Loading...
HomeMy WebLinkAboutNTB_09-50_Tinnin,J Donald Martin, Mayor s )`��� i Lara I. Burleson M.P.A Larry Hardison, Mayor Pro TernT Town Manager Aldermen: Richard Farley � °Od Carin Z. Faulkner, MPA Richard PetersTown Clerk Robert Swantek Daniel Tuman 8/28/2009 Exemption Number - 09-50 Wallace Tinnin 310 Whirlaway Boulevard North Topsail Beach, NC 28460 RE: EXEMPTED PROJECT -MAINTENANCE AND REPAIR of STRUCTURES CONSISTENT WITH CURRENT RULES [15A NCAC 07K .0209(c)] PROJECT ADDRESS — 2280-1 New River Inlet AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard Dear Mr. Tinnin: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 4/6/2009, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing and materials list submitted on 4/6/2009, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR — [15A NCAC 7K .0209(c)] - Any structure, or part thereof, consistent with current CRC rules may be maintained, repaired or replaced in a similar manner, size and location as the existing structure without requiring a permit, unless the repair or replacement would be in violation of the criteria set out below. This exemption applies to those projects that are not within the exclusion for maintenance and repairs as set out in G.S. 113A-103(5)b.5., Rule .0103 of this Subchapter and Rule 07J .0210. 1. the development must not disturb a land area of greater than 200 square feet on a slope of greater than 10 percent; 2. the development must not involve removal, damage, or destruction of threatened or endangered animal or plant species; 3. the development must not alter naturally or artificially created surface drainage channels; 4. the development must not alter the land form or vegetation of a frontal dune; 5. the development must not be within 30 feet of normal water level or normal high water level; and; 6. development must be consistent with all applicable use standards and local land use plans in effect at the time the exemption is granted. CEP 0 9 2009 L)Lwi vVILIMINGTON, NC Structures may be repaired in a similar manner, size and location as the original structure. No expansions or additions are permissible and the following specific conditions apply: 1. The project consists of the repair of 2280-1 Duplex Structure, as shown on the attached drawing and materials list provided by Agent, Wallace Tinnin on 4/7/2009 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. Repair and maintenance of North Face of the structure. Repairs are not to be made to adjacent duplex and are only for 2280-1. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Ryan C. McAlister, LPO Town of North Topsail Beach 2008 Loggerhead Court North Topsail Beach, NC 28460 Cc: Jon Giles, DCM Field Rep / Wilmington Field Office Wallace Tinnin (910)358-4809 - Cell (910)327-2605 - Home To: Joe Kosko 4001 Hopper Street Raleigh, NC 27616 Re: 2208-I New River Inlet Rd., N. Topsail Beach April 6, 2009 PROPOSAL 1. Remove siding on North wall and East wall (14 x 16 feet + 10 x 8 feet wall) 2. Remove 1/2 backing board- install %2 treated plywood 3. Remove 2 x 12 header over window 4. Remove 2x4 as needed 5. Remove beam under window 6. Install insulation RI as needed 7. Patch, fill and paint sheet rock- bedroom room (14 x 10 feet) 8. Caulk and paint siding to match existing 9. Replace 3/8 inch plywood under house 10. Remove hard wood flooring + % plywood - 4 x 14 foot. Install new flooring- to match existing. jotal. Materials and labor- $2,500.00 Town of North Topsail Beach ]planning / Zoning Department APR 3 - 2009 p,ECIEIIVIED By: