sheetpile breakwater. Only 1,100 feet Lam' was constructed. GP 65529-B issued 1262016 to current owner for a pier and 2 pUG open boatlifts. h. Signed consultant or agent authorization form, if applicable. I. Welland delineation, If necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land J I understand that any permit issued in response to this application will allow only the development aescnrea in me appawkrvrr. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 8f32017. Print No fr _John Chiavetta Signature RECE9\�IL q J, Please indicate application attachments pertaining to your proposed project. SEP 11 2017 ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development DCM- MHD CITY 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form pCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit ❑DCM MP-4 Structures Information RECEIV - 6 SEP 11 2017 D Nun 15 Zo11 \,N PAO DCM- MHD C ',1" 252-808-2808 :: l-888.4RCOAST :: www.nccoastalmanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet Access Other Channel Canal Boat Basin . Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL stabilization Length 193 Width 10 Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 12. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. c. (i) Do you claim title to disposal area? []Yes []No ❑NA (li) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (8B), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None (ii) Describe the purpose of disposal in these areas: b. Dimensions of disposal area. d. @ Will a disposal area be available for future maintenance? []Yes []No ❑NA (i() If yes, where?�yp� nCt E () Does the disposal include any area in the water? ❑Yes ❑No ❑NA n11 G 15 2011 (ii) If yes, how much water area is affeolf�i? aRcRL-/1r�o.. _ o AI SEP 112017 DCM- MHD CITY 252-808-2808 :: 1-888.4RCOAST :: vm w.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 3) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: 2215 ❑Bulkhead ®Riprap ❑Breakwater/Sill ❑Other c. Average distance waterward of NHW or NWL: 5 e. Type of stabilization material rock, brick, broken concrete g. Number of square feet of fill to be placed below water level. Bulkhead backfill T Riprap 12245 Breakwater/Sill Other _ i. Source of fill material. offsite — rock, brick, broken concrete Width: 15 d. Maximum distance waterward of NHW or NWL: 6 f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ONO ❑NA (ii) If yes, stale amount of erosion and source of erosion amount information. 5 to 6 feet: Google earth aerial photography h. Type of fill material. rock, brick, broken concrete 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. () Will fill material be brought to the site? ❑Yes ONO ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (il) Amount of material to be placed in the water (iii) Dimensions of fill area IN) Purpose of fill a. How will excavated or fill material be kept on site and erosion controlled? large heavy rock, brick or broken concrete will not erode away c. (i) Will navigational aids be required as a result of the project? ❑Yes ONO ❑NA (11) If yes, explain what type and how they will be Implemented. 8/3/2017 Date Pungo River Farms shoreline stabilization suomergea aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV _ ❑SB OWL _ ❑None (ii) Describe the purpose of the fill in these areas: b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? dump truck, excavator, irontend loader, rock box d. (i) Will wetlands be crossed in transporting equipment to project site? ®Yes ONO ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Large temporary mats will be used in Segment 3 of the project to avoid disturbing the soil surface and plant roots. This area is mostly herbaceous vegetation and will recover quickly after construction is complete. Project John ChiavemVP 112017 Appl c5fth - M H D CITY 252.808-2808 :: 1.888.4RCOAST :: www.ncconstalmanaeament.net revised: 12/26/06 Form ©CM MP-2 (Excavation and Fill, Page 3 of 3) �24-- Appilwat Sigr{ l ure REC; pU6 5 2Gi7 SEP 1 J ACM- we"; \9 V 252.808-2808 :: 1-888-4RCOAST :: w .nccoestsimansoement net revised: 12/26/06 Belhaven L � `Scranton .Pungo River Farms shoreline project N Segment 1 (_imam 'tray 4 Segment 2 Segment 3 gment 4 End of Project - PUNGORIVER ,)J.... A �_pFt x 43W 1104. -- UPLAND 1056 „4 Pungo River Farms shoreline project 2 _;JJ:. Wetland Delineation verified by USACE /f--- Original verification in 2005 /-...)✓__ Renewed in 2016 N-995 JJ.... A Figure igure 3 A .)J....A .U.....)J.-A .)J....A .)J.... A M,L)- .)J....A 5625'S6" E .)J.... A )J.... A ...)✓- JJ.... A .)-...)J— —k - JJ.... A N 6570 a - JJ.... A JJ.... A / ...)✓- J-J L2355 2 �""; =___y JJ....A JJ....A t2322 A> A JJ...p.- 4----- i:: - _ - L2 3 - - - 76 /f W-6274 L2302 = =: :=: =:"d =- W-P-713 y f! N 45-39'26" _ I W-8255 221 RECEIVED SEP 11 2017 w_ur........ gs= DCM- MHD CITY =L6 W_3202 - UPLAND W-B146 86 LINE I J \ WMMDs UPLAND .500 W_C-502 _W-C-503 Typical section of eroding shoreline that has a sloping sandy beach. Figure 4 Photo taken 5/10/2017 Location: 35.42980 N-76.59364 W --I Cross-section for Segment 1 Riprap along 335 feet of shoreline at Pungo River Farms, LLC. No riprap placed below NWL. Scale: Not to scale, dimensions shown Normal Water Level Toed in to prevent undermining of riprap 4,020 to 5,025 sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap 2:1 slope; Riprap varies 12 to 15 feet landward of NWL 10/12/2017 RECEIVED OCT 13 2017 DC"- MHD CITY Cross-section for Segment 2 Riprap along 1,222 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 7,332 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown Normal Water Level Toed in to prevent undermining of riprap 2:1 slope; Riprap varies 4 to 6 feet waterward of NWL and 5 to 8 feet landward of NWL 10/12/2017 RECEIVED ocr 13 2017 DCM_ MHD CITY Cross-section for Segment 3 Riprap along 193 linear feet of shoreline at Pungo River Farms, LLC. 965 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown 965 sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap Normal Water Level Riprap breakwater Base width = 10 feet Top width = 2 feet Total height = 2 feet 2:1 slopes 10/12/2017 Construction access will be on temporary mats when crossing vegetated areas RECEIVED OCT 13 2017 DCM- MHD CITY Cross-section for Segment 4 Riprap along 658 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 3,948 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown RECEIVED OCT 13 2017 DCM- MHD CITY Normal Water Level Toed in to prevent undermining of riprap. Riprap varies 4 to 6 feet waterward of NWL 3,290 to 5,264 sq. ft. depending on the escarpment height of riprap impact in of 2 to 3 feet. buffer Zone 1 Riprap to extend 5 to 8 feet landward of CEIVED NWL. :T 13 2017 I- MHD CITE 20-foot zone cleared for construction access Any part of the construction corridor not impacted by riprap will be allowed to revegetate from the existing undisturbed root mat. 10/12/2017 DCM Coordinator: 60Dr'1 r' (Z Permit #: _. c� MAH.ING DISTRIBUTION SHEET--. - Permitee:_ %C, (Zi is atwg Agents: Wr�(4k ffes&17 8s9 gm w rrww Rol 6' oson il/� 27553 DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Blandfeaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) Josh Peletier (Bettie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pander) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pander) Cultural Resources: Renee Gledhill -Earley Public Water Supply: Heidi Cox (WTRO) Clif Whitfield (WARD) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Hams Shellfish Sanitation: Shannon Jenkia*f State Property: 46 Tim Walton DEMI"WR: Karen Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 I Roger 'Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401(Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401(Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn (WARO) LPO: Fax Distribution: Permittee N, Coastal Management ENVIRONMENTAL WALItV ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director October 18, 2017 Pungo River Farms, LLC. FILE Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Pungo River Farms LLC in Beaufort County Dear Mr. Chiavetta: This letter is in response to the above referenced CAMA permit application, which was accepted as complete by the Division's Washington office on August 15, 2017. On September 22, 2017, processing of your application was placed on hold pending resolution of issues with The NC Division of Water Resources (NC DWR). This office received an email from the NC DWR staff that their request for additional information had been satisfied on October 18, 2017. Therefore, processing of your permit application has officially resumed. The revised projected 75-day deadline for making a decision is November 24, 2017. Please feel free to contact me by phone at (252) 808-2808 ext. 215 if you would like to discuss this matter further. Sincerely, Gregg Bodnar Assistant Major Permits Coordinator State of North Carotita I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 8082808 Coastal Management ENVIRONMENTAL WALRT September 22, 2017 Pungo River Farms, LLC. Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 ROY COOPER Gatemor MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Dlreewr FILE SUBJECT: Coastal Area Management Act (CAMA) Permit Application Submittal for Pungo River Farms LLC in Beaufort County Dear Mr. Chiavetta: This letter is in response to the above referenced CAMA permit application, which was accepted as complete by the Division's Washington office on August 15, 2017. Processing of the application is ongoing. However, it has been determined that additional information will be required prior to the Division taking final action on your application. These required items are summarized below: 1) In accordance with 15A NCAC 07H.0208(a)(2)(B), it is the policy of this Division that, prior to taking final action on a project of this nature, a Water Quality Certification for the proposed development must first be approved by the Division of Water Resources (DWR). Based upon the attached hold for additional information from the DWR dated September 22, 2017, it appears as though additional information from the applicant will be required before a final decision on issuance of a Water Quality Certification can be made. Therefore, it is necessary that processing of your permit application be placed in abeyance until such time as the required information is provided to the DWR, a Water Quality Certification is issued for the project, and a copy of the approval supplied to this office. If you have any questions concerning these matters, please feel free to contact me by telephone at (252) 808-2808 extension 215, or by email at gregg.bodnar(e)ncdenr.gov. State of North Caroftna I ERNronmeroal Quaft I Coastal Management Morehead City office 1 400 Commerce Avenue I Morehead Cny, NC 28557 2528082808 �I CC: Sincerely, Gregg Bodnar Division of Coastal Management Assistant Major Permits Coordinator William Wescott c/o Wescott Environmental Services (via email) Anthony Scarbraugh, DWR WaRO (via email) Raleigh Bland, USACE Washington Regulatory Field Office (via email) Josh Pelletier,, USACE Washington Regulatory Field Office (via email) Washington DCM State of North Cambria I Environmental Qualtty l Coastal Maragement Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 2528082808 Water Resources I:nvirmmrental Quality 'September 22, 2017 CERTIFIED MAIL: 7017 2070 0000 7793 8515 RETURN RECEIPT REQUESTED Pungo River Farms, LLC ' Attn: Mr. John Chlavetta 601St. Marys Street Raleigh, NC 27605 Subject: REQUEST FOR ADDITIONAL INFORMATION Pungo River Farms Shoreline Protection (Previously Linear Bay Subdivision DWR # 08-0297 V4) Dear Mr. Chlavetta: ROY COOPER Gnarrnar MiCHAEL S. REGAN • .5'rrrrmry S. JAY ZiMMERMAN l)IIYr'lUr DW R # 17-1143 BEAUFORT County On September 9, 2017, the Division of Water Resources (Division) received your application dated September 6, 2017, requesting a 401 Water Quality and Buffer Authorization Certification from the Division* for the subject project. The Division has determined that your application Is Incomplete and cannot be processed. The application is on -hold until all of the following Information Is received: 1. Plan Detail for Tar -Pam lico Riparian Buffer Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). The Division recommends highlighting by hatching or shading all Impacts areas for temporary impact areas and permanent Impact areas. [35A NCAC D21-1.0502(g).and 15A NCAC 02B .0259(8)(b)(iv)j 2. Practical Alternatives for Tar -Pamlico Riparian Buffer Impacts Please provide more details regarding why Impacts associated with equipment access within the buffer cannot be minimized through alternative construction methodologies. [15A NCAC 02B .0259(g)(a)(1)) This Office believes that the proposed Impacts to buffer on the plans as described can be moved or reconfigured to minimize the Impacts. Please revise the plans to minimize the Impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to better minimize disturbance to the buffer. As part of the narrative, please conduct an alternative analysis addressing why this Is the preferred methodology compared to other access methods. In addition, this Office will require fallen trees, stumps and other debris removed during construction to be placed outside of the riparian buffer. �^NorhtntlCompares'.• , State or North Carolina I environmental Quality I Woter Resources^Welor Quality Regional Oper itimn Seetion.Washington ResJonal Onlee 943 Washington Squon Mail. Washinglon. Ncuh Carolina 27889 25:-046-6481 1 Pungo RIVer Forms, LLC Atthi Mr.,16M.Chlavetto Request for Additional Information 31 BufferAestoration: Please Provide this office with_a buffer,restoration associated Wlththe,cutilrig andremoval . .06 plan ass tiat of buffer vegetation as described In your application. ThIs planting plan must be: developed such that.at least tWO native tree specfes are tobepfanted at a density sUffitieht to provide260.tpees per Ore At.Maturlty, This density can be q*eveci. by pionfirig approx., motely 3§9 (11% it feet spacing) to 538,(9"x:9 feet spaclhg): trees per acre.. Restoration of.trees/shrubs/forest mustbe tomip.16teid 691hoirstso, 45040ent (Ndvemlidrir6_'th U0. te" Kmafcfi_36)� 140 ffthe� troep!Op.fipgs.do not ".N.eif qyVjII.needjt9be re -6.4erimt IssUffidienito, ptat4sQ6 that ih ' provide 32-01fees per acre4t maturity; As -,a part of this. plan, your response must include an implementation/planting theduje wtt�xlear date This can Malkin 'Wood - Old . be a6lieved by Malkin stemmed vegetation is'described .in:Gu[OLINnosfor -Ripotipo'qVffer Aeitoratloij provided online [15A NCAC 01.0259(4)(a)j pursuant to,ISANCACO2H4502(g);:ISA.NgAi 02.0259(2)i15A CACO24 .02 9 51180)(10440CAC628' .0259(8)(a)(1) an ' d 1�;A.NCAC'02 OZ59(4)(a) the applicant* $hall furnish all of the above requested information .for the proper consideration:of t application: it ail of !be reclut ed inf6rhipti- �erp (ation. sit Wls riot received :in writing Within 30-calendardays of-recelpt.of this letter, .tlhe.Dlyjstop Will be unable to approve. the: ,apolleatfona6dit-Wlllbereturned. TN-eeturn of this project Will necessitate reapplication to the blylsfori-for appr9y .1 a a fee. _2qj,: Oudlogg compliette applicattenp c-k.ge and the appropriate. Nease respond. In Writing Within 30 talenclar days of receipt of this letterbV sending three copies of all of the above requested information to the:q_Ql duffer Perm.mIttirig Unit, 26i7r Mali Service ; A. h,CenTerRaIeIg NC 276954617; please be.aware lhol;,you have no authorization under section 401 . of the dean'Water Act and Tar-'Pamllco Riparian Buffer Rules.for this activity and any 'work done within waters of the state and buffer may be a violation of North Carolina r2efieral. Statutei and Administrative Code.. Please.contact Anthony Scarbraugh.at 252-948-.3924 or anthony.scarbrauehOncdenr.2ovif.youhave any gUes6ons ortancernt. Sincerely; Robert Tank: gional Supervisor Wat6rQuallty Regronal OperitionSectl6n Division of.. Water Resources, NCDEQ c.c, . William Wescott, .Westott Environmental ServIces, Inc. (ernall; w h Pungo River Farms, I.I.C. Attn: Mr. John Chiavetta Request for Additional Information Page 3 of 3 . Raleigh Bland, USACE Washington Regulatory Field Office (via emall) Steve Trowell, DCM WaRO Gregg Bodnar, DCM Morehead City Samir Dumpor, DEMLR WaRO DW R WaRO 401 files Laserfiche DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Pungo River Farms, LLC County: Beaufort LOCATION OF PROJECT: SR 1725, Pamlico Beach Road, adjacent Linear Bay off the Pungo River near Belhaven, in Beaufort County, North Carolina. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 15 August 2017 FIELD RECOMMENDATION: Attached: YES To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Steve Trowell DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: $ 400.00 PUBLIC NOTICE REC'D: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: ON: C) 75 DAY DEAD (, f �I51DEPLINE: MAIL OUT DATE: STATE DUE DATE: FEDERAL DUE DATE: PERMIT FINAL ACTION: ISSUE DENY FED COMMENTS REC'D: DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative 8/0 /r !tea• Coastal Management - LUP Consistency Q L 1-7 IQ Qcr u Division of Community Assistance 4�/ Land Quality Section Division of Water Quality �(o l LZ tt l ( tb Id clic-i'Zig, Storm Water Management (DWQ) State Property Office !� Division of Archives & History it Division of Environmental Health I I Division of Highways Wildlife Resources Commission 4IlS d�"4�� �• 1Tt Local Permit Office Division of Marine Fisheries 4 / % Corps of Engineers RECEIVED zol-7 d `1 Pw5 g17h K DCM- MHD CITY Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM ROY COOPER anen"', MICHAEL S. REGAN 5ecwlwy BRAXTON C. DAVIS Director To: Doug Huggett From: Steve TrowellvSV�—. Through: Jonathan Howell' Subject: Pungo River Farms LLC Major CAMA/Dredge and Fill permit application Date: 29 August 2017 Enclosed is a Major CAMA/Dredge and Fill permit application for the proposed stabilization of 2,400 linear feet of shoreline on a 960-acre tract located off SR 1725, Pamlico Beach road adjacent the Pungo River and Satterthwaite Creek near Belhaven in Beaufort County, North Carolina. I have met onsite with Raleigh Bland USACOE and the applicant's consultant to confirm the wetland lines and to review the project site. Staff has reviewed the applicant's proposal for development considering the development standards found in NCAC 7H.0205, .0206, .0207, .0208 and .0209 barring any significant objections from the review agencies, staff recommends issuance of the permit. Staff recommends the standard permit conditions for riprap toe revetments including height above the wetland escarpment, distance offshore and slope of the revetment. Also, a condition requiring the use of construction mats for the crossing of wetlands with mechanized equipment is needed. Staff recommends a standard permit condition prohibiting the double handling of riprap materials in wetlands or open waters. The applicant's consultant has indicated that the shoreline stabilization will be done in phases, with the areas where erosion threatens the existing logging road getting the work done first. Therefore, I recommend a standard permit condition requiring the work begin within 30 days of the staked alignment established during the required preconstruction meeting with the landowner and his contractor. If you have any questions, please give me a call or send me an email. RECEIVED SEP 11 2017 DCM- MHD °�_- Y �Nothinq Compares"1. _ Sam afNa& Cadva 1 ra.;� Q&Wky I Cc=W MamEama<t 943Wmh43qa Man Iwvhklk ,NC 27M 752%6"81 Coi+s alAtcury(le raeni TO: Stp 0 7 eo» MEMORANDUM Mr. Cliff Whitfield Public Water Supply Section NCDENR WARO ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Coastal Management Division Morehead City Office 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project.and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY —:7— This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed _ //G* Date YZ 9-7-aar7 3 u:e o?NR:h Cudina Emironnxrsal Qsdiy Caul Mamtam�nt 9431rnhirdmn 6 gwa\fall Wa,htnfhn.NC." :3:9466481 Coos rat Afonagcmenr rNVIR0NMEN7AE 0UAE11Y TO: MEMORANDUM Mr. Lee Padrick Division of Community Assistance ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY' This office has no objection to the project as proposed. L/ This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Sign6d Date Nothing Compares . Stu ortam Currw�Paimrme�l Q»:+yleeut+l>U�ur•�1- - 433R'n},�poSRw�Sfaalni�hie3•<A.�C:7839 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAYTON C. DAVIS Director RECEIVFD MEMORANDUM SEP () 6 201I TO: Mr. Shane Staples DCM•Flshsrlea Division of Coastal Management WARD 943 Washington Sq. Mall FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017, SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the incorporated. See attached. This office objects to the comments. proposed project only if the recommended changes are proposed project for reasons described in the attached Date 9 // s ua ofSain Cu6ina Emiivnm�w:!Qw!in• Cwiul \!,mrnnlnl 9�3 R'a�F.irt'dr.5 i'+u� `•!ai:.l\i�hintan,$C :%$$9 -5:906:si Coastal Management ENVIRONMENTAL OUALITY MEMORANDUM ROY COOPER Governor MICHAELS.REGAN Secretary BRAXTON C. DAVIS Director TO: Ms. Rachael Love-Adrick District Planner Division of Coastal Management FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Pease indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. _ This office has comment on the proposed project. S8E QM�6t,/'C�' This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached Wou'laij 11 A ZON Date 11i 2 l 2 I !'/'Nothing Compares._ SuNOf%'ad,CudmI Fmimnmrtal Q+aliry CWWNIANE1 t 943WuhilrmASavn JVtl %Vohi,%mn.,C:7$29 :<2 946648: RECEIVED SEP 0 8 2017 DCM- MHD CITY ROY COOPER Governor y Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Rachel Love-Adrick, District Planner, e Division of Coastal Management `_tfk, SUBJECT: Major Permit Request by Pungo River Farms, LLC DATE: September 12, 2017 MICHAEL S. REGAN .Secretary BRAXTON C. DAVIS Direrror Consistency Determination: The request is consistent with/not in conflict the Beaufort County Joint Land Use Plan 2006 Update certified by the CRC on January 13, 2010, provided that the land development and land use activities comply with the requirements of the Tar -Pamlico Buffer Rule, unless located in the exempted or allowed areas (see policy 2.1.5). Overview: The applicant is proposing to stabilize ±2,400 linear feet of the Pungo River shoreline with riprap revetment to protect an existing logging road. The project site is located off SR 172 and Pamlico Beach Road, on the Pungo River and Satterthwaite Creek, near Belhaven in Beaufort County, North Carolina. The site is 96012 acres, with 31,152 ft of shoreline. The sites existing features include: logging roads, culverts, pier with boatlifts, and 1',000'verticle breakwater. AECs involved include: Coastal Wetlands, Public Trust Areas, Estuarine Waters, Estuarine Shoreline, and Public Trust Shoreline. The project is located within in Tar -Pamlico River Basin and is subject to the Tar - Pamlico Buffer Rule. The Pungo River is classified as SA;HQW;NSW. The site is a not a Primary Nursery Area, there is no submerged Aquatic Vegetation (SAV), and is open to shellfishing. The property is comprised mainly of managed pine plantation in various stages from recent clear cuts to mature stands of loblolly pine with some mixed hardwoods. Vegetation on the project site consist of coastal wetlands (Juncus roemaerianus, Spartina cynosuroides, Caldium jamaicense and Spartina patens) wooded Section 404 wetlands A review of archaeological/cultural resources was not provided. Anticipated impacts resulting from this project are expected to include: the filling of ±13,120 ft2 of shallow Pungo River bottom and 4,523 ft2 of Estuarine sandy beach. Placement of the riprap revetment will cause temporary impact to vegetation in the work corridor totaling 48,160 ft2. The hardening of the sediment bank will likely increase erosion on the adjacent unprotected shorelines. The sandy beach that remains seaward of the revetment will erode over time. Construction of the riprap revetment will result in temporary short- term turbidity. Nothing Compares..-..,.. state of North Carolina I Environmental Qmfity I Coastal Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-2808 1252-247-3330 (fax) North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 2 of 2 Basis for Determination: The project is subject to the Beaufort County Joint Land Use Plan 2006 Update. The counties Future Land Use Map (FLUM) classifies the site as Agriculture -Forestry -Rural Housing, with a Conservation II Overlay (land), and Conservation I (water). The following LUP policies may be applicable to this request: 2.1 Conservation I 2.1.3 Only development and land/water use activities that are consistent with the use standards for coastal wetlands, estuarine waters, and public trust areas (15A NCAC 07H .0208) are allowed in this classification. Permitted extractive uses in the Aurora area will continue. 2.1.5 Unless in the exempted or allowed, land development and land use activities must comply with the requirements of the Tar -Pamlico Buffer Rule (15A NCAC 02B .0259). 2.2 Conservation II 2.2.2 Only development that is consistent with the use standards for the estuarine shoreline AEC and the public trust shoreline AEC (15A NCAC 07H .0209(d)) is allowed. !'Alotfing Compares,.-,.,,.. State of North Carolina I Environmental Quahty I Coastal Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-28081252-247-3330(fn) E Coastal Management ENVIRONMENTAL OUALITV ROY COOPER Governor MICHAEL S. REGAN Secretary B `R1i1AXTON C. DAVIS r U U` I f� I Director 1r1L'1r1Vl�t'El\LV1Ti L—� TO: Mr. Shannon Jenkinsater duality cs_. �. NCDENR Division of Environmental Health FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed � �6 6DateA U f l 11 �� 6han �1evi J- o K in T RECEIVED SEP 13 2017 !/ Nothing Compares'%. Ea.or.o6 cva M r.:q O�R4iQlib CMWMAMI« t DCM- MHD CITY 943Tcuhwroesa=.\UU Wadmrw XC27889 2529466481 Bodnar, Gregg From: Thorpe, Roger Sent: Monday, September 18, 2017 9:43 AM To: Bodnar, Gregg Subject: CAMA Major: Pungo River Farms proposed 2,403 feet of shoreline stabilization - Beaufort County Gregg The subject project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 %-'"Nothing Compares...,. Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties. Coastal Managemen r ENVIRONMENTAL QUALITY TO: SE'P 12 20V MEMORANDUM Ms. Renee Gledhill -Early NC Department of Cultural Resources Archives & History Building ROY'COOPER Governor MICHAEL S: REGAN Secretary BRAXTON C. DAVIS Director R 1-71710 ' Due alaty FROM: GregBodnar Respond to Greg Bodnar Major Permits: Processing Coordinator Morehead City Ofifice Coastal Management Division 400 Commerce Avenue Morehead City NC N557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico BeachRoadadjacent the P.ungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina: PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging: road. Please indicate below your position or viewpoint on:the proposed project and return this form, by27 September 2017. Please contact<Steve Trowell at M-949-3854,, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested, REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the .attached comments. Signed Date Ct (2 (+ Nothing Compares" 5 uN o:\ath Cn&N!Eniwo"t 4 Q14W I CN541 MINJIMInt 933yty.hir4Ion Sgw14 \1-111 P1.hin3xn,\C 273S9 2!29�66�5! SEP 13 7017 NOT A CAMA PERMIT Water Resources Environmental Quality November 1, 2017 Pungo River Farms, LLC Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 17-1143 BEAUFORT County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS APPROVAL OF TAR-PAMLICO RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS PUNGO RIVER FARMS SHORELINE PROTECTION (Previously Linear Bay Subdivision DWR # 08-0297 V4) Dear Mr. Chiavetta: You have our approval for the impacts listed below for the purpose described in your application dated September 6, 2017 and received by the Division of Water Resources (Division) on September 9, 2017 with subsequent information received on October 13, 2017. These impacts are covered by the attached Water Quality General Certification Number 4097, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the fallowing additional conditions: The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B. 0259(8)j Type of Impact Amount Approved Amount Reduced Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water OW-1 (Rip -Rap Stabilization) 0.28 (acres) 0 (acres) Cross -Section for Segments 2 and 4 OW-2 (Breakwater Fill) 0.02 (acres) 0 (acres) Cross -Section for Segment 3 State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946.6481 7 PUNGO RIVER FARMS, LLC DWR# 17-1143 401 AND BUFFER APPROVAL Page 2 of 4 Buffers -Zone 1 B-1(Rip-Rap Stabilization) 5,025 (square feet) 0 (square feet) Cross -Section for Segment 1 B-2 (Rip -Rap Stabilization) 9.776 (square feet) 0 (square feet) Cross-Sectionfo,r Segment 2 B-3 (Breakwater) 965 (square feet) 0 (square feet) Cross -Section for Segment 3 B-4 (Rip -Rap Stabilization) 5,264 (square feet) 0 (square feet) Cross Section for Segment 4 2. Water Quality Certification The proposed project must comply with all the conditions of the.General Water Quality Certification(s) 4097. [15A NCAC 02B .0507(c)] Continuing Compliance 3. Turbidity Standard The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SB Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B`.0220] Other Conditions 4. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 360 (11 x 11 spacing) to 538 (9 x 9 spacing) trees per acre.) Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 320 trees per acre at maturity. [15A NCAC 02H .0507 (c), 15A NCAC 02H .0506 (b)(3), and 15A NCAC 02B .0259(6)] S. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http://portal.ncdenr org/web/wo/swo/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0506(b)(5)] 6. This approval and its conditions are final and binding unless contested. [G,S.143-215.5] PUNGO RIVER FARMS, LLC DWR# 17-1143 401 AND BUFFER APPROVAL Page 3 of 4 These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www,ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within`sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition maybe faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearing's 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the.petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water and Tar -Pamlico Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraueh ncdenr.gov if you have any questions or concerns. Sincerely, A/ Ily RobertTankard, Assis ant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC4097 Certification of Completion PUNGO RIVER FARMS, LLC DW R# 17-1143 401 AND BUFFER APPROVAL Page 4 of 4 cc: Gregg Bodnar, DCM Morehead City Office (via email) Steve Trowell, DCM WaRO (Via email) Raleigh Bland, USACE Washington Regulatory Field Office (via email) Samir Dumpor, DEMLR WaRO Laserfiche File William Wescott, Wescott Environmental Services, Inc. (email: wescottenvironmentalservices@gmails.com) Cross-section for Segment 1 Riprap along 335 feet of shoreline at Pungo River Farms, LLC. No riprap placed below NWL. Scale: Not to scale, dimensions shown 4,020 to 5,025 sq. ft. APPROVED of unvegetated beach North Carolina' Environmental in buffer Zone i to be Management Commission impacted by riprap Division of Water Resources 11 ! a 7_tl 1-1 Permit# _ 1?-r1Y3 zi.2:1 slope; NormalIII III�II� MVI OO<O>OOOOGGGRiprap varies 12 to 15 ,,_Level IIIIIIIIIII%feet landward of NWL Toed in to prevent undermining of riprap 10/12/2017 Cross-section for Segment 2 Riprap along 1,222 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 7,332 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown APPROVED North Carolina Environmental Management Commission Division of water Resources Date 1 i 1 r 20 r' Permit # 174143 Normal Water Level Toed in to prevent undermining of riprap 6,110 to 9,776'sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap . 2:1 slope; Riprap varies 4 to 6 feet waterward of NWL and 5to8feet landward ofNWL 10/12/2017 Cross-section for Segment 3 Riprap along 193 linear feet of shoreline at Pungo River Farms, LLC. 965 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown APPROVED North Carolina Environmental Management Commission Division of Water Resources Date 6f / r 20 17 Permit# ("7-/lq3 Normal Water Level Riprap breakwater Base width =10 feet Top width = 2 feet Total height = 2 feet 2:1 slopes 965 sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap 10/12/2017 Construction access will be on temporary mats when crossing vegetated areas Cross-section for Segment 4 Riprap along 658 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 3,948 square feet of riprap placed below NWL. Scale; Not to scale, dimensions shown APPROVED nvn_menMorttal management commission t}ivWon of Water Resources Date Permit# 11-Ili Normal Water Toed in to prevent undermining of riprap. Riprap varies 4 to 6 feet waterward of NWL depending on the escarpment height of 2 to 3 feet. Riprap to extend 5 to 8 feet landward of NWL. 3,290 to 5,264sq. ft. of riprap impact in buffer Zone 1 t20-foot zone cleared for construction access Any part of the construction corridor not impacted by nprap will be allowed to revegetate from the existing undisturbed root mat. 10/12/2017 Bodnar, Gregg From: Scarbraugh, Anthony Sent: Wednesday, October 18, 2017 8:41 AM To: Bodnar, Gregg Subject: Additional Information Request for Pungo River Farms Shoreline Protection (DWR Project # 17-1143) G regg, The information provided by Mr. Wescott will be sufficient to address the Division of Water Resources' additional information request. Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Water Resources Environmental Quality September 22, 2017 CERTIFIED MAIL: 70171070 0000 7793 8515 RETURN RECEIPT REQUESTED Pungo River Farms, LLC Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 Subject: REQUEST FOR ADDITIONAL INFORMATION Pungo River Farms Shoreline Protection (Previously Linear Bay Subdivision DWR # 08-0297 V4) Dear Mr. Chiavetta: ROY COOPER Lnyrrgr„• MICHAEL S. REGAN Seerelary S. JAY ZIMMERMAN Phyrio • DW R # 17-1143 BEAUFORT County On September 9, 2017, the Division of Water Resources (Division) received your application dated September 6, 2017, requesting a 401 Water Quality and Buffer Authorization Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Plan Detail forTar-Pamlico Riparian Buffer Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). The Division recommends highlighting by hatching or shading all Impacts areas for temporary impact areas and permanent impact areas. [15A NCAC 02H .0502(g) and 15A NCAC 02B .0259(8)(b)(iv)] 2. Practical Alternatives for Tar -Pamlico Riparian Buffer Impacts Please provide more details regarding why impacts associated with equipment access within the buffer cannot be minimized through alternative construction methodologies. 115A NCAC 02B .0259(8)(a)(i)] This Office believes that the proposed impacts to buffer on the plans as described can be moved or reconfigured to minimize the impacts. Please revise the plans to minimize the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to better minimize disturbance to the buffer. As part of the narrative, please conduct an alternative analysis addressing why this is the preferred methodology compared to other access methods. In addition, this Office will require fallen trees, stumps and other debris removed during construction to be placed outside of the riparian buffer. Nothinq Compares - State of North Carolina I Environmental Quality I Water Resources-Waler Quality Regional Operations Section-Washingon Regional Office 943 Washington Square Mall. Washington. North Carolina 27889 252-946-6481 Pungo River Farms, LLC Attn: Mr. John Chlavetta Request for Additional Information Page 2 of 3 3. Buffer Restoration: Please provide this Office with a buffer restoration plan associated with the cutting and removal of buffer vegetation as described in your application. This planting plan must be developed such that at least two native tree species are to be planted at a density sufficient to provide 260 trees per acre at maturity. This density can be achieved by planting approximately 360 (11 x 11 feet spacing) to 538 (9 x 9 feet spacing) trees, per acre. Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 36). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 320 trees per acre at maturity. As a part of this plan, your response must include an implementation/planting schedule with clear dates. This can be achieved by planting wooded stemmed vegetation as described in Guidelines for Riparian Buffer Restoration provided online (http://www.nceep,net/news/reports/buffers.pdf), 115A NCAC 02 .0259(4)(a)) Pursuant to 15A NCAC 02H .0502(g), 15A NCAC 02 .0259(2),15A NCAC 02B .0259(8)(b)(iv),15A NCACO2B .0259(8)(a)(i), and 15A NCAC 02 .0259(4)(a) the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under Section 401 of the Clean Water Act and Tar -Pamlico Riparian Buffer Rules for this activity and any work done within waters of the state and buffer may be a violation of North Carolina General Statutes and Administrative Code. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scarbraugh@ncdenr.aov if you have any questions or concerns. Sincerely, Robert TankAsnRegional Supervisor Water Quality Regional Operation Section Division of Water Resources, NCDEQ cc: William Wescott, Wescott Environmental Services, Inc, (email: wescottenvironmentalservices@gmails.com) Pungo River Farms, LLC Attn: Mr. John Chiavetta Request for Additional Information Page 3 of 3 Raleigh Bland, USACE Washington Regulatory Field Office (via email) Steve Trowell, DCM WaRO Gregg Bodnar, DCM Morehead City Samir Dumpor, DEMLR WaRO DWR WaRO401 files Laserfiche Wescott Environmental Services, Inc. (252) 402-9662 wescottenvironmentalservicesPgmail.com 11 October 12, 2017 Mr. Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operation Section Division of Water Resources, NCDEQ The Pungo River Farms LLC. shoreline protection project is divided into four sections. Section 1 is 335 linear feet of shoreline. All riprap will be placed landward of the normal water level (NWL). The riprap will impact between 4,020 to 5,025 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 2 is 1,222 linear feet of shoreline. The unvegetated beach is narrower therefore approximately half of the riprap will be landward of the NWL. The riprap will impact between 6,110 to 9,776 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 3 is 193 linear feet of shoreline. Riprap will be placed to form a free-standing breakwater with a base width of 10 feet. Half of the structure will be landward of the NWL. The structure will impact approximately 965 sq. ft. of unvegetated beach within Zone 1 of the buffer. Section 4 is 658 linear feet of shoreline. The shoreline has a 2 to 3-foot-high escarpment and no beach. A 20-foot wide construction corridor will be needed along the shoreline. Riprap will impact between 3,290 to 5,264 sq. ft. of Zone 1 of the buffer. Any part of the construction corridor not impacted by riprap will be allowed to revegetated from the existing undisturbed root mat. The long-term cumulative buffer impacts due to riprap placement for sections 1, 2 and 3 will be between 11,095 to 15,766 sq. ft. of unvegetated beach in Zone 1. Once the shoreline is protected by riprap any unvegetated beach not impacted by riprap is expected to be colonized by Spartina patens. The existing roads will provide access to the shoreline in sections 1, 2 and 3. Equipment will work along the existing beach which minimizes impacts to the vegetated parts of the buffer. RECEIVED OCT 13 2017 DCM- MHD CITY Wescott Environmental Services, Inc. The long-term buffer impacts for section 4 will be between 3,290 to 5,264 sq. ft. to Zone 1. Any debris removed from the construction zone will be placed on uplands outside of the buffer. The intent of the proposed design is to minimize impacts to buffers. If you have any additional questions I can be reached by email or phone. Thank You, William Wescott, PWS RECEIVED OCT 13 2017 DCM- MHD CITY (252) 402-9662 wescottenvironmentalservices@gmail.com Page 2 Cross-section for Segment 1 Riprap along 335 feet of shoreline at Pungo River Farms, LLC. No riprap placed below NWL. Scale: Not to scale, dimensions shown Normal Water Level Toed in to prevent undermining of riprap 4,020 to 5,025 sq. ft. ofunvegetated beach in buffer Zone 1 to be impacted by riprap 2:1 slope; Riprap varies 12 to 15 feet landward of NWL 10/12/2017 RECEIVED OCT 13 2017 DCM- MHD CITY Cross-section for Segment 2 Riprap along 1,222 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 7,332 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown Normal Water Level Toed in to prevent undermining of riprap 6,110 to 9,776 sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap 2:1 slope; Riprap varies 4 to 6 feet waterward of NWL and 5 to 8 feet landward of NWL 10/12/2017 RECEIVED iCT 13 2017 DCM- MHD CITY Cross-section for Segment 3 Riprap along 193 linear feet of shoreline at Pungo River Farms, LLC. 965 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown 965 sq. ft. of unvegetated beach in buffer Zone 1 to be impacted by riprap Normal Water Level Riprap breakwater Base width = 10 feet Top width = 2 feet Total height = 2 feet 2:1 slopes 10/12/2017 Construction access will be on temporary mats when crossing vegetated areas DECEIVED OCT 13 2017 DCM- NIHD CITY Cross-section for Segment 4 Riprap along 658 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 3,948 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown Normal Water Level Toed in to prevent undermining of riprap. Riprap varies 4 to 6 feet waterward of NWL depending on the escarpment height of 2 to 3 feet. Riprap to extend 5 to 8 feet landward of NWL. 3,290 to 5,264 sq. ft. of riprap impact in buffer Zone 1 20-foot zone cleared for construction access Any part of the construction corridor not impacted by riprap will be allowed to revegetate from the existing undisturbed root mat. 10/12/2017 W U > 2 0 M U C W CD 1 it U 0 Coastal Management ENVIRONMENTAL GUALITV RECEIVED SEP 1 l 2017 DOA STATE PROPERTY OFFICE MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Tim Walton Director State Property Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. ti/ This office has no comment on the proposed project. This office approves of the incorporated. See attached. This office objects to the comments. proposed project only if the recommended changes are proposed project for reasons described in the attached Date !'� Nothing Compares 5uwofNcvh Cadw Zn,, d&1Q,&bt5, CMWNIAIW�t 943WwhwgMSane#\Ia0 R3Ih-I11oo.NC:;389 2$2194E Ns! RECEIVED SEP 2 2 2017 DCM- MHD CITY e ROY COOPER Governor K! 0- MICHAEL S. REGAN Secretary Coastal Management ENVIRONMENTAL OUALITV BRAXTON C. DAVIS Director MEMORANDUM TO: Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 6 September 2017 SUBJECT: CAMA Application Review APPLICANT: Pungo River Farms, LLC PROJECT LOCATION: Project site is located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven, Beaufort County, North Carolina. PROPOSED PROJECT: Applicants propose to stabilize 2,403' of shoreline to protect an existing logging road. Please indicate below your position or viewpoint on the proposed project and return this form by 27 September 2017. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. VThis office has no comment on the proposed project. This office approves of the incorporated. See attached. This office objects to the comments. ''Nothil proposed project only if the recommended changes are proposed project for reasons described in the attached Date cij 2-;ja�l SEP 2 S 2017 IEpCIVI- MHD CITY 3 uM oE�am Cadma Fa.+lvrrnni QilJQ' Can: \lana[.nmt 9�)R'yl�rygn3avn>4ll R'alhiePm,\C :'399 :5:9+6 W 33 -1 ♦ -, SEP 2017 RECEIVED ® North Carolina Wildlife Resources Commission Gordon Myers, Executive Director MEMORANDUM TO: Gregg Bodnar Division of Coastal Management North Carolina Department of Environmental Quality RECEIVED FROM: Maria T. Dunn, Coastal Coordinator SEP E 8 2017 Habitat Conservation Division DATE: September 25, 2017 DCM- MHD CITY SUBJECT: CAMA Dredge/Fill Permit Application Pungo River Farms, LLC, Beaufort County, North Carolina. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the permit application with regard to impacts on fish and wildlife resources. The project site is located adjacent the Pungo River within Linear Bay off Pamlico Beach Road near Ransomville, NC. Our comments are provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100 through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). The applicant proposes complete shoreline stabilization for a 960-acre tract of land that previously had been permitted (#104-09) for a bulkhead. The remaining +2,400' of shoreline is proposed to be stabilized with either a riprap revetment or breakwater in front of wetlands. The Pungo River at this location is classified SA HWQ NSW by the Environmental Management Commission and is subject to the Tar / Pamlico Basin Buffer Rules. The NCWRC has reviewed the permit application and while we do not object to shoreline stabilization, we believe insufficient information regarding construction methodology and avoidance / minimization of impacts to the Tar / Pamlico buffer, wetlands, and shallow water habitats has been provided. Efforts should be made to minimize vegetation impacts to the buffer during construction and contact should be made with NC Division of Water Resources to determine if planting of vegetation / ground cover after construction is appropriate. We also Mailing Address: Habitat Conservation - 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919)707-0220 • Fax: (919) 707-0028 CMDF_Pungo River Fe s, LLC September 25, 2017 request details be provided for the breakwater including water depths, distance from wetlands, and a calculated base with 2:1 slope rather than a set 10' base width. Height above the NWL could also be reduced to 1' to further minimize the footprint and shallow water habitat fill while still allowing adequate hydrologic connectivity to wetlands, fish passage to foraging habitat, and protection of wetlands. We appreciate the opportunity to review and comment on this permit application and look forward to any forthcoming information. If you need further assistance or additional information, please contact me at (252) 948-3916 or at maria.dunn@ncwildlife.org RECEIVED SEP 2 8 2017 DCM- MHD CITY Bodnar Gregg From: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Sent: Tuesday, October 31, 2017 7:21 AM To: Bodnar, Gregg Subject: [External] Comments CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. T.A. Newbold Miller, LLC SAW 2017-01996 PGP 198000291 Roger Peck SAW 2017-02059 PGP 198000291 Pungo River Farms, LLC Hope these help!!!!! Thanks! V/R SAW 2017-01997 PGP 198000291 Raleigh W. Bland, P.W.S. Regulatory Project Manager U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, North Carolina 27889 910-251-4564 October 31, 2017 October 31, 2017 October 31, 2017 1 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Pungo River Farms LLC 2. LOCATION OF PROJECT SITE: Project site is located off SR 1725, Pamlico Beach Road, adjacent Linear Bay off the Pungo River near Belhaven in Beaufort County, North Carolina. Photo Index- 2006: 108-8486; M-5 2000: 108-1262; N-4 1995: 108-8486; A-13 Lat Long: 35�25'52.84°N 76°35'40.16"W 3. INVESTIGATION TYPE: CAMA/Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —18 July 2017 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received —15 August 2017 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP — Limited Transition (B) AEC(s) Involved: CW, PTA, EW, ES, PTS RECEIVED (D) Water Dependent: Yes (D) Intended Use:. Private SEP 11 2017 (E) Wastewater Treatment: Existing - None. Planned -N/A n�.�A Hnn ��++ TT (F) Type of Structures: Existing — Logging roads, culverts, pier with oa an 1,700" ITrycle breakwater Planned — Shoreline stabilization with rip rap toe revetment and breakwater.. (G) Estimated Annual Rate of Erosion: 5' HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER 48,160 ft2 (A) Vegetated Wetlands (Temporary access along (Wooded 404) shoreline) (B) Non -Vegetated Wetlands 12,245 ft2 (riprap) 965 ft (Breakwater) (Pungo River Bottom) (C) Other 4,523 ft2 (riprap) Estuarine sandy beach (D) Total Area Disturbed: 64,928 ft2 (1.50 acres) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW, NSW Open: Yes 8. PROJECT SUMMARY: The applicants propose to stabilize 2, 403' of shoreline to protect an existing logging road. Pungo River Farms LLC Pungo River Beaufort County Project Setting The 960-acre project site is located off SR 1725, Pamlico Beach Road, on the Pungo River and Satterthwaite Creek, near Belhaven in Beaufort County, North Carolina. This tract of land was previously owned by a land developer who planned a 400-lot residential subdivision. The proposed subdivision development was never undertaken and the property has been sold to Pungo River Farms LLC. The property is comprised mainly of managed pine plantation in various stages from recent clear cuts to mature stands of loblolly pines with some mixed hardwood areas. The understory is vegetated with red maple, sweet gum, wax myrtle, groundsel bush, switch cane and poison ivy. There are existing logging roads used to manage and harvest timber. There is an existing logging road that parallels the Pungo River shoreline. A portion of this road recently succumbed to erosion and had to be reconstructed approximately 80' landward of the NWL. Significant areas of the pine plantations (249.3 acres) have been delineated as Section 404 wetlands by the US Army Corps of Engineers. There are several coastal wetland marsh fingers off Satterthwaite Creek that bisect the blocks of managed pines. The wooded 404 wetlands are vegetated with loblolly pine, red bay, red maple, ferns, wax myrtle, greenbrier and switch cane. The coastal wetland marsh areas are vegetated with black needle rush Juncus roemerianus), giant cordgrass (Spartina cynosuroides), sawgrass C( aldium jamaicense) and salt meadow hay (Spartm patens . The shoreline along the Pungo River is actively eroding with a t2' escarpment with most areas having a sloping sandy estuarine beach. The project area shoreline is orientated to the north and northeast. Along the southern half of the project area shoreline the sandy beach narrows and the erosion escarpment is more pronounced likely due to more clay than sand present in the sediment bank. The top of the escarpment is vegetated with salt meadow hay, wax myrtle, groundsel bush and pines. The beach area and shallow nearshore area is littered with stumps and blown over pine trees. The adjacent land areas to the Pungo River have been delineated as wooded 404 wetlands. There is an area of coastal wetlands marsh in the project area along the Pungo River shoreline. There is a sandy beach ±10' wide between the vegetated marsh and the NWL. Major CAMA permit 104 -09 issued on 24 July 2009 to the previous landowner authorized 3,162 linear feet of free standing vertical breakwater for shoreline stabilization along the normal water level (NWL) of the Pungo River. The height of the breakwater was permitted at l' above NWL. The permit was modified later to increase the height of the breakwater to 1.5' above the NWL. Approximately 1,200' linear feet of breakwater was constructed. A site visit related to this permit application was conducted on 18 July 2017. There was no submerged aquatic vegetation (SAV) observed in the nearshore of the project area. The Pungo River is classified as Coastal Waters by the NC Marine Fisheries Commission and SA; HQW NSW by the Environmental Management Commission and is open to shellfishing at tliis iff iqv SEP 112017 DCM- MHD CITY Pungo River Farms LLC Pungo River Beaufort County Page Two Project Description The applicant proposes to stabilize f2,400 linear feet of Pungo River shoreline with a riprap revetment to protect the existing logging road. Construction of the riprap revetment will begin on the southern end of the existing vertical freestanding breakwater and will end at an area of coastal wetlands marsh near the confluence of Satterthwaite Creek and the Pungo River. Much of this riprap revetment would remain above the NWL on the slope of the existing sandy beach to the top of the erosion escarpment. In areas where the sandy beach is absent with a more vertical escarpment, the rip rap will be placed on a 2' :1' slope against the bank with the toe of the revetment 5' to 8' below the NWL depending on the height of the bank. The one area of coastal wetlands marsh in the project alignment will be protected with a rock breakwater. The breakwater will straddle the NWL with a 10' base width and a height 1.5' above the NWL. The construction of the revetment will require a work corridor on the landward side of the revetment. This is necessary to provide space for the excavator to swing while placing the riprap and for the movement of materials down the shore. Stumps and blown over trees in the alignment of the revetment will be removed and placed on the landward side of the work corridor. Trees and shrubs in the work corridor will be cut to ground level and placed on the landward side of the work corridor. As much as practical the existing logging road will be used to move equipment and riprap material for final placement. Wooden equipment mats will be used to support the heavy equipment and an assortment of rock boxes will be used to contain the riprap stock pile along the top of the bank. Project Impacts The project as proposed will result in the filling of ±13,210 ft2 of shallow Pungo River bottom. Placement of the riprap revetment will cause temporary impact to vegetation in the work corridor totaling 48,160 ft. The hardening of the sediment bank will likely increase erosion on adjacent unprotected shorelines. The sandy beach that remains seaward of the revetment will erode over time. Construction of the riprap revetment will result in temporary short-term turbidity. Steve Trowell — Washington Regional Office- 29 August 2017 RECEIVED SEP 112017 DCM- MHD CITY -0 • . fti m Ln ,`ertlfied Maf Fae $3.35 ru $ O Extra ces &Fees (Uredt a,vi eR ❑Peron Receipt (derddcln1 i C3 ❑wm„vxeryt(eian,omd s ❑eenaed Mas flestrlctaa pdrvery i OAdueelgrotwa RequM1aO i ❑ Adutt Signature Res ad t>e•+ i Postage $1.61 S 0 Total Postage and FA r .71 $ L! � Sentfi �rJALP c C3 S&eeisildApi'MYo.; 3ip� FfczTk tti ,'1`1Q liil]Fr atk 1 AFT.............---. ac ■ Complete items 1, 2, and 3. ■ PrInt your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the maiipiece, or on the front N space permits. 1. Article Addressed tn: ►ZO OONI-D CRAFT arlq N10CAWAY 10 6eLOAVC"J II�II'I'I'III III III III I�I II IIII'I II' III II'll 9590 9403 0334 5155 8598 70 2. Article Number (Transfer from service label) A. B. • D. Is delivery address different from Item If YES, emer delivery address below. 3. Service Type ❑ Priority Ma Evresse ❑ Adutt Signature ❑ Registered Mall— ❑ Adult Signature Restricted Delivery ❑ ReeEgr red Mall Resdfcled ❑ Cerdged Made DalNary D Certified Mail Restricted Delivery EI Return Recellet for D Collect on Delivery Merchandise ❑ Collect on Delivery Restricted Delivery D Signature Confirmedon`� Cl Ireured Mail ❑ Signature Confirmation ❑ Insured Mail ResMc[ed Delivery Restrioted Delivery fover$500) _ PS'Fonn 3811. April 2015 PSN 7530-02-000-gM Domestic Retum fter ''LzzCEIVED SEP 11 201? DClye h1 HD CITY WU 15zl1v PAO CAMA MAJOR PERMIT APPLICATION Pungo River Farms LLC Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 6/21/2017 Ms. Oliva M. Carter and Mr. John Wallace 205-12 109th Avenue St, Albans, New York 11412 Dear Ms. Carter and Mr. Wallace: Pungo River Farms LLC is applying for a CAMA Major permit to place riprap along 3,360 linear feet of shoreline of the Pungo River, in Beaufort County, North Carolina. The specifics of the proposed work are in the enclosed maps and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached information and drawings. o 0 Should you have any objections to this proposal, please send your written comments to: 1" Mr. Steve Trowell NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 252402-9662, or e- mail me at wescottenvironmen talservices(o)gmail.com Sincerely, William Wescott Wescott Environmental Services, Inc. (RECEIVED SEP 11 Z017 DCM- MHD CITY Enclosures U.S. Postal Service"' CERTIFIED MAIL`' RECEIPT Domestic f-731i Only For tletivery inrormaHon, visit our website dt t9Ww.usils.com'. rr LIT ru 0 .n a O 0 C3 S C3 O Ill r-9 O ry s Complete items 1, 2, and 3. ■ Print your name and address on the reverse X do that we can return the Card to you. ■ Attach this card to the back of the mailpiece, B' or on the front if space permits. _ SON � W ALLACG ,jI)5-i& lo9rtl Agolvt: AL6,10$1 NY I114k), ,90 9403 0334 5155 8598 63 -nber ?ransfer from service CE G- $ JV WED SEP 112917 amn DO11 - MHD CITY ❑ Agent D. is delivery address different from ftlim 17 u xes if YES, enter delivery address below. 13140 3, Service Type ❑ Priority Mail Egress® ❑ Adult Signature ❑ Registered MellTM O Adult signature ResMcted Delivery ❑ Registered Mail Restricted ❑ CedMed Mail® Delivery ❑ Certified Mail Restricted Dan" ❑ Return Recent for E3 Dolled on Delivery Merchandise 0 Signature centenarian- ❑ Collect w Delivery Restricted Delivery ❑ Signature Confirmation 0 Insured Mall ❑ insured Mall Restricted Delivery Restricted Delivery Domestic Return Receipt ipri12015 PSN 7530-02-000-9053 f 3 OKI89OP6579 3" o" cm.. stem tac i•+ ottse "n.ea ✓ x� shm": svoo.ao STATE OF NORTH CAROLINA COUNTY OF BEAUFORT Parcels 007026963, 15004907, 15019473 & 15019471 cox xBlsrp1W xrC1a a arms .N,nlfx tt H,lttl 'k 9tax"fe s t&33:59 M 9ooY 1�e Pia 579.581 FEE: $=.a WME SW $2,3N.N 1151pIW t 781 p61W 111W Prepared by and return to: John B. Tate III PO Box 700, Chocowinity, NC 27917 SPECIAL WARRANTY DEED THIS DEED, made this 29 day of December, 2015, by LINEAR BAY PROPERTIES, LLC, a North Carolina limited liability company, Grantor, whose address is 1100 South Stratford Road, Suite 102•C, Winston Salem, NC 27103, Grantor, to PUNGO RIVER FARMS, LLC. Grantee, whose address is 3312 Rock Creek Drive. Raleigh, NC 27609; WITNESSETH: That Grantor, for a valuable consideration paid by Grantee, the receipt of which is hereby acknowledged, has sold, and by these presents, does grant, bargain. sell and convey unto Grantee, its successors and assigns, in fee simple, those certain tracts or parcels of land lying and being in Bath Township, Beaufort County, North Carolina, and being more particularly described as follows: PARCEL ONE (1) containing 891.10 acres (Schram Tract containing 1.16 acres, Portion of Registered Estate No.789 (now Registered Estate No. 969) containing 563.44 acres, DB: 475: PG: 102 containing 326.50 acres) as shown on the map hereinafter referred to. PARCEL TWO (2) containing 61.69 acres (B.F. Godley Tract) as shown on the map henwstLer referred to. RECEIVED SEP 11 2017 DCM" MHD CITY 51890PG580 PARCEL ONE (1) and PARCEL TWO (2) are shown on that map prepared by Ralph S. Jarvis, Professional Land Surveyor, dated April 10, 2001, revised June 13, 2001. and furtherrevised September 9.2002. and identified by the following legend: "MAP OF PROPERTY OF: WEYERHAEUSERCOMPANY BEAUFORT47". This map is of record in Plat Cabinet G, Slide 10-6. Beaufort County Registry and further reference is hereby made to said reap for a more complete and accurate description of this property by metes and bounds. This property was conveyed to the Grantor in Deed Book 1420, Page 137, Beaufort County Registry. The property herein conveyed does riot include the primary residence of Grantors. TO HAVE AND TO HOLD the aforesaid parcel of land and all privileges and appurtenances thereto belonging to the Grantees in fee simple. but subject to the following: 1. The current year's Ad 6aforem taxes, prorated at closing. 2. Valid and enforceable easements, rights -of -way and restrictions of record. if any, and non-compliance with any local. county, state or federal govenunemal laws, ordinances or regulations relative to toning. subdivision, occupancy. use, construction or development of the subject pmpc ty. 3. Title to that portion of the property lying below the mean high water marl: of the Pungo River, Satterthwaite Creek and Tarkiln Creek. 4. Rights of others in and to the continued uninterrupted flow of branches- streams and ditches crossing or bordering insured premises. 5. Reservation of Mineral Rights and all Terms and Conditions thereof as set forth in Deed recorded in Book 1329. Page 628, Beaufort County Registry. 6. Power lines and poles as shown on survey last revised September 9, 2002, by Jarvis Associates, P.A. 7. Title to that portion of the property within the bounds of SR 1725 - Pamlico Beach Road 8. Such state of facts as would be disclosed by an accurate survey and inspection of the premises occurring subsequent to September 9. 2002. The Grantor covenants with the Grantees that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, subject to valid and enforceable easement& rights -of way and restrictions of record. if any, and a pro rate stare of the current year's ad valorem property taxes. RECEIVED SEP 112017 DCM- MFID CITY K R(189OPGSB I The designation Grantor and Grantee as used herein shall include said patties. their heirs, successors and assigns, and shall include singular. plural. masculine, feminine or neuter as required by context IN WITNESS WHEREOF. Linear Bay Properties. LLC. By Tumpike Management. LLC, Manager, a North Carolina limited liability company, has caused this instrument to be signed in its name by its Manager, as an act of the company, all by authority duly given. this the day and year first above written. LINEAR BAY PROPERTIES. LLC By: Turnpike Management, LLC. Manager By: 0 '1'"'e'� (SEAL) O. Rolf Bli4wd. Ill. Manager STATE OF offa3zf CabLitiA COUNTY OF W40cr_ I, dam /Xnrre a Notary Public for the County and State aforesaid, do certify that O. ROLF BLIZZARD. Ill. LINEAR BAY PROPERTIES, LLC. By: Turnpike Management, LLC. Manager, personally appeared before me this day and acknowledged to me the due execution of the foregoing instrument for the terms and purposes therein set forth. Witness my hand and notarial seal, this jg_ day of December, 2015. My Commission expires: /e• AeO f � RECEIVED SEP 1 1 ton DCM- MHD CITY U.S. ARMY CORPS OF LV 1931 t►[e7[I<GRI II&I 0:iTSTI Action Id. SAW-2016-01762 County: Beaufo U.S.G.S. Quad: NC-PAMLICO BEACH NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Punao River Farms, LLC Matthew Fritter Address: 3312 Rock Creek Drive Raleigh, NC, 27609 Telephone Number: (919) 616-6855 Size (acres) 660 acres Nearest Town Belhaven Nearest Waterway Jordan Creek and Pungo River River Basin Pamlico USGS HUC 03020104 Coordinates Latitude: 35.43501 Longitude:-76.5981 Indicate Which of the Following Aaaly: A. Preliminary Determination VC0 PSG 15 JV Based on preliminary information, there may be waters of the U.S. including wetlands on the above de �r ject area We strongly suggest you have this property inspected to determine the extent of Department ofSFRi1i yA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. Tiffs preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination _ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are 250 acres of wetlands on the above described 660 acre tract subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our publishe fttC�,at aNp4D relied upon for a period not to exceed five years. r( ll�i �G �1 VV I� Page 1 of 2 SEP 112017 DCM- MHD CITY X The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on September 6.2016. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, North Carolina to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Gary Beecher at 910-251-4629 or Gary. H.BeecherAusace.a rmv.mil. C. Basis For Determination: Determination based on the 1987 Corns of engneers Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Reeional Supplement. D. Remarks: This JD is a renewal of SAW-20WI0010. This tract was purchased by new owners (Puneo River Farms, LLQ in December 2015. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you obj et to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Encil will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to determination you must submit a completed RFA form to the following address: 1 US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 PUG15 �p1 �N wo In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by November 5.2016. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** oi9miy4gr d by RM04MGANYH.1e5W73208 BEECHER.GARY.H.1052973208 � BE-U.S. GHI .3l g moD,awPKL...USA. Corps Regulatory Official: D*M:2016MD51Q1504-aroo' Date: September 6, 2016 Expiration Date: September 6, 2021 RECEIVED SEP 112017 DCM- MHD CITY A110 ®HW -woa LIOZ I I d3s a3AI3Wa +. I jEEt^- E f ,' � + z; xL � E ft �.yi� — i E �° p�E t ,� k EEEi tlEEtlEltEtl j:`,. �`It FlFE4E4ttitEF `EE i ! d�IEEEtEEltE t�� `.,EEE t_ ' t a �'' �,:` a' •Ejt k E E[ I E I� E t E � a t��< i , + E'EItkFFtEkEEt E[tt E[k E I�t t ;'fttttflilEEIEEE t"'kE EtlEki � (�x � ' 0 _ �� EEFIfEkEEEEEI! tE[[EIEfFIEEIEE r•_ �rkEt '�Ck ;#IEEEEkf, ,rt "�' , ...f,•. EEfEEEEEEIIEtt ! E k E E E t t I E E E f ♦—•- ® E f E t t E t E E E E k! t ki EEEf tEEEFIF iE E t E l.E '€tfEf If �� itEEEFEf EfiEE[k�tkfEEEIEEEEEFFE k kfEEEtfEEElE �„ :,-, �( t i E! E E I E i t �'EElEElElEEIE�EkEtlEEEtEEEEEEttI E! E t E E f! f E f f E E E E E E E EEFI�IEE •::� ;�` f -4 I!aEItEEEtfIIEEEEEEYEEEFEEEIEEEE! ESE E E F I F E E E E i F� f E f f t f l k l l l t f l EFtEEt ",fink r -« EEtfffEi[ItEEEtEFE1EiEfElE • E E t! E E F t� EtFktEEttI EtIEEEEEEEtti n!;Jill I, l E E k E[ F I E E t k E k E f t t F! �� tw i l l i E [ I I I I I I I I I I I I I I I I I I I I I a I id EltEtI I l t tifEEEIEIEEttEEEiEE i I t'IkfllfEitElEfIE I EEEEE'kEFIFElEFlEEIM1 �.I[EEFkIIEFEf4E 'aaSSaa•Ia I !i EFEEEEEItEf it'el'a°'n ti;; '�ia'' iE�i ES'• ItlF!,�C � I BB lilt ConnectGIS Feature Report Page 1 of 2 Beaufort Printed June 21, 2017 See Below for Disclaimer Parcels Property Land Owners Interior Tract Lines Centerlines County Line 13 Courty Line (Solid) State RECEIVED SEP 112017 DCM- MHD CITY https:/ibeaufort.connectgis.com/DownloadFile.ashx?i=_ags_map54d7b56ae63f421 db01057996ce£.. 6/21 /2017 r ConnectGIS Feature Report Page 2 of 2 OBJECTID GPIN GPIN Long 42533 7612-42-9664 7612-42-9664 OWNER NAME OWNER NAME2 MAILING ADDRESS PUNGO RIVER FARMS LLC 601 ST MARY'S STREET MAILING ADDRESS 2 CITY STATE RALEIGH NC ZIP PROP DESC LAND VAL 27605 369 AC BEAU #47 1113416 BLDG VAL TOT VAL DEFR VAL 0 1113416 0 TAXABLE VA PREV ASSESS ACRES 1113416 1113416 337.14 PROPERTY ADDRESS TOWNSHIP MBL SR 1764 OFF 07 DATE DEED BOOK and PAGE STAMPS 12/30/2015 12:00:00 AM 1890/00579 2300 SALE PRICE NOR BLDG NBHD CDE 1150000 0 SH W R NSHD DESC LAND USE EXEMPT AMT ROAD TYPE YR BUILT SQ FT DIRT SUB WE SUB DESC NBR BED EFF YR PIN 15004807 17876 Beaufort County online map access is provided as a public service, as is, as available and without warranties, expressed or implied. Content published on this vrebsite is to nformational purposes only and is not intended to constitute a legal record nor should It be substituted for the advice or services of industry professionals. The County c teaufort and the Website Provider disclaim all responsibility and legal liability for the content published on this website. The user agrees that Beaufort County and it tssigns shall be held harmless from all actions, claims, damages orjudgments arising out of the use of County data. p P RECEIVE SEP 11 2017 DCM- MHD CITY https://beaufort.connectgis.corn/DownloadFile.ashx?i=_ags_map54d7b56ae63f42l dbO1057996cef... 6/21/2017 ROY COOPER cowmor N. r-0- MICHAEL S. REGAN s°eremry Coastal Management ENVIRONMENTAL OLALITY BRAXTON C. DAVIS Director 6 September 2017 Pungo River Farms, LLC Attn: Mr. William Wescott Wescott Environmental Services, Inc. 859 Manson Drewry Rd Manson, NC 27553 Dear Mr. Wescott: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of property belonging to Pungo River Farms LLC located off SR 1725, Pamlico Beach Road adjacent the Pungo River and Satterthwaite Creek near Belhaven in Beaufort County, North Carolina It was received on 21 April 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is 20 November 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Steve Trowell, Field Representative for the Division of Coastal Management is responsible for processing your permit and he can be reached at 252-948-3854 or via email at ,,11. t ov if you have any questions. If this agency does not render a permit decision within 70 days from 15 August 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way RECEIVED --�--'Nothinq Compares- SEP 11 2017 S nteof\aA Carding Emi.ft lQuality Cmanl Mamlammt 943Wmh%n ton Sgwe Mall %VarhtnSto .NC27889 DCM- MHD CITY _5294664S7 F7 Mr. William Wescott 6 September 2017 Page 2 of 2 fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Steve Trowell Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator WARO RECE? . SEP OCM_�rQ. Si- MAJOR PERMIT IEEE MATMX Agglicant: Rope) R iy etr rcr L_b selection Development Type Fee DCM % DWQ % (14300 1601435100093 1625 6253) 1 (243001002 435100095 2341) development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o n water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3490 (See III(8). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be aoDlied: Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or III(D). If General Water ❑ Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) cannot be applied: IV. For development that involves the filling and/or $475 60% ($285) O0) excavation of more than EC ®°" one acre of wetlands and/or o en water areas: NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. I I3A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the Coastal Area Management Act (CAMA) was received on 15 August 2017. According to the said application submitted by Pungo River Farms, LLC, applicant proposes to stabilize 2,403' of shoreline to protect an existing logging road off SR 1725, Pamlico Beach Road, near Belhaven, in Beaufort County, North Carolina. A copy of the entire application maybe examined or copied at the office of Jonathan R. Howell, District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC, during normal business hours. Public comments received by 29 September 2017 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request. Please publish on: 9 September 2017 Steve Tmwell, Field Representative Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 (252)948-3854 RECEIVED SEP 11 2017 DCM- MHD CITY Water Resources ENVIRONMENTAL OUAlITY Washington Daily News PO Box 1788 Washington, NC 27889 6 September 2017 Attention: Legal Advertising Department ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Please include the enclosed Notice of Filing in the Public Notice section of the September 9, 2017 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3920. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to: Thank you. 4%0K[yO131WIII Cc: File Melissa Sebastian NCDENR COASTAL MANAGEMENT DIVISION 400 COMMERCE AVENUE MOREHEAD NC 28557 252-808-2808 ext. 229 Sincerely, Della Robbins, Administrative Assistant Division of Coastal Management -="`i+rtnilrtlg �otttpares�._�_ RECEIVED SEP 112017 DCM- MHD CITY sar.ofNmnc„ow, En.am =a1QuxRty'C=t,1N1i=j t 943Wwh.gm Sq..%fall Ni,hmrW,,NC278S9 .5. 9466421 \To1'1'I(01$1: CAMA PERM APPLIED PROJECT: FOR ;me );Co a see washir�tah �i yNewS 9-9�17ec�i�ro✓� COMMENTS ACCEPTED THROUGH c29� kmb&y- e2tia APPLICANT: I ! • • iA L� //` Wire eYi't : ►nesco* rr►wirovl ►11en1a.) scyvlcP h3W i 11 i qm wesco7t- FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Punoo River Farms LLC. Mailing Address: Phone Number: Email Address: gttn: John Chiavetta 601 St. Msary's Street Raleigh, NC 27605 _j LhnLhLi vtttaOc yahoo&om I certify that I have authorized Wescott Environmental Services. Inc. (Williarn Wescott) , Agent! Con!ractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the (ollov,ing proposed development: riprgip_shorehne sta ilization for 3 3GQ liq. Lr feet of slmrnline�lcmgtli Pungo River at my property located at {SIN 115004807 off of Pamlico Beach Road (NCSR 1725) in_ Beaufort County. I furthcrrnore certify that t am authori7ed to grant, ,and do in fact grant permission to Division of Coastal hfivageame-at slnlf. the Lost Permit Officer and their agents to enter on tho aforementioned lands in connection vvith evaluating iWonnation related to this permit application. Property Owner Information: Signature -- — John chiav&Va Print or Type Name Parinorl Owner Title 06 _ I 21 1 2017 Date This certification is valid through 12 1 31 12017 RECEIVED SEP 112017 DCM- MHD CITY "'This is a word processing form to be completed in Microsoft Word — NC Division of Coastal Management Major Permit Application Computer Sheet (02M 52010) Applicant: `n � 1 //, C Date: 8292017 Project Site County 1 / - Staff: W� District: Elizabeth City Washington ❑Morehead City ❑Wilmington Project Name: !�S / r Rover File: Date application "received as complete' in the Field office (EX: 1/82007): Permit Authorization)CAMA PrDredge & Fill ❑Both SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes No Photos Taken: Yes N Setback Required (riparian): []Yes EXp Critical Habitat: ❑Yes No ❑Not Sure 15 foot waiver obtained: ❑Yes No Hazard fVfification Returned: ❑Yes InNo SAV: ❑Yes o Not Sure Shell Bottom: ❑Yes No ❑ Not Sure Temporary Impacts: Yes ❑No Sandbags: ❑Yes No Ll Not Sure Did the land u8e classification come from county LUP: Yes [-]No Mitigatio0equired []Yes (optional): XNo Moratorium Conditions: ❑Yes o ❑NA Environ tal Assessment Done: []YesAlo ❑NA SECONDARY WATER CLASSIFICATION - OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) Nutrient Sensitive Waters (NSW) Swamp Waters (SW) High Quality Waters (HQW) ❑Outstanding Resource Waters (OR" WETLANDSIMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemiflora) cynosuroides) (DS) Salt or spike grass (Distichlis (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 ❑ III(D) Priv. public or Comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major U Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 I I I(B) Public or commercial w/ D&F to 1 Express Permit - $2000 aae; 3490 can be applied - $400 RECEIVED ❑ Major development extension request - ❑ II. Public or commercial/no dredge $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQagreement -$400 DCM- MHD CITY 232-808.2808 :: 1.888-4RCOAST :: www.neeoastalmanaaement.net revised: 02/15/10 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) i Applicant: /1� IA- fl lr �GL Date: 8/29/2017 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet TYPE REPLACE Activity Name Number se Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 D D New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N - New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New WoiW-CF Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work= Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work E Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N DCM- MHD CITY revised 02115M 0 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Date: 8292017 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount / { Dredge ❑ Fillt Both ❑ Other ❑ 3 d Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED SEP 112017 DCM- MHD CITY 252-808-2808 :: 1.888dRCOA8T :: www.nccoastalmanaaement.net revlsed:02/15/10 Cross-section for Segment 1 Riprap along 335 feet of shoreline at Pungo River Farms, LLC. No riprap placed below NWL. Scale: Not to scale, dimensions shown 1^1 Normal Water Level Toed in to /prevent undermining of riprap i Figure 5 c' 7/27/2017 W 20-foot zone cleared for construction access Cross-section for Segment 2 Riprap along 1,222 linear feet of shoreline at Pungo River Farms, LLC. Maximum of 7,332 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown Toed in to prevent undermining of riprap Figure 6 7/27/2017 W Ifor ss Cross-section for Segment 3 Riprap along 193 linear feet of shoreline at Pungo River Farms, LLC. 965 square feet of riprap placed below NWL. Scale: Not to scale, dimensions shown Riprap breakwater Base width = 10 feet Top width = 2 feet Total height = 2 feet 2:1 slopes Figure 7 7/27/2017 U W "' Cross-section for Segment 4 > N 0 Riprap along 658 linear feet of shoreline at Pungo River Farms, LLC. L Maximum of 3,948 square feet of riprap placed below NWL. LuLU Scale: Not to scale, dimensions shown Toed in to prevent undermining of riprap. Riprap varies 4 to 6 feet waterward of NWL depending on the escarpment height of 2 to 3 feet. Riprap to extend 5 to 8 feet landward of NWL. Figure 8 } H C? ® 7/27/2017 0 l�OZ9� or CAMA MAJOR PERMIT APPLICATION Pungo River Farms LLC Attn: Mr. John Chiavetta 601 St. Mary's Street Raleigh, NC 27605 6/21/2017 Mr. Ronald Craft 279 Hideaway Road Belhaven, NC 27810 Dear Mr. Craft: Pungo River Farms LLC is applying for a CAMA Major permit to place riprap along 3,360 linear feet of shoreline of the Pungo River, in Beaufort County, North Carolina. The specifics of the proposed work are in the enclosed maps and drawings. As the adjacent riparian property owner to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached information and drawings. Should you have any objections to this proposal, please send your written comments toe -'.E � V E D Mr. Steve Trowell SEP 11 2017 NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 DCM- MHD CITY within 30 days of your receipt of this notice. Such comments will be considered by the Department in reaching a final decision on the application. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at 252-402-9662, or e- mail me at wescottenvironmentalservices ar7.gmail.com Sincerely, I + A William Wescott Wescott Environmental Services, Inc. ®C Pao Enclosures PUNGORIVER _e_ JJ.... A 43' yy �04 µ_=L - Pungo River Farms shoreline project 9$. Wetland Delineation verified by USACE W_81o5 1''1J--- Original verification in 2005 �'�- Renewed in 2016 UPLAND i = JJ... A 1-...J✓— yar L1056 i }J....A )J ...A Figure 3 z _ : J--J-J1 )J.... A L1....A JJ....A >J. 6 25 5 ) J )J....A ) J J A J E 5 6 � JJ.... A 168.22 DTI ) ....A _ _ - - ) q •-- --- = _ ....A - ' _ _... ) J.. _ 7NA _= ---= mac= f - = --- = - — :_ __ E-,_�•_:L'.-v1••'r_'i, r_3=^'> r�_::'s_:=.r�a:r.=;:: �_y==•'=::: ^�.:.,a=-:.:u.,- t =_ W- 168WETIA_N. ER LINE i ${' 8 �Er.-L__ _ .y��: I ..-•:'='ins_=_ _ _ _ __ ___ ___ r__ _ _.__ �'_ _ __ _ - . V'.:G _ ___r_� L Ili= _S.:•_•'�, �^:: _ _ •..JIB '_••_ _ _ =__i. ^�� _ �'•N-8175;_~ -- -'3 •%-__-_ _- L2446���i��.'.. 1 — 82 �. r 11 .h-32/4-.`.:»..:_ N .>T��E)• w-X704 =. _ w_�_ q!! •Y�r......:...- 145-�433 553 Wq N_313o /) W-3265 -__ ] ... = W-C-500 - = - _ - - - 03 ----