Loading...
HomeMy WebLinkAbout2-17 Oakley, Thomas & JanicePermit Class AMENDED Permit Number 2-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Thomas & Janice Oakley, 213 Pelican Walk, Hampstead, NC 28443 Authorizing development in Pender County at adi. to the AIWW, 213 Pelican Walk, H=pstead , as requested in the permittee's application dated 7/11/16 =-1). 9/8/16 O2- 4), incl. attached workplan drawings (2), 1 of 3 dated revised 9/11/16, and 2 of 3 dated 9/19/16. This permit, issued on February 13, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may ie suuJeci w lines, imprisonment or civu action; or may cause me permit to oe nuu ana vota. Dockina Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. �-� Any maintenance work or project modification not covered rvO Braxton C. Davis, Director hereunder requires further Division approval. RECEIVED Division of Coastal Management All work must cease when the permit expires on FEB $ Y 201/Chis permit and its conditions are hereby accepted. December 31, 2020 MM In issuing this permit, the State of North CarolmaCagl€bs AdHD CIry your project is consistent with the North Carolina Coastal Management Program. X Signature of Permittee Thomas & Janice Oakley ADDITIONAL CONDITIONS Permit No. 2-17 Page 2 of 3 3) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 3 formalized boat slips, as well as a jet ski platform and a jet ski lift. 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owners' riparian access corridors. 7) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 8) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 9) The authorized covered platform shall be single story, and shall not be designed to allow for second story use. 10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. NOTE: The permittee is advised that in accordance with 15A 07H .0208, the Rules of the Coastal Resources Commission prohibit new dredging or excavation of submerged aquatic vegetation (SAV). The presence of SAV has been identified around the project area. Dredging within any SAV habitat in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. General 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 12) This permit shall not be assigned, transferred, sold, or otherwise dispose,�q�t�a�tt �� ijrd ygrty without the written approval of the Division of Coastal Management. �{ tt V tt DU FEB 21 2017 DCM- MHD CITY Thomas & Janice Oakley ADDITIONAL CONDITIONS Permit No. 2-17 Page 3 of 3 13) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 14) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit. 15) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant shall implement the U.S. Fish & Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements within. The guidelines can be found at: httv://www.fws.eov/nc-es/mammal/manatee euidelines Ddf. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of General Permit 197800056 (Action ID No. SAW-2016-02284), which was issued on 12/5/16. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 16-1134. NOTE: An application processing fee of $250 was received by DCM for this project. RECEIVED EEB 21 2017 DCM- MHD CITY DCM Coordinator: (p-Cn T Permit #: 2-17 MAILING DISTRIBUTION SHEET TttSM A 3 {� 3'&, -CT Permitee• C AgCLt� Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) rehea as mgton Wilmington US ACOE Offices: Washington: Raleigh Bland William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbley Liz Hair Cultural Resources: Renee Gledhill -Early Public Water Supply: Heidi Cox (WIRO) Joey White (WARO) DCM/ Shane Staples Fisheries Specialist Gregg Bodnar NC DOT: Ben Hughes (BR/NHC) Patrick Riddle (PN/ON) DMF/ Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton Water Resources: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Wilmington: Chad Coburn — 401 Robb Mairs- 401 RECEIVED DEMLR Washington: Scott Vinson-Stormwater FEB 15 2017 Wilmington: Georgette Scott- Stonnwater Wildlife Resources: Maria Dunn DCM- MHD CITY LPO: Fax Distribution: Permitee #: Agent #: m i./ Permit Class NEW Permit Number 2-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for RECEIVED FEB 13 2017 DCM- MHD CITY X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Thomas & Janice Oakley, 22 Lower Road Paradise Pt, Lakeville, PA 18438 Authorizing development in Pender County at adi. to the AIWW, 213 Pelican Walk, Hampstead , as requested in the permittee's application dated 7/11/16 02-1). 918/16 flViP- 4), incl. attached workplan drawings (2), 1 of 3 dated revised 9/11/16, and 2 of 3 dated 9/19/16. This permit, issued on January 18, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may 1e sUUJML lU lilies, imprisonment or crvu action; or may cause me permit to oe nua ano vora. Dockine Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. 9 r K BraxtotrC.Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Th¢mas & Janice Oakley ADDITIONAL CONDITIONS Permit No. 2-17 Page 2 of 3 3) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third parry. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 3 formalized boat slips, as well as a jet ski platform and a jet ski lift. 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owners' riparian access corridors. 7) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 8) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and shall be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 9) The authorized covered platform shall be single story, and shall not be designed to allow for second story use. 10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. NOTE: The permittee is advised that in accordance with 15A 07H .0208, the Rules of the Coastal Resources Commission prohibit new dredging or excavation of submerged aquatic vegetation (SAV). The presence of SAV has been identified around the project area. Dredging, within any SAV habitat in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. General 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Thomas & Janice Oakley Permit No. 2-17 Page 3 of 3 ADDITIONAL CONDITIONS 13) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 14) No excavation or filling of any open water area or vegetated wetlands is authorized by this permit. 15) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant shall implement the U.S. Fish & Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements within. The guidelines can be found at: http://www.fws.gov/nc-es/mammal/manatee guidelines.odf. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the proposed project by way of General Permit 197800056 (Action ID No. SAW-2016-02284), which was issued on 12/5/16. NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. DWR- 16-1134. NOTE: An application processing fee of $250 was received by DCM for this project. W-rD Energy, Mineral& Land Resources ENVIRONMENTAL OUALRV February 8, 2017 Mr. & Mrs. Thomas Oakley 22 Lower Road Paradise Point Lakeville, PA 18439 Subject: EXEMPTION Stormwater Project No. SW8 161114 Oakley Family Pier Pender County Dear Mr. & Mrs. Oakley: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director On November 10, 2016, the Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources received a copy of the CAMA Major Permit Application for the subject project. Staff review of the plans and specifications on November 14, 2016 has determined t9t the development activities proposed at this time will not pose a threat to surface water quality from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000, the stormwater rules. By copy of this letter, we are informing you that this project will not require a stormwater management permit. If the subject project disturbs one acre or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge requirements. You are required to have an NPDES permit for stormwater discharge from projects meeting these criteria. All temporary built -upon area associated with the construction of the project must be removed within 30 days of completion of the project, or when it is no longer needed, whichever occurs first. If you have any questions or need additional information concerning this matter please contact Georgette Scott at (910) 796-7215, or via e-mail at georgette.scott macdenngov- Sin ely, Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources GDS/gds: \\\Stormwater\Permits & Projects\2016 \ 161114 Exemption\2017 02 peRgit t C I V E D cc: Allied Marine Construction, LLC �� CC l� Pender County Building Inspections FEB 1 5 2017 Jason Dail/Shaun Simpson - DCM WIRO Wilmington Regional Office Stormwater File DC-M - More "t"'+ c t 11 DCM- MHD CITY State o.` North Carolina ! Environmenta! Quality I Energy. Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension ! Wilmington. NC 28405 910 796 7215 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Oakley Family Pier cdo Thomas Oakley COUNTY: Pender PROJECT NAME: Oakley Family Pier LOCATION OF PROJECT: 213 Pelican Walk, adjacent to the AIR'W, in Hampstead DATE APPLICATION RECEIVED COMPLETE BY FIELD:10-28-16 FIELD RECOMMENDATION: Attached: Yes To Be Forwarded: CONSISTENCY DETERMINATION: Attached: n/a To Be Forwarded: n/a RECEIVED NOV 10 Z016 DCM- MHD CITY FIELD REPRESENTATIVE: Dail ��) DISTRICT OFFICE: WILMINGTON DISTRICT MANAGER REVIEW: lirfot V IV B) DATE RECEIVED BY MAJOR PEAHTS UNIT: PUBLIC NOTICE REC'D: 11-11-16 /krN� to jivil. 6C ADJ. RIP. PROP NOTICES REC'D: :i Uti . 119"N 66 APPLICATION ASSIGNED TO: C) 75 DAY DEADLINE: 11111in ✓ MAIL OUT DATE:11-9-16 FEDERAL DUE DATE: FEE REC'D: $250 / #5034 / END OF NOTICE DATE: 12-2-16 ✓ DEED REC'D: 10 (^ ON: ) � )10 1 le 150 DAY DEADLINE: STATE DUE DATE: 12-2-16 FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON NW QNh/0F&l AGENCY Ro $RJ ia�}o�.do*en 1!0(oh 114,06 wg 5 L = fsovs f A tirtxr FAA • DATE COMMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative Coastal Management - LUP Consistency I 13 Division of Community Assistance 1 q ( t{ ✓ Land Quality Section (DEMLR) I I l0/1 to Division of Water Resources (401) 1� �� / '� 1 l/ 1154 ovir— Storm Water Management (DEMLR) 1 I 1 State Property Office 11/30140 Division of Archives & History 11 t 91�1 to Division of Environmental Health 1 yt 5/1 to Division of Highways A I I b 1 b Wildlife Resources Commission 1 f �11e Local Permit Office Division of Marine Fisheries /DCM 11 3c�lio CCMMGn—<S&Aok- CorpsofEngineers I S�lt/ ✓ vj( SM-+210lb—%ZW 'tf C 1-21VI, Pv3S NIPP i I. Recommendations for State Permit — Oakley Family Pier C/o Thomas Oakley The total area of the existing and proposed structures was calculated as follows: Shoreline length = +/-100 ft. x 8 sq. ft = 800 sq. ft. allowable. Proposed: Platform = 20' x20' = 400 sq. ft Floating dock = 8' x 20' =160 sq. ft. Jet Ski platform = 6' x 12' = 72 sq. ft. Finger Piers = 4' x 42' =168 sq. ft. Total (proposed) = 800 sq. ft. The proposed development would provide docking space for a total of four (4) vessels (including jet dock). The proposed docking facility currently extends approximately 50' into the waterbody, which measures approximately 675' across, which is CONSISTENT with NCAC 07H .0208 (b)(6)(G). The application also appears to be CONSISTENT with the remaining use standards set forth in NCAC 07H .0208(b)(6), including those which dictate the maximum allowable platform area (the 8 square foot rule), the 15' riparian setback and federal channel setback. It appears the project would not impact any visible beds of SAV, and would therefore be CONSISTENT with NCAC 07H .0208(b)(1). Provided the resource agencies do not have any concerns regarding significant adverse impacts resulting from the proposed project, this office has no objections to the issuance of a permit. RECEIVED NOV 10 2016 DCM- MHD CITY ;1 MEMORANDUM To: Heather Coats From: Michael Christenbury, Wilmington District Planner Subject: Consistency Determination, Major Permit Applica on, Oakley Family Pier, Hampstead, Pender County Date: January 13, 2017 not in co' with the 2012 The applicant proposes to construct a 4 (four) slip private docking facility. The site is located at 213 Pelican Walk, adjacent to the AIWW in Hampstead, Pender County. Areas of Environmental Concern (AEC's) impacted by the proposal are PT and EW. Waters at the project site are classified as SA and are open to the harvesting of shellfish. The area is not a Primary Nursery Area. I have reviewed this proposal for consistency with the Pender County Comprehensive Land Use Plan and offer the following comments. The general area of the project is classified Developed, while the AECs impacted by the work are classified as Conservation and Resource Protection. In general, Pender County allows development in Conservation and Resource Protection classified AECs which is consistent with the State's minimum use standards. The Pender County Land Use Plan contains some policies, which exceed the State's minimum use standards. However, none of these more restrictive policies appear to be applicable to this project. This project is consistent with the 2012 Pender County Comprehensive Land Use Plan Update. Cc: File Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Mark Zeigler Division of Community Assistance Wilmington Regional Office PAT MCCRORY Governor DONALD R. VAN DER VAART Secretory BRAXTON DAVIS Direcmr FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsCr�ncdenrpov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: : This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED I t l '7 1 L State or North Carolina I Environmental Qaalily I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 M Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 11193 Dan Sams District Manager-DEMLR Wilmington Regional Office PAT MCCRORY Governor DONALD R. VAN DER VAART Secremry BRAXTON DAVIS Director r -� ,, tz N�VOsr�a�s FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatso()..ncdenr.gov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c% Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. SIGNED This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATED JG 1 ° 1,1' RECEIVED DCM WILMINGTON, NC NOV 10 2016 State of North Carolina I Environmental Quality [ Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 ,v Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Robb Mairs 401 Wetlands DWR-WiRO PAT MCCRORY Governor RECEIVED/NMENRONALD R. VAN DER VAART Secremry NOV 10 2016 Water Quality Regional Operations Section Wilmington Regional Office BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsa7.ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. �L h Additional comments may be attached" fil11Y41 /This agency has no comment on the proposed project. r�Vh/ �I,(J,tF 6� Lt/ ges J This agency approves of the project only if the recommended chani114 are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. s DATED I ` I �o SIGNED State of North Carolina I Enwomnental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 Ov- IN - Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 ECEIVE r�ov � 0 2n�s PAT MCCRORY Governor DONALD R. VAN DER VAART serreln,y BRAXTON DAVIS Ulraolor TO: Georgette Scott Stormwater Section DEMLR - WiRO F M: t Heather Coats, Assistant Major Permits Coordinator u NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(c),ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. s REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATED i _ 4 (o DCM WILMINIGTON, Ne NOV 2 2 2oI6 Stale of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 �i Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Tim Walton Dept of Administration State Property Office Ik1iv . PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS DireWor FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats@ncdenrgov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant. Oakley Family Pier c% Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. ** dditional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments SIGNED DATED A RECEIVED DCM WILMINGTON, NC NOV 3 0 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Dore Ext., Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY 0 November 9, 2016 TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: v✓ PAT MCCRORY DONALD R. VAN DER VAART Se,MU0r BRAXTON DAVIS lhrtnor Renee Gledhill -Early '0 it, Dept. of Cultural Resources k NG y1' Archives & History i1 Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatswncxfenroov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review tJ 13 (I4 Oakley Family Pier c% Thomas Oakley 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached"* This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED Vt b1ddX�%J ,-WDATED ..:,vE1D D6ivi WILMINGTON, NC NOV 2 S 2016 State of North Carolina i Errviraaoerdal Qaalily I COMW Ma WITKTn NOV+/ 127 Cardinal Dmt Eat., Wd ntIaWmr, NC 29405 NOV 1 6 2016 910.796.7215 Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Shannon Jenkins NC DMF Shellfish Sanitation Section PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)ncdenr.aov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c% Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pander Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached'" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGN DATED j �! Received NOV 15 2016 State of North Carolina I Environmental Quality I Coastal Management DC M 127 Cardinal Drive Eat., Wilmington, NC 28405 910-796-7215 Nb Ih+PAGT IU (b[U1 NOV 1.5 2016 PAT MCCRORY Gommor 0 s' Coasta[Management ENVIRONMENTAL QUALITY November 9, 2016 TO: 'FROM: SUBJECT: DONALD R. VAN DER VAART Secre(my BRAXTON DAVIS Dimclor Patrick Riddle NC Dept. of Transportation PN Co. & ON Co. Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats(a)-ncdenraov Fax: 395-3964 (Courier 04-16-33) CAMA Application Review Applicant: Oakley Family Pier c% Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIM,, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form.to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: ✓ ThiS agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATED L Received Nov 1.6 2016 DCM State of North Carolina I Environmental Quality I Coastal Management IV Confine! Drive EA, Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Maria Dunn NC Wildlife Resources Commission For WiRO PAT MCCRORY Oovemor DONALD R. VAN DER VAART S'ecmtary BRAXTON DAVIS Dlr,,Ior FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsanncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" 11X This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED A J DATED Q z 1,1(: RECEIVED DCM WILMINGTON, NC DEC 0 8 20% State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Dove Ent, W ilminbdon, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Gregg Bodnar Fisheries Resource Specialist DCM, Morehead City PAT MCCRORY Gommor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director ® 0EC Y E® NOV 10 2016 DCMV MHD CITY FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats()ncdenr.gov Fax: 395-3964 (Courier 04-16-3 SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pander Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coa s at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. t1 SIGNED DATED 13d/t(o State of North Carolina I Fnvironmental Quality I Coastal Management 127 Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 PAT MCCRORY Govemor K�'Z._ DONALD R. VAN DER VAARTC�secrelapz BRAXTON DAVIS Coastal Management Director ENVIRONMENTAL QUALITY MEMORANDUM: TO: Heather Coats, DCM Assistant Major Permit Coordinator FROM: Gregg Bodnar, DCM Fisheries Resource Specialist SUBJECT: Oakley Family Pier DATE: 11/30/2016 A North Carolina Division of Coastal Management (DCM) Fisheries Resource Specialist has reviewed the subject permit application for, proposed actions that,impact fish and fish habitats. The applicant proposes to construct a 4,slip docking facility, to include 2 boat lifts; a" floating dock, a jet ski lift and jet ski platform. Waters are classified as SA, and open to shellfish harvest. The report notes submerged aquatic vegetation (SAV) is,in the immediate area; and states that SAV is not within the facilitiesfootprint. Depth ranges from -1.5ft to 2ft at normal low water (NLW). On the Atlantic coast, North Carolina ranks second behind Florida in SAV presence (Funderburk et al: 1991; Sargent et al.1995). Observations since"2000 have indicated that SAV coverage in North Carolina is expanding into previously unobserved areas. SAV is a vital component to the.estuarine system and is prime nursery area for many fisheries species, such as gag grouper, flounder; red drum, black sea.bass, weakfish and Atlantic croaker (Deaton et al. 2010). SAV supports high diversity of foraging fish and invertebrates, and provides.valuable ecosystem services as a primary producer and enhancer of water quality,(Deaton et al. 2010). SAV filters water, stabilizes sediment (Fonseca 1996; Stephan and Bigford 1997), and provides.refuge forjuvenile finfish, crabs and shrimp (Savino and Stein 1989; Rooker et al. 1998). SAV supports a vast array of epiphytes and other -sessile invertebrates that serve as a food source for many fisheries species. Waters containing SAV have higher species richness and abundance than those without SAV (Thayer et al. 1975, Ross and Stevens 1992), and,:can improve water quality and clarity.through the filtration of water by"the associated epiphytic community. SAV is recognized as essential fish habitat due to its primary production, structural complexity, modification of energy regimes, sediment and shoreline stabilization, and nutrient" cycling (Deaton et al. 2010). Fonseca et al. (1998) identified that'patchySAV habitat often has higher density root mass than contiguous beds. Furthermore, the unvegetated bottom between patches in proximity to _ .each other can.co.ntain rhizomes and/or seedlings as beds migrate, and is considered a component of SAV (Fonseca et 61.'1998). The North Carolina Coastal Habitat Protection Plan has summarized the primary environmental factors controlling SAV distribution which are; water depth, sediment composition, energy, and light penetration (NCDEQ 2016). Thayer et al. (1984) notes that eelgrass (Zostera marina) is tolerant of high energy waters, and SAV is evident along much of the extent of the AIWW (NCDEQ 2016a). Provided these factors are within limits of the. particular species, growth is possible. In addition, docking facilities have the, potential to reduce current velocities and increase shoaling. Due to'the patchy SAV .. .. State of North CamliRa I ERvuomoeoml Quality I Coastal Maoagemeot . 406 Commerce Avenue I Morehead City, NC 28557 252-808-28081252-247-3330(11az) distribution, but established presence of SAV in the vicinity, and potential for shoaling, SAV may colonize the area in the future. If SAV does colonize, it may potentially,iriipact any future development proposals, -to include facility expansion/modification and dredging. Contact Gregg Bodnar at (252) 808-2808 ext. 213 or gregg.bodnar@ncdenr.eov with further questions or concerns: Deaton, A.S. W.S. Chappell, K. Hart, J. O'Neal,- B. Boutin. 2010. North,Carolina Coastal Habitat Protection Plan. North Carolina Department of Environment and Natural Resources. Division of Marine Fisheries, NC.;639 pp. Fonseca, M. S. 1996.'The role of seagrasses in nearshore sedimentary, processes: a review. p. 261-286 in C. Roman and K. Nordstrom (eds) Estuarine Shores: Hydrological, Geomorph'ologica1:and Ecological Interactions.. Blackwell, Boston, MA, Fonseca, KS., W;J. Kenworthy, and G.W. Thayer'. 1998; Guidelines for the conservation and restoration of seagrasses in the United States and adjacent waters. NOAA Coastal Ocean Office, Silver Springs, Md. Funderburk,'S. L., J. A. Mihursky, S. J. Jordan, and D. Riley. 1991. Habitat requirements. for Chesapeake Bay living resources.. Habitat Objectives Workgroup, Living Resources Subcommittee:and Chesapeake Research Consortium with assistance from Maryland Department of Natural Resources, Solomons, ' MD. NCDEQ (North. Carolina Department of Environmental Quality)'. 2016. North Carolina Coastal Habitat Protection Plan Source Document. Morehead City, NC. Division of Marine. Fisheries. 477 p. NCDEQ (NC Department of Environmental Quality). 2016a. h'tto://portal.ncdenr.ore/yieb/mf/habitat/SAV Rooker, J. R., G,1_ Holt and'S.A. Holt ].998: Vulnerabilit of ,newly settled red drum (Sciaenops ocellatus) to Y , predatory fish: is.early-life survival enhanced'by seagrass meadows? Marine Biology.131(1):145-151. Ross, J. L. and T.M. Stevens.,1992. Life history and population dynamics of red drum (Sciaenops-ocellatus) in North Carolina waters. NC Division of Marine Fisheries Morehead City, -NC, Marine Fisheries' Research Completion Report;Project F-29,130p. Sargent, F. J.J. J. Leary, D. W..Crewz, and C. R., Kruer. 1995. Scarring of Florida's seagrasses: Assessment and managemenboptions. Florida Department'of Environmental Protection, St. Petersburg, FL, Savino, J: F. and R.A. Stein.1989. Behavior of fish predators and their prey: habitat choice between open. water and dense vegetation. Environmental Biology of Fishes 24(4): 2877293. Stephan,`C. D.'and T.E. Bigford. 1997. Atlantic coastal submerged aquatic vegetation: a review of its ecological role, anthropogenic impacts, state regulations, and value to Atlantic coastal fish stocks. Atlantic States Marine Fisheries Commission; 77p. Thayer, G. W.,S.M. Adams, and M.W. La Croia. 1975. Structural and functional aspects of a recently established Zostera marina community. p. 518-540 in L.E. Cronin (ed.), Estuarine Research. Academic. . Press, New York, NY. State of North Carolina I Envuorun=tal Quality I Coastal Management 1367 US Hwy 17 South I Elizabeth City, NC 27909' .. 252-264.3901 . �w DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 88 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 December 5, 2016 Regulatory Division Action ID No. SAW-2016-02284, General Permit No. 197800056 Mr. Thomas Oakley 22 Lower Road Lakeville, Pennsylvania 18438 Dear Mr. Oakley: Through coordination with the North Carolina Division of Coastal Management we have learned of your request to construct a new docking facility at 213 Pelican Walk., along the AIWW in Hampstead, Pender County, North Carolina. Coordinates are: 34.4035 N,-77.6102 W. On January 1, 2011, we renewed general permit No. 197800056, (copy enclosed), that authorizes the maintenance, repair, construction and installation of piers, docks, boathouses and boat shelters, mooring piles, dolphins, jetties and breakwater structures in navigable waters of the United States in the State of North Carolina pursuant to Section 10 of the Rivers and Harbors Act of 1899. Your work is authorized provided it is accomplished in strict accordance with your submitted plans, the enclosed general conditions, and the following special conditions: 1. All work authorized by this permit must be performed in strict compliance with the submitted plans received on 15 November, 2016, which are a part of this permit. 2. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at httn://www.fws.gov/nc-es/Manunal/manatee guidelines.ndf. Please read the enclosed permit to prevent an unintentional violation of Federal law. As this Department of the Army regional general permit does not relieve you of the responsibility to obtain any other required approvals, you should contact appropriate State and local agencies before beginning work. RECEIVED DCM WILMINGTON, NC DEC 0 5 2016 and coop��tioii. If you ha,,V6,quekiori§� please contact Liz Tli z Haif, of 'Sin `(N- Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 TO: Heidi Cox Assistant Regional Engineering Supervisor Public Water Supply-WiRO PAT MCCRORY Gnvernnr DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Director NOV 0 9 20 sron 16 NiRO-p bVca0/a�rs�p�es FROM: Heather Coats, Assistant Major Permits Coordinator NCDEQ — Division of Coastal Management 127 Cardinal Drive Ext., Wilm., NC 28405 heather. coatsCaD-ncdenroov Fax: 395-3964 (Courier 04-16-33) SUBJECT: CAMA Application Review Applicant: Oakley Family Pier c/o Thomas Oakley Project Location: 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender Co. Proposed Project: to construct a 4-slip private docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Heather Coats at the address above by December 2, 2016. If you have any questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate in-depth comments with supporting data is requested. REPLY: ✓ This agency has no objection to the project as proposed. "Additional comments may be attached"" SIGNED This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATED RECEIVED DCM WILMINGTON, NC NOV 17 2016 State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive E,a , Wilmington, NC 28405 910-796-7215 Coastal Management ENVIRONMENTAL QUALITY January 11, 2017 Allied Marine Contractors, LLC c/o Mr. Hal Fogleman 92 Harold Ct. Hampstead, NC 28443 Dear Mr. Fogleman: ILb ROY COOPER Gowmor WILLIAM G. ROSS, JR. interim Secretary BRAXTON DAVIS Director This letter is with reference to your application for a Coastal Area Management Act Major Development permit, acting as agent for Thomas and Janice Oakley, to undertake development activities at property adjacent to the AIWW, at 213 Pelican Walk, in Hampstead, Pender County. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make March 27, 2017, the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact me by phone (910) 796-7302 or e-mail at: heather.coats@ncdenr.gov. cc: Wilmington/MHC Files Sincerely, Heather Coats Assistant Major Permits Coordinator RECEIVED JAN 17 2017 nothing Compares D C M- M H D CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Extension I Wilmington, NC 29405 910-796-7215 T RECEIVED DIVISION OF COASTAL MANAGEMENT NOV 1 0 2016 FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Oakley Family Pier C/o Thomas Oakley DC M- M H D CITY 2. LOCATION OF PROJECT SITE: 213 Pelican Walk, adjacent to the Atlantic Intracoastal Waterway (AIWW), in Hampstead, Pender County. Photo Index - 2006: 26-6632, P,Q-17 State Plane Coordinates - X: 66892 Y: 729301 Lat:34°24'12.75"N Long:77°36'37.06"W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 11/3/16 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received—10/28/16 (Complete) Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan — Pender County Land Classification from LUP - Conservation (B) AEC(s) Involved: PT, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Septic Planned - N/A (F) Type of Structures: Existing —Single-family Planned — Four (4) slip docking facility (G) Estimated Annual Rate of Erosion: N/A Source - N/A HABITAT DESCRIPTION: [AREA] DREDGED FRIED OTHER (A) Vegetated Wetlands (Mixed coastal & 404-type) (B) Non -Vegetated Wetlands 800 sq. ft. (Open water (incorporated) (C) Other (D) Total Area Disturbed: 800 sq. ft. (0.018 acres) (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes PROJECT SUMMARY: The applicant proposes to install a four -slip docking facility. M Oakley Family Pier C/o Thomas Oakley Page 2 9. PROJECT DESCRIPTION: RECEIVED NOV 10 2016 DCM- MHD CITY The project site is located at 213 Pelican Walk, adjacent to the AIWW, in Hampstead, Pender County. To locate the property from the WIRO office, drive north on NC Highway 17, turn right at Sloop Point Road, which is adjacent to Hilltop Grocery, across from "Eastern Outfitters", approximately 3.7 miles north of Topsail Middle School. Follow Sloop Point Road for approximately 2.3 miles and bear right onto Sloop Point Loop Road. In 0.5 miles, turn left onto Alton D Rivenbark Road and continue until the road ends. At the intersection, turn right onto Pelican Walk Road and the property will be located on your left, at house number 213. The property consists of a 0.71 acre parcel that is approximately 4-6 feet above mean high water (MHW) and is vegetated primarily with lawn grasses. A single-family residence occupies the highground portion of the property. The shoreline is natural (i.e. no man-made features such as a bulkhead), and coastal and 404-type wetlands extend upland from the waters edge, a distance approximately 125 linear feet. Groundsel bush (Baccharis halimifolia) and Bulrush (Scirpus spp.) are among the species that vegetate the upper wetlands, and Smooth Cordgrass (Spartina alternii fora), Black Needlerush (Juncus Romarianus ssp), Glasswort (Salicornia spp.) and Sea Lavender (Limonium carolinianum) comprise the lower wetlands that extend into the open water area of the AIWW. The width of the waterbody measures approximately 1,200' from marsh to marsh in the vicinity of the proposed pier; however, the project will be restricted by the existing pier -head alignment (allows for a 50-55' long pier beyond the outer edge of the marsh edge). Based on aerial photography, it appears the adjacent channel has a history of dredging activities. Submerged aquatic vegetation (SAV) is present in the vicinity of the proposed project, with spare patchy areas within 50' of the proposed project. However, no SAV was observed within the footprint of the dock expansion (during DCM's latest site visit 11/3/16). The waters of the AIWW are classified SA by the Division of Water Quality. The project area is NOT designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries and is OPEN to the harvest of shellfish. PROPOSED PROJECT: According to the application package, the property owner wishes to construct a four -slip docking facility adjacent to a man-made canal, off the AIWW, at 213 Pelican Walk, in Hampstead, Pender Co, North Carolina. Based on information provided by the applicant's agent (Hal Fogleman — Allied Marine Contractors, LLC), a 6' x 110' access pier would originate from a point above the "404" type wetlands line and extend toward the east, terminating into a 20' x 20' covered platform (approximately 50'- 55' beyond the outer edge fo the marsh). An "L-shaped" fixed finger pier would extend along the southern side of the access pier (beginning just before covered platform) and would consist of a 4' x 18' elevated pier that would turn 90 degrees and provide access to a 4' x 24' fixed finger pier. This finger pier extension would provide access to two (2) 13' x 13' *-' RECEIVED Oakley Family Pier C/o Thomas Oakley NOV 10 2016 boatlifts that are planned along the southern side of the proposed dock (i.e. south of ReC M- M H D CITY platform). Along the northern side of the covered platform, the applicant proposes to install a 6' x 12' jet - ski platform and an 8' x 20' section of floating dock. According to the work plan drawings, the proposed jet -ski platform (i.e. jet port) would be situated between the proposed floating dock and the covered gazebo. The property appears to have approximately 100 linear feet of shoreline and the facility's design appears to remain within the applicant's area of riparian access, meaning that no waivers would be required for the proposed project. Water depths in the vicinity of the proposed facility range from -1.0' at normal low water (NLW) to -2.0' near the terminal end. The adjacent man-made (dredged) canal is located immediately waterward of the proposed structures and the applicant's design extends as far waterward as possible without encroaching into that waterbody and/or beyond the established pier -head line. 10. ANTICIPATED IMPACTS The proposed docking facility would result in the incorporation of approximately 800 square feet of Estuarine Waters and Pubic Trust Area. Although no SAV was observed within the immediate project area, there are established beds of SAV nearby. The proposed development would be located outside of the adjacent 15' riparian corridor setbacks on both sides and would be constructed outside of the federal channel setback, within'/< of the width of the waterbody. Turbidity associated with the piling installation would be kept to a minimum. Submitted by: Jason Dail Date: 11/4/16 Office: Wilmington F- LU U U Lu CD Q � x °i 3 mew T Z tl Pe [rZ0^ to^ ` OaK ley c,.,'1 f,•Fr Flan V `C vJ �rAWi� �CAwia l of 3 �e Chg(i4cu7i-II Srate; S-=1� byWz Q I�ropco� -2� .v yn'1 2'mr.� g i sx2a Sct \Zoxio 13X13 13x1347 I Boof If# j Gt J u }� I %L1 1587{wcK l i � 1'7G w 1 2-0 Pe( Ca'n ln�R(K oa[f-tey KI \t \, 4i Zls IQI.L„-, PC, ck-C-r v o Ko n C)< -� mIm _N < Z n � m n v -7 �mn�n Kjt��,f -5501� d? 9 M APPLICATION for NOV 10 2016 Major Development Permit OCM_ MHD CITY (last -11" 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/Landowner Information Business Name Project Name (it applicable) i OAKIe MI IP� Applicam 1: First Name ��omat5 Mi Last Name OaKle Applicant 2: First Name MI Last Name Qal<le 1-4nItC tl additional applicants, please attach an additional page(.) with names listed. PO Box CiTy Mailing Address n St�te �ower (Z&O I"arAo%(SG Pt_ LaKeville 4 ZZ one No. ZIP Country PhFAX No. I $ 3 U 5 - - ext. Street Address (ofdgfewt from above) City State ZIP Email 2. Agent/Contractor Information Business Name II A( ,IG' COnkAr /S LLG Agardl Contractor 1 •. First Name MI Last Name -o (ems A a ^ Agent/ Comractor 2: First Name MI Last Na Mailing Address Iz Hot roV Gt PO Box City #07 5)� State Nt ZIP a 3 Phone No. 1 I O - .367- Phone No. 2 � FAX No. Contractor i 6DRIz Street Address (if different from above) City State ZIP Email 0CM 1NILMINO I VIv, Nk! <Form continues on bscb OCT 2 8 2016 Form DCM MP-1 (Page 2 of 4) RECEIVED APPLICATION for (ft� Major Development Permit NOV 10 2016 3. Project Location County (can be multiple) Pen Street Address WaIK State Rd. M e .21 Subdivision Name City state Ale, Zip Z 3+4 3 Phone No. Lot o-(s) (If many, attach additional page with list) • - ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Ca p f Fekr IC'0 c. Is the water body Identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. []Natural {Manmade ❑Unknown R I lQ n-h G 0 c ea l e. Is proposed work within city limits or planning jurisdiction? 1. II applicable, list the planning Jurisdiction or city limit the proposed Yes []NO work falls within. Pell r4er -CO vnf 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (aq.tt.) too X 312 = ,3 �� zoo 5 F IDo' c. Size of individual lots) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (if many lot sizes, please attach additional page with a list) / r PNHW or ❑NWL % e. Vegetation on tract 144-Ura,I rRsws d free-5 I. Man-made features and uses now on tract r SI n�j�e fPtMr'(y FeSeWenCe Uadiscent g. Identify and describe the existing land uses to the proposed project site. 51'n5fe famf'hy resr'��ce �J It. How does local government zone the tract? Is the proposed project consistent with the applicable zoning? 71, ^/ A / (Attach zoning compliance canNicata, ii applicable) >}�Yea ❑Na ❑NA j. Is the proposed activity pan of an urban waterfront redevelopment proposal? []Yes ONO it. Hasa professional archaeological assessment been done for the tram? It yes, attach a copy. []Yes ❑No �41NIA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does It Involve a ❑Yes ❑No MNA 'RECEIVED National Register listed or eligible property? <Form continues on next page> OCT 28 2016 Form DCM MP-1 (Page 3 of 4) RECEIVED APPLICATION for Vt-' Major Development Permit NOV 10 2016 m. (1) Are there wetlands on the site? PYes ❑No DCM- MHD CITY Yes [:]No(11) Are there coastal wetlands on the site? (fit) If yes to either (I) or (ii) above, has a delineation been conducted? []Yes jMNo (Attach documentation, U available) n. Describe existing wastewater treatment facilities. Seftt`(' {��k o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment systems. f pf5 9^ D J5G- 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government p[Private/Community b. Give a brief description purpose, use, and daily operations of the project when complete. jof �(' jje �aMl (Y pri�(Afe d0t-l40h {�4cr lI c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. bi 4t 6er5e 01V be 06es fr, Wksti r', P;It ►Z5 d. List all development activities you propose. C9n6ffjej K e. Are the proposed activities maintenance of an existing project, new work, or both? / v e w w o r- x 1. What is the approximate total disturbed land area resulting from the proposed project? r /0odaSq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ❑No NA that the public has established use of? h. Describe location and type of exiatIng and proposed discharges to watersofthe state. NIA I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ONO ONA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ONO ONA j. Is there any mitigation proposed? ❑Yes ❑No CM WILMINGTON, If yes, attach a mitigation proposal. ?nitz <Form continues on back> C Form DCM MP-1 (Page 4 of 4) !RECEIVED NOV 10 2016 ArT\/ APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat ill tcluding plan view and cross•sectionai drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other go pars under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DEW I. A lit of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plts by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Wi ltir JD�tn3'1"ox ff • Plane No. Address Z RD!(I 61(5 (D+� i(W( -k"` 'Ai 2 qc`9 p Petrone No. Name / M rlAf•fl n t ac � Address 2- l S PeP- I 1AJ -. I K a r* 5 i nIG aqq 3 phone No. Name Address g, A lit of previous state or federal permits Issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. 1. Wetland delineation, if necessary. I. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) Involves expenditure k of public funds or usessncof public lands, attach a statementd locumenting mpliance with I North Carolina Environmental mental Policy Act. MENMEtion and Permission to Enter on ►.anothat any permR Issued In response to this applicationill be subject to the conditions and restrictions containam authorized to grant, and do in tact grant permissiaforementioned lands in wnnection with evaluating information related to this permit app up monitoring of the project. I further certify that the information provided in this application is truthful to the bet of my knowledge. Date 7-(L 64 Print Name Signature ,,-y Please Indicate application attachments pertaining to your proposed project. RECEIVED ODCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts DCM WILMINGTON, NO ❑DCM MP-3 Upland Development OCT 28 2016 ❑DCM MP-4 Structures Information 0- Form DCM MPA RECEIVED NOV 10 2016 STRUCTURES DCM- MHD CITY (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITYANARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ❑Private/Community El This section not applicable b. (i) WIII the facility be open to the general public? ❑Yes [ZNo Oc. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? MYes ❑No u Number a If yes: a (III) Length a o , (it) Number (iv) Width 8 I� _� (Ili) Length Z H (v) Floating I(IYes ❑No (iv) Width (v) Floating ❑Yes ®No e. (i) Are Platforms included? I3Yes ONO 1. (1) Are Boatlifts included? WYes ONO It yes: If yes: 3 (it) Number I (it) Number S 1 i 31 (Ili) Length a 0 (Ili) Length (iv) Width 1518 IN) Width ao (v) Floating Oyes ®No Note: Roofed areas are calculated from ddpline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. r vnI /�i ❑ Full service, including travel lift end/or rail, repair or �/ — maintenance service (ii) Number of slips existing ❑ Dockage, fuel, and marine supplies ❑ Dockage (-wet slips") only, number of slips: — ❑ Dry storage; number of boats: — ❑ Boat ramp(s); number of boat ramps: — ❑ Other, please describe: I. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). ❑ Land cut and access channel oe� r �a6o�fi ❑Open water; dredging for basin and/or channel — � ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: c2 1� ' r v n ` 6 ovt I. (i) WIII the facility be open to the general public? ❑Yes ®No m. RECEIVED (i) Will the facility have tie pilings? DCM WILMINGTON, NO ❑Yes IANo (ii) It yes number of tie pilings? OCT 28 2016 0" I DOCKING FAcuryAwARINA OPERATIONS This section not applicable a. Check each of the following sanitary facilities that will be Included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: _; Location: AIM ❑ Showers ❑ Boatholding tank pumpout; Give type and location: RECEIVED b. Describe treatment type and disposal location for all sanitary wastewater. N O V 10 2016 c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (1) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake' signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? RECEIVED [)CM WILMIINGTON, NO I. If this project is an expansion of an existing marina, what types of services are currently provided? O C T 2.8 ZO 16 RECEIVED V' - m. Is the marina/docking facility proposed within a primary or secondary nursery area? N O V 10 2016 ❑Yes ❑No n. Is the mai inaldocking facility proposed within or adjacent to any shellfish harvesting area? DC M _ M H D CITY ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (0), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected, ❑CW — ❑SAV ❑SB — OWL _ ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) a. (i) Is the boathouse structure(s). ❑Commercial ❑Public/Government ❑Private/Community (ill Number _ (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. section not applicable 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) This section not applicable a. (i) Number _ (it) Length (iii) Width 5. BREAKWATER (e.g., wood, sheelpile, etc.) a. Length c. Maximum distance beyond NHW. NWL or wetlands section not applicable b. Average distance from NHW, NWL, or wetlands 6 MOORING PILINGS and BUOYS This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. u. ivumoer d. Description of buoy (color, inscription, size, anchor, etc.) RECEIVED [)CM WILMINGTON, NO e. Arc of the swing - OCT 28 2016 M 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. rlor_�� - IS rjD�th - 15 ` rlt.r Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body _I)I(�9' e. (i) Will navigational aids be required as a result of the project? []Yes Wo ❑NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER a. Give complete description: / Pr i dale 5in11� - I Arni rtzr n�i% , Date ()a , t F m I"r Pr Project Name is p n Applicant Name (Ot— Applicant Signature Dd. Water depth at waterward end of structure at NLW or NWL a' DECEIVED NOV 10 2016 DCM- MHD CITY ❑ This section not applicable '•D 1/1G�J�G oZ. �7 -�f lirir6k; r� 1—fal DCM RECEIVEDILTN, NO OCT 28 2016 W_— RECEIVED Project Narrative NOV 10 2016 DCM- MHD CITY The Oakley Family Pier project will consist of construction of a private single-family dock. Included in the project will be a 8 x 20 floating dock, (2) 13 x 13 boat lifts, 1 jet ski port and 1 jet ski lift. There will be a 20 x 20 roof over the platform, and a 6 x 110' walkway leading from the yard to the end of the pier. The structure will be a strictly residential use docking facility, allowing the homeowner full use of their waterfront property, as well as access to the local waters. RECEIVED DCM WILMINGTON, NO OCT 2 8 2016 RECOVED NOV 10 2016 DCM- MHD CITY W \ N O AIfon �1 rt^ rK j wioa aoo 9 , n A ^ s a L 3 O 0 RECEIVED DCM WILMINGTON, NC OCT 28 2016 K3 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management eeverly Eaves Perdue, Ciovemor James H. Gregson, Director Dee Freeman, Secretary Date 4 l (I Name of Property (honer Applying for Permit: Mailing Address: RECEIVED NOV 10 2016 DCM- MHD CITY I certify that 1 have authorized (agent) 0 "�- `b0L 'M'�h% to act on my behalf, for the purpose of applying for and obtaining all LAMA Permits necessary to r . install or construct (activity) ()oCY.' at (my property laeated01) 1� L1C':,� 1, l.��L I�i Nr'� 1 S Pv N C This certification is valid thru (date) 461L Date 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 V FAX: 252-247-33301 Intemet www.necoasialmanagement.net An Equal Oppoounny I Aoumattve Aaiun Emgoyer - W%Hecyaeo t 10%Pos1 Consumer Paper DCM WECVED ILMINGTON, NC J 11, ■ Complete Items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to. 1-$%Af- P Yl Ar -.. t/� yos1 „Fr n2 as-1K3 III IN I111111111 9590 94,02 2145 6193 49M 78 7015 1730 0002 1609 1788 PS Form 3811, July 2015 PSN 7530-02-000-9053 ❑ Agent X Q.. __.._I5 Addressee B. Aeceived by (Printed Nan 6tJ^ C. Date of Delivery D. Is deliverryyarok1?4 13 If YRM�Lw vMe/�y 1317f. OCT 2 8 2016 3. Service Type ElPriority Mail Express® ❑ Adult Signature-, ClAdult Slglyture ResMcted Delivery ❑ Registered MaflTM p Repreteretl Mail Restrlctetl �CerNfied'M611® caury D Certified Mail Restricted Delivery ❑ Return Recelptfor ❑ Collect on Delivery Merchandise ❑ Collect on Delivery Restricted Delivery ❑ Signature Confirmetion- IlnsuradMai ❑ SignatureCongonetlon I Insured Mail Restricted Delivery Restricted Delivery Domestic Return Receipt ■ Complete items 1, 2, and 3. IN Print your name and address on the reverse so that we can return the card to you. A. Signat ❑ Agent ❑ Addra B. Received byplri Marne) C C. Date of Deli I t) - 17 _ ( ■ Attach this card to the back of the maliplece, or on the front if space permits. 1. Article Addressed to: Mr'lb,1r Jehns 91z '!ls Covr- IVL isWo9 D. Is delivery I[}arn tiY 1 OCT 28 2016 item 1? ❑ Yea ❑ No NIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII3 Nice 0 Priority Mail Exprw* ❑ Adult SignaNreeRestricted Delivery oRgistV Mal Restricted 9590 9402 2145 6193 4363 61 �f certified Mai'® lMlrvery Cerllfled Mall Restricted Delivery ❑ Return Receipt for ❑ Collect on Delivery Memir ise 2. Article Number (transfer tom service label) ❑ Collect on Delivery Restricted Delivery ❑ Signature Confrmatlonne ^ Insured Mall ❑ Signature Confinntion 7 015 1730 0002 1609 1801 inured Mail Restricted Delivery Restricted Delivery (ov�r$500) PS Form 3811, July 2015 PSN 7530.02-00D-9053 Domestic Return Receipt RECEIVED NOV 10 2016 DCM- MHD CITY State of North Caroline I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 29405 910-796-7215 PAT MCCRORY GoMor a DONALD R. VAN DER VAART Swmwv BRAXTON DAVIS Coastal Management Dbenor ENVIRONMENTAL QUALITY November 4, 2016 Allied Marine Contractors, LLC c/o Hal Fogleman 92 Harold Court Hampstead, NC 28443 Dear Mr. Oakley: The Division of Coastal Management hereby acknowledges that on October 28, 2016, we received your completed application requesting State approval for the development of property located at 213 Pelican Walk, in Hampstead, Pender County. The projected deadline for making a decision on your permit application is January 11, 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter w111 be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from October 28, 2016, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS I I3A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewingagencies. Sincerely, RECEIVED NOV 10 2016 n D r Field Representative DCM- MHD CITY cc: MHC file; WiRO file Robb Mairs, DWR; Liz Hair, USACE Thomas Oakley, applicant Star ofNorth Carolina I Environmental Quality I CowW Management 127 Cardinal Drive Est, Wilmington, NC 28405 919 796 7215 !IL DECEIVED NOV 10 2016 [)CM- MHD CITY facili in Ha N(1'1'I(01$1's AMA PERMIT APPLIED FOR �s -i V14 aujull APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: rhnmas A Janice Oakley NC Div. of Coastal Management 22 Lowpr Road Paradise Point 127 Cardinal Dr. Extension Laks%yHle, Po 1R43R Wilmington, NC 28405 Brooks Surgan, Field Representative 910-796-727 Agent: Hal Fogleman (910) 367-2159 Coastal Management ENVIRONMENTAL QUALITY November 9, 2016 Advertising@stamewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington, North Carolina 28402 RECEIVED NOV 10 2016 DCM- MHD CITY Re: Major Public Notice for Thomas Oakley/ Pender County PAT MCCRORY Governor DONALD R. VAN DER VAART Secretory BRAXTON DAVIS Director Kyle & Heather: Please publish the attached Notice in the Friday, November 11, 2016 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Shaun Simpson at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington, NC 28405, 910-796-7226. Paying by credit card to the attention of Tanya Wright, (Ref acct # 796-7215). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Wilmington office. cc: Sincerely, J�4� � 'A-L� Shaun K. Simpson Permitting Support & Customer Assistance Heather Coats - WiRO Doug Huggett - MHC Liz Hair - USACE Robb Mairs - DWR Sarah Young - DCM State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext., Wilmington, NC 28405 910-796-7215 t NOTICE OF FILING OF RECEIVED APPLICATION FOR CAMA MAJOR NOV 10 2016 DEVELOPMENT PERMIT DCM- MHD CITY The Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that the following application was submitted for a development permit in an Area of Environmental Concern as designated under the CAMA: On October 28, 2016, Thomas Oakley proposed to construct a private docking facility at 213 Pelican Walk., adjacent to the AIWW, in Hampstead, Pender County. A copy of the application can be examined or copied at the office of Jason Dail, N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910-796-7221) during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557-3421, prior to December 2, 2016 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. State of North Carolina I Environmental Quality I Comm] Management 127 Cardinal Drive Eut., Wilmington, NC 29405 910-796-7215 azi Excise Tax IF Tax Map 10 If BK 4610 PG 1058 - 1059 (2) DOC* 20004552 This Document eRecorded: 11/16/2015 08:12:59 AM Fee: $26.00 DocType: DEED Tax: $650.00 Pender County, North Carolina Sharon Lear Willoughby, Register of Deeds Prepared by Parcel ID#4214-80-5226-D000 Melissa Gott BRIEF DESCRIPTION FOR INDEX —LOT 5 'EL1CAN WALK STATE OF NORTH CAROLINA COUNTY OF PENDER DATE 9 November 2015 RECEIVED NOV 10 2016 DCM- MHD CITY :ssa Gott, The Law Group GENERAL WARRANTY DEED and MEMORANDUM OF TRUST fCharloo David Atkinson, as Trustee I Thomas L. Oakley and wife, .ozdinq ;.o t.hr, corms nt "Charles David Janice 9. Oakley Atkinson Revocable Trust dated June 19, 2014" an unrecorded trust agreement i Mailing Address: �b 1 tYf7�>c1 NC �b4�3 -...---..._..._"Grantor" — ............._- Grantee" _. the fhe include the masculine as well as the feminine WITNESSETH FOR VALUABLE CONSIDERATION RECEIVED. receipt of which is hereby acknowledged. the GRANTOR hereby has bargained sold and conveyed in fee simple unto the GRANTEE all that certain lot or parcel of land the City of Hampstead. Pender County more particularly described as follows. RECEIVED [THIS PORTION OF THE PAGE INTENTIONALLY LEFT BLANK] OCM WILMINGTON, NO OCT 28 2016 submitted electronically by "The Law Group" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Ponder County Register of Deeds. NC Division of Coastal Management Major Permit Application Computer Sheet AEC: AIWW Ftla 8250 #503� CDAITS MHC cc Applicant: Thomas & Janice Oakley Agent/Contractor: Allied Marine Contractors, LLC Project Site County: Ponder Staff: Jason Dail District: Wilmington Project Name: Oakley Family Pier Rover File: We River Basin: Cape Fear Initial date of application submittal: 10-28-16 KLIULIVED Date application "received as complete" in the Field office: IUV 1 V (Ulu SITE DESCRIPTIONIPERMIT INFORMATION 19 1 ORW: Yes JMNo PNA: []Yes RNo Photos Taken: Yes Nor Setback Required (riparian): Yes o Critical Habitat: Yes XrNo ❑Not Sure 15 foot waiver obtained: ❑Yes kNo Hazard tification Returned: ❑Yes Q No SAV: []Yes El No kNot Sure Shell Bottom: ❑Yes kNo ❑ Not Temporary Impacts: ❑Yes o Sure Sandbags: Yes No ❑ Not Sure Did the land use cl ssification come from Mitigatio#jRequired (optional): No county LLIP: Wyes ❑No []Yes j Moratorium Conditions: EnvironMgptal Assessment Done: ❑Yes to []NA L ngth o f Shoreline: ❑Yes *No ❑NA FT S sh Area Designation: Project Description: (code) Development Area: (code) Op e r- Closed < CI, Z ONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) I ❑ Swamp Waters (SW) 1#igh Quality Waters (HQW) El Outstanding Resource Waters (ORW) WETLANDSIMPACTED ❑ (404) Corp. of Engineers (Jurisdictional El (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicornia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina alterniflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus ❑ (TY) Cattail (Typha sp.) spicata) sp J ❑ (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina roemedanus) patens) APPLICATION FEE No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 T7 III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 LJ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major LJ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 El Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - ❑ II. Public or commercial/no dredge $100 and/or fill - $400 I. Private no dredge and/or fill - $250 ❑ III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs DWQ agreement - $400 Oakley Family Pier Date: 10-28-16 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet. TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One n New Work Replace L� I/II'f Maint ❑ ❑ Y [jIN jj NewWorkf5 Replace Maint ❑ ❑ Y ON c 5 New WorkofV Replace / Maint ❑ ❑ Y [31N (% / New W04 Maint ❑ Replaced ❑ Y IJ N L1� D 017 44" New Wo Maint ❑ Replace ❑ Y 1 New Work Maint ❑ Replac—e,! ❑ Y 2 6 � New Work El Replace, Maint ❑ ❑ ! Y ury New Work ❑ Replace Maint ❑ ❑ Y ❑ N Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration and/or restoration or and/or temp restoration or temp impact tempim a impact amount temp impacts amount) � �9 IVDredge ❑ Fill ❑ Both ❑ Other Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ 919-733-2293 :: 1-888.4RCOAST :: www_ncco_astal_manaaemenl net revised: 10/12/06 MAJOR PERMIT FEE SCHEDULE Q� Thomas & Janice Oakley/$250, CK #5034/Pender Co DCM % DWQ % Development Ta Fee 14300160143510009316256253 2430016024351000952341 I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% $250 0% $0 II. Public or commercial development that does not involve the filling or excavation of any wetlands or open water areas: $400 100% $400 0% (SO) III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C, or D below applies: III(A). Private, non-commercial development, if General Water Quality Certification No. 3900 See attached can be applied: $250 100% $250 0% $0 III(B). Public or commercial development, if General Water Quality Certification No. 3900 See attached can be applied: $400 100% $400 0% $0 III(C). If General Water Quality Certification No. 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 1 60% $240 40% $160 III(D). If General Water Quality Certification No. 3900 see attached cannot be applied: $400 60% $240 40% $160 IV. Development that involves the filling and/or excavation of more than one acre of wetlands and/or open water areas: $475 60% $285 40% $190 RECEIVED NOV 10 2016 DCM- MHD CITY DENR LAMA Dalh, Check Log for WIRO Date Recei Date Deposl Check F m acre Name of Permit Holder Ventlof Check NumW Check amount Permh NumbedCommeats Recei t or ReNu ealhxatatl 1028201fi. 'Allied Manm Contractors LLC TMmas & Janice Oakley First Citizens Bank wu 250.00 mafee 213 Pelican Walk Ham steatl Pentler JD at. 2]9]D W D W 7 p Lll 0 2 W/ � o e 1.1®