Loading...
HomeMy WebLinkAbout1-17 Piedmont Natural Gas1n J�r 5 Permit Class + Permit Number NEW 1-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Piedmont Natural Gas, 4720 Piedmont Row Drive, Charlotte, NC 28210 Authorizing development in New Hanover/Brunswick Counties at Cedar Hill Road, Navassa, to 801 Sutton Steam Plant Rd.. Wilmington_ zing under the Cane Fear River, as requested in the permittee's application dated 10/13/16, including workolan drawings (7), 1,2,6,& 7 of 7 dated 9/16/16, and 3-5 of 7 dated 9/30/16. This permit, issued on January 10, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Natural Gas Line 1) Unless specifically altered herein, this permit authorizes only the replacement of approximately 2 miles of Natural Gas Line 4, including directional drilling of the natural gas line under the Cape Fear River, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (910) 796-7215 for this determination. RECEIVED JAN 17 2017 (See attached sheet for Additional Conditions),., C M- M H D CITY This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. 02 Braxton . Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Pemnittee Piedmont Natural Gas Permit # 1-17 Page 2 of 2 ADDITIONAL CONDITIONS 2) All staging areas and directional drilling pits shall be located outside of all Coastal Area Management Act Areas of Environmental Concern (AEC). Sedimentation and Erosion Control 3) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials resulting from the excavation of the estuarine shoreline for the directional boring drilling operations do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environmental Quality, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. Stormwater Management 4) A stormwater management permit from the Division of Energy, Mineral and Land Resources will be required for the authorized project. A copy of the stormwater management approval shall be obtained and a copy provided to the Division of Coastal Management prior to the initiation of any development activities authorized by this permit. General 5) No work shall take place on any property until such time as the permittee has obtained proper legal authority (i.e. deeds, easements, right of way encroachment agreements, etc.) for said property. 6) Any alteration of or addition to the approved natural gas line route that involves any Area of Environmental Concern shall require additional authorization from the Division of Coastal Management. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. 7) No Coastal Wetlands or open water areas shall be excavated or filled, even temporarily. 8) The permittee and/or his contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including, but not limited to, the U.S. Army Corps of Engineers. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of I Resources. ID JAN 17 2017 Division of Coastal Management Application Processing Notes Applicant: I)i co',�r-'T N fK� &kS Type (check all that apply) NEW ,/ MAJOR MOD MINOR MOD Permit Coordinator: +f - 60 M-S Field Representative: sEvto 77-fr Z t RENEWAL TRANSFER Date/Time Message mac. DV-- jieovn. JV Cooe-Dti� v if Dt+lckz -M tSSatE' DECEIVED JAN 17 2017 DCM- MHD CITY DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD RECEIVED 1) APPLICANT: Piedmont Natural Gas clo AECOM COUNTY: New HankQ?Y-1 r 444k PROJECT NAME: Line 4 Replacement DM- M H D CITY LOCATION OF PROJECT: The western terminus is located at Cedar Hill Road, in Navassa, Brunswick County, crossing the Cape Fear River to the eastern side located at 801 Sutton Steam Plant Rd, off US Hwy 421, in New Hanover County DATE APPLICATION RECEIVED COMPLETE BY FIELD:10131116 FIELD RECOMMENDATION: Attached: Yes CONSISTENCY DETERMINATION: Attached: No FIELD REPRESENTATIVE: Sean Farrell DISTRICT MANAGER REVIEW: ,,y .P-�� B) DATE RECEIVED BY MAJOR PERMITS UNIT: C) To Be Forwarded: n/a To Be Forwarded: n/a DISTRICT OFFICE: WILMINGTON FEE REC'D: $400 / #4000428288 PUBLIC NOTICE REC'D: 11-10-16 ND OF NOTICE DATE: 12-1-16 CL awt v We&/IV G Hjap ADJ. RIP. PROP NOTICES RECD: at• o% w�� to/t/iV G�awz&ED REC'D: APPLICATION ASSIGNED T : �`f'� ON: I 75 DAY DEADLINE: 150 DAY DEADLINE: MAIL OUT DATE:11-8-16 STATE DUE DATE: 12-1-16 FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT J AGENCY �• � nP, oi- v a.q f w v 4 L1-FO10 DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency Division of Community Assistance Land Quality Section (DEMLR) I q ls5 S C PIN+ S W Division of Water Resources (401) 111,5 Storm Water Management (DEMLR) 11 vLpl./ State Property Office iIto��� Division of Archives & History �t ({ Division of Environmental Health 1 ZI l4 Division of Highways Wildlife Resources Commission Local Permit Office Division of Marine Fisheries / DCM Corps of Engineers L w� 1l/17/16 f 32 Recommendations for State Permit — Piedmont Natural Gas, c/o AECOM 11/07/2016 It is the staff s recommendation that the proposed development is CONSISTENT with the Rules of 15 NCAC 71-1.0206 (d) Use Standards for Estuarine Waters and Rules of 15 NCAC 711.0207 (d) Use Standards for Public Trust Areas. It appears that the project is consistent with the use standards set forth in NCAC 07H .0208(a) General Use Standards. It is the staffs recommendation that the proposed upland development is CONSISTENT with the Rules of 15A NCAC 07H .0209 COASTAL SHORELINES (d). The proposed utility line project also appears to be consistent with the General Permit conditions under 15A NCAC 07H.1500 General Permit for the installation of aerial and subaqueous utility lines with attendant structures in Coastal Wetlands: Estuarine Waters: Public Trust Waters and Estuarine Shorelines. This office has no objection to the proposed work, provided it is consistent with state and federal permitting requirements regarding the conversion of §404 wetlands and drilling under a federally maintained channel. An easement should be obtained from the State Property Office for the proposed development within Public Trust Area. It is recommended that any permit issued include standard permit conditions. RECEIVED NOV 10 2016 DCM- MHD CITY MEMORANDUM To: Heather Coats From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Applicati n, Piedmont Natural Gas, Brunswick County and New Hanover County Date: January 9, 2017 This project appears to be consistent with the Brunswick County Land Use Plan Update and the New Hanover County Comprehensive Land Use Plan. The applicant is proposing to directionally drill a 2-mile long natural gas line approximately 10" in diameter beneath the bottom of the Cape Fear River. The western terminus of the project is located at Cedar Hill Road in Navassa in Brunswick County with the eastern side of the project located at 801 Sutton Steam Plant Road, off US HWY. 421 in New Hanover County. Areas of Environmental Concern (AFC's) impacted by the proposal are Estuarine Shoreline, Estuarine Waters and Public Trust areas. Waters at the project site are classified as C-Sw and are not open to the harvesting of shellfish. The area is a Primary Nursery Area. I have reviewed this proposal for consistency with the 2007 Brunswick County Land Use Plan and the New Hanover County Comprehensive Land Use Plan and offer the following comments. The general area of the project is classified as Conservation. In general, Brunswick County and New Hanover County allows development in Conservation classified AECs, which is consistent with the State's minimum use standards. The Brunswick County and Wilmington -New Hanover County Land Use Plan contains some policies, which exceed the State's minimum use standards. However, none of these standards appear to be applicable to this proposal. This project appears to be consistent with the Brunswick County and New Hanover County Land Use Plan. Cc: File 0 Coastal Management ENVIRONMENTAL QUALITY November 7. 2016 TO: Mark Zeigler Division of Community Assistance Wilmington Regional Office PAT MCCRORY (luvernnr DONALD R. VAN DER VAART Secretary BRAXTON DAVIS [)hector FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(o)--ncdenrpov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA/Dredge 8 Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED Al A44//_' An 19,E DATED State of North Carolina I Environmental Quality I Coautat Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 PAT MCCRORY Governor !.a DONALD R. VAN DER VAART Secretary Coasta/Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director 1. November 7, 2016 ALZ "^ Nov 0 82016 TO: Dan Sams br _ District Manager-DEMLR Wilmington Regional Office FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats laDncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes i ( are pincorporated. See attached. tv^�iii �•e-w�...—C� bt S.i L. 't4v.� f Urfa. 2tuS•.s.` � sa_�...e..� e.0 �+:.� awc� g�pf,wo.y-may a foJc'S 1 This agency objects to the project for reasons described in the attached comments. SIGNED —�/� DATED_ \t I &ELL DCM WILMINGTON• NC Nov ©y ZU16 State of North Carolina I Environmental Quality � Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 910496-7215 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: PAT MCCRORY Governor DONALD R. VAN DER VAART Seoelory RECEIVED/NCDENOWR NOV 0 & 2016 Robb Mairs 401 Wetlands Water Quality Regional DWR-WiRO Operations Section Wilmington Regional Office BRAXTON DAVIS D,,ecror FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 0jt 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsta�.ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA/Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. /S�64-'k, "Additional comments may be attached" /.�;), %-D-6/ L This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. rr�� SIGNED DATED /d—' JLazl4 DCM WILMINGTON, NO DEC 12 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive ext., Wilmington, NC 28405 910-796-7215 Wa; er Resources ENVIRONMENTAL CUALITY Piedmont Natural Gas c/o Chris Albers 4720 Piedmont Row Drive Charlotte, NC 28210 Subject Property: Dear Mr. Albers: December 9, 2016 PAT MCCRORY Gnrarnnr DONALD R. VAN DER VAART seowla : S. JAY ZIMMERMAN DWR Project It 2016 1113 New Hanover County Direclnr Duke Energy Sutton Plant -Line 4 Replacement, Wilmington Approval of 401 Water Quality Certification with Additional Conditions You have our approval, in accordance with the attached conditions and those listed below, to impact 0.56 acres (24,394 square feet) of wetlands (convergence from forested to emergent) and 0.16 acres (7,000 square feet) of shallow bottom area due to the directional drilling of a 10" natural gas line underneath the Cape Fear River as described within your application received by the Division on November 8, 2016. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 3900 (GC 3900). You should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non -discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This Certification can also be found on line at: httv://I)ortal.ncdenr.org/web/wq/swi)/ws/40 I/certsmdZermits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new �Cf A IMINGTON, NC RECEIVED State of North Carolina I Department of Environmental Quality I Division of Water Resources 127 Cardinal Drive Ext., Wilmington, NC 28405 DEC .� qq 9197967215 k 20161 Piedmont Natural Gas c/o Chris Albers DWR # 2016-1113 Page 2 of 4 application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name {I 5A NCAC 02H .0501 and .0502) . 2 Any final construction plans for this project must include or reference the application and plans approved by the Division under this authorization letter and certification. The applicant will also be required to evaluate all acquired permits to assure that they are consistent and all relative impacts are accounted for and shown on the construction plans. [15A NCAC 02H .0502 (b) and 15A NCAC 02H .0506 (4)]. The applicant shall require his contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B .0220. Appropriate sediment and erosion control practices must be used to meet this standard. Turbidity curtains shall be used as appropriate. Please notify this Office if any turbidity issues arise at 910.796.7215 This General Certification shall expire on the same day as the expiration date of the corresponding General Permit. The conditions in effect on the date of issuance of the Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration of this Certification. The permittee shall require its contractors and/or agents to comply with the terms of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project a copy of this certification. A copy of this certification including all conditions shall be available at the project site during the construction and maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 021-1.0506 (b)(2) and (c)(2)] 6 Continuing Compliance: The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with 303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, than the Division may reevaluate and modify this General Water Quality Certification. [I 5A NCAC 02H .0507(d)] 111tfLMING7-ON Ne DEC 12 2016, .Piedmont Natural Gas c/o Chris Albers D W R N 2016-1113 Page 3 of 4 7 All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permittee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Wilmington Regional Office at 910.796.7215 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [ 15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A]. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)]. This certification grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours 15A NCAC 02H.0502(e). 10 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant and/or authorized agent is required to return a completed certificate of completion form to the NCDEQ DWR 401 and Buffers Unit North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699 within ten days of project completion. The certification of completion is available at: bZ://Rortal.ncdenr.or web/wq/swp/ws/401/certsandpermits/apply/formsl. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00 am and 5:00 pm, excluding official state holidays).The petition may be faxed to the OAH at (919) 431-3100, provided the original and one c&}Ni, Ong DEC 12 2016 Piedmont Natural Gas c/o Chris Albers DWR # 2016-1113 Page 4 of 4 with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam M. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Robb Mairs in the DWR Wilmington Regional Office at 910.796.7215 or Robb.Mairsna),ncdenr.gov. Sincerely, Jim egson, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Enclosure: GC 3900 cc: Paul Masten — AECOM Tyler Crumbley - USACE Wilmington Regulatory Field Office Heather Coats — DCM Wilmington DWR 401 & Buffer Permitting Branch file WiRO O n W� 41 AtGTON Atc D ct 1,9 2016 VV Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: F RdMZI SUBJECT: Applicant: Georgette Scott Stormwater Section DEMLR - WiRO PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary ECEIVE NOV 0 8 2016 BY: BRAXTON DAVIS Di o,, I Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatscDncdenraov Fax: 395-3964 (Courier 04-16-33) CAMA / Dredge & Fill Application Review Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 09 �J DATED it L- RECEIVED DCM WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management NOV 2 2 2A 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 P/ PAT MCCRORY Governor Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: Tim Walton Dept of Administration State Property Office RIKEIVE! NOV 14 2016 STATE PFiOPERTY C =FICE DONALD R. VAN DER VAART Secretary BRAXTON DAVIS loo"I"r FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(o)..ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA/ Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. �"Additional comments may be attached" V This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED `' �DATED �� ✓ \ RECEIVED DCM WILMINGTON, NC State of North Carolina En vironmental Quality I Coastal Management DEC 16 2016 127 Cardinal Dove Ext., Wilmington, NC 28405 910-796-7215 Mra State Property Office December 6, 2016 Paul Masten AECOM 201 North Front Street, Ste 509 Wilmington, NC 28401 Re: Council of State Approval File No. 10-EE Dear Mr. Masten: Pat McCrory Governor Kathryn Johnston Secretary This is to advise you that the Council of State, at its meeting held on the above date, approved the attached item. This matter will be referred to the Attorney General's Office at the appropriate time for preparation of documents. In the meantime, if you have any questions regarding this transaction, please contact Joy Wayman of this office. JMW:tm Attachment Cc: Don Teeter Sincerely, Tim Walton Director Nothing Compares_ RECEIVED DCM WILMINGTON. NC JAN 0 5 ?017 State of North Carolina I Administration I State Property Office 1321 Mail Service Center l 116 W. Jones Street I Raleigh, NC 27699-1321 http://www.ncspo.org 1 919 807 4650 T 1 919 733 1431 F DISPOSITION BY EASEMENT ITEM 3 GRANTOR: State of NC, Department of Administration GRANTEE: Piedmont Natural Gas Company, Inc. LOCATION: Near Cedar Hill Drive, Cape Fear River, Brunswick and New Hanover Counties EASEMENT AREA: t7,000 linear feet crossing Cape Fear River CONSIDERATION: $250 COMMENTS: Utility Easement. Proposed easement is needed for subaqueous installation of a natural gas line by horizontal directional drill. RECEIVED DCM WILMINGTON, NC JAN 0 5 ?�17 w. It NOV 1 5 2016 D NALD R i^'�R ,ccgenr,IrvyrjFFt�"� Coastat Management ENVIRONMENTAL QUALITY PAT MCCRORY Goren w VAN DER VAART se, rewy BRAXTON DAVIS Dtmc November 7, 2016 21622 TO Renee Gledhill -Early I tt, Dept of Cultural Resources t Archives & History t v FROM: Heather Coats, Assistant Major Permits Coordinator 14", NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm , NC 28405 heather. coats(cilncdenr.aov Fax:395-3964 (Courier04-16-33) SUBJECT CAMA / Dredge & Fill Application Review r Applicant: Piedmont Natural Gas (Line 4 Replacement) Is, 't'� �� �t;tte cx� Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated See attached. This agency objects to the project for reasons described in the attached comments. SIGNED V DATEDag C _)CM WILMiNGTC: 140V 2 8 2016 h State of North Cmo im I En"roraneMRl Qtuilny Co l Mmnµgment 9+ tl 127 Cudmal fhwc ExI, Wilefirt , NC 2W3 910-7%-7215 NOV 1 6 2016 0 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: Shannon Jenkins NC DMF Shellfish Sanitation Section PAT MCCRORY Oovemm DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Utredar FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats Drhodenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016, If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** 4 This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. For AJy 8a "le" SIGNED DATED Il R CEIVED NOV 21 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive EM , Wilmington, NC 29405 D C M - M H D CITY 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: Ben Hughes NC Dept. of Transportation NH Co. & BR Co. 11' PAT MCCRORY Governor DONALD R. VAN DER VAART Set retary BRAXTON DAVIS Do-ecor DISTRICT 3 NOV 14 2016 FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)-ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" 11 This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED -�- J7" DATED ((- ? `? RECEIVED DCM WILMINGTON, NC DEC 0 S 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: Maria Dunn NC Wildlife Resources Commission For WiRO PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(aDncdenr_go v Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED jl,L-1I-1— DATED 0--i-J�It, RECEIVED DCM WILMINGTON, NC RECEI �I DCM LMI GTON, NC Slate of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drn a Ear, Wilmington, NC 28405 ` 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 TO: RECEIVED NOV 2 2;;5 NEW HANOVER COUNTY PLANNING & ZONING Ben Andrea Local Permit Officer Supervisor County of New Hanover PAT MCCRORY DONALD R. VAN DER VAART BRAXTON DAVIS Ulnaor FROM. Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(c)ncdenr.vov Fax 395-3964 (Courier 04-16-33) SUBJECT. CAMA/Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNEDATED RECEIVED DCM WILMINGTON, NC Mule of N,mh CmoLna rmironmental O<mhn CoaNa1 ManaKem DEC 0 12016 Cardinal 1) ..r Em , R'dmmp., NC 29405 910-796-721S M PAT MCCRORY Governor 2:t DONALD R. VAN DER VAART 1 -cmary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director November 7, 2016 RECEIVED TO: Gregg Bodnar NOV 10 2016 Fisheries Resource Specialist DCM, Morehead City DCM- MHD CITY FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats<cilncdenr.00v Fax: 395-3964 NNIMMKO, SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and - t the address above by December 1, 2016. If you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: X_ This agency has no objection to the project as proposed. "Additional comments may be attached*" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED _ DATED f t l 3D/t- 1 REC`IVED DCM WILMINGTON, NC State ol'North Carolina Environmental Quality I Coastal Management DEC 0 1 2016 127 Cardinal Drive Ent. Wilmington, NC 28405 910496-7215 PAT MCCRORY , DONALD'R. VAN DER VAART 4 , . - 'Secxerory - SRAXTON-DAVIS Coastai'Management Otrecier ENVIRONMENTAL OUALITY MEMORANDUM: TO: Heather Coats, DCM Assistant Major Permit Coordinator} FROM: Gregg Bodnar; DCM Fisheries Resource Specialist / SUBJECT. Piedmont Natural Gas Line 4 Replacement ( � DATE: 12/1/2016' ANorth Carolina Division of Coastal' Management (DCM) Fisheries Resource Specialist has reviewed the . subject permit application for;p'roposed actg nsptphatimpact fish and fish habitats.' The' applicant,proposes to -o en trench and directional bore a natural as i line "under the Ca a Fear Rtver. The surroundingwaters are classified'as,Primary NurseryArea (PNA), Anadromous Fish Spawning Area (AFSA), C-SW, and are closed . to shellfish harvest. The applicant describes within their narrative and associated drawings measures to reduce potential impact to the surrounding habitat. These measuresare recommendedif the permit is authorized. The directional . bore is estimated to be 70ft below the existing bottom contour of the Cape Fear River 'At this depth a moratorium for in -water work is not necessary.. If the-bore.depth changes then additional review'may, be required, Some existing Iinesare to'be,leftin place and capped. Contactwith uncured pipeline capping,. compound and surface watersor wetlands should be avoided: Op'en.trenching is proposed outside any AECs yet within the estuarine system, to mclude,wetlands. The narrative indicates there will.be no proposed.'' permanent. coastal Wetlands impacts, and 0.56 acres of §404 impacts. As indicated in'the narrative, an , approved §404 wetlandsurvey was not submitted with the application. The applicant notes in the wetland ' mitigation narrative.that they have.worked wlth.USACE-to, mitigate for §404 impacts at a 1 1 ratio.with credits from.the Lower Cape'Fear Umbrella Mitigation Bank. Any BMPs/recommendations provided by .' USACE or NC WRCtor the' minimization of wetland'impacts associated with the open trenching and existing reduction are r "'ported a well an additional comments raised by NC_ WRC relating to habitat impact ' gas line work ar PP supported. Finally,y o .. pp . I Contact Gregg�Bodnar at (252), 808-2808.ext. 213 or a�eas.b'odnar@ „ ncdenr.¢ov with further ,questions or. .concerns., State ofNmtKCarolina - . - . ' ' `•. .. Fnttilonmental Qualiryl Coas,W Mapagemeot '.. .• " '. ..• 400.Commeme Avane I Morehead City, NC 28557.. - '252-W&28081252-M-3330 (fax) Coats, Heather From: Crumbley, Tyler CIV USARMY CESAW (US) <Tyler.Crumbley@usace.army. mil> Sent: Monday, December D5, 2016 1:54 PM To: Spencer, Thekla M CIV USARMY CESAW (US); Mairs, Robb L Cc: Coats, Heather Subject: RE: NH Co. Projects Robb, I'm sure you saw the email Liz put out today for the Morris project. She is working on that for me while I get the OIB ROD issued. She is going to process that under a GP291. I'll eventually issue the PNG line 4 App under NWP12 when I get to it. If you want to talk about either of those, let me know. -Tyler -----Original Message ----- From: Spencer, Thekla M CIV USARMY CESAW (US) Sent: Monday, December 05, 2016 11:53 AM To: Mairs, Robb L <robb.mairs@ncdenr.gov> Subject: RE: NH Co. Projects Hey Robb! Tyler is going to do a NW12 for this project with a Mitigation Responsibility Transfer form . Attached please find a copy of the NW12 conditions. http://www.saw. usa ce. a rmy. m i I/Po rta Is/59/docs/regulatory/regdo cs/N W P2012/N W P12_3-23. pdf Let me know if you need any further info, Robb! -----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (US) Sent: Monday, December 05, 2016 10:23 AM To: Spencer, Thekla M CIV USARMY CESAW (US) <Thekla.M.Spencer@usace.army.mil> Subject: FW: NH Co. Projects Are these in that pile for me? -----Original Message ----- From: Mairs, Robb L [mailto:robb.mairs@ncdenr.gov] Sent: Monday, December 05, 2016 9:15 AM To: Crumbley, Tyler A CIV USARMY CESAW (US) <Tyler.Crumbley@usace.army.mil> Subject: [EXTERNAL] NH Co. Projects Hey man, just checking to see on your thoughts fort Morris (228 Seacrest Dr.) and Piedmont Gas. Were these going through the 291 process? Robb Mairs Environmental Senior Specialist Division of Water Resources North Carolina Department of Environmental Quality 910 796.7423 office robb.mairs@ncdenr.gov <mailto:robb.mairs@ncdenr.gov> 127 Cardinal Drive Extension Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. M Coastal Management ENVIRONMENTAL QUALITY PAT MCCRORY Governor DONALD R. VAN DER VAART S"ft "y BRAXTON DAVIS uireca,r November 7, 2016 TO: Heidi Cox dd Assistant Regional Engineering Supervisor Divi �NOV 0 8 2016Public Water Supply-WiRO It'iRpnpf a p46W erkes FROM: Heather Coats, Assistant Major Permits Coordinator o Waters pp�ls NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(o)-ncdenrpov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA / Dredge & Fill Application Review Applicant: Piedmont Natural Gas (Line 4 Replacement) Project Location: spanning beneath the bottom of the Cape Fear River from Cedar Hill Road in Navassa, Brunswick County, to 801 Sutton Steam Plant Rd., off US Hwy 421 in New Hanover County Proposed Project: to install a 2-mile long natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 1, 2016., if you have any questions regarding the proposed project, contact Sean Farrell at (910) 796-7423 when appropriate in-depth comments with supporting data is requested. REPLY: _� This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNE DATED (0 b RECEIVED DCM WILMINGTON, NC State of North Carolina I Environmental Quality I Coastal Management NOV 17 2016 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 W DIVISION OF COASTAL MANAGEMENT RECEIVED FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Piedmont Natural Gas, c/o AECOM NOV 10 2016 2. LOCATION OF PROJECT SITE: The western terminus of the project is locaDGM@dM"M(MiFy Navassa, Brunswick County, crossing the Cape Fear River to the eastern side of the project located at 801 Sutton Steam Plant Road., off US Hwy. 421 New Hanover County. Photo Index - 2006: 16-7329 Latitude: 34°28'28.70" N Longitude: 77° 99'62. 53" W 3. INVESTIGATION TYPE: CAMA/Dredge & Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - N/A 5. PROCESSING PROCEDURE: Application Received - 10/13/2016, 10/31/2016 (complete) Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Brunswick County, New Hanover County Land Classification from LUP -Conservation, Industrial (B) AEC(s) Involved: EW, PTA, ES, PTS Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - (Sutton Plant) Private Sewer system, ash ponds (NPDES- NC0001422) Planned - None (F) Type of Structures: Existing - (Sutton Plant) -Power generating steam plant, existing natural gas meter stations Planned - Directionally drill 10" natural gas line and construct two associated compressor stations. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHE 0.56 acres (A) Vegetated Wetlands- § 404-type (Converted from forested to emergent) (B) Non -Vegetated Wetlands -7,000 square feet (Shallow Bottom) (drilled) (C) Other - Highground - 3,560 square ft. (open trenching) (D) Total Area Disturbed:-34,848 sq. ft. (0.80 acres) (E) Primary Nursery Area: Yes (F) Water Classification: C-Sw Open: No PROJECT SUMMARY: The applicant is proposing to install a 2-mile long natural gas line approximately 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River. Piedmont Natural Gas, clo AECOM Page Two RECEIVED NOV 10 2016 9. PROJECT DESCRIPTION nn yy The project area extends from Brunswick County east to New Hanover County, oss g 9eCtape'Fear River north of Royster Road in Navassa, Brunswick County into New Hanover County at the L.V. Sutton Plant. To find the western (Brunswick) project site, travel south on US Highway 17 to NC Highway 133 South (River Road SE). Travel approximately 6.3 miles down River Road and the access road to the site will be on the left. It is located before Town Creek and a baseball field can be seen at the turn to the road. Two dirt roads diverge at the baseball field off River Road. Access to the site is through the road to the left, which runs approximately 90 degrees to River Road. Please note this is a private road with locked gate, so access must be arranged prior to a site visit. Follow this road approximately 1.25 miles. The project area is located on the left (northern) side of the easement. The New Hanover County project site is located at 801 Sutton Steam Plant Road, off US Hwy. 421, on the north side of the Cape Fear River, in New Hanover County. To fmd the eastern project site (New Hanover) from the Wilmington Regional Office (WiRO), travel south on US Highway 17 (Market Street) and then take a right onto NC Highway 74 to NC Highway (Martin Luther King Jr. Parkway). Travel approximately west approximately 6.0 miles towards downtown Wilmington. Merge right and continue over the Isabelle Holmes Bridge until you reach the stop light at NC Highway 421. Turn right onto NC Highway 421 and travel north approximately 2.0 miles until you reach Sutton Steam Plant Road on the left. Turn left onto Sutton Steam Plant Road and travel approximately 1.0 mile until you reach the property of interest. Please note that access to the site must be arranged prior to a site visit. The Brunswick site consists of approximately 430 acres, which is mostly undeveloped apart from multiple utility easements and sand borrow pits. The tract is primarily uplands transitioning to wetland vegetation as you near the bank of the Cape Fear River to the east. There is currently an existing natural gas meter station cleared easement with aerial transmission lines crossing the Cape Fear River to the New Hanover County side of the project. The New Hanover County site is adjacent to the Duke Energy Sutton Plant with an existing natural gas meter station. Coastal wetland vegetation present on site consists primarily of Cattails (Typha spp.), Bulrush (Scirpus sp.) and Giant Cordgrass (Spartina cynosuroides). Section 404 wetlands are also present on site; however, an approved §404 wetland survey was not submitted as part of the application package. In the project area, the waters of the Cape Fear River are classified as C-Sw, by the NC Division of Water Resources. These waters are designated as Primary Nursery Area (PNA), by the NC Division of Marine Fisheries. The Cape Fear River (CFR) is approximately 800 feet wide in this location, and is classified as Joint waters by the NC Division of Marine Fisheries and the NC Wildlife Commission. Piedmont Natural Gas, cto AECOM RECEIVED Page Three NOV 10 2016 Mi 10. PROPOSED PROJECT DC M- M H D CITY The applicant is proposing to install a 2-mile long natural gas line approximately 10" in diameter and tie in to two (2) existing natural gas meter stations. The proposed project is to partially replace the existing Piedmont Natural Gas line 4 as well as to remove a section of the line that has become exposed within the wetlands along the west bank of the Cape Fear River. As stated in the project narrative, sections of line are to be removed that are within coal ash basins at the Duke Energy Sutton Plant, which are in the process of being excavated with the coal ash being transported offsite as part of Duke's LOLA Project. Portions of the existing line 4 are also proposed to be grouted and abandoned in place (see site plan: ENV 200). The proposed installation involves approximately 3,500' of open trenching landward of the Areas of Environmental Concern (AEC's) within the estuarine system and approximately 7,000' of horizontal directional drilling beneath the bottom contour of the Cape Fear River. The directional drills are proposed to achieve a depth of approximately 70' below the existing bottom contour of the CFR. The 10" pipe would be installed within the drill path. The application states that the spoil will be taken offsite, however an exact location was not specified. As state in the project narrative, two separate bore holes are proposed, with an entry point on either side of the CFR. The proposed entry point for the New Hanover County side of the river would be located approximately 1,200' landward of the normal high water (NHW) line. The proposed entry point for on the Brunswick County side of the river is approximately 5,000' landward of NHW. The open trenching is proposed to occur landward of either entry point for the directional drilling, and would involve mostly high ground disturbance with approximately 0.56 acres of § 404 wetlands impacts. ANTICIPATED IMPACTS As previously stated, approximately 0.56 acres of § 404 wetlands would be converted from forested to emergent wetlands. The applicant has included a statement of credit availability from the Lower Cape Fear Umbrella Mitigation Bank, for a 1:1 impact/mitigation ratio. The project does not propose any permanent impact to coastal wetlands. The proposed directional drill would cross under approximately 800' of open water (designated Public Trust Area and Estuarine Waters AECs) as well as boring beneath the surrounding coastal wetlands. Submitted by: Sean Farrell Date: 11/07/2016 Office: Wilmington IMPACT JUSTIFICATION, AVOIDANCE, AND MINIMIZATION The project will avoid 9.38 acres of bottomland hardwood, riverine swamp forest and coastal wetland by using horizontal directional drill (HDD) technology and equipment to install the section of line that will be located beneath the Cape Fear River and adjacent floodplain wetlands. The proposed line will be located within an existing, maintained easement that is already permitted for permanent maintenance so that no new clearing and conversion will occur within the HDD river bore. The only proposed permanent impacts will not result in a loss of waters of the US but will only result in a conversion from forested wetland to emergent wetland and will total 0.56 acres. These impacts will occur in a finger of wetland that extends east from the main floodplain wetland areas of the river. The presence of a stormwater pond on the Sutton Power Plant property within the extrapolated linear path leading from the HDD river bore is causing the alignment to be shifted slightly south and resulting in the impact. WETLAND MITIGATION Mr. Tyler Crumbley with the U.S. Army Corps of Engineers stated that wetland mitigation ratio for the permanent conversion will be provided at a 1:1 ratio. Accordingly, offsite mitigation has been coordinated with the Lower Cape Fear Umbrella Mitigation Bank for 0.6 acres of wetland mitigation. Also, the section of the existing, maintained easement line that is present in the Cape Fear River floodplain wetlands that will be abandoned in place will be allowed to return to pre -project conditions (forested floodplain wetland). RECEIVED NOV 10 Z016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC 0 C T 13 2016 PROJECT NARRATIVE PNG LINE 4 REPLACEMENT RECEIVED NOV 10 2016 DCM- MHD CITY The proposed project will include replacing approximately 2 miles of the existing PNG Line 4, 10-inch diameter steel natural gas transmission line. The replacement is being proposed through PNG's Pipeline Integrity Management program in order to remove a section of the line that has become exposed within the wetlands along the west bank of the Cape Fear River and to remove sections are located with coal ash basins on the Duke Energy Sutton Plant as part of Duke's LOLA Project. The coal ash basins at this particular power plant are in the process of being excavated with the ash being either transported off - site or relocated to a future on -site lined landfill. The western terminus of the project is an existing natural gas meter station located on an approximately 430-acre parcel on Cedar Hill Road in Navassa that contains mostly undeveloped land but also includes multiple utility easements and sand borrow pits. The eastern terminus is an existing natural gas meter station located adjacent to the east of the Duke Sutton plant property and north of the 1-140 bypass that is currently under construction. Environments within the project corridor include the Cape Fear River and associated floodplain areas with riparian wetland systems, and alluvial -deposit upland areas on either side of the floodplain areas. This includes coastal wetland along the river and long -leaf pine forested areas. The subaqueous crossing of the Cape Fear River will be performed via horizontal directional drill (HDD) technology. Due to the length of the drill, it is likely that two drilling rigs will be used, one on each side of the river, to create separate boreholes which will meet approximately in the middle of the total bore. The majority of the remaining portion of the line will be installed using open trench placement, namely from the western terminus of the line to the western HDD set up and from the east side off the HDD exit to the eastern terminus. Additional HDDs will be used to cross under the Duke Energy railway line, Sutton Steam Plant Road and the adjacent abandoned railway line. Sections of the existing line underneath the river and adjacent floodplain wetland will be abandoned in - place and filled with grout. Sections located within the berm of the ash basin areas will also be grouted in -place. Aerial sections crossing over a Duke Energy outfall canal and those located within the ash basin areas will be removed. The remaining sections will remain in place. AECOM personnel haven performed jurisdictional delineations and federally -protected species assessments along the entire length of the project and have coordinated a site meeting with US Army Corps of Engineers (USACE) for approval of the field delineations. Federally -protected species or their habitats were not observed or are being avoided by the use of the HDD crossing of the Cape Fear River. Proposed impacts to jurisdictional waters of the US are limited to 0.56 acres of permanent conversion of forested wetland to emergent wetland. No loss of waters of the US is proposed and no impacts to CAMA features are proposed. Wetland mitigation for the conversion is being provided at a 1:1 ratio by the Lower Cape Fear Umbrella Mitigation Bank (reservation letter attached). A land disturbing permit application will be submitted to NC DEQ at a later date. No impervious surfaces are proposed. RECEIVED DCM WILMINGTON, NC 0 C T 13 2016 1V 1 DCM M!-1 E APPLICATION for Malor Development Permit Nov 10 Zo,s (last revised 12/27/06) DCM- MHD U I North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Piedmont Natural Gas Project Name (if applicable) Line 4 Replacement Applicant 1: First Name Chris MI Last Name Albers Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 4720 Piedmont Row Drive PO Box City Charlotte state NC ZIP 28210 Country USA Phone No. ext. FAX No. Street Address (if different from above) City State ZIP Email chris.albers@piedmontng.com 2. Agent/Contractor Information Business Name AECOM Agentt Contractor 1: First Name Paul MI Last Name Masten Agent/ Contractor 2: First Name MI Last Name Mailing Address 201 North Front Street, Suite 509 PO Box City Wilmington State NC ZIP 28401 Phone No. 1 910-667-2391 ext. Phone No. 2 910-512-1253 ext. FAX No. Contractor # Street Address (d different from above) City State ZIP Email paul.masten@aecom.com <Form continues on back> DCM WILMINGTON, NC 0 C T 13 2016 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement. net Form DCM MP-1 (Page 2 of 4) RECEIVED APPLICATION for Major Development Permit NOV 10 2016 3. Project Location _ MHD CITY County (can be multiple) Street Address State Rd. # New Hanover Brunswick Cedar Hill Road and Sutton Steam Plant Road Subdivision Name city State Zip N/A Navassa and Wilmington NC Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Cape Fear River Cape Fear River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Cape Fear River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Navassa 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 55 feet 34.7 acres c. Size of individual lolls) d. Approximate elevation of tract above NHW (normal high water) or NA, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 0-10 feet ®NHW or ❑NWL e. Vegetation on tract Welland areas consist of cypress, black gum, sweet bay, red bay, loblolly pine, water oak, greenbriar, cinnamon fem, netted chain fem, giant cane, lizard's tail, sphagnum moss, cattails and other marsh species. Upland areas consist of longleaf pine, water oak, live oak, bracken fem, wire grass and other upland herbaceous species. f. Man-made features and uses now on tract The easement includes two railway lines and one road (Sutton Steam Plant Road). The string out area on the west side of the river crosses Cedar Hill Road. g. Identify and describe the existing land uses a 'ac nt to the proposed project site. Property on the west side of the river includes the Cape Fear River floodplain wetlands, undeveloped upland, and a borrow pit. Property on the east side of the river includes the Sutton Power Plant property, the NCDOT 1-140 bypass under construction, Cape Fear River floodplain wetlands and undeveloped upland. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Rural and Planned Use Development on the west side of (Attach zoning compliance certificate, if applicable) the river and Industrial on the east side of the river. ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ❑No ❑NA If yes, by whom? AECOM 1. Is the proposed project located in a National Registered Historic District or does it Involve a ❑Yes ®No ❑NA National Register listed or eligible property? RECEIVE[ <Form continues on next page> DCM WILMINGTON, NC OCT 13 2016 252-8e8-28e8 .. '6 r5 t3 s. eto vx :J ;::ST .. w vv w. nccoassta l management. net \kV Form DCM MP-1 (Page 3 of 4) IECEIVED APPLICATION for Major Development Permit N(1\/ 1 0 7nip m. (i) Are there wetlands on the site? ®Yes []No (it) Are there coastal wetlands on the site? D C M - M H D CITY ®Yes ❑No (Ili) If yes to either (i) or (it) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater treatment facilities for the Sutton Power Plant are present on the plant property. o. Describe existing drinking water supply source. Drinking water supply sources for the Sutton Power Plant are provided by CFPUA p. Describe existing storm water management or treatment systems. Stormwater management/treament systems are present on the Sutton Power Plant property. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Governmenl ®PdvatetCommunity b. Give a brief description of purpose, use, and daily operations of the project when complete. The project will replace sections of an exisitng natural gas line that are becoming exposed and/or are located within coal ash basin areas that will be excavated by Duke Energy. Replacing these sections will allow for continued gas service through the line. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The Cape Fear River crossing will be performed using horizontal directional drill (HDD) technology and equipment using two drill rigs on either side of the river. Two other HDDs will be used to cross under the Duke railway line and the Sutton Steam Plant Road and CSX railway area. Other areas of the project will be constructed using open trench placement. Mechanical clearing equipment will be used to clear the easement and excavation equipment will be used to excavated and backfill the pipe trench. d. List all development activities you propose. Development activities include clearing and grubbing, pipe trench excavation and backfilling, HOD bores of the Cape Fear River, Duke railway and Steam Plant Road/CSX railway, and installation of sedimentation erosion control measures. e. Are the proposed activities maintenance of an existing project, new work, or loth? Both I. What is the approximate total disturbed land area resulting from the proposed project? 21.7 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No discharges to waters of the state are proposed. Two wetland impacts are proposed but those will be permanent conversions from forested wetland to emergent wetland which will total 0.56 acres. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes []No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA I. Is there any mitigation proposed? ®Yes ❑No ❑NA If yes, attach a mitigation proposal. RECEIVE <Form continues on back> UUM WILMINGTON, NC OCT 13 2016 252-808-2808 .. t-888-4RCOAST .. www.necoasta l management. net Form DCM MP-1 (Page 4 of 4) RECEIVED APPLICATION for Major Development Permit NOV 10 2016 6. Additional Information s� In addition to this completed application form, (MP- 1) the following it Mrif WY", E;I ttTeyubmitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name see attached list Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Sutton Plant Gas Transmission Line (2009) h. Signed consultant or agent authorization forth, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date October 13, 2016_ Print Na Zausten Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts [-]DCM MP-3 Upland Development ❑DCM MP-4 Structures Information RECEIVED DCM WILMINGTON, NC OCT 13 2016 252.800-2808 :: 1.888.4RCOAST :: www.nccoastaimanagement.net no Form DCM MP-2 EXCAVATION and FILL RECEIVED NOV 10 2016 (Except for bridges and culverts) DCM- MHD CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. HDD bore - approximatley 7.000 feet long c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (if) Describe the purpose of the excavation in these areas: ��r•�3nr•13a��►�ri��.:r� a. Location of disposal area. Drilling mud will be taked offsite by the HDD contractor c. (i) Do you claim title to disposal area? ❑Yes ❑No ®NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. []CW ❑SAV ❑SB _ ❑WL ®None (it) Describe the purpose of disposal in these areas: ❑This section not applicable d. High -ground excavation in cubic yards. none ❑This section not applicable b. Dimensions of disposal area. N/A d. (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA III) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes JEW ❑NA (ii) If yes, how much water area is affected? RECEIVED DCM WIL.MINGTON, NC OCT 13 2016 252-808.2808 :: t•888-4RCOAST :: www..nccoastainnanagement.net. revised: 12126i06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION 0This section not applicable (if development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: b. Length: []Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead backfill _ Riprap Breakwater/Sill Other I. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes []No ❑NA III) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. RECEIVED NOV 10 2016 4. OTHER FILL ACTIVITIES D M-s"M Ut Q i a le (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? []Yes []No El NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (56), or (ii) Amount of material to be placed in the water _ other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV _ ❑SB (iv) Purpose of fill ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? silt fence and ground stabilization practices HDD rigs for bores and backhoe for open trench cuts (all trenching will be outside of AECs) c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project []Yes ®No ❑NA site? ❑Yes ®No []NA III) If yes, explain what type and how they will be implemented. III) If yes, explain steps that will be taken to avoid or minimize environmental impacts. October 13, 2016 Date PNG Line 4 Relocation Project Name Piedmont Natural Gas A licanpp/ame tVIle- it PyG J Applicant Applicant Signature RECEIVED DCM WILMINGTON, NC 252-808.2808 :: 1-888.4RCOAST :: www.srccoastatmanagement.net revised: 12:26/06 Coastal Management ENVIRONMENTAL QUALITY November 8, 2016 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 Piedmont Natural Gas / New Hanover & Brunswick Counties PAT MCCRORY W Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director RECEIVED NOV 10 2016 DCM- MHD CITY Kyle & Heather: Please publish the attached Notice in the Thursday, November 10, 2016 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Tanya Wright, (Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. cc: Sincerely, Shaun K. Simpson Permitting Support &Customer Assistance Heather Coats - WiRO Doug Huggett - MHC Tyler Crumbley - USACE Sarah Young- DCM State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 q-v NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On October 31, 2016, Piedmont Natural Gas proposed to install a natural gas line approx. 10" in diameter by means of horizontal directional drilling beneath the bottom of the Cape Fear River, from Cedar Hill Rd, in Navassa, Brunswick County to 801 Sutton Steam Plant Rd, in New Hanover County. A copy of the application can be examined or copied at the office of Sean Farrell, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7424) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to December 1, 2016 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. RECEIVED NOV 10 2016 DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 LOWER CAPE FEAR UMBRELLA MITIGATION BANK STATEMENT OF CREDIT AVAILIBILITY September 29, 2016 TO: Paul Masten FROM: Lower Cape Fear Umbrella Mitigation Bank AECOM c/o Land Management Group, Inc. 201 North Front Street 3805 Wrightsville Avenue, Suite 15 Wilmington, NC 28401 Wilmington, NC 28403 Project: Line 4 Replacement — Piedmont Natural Gas Dear Paul: Pursuant to your recent credit request, the Lower Cape Fear Umbrella Mitigation Bank (LCFUMB) is providing confirmation of acceptance to supply wetland and stream mitigation credits for proposed impacts associated with the Piedmont Natural Gas Line 4 Replacement (Town of Navassa, NC). This acceptance is conditional upon receipt of payment as outlined below. Please refer to the table below depicting the type and quantity of credits requested and reserved for your project. Mitigation Type Credits Reserved Fee Per Unit Stream 0 $390.00 Non -Riparian Wetland 0.0 Riparian Wetland 0.6 $51,370.00 $71,201.00 Fee $0.00 $0.00 $42,763.80 Total Fee'. $42,763.80 Based upon receipt of your credit request transmitted on September 29, 2016 LCFUMB will reserve 0_6 riparian wetland credits for a period of up to 90 days from the date of this letter. Note that requests to reserve credits beyond 90 days will require a deposit. Please contact us if you need a reservation to extend beyond the 90-day period. Upon request for receipt of credit transfer, LCFUMB will issue an invoice in the amount of $42,763.80. Upon receipt of payment, LCFUMB will provide an executed Transfer of Credit Certificate. Note that all payments must be made with certified funds. It is the applicant's responsibility to ensure that the credit types and amounts requested are consistent with the compensatory mitigation requirements of the permit(s) issued. LCFUMB and/or its agents are not responsible for determining the applicant's mitigation requirements. If you have any questions or need additional information, please contact me by phone at (910) 452-0001 or by email at coreziosi(@Im¢rouo.net. Sincerely, Land Management Group, Inc. (agent for LCFUMB) Christian w Preziosi Christian Preziosi Section Manager RECEIVED NOV 10 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC OCT 13 2016 LM Letter of Authorization 1 ( (+(e t S 1'3 EIS , with Piedmont Natural Gas, authorize AECOM to act as our limited agent to coordinate with the U.S. Army Corps of Engineers and North Carolina Department of Environmental Quality for the preparation and submittal of jurisdictional determinations and 404/401 and CAMA permit applications associated with the Line 4 Replacement project located in Brunswick and New Hanover Counties, North Carolina. Authorization will terminate on either final agency action or upon written notification from either party involved. Company Name: Piedmont Natural Gas Contact Name: Chris Albers Client Address: 4720 Piedmont Row Drive Charlotte, INC 28210 Client Phone #: Client Fax #: Client Email: chris.albers@oiedmontng.com r Signature of Client Date RECEIVED NOV 10 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON. NC 0 C T 13 2016 ((L ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: 1�•GI.Grd c'Ar K 2 0 1(r CCC61- 14,111 Roo d /V e Le1a��, A/c, 2gH5-( A. B. Received by (Pnnted Name) 1 D. Is delVAWRntfi ❑ Agent ❑ Addressee Date of Delivery 17 ❑ Yes IIIIII IIII III I II I I III III II IIIIIIIII II I III3. Service Type ❑ Priority Mail 11 ❑ Adult Signature ❑Registered Mail*" ❑ AQutt SlgrM Restricted Ivory ❑ Registered Mail R clad 9590 9402 2204 6193 4489 77 ❑ Certified Mall RestrictedDelive Delhvery evel _ ❑ Collect on Delivery G m ire label) ❑ Collect on Delivery Restricted Delhv 'nature 7016 2070 D000 nlnmrtad Mal net �� onM 6 411 610 4 ;%' Reiet� Delivery 4Bry PS Form 3811, July 2015 PSN 7530-02.000-9053 Domestic Return Receipt i ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: C:k ('lA�d3cr ❑ Agent '• ❑ Addressee B. Received y (Pnnted Name) C. Date of Del D. Is delivery t f crpitgm 17 Y Ifi'1brlfll�il®It'i� Blflava: 0'No ,r RECEIVED NOV 1 0 2016 IIIIIIIII IIII III I II I I I IIII IIIIIIIII I II IIIJ. - M D CITY ❑ Adult S gnalum ResMcted Delivery ❑ Re Ishwed Meal Restricted 9590 9402 2204 6193 4489 91 o ce ai eed Mail Restricted Delivery ❑ Return Receipt for ❑ Collect on Delivery Merchandise 2. Article Number (1 ansfer from Service label) ❑ Collect on Delivery Restricted Delivery ❑ Signature Confirmafionc^ 7 016 2070 0000 6491 6111 dltoted Delivery ❑ Signature Confirmation Restricted Delivery PS Form 3811, July 2015 PSN 7530-02-f10D-9053 Domestic Return Receipt ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mallplece, or on the front if space permits. 1. Article Addressed to: .p IZet 1,1�,(r ^,54,v,r vG 28`{o( X ❑ Agent ❑ Addressee B. Rilicelved by (Pnnted Name) C. Date of Delivery D. Is delivery ad If YESe8jo UCT � � �fJi61 IIIIIIIII IIII III I II I I I I IIII IIIIII II II IIII o J6rvlCe IYPe ❑ Priority red ExpressQ ❑ Adult Signature ❑ Registered Malpe ❑ Ad Signature Restricted Delivery ❑ Reg�Ivlatered Mall Restricted 9590 9402 2204 6193 4489 84 ❑ Certified mean Restricted Delivery ❑R tunnRecelptfor ❑ Collect on Delivery Merchandise 2. A - r .cnayar from service label) ❑ Collect on Delivery Restricted Delivery ❑ Signature ConfirmatlonTM 7016 ❑Insured Mall ❑ Signature Confirmation 2070 0000 6411 ^..... '" Mail Reaaloted Delivery Restricted Dellvery 6128 PS FOlm 0011, July 2010 PSN 7530-02-000- Domestic Return Receipt USPS.com® - USPS Tracking® ' Domestic Mail Only a `0 RAI xjGI� r � r EndHb Cu.twnr Sera- USPS Ill 0-Oemtlw 1e6 e6 $3.30 041.12 E 13 Extra SBrvices 8 Fees (r.MctbmG ed1M.PIpprFMeU ALERT. The Posted Service is rtpnaoriny It1e progress of Hurricane Matthew. Chetll for up6 G ❑Return necelpt (nardcopll E ilt �J �J r Cl/'kC A/// r3 ❑ Return R.rot aar,'.lc) E ill. rill POEbayg /CUSP SCOrIr O O CNm�Malaeemuirac NM' E so iiNB news Signature Acquired E en nn �Adu4 Signature Rerstocted Delivery E p Postage 81 .36 USPS Tracking® � 1btslPostageand" 3ti 1(I/l74/2016 fL Y �/ J Senf To C ffi ChY• wl,Ir� k . 7v G 2? -CI9 Tracking Number: 70162070000064916135 Expected Delivery Day: Thursday, October 6, 2016 Product & Tracking Information Available Actions Postal Produce Features: First -Class Wife Carried Mad" Return Receipt Text Updates Sea tracking for related item: 9590940222046193449004 Email Uptlalea DATE &TIME STATUS OF ITEM LOCATION October S. 2016, 10:54 am Delivered RALEIGH, NC 27698 Your stem Was delivered at 10.54 an, on October 6. 2016 in RALEIGH, NC 27699. October 6. 2016, 19:07 are Armed at Unit RALEIGH. NC 27611 October 5, 2016, 8:40 per Departed USPS Facility RALEIGH, NC 27676 � RECEIVED R E C EI v E D Odober 5. 2016. 10:24 am Arrived at USPS Facility RALEIGH, NC 27676 N110 2016 NOVq Comber 5.2016, 2:46 am Departed USPS Facility CHARLOTTE, 128228 October 5, 2016, 1:42 am Airmail as USES Ongre Facility CHARLOTTE, NC 28228 DCM— MHD CITY October 4. 2016, 5:57 pm Departed Post O81oe WILMINGTON. NC 28401 October 4,2016, 3:18 pm Acceptance WILMINGTON, NC 28401 Track Another Package Manage Incoming Packages hMklnq for receipt) number pedre a OeabbaaN. Trallo alargr backs emery tracke, nll Ngck neressn ual Track D Sign up for My USPS > RECEIVED DCM WILMINGTON, NC OCT 13 2016 https://tools.usps.com/go/TrackConfinnAction.action?tRet=fullpage&tL.c=1 &text28777=... 10/ 10/2016 9- PNG LINE 4 REPLACMENT ADJACENT RIPARIAN PROPERTY OWNERS New Hanover County side of Cape Fear River City of Wilmington c/o City Manager 102 North 3rtl Street Wilmington, NC 28402 Bruce B Cameron Trustee Heirs c/o Mr. Bill Cameron 1201 Glen Meade Road Wilmington, NC 28401 Brunswick County side of the Cape Fear River NCDOT 1546 Mail Service Center Raleigh, NC 27611 Richard Clark 2046 Cedar Hill Road NE Leland, NC 28451 RECEIVED NOV 10 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC 0 C T 13 2016 Coastal Management ENVIRONMENTAL QUALITY November 7, 2016 Paul Masten AECOM 201 North Front Street Wilmington, NC 28401 Dear Mr. Masten: PAT MCCRORY Govemor f� DONALD R. VAN DER VAART secretary BRAXTON DAVIS Director The Division of Coastal Management hereby acknowledges receipt of your application, acting as agent for Piedmont Natural Gas for State approval for development of the property located at 801 Sutton Steam Plant Road adjacent to the Cape Fear River in Brunswick and New Hanover County. It was received complete on October 31, 2016, and appears to be adequate for processing at this time. The projected deadline for making a decision is January 14, 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from October 31, 2016, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, *Seanarrelikk Field Representative Enclosures CC: Doug Huggett, DCM Heather Coats, DCM Ben Andrea, NH County Tyler Crumbley, ACOE Robb Mairs, DWR Piedmont Natural Gas, applicant RECEIVED NOV 10 2016 DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 RECEIVED NOV 10 2016 NOTI(01*417j DCM- MHD CITY LAMA PERMIT APPLIED FOR To install a 2-mile long natural gas line approx. 10" in off US Hwy 421, in New Hanover County COMMENTS ACCEPTED THROUGHDecember 1. 2016 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Piedmont Natural Gas NC Div. of Coastal Management c/o Chris Albers 127 Cardinal r. Extension 4720 Piedmont Row Dr. Wilmington, NC 28405 Charlotte, NC 28210 Sean Farrell, Field Representative 010-796-7424 Agent: Paul Masten (910) 667-2391 >3 4U" � STAIR OF NORTH CAROLINA: NEW HANOVER COUNTY The foregoing certificate of Glenn M. Tucker Notary Public of New Hanover County, is ad- judged to be correct. Let the instrument with Us certificate be recorded. This the 15 day of July 1952. RECEIVED Ethel A. Browns Deputy Received and recorded the 15th day of Clerk Superior Court. July 1952 at 10-45 A.M. and verified. NOV 10 2016 giater o eeT- R. F. HOBBS ET UI _ _ - - "COUNTY F NORTHHCAROLI A: DC'V'� M" C'• TO 04HOLINA POWER & LIGHT CO. NARRANTY_DERO _ _ _ _ _ _: THIS DEED Made this 15th day of July, 1952, by and between R. F. Aobbs and wife. Daisy E. Hobbs of the County of New Hanover, State of North Carolina, parties of the first part, and CAROHNA POWER AND LIGHT COMPANY, a corporation Organised and existing under the laws of the State of North Carolina, party of the second parts WIT RE a! E T H• That the said parties of the first partfor and in consideration of the sum of One Hundred Dollars ($100.00) and other good and valuable considerations to them in hand paid by the said party of the second part, the receipt of which is hereby acknowledged have granted, bargained, sold and conveyed, and by these presents do hereby grant, bargain sell and convey unto the said party of the second part and to its successors and assigns forever, all of that certain tract or parcel of lands situate, lying and being in Cape Fear f'oanship, County of New Hanover, State of North Carolina, and more particularly described as follows: BEGINNING at an old marked cypress tree on the South edge of Mount Misery and on the Eastern bank of the Cape Fear River, said point of beginning being a coiner of the lands of the parties of the first part and the City of Wilmington, and runs thence, with and along the Northern and Eastern boundaries of the lands of the City of Wilmington, North 74 degrees 13 minutes East 1,432 feet to a stake and South 35 degrees 54 minutes East 2,489 feet to a stake; thence North if degrees 31 minutes West 19667,64 feet to a stake; thence SOath 80 degrees 51 minutes East, 1,415.34 feet to a stake in the Western boundary of the lands of Fleming and Royal; thence, with and along the Western boundary of said lands, Worth 18 degrees 49 minutes West 962.)9 feet to I stake; thence North 80 degrees 51 minutes West 1,301.7 feet to a stake ;thence North 12 degrees 31 minutes West hence So feet to a stake; thence North 45 degrees West ).658 feet to the run of Catfish Creak; thence SoutMestwandly with the run of Catfish Creek to the Cape Fear River; thence down and with the Cape Fear River to the point of beginning, as shown and described on Carolina Power & Light Company Drawing No. RA-9410; containing 660.3 acres, more or less. TO HAVE AND TO HOLD the above granted and conveyed lands and premises, together with all and singular, the rights privileges, easements, tenements, appurtenances and riparian ri-hts thereinto belonging or in anywise appertaining unto the party of the second part, its successors and assigns, in fee simple, forever. And the said parties of the first part, for themselves, their heirs, executors and admini- strators do covenant to and with the said party of the second part, its successors and assigns, that they are seised in fee of the above granted and described premises and they have good right to sell and convey the Same in fee simple; that the same are free and clear from any and all an - cumbrances and that they will and their heirs, executors and administrators shall warrant and defend the title to the same against the lawful claims and demands of any and all persons whom - =ever. IN TESTIMONY WHEREOF, the parties of the first part have hereunto set their hands and seals the day and year first above written. U.9.Doc. Stamps $9.90 Daisy a Hob,Hobbs bs (Seal) STATE OF NORTH CAR)LINA: COUNTY OF NEW HANOVER : 1, Edwina Mial Dewey, a Notary Public in and for the State and County aforesaid, do hereby certify. that R. F. Hobbs and wife, Dairy E. Hobbs, this day personally came before me and acknow- ledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial Seal, this 15th day of July, 1952, Edwina Mial Dewey, (Notarial Seal) My co®. expires: Feb. 26, 1953. Notary Public. STATE OF NORTH CAROLINA. COUNTY OF NEW HANOVER •: The foregblag certificate of EdwinMial Dewy, Notary Public of New Hanover County, is ad- judged to be corracts__Int the instrument with the Certificate be recorded. This the 15 day of July 1952. R EC E IV D ' Margaret Yeraell DeVan e, Asst. Received and recorded the 15th day of Clerk Superior Court. DCM WILMING N, NC July 1952 at 10-45 A.M. and verified. a stems s. 0 C T 3 12 6 ______________________________ _____"- A. I. LEB ET UI "_ -- TO STATE OF NORTH CAROLINA: D. G. GRANGER ET UI COUNTY OF NEW HANOVER R E L E A S E !%kASE_______— day of July, 1952, by and between A. I. Lee and wife, Sudie ofAtheCounty Hof Newt Hanover RECEIVED STATE OF NORTH C„kOLINA 14uv 1 V LU)b COUNTY OF m.MPcON I,Richard A.Shew, a notary public in and for the State and County afore aid, do ' hereby certify that this day personally came before me C. S.Roya1U�'�P�.(�i1FgFes ��11,g��I(FNp /A�T�/ O,k,Fleminr, Widowed, Mildred Fleming Powell and husband, H,E.Powk� dd1 dNla�cI% dCC.YaRN hhN due execution of the foregoing Ina trvsent for the ourposes therein expressed. Witness my hand and Notarial weal this 9 dayof August 1952. U.S.-)oC.SLaw-S $4.40 Richard A.Shew (notarial seal) Notary Public My comiszton empires Feb. 9, 1953 STATE OF NORM GA OLINA NEWli ;.OV: COUNTY The foregoing certificate of Richard ...Show notary public of New Hanover County I, adjudged to be correct. Let the instrument with the certificate be recorded. This the 11 day of August 1952. Margaret Vernell DeVane,Asst Received and recorded ,1952 Clerk Superior Court at 11:25 a.m. and verified. Register o cads - - - - - - - - - - - - - - -- - -:- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - C. S. ROYAL, ET UX, ET AL STATE OF NORTH C,.ROLINA TO COUNTY OF NEU H,.NOVER CAnCLINA PLY.-h a LIGHT COMPANY THIS DEED, MADE THIS 9th dayof August, 1952. �UITCL IM DEED by and between C.S. Royal and wife, Ella K.RoyaL, G.W. --------------------------------- -- Fleming, widower, Mildred Fleming Powell and husband H. E. Powell, of the County of Sampson, State of North Carolina, parties of the first Dart, and Carolina Power A. Lieht Company, a corporation organized and existing under the laws of the State of North Carolina, party of the second Dart. 4 I T N E o s c :H: That the said parties of the first Dart, for and in consideration of the sum of One Dollar (41.00) to them in hand Paid the receipt of which is hereby acknowledged, have granted sold, remised, released an^ quitclaimed, and by these presents do hereby grant, sell, remise, ' release and forever quitclaim unto the Party of the second Part, Its successors and assigns, all right, title, claim and interest of the said parties of the first Dart in and to a certain tract or parcel of land lying and being in Cam Fear Twnship,County of New Hanover, State of North Carolina, and more particularly described as follows: Beginning at an old marked cypress tree on the south edge of Mount Misery and on the Eastern bank by the Cam Fear River, said point of beginning being a corner of the lands owned by the party of the second part, formerly the Hobbs lands, and the City of wilmington, and runs theme with and along the northern and eastern boundaries of the lands of the City of Wilmington North 74 degrees 13 minutes East 1432 feet to a stake and mouth 35 degrees 54 minutes East 2489 feet to a stake; theme North 1^ degrees 31 minutes west 1667.64 feet to a stake; thence south 80 degrees 51 minutes east 1415.34 feet to a stake in the Western boundary of the lands of Flaming and Royal- thence, with and along the Western Boundaryof said lands, North 18 decrees 49minutes rest 962.39 feet to a stake; thence north 80 degrees 51 minutes rest 1,301.7 feet to a stake; thence north. 12 decrees 31 minutes West 2,497.64 feet to a stake; thence north 45 degrees West 3,658 feet to the run of Catfish Creek; thence 9outhwestwardly, with the "*of Catfish Creek to the Cam Fear River- thence down and with the Cape Fear River to the point of Beginning, as shown and described on6aro line Power A Lleht Company Drawing No. RA-'410; containing 660.3 acres more or less. The above described lands being the same property conveyed to the Carolina Power and Light Go by R.F.Hobbs and wife. TO HAVE AEU TO HOID the above described premises together with all and singulcr, the rights, Privileges, easements, tenements, =nourtenances and riparian rights thereunto belonging or in anywise appertaining unto the party of the second part, its successors and assigns, forever. IN TESTINCNY WHEREOF the Parties of the first Part have hereunto set their hands and seals the day and year first above written. C,S. Ro77el (seal) Ella K.Royal (seal) yy W.Fleml N1Idred Flaming Powell (seal) STATE OF NORTH CAROLINA H•L•Powell (SO&O CO!MTY OF SANPSON I,Ridurd A.Shew a Notary Public in and for the State and Count aforesaid, do ' hereby certify that C.S.Royal and wife, Ella K.Royal , G.Y. Fleming, a idower, Mildred Flemi60 Powell and husband, H.E.Powell, each personally before ee chla day end acknwl edged the due execution of the foregoing Snacnvmant for the purposes therein expressed. Witness my hand and notarial seal this 9th dayof August, 1952, RFC EiV E1 Richard A.Shew WILMINGTOP (notarial seal) Notary Public DCM My commission expires: Feby 9th 1953 Ott 2A STATE OF NORTH C,.HOLIPA 1. NEW HANOVER COUNTY The foregoing cartllcate of Richard A.Shew, notary public of paw Hmmw County Is adjudged to be correct. Let the in etrument with the certificate be recorded. Admitted to woord L- day of 1926 ,gr,880 RUE 449 at io.so q. M Rttorded in Rook ..._..._.... Page _.._..._.... STATE OF NORTH CAROLINA Lois C. Lr Rvy. PI,Ltrar DEED Ncw lienovrr Co„ \. C. COUNTY OF NEW HANOVER , THIS INDENTURE, made this 20th day of March, 1970, by and between ROY H. HOBBS and JAMES F. HOBBS, Executors and Trustees under the Last Will and Testament of Roy F. Hobbs, Deceased, and ROY H. HOBBS and wife, GRACE G. HOBBS; JAMES F. HOBBS and wife, MARY C. HOBBS; HARRY R. POTTER and wife, DELORES N. POTTER JAMES WESLEY REEDER and wife, BETTY B. REEDER; HAZEL MARYETTA HERRING WELLS and husband, JERRY U. WELLS; ROY THOMAS HERRING and wife, JEANNIE C. HERRING and SANDRA K. HERRING, acting by and through her General Guardian, ROY H. HOBBS, parties of the first part, to CAROLINA POWER & LIGHT COMPANY, a North Carolina Corporation, party of the second part, WITNESSETH: THAT, WHEREAS, ROY H, HOBBS and JAMES F. HOBBS, as Executors and Trustees under the Will of Roy F. Hobbs, and ROY H. HOBBS, Guardian for SANDRA K. HERRING, Minor, are duly authorized to execute this deed pursuant to an Order entered by the Clerk of Superior Court of New Hanover County, on the 20th day of March, 1970, which said order was duly approved by L. Bradford Tillery, Senior Resident Superior Court Judge of the Fifth Judicial District, on the 23rd day of March, 1970, NOW, THEREFORE, the said parties of the first part, for and In consideration of the sum of TEN ($10, 00) DOLLARS and other valuable considerations to them in hand paid by the said party of the second part, the receipt whereof is hereby acknowledged, have given, granted, bargained and conveyed, and by these presents do hereby give, grant, bargain and convey and confirm unto the said party of the second part, its successors and assigns, forever, all that certain lot of land situated, lying and being In New Hanover County, North Carolina, bounded and described as follows, to -wit: STATE or ^ • Y��E ma GPutirrc f _ Re2Eeglal0e = ExcsaxiTNCRUB�NA I8.57 - RECEIVED ..__......... _ ....J�i.EC DCM WILK I E Cr TONI NC NOV 10 2016 OCT 3 1 3 net880 rw. 450 BEGINNING at a concrete monument at the Intersection of the Fleming and Royal line and the southern line of the Caroline Power 6 Light Company tract of land leading from the Sutton Steam Generation Plant, (passing through U. S. Highway #421), to the Northeast Cape Fear River, said concrete monument being located In the following manner from North Carolina Geodetic Survey station monument "Nltrex"; occupying Station "Nltrex" turning an angle of 00 deg, 22 min. 00 sec, clockwise from North Carolina Geodetic Survey Statiom monu- ment "Runner' and going a distance northwardly of 1,046.54 feet to point 41; theme occupying Station #1, turning an angle of 126 deg. 46 min, 00 sec. clockwise from North Carolina Survey Station "Nitrex" and going westwardly a distance of 4,232.9 feet to Station #2; thence occupying station 12, turning an angle of 62 deg. 16 min. 08 sec, clockwise from Station #1 and going south- wardly a distance of 377.8 feet to the beginning point of this herein described tract of land; mid beginning point being also located as being South 79 degrees 00 mins. East 1415.08 feet and South 79 degrees 01 mins. East 123.0 feet from a stone marked "W', said stone being the Northwest comer of R. F. Hobbs Heirs land and a comer with Carolina Power 6 Light Company; running thence from said beginning point and with the aforementioned Fleming and Royal line In part, South 17 degrees 34 mins. East 4,675.83 feet to a concrete monument marking the northeastern corner of the Oak Grove Cemetery as shown on the map of Oak Grove Cemetery as recorded in Map Book 8 at Page 68, of the New Hanover County Registry; and running thence at right angles South 72 degrees 26 mins. West 330.0 feet to a concrete monument marking the northwestern corner of said cemetery; running thence South 17 degrees 34 mins. East 793.25 feet to a concrete monument marking the Southwestern comer of said cemetery, running thence at right angles, North 72 degrees 26 mins. East 330.0 feet to a concrete monument marking the south- eastem corner of said Oak Grove Cemetery; running thence South 17 degrees 34 mins. East 204.92 feet to a concrete monument marking the northeastern corner of the 158.87 acre tract of land conveyed to Carolina Power 6 Light Company by the heirs of R. F. Hobbs and recorded in Book 835 at Page 824 of the New Hanover County Registry; running thence with the northern line of said Carolina Power 6 Light Company tract of lard North 77 degrees 58 mins. West 2,618.80 feet to a concrete monument In the eastern edge of the Seaboard Coast Line Railroad (50.0 feet from its centerline) right of way leading to Carolina Power S Light Company's Sutton Steam Electric Plant; mooing theme with the eastern edge of said right of way, North 6 degrees 42 mins. East 1,872.72 feet to a turn to the left of said right of way; continuing thence with the eastern edge of said right of way to the end of said curve, said end of curve being located North 10 degrees 38 mins. 11 sec. West 979.48 feet from the preceeding point as measured along the chord of said curve; continuing thence with the eastern edge of said right of way, North 28 degrees 19 mins. West $94.1 feet to the beginning of another curve to the left of said right of way; running thence with said curve to the left to a concrete monument, said monument being located RECEIVED Nov 10 2016 DCM- MHD CITY DCM I CEIV WING NC T 312 eo6A880 rAu 451 INorth 31 degrees 37 mins. West 199.9S feet from the preceeding point as measured along the chord of said curve; running thence North 10 degrees 43 mins. West I, 668.6 feet to a Carolina Power 6 Light Company's monument marked "W" in a southern line of the Carolina Power 6 Light Company tract; running thence with said southern line of Carolina Power 6 Light Company, South 79 degrees 00 mins. Fast 1,415.08 feet to a Carolina Power 6 Light Company's monument marked "V" In said line; continuing thence with said southern line of the Carolina Power 6 Light Company South 79 degrees 01 mins. East 123.0 feet to the point of beginning, containing 202. 69 acres, more or less and being a portion of the R. F. Hobbs tract of land. Subject to the right-of-way of Sampson Street as shownon Map In Map Book 8, Page 68, New Hanover County Registry, TO HAVE AND TO HOLD the above granted and described premises, together with all and singular, the rights, privileges, easements, tenements and appurtenances thereunto belonging, or In anywise appertaining unto the said party o f the second part, Its successors and assigns, In fee simple, FOREVER. Anti the said parties of the first pact, for their heirs, executors and administrators, do covenant to and with the said party of the second per[, Its I successors and assigns, that they are seized In fee of the above granted and des- cribed Premises, and they have good right to sell and convey the same In fee simple; that the same are tree and clear from any and all encumbrances, and that they will and their heirs, executors and administrators, shall WARRANT and DEFEND the title to the same against the lawful claims and demands of any and all persons whomso- ever. IN TESTIMONY WHEREOF, the said parties of the first panhave hereunto set their hands and affixed their seals day and / ar fi Tst bb 'Written. �fL� Roy H Hobbs, Executor and Trustee (continued) -3- RECEIVED REGEW NOV 1 0 2016 DCM WIL INGT NC OCT bocK880 rxE 452 (SEAL) as F. Hobbs (SEAL) Me C. o bs (SEAL) Ha a . Potter 0 a.�% Ay et"a /G /4'. EAL) Delores H. Potter mes Wes//l��ey Aeeder (B ^11 (SEAL) Bee/tty B Reeder ♦� deQytta H: �.wrn � • SEAL) Na el Mary! to Harting ells 0�6rrr W Wells (SEAL) Roy s Herring e (SEAL) Jeannie C. Herring or Sandra K ing (S L) By I` 3`. A Roy H. bs, Guardian for Sandra K. Herring, Minor '4- RECEIVED NOV 10 2016 RE F DCM- MHD CITY DCM WIL OCI 3 =1VED NGTON,NC 12016 ,'CCM0 fICE 453 STATE OF NORTH CAROLINA: COUNTY OF NEW H/A///�fNN���IOVER 1,' �l�'t'�% +,� - �p��,..�J, a Notary Public In and for the State and County aforesaid do hereby certify that ROY H. HOBBS and TAMES F, HOBBS, each personally appeared before me this data and acknowledged that they are the Executors and Trustees under the last Will and Testament of Roy F. Hobbs, Deceased, and that by authority duly given by the Superior Court of New Hanover County they acknowledge the due execution of the foregoing Deed for the purposes therein expressed, ����,,aa;t�asg WITNESS my hand and Notarial Seal, th1e.ZA day of MareH-; o:ei Notary public ;rat MllO.i' My commission expires: Fn; STATE OF NORTH CAROLINA COUNTY OF NEW HHAANNOVER /¢ 1✓ / N w:i ✓ .- , a Notary Public in and for the State and County aforesaid, do hereby certify that ROY H. HOBBS and wife, GRACE G. HOBBS, each personally appeared before me this date and acknowledged the due execution of the foregoing Deed for the purposes therein expressed. ,..•wW WITNESS my hand and Notarial Seal, thls••2e /�%ay of MarcK;A;" 1970. ' �; .,, -'.'�. •d.$yi jai My commission expire'y`J9Ln•-`/.i STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I. m (. /lj-r-a ,p , a Notary Public In and for the State and County aforesaid' do hereby certify that LAMES F. HOBBS and wife, MARY C. HOBBS, each personally appeared before me this date and acknowledged the due execution of the foregoing Instrument for the purposes therein expressed. WITNESS my hand and Notarial Seal, thlsAJ 19-d//yQQof March,. 1970. Notary Public My commission RECEIVED NOV 10 2016 DCM- MHD CITY REC W DCM WIL NGT 1rNC 80,880 PAC[ 454 STATE OF FLORIDA ' COUNTY OF pp /. F. /?rP✓AYb I, //O�* ISh-i/El a Notary Public in end for the State and County aforesaid, do hereby certify that HARRY R. POTTER and wife, DELORES N. POTTER, each personally appeared before me this date and acknowledged the due execution of the foregoing Deed for the purposes therein expressed, ;:�I'�3y. WITNESS my hand and Notarial Seal, this Zf day of STATE OF NEW JERSEY COUNTY OF I, a Notary Public In and for the State and County aforesaid, do hereby certify that JAMES WESLEY REEDER and wife, BETTY B. REEDER, each personally appeared before me this date and ack- nowledged the due execution of the foregoing lnstnunent for the purposes therein expressed. " .I WITNESS my band and Notarial Seal, this 31 day My commission STATE OF NORTH CAROLINA : COUNTY OF NEW HANOVER I,/ , a Notary Public in and for the State and County aforew B, do hereby certify that HAZEL MARYETTA HERRING WELIS and husband, JERRY U. WELLS, each personally appeared before me this date and acknowledged the due execution of the foregoing Instrument for the purposes therein expressed. WITNESS my hand and Notarial Seal, thla, L {4day of March, 1970. / .aeatz.;, Notary Public My commission expires ox-! � •/ .-''",. a :.' l)I ' v�y�d4i�t�t4%i RECEIVED NOV 10 2016 raE :CtVE DCM- MHD CITY DGM WI IviINGTO 3 12016 W"880 EKE 455 STATE OF NORTH CAROLINAM COUNTY OF NEW HANG T, a Notary Public In and for the State and County afOreirald, do reby certify that ROY THOMAS HERRING and wife, JEANNIE C. HERRING, each p sonally appeared before me this date and acknow- ledged the due execution of the foregoing instrument for the purposes therein expressed. '•.Jr1PL,aia .. �ri5j' •`.',�. WITNESS my hand and Notaria481hIs raMyn STATE OF NORTH CAROLI NA COUNTY OF NEW H OVER I, a Notary Public in and for the State and County aforesaid, do by certify that ROY H. HOBBS personally appeared before me this date and declare's that he Is the Guardian of SANDRA K. HERRING, Minor, and that by authority duly given by the Superior Court of New Hanover County, he acknowledges the due execution of the foregoing Deed for and on behalf of the said SANDRA K. HERRING, Minor. iG Y„_ rcj, :,,4 WITNESS my hand and Notarial Seal, this -day of March, 1970. %`_ .L3�-N113�Notary Public > g�;' �r l•u �� � My commission expires:1 tip; ysr,: 'QCPe d e�j `r4tt OP AMTR CAa01lKn. RA avewr Cerny _ -nw.s c.nise g w _Beatr_ice_Jane DavisM , •'.overt k:. Isiel, Anna Raider, and_E. rnue_ April.nw+aa.r,ae, 70 a.vee er_ ttlux rr. -7- RECEIVED NOV 10 2016 DCM- MHD CITY Received and April 10. 19 I JUL1P 110110nTORECORD IIEtH'E1`i3o AN'70 enl:686 nu 829 it'[; st:oey ::I SI RAR I1%if !A' gCVLR CO., R,C. STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER ; WARRANTY DEED THIS INDENTURE, made this 16 day of July, A. D. 1970, by and between RICHARD A. SHEW, Trustee, and RICHARD A. SHEW and wife, IDALORA W. SHEW, of the first pert, to CAROLINA POWER AND LIGHT COMPANY, a North Carolina corporation, of the second part. WITNESSETH, that said parties of the first part, for and In consideration of the sum of One Hundred (6100) Dollars and other valuable considerations, the receipt Of which Is hereby acknowledged, have bargained and sold, and by these presents do grant, bargain, sell and convey to said party of the second part and to its successors and assigns, a certain tract or parcel of land In Cape Fear Township, New Hanover County, State of North Carolina, bounded and described as follows, to -wit: Beginning at a concrete monument marking a southwestern corner of the Fleming and Royal heirs In a northern property Kwo 31.�qh line of Carolina Powel & Light Company; and runs thence 0V41along and with said northern property line of Carolina Power 0 4 3 C 0 S & Light Company North B3 degrees 44 minutes 15 seconds u West 1,413,46 feel to a concrete monument marking a corner of Carolina Power & Light Company's R. F. Hobbs s' p'Ao Tract; thence along and With an eastern property line of Zir said R. F. Hobbs Tract North 1S degrees 2S minutes 17 D seconds West 2,497.31 feet to a concrete monument; thence along and with a northeastern property line of said R. r. Hobbs Tract North 49 degrees 14 minutes 44 seconds West 3,672.59 feet, more or less, to the northernmost corner of said R. F. Hobbs tract In th,, run of Catfish Creek; thence ^u along and with the run of Catfish Creek and the northernmost o'er property line of said R. F. Hobbs Tract southwestwardly o �a 5,300 feet, more or less, to the Cape Fear Raver; thence w» westwardly and northwardly with the Cape Fear River as It o xp IIIIII11111 meanders 10,000 feet, more or loss, to a southwestern corner of B. B. Cameron; thence along and with a south- eastern property line of B. B. Cameron North 55 degrees 27 minutes 26 seconds East 6,692.19 feet, more or less, to a concrete monument marking a southeastern corner of B. B. 11' RECEIVED Nov 10 2016 DCM- MHD CITY I CM WILMIN T( OCT 3 1201 41Ill 80886 Part 830 Cameron in a western property line of the Fleming and Royal heirs; thence along and with western property lines of the Fleming and Royal heirs the following courses and distances; South 22 degrees 15 minutes 50 seconds East 184.96 feet to an Iron pipe, South 22 degrees 15 minutes 46 seconds East 1,466.83 feet to a concrete monument, and South 22 degrees IS minutes 54 seconds East 660. 50 feel to a concrete monument marking a southwestern corner of the Fleming aid Royal heirs and a northwestern corner of Hercules, Incorporated; thence along and with western property lines of Hercules, incorporated, the following courses and distances: South 22 degrees 15 minutes 52 seconds Cast 1.662.44 feet to a concrete monument, South 22 degrees 15 minutes 58 seconds East 3,477. 20 feet to a concrete monument, South 22 degrees I6 minutes 05 seconds Cast 2, 681.97 feat to a concrete monument, South 22 degrees 16 minutes 10 seconds East 665.65 feet to a concrete monument, and south 22 degrees 17 minutes 00 seconds East 633.41 feet to a concrete monument marking a southwestern corner of Hercules, Incorporated; thence along and with a western property line of the Fleming and Royal heirs South 22 degrees 16 minutes 10 seconds East 916.77 feet to a concrete monument; and thence along and with a western property line of the Fleming and Royal heirs South 22 degree., 17 minutes 00 seconds East 1,949.66 feet to the beginning point, containing 1, 584.97 acres, more or less. Together with a 60 foot road right-of-way extandtno westwardly '. from U. S. highway 421 to the above described lands, said right -al -way being described Ina grant recorded In Book $28 Page 185, Now Hanover County Registry. Subject to rights -of -way conveyed to Carolina Power and Light Company by grants recorded In Book 526, Page 29, Book 521, Page 319, Book 522, Page 171, Book 606, Page 518; and the right-of-way conveyed to N. C. Natural Gas Company recorded In Book 633. Page 133, all of the New Hanover County Registry. Also subject to the perpetualeasomenlfor spill area granted to the United States of America by grant recorded In Book 053, Page 118, New Hanover County Registry. together with all and singular, the lands, tenements, easements and i appurtenances thereto belonging, or In anywise appertaining TO HAVE AND TO HOLD the above granted and described premises, together with all and singular, the rights, privileges, easements, tenements and appurtenances thsreunto belonging, or in anywise appertaining • unto the sold party of the second part its heirs and assigns, In fee simple, FOREVER. _p_ i ..--RECEIVED • NOV 10 2016 Dt M WILMING DCM- MHD C!TY \ OCT 3 1 it I I i BOOt886 seer 831 And the said parties of the first part, for their heirs, executors and administrators do covenant to and with the said party of the second part Its heirs and assigns, that they are seized In fee of the above granted and described premises, and they have good right to sell and convey the same in fee simple; that the same are Ores, and clear from any and all encumbrances, and that they will and their heirs, executors and administrators shall WARRANT and DEPEND the title to the same against the lawful claims and demands of any and all persons whomsoever. IN TESTIMONY WHEREOF, the said parties of the first part do hereunto subscribe their names and affix their seals the day and year first above written. Lta;�(SEAL) Trustee (SEAL] STATE OF NORTH CAROLINA NEW HANOVER COUNTY Lv 1, 3/7a ,,,L --�. 5' -- , a nutary public In and for the state and county aforesaid do hereby certify that Richard A. Shaw, Trustee, and Richard A. Show and wife, Idalora W. Shaw personally appeared before me this day and acknowledged the due execution of the foregoing Instrument for the purposes :herein expressed. e ,a`• Ct100y.��b Witness my hand and seal this C my commission ��e�xpires: (LI�'rL.LL--�— - RECEIVED - NOV 1 0 2016 BTATI: Or MCIRII CAROL'. New I..' C-11 TMf—I.I.rC 111 d- -1 J''rmCS_ II. McLamb,_ Npiary-P.ublic,__ T: eJilu ei to wrvlmil. -3- Tmuro 20 dl-, July-----140 m..,, nr-Poke. on Dornhi11.4 acr;.von LMr le q. 1tra�mr W IF'..I. Received and R c d July 7970r3\�. Register of Deed 2., OCT 3 1 t01 66 414) IT IJ 5TIPUL,Te'D� W AGhLED that if said part of the first Dart shall pay off said note and interest and discharge fully the trusts herein declared, Wfore such sale, or if the sane shall be done by a sale of said lands, than so each of said lands as my not have been sold, and .re not required to met any of said trusts, shallbe recomeyed to said Darcy of the first Dart, or the title thereto be revested in her according to the provisions of law. IN TE�TIMDNY WHEREOF* the said party of the first part does hereto subscribe her name and affix her seal the day and year first above written. Li tie Brooks (seal) SL3E OF NOhTIi C.,iCLINA COUNTY OF NEW N.,NOYi;N Personally appeared before me W'.n. Johnson, a notarypublic In and for the State and county aforesaid, LStzie Brooks (widow ) and acknowledged the due execution of the foregoing instrument. 4 RECEIVED Witness hand and official seal this 11 day of Augtat,1952. W.-.Johnson (notarial seal) Notary Public NOV O 2��U My Commission expires: let Nov. 1953 N y STnl F. OF NORTH C.ROLINA Nos E.Noia COUNTY M M H D The foregoing certificate of W.a_Johnson, notary public of New Hanover County -ad- ITY Judged to We correct. Let the instrument with cne certificate be recorded. This the 11 day of August,1952. Ethel A.Rrown,Debuty Clerk Superior Court at 11-20 A.M.recorded verified. Aug. 11,1952 at 11-20 A.and rer if fed. egister - eerie -----------------------------------r----------------------------------------------------"------- C. 5. ROYAL, LT UA,ET AL STATE OF NORTH CAROLINA TO COUNIT OF Na HANOVER C.ROLlb. PO.ER k LIGHT CO THIS DEED, +fade this 9th day7 of August, WAdHANTY DEED 1952, by and between C.S.Royal and wife, Ella R.Royal, ----------------------------------- G.W. Fleming, widower, Mildred Fleming Powell and husband, H.E.Powell, all of the County of Sampson, State of North Carolina, parties of the first Dart and Carolina Power k Light Company, a corporation organised and ex1,tior under the laws of the State Of North Carolina, Darcy of the second Dart. W I T N E � b E T H: THAT THE o.ID parties of the first Dart, for and in consideration of the am of One Hundred Dollars ($100) and other good and ♦+luable considerations to them in handoaid by the .-said party of the second Dart, the receipt of which is hereby acknowledged, have granted, bargained, sold and conveyeds and by these presenta do hereby grant, bargain, sell and convey unto thesaid party of the secondnart and to its successors and asslgna,forever, all of that certain tract or oarcel of land, situate,lying and being in Cape Fear Township, County of New Hanover, State of North Carolina, and more particularly described as follows: BEGINNING eT AN IRON nips in the Swift -Fleming and Royal line, said iron pipe being located South 80 degrees 51 minutes east 1950.75 feet from the center of the Atlantic Coast Line Railroad Company track leading from Wilmington to Fayetteville, and said point in said Railroad tract being located North 26 degrees 40 minutes West measured &loop the center of said track 484 feet from the three Nile Post, which is marked F-289; and running from said iron pipe, the beginning corner, North 80 degrees 51 minutes West crossing the new highway, said Atlantic Coast Line Railroad Company right of ray, and old Nigger Head Road 4882.68 felt to the dividing line between Hobhs-Flemiryl andRoyal lands; running thence with said dividing line North 18 degrees 49 minutes mat 962.39 feet; thence Oouth 80 degrees 51 minutes East 1212.4 feet to the Western edge of the old Nigger Head Road; thence South 22 degrees 51 minutes East 58.96 feet; thence crossing said old Rigger Head Road South 80 degrees 51 minutes east 1483.05 feet to the Western line of a a id Atlantic Cos at Line Railroad Company right of way; thence South 26 degrees 40 minutes East 61.67 feet; thence crossing said Atlantic Coast Line Railroad Company's right of way South 80 degrees 51 minutes east 1455.44 feet to the Western line of the right of way of the new hl4ww9y leading to ailmington; thence mouth 30 degrees 03 minutes Nast 193.12 feet, thence crossing said new highway South 80 degrees 51 minutes East 502.30 feet to the Swift -Fleming and Royal Lice; thence mouth 30 degrees 16 minutes East with and along the said dividing line between Swift -Flaming mdRoyal lands 776.65 feet to the point of beginning, costalnln6 78.15 acres, more or lees, as shown and described on Carolina Power k Light Company Drawing No.RA-9412. TO HAVE AND TO HOLD the above granted and conveyed lands and orsmisea, together with all and singular the rights, privileges, easasants, tansmsm.s, and &peartemanees thereunto belonging or in anywise sopertaining unto the oarty of the second part, its euccessora and aaafgns, In fee simple, forever. AND THE &AID PAHTI&5 of the first sort, for themselves, their heirs, executors, and administrators do covenant toand with the said party of the second pert, its successors end assigns, thatthey are seized in fee of the above granted and described premisest end theey� da good right to Bell and convey the cams In foe simple• that the gams are free s clear fFoi EIU end all encusbrandes and that they will and their heirs, executors and admletatrat ode�jeilA/II n^�^Lf.T�N� warr,nt and defend the title to the gas against the lawful claims and demands of any and fill bNP olfb� whomsoever. IN TESTIIDNY WHEREOF, THE parties of the first part have hereunto set their hand, a43 12016 scale the day and year first above mitten. WS.Doc.Stamps $4.40 C. Ella Eoy l ei G.W. Fleming (a Mildred Fleming Rowell said school tract and parallel to Greenfield Street south 84 degrees 23 minutes West 576.0 feet the easterr line of 13th. Street; running thence northwardly with 13th. Street North 5 degrees 3 minutes west 462 feet to the point of beginning, containing 9.38 acres, the aame being all of Block E and all of Lots 1, 2, 3, 4 and 5 in Block I and all of Willard Street which Se bounded b the eastern line of 13th. Street and the western line of 156h. Street as per the aforementioned nap of the City of Wilmington, N. C.; and all buildings and fixtures erected or to be erected thereon or appurtenant thereto. The Local Authority hereby declares and acknowledges that during the existence of the tru herby created, the PHA and the holders from time to time of the Bonds Refunding Bonds, or Per- manent Notes issued or to he issued pursuant to the provisions of the dnnual Contributions Contr have been granted and are possessed of an interest in the above described Project property, to-w The right to require the Local Authority to remain seized of the title to said property a to refrain from transferring, conveying, assigning, leasing, mortgaging, pledging, or otherwise encumbering or permitting or suffering any transfer, conveyance, assignment, leasing, mortgage, pledge or other encumbrance of said property or any part thereof, appurtenances thereto, or any rent, revenues, income, or receipts therefrom or in connection therewith, or any of the benefits or contributions granted to it by or pursuant to the Annual Contributions Contract, or any inter est in any of the same except that the Local Authority (1) may, to the extent and in the manner provided in Sec. 313 of the Annual Contributions Contract, (a) lease dwellings and other spaces and facilities in any Project, or (b) convey or otherwise dispose of any real or personal proper which is determined to be excess to the needs of any Project, or (c) convey or dedicate land for use as streets, alleys, or other public rights -of -way and grant easements for the establahment, operation, and maintenance of public utilities, or (21 with the approval of the PHA release any Project which has not then been financed by an issue or issues of Bonds from the trust hereby created: Provided, that nothing herein contained shall be coratrued as prohibiting the conveyanc of title to or the delivery of possession of any Project to the PHA in pursuance of Sec. 501 or Sec. 502 of the Annual Contributions Contract. The endorsement by a duly authorized officer of the PHA (1) upon any conveyance made by t Local Authority of any real or personal property which is determined to be excess to the needs o any Project, or (2) upon any instrument of conveyance or dedication of property, or any interest therein, for use as streets, alleys, or other public rights -of -way, or for the establiahment, operation, and maintenance of public utilities, or (3) upon any instrument of release made by the Local Authority of any Project which has not then been financed by an issue or issues of Bonds shall be effective to release such property from the trust hereby created. When all indebtedness of the Local Authority to the PHA arising under the Annual Contri- butions Contract has been fully paid and when all the Bonds, Refunding Bonds, and Permanent Note together with interest thereon, have been dilly paid, or monies sufficient for the payment there of have been deposited in trust for such payment in accordance with the respective resolutions o the Local Authority authorising the issuance of such Bonds, Refunding Bonds, and Permanent Notes the trust hereby created shall terminate and shall no longer be effective. Nothing herein contained shall be construed to bestow upon the holder of holders of any of the Bonds or Refunding Bonds or of the coupons appertaining thereto, or any holder of the Pe manent Notes (other than the PRA) any right or right of action or proceeding by which the Local Authority might be deprived of title to or possession of any Project. IN WITNESS WHEREOF, the Local Authority by its officers thereunto duly authorized has cau these presents to be signed in its name and its corporate seal to be hereunto affixed and attest th"s 23rd. day of September, 1952. CORPORATE SEAL HOUSING AUTHORITY OF THE CITY OF (SEAL) WILMINGTON, NORTH CAROLINA ATTEST: B. H. Marshall, Jr., By Harry M. Solomon, Secretary Chairman STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER On this September 30, 1952, personally came before me Dorothy Forbes, a notary public, and for the State and County aforesaid, B. H. Marshall, Jr., who being by me duly sworn says tl he knows the common seal of the Housing Authority of the City of Wilmington, North Carolina, m is acquainted with Harry M. Solomon, who is Chairman of the said corporation and that he, the said B. H. Marshall, Jr. is the Secretary of said corporation and saw the said Chairman sign tl foregoing instrument and saw the common seal of said corporation affixed to said instrument by said Chairman and that he, the said B. H. Marshall, Jr. signed his name in attestation of the ecution of said instrument in the presence of said Chairman of said corporation. Witness my hand and notarial seal this 30th, day of September, 1952. Notarial Seal Dorothy Forbes, My Commission Expires June 25, 1954 Notary Public STATE OF NORTH CAROLINA NEW HANOVER COUNTY The Foregoing Certificate of Dorothy Forbes, notary public of New Hanover County, is ad. judged to be correct. Let the instrument with the Certificate be recorded. This the 30th, day of Sept. 1952. Received and Recorded, Sept. 30, 1952 at 3:10 P. M., and Verified. h� Register of Deeds CITY OF WIIlAINGTON,. N. C. TO Margaret Vernell DeVane, Aast. Clerk Superior Court. STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER CAROLINA POWER AND LIGHT uvmrAvz 11f/77 9g DEED : THIS DEED, Made and executed ltais.3 ------------------------------------- 3rd. day of October, 1952, by and between the City of Wilmington, a municipal corporation situated in New Hanover County, North Carolina, party of the first part, and Carolina Power i Light Company, a corporation organized under the laws of the State of North Carolina, party of the second part, WITNESSETH: WHEREAS, The party of the first part, owner of the lands and premises heret. after described, by and through its City Council, heretofore directed that the lands and premi hereinarter described be sold at public auction for cash to the highest bidder, at the Courtho door in New Hanover County, after advertising the same at said Courthouse door for a period of RECE RECEIVED NOV 10 2016 M- MHD CITY VED�3TON, 2016 LETTER OF TRANSMITTAL Date: October 13, 2016 TO: Tara McPherson FROM: Paul Masten Division of Coastal Management NCDEQ 127 Cardinal Drive Extension Wilmington, NC RE: PING LINE 4 REPLACEMENT JOB No.: 60513137 The following items are being sent: ®Attached ❑ Under separate cover by Shop Drawings ❑ Prints ® Plans Samples Specifications Copy of Letter ® Other Item Copies Date Description 1 1 October 13, 2016 CAMA Major Permit Application Transmittals for reasons checked: ❑ For Your Approval For Your Use ❑ As Requested ® For Review and Comment Remarks: Copies Cc: AECOM 201 N. Front Street, Suite 509 Wilmington, North Carolina 28401 (910)763-8063 (910) 763-8289 (Fax) No Exceptions Taken ❑ Make Corrections Noted Amend and Resubmit ❑ Resubmit copies for approval ❑ Submit 2 copies for distribution ❑ Return corrected prints El Name: l J Paul Masten, LSS, PWS, LEED-AP Senior Environmental Scientist RECEIVED Nov 10 2016 DCM- MHD CITY OCT 13 2015 NC Division of Coastal Management Major Permit Application Computer Sheet AEC: Cape Fear River Fee: $400 /;;t4000428W RFCFI�%PT� MHCcc_ Applicant: Piedmont Natural Gas (Line 4 Replacement) Agent/Contractor: AECOM c% Paul Masten Project Site County: Brunswick & New Hanover Staff: Tara MacPherson \District: lNl , Project Name: Line 4 Replacement over File: We River Basin: Cape Fear Initial date of application submittal: 10-13-1 B Date application "received as complete" in the Field office: 10 Permit Authorization: fikCAMAXDredge & Fill Roth SITE DESCRIPTION/PERMIT INFORMATION ORW: ❑Yes 1ANo I PNA: es ❑No Photos Taken: YesO No Setback Required (riparian): ❑Yes DNo Critical Habitat: ❑Yes ❑No Not Sure 15 foot waiver obtained: ❑Yes IgXo ' Hazard No'fication Returned: Oyes IKo SAV: ❑Yes ®No [-]Not Sure Shell Bottom: ❑Yes I�io El Not Temporary Impacts: es ❑No Sure Sandbags: ❑Yes o ❑ Not Sure Did the land use cla sification come from county LUP: Wes ❑No Mi ligation Required (optional): (Yes ❑No Moratorium Conditions: ❑Yes ❑No *A Environmental Assessment Done: ❑Yes 0o ❑NA Length of Shoreline: 44:T. Shellfish Area signation: Project Description: (code) Development Area: (code) -gLfh Open -or- lose 9K5 6-1, 0 40 4 cn8 SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) 0 Swamp Waters (SW) ❑ High Quality Waters (HQW) ❑ Outstanding Resource Waters (OR" WETLANDSIMPACTED (404) Corp. of Engineers (Jurisdictional El(LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemiflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis 0 (SC) Bullrush or three square (Scirpus U (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncos (SP) Salt/meadow grass (Spartina roemerianus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 U III(D) Priv. public or Comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ I II(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ 11. Public or commercial/no dredge $100 and/or fill - $400 ❑ I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 Piedmont Natural Gas Date: 10-3-16 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One NewWorkjq Replace Maint ❑ ❑ Y New Work Replace U t Maint ❑ ❑ Y 0 t7 New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Mart ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact temp impacts) impact amount) temp impacts) amount Dredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919-733.2293 :: 1-8884RCOAST :: www.nccoastalmana$ement.net revised: 10/12/06 'f— Piedmont Natural Gas Date: 1D-3.16 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One New Workq Replace Maint ❑ ❑ Y 1 Newwork,W Replace IL Maint ❑ ❑ Y b iJ .New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N Now Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace. Maint ❑ ❑ Y ❑ N Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. FL TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration end/or restoration or and/or temp restoration or temp impact tamp impacts) impact amount) tamp impacts amount Dredge.❑ Fill ❑ Both ❑ Other ty Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑. Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919-733-2293 :: 1-888.4RCOAST t: wwwmccoastalmanaaement.nat revised: 10/12/06 v MAJOR PERMIT FEE SCHEDULE try lm� Cedar Hill Road & Sutton Steam Plant Road / $400, CK #4000428288/NH & Br Co DCM % DWQ % Development Type Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% ($0) III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3900 See attached can be applied: $250 100% $250 0%($0) III(B). Public or commercial development, if General Water Quality Certification No. 3900 See attached can be applied: $400 100% $400 0% ($0) III(C). If General Water Quality Certification No. 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% $240 40% $160 III(D). If General Water Quality Certification No. 3900 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECEIVED NOV 10 2016 DCM- MHD CITY 0 ~ W > N A Z � uv AECOM October 13, 2016 Ms. Tara McPherson NC Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405-3845 RE: Joint CAMA Major and Section 404/401 Permit Application PNG Line 4 Replacement Brunswick and New Hanover County, North Carolina Dear Ms. McPherson: Please find the attached permit application for a Joint CAMA Major and Section 404/401 permit for the construction/replacement of an existing natural gas line in Brunswick and New Hanover Counties, NC. Delineations of jurisdictional features were performed on July 7, 2016 by AECOM personnel, with field concurrence provided by Mr. John Policarpo, U.S. Army Corps of Engineers, on August 23, 2016. The project will consist of an approximately 2-mile length of 10-inch ductile steel transmission pipeline with the west terminus being on the west side of the Cape Fear River in Brunswick County and the east terminus being located at an existing meter station adjacent to the Duke Energy Sutton Power Plant property on the east side of the river in New Hanover County. Proposed impacts to waters of the US include 0.56 acres of permanent wetland conversion. No impacts the Coastal Area Management Act features are proposed. The following documents have been provided in support of this application: • Agent Authorization • Project Narrative • DCM-MP1 Form • DCM-MP2 Form • Impact Avoidance, Minimization and Mitigation Discussion • Wetland Mitigation Reservation Letter • Adjacent Riparian Property Owner Notifications • Project Drawing Sheets • CAMA Major Permit fee of $400 payable to NCDEQ Please feel free to contact me at 910-667-2391 or Paul. masten(cilaecom.com if you have any questions, or need any further information. Sincerely, AECOM — North Carolina Paul Masten, LSS, PWS, LEED-AP Senior Environmental Scientist AECOM 201 N Front Street, Suite 509 Wilmington, NC 28401 Tel 910.763.8063 Fax: 910.763.8289 RECEIVED NOV 10 2016 DCM RECEIVED DCM WILMINGTON, NC 0 C T 13 2016 Carolina Power & Light c/o Duke Energy \ R02300-002-001-000 / Richard Clark / 017000E Bruce B Cameron Trustee Heirs R01500-001-002-000 (upstream of Duke (Energy) LLC EXISTING LINE 1751 EXISTING LINE 4 WESTERN PROJECT TERMINUS SAME OWNER/ Wilmington River Club, LLC 0240000117 LCFUMB. LLC LCFUMB, LLC Carolina Power & Light c/o Duke Energy R03200-001 -001 -000 EXISTING LINE 5 / PROPOSED LINE 4 EXISTING LINE 4 TO BE PROJECT TERMINUS olina Power & Light Duke Energy 0 / / 500' 1,000' SCALE: 1" = 1,000' PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RDA) POLICY 1001 DARE 1 1 By I CHR n pESCRplpN APNNVALa (16120161 ISSUED FOR REVIEW PHWI JJ I BG [AREA CODE �� °:,.N_., REGbNAL LINE 4 REPLACEMENT PROJECT ENGINEER Piedmont RGRTECH Natural Gas ,STO E°°s'° COUNTIES, NORTH CAROLINA PRINGIPPL C ]019PIEOYOHI IMNML WSCdiP. BRUNSWICK & NEW HANOVER ENGINEER CORP'OPPKE 4M PIEONON( ROW MNE WILMINGTON RESOURCE CENTER. WILMINGTON, NC c LOTIE. MC 2UIO RECEIVED NOV 10 2016 DCM- MHD CITY RECEIVED 'ACM WILMINGTON, NC OCT 1 3 2016 REE OWG(S) PNGC4-00010D2 SHEET(S) 1 OF 7 OWG SCALE AS N DWG DATE 09MI2016 SUPERSEDED DRAWING WIMER ��RI ENV 200 I NOTES: 1. HORIZONTAL CONTROL NAD 83. VERTICAL ELEV. REF NAVD88. aft \ \ A STRING OUT FOR HOD RECEIVED \ NOV 10 2016 \ DCM- MHD CITY S RECEIVED 0 100' 200' 400' CM WILMINGTON, NC OCT 13 2016 SCALE: 1" = 200' PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY REf. DWG(S PNGC-0-0BOiW2 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTW.(OlA1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE -TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS& INFO. MANAGEMENT(RIM) POLICY 1001 ) MM REVISIM(S) OE9CRNTGN er cm 1�mj OEeCAPTON APPAwus SHEEf(S) 2OF7 DWG SCALE AS NOTE I/1612016 ISSUED FOR REVIEW H JJ BG AREA CODE NI ¢��'.m"' 9ER Piedmont LINE 4 REPLACEMENT PROJECT ACCOUNT NUMBER - NIA WA DWG DATE 08OW2016 SUPERBEDED _ ROJECTNUMBER 2361320 Natural Gas IX MNG NW RPAWING By DNw "'A wn BRUNSWICK 8 NEW HANOVER COUNTIES, NORTH CAROLINA ENV 201 TATION ID N/A °"` """ """ ta PIEoyoNllMIURALMscwv.OBf30/2016 RM� earoL. oPPlcEam Peoeloxr Row oPrvE WILMINGTON ftESWRCE CENTER, WILMINGTON. NC PIPELINEP%NANNGTGNREGOURCECEMERIt 4NfCNFR INITIALS .LI[Nem ifnc. N[aane _. EXISTING GAS LINE © NOTES: 'V — 1. HORIZONTAL CONTROL NAD 93,VERnCALCONTRe- ELEV. REF NAVD 88. EXISTING t T. GAS LINE r �— \ a a — Ilk �"a�s—ou—aA—as�ws—''�—I ---------------------------------------- 10" HDD GAS PIPELINE EXIT 0 100' 200' 400' SCALE: 1" = 200' BORE _... _.... EXIT 40' 40 BOTTOM OF RIVER EXISTING Sta. 4+28.07V _ GAS LINE Elev 16.325 y 20' 20' RECEIVE® 0' 0' Sta. 4+47.09 NOV 1 0 2016 Elav 12.282 W J —20' _20. -_... .... 'ID 01 0 O a a -ao' -ao' °.w aZ sta. 7+40.78 Elev—50.143 PROPOSED GAS LINE _..... . __ .... a RECEIVED � z ACM WILMINGTON, NC —BO' —60' G J OCT 1 3 2016 —80' —80' ;i Sta. 9+48.69 Elev—71.995 LEGEND s * WETLAND AREA W W + 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 PROPRIETARY B CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1M)DRAWING IS CURRENT ONLY THROWN THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS B INFO. MANAGEMENT (RIM) POLICY 1001 REP DWG(S) NO. DAM REVISIONIST DESCRMIION 9Y q1N MVa aE4Cippflpl M VNB Piedmont LINE 4 REPLACEMENT PROJECT SHEET(S) DWEDED AS NOTED A AREA CODE ACCOUNT NUMBER - - NIA N/A REGIONAL ENGNEER AI6 DWG DATE 0413N2018 SUPERSEDED _ "" '""""""'"" INIAWING MIFEER REVISION 11 PROJECT NUMBER 2351320 "/A "'^ A TCH Natural Gas DRAWING BY CAM �a><Em BRUNSWICK & NEW HANOVER COUNTIES, NORTH CAROLINA ENV-202 STATION ID N/A HECKER INInALS PM NI N/A ""A' '"""' N/A PRINCIPAL ENKNNEER c 301EPIEDMa1lT xnvRALcu caRP. cOPP' cNARL4 orrIE NAzmow wuvE WILMINGTON RESOURCE CENTER. WILMINGTON. NC PIPELIIff INA.MRIGTON RESOaRCE fEN1ER1L1NE4 TOP OF BANK NOTES: (NORMAL HIGH WATER LINE) IN UEV.REFN`,, ` 30' CAM: SETBACK — �_ -- 75' ESTUARINE — SHORELINE AEC / ----------------------------------------------- �G14�gy 6{S=bA4 -------- ---- C18r—a@ M9= —1-W —'k- YID—)/S/S G8 Lt�61� 8Id'4-yS�c gd GAS _,I._ A6 OK z a CL ' --- ' COASTAL WETLAND AEC , oo' 200' 400' / - - - f'* A F R I SCALE: 1" = 200' _ 75' ESTUARINE I I I 40' 40' _. _: _. _. ._ SHORELINE AEC t i + 40' 40' ! ) I I 30' CAMA SETBACK �� l 20' 20' —°. y 20' 20' I I i RECEIVED TOP OF BANK (NQRMAI HIGH WATER I E I ° ° NOV 10 Z016 I I ; i I I ul ; ! 20' 0' w MHD CITY —20' —20' DCM- 1L i i } LL O � j 1 -40' -40• I j -40' -40' a y RECEIVED DCM WILMINGTON, NC ... -60". -60'. 1 I -60' -60, 0 C T 1 3 2016 I I j; ! LEGEND —100' —TaD' I ; + I _IOU• -too•. I = WETLAND AREA 26+00 28+00 30+00 32+00 34+00 36+00 38+00 40+00 42+00 44+00 46+00 48+00 50+00 52+00 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OW1095)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS B INFO. MANAGEMENT (RIM) POLICY 1001 W. MM RENsxM oEs WTM IerI CHK 1a 11 LINE 4 REPLACEMENT PROJECT SHEET(S) 4 OF 7 DWG SCALE AS NOTED A ARFAGODE - 4""Y RE` "%A w"' Piedmont DWGDATE oaZJ SUPERSEDED ACCOUNT NUMBER - PROJECT NUMBER 2351320 "" N/A ""'"""` NIA••sE NAR TECH awwlHCeur.�a aEvisHx+ Natura Gas DRAWING HV CAM aECasTo BRUNSWICK & NEW HANOVER COUNTIES, NORTH CAROLINA ENV 203 STATION ID N/A "' N/A •"'"°' "'""` z/ aRiHGPK ENCdNEEa c zofswmwoxr MluRU Mscww. c��'O�Eo�P1E0MO12R0MORO� cHnRim,F. xc zsz+o WILMINGTON RESOURCE CENTER. WILMINGTON. NC HECKER INITIALS PM wvEUHEi�roH aesaalcE CEHrEa)LIMEa Q TOP OF BANK (NORMAL HIG TER LINE) / __ _ _� — , — / _ — — — _ _ NOTES: 1 HaNaairuca RaNwea.vER ca CONTROL ELEV REFMwae `j 30' CAMA SETB J/ Q7 �14 75' ESTUARINE r �� SHORELINE AEC 10" HD GAS PIPELINE ENTRY \ x a \ y COASTAL WETLAND AEC WETLAND IMPACT AREA 1 0.33 ACRES 0 100' 200' 400' WETLAND IMPACT AREA 2 0.23 ACRES SCALE: 1" = 200' 60' 60' l i i 75' ESTUARINE SHORELINE AEC I i BORE ENTRY 40' 40' — 1 i 30' CAMA SETBACK 7 .64 TOP OF BANK SioV +1 (NORMAL HIGH WATER LINE) 20. 20' RECEIVED o, NOV 10 2016 Sto. 72+93.94 r — - Ui Elev ,.646 -20' —20' LL DCM- MHD CITY 0. a —40-40 050Sto. RECEIVED 37 14 g s DCM WILMINGTON, INC y i F —60' —60 OCT 13 2016 Sto. 68+42.38 a —80' —80' a Y+ i EI v —71s95v LEGEND I I I i G x _100' —100' ' _ W W WETLAND AREA 54+00 56+00 58+00 DDM Nam, 60+00 62+00 64+00 66+00 68+00 70+00 72+00 74+00 76+00 78+00 W w PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING -USE DIMENSIONS ONLY REF. DWGIS) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL(OW10%)DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS& INFO. MANAGEMENT (RIM) POLICY 1001 +. ` No. DATE REwsw OMMPnuN er c- — DESDRIPnox avaawua LINE 4 REPLACEMENT PROJECT (s) 50F7 DWG SCALE AS NOTED AREA CODE RED« S AC COUNT NUMBER - N/A WA ENGWEER Piedmont DWG DATE 09l3020I SUPERSEDED _ PROJECT NUMBER 235t320 REcssm DRawwc NwoER Renslow Natural Gas Id. DRAWING BY CAM tEt BRUNSWICK & NEW HANOVER COUNTIES, NORTH CAROLINA ENV 204 STATION ID N/A °"` N/A =""" """"' NlA PRINCIPAL ENGINEER mtsvFnt4M TRAacam. caRP. aPPICEAno TS otao"T RDwo"rvE CXMLOTIE, NC 28210 WILMINGTON RESOURCE CENTER. WILMINGTON. NC HECNER INITIALS PM FIPELME/W1LMNiGiGN RE3OD0.CE CENIER!LINE• HORIZONTAL CONTROL NAD 83, VERTICAL ELEV. REF NAVD 88. 1 U 100 200400' SCALE: 1" = 200' u R PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONTS NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)' DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS 8INFO. MANAGEMENT TRIM) POLICY 1001 WA wrens ENGINEER ENGINEER Piedmont Natural Gas " N/A� RE C&m • � M 2W%ME9"GMN9RIRILG"Cd . RM PRMGPPL ENGINEER CGRP.G E otxE."Nc"GNT oM G""E LINE 4 REPLACEMENT PROJECT BRUNSWICK & NEW HANOVER COUNTIES, NORTH CAROLINA WILMINGTON RESOURCE CENTER. WILMINGTON. NC RECEIVED NOV 10 2016 DCM- MHD CITY RECEIVED DCM WILMINGTON, NC OCT 1 3 2016 REF. DWG(S) PNG-C4U001002 DWG DATE 0813012018 ISUPERSEDED _ rnuwlNGNuueEn REVIs�oN ENV 205 w- rn I II III I, I III I I 111 II III III II III III III II fri tt (r t m- 0 100' 200' 400' I SCALE: 1" = 200' PROPRIETARY d CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)- DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE -TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS d INFO. MANAGEMENT (RIM) POLICY 1001 REGINNAL LINE 4 REPLACEMENT PROJECT ENG'NEER Piedmont MGP TE°� Natural Gas PE`ssT° BRUNSWICK & NEW HANOVER COUNTIES, NORTH Q ENQN PK ErvGINEER C At5gE0YOMitMNRI1G8G011P. cNRP.OPskE anE geo�Nxr ROW NMVE WILMINGTON RESOURCECENTER. WILMINGTON. NO CIURLOTTE, MC lBYtO RECEIVED NOV 10 2016 DCM- MHD CITY r�ECEIVED DCM WILMINGTON, NC 0 C T 13 2016 REF, DWG(S) PNG-C40001002 DWG DATE 08=16 ISUPERSEDED _ CPAmNN 1uLBER REvlslox ENV 206