HomeMy WebLinkAbout77-17 NC Seafood Industrial Park Authorityrermi�Class NEW Permit Number 77-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit Q for X Major Development in an Area of Environmental Concern E C E I V E D pursuant to NCGS 113A-118 JUN 2 9 2017 Excavation and/or filling pursuant to NCGS 113-229 DCM- MHD CI' Issued to NC Seafood Industrial Park Authority, PO Box 549, Wanchese, NC 27981 Authorizing development in Dare Countyat _adi. to Broad Creek off Roanoke Sound at 615 Harbor Rd., Lot 4, Wanchese, as requested in the permittee's application dated 2/6/17 (MP-1) and 4/7/17 (MP-4), including attached workWan drawings (2). both dated 1/19/17. This permit, issued on June 21, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )r mese terms may De suoject to lines, imprisonment or civil action; or may cause the permit to be null and void. Shellfish Lease Demonstration 1) The shellfish lease demonstration originally proposed for this project and indicated on the attached application and workplans shall require a shellfish lease from the Division of Marine Fisheries in lieu of permit authorization from the Division of Coastal Management. Any and all reference to the originally proposed shellfish lease demonstration in the attached permit application or workplan drawings is hereby considered null and void. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxtofi C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. v Signatureof Permittee NC Seafood Industrial Park Authority Permit No. 77 17 Page 2 of 3 ADDITIONAL CONDITIONS Dockine Facility 2) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 3) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 1 formalized boat slip. `z 9 2011 Shoreline Stabilization nnrr D C'TY 6) The breakwater shall be positioned no more than 5 feet waterward of the wategvVedge'of existing emergent wetlands at any point along its alignment. 7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized sills. 8) The wooden sill shall be constructed with an equal gap between each sheathing board totaling at least one inch of open area for every linear foot of wooden. The sills shall have at least one, five foot opening at every 100 feet. The sill sections may be staggered and overlap as long as the five-foot separation between sections is maintained. Overlapping sections shall not overlap more than 10 feet. 9) The permitted sills shall be constructed of treated wood, plastic lumber, metal or vinyl sheet piles or other suitable materials approved by Department personnel. 10) Sills shall be marked at 50 foot intervals with yellow reflectors extending at least three feet above normal water level. 11) No backfill of the sill or any other filling of wetlands, estuarine waters, public trust areas or high ground is authorized by this permit. 12) The permittee shall maintain the sills in good condition and in conformance with the terms and conditions of this permit or the remaining sill structure shall be removed within 90 days of notification from the Division of Coastal Management. NC Seafood Industrial Park Authority Permit No. 77-17 Page 3 of 3 ADDITIONAL CONDITIONS General 13) No attempt shall be made by the permittee to prevent the free and full use by the public of all navigable waters adjacent to the authorized work. 14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 15) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 16) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: This permit does not convey any rights, either in real estate or material. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-201700723). NOTE: The N.C. Division of Water Resources has assigned the project DWR Project No. 2017-0485. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVED JUN 2 9 2011 DCM- MHD CITY D9VISIOfN OF -COASTAL MANAGEMENT Applicant: K) L Application Processing Notes QC COO-41AJ Type: (check all that apply) New Major Mod_ Permit # Minor Mod_ Renewal_ Transfer_ Permit Coordinator: W)OO-Q42_ Field Representative Date Time �" Message I [ 1211-1 `7�1i4E W/ �IIOn ( �;..p llc�iGt+vtirt 5, O'cle DCM Coordinator: I Permit #: MAILING DISTRIBUTION SHEET-_.. Permiee: �,� 'ai Pa-L Al'11 �b ?c�,Sy9 h�.� ,t/G 27fvl DCM Field Offices Elizabeth City r (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) josh Peletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Pender) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender) Cultural Resources: Public Water Supply: Marine Fisheries: NC DOT: Shellfish Sanitation: State Property: DEMLR/DWR: Renee Gledhill -Earley Heidi Cox (WIRO) Clif Whitfield (WARO) Shane Staples Curt Weychert David"Harris Shannon Jenkins Tim Walton Karen Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Pender, New Hanover) Chad Coburn — 401 (Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender) Wildlife Resources: LPO: Fax Distribution: Maria Dunn (WARD) Permittee #: Agent# I ,A [A Permit Class' NEW Permit Number 77-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to NC Seafood Industrial Park Authority, PO Box 549, Wanchese, NC 27981 Authorizing development in Dare County at adi. to Broad Creek off Roanoke Sound at 615 Harbor Rd., Lot 4, Wanchese, as requested in the permittee's application dated 2/6/17 (MP-1) and 4/7/17 (MP-4), including attached workplan drawings (2), both dated 1/19/17. This permit, issued on June 21, 2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations; special conditions and notes set forth below. Any violation it mean MORS miay oe suDJect to lines, imprisonment or ctvtt action; or may cause me permit to De nuts ana Shellfish Lease Demonstration 1) The shellfish lease demonstration originally proposed for this project and indicated on the attached application and workplans shall require a shellfish lease from the Division of Marine Fisheries in lieu of permit authorization from the Division of Coastal Management. Any and all reference to the originally proposed shellfish lease demonstration in the attached permit application or workplan drawings is hereby considered null and void. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxt C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature ofPermittee NC Seafood Industrial Park Authority Permit No. 77-17 Page 2 of 3 ADDITIONAL CONDITIONS Docking Facility 2) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on,'in or over Public Trust waters without permit modification. 3) Any portion of the permitted access pier and docking facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 4) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities -At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 5) This permit authorizes a maximum of 1 formalized boat slip. Shoreline Stabilization 6) The breakwater shall be positioned no more than 5 feet waterward of the waterward edge of existing emergent wetlands at any point along its alignment. 7) The permittee is advised that submerged aquatic vegetation (SAV) habitat exists in close proximity to the authorized project. All available precautions shall be utilized to ensure that damage to SAV habitat does not result from the construction and/or operation of the authorized sills. 8) The wooden sill shall be constructed with an equal gap between each sheathing board totaling at least one inch of open area for every linear foot of wooden. The sills shall have at least one, five foot opening at every 100 feet. The sill sections may be staggered and overlap as long as the five-foot separation between sections is maintained. Overlapping sections shall not overlap more than 10 feet. 9) The permitted sills shall be constructed of treated wood, plastic lumber, metal or vinyl sheet piles or other suitable materials approved by Department personnel. 10) Sills shall be marked at 50 foot intervals with yellow reflectors extending at least three feet above . normal water level. 11) No backfill of the sill or any other filling of wetlands, estuarine waters, public trust areas or high ground is authorized by this permit. 12) The permittee shall maintain the sills in good condition and in conformance with the terms and conditions of this permit or the remaining sill structure shall be removed within 90 days of notification from the Division of Coastal Management. 0I I Industrial Park Authority Permit No. 77-17 Page 3 of 3 ADDITIONAL CONDITIONS General No attempt shall be made by the perittee to prevent the free and full use by the public of all navigable waters adjacent to the authorized work. This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. The permittee shall maintain the authorized work in good condition and in conformance with the terns z and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. The permittee and/or his or her contractor shall meet with a representative of the Division prior to proiect initiation. DTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. OTE: This permit does not convey any rights, either in real estate or material. The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-201700723). The N.C. Division of Water Resources has assigned the project DWR Project No. 2017-0485. Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. APR 7 - 2017 DMEC Wanchese Seafood Industrial Park Dock, Living Shoreline and Shellfish Aquaculture Demonstration Dare County, North Carolina Proiect Narrative Applicant: Wanchese Seafood Industrial Park in partnership with The North Carolina Coastal Federation Prepared By: The North Carolina Coastal Foundation 637 Harbor Road Wanchese, NC 27981 and Quible and Associates PO Box 870 Kitty Hawk, NC 27949 RECEIVED January 24, 2017 APR 17 2017 DCM- MHD CITY Lot 4C- Wanchese Seafood Industrial Park Wanchese Seafood Industrial Park CAMA Major- Project Narrative 219/17 Project Introduction The North Carolina Coastal Federation, a non-profit organization that focuses on restoring, educating and advocating for a healthy coast recently moved offices to the Wanchese Seafood industrial Park and has entered a long-term lease agreement with the park for Lot-4C. This lot is adjacent to the shoreline of Broad Creek, NC. The Coastal Federation has partnered with the Industrial Park as well as the engineering firm Quible and Associates to design a dock for access to Broad Creek. In addition, the Coastal Federation has proposed a series of living shoreline sills (or marsh toe sills) that will protect existing coastal marsh from erosion. Living shorelines stabilize estuarine shorelines while maintaining the connectedness of upland and intertidal habitats, thereby preserving natural ecological processes and providing valuable and increasingly scarce estuarine habitat. Finally, the Coastal Federation has partnered with North Carolina Sea Grant to design and permit demonstration oyster aquaculture sites near the dock and living shoreline. There is a growing awareness of oyster aquaculture as an industry in North Carolina but there is dirth of demonstration and extension services offered to perspective aquaculturists. North Carolina Sea Grant has received funding from NOAA to help remedy this by creating four aquaculture demonstration sites along the coast. This site would serve as their northern most site for the state. Project Need The property is under a long-term lease with the Coastal Federation. The Federation is a private non- profit conservation group working to protect and restore coastal water quality and habitats throughout North Carolina coast. The construction of the pier will serve as a research pier and a working pier for shoreline enhancement projects in the region. It is a stated goal of the federation to protect the natural functions of estuarine shorelines and to restore and sustainably manage oysters. This will be an ideal setting for shoreline protection and oyster aquaculture demonstrations. The purpose of the proposed shellfish demonstrations is to provide a site for seeing first hand a variety of shellfish growing techniques. This will be helpful as the aquacufture industry continues to grow and expand in the state. Existing Conditions The site is a 0.65 acre (28,435 sq. ft.) parcel of land located along Harbor Road and owned by the N.C. Seafood Industrial Park Authority (Seafood Park) in Wanchese, Dare County, North Carolina, and on a long term lease with the North Carolina Coastal Federation. The parcel of land (Lot 4C) is located adjacent to the Roanoke Sound (Broad Creek). The upland portion of the property is dominantly covered with maintained grasses with areas of gravel and concrete. Wetlands along the shoreline contain wax myrtle, groundsel bush, black needle rush, smooth cordgrass, giant cordgrass and Phragmites spp. The existing conditions on the lot include a one and a half story frame building, asphalt parking lot, generator and cell tower located on the southern part of the property. The waters off shore where shellfish lease demonstrations and living shoreline demonstrations are proposed are classified as SA- open waters. RECEIVED APR 17 2017 ®CM- MH® CITY Lot 4C- Wanchese Seafood Industrial Park Wanchese Seafood Industrial Park CAMA Major- Project Narrative 2/9/17 Proposed Work -Dock Currently proposed work requiring CAMA permitting includes construction of an 8 ft x 215 linear foot (LF) fixed pier with a 12 ft x 20 ft tee platform on the end. The pier is proposed to begin on Lot 4C, and extend out 215 LF (as shown on the CAMA plan). The proposed pier is to contain a boat slip with a boat lift as shown. Adjacent to the proposed pier there is a proposed 8 ft x 16 ft floating platform for water access and kayak/ paddle -craft launching. Logging mats will be used to cross wetlands for construction of the proposed pier, Proposed Work- Livin¢ Shoreline In addition, along 500 LF of the shoreline the federation proposes to install demonstration living shoreline techniques. Five different shoreline stabilization techniques are proposed and detailed below. The first would be to construct a low -profile sill out of granite rip -rap, the second would be constructed of bagged oyster shells, the third would be a low profile wooden sill and the fourth would be an alternative design of either oyster domes and/or crab pots. Rip -Rap Sill Construction Approximately 100 linear feet of shore -parallel, low profile, rip -rap sill will be constructed no more than 5' from the waterward edge of existing coastal marsh shoreline at the project site. Stone will be composed of NCOOT Class II granite rip -rap, weighing between 25 - 250 ibs and measuring between 9 — 23 inches. Prior to placement of the riprap a geotextile filter fabric will be installed to reduce scouring and uneven settlement. Water depths along the shoreline range from 2.3-3.2'. Initially the crest of the sill may extend 8 —12 inches above the MHW elevation, however, after settlement, it should average approximately 6 inches, giving a maximum height of the sill after settlement to be 3.7'. To allow for fish passage and water circulation a 10' gap between this sill structure and the next will be provided at an interval of 1 every 90-100'. Reflective tape, extending a minimum of 3' above MHW, will be placed along the sill at 50' intervals. Ouster Shell Bag Sill Construction Approximately 100 linear feet of shore -parallel, low profile, oyster shell bag sill will be constructed no more than 5' from the waterward edge of existing coastal marsh shoreline at the project site. Nylon mesh material will be filled with recycled oyster and clam shells to create bags weighing between 15.25 Ibs and measuring approximately 2-3 feet in length and 6-8 inches in diameter. The sill will be constructed so that initially the top of the sill may extend 8 —12 inches above the MHW elevation, however, after settlement, it should average approximately 6 inches. Water depths along the shoreline range from 2.3-3.2'. Maximum height of the sill would be 37. To allow for fish passage and water circulation a 10' gap between this sill structure and the next will be provided at an interval of 1 every 90- 100'. Reflective tape, extending a minimum of 3' above MHW, will be placed along the sill at 50' intervals. See construction drawings for further details. Wooden Low-Proflie Sill Construction Approximately 100 linear feet of a shore -parallel, low -profile, wooden sill will be constructed no more than 5' from the waterward edge of existing coastal marsh shoreline at the project site. The wooden sill will be constructed of treated lumber. Pilings will be driven into the sediment at Ig4d@e1ikA tn® APR 17 2017 DCM- MHD CITY Lot 4C- Wanchese Seafood Industrial Park Wanchese Seafood Industrial Park CAMA Major- Project Narrative 2/9/17 will be spaced at roughly 4' Intervals. The sill will be constructed of wooden planks/boards spaced with a 1 inch gap between the boards. The sill will extend, on average 6-8 inches above MHW. To allow for fish passage and water circulation a 10 foot gap between this sill structure and the next will be provided at an interval of 1 every 90-100'. Reflective tape, extending a minimum of 3' above MHW, will be placed along the sill at 50' intervals. Monitoring and Maintenance As part of the demonstration and research of these techniques, annual monitoring of both the sill and marsh will take place for the first three years. Monitoring will include basic water quality measurements and yearly marsh abundance, diversity and coverage measures. These monitoring results will be made available to any agency wishing a copy. The Coastal Federation is committed to the success of this project and implementation of all phases as funding allows. Proposed Work- OvsterAouaculture Demonstration The North Carolina Sea Grant has secured grant funds from NOAA to implement four oyster aquaculture demonstration leases throughout the state. They have been long time partners with the Coastal Federation in implementing the N,C. Oyster Blueprint for Action- an interagency, long-range plan for restoring and sustainably managing oysters in the state. And have taken the lead in providing extension services to stakeholders interested in pursuing a career in aquaculture. The demonstration site at the Seafood Industrial Park will aid in the expansion and diversification of the NC shellfish aquaculture industry. it is proposed that a 100 ft. x 50 ft. area is designated approximately 30 to 40 feet from the waterward edge of the proposed living shoreline demonstration area. In this 5,000 sq foot demonstration lease four different types of gear would be displayed. Long line cages, floating cages, raised bottom cages with bag Inserts and floating bags would be demonstrated on site. The long term plan for the site is to install nonpermanent structures (anchor screws and PVC pipe risers) for support of various water column culture gear types. In addition, it is planned to install non- permanent bottom culture gear including netting and mesh bags and cages for clam culture. There is no SAV in the proposed area for aquaculture demonstrations. Initially, the following oyster culture gear types are proposed to be deployed: off bottom cages, floating bags, LowProGrol cages, and Oystubeo baskets as part of a long -line culture system. As described in the specifications of the gear, spans or length of rope or line supporting floating or suspended gear will range from 30 to 75'. Anchor screws will be twisted fully into the bottom manually and PVC risers will be jetted in via water pump. For clam culture, deployment of protective netting panels, mesh bags, and mesh cages Is proposed. These gear types will be secured to the bottom with rebar or other staking material. Storm and Hurricane plan The site will be managed according to Coastal Federation and the Industrial Park storm and hurricane policy. If deemed necessary, gear and associated structures will be secured or removed to prevent loss as well as marine debris. RECEIVED APR 17 2017 DCM- MHD CMS DCM MP-1 FEB 14 '"- APPLICATION for DCM Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name N.C. Seafood Industrial Park Authority Project Name (if applicable) LOT 4 - Wanchese Seafood Park Applicant 1: First Name MI Last Name Applicant 2: First Name MI Last Name It additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 549 City Wanchese State N.C. ZIP 27981 Country USA Phone No. 252-473-5867 ext. FAX No. 252-473.6139 Street Address (rf different from above) 615 HARBOR ROAD city Wanchese State INC ZIP 27981- Email BPEELE@NCCOMMERCE.COM 2. Agent/Contractor Information Business Name Quible & Associates, P.C. Agent' Contractor 1: First Name MI Last Name Brian D Rubino Agent/ Contractor 2: First Name MI Last Name Meiling Address PO Box City state 870 Kitty Hawk NC ZIP Phone No. 1 Phone No. 2 27949 252.261.3300 ext. ext. FAX No. Contractor # Street Address (if different from above) City State ZIP 8466 Caratoke Highway Suite 400 Powells Point NC 27966 - Email brubino®quible.com RECEIVED <Form continues on back> APR 17 2017 DCM- M 252.808.2808 :: i.888.4RCOAST :: www.nccoastaimanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # DARE HARBOR ROAD 1140 Subdivision Name City State Zip WANCHESE SEAFOOD INDUSTRIAL PARK WANCHESE N.C. 27981 - Phone No. Lot No.(s) (rf many, attach additional page with list) 252 - 473 - 5867 ext. Lot 4, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project PASQUOTANK BROAD CREEK c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown ROANOKE SOUND e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes [:]No work falls within. Wanchese Industrial Seafood Park (NC SIPA) 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) +/-1,710 LF 28,435 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 13,267 sq. ft., NWL (normal water level) (if many lot sizes, please attach additional page with a list) 5' ❑NHWor®NWL e. Vegetation on tract Uplands on site are mostly maintained grasses with areas of gravel and concrete. Wetlands along the shoreline contain Phragmites, wax myrtle, groundsel bush, black needle rush, smooth cordgrass, and giant cordgrass. f. Man-made features and uses now on tract The North Carolina Coastal Federation (NCCF) holds a long term lease in the office building on -site, which includes parking, and a radio/cell tower occupies the tract as well. g. Identify and describe the existing land uses adiacent to the proposed project site. BOAT BUILDING OPERATION & COMMERCIAL FISHING OPERATIONS h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? WANCHESE SEAFOOD INDUSTRIAL PARK ZONE (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does @ involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> APR 17 2017 MHD CITY 252.808.2808 .. 1-888.4111COAST .. www. n c coastal man agement.net , Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (II) Are there coastal wetlands on the site? ®Yes []No (III) If yes to either (1) or (11) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater is treated in an approved on -site wastewater treatment systems consisting of septic tanks and drain fields. o. Describe existing drinking water supply source. Drinking water is provided by Dare County Water Distribution System. p. Describe existing stone water management or treatment systems. The Wanchese Seafood Industrial Park utilizes an exisiting and permitted stormwater treatment system that combines an engineered system of swales and infiltration basins. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government SPrivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Property is under a long-term lease with North Carolina Coastal Federation the Federation is a private non-profit conservation group working to protect and restore coastal water quality and habitats throughout North Carolina coast. The construction of the pier should serve as a research pier to educate visitors on protecting and restoring the North Carolina Coast. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it Is to be stored. Barge and excavator with vibratory hammer; equipment to be stored onsite. d. List all development activities you propose. Construction of an 8' wide by 215' long fixed pier with a tee head and boat lift, and a 8x16' floating platform. In addition, shoreline stabilization consisting of five (5) 100 LF sills made of bagged oyster shells, rock, timber, etc. All proposed activities are shown on the enclosed site plan. e. Are the proposed activities maintenance of an existing project, new work, or both? NEW WORK f. What is the approximate total disturbed land area resulting from the proposed project? NA ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes SNo ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The Wanchese Seafood Industrial Park manages stormwater through a system of permitted and approved swales and stormwater infiltration basins. i. Will wastewater or stormwater be discharged into a wetland? []Yes SNo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No JNA j. Is there any mitigation proposed? ❑Yes ❑ If yes, attach a mitigation proposal. Arm 1 1 LUI/ <Form continues on back> DCM- MHD CITY 252.808-2808 .. 1-888-4RCOAST .. www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (n are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly Indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other Instrument under which the applicant claims titre to the affected properties. 6. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mall. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name WILLIE DANIELS, JR. Phone No. 252-473-5729 Address 3652 MILL LANDING ROAD, WANCHESE, N.C. 27981 Name ETHERIDGE FAMILY PROPERTIES LLC Phone No. 252-473-2217 Address P.O.BOX 69, WANCHESE, N.C. 27981 Name TILLET GIRLS LLC Phone No. Address 375 The Lane, Wanchese, NC 27981 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittes, and issuing dates. SEE ATTACHED LIST h. Signed consultant or agent authorization form, If applicable. I. Wetland delineation, if necessary. J. A signed AEC hazard notice for projects in oceanfront and Inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 2/6/17 Print Name BOB PEELE %����,� 6\ c 2rASs 0-- tp. C . Signature D IOW1Y A,* 762'Frv—+ Please indicate application attachments pertaining to your proposed project. Received ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development RECEIVED FEB 14 >„! ®DCM MP-4 Structures Information APR 17 2017 DCM-EC nCM_ MHD CITY 252-808.2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net Form DCM MP-4 t n 'i - 7017 STRUCTURES DCM-EC (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental Information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (1) Is the docking facility/marina: []Commercial []Public/Government ®Privata/Conmunity c. (1) Dock(s) and/or piers) (11) Number 1 (fit) Length 25 (iv) Width W (v) Floating []Yes ®No e. (1) Are Pladorn t Included? ®Yes []No 11 yes: (II) Number a (tii) Length 1 0 20'. 1 @ 16' IN) Width 1 ® 12'. 1 ® 8' (v) Floating ®Yes ®No Note: Roofed areas are catculaled from dripline dimensions. g. (I) Number of slips proposed 1 (if) Number of slips existing 0 I. Check the proposed type of siting ❑ Land cut and access channel ❑Open water, dredging for basin and/or channel ®Open water; no dredging required []Other; please describe: k. Typical boat length: 2Y m. (I) Will the facility have Ile pilings? ❑Yes ®No (it) 11 yes number of de pilings? ❑This section not applicab)e b. (1) Will the facility be open to the general public? ❑Ves ®No d. (1) Are Flnger Plers Included? ❑Yes ®No It yes: (II) Number (III) Length (iv) Width _ (v) Floating ❑Yes []NO f. (1) Are Boatlifts included? ®Yes []No If yes: (11) Number 1 (III) Length ii IN) Width 13' h. Check all the types of services to be provided. ❑ Full service, Including travel lift and/or fall, repair of maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: _ ❑ Dry storage: number of boats: _ ❑ Boat ramp(s); number of boat ramps: ® other, please describe: One slip on elevated boat lift ). Describe the typical boats to be served (e.g., open runabout, charter boats, sell boats, mixed types). Open runabout I. (1) Will the facility be open to the gerREWE I V E D ❑Vas ®No APR 17 ton DCM- MHD CITY 252-808-2808:: 11-888.4RCOAST :: www.neeoastalmanaaement.net revised:'f2127(O6 Form DCM MP-4 (structures, page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ❑ This section not applicable a. Check each of the following sanitary, facilities that will be Included In the proposed project. ® Office Toilets ❑ Toilets for patrons; Number: _; Location: ❑ Showers ❑ Boatholding tank pumpoul; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. All sanitary wastewater is disposed of using existing and permitted on -site septic tanks and drain fields. c. Describe the disposal of solid waste, fish offal and trash. All solid waste will be disposed of using trash cans and dumpsters. d. How will overboard discharge of sewage Irom boats be controlled? There is no overboard sewage dumping from vessels allowed. e. 0) Give the location and number of 'No Sewage Discharge' signs proposed. N/A (0) Give the location and number of'Purnpout Available' signs proposed. N/A f. Describe the special design, If applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. WA g. Where will residue from vessel maintenance be disposed of? No vessel maintenance will be conducted on site. In Give the number of channel markers and 'No Wake' signs proposed. WA - Exisfina federal channel markers to be observed 1. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. N/A j. What will be the marina policy on overnight and live -aboard dockage? No live -aboard or overnight dockage is allowed. It, Describe design measures that promote boat basin gushing? N/a - open water I. If this project is an expansion of an existing marina, what types of services are currently provided? N/a RECEIVED APR 17 2011 m. Is the madna/docking facility proposed within a primary or secondary nursery area? ❑Yes MNe DCM- MHD CITY 252-80&2808 a 1-888.4RCOAST :: www,nccoastaLrnanagement t revised: 12/2VOS Form DCM MP-4 (Stnac►ures, Page 3 of 4) n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? ®Yes ONO o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegeta8on (SAV), shell bottom (SB), or other wetlands (WL)? It any boxes are checked, provide the number of square feet affected. ®CW Approx. 1.384 SF of shading by the proposed pier. ❑SAV ❑SB OWL _ ❑None p. Is the proposed madnaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ONO If yes, give the name and address of the leasehdder(s), and give the proximity to the lease. N/A 3. BOATHOUSE (including covered lifts) ® This section not applicable a. (1) Is the boathouse structure(s): ❑Commercial ❑Public/Govenvnent ❑Private/Community (ii) Number (lil) Length (Iv) Width _ Nola: Roofed areas are calculated from ddpllne dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill) ®This section not applicable a. (1) Number (il) Length (III) Width .� 5. BREAKWATER (ag., wood, sheefptle, etc.) ❑This section not applicable a. Length (S1 100 LF sills b. Average distance from NHW. NWL, or wetlands 500 LF total 55 it o. Maximum distance beyond NHW, NWL or wetlands u 16. MOORING PILINGS and BUOYS 0This section not applicable a. Is the structure(s): ❑Commercial ❑PubkdGovemment ❑Pnvate/Community c. Distance to be placed beyond shoreline „_ Note: This should be measured from marsh edge, If present. e. Are of the swing 7. GENERAL b. Number d. Description of buoy (color, Inscnption, size, anchor, etc.) RECMEO APR 17 Z017 DCM- MHD CITY 252-808-2801 :: 1-8884RCOAST :: www nccoastalmanagoment.nat revised: 12127106 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines Approx. 484 LF to the Tillet Girls, LLC property line to the north and approx. 324 LF to the adjacent lease parcel line Within the industrial park to the south. There are no established adjacent riparian property lines in the Wanchese Seafood Park Harbor, only lease parcel lines. Note: For buoy or mooring plBng, use arc of swing lnchictlng length of vessel. c. Width of water body 2,237 tt e. (I) WIN navigational alds be required as a result of the project? ❑Yes ®No ❑NA (II) If yes, explain what type and how they will be Implemented. b, Proximity of suucture(s) to adjacent docking facilities. 1,248- d. Water depth at watorward end of structure at NLW or NWIL 18. OTHER ❑This section not appf(cable I a. Give complete description: A 50It x 100 it aclaucuiture demonstration area is proposed to be located offshore of the site. /Z/77- Dale t t �3 L)a vv- ? L696l.. -Paf � Project Name NC- 504.1 Tea .1 P�ti qy�d�: f�t ANIL' _ Appii e A � B•,% Aber. "'i ¢ A3SaG. pl Signature APR 17 2017 DCM- MHD CIT' 262.808.2808 n i-888.4RCOAST:: www.nccoastalmonagement.net revised: 12f27106 mVo1N�w.1\Dm.l�a•\P�m.1-xa-wL.ew yVnlr v:v .ui smwPm P w WWW u u PR pjN�9P pY 1 � 8'BwE^ L �N , � I At ,\ �9p k� k N a !f.h m� R Li ji lk lei Ex \\ i Y -oA l; 4"ittECEIVED 17 2017 DC _ .� PROJECT CDPYRIONIO." ro DD, 'o a AssoMM. P.0. AOE E - NORTH CAROLIIU COASTAL FEDERATION PI[G[ TNT$ DaCUNEN, I0 TNE PROPERTY OF O uible ' 101 wlsI k uS50 m PC. DRAB, BE KIE. OE 1M5 DECWE. I5 PARCEL PR.,.,ED. & AEECICiat n[E/mN v B's B.C.O., I5 Nor BONED .0 WANCMW EBAIOM RMUS RUL PARK z EG P.C. 5V 1) BY A JUNSED PROFESSOR& l", (� ENGINEERIxC LONSOLiING PUNNING CHECKED BY THEN MIS DOCUMENT SMALL RE WANCHESE DARE COUNTY ENVIRONNENTAE SQENtEs • SURVEYING CON!D RED PRELI lw , NOT A NI CAROUN4 NO Ll44 :t. C-0208 FOR MITI DOCUMENT .w0 SMAL NOT BE USED FOR CONMICTON. PO On— 870. Nwk. NC 27949 DATE RECO�OTION YEE OR Wq 0 IW 1. (2s2) aI-eTa 1/16/17 AYµ UNLE1. .M OlNmcsE GRAPHIC SCKE n' ^'(' [-Nen:.wmlssni.Yr,ve.�.ulu..mm EEO CD 10 Received Dare County/North Carolina Coastal Federation SAV Survey Lot 4 - Wanchese Industrial Seafood Park FEE 14 f f;; Quible & Associates, P.C. August 2016 I. INTRODUCTION DCM-EC The purpose of this document is for Quible & Associates, P.C. (Quible) to provide state and federal regulatory agencies with a review of submerged aquatic vegetation (SAV) in Broad Creek, adjacent to Lot 4 in the Wanchese Industrial Seafood Park (the Site). Proposed future work includes construction of a pier with tee head, boat lift, and floating platform. The August 5'", 2016 SAV survey was conducted to examine the substrate for the presence of SAV, and to document the conditions that may relate to the SAV habitat. Broad Creek is located within the Roanoke Sound which is characterized as a low -salinity, medium -high turbidity shallow water environment. Consequently, the SAV communities are expected to be dominated by species that are adapted to low salinities in shallow water. II. METHODOLOGY The SAV analysis took place on August 9, 2016 by qualified environmental scientists from Quible with guidance from NCCF representatives who had already performed a cursory analysis. The accompanying base map includes 2012 aerial photography provided by Dare County with the study area identified with sampling stations and collected water depths. Water depth surveying was conducted using survey -grade GPS and plotted relative to normal water level (NW L). A bathymetric map was generated using Autocad to clearly identify existing conditions. The method of sampling consisted of a cursory analysis of SAV throughout the Site followed by a detailed survey by performing a series of transects to fully understand the extent and coverage of SAV. At each sampling station, a 1.0 meter x 1.0 meter PVC quadrant (with holes so that it would sink) was haphazardly tossed' into the water. At each station water depths, substrate types, and SAV identification was recorded. Where any live SAV was encountered, coverage estimates were made based on percent cover standards'. In addition, the substrate between sampling stations was observed for the presence of SAV, RECEIVED APR 17 2017 DCM- MHD CITY ' Haphazardly tossed is a term used to indicate that the quadrat was not systematically placed in a location that was observed prior to the quadrat lying on the substrate. ' A resource on hand during the investigation was percent cover standards (photographs) that were taken from httpJ/seagrasswatch.org/home.html Dare County/North Carolina Coastal Federation SAV Survey Lot 4 - Wanchese Industrial Seafood Park Quible & Associates, P.C. August 2016 III. FINDINGS The attached table summarizes coverage estimates at each sampling station. The first column is the sampling station number and the second column is the survey GPS waypoint (205-313). The third and fourth columns are that latitudinal and longitudinal coordinates. The fifth column is the water depth (based on NWQ. The sixth column is the mean cover estimate per station, and the seventh column is the bottom type/notes. The substrate types encountered varied between peat and sand. In general, there is a broad peat bank that extends waterward from the edge of the coastal marsh shoreline. In some areas, there is a layer of sand (of varying thicknesses) overlying the peat. There were scattered oyster shells in some areas. This area has only a minimal amount of SAV present. This has been our experience in Broad Creek in the past for nearby project sites. Some of the limiting factors for making this a prime habitat for SAV include the extensive peat as well as turbid, high-energy waters. The only species of SAV encountered was Ruppia maritima (Widgeon Grass). Widgeon grass was found in only five of the 108 sampling stations which are plotted on the CAMA base map. These areas consisted of patchy SAV (coverages and bottom type are indicated in Table 1). It should also be noted that there were ripped up accumulations of Widgeon grass that appear to have drifted into the area, especially inside the existing gut at the Site. V. Aquatic Weeds: A Pocket Identification Guide for the Carolinas, 2012, NC State University Crop Science. Bay Grass Identification Key, 2008, http://www.dnr.state.md.us/bav/SAV/kev/, Maryland Department of Natural Resources. Caldwell, W.S., 2001, Hydrologic and Salinity Characteristics of Currituck Sound and Selected Tributaries in North Carolina and Virginia, 1998-99, U.S. Geological Survey, Water Resources Investigations Report 01-4097, 36 p. RECEIVEC' GMCO's Chartbook of North Carolina, 2000, GMCO's Maps and Charts, pg.119. APR 17 2017 DCM- MHD CI T tr Dare County/North Carolina Coastal Federation SAV Survey Lot 4 — Wanchese Industrial Seafood Park Quible & Associates, P.C. August 2016 Seagrass-Watch Percent Cover Standards, 2008, httP:Hseagrasswatch.orcl. RECEIVED APR 17 2017 DCM- MHD CITY TABLE 1- DARE COUTNY, WANCHESE INDUSTRIAL PARK, NCCF BUILDING SAV SAMPLING STATIONS (LOCATIONS, WATER DEPTHS, SAV COVERAGE, and BOTTOM TYPE) Sample Station Longitude Latitude Water Depth in feet (NWL) Mean SAV Cover per Station (%)" Bottom Type/Notes 1 205 W075.371894 N035.505372 -2.18' 0 Peat 2 206 W075.371885 N035.505383 -3.11' 0 Peat 3 207 W075.371874 N035.505396 -3.92' 0 Peat 4 208 W075.371860 N035.505408 -3.97' 0 Peat 5 209 W075.371843 N035.505428 -4.62' 0 Peat 6 210 W075.371824 N035.505445 -4.64' 0 Sandy Peat 7 211 W075.371806 N035.505457 -5.03' 0 Sandy Peat 8 212 W075.371772 N035.505428 -5.00' 0 Sandy Peat 9 213 W075.371786 N035.505407 -4.46' 0 Peat 10 214 W075.371796 N035.505392 -4.59' 0 Peat, few oyster shells 11 215 W075.371812 N035.505378 -3.87' 0 Peat 12 216 W075.371827 N035.505366 -4.20' 0 Peat 13 217 W075.371838 N035.505350 -1.87' 0 Peat 14 218 W075.371804 N035.505331 -2.60' 0 Peat 15 219 W075.371790 N035.505340 -3.54' 0 Peat 16 220 W075.371776 N035.505356 -4.13' 0 Peat 17 221 W075.371762 N035.505367 -4.37' 0 Peat, trace amount of sand 18 222 W075.371747 N035.505377 -4.67' 0 Peat, trace amount of sand 19 223 W075.371733 N035.505387 -5.01' 0 Sandy Peat, oyster shells 20 224 W075.371717 N035.505399 -5.20' 0 Sandy Peat, ripped up SAV 21 225 W075.371701 N035.505412 -5.13' 0 Fine Sand, some peat 22 226 W075.371668 N035.505380 -5.08, 0 Peaty Sand 23 227 W075.371679 N035.505358 -4.63' 0 Sandy Peat 24 228 W075.371694 N035.505340 -4.51' 0 Sandy Peat 25 229 W075.371706 N035.505329 -4.08' 0 Peat 26 230 W075.371722 N035.505317 -4.00' 0 Peat 27 231 W075.371734 N035.505307 -3.72' 0 Peat 28 232 W075.371748 N035.505296 -3.21' 0 Peat 29 233 W075.371759 N035.505289 -3.20' 0 Sandy Peat with shell fra . 30 234 W075.371718 N035.505267 -2.72' 0 Peat 31 235 W075.371700 N035.505279 -3.36' 0 Peat 32 236 W075.371693 N035.505291 -3.60' 0 Peat 33 237 W075.371681 N035.505301 -3.91' 0 Peat 34 238 W075.371668 N035.505312 -4.06' 0 Peat 35 239 W075.371658 N035.505325 -4.44' 0 Sandy Peat 36 240 W075.371644 N035.505342 -4.81' 0 Sandy Peat 37 241 W075.371631 N035.505356 -4.91' 0 Sandy Peat 38 242 W075.371615 N035.505371 -5.33' 0 Sandy Peat 39 243 W075.371575 N035.505329 -5.12' 0 Sandy Peat, oyster shells 40 244 W075.371590 N035.505311 -4.93' 0 Sandy Peat 41 245 W075.371600 N035.505301 -4.52' 0 Sandy Peat 42 246 W075.371612 N035.505288 -4.17' 0 Peat 43 247 W075.371622 N035.505277 108' 0 Peat 44 248 W075.371634 N035.505265 -3.71' 0 Sand Peat 45 249 W075.371640 N035.505256 -3.57' 0 Sandy Peat 46 250 W075.371656 I N035.505253 -3.16' 0 Peat 47 251 W075.371666 N035.505244 -2.87' 0 *Mean cover estimated at each Sampling Station; based on percent cover standards that can be fouoPA 17 2017 http://seagrasswatch.org/home.html ®CM- MHD C ._ TABLE 1- DARE COUTNY, WANCHESE INDUSTRIAL PARK, NCCF BUILDING SAV SAMPLING STATIONS (LOCATIONS, WATER DEPTHS, SAV COVERAGE, and BOTTOM TYPE) 48 252 W075.371672 N035.505240 -2.57' 0 Peat 49 253 W075.371627 N035.505209 -2.42' 20 Ru ., sand eat 50 254 W075.371608 N035.505213 -3.59' 0 Sand Peat 51 255 W075.371596 N035.505227 -3.62' 0 Peat 52 256 W075.371582 N035.505235 -3.95' 0 eat, netting from oyster beds 53 257 W075.371568 N035.505250 -4.41' 0 Peat 54 258 W075.371555 N035.505263 -4.66' 0 Sand Peat with shell fra . 55 259 W075.371538 N035.505280 -4.64' 0 Sand Peat 56 260 W075.371520 N035.505295 -5.18' 0 Peat 57 261 W075.371478 N035.505274 -5.22' 0 Sand Peat 58 262 W075.371494 N035.505259 -5.23' 0 Peat with shells 59 263 W075.371508 N035.505243 -4.56' 0 Peat 60 264 W075.371521 N035.505233 -4.54' 0 Peat 61 265 W075.371542 N035.505217 -4.12' 0 Peat 62 266 W075.371554 N035.505207 -4.01' 0 Peat 63 267 W075.371562 N035.505197 -3.71' 0 Peat 64 268 W075.371580 N035.505187 -2.97' 0 Peat 65 269 W075.371591 N035.505178 -2.74' 30 Ru ., peat 66 270 W075.371598 N035.505172 -2.69' 30 Ru ., peat 67 271 W075.371607 N035.505167 -2.30' 35 Ru ., peat 68 272 W075.371616 N035.505165 -1.16' 0 Sandy Peat 69 273 W075.371672 N035.505102 -1.57' 0 6 inches detritus over sand 70 274 W075.371654 N035.505110 -1.83' 0 6 inches detritus over sand 71 275 W075.371642 N035.505118 -1.88' 0 2 inches detritus over sand 72 276 W075.371632 N035.505122 -1.94' 30 Ru ., sand 73 277 W 075.371619 N035.505129 -2.35' 0 Sand, some shells, outside quad sparse rup. 74 278 W075.371608 N035.505136 -2.68' 0 Sand, some shells 75 279 W075.371592 N035.505148 -3.33' 0 Peaty Sand 76 280 W075.371586 N035.505155 -3,53' 0 Peaty Sand 77 281 W075.371565 N035.505166 -3.89' 0 Peat 78 282 W075.371556 N035.505176 -4.15' 0 Peat 79 283 W075.371541 N035.505185 -4.32' 0 Peat 80 284 W075.371522 N035.505199 -4.47' 0 Peat 81 285 W075.371492 N035.505198 -4.23' 0 Sand, a lot of oyster shells 82 286 W075.371455 N035.505209 -4.42' 0 Sandy Peat 83 287 W075.371434 N035.505219 -4.62' 0 Peat 84 288 W075.371416 N035.505228 -5.25' 0 Peat 85 289 W075.371380 N035.505196 -4.85' 0 Sandy Peat 86 290 W075.371397 N035.505188 -4,60' 0 Sandy Peat 87 291 W075.371417 N035.505179 -4.48' 0 Sand Peat 88 292 W075.371422 N035.505166 -4.25' 0 Peat with shells 89 293 W075.371433 N035.505157 -4.11' 0 Peat 90 294 W075.371444 N035.505146 -4.05' 0 Peat 91 295 W075.371456 N035.505138 -3.52' 0 Peat 92 296 W075.371470 N035.505127 -3.14' 0 Peat 93 297 W075.371435 N035.505103 -2.97' Peat 94 298 W075.371423 N035.505116 -3.27' 0 Peat 95 299 W075.371410 N035.505127 -3.76' Peat 96 300 W075.371398 N035.505139 -4.03' 0 Peat 97 301 W075.371388 N035.505152 -4.20' 0 Peat 98 302 W075.371376 N035.505164 -4.44' eat 99 303 W075.371357 N035.505175 -4.52' 0 Sandy Peat *Mean cover estimated at each Sampling Station; based on percent cover standards that can be found at http://seagrasswatch.org/home.html TABLE 1- DARE COUTNY, WANCHESE INDUSTRIAL PARK, NCCF BUILDING SAV SAMPLING STATIONS (LOCATIONS, WATER DEPTHS, SAV COVERAGE, and BOTTOM TYPE) 100 304 W075.371337 N035.505187 -4.91' 0 Sandy Peat 101 305 W075.371324 N035.505191 -4.98' 0 Sandy Peat 102 306 W075.371292 N035.505165 -4.99' 0 Sandy Peat 103 307 W075.371304 N035.505152 -4.72' 0 Sandy Peat 104 308 W075.371315 N035.505144 -4.57' 0 Peat 105 309 W075.371331 N035.505127 -4.30' 0 Sandy Peat 106 310 W075.371339 N035.505119 -4.00' 0 Peat 1071 311 1 W075.371345 N035.505110 -3.68' 0 Peat 108 312 W075.371352 N035.505105 -3.46' 0 Peat 109 313 W075.371357 N035.505102 -3.41' 0 Peat 'Mean cover estimated at each Sampling Station; based on percent cover standards that can be found at http://seagrasswatch.org/home.htmi 3 OPTIONS: EXISTING OR RESTORED MARSH GRASSES OYSTER REEF / SILL s WITH PLANTINGS` not to scale o DOYSTER DOMES ,y ' SUBMERGED AQUATIC VEGETATION a � LOOSE. \—\ \\,OYSTER SHELL ti ® �r OYSTER North Carolina BAGS e COaS to I„Federvation an'av ewer, e. o a.m amao. nuc n m n � m0 s am -c Received .. JAN :/ 6 DCM-EC (3) ttoui U � U N f0 44- c Ln O N O x 4. O s O d -� x c %n r� J Ln a- Q1 C L aj CO EN t O Q U 41 � O N Ln dA O m O U to E O a� _ O � O N -O L N Ln O Ln 0- 0 w o :gIECENED E Q) APR 17 Z017 JCM- MN� CITY 0 v 0 � m 0 _ m N I O 0 � m 30' Rope 1 Screw anchors ------ ► Diagram of proposed floating bag deployment (L) and photo of individual floating bag (R). Dimensions of bags are 40" x 18" wide including floats. A total of 12 bags will be deployed per 30' span (6 bags on each side of line). C-j m n Q Rope Screw anchors —� Diagram of proposed LowProGro ° cage deployment (L) and photo of individual cage (R) *imensions of cages are 36" x 24". A total of 12 cages will be deployed �m � � n m v o �m per 60' span. v C -i ` � n CL . v 0 � m n _ m v o < -coated metal tension line Screw anchor Diagram of proposed Oystube° basket deployment using a long -line suspension system(L) and photo of individual basket (R). Dimensions of baskets are 36" x 12". A total of 12 baskets will be deployed per 75' span. � z Q Coastal Management ENVIRONMENTAL QUALITY June 21, 2017 NC Seafood Industrial Park Authority P.O. Box 549 Wanchese, N.C. 27981 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Enclosure �yDduglas Sincere V. Huggett7 Major Permits Manager N.C. Division of Coastal Management State of North Carolina I Environmental Quality I Coastal Management Morehead City Office 1 400 Commerce Avenue. I Morehead City, NC 28557 2528082808 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC Seafood Industrial Park Authority 2. LOCATION OF PROJECT SITE: 615 Harbor Road Lot 4, Wanchese, Dare County, in Broad Creek, off the Roanoke Sound Photo Index — 2006: 183-7196 (N-5, M-5, N-6, M-6) Latitude: X: 914727.523mE Longitude: 237889.520mN 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — March 16, 2017 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete — April 7, 2017 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County/ Wanchese Land Classification From LUP — Conservation (B) AEC(s) Involved: Coastal Wetlands, Estuarine Shoreline, Estuarine Waters and Public Trust Area (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing — onsite septic Planned -none (F) Type of Structures: Existing — Two story office building, parking lot, cell tower, and generator Planned - New pier with 2 platforms, 5 wetland sills, boatlift, and aquaculture demonstration area (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED SHADED (A) Coastal Wetlands, Estuarine 1,464 sqft Shoreline (B) Public Trust Area, Estuarine 3,000 sqft 5,761 sqft Waters (C) Other (D) Total Area Disturbed: 10,225 sqft (0.23 acre) (E) Primary Nursery Area: Yes (F) Water Classification: SA, SC and HQW Open: Yes RECEIVED APR 17 2017 DCM- MHD CITY .4 Field Investigation Report Page 2 PROJECT SUMMARY: The applicant proposes to construct a pier, five wetland sills and an aquaculture demonstration area in Broad Creek. Project Setting The property proposed for development is located at 637 Harbor Road in the Wanchese Seafood Industrial Park, and consists of 0.65 acres adjacent to Broad Creek and the Roanoke Sound. The upland portion of the property is covered with maintained grasses with an asphalt parking area and a two-story office building. On the southwestern portion of the property there is a cell tower and generator. Along the shoreline there are various species of small trees and shrubs. The property to the north is an empty lot owned by a private property owner and the property to the south is a commercial property. Vegetation noted on the site includes, but is not limited to, wax myrtle (Myrica cerifera), indigenous yard grass, groundsel brush (Baccharis halimifolia), black needlerush (Juncus roemerianus), smooth cordgrass (Spartina alternaflora), giant cordgrass (Spartina cynosuroides), Phragmites spp. Soil types include, but are not limited to Hobonny muck (HoA). The water classification for this site is High Quality Waters (HQW), Market Shellfishing, Saltwater (SA), and Aquatic Life, Secondary Recreation, Salt Water. Submerged Aquatic Vegetation on the site includes but is not limited to, Widgeon Grass (Ruppia maritima). The property has an elevation of about 4 feet above Normal Water Level (NWL), and the property has a Coastal Wetland fringe. Development Proposal The applicant proposes to construct an 8 foot by 215-foot pier with a 12 foot by 20 foot "T end platform extending over the wetlands into Broad Creek along with an 8 foot by 16-foot floating kayak platform on the eastern side of the pier. At the terminus of the pier the applicant proposes to install a 13 foot by 13-foot boat lift in 3.71 feet of water. The applicant also proposes to construct five 100-foot wetland sills that are 6 feet wide and will extend 1 foot. above Normal Water Level 5 feet from the shoreline. One sill will be composed of NCDOT class II granite rip -rap, weighing between 25-250 pounds. Another will be composed of oyster shell bags 2-3 feet long weighing 15-25 ponds. Another will be composed of wood and will be about a 1 foot in width. The other will be constructed out of oyster domes and /or crab pots. On the North-Eastern End of the property in Broad Creek 40 feet from the proposed sills the applicant also proposes to construct an aquiculture demonstration area that is 100-feet by 50- feet with four different types of gear, long line cages, floating cages, raised bottom cages and floating bags. 1' APR 17 2017 DCM- MHD CITY Field Investigation Report Page 3 Anticipated Impacts The proposed development of the 215-foot pier with the 12 foot by 20 foot "T" end platform and 8 foot by 16-foot floating platform will result in the shading of 1,464 square feet of Coastal Wetlands and Estuarine Shore Line AEC and 592 square feet of Public Trust Area and Estuarine Waters AEC. The proposed development of a 13 foot by 13-foot boat lift will result in the shading of 169 square feet of Public Trust Area and Estuarine Waters AEC. The proposed development of five 100-foot wetland sills will result in the filling on 3,000 square feet of Public Trust Area and Estuarine Waters AEC. The proposed development of a 100 foot by 50 foot aquiculture demonstration area will result in the shading of 5,000 square feet of Public Trust Area and Estuarine Waters AEC. Temporary turbidity will occur during construction. Submitted by: Cynthia Rountree Date: April 10, 2017 RECEIVED APR 17 2017 DCM- MHD CITY Bodnar, Gregg From: Brian Rubino <brubino@quible.com> Sent: Friday, May 12, 2017 9:10 AM To: Bodnar, Gregg Subject: RE: NC Coastal Federation / Wanchese Seafood Park Categories: Important Gregg, That is the one. I did not realize that condition made it to that permit. They may want to revisit that before they construct because they will have some of the same issues. We still would like to maintain the request to go 8 ft wide for the Coastal Fed pier for the materials transport and safe usage for others on the pier. I understand that this may or may not be possible to permit. Thanks, Brian Brian D. Rubino, P.G. Vice President Quible & Associates, P.C. 8466 Caratoke Highway, Bldg 400 Powells Point, NC 27966 P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.491.8147 f 252.491.8146 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Bodnar, Gregg [mailto:gregg.bodnar@ncdenr.gov] Sent: Friday, May 12, 2017 8:54 AM To: Brian Rubino <brubino@quible.com> Subject: RE: NC Coastal Federation / Wanchese Seafood Park Morning Brian, Thanks for the additional information. As I was reviewing I wanted to see if you could give me some clarification concerning the 8 foot wide pier you referenced. If I have the right permit (#100-16 issued to NC Seafood Industrial Park), our permit contains condition #5 which states, "Any portion of the permitted access pier and marina facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking." I was not a part of permit #100-16 or any of those projects in the Park, so could it be you're talking about another project? Thanks for the help, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg. Bodnar(a)ncdenr.aov 400 Commerce Ave Morehead City, NC 28557 0P. fiNothing Compares..,.,.. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brian Rubino [mailto:brubino@guible.com] Sent: Monday, May 08, 2017 2:00 PM To: Bodnar, Gregg <ereaz.bodnar@ncdenr.aov> Subject: NC Coastal Federation / Wanchese Seafood Park Greg, This email is in response to our conversation last week about needing to provide justification for a 8 ft wide pier. As described in the project narrative, the property is under a long-term lease with the Coastal Federation. The Federation is a private non-profit conservation group working to protect and restore coastal water quality and habitats throughout North Carolina coast. The construction of the pier will serve as a research pier and a working pier for shoreline enhancement projects in the region. It is a stated goal of the Federation to protect the natural functions of estuarine shorelines and to restore and sustainably manage oysters. It will be very important to be able to traverse the pier with a motorized vehicle, such as a Gator-type small utility vehicle. This will especially be used to carry oyster shells, plants and other living shoreline creation materials to and from the boat slip at the end of the pier. A 6 ft wide pier cannot accommodate this, especially if there are other workers on foot using the pier. This 8 ft wide pier concept was permitted in a nearly identical manner two lease areas to the west in the Seafood Park last year (The Broad Creek Marina and Breakwater Project- permitted, but not yet built). Please let me know if you have any questions as the review continues or if any other review comments arise. Thanks, Brian Brian D. Rubino, P.G. Vice President Quible & Associates, P.C. 8466 Caratoke Highway, Bldg 400 Powells Point, NC 27966 P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.491.8147 f 252.491.8146 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. Bodnar, Gregg From: Brian Rubino <brubino@quible.com> Sent: Monday, May 08, 2017 2:00 PM To: Bodnar, Gregg Subject: NC Coastal Federation / Wanchese Seafood Park Categories: Important Greg, This email is in response to our conversation last week about needing to provide justification for a 8 ft wide pier. As described in the project narrative, the property is under a long-term lease with the Coastal Federation: The Federation is a private non-profit conservation group working to protect and restore coastal water quality and habitats throughout North Carolina coast. The construction of the pier will serve as a research pier and a working pier for shoreline enhancement projects in the region. It is a stated goal of the Federation to protect the natural functions of estuarine shorelines and to restore and sustainably manage oysters. It will be very important to be able to traverse the pier with a motorized vehicle, such as a Gator-type small utility vehicle. This will especially be used to carry oyster shells, plants and other living shoreline creation materials to and from the boat slip at the end of the pier. A 6 ft wide pier cannot accommodate this, especially if there are other workers on foot using the pier. This 8 ft wide pier concept was permitted in a nearly identical manner two lease areas to the west in the Seafood Park last year (The Broad Creek Marina and Breakwater Project- permitted, but not yet built). Please let me know if you have any questions as the review continues or if any other review comments arise. Thanks, Brian Brian D. Rubino, P.G. Vice President Quible & Associates, P.C. 8466 Caratoke Highway, Bldg 400 Powells Point, NC 27966 P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.491.8147 f 252.491.8146 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. Bodnar, Gregg From: Bodnar, Gregg Sent: Friday, May 12, 2017 8:54 AM To: 'Brian Rubino' Subject: RE: NC Coastal Federation / Wanchese Seafood Park Morning Brian, Thanks for the additional information. As I was reviewing I wanted to see if you could give me some clarification concerning the 8 foot wide pier you referenced. If I have the right permit (#100-16 issued to NC Seafood Industrial Park), our permit contains condition #5 which states, "Any portion of the permitted access pier and marina facilities built over Coastal Wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking." I was not a part of permit #100-16 or any of those projects in the Park, so could it be you're talking about another project? Thanks for the help, Gregg Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality 252 808 2808 ext 215 office Gregg. Bodnar@ncdenr.gov 400 Commerce Ave Morehead City, NC 28557 c Nothing Compares_-,_-_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Brian Rubino [mailto:brubino@quible.com] Sent: Monday, May 08, 2017 2:00 PM To: Bodnar, Gregg <gregg.bodnar@ncdenr.gov> Subject: NC Coastal Federation / Wanchese Seafood Park Greg, This email is in response to our conversation last week about needing to provide justification for a 8 ft wide pier. As described in the project narrative, the property is under a long-term lease with the Coastal Federation. The Federation is a private non-profit conservation group working to protect and restore coastal water quality and habitats throughout North Carolina coast. The construction of the pier will serve as a research pier and a working pier for shoreline enhancement projects in the region. It is a stated goal of the Federation to protect the natural functions of estuarine shorelines and to restore and sustainably manage oysters. It will be very important to be able to traverse the pier with a motorized vehicle, such as a Gator-type small utility vehicle. This will especially be used to carry oyster shells, plants and other living shoreline creation materials to and from the boat slip at the end of the pier. A 6 ft wide pier cannot accommodate this, especially if there are other workers on foot using the pier. This 8 ft wide pier concept was permitted in a nearly identical manner two lease areas to the west in the Seafood Park last year (The Broad Creek Marina and Breakwater Project-, permitted, but not yet built). Please let me know if you have any questions as the review continues or if any other review comments arise. Thanks, Brian Brian D. Rubino, P.G. Vice President Quible & Associates, P.C. 8466 Caratoke Highway, Bldg 400 Powells Point, NC 27966 P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.491.8147 f 252.491.8146 www.auible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: NC Seafood Industrial Park Authority & NC Coastal Federation County: Dare LOCATION OF PROJECT: Lot 4C Harbor Road, Wanchese, in Broad Creek, off Roanoke Sound DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 04/07/17 FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Cynthia Rountree n DISTRICT OFFICE: Elizabeth Cltv DISTRICT MANAGER REVIEW:Date: / B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE RECD: $ 400 (60/40%1 PUBLIC NOTICE RECD: Advertise: 04/16/17 END OF NOTICE DATE: Comments due: 05/06(17_ ADJ. RIP. PROP NOTICES RECD: DEED RECD: APPLICATION ASSIGNED TO: td h64-z_ ON: < 0) _ C) 75 DAY DEADLINE: 06/21/17 MAIL OUT DATE: Circulation: 04/13/17 FEDERAL DUE DATE: 150 DAY DEADLINE: STATE DUE DATE: Comments due: 05/04/17 FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY. DRAFT ON AGENCY DATE M COMENTS RETURNED OBJECTIONS: YES NO NOTES Coastal Management - Regional Representative 5 ZI ('( X (p,h w.� w. �(. 't/- Coastal Management - LUP Consistency Division of Community Assistance W i, IBII !� Land Quality Section--DEMLR DWR/DWQ-A"ff'ti�i6t�Ction 'N(t I t. zV1'1-04$5 DWR/DWQ - Storm Water 1 t o � .'Wl DWR- PublicWaterSupply WIiAi4 State Property Office 0&4" T 2p Division of Archives & History —Cultural Res. sh I i Division of Env. Health —Shellfish Sanitation `{ IQ 11 <ag 6m,4w%„ Division of Highways --DOT Wildlife Resources Commission Alb Ap Local Permit Office/Planning Dept. COY 4 (1 j� CU DMF—DCM Fisheries Resource Specialist ' I ( kAPR 7 2017 Corps of Engineers 1S ( k Zul Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management, Morehead City ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director THROUGH: Frank Jennings, District Manager -AAF Northeastern District, Division of Coastal Management FROM: Cynthia Rountree, Field Representative 0- DATE: May 2, 2017 SUBJECT: NC Seafood Industrial Park and NC Coastal Federation Major Permit Recommendations The applicant proposes to construct an 8 foot by 215-foot pier with a 12 foot by 20 foot "T" end platform, an 8 foot by 16-foot floating platform and 13 foot by 13-foot boat lift, five 100-foot wetland sills and a 100 foot by 50-foot aquiculture demonstration area. The property is located at 615 Harbor Road Lot 4, Wanchese, Dare County, in Broad Creek off Roanoke Sound. The development proposal involves the Public Trust Area (PTA), Coastal Wetlands (CW) Estuarine Shoreline (ES) and Estuarine Waters (EW) Areas of Environmental Concern. I have reviewed the Rules of the Coastal Resources Commission (CRC) as they pertain to this project and my findings are as follows: 07H.0208 Use Standards (a) General Use Standards (a)(1) Uses which are not water dependent shall not be permitted in coastal wetlands, estuarine waters, and public trust areas. Restaurants, residences, apartments, motels, hotels, trailer parks, private roads, factories, and parking lots are examples of uses that are not water dependent. Uses that are water dependent include: utility crossings, wind energy facilities, docks, wharves, boat ramps, dredging, bridges and bridge approaches, revetments, bulkheads, culverts, groins, navigational aids, mooring pilings, navigational channels, access channels and drainage ditches; Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration area are consistent with the intent of this rule. RECEIVED ^Nothing Compares State of North Carolina I Environmental Quality I Coastal Management MAY 0 S 2017 401 S. Griffin St., Ste 3001 FJizabeth City, NC 27909 252-264-39011252-331-2951 [fax] DCM- MHD CITY R9 North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 5 April 25, 2017 (a)(2)(A) The location, design, and need for development, as well as the construction activities involved shall be consistent with the management objective of the Estuarine and Ocean System AEC (Rule .0203 of this subchapter) and shall be sited and designed to avoid significant adverse impacts upon the productivity and biologic integrity of coastal wetlands, shellfish beds, submerged aquatic vegetation as defined by the Marine Fisheries Commission, and spawning and nursery areas; Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration area are consistent with the intent of this rule. (a)(2)(B) Development shall comply with state and federal water and air quality Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration shall comply with air and water quality standards. (a)(2)(C) Development shall not cause irreversible damage to documented archaeological or historic resources as identified by the N.C. Department of Cultural resources; Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration will not cause damage to historic resources. (a)(2)(D) Development shall not increase siltation Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration will not increase siltation. (a)(2)(E) Development shall not create stagnant water bodies Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration will not create stagnant water bodies because of the 5 foot gaps proposed between each 100-foot section of sills. (a)(2)(F) Development shall be timed to avoid significant adverse impacts on life cycles af— E �/ estuarine and ocean resources ED Consistent: The proposed development of a dock, wetland sills and aquiculture MAY 0 S 2017 demonstration area will be timed to avoid impacts to resources. DCM- MHD �C."'"r (a)(2)(G) Development shall not jeopardize the use of the waters for navigation or for other public trust rights in public trust areas including estuarine waters. Consistent: The proposed development of a dock is less than a quarter width of the waterway and would not impact navigation, the wetland sills are 5 feet from NWL and will not impact navigation and the aquiculture demonstration area is at the farthest 92 feet from NWL which would not impact navigation. (a)(4) Primary nursery areas are those areas in the estuarine and ocean system where initial post larval development of fmfish and crustaceans takes place. They are usually located in the uppermost sections of a system where populations are uniformly early juvenile stages. They are R North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 3 of 5 April 25, 2017 designated and described by the N.C. Marine Fisheries Commission (MFC) and by the N.C. Wildlife Resources Commission (WRC) Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration area are not located in a primary nursery area. (a)(6) Beds of submerged aquatic vegetation (SAV) are those habitats in public trust and estuarine waters vegetated with one or more species of submergent vegetation. These vegetation beds occur in both subtidal and intertidal zones and may occur in isolated patches or cover extensive areas. In either case, the bed is defined by the Marine Fisheries Commission. Any rules relating to SAVs shall not apply to non -development control activities authorized by the Aquatic Weed Control Act of 1991 (G.S. 113A-220 et seq.). Consistent: The proposed development of a dock, wetland sills and aquiculture demonstration area have been located to avoid areas of submerged aquatic vegetation. (b) Specific Use Standards (b)(6) Addresses Piers and Docking Facilities. (b)(6)(A) requires that piers shall not exceed six feet in width. Piers greater than six feet in width shall be permitted only if the greater width is necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur. Inconsistent: The proposed piers are 8 feet in width which is inconsistent with this rule. (b)(6)(B) requires that the total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be eight square feet per linear foot of shoreline with a maximum of 2,000 square feet. In calculating the shaded impact, uncovered open water slips shall not be counted in the total. Projects requiring dimensions greater than those stated in this Rule shall be permitted only if the greater dimensions are necessary for safe use, to improve public access, or to support a water dependent use that cannot otherwise occur. Size restrictions shall not apply to marinas. Consistent: The proposed platforms are 20 feet by 16 feet with a shaded area of 320 square feet,12 foot by 8 foot with a shaded area of 96 square feet and 13 foot by 13-foot boatlift with a shaded area of 169 square feet for a total of 434 square feet of shading. The shoreline along the project area is 1,710 feet which allows for the maximum of 2,000 square feet of shaded area. (b)(6)(C) requires that piers and docking facilities over coastal wetlands shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking. Inconsistent: The proposed pier extending over wetlands will be 8 feet wide which is inconsistent with this rule. (b)(6)(E) require that the total area enclosed by an individual boat lift shall not ekeIV D square feet except to accommodate a documented need for a larger boat lift. MAY 0 8 2017 DCM- MHU, CITY Jft North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 4 of 5 April 25, 2017 Consistent: The proposed boat lift will be 13 feet by 13 feet with a shaded area of 169 square feet. (b)(6)(F) requires that piers and docking facilities shall be single story. They may be roofed but shall not be designed to allow second story use. Consistent: The proposed pier is single story. (b)(6)(G) requires that pier and docking facility lengths shall be limited by: (i) not extending beyond the established pier or docking facility length along the same shoreline for similar use; (This restriction does not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference with navigation or other uses of the waters by the public); Consistent: The proposed pier will not extend beyond the established pier and docking facility length along the same shoreline. (ii) not extending into the channel portion of the water body; and Consistent: The proposed pier will not extend into the channel portion of the waterbody. (iii) not extending more than one-fourth the width of a natural water body, or human -made canal or basin. Measurements to determine widths of the water body, canals or basins shall be made from the waterward edge of any coastal wetland vegetation that borders the water body. The one-fourth length limitation does not apply in areas where the U.S. Army Corps of Engineers, or a local government in consultation with the Corps of Engineers, has established an official pier head line. The one-fourth length limitation shall not apply when the proposed pier is located between longer piers or docking facilities within 200 feet of the applicant's property. However, the proposed pier or docking facility shall not be longer than the pier head line established by the adjacent piers or docking facilities, nor longer than one-third the width of the water body. Q Consistent: The proposed pier and platforms extend into Broad Creek which is 2,237 fete across and will net extend more than '/4 width of the waterway. 4 (b)(6)(I) requires that piers and docking facilities shall not interfere with the access to c riparian property and shall have a minimum setback of 15 feet between any part of ther or docking facility and the adjacent property owner's areas of riparian access. The line of division of areas of riparian access shall be established by drawing a line along the channel or deep water in front of the properties, then drawing a line perpendicular to the line of the channel so that it intersects with the shore at the point the upland property line meets the water's edge. Consistent: The proposed pier and platforms will not go beyond the 15 foot setbacks. Based on my review of the applicable subsections of the North Carolina Administrative Code, the permit application, and plans, I recommend a Major Permit be issued to N.C. Seafood Industrial Park with the following conditions. Piers shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking. ROY COOPER .. C'ovemnr MICHj E` S. RE`'GAN .. 'ln•• Sevelary BRAXTON C. DAVIS Coastal Management Din-dor ENVIRONMENTAL QUALITY RECEIVED April 13, 2017 A41 S 2017 MEMORANDUM BY: TO: Clif Whitfield, Environmental Engineer DWR—Public Water Supply Section, WaRO FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT:. CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Authority & NC Coastal Federation Project Location: Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This"agency has no objection to the project as proposed. V This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED C.Y flZ' DATE 'Nothing Compares ... State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St. Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951[fu] Coastal Management ENVIRONMENTAL OUALITV April 13, 2017 MEMORANDUM. TO FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Ow mer MICHAEL S. REGAN Starlary BRAXTON C. DAVIS pvedor Lee Padrick Division of Community Assistance Dou ,Huggett,,Major Permits Coordinator Division of Coastal, Management CAMA/DREDGE & FILL Permit Application Review NC, Seafood Industrial Park Authority`&NC Coastal,Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Pier, platforms, boatlift, wetland, sills, aquaculture demonstration area. Please indicate below your agency's position or viewpoint on the proposed project and return this form 6 OS/OW to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). `If you have any questions regarding the proposed project, please contact'Cynthia Rountree at (252) .. 264-39.01,.ext. 233. When appropriate, in-depth comments with supporting, .data are requested. RE pLy °,;. This agency has no objection to the project as proposed. This agency has no comment on the proposed project. z, This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects, to. the project for reasons described' in the attached comments. SIGNED 7/i� DATE f. ^Nothing Compares.... Sttie-afN"C..U.l Fatl o..enul Q--UI'I 6215W MME-1-1 . 401 S. OrM St, Ste 300I DimbaL City. NC 27909 1 '' 25N264-39011252-331-2951(f.) Kra Coastal Management ENVINONMENTAL OUALITV April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Donna Creef, Planning Director Dare County Doug Huggett, Major Permits Coordinator Division of Coastal Management ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director RECEIVED APR 19 2017 DCM- MHD CITY CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED 3Z4-Ai,x-- DATE 7 -Irl- )-On - 'Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 401 S. Giffin St., Ste 300 1 Elizabeth City, NC 27909 252-264-39011252-331-2951 [ful N, Marine Fisheries ENVIRONMENTAL QUALITY April 19, 2017 MEMORANDUM TO: From: Through: SUBJECT: Applicant: Project Location: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dire for Doug Huggett, Major Permits Coordinator Division of Coastal Management Valerie Wunderly, Environmental Health Regional Specialist Shannon Jenkins, Section Chief Shellfish Sanitation & Recreational Water Quality CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area We have no concerns or comments regarding this CAMA permit application. However, in the interest of public health we would recommend that the applicant contact the Shellfish Sanitation and Recreational Water Quality Section prior to the handling of shellfish intended for human consumption. This includes, but is not limited to: harvesting, buying, selling, processing, or distributing to other individuals or parties. It is also recommended that the applicant contact the Fisheries Management Section to inquire if a Research Sanctuary would be appropriate to protect the aquaculture demonstration project from shellfish harvest by the public. -% Nothing Compares State of North Carolina Divislon of Marine Fisheries 3441 .Arendell Street P.O. Box 769 1 Ma ehead City. North Carolina 28557 252-72h-7021 RECEIVE,) APR 2 4 2017 DCM_ ►WHD CITY Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: I � APR > ] 20n L Shellfish Sanitation ii Recreational Quality Section Shannon Jenkins Environmental Health— Shellfish Sanitation Doug Huggett, Major Permits Coordinator Division of Coastal Management ROY COOPER Govemor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Project Location: Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. V 5 e e "oc✓kfA (Yte rvtp REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �� .�tiLf t 620A%&A DATE �l 7 -Fop- 5ho-nrtoo denV-cns DECEIVED -� s, Nothing Compares , APR 2 4 2017 State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 ®� M _ M H D CITY 252-264-39011252-331-2951 [fax] K�r`# Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: RECEIVEED APR 17 2017 DOA STATE PROPERTY OFFICE Tim Walton, Manager State Property Office Doug Huggett, Major Permits Coordinator Division of Coastal Management ROY COOPER Gowmor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Dimclor CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: /This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 2: i� DECEIVED APR 2 4 2017 ^'Nothing Compares State of North Carolina I Environmental Quality I Coastal Management D C M - M H D CITY 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 252-264-3901 I252-331-2951 [fazJ Bodnar, Gregg From: Thorpe, Roger Sent: Friday, April 21, 2017 9:53 AM To: Bodnar, Gregg Subject: NC Seafood Industrial Park Lot 4, Harbor Road Wanchese, Dare County Gregg A CAMA application has been submitted for a pier, platforms, boatlift, wetland sills, and an aquaculture demonstration area at the subject site. A State stormwater permit will not be required for this project. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 !: -`'—� Nothing Compares .-. . Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. c. (a Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant; Project Location: Proposed Project: RECEIVED/NCDENR/DWR APR 17 2017, Water Quality Regional operations Section Washington Regional office ROY COOPER Governor MICHAEL S. REGAN secrelnry BRAXTON C. DAVIS Director Anthony Scarbraugh, DWR - Water Quality - 401, WaRO Doug Huggett, Major, Permits Coordinator Division of Coastal Management CAMA/DREDGE & FILL Permit Application Review NC Seafood'Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County; in Broad Creek Pier, platforms, boatlift, wetland, sills,.aquaculture demonstration area ,Please indicate below your agency's position or viewpoint on, the • proposed project and return this form by 05/04/17.to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please.contact Cynthia Rountree at (252) 264-3901, ext. 233. When'approprtate, in-depth comments with supporting data are requested. REPLY: This.agency has no objection to the project as proposed. This agency has no comment on the proposed project. SIGNEI This agency approves of the project, only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE ipares�,.. .Slate of Noah Catalina I Emironmental Quality I Coastal Management 401 S. Griffin SI., Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951[faz] 'A `t Water Resources Environmental Quality NC Seafood Industrial Park Authority Attn: Mr. Bob Peele PO Box 549 Wa nchese, NC 27981 ROY COOPER Governor NOT A CAMA PERMITMICHAELS. REOSecreaq S. JAY ZIMMERMAN Director May 18, 2017 DW R # 2017-0485 DARE County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS LOT 4C— WANCH ESE SEAFOOD PARK Dear Mr. Peele: You have our approval for the impacts listed below for the purpose described in your application dated April 13, 2017 and received by the Division of Water Resources (Division) on April 18, 2017. These impacts are covered by the attached Water Quality General Certification Number 4097 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] Type of Impact Amount Approved (units) Permanent Amount Reduced (units) Temporary Plan location/ Reference Attached Coastal Wetlands W1 (Shading from Pier) 0.03 (acres) 0 (acres) PAGE 1 Open Water OW-1 (Shading from Pier) 0.01(acres) 0 (acres) PAGE 1 OW-2 (Shading from Boatlift) 0 (acres) 0 (acres) OW-3 (Fill from Marsh Sills) 0.07 (acres) 0 (acres) OW-4 (Fill from Aquaculture Demonstration) 0 (acres) 0.11(acres) State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252.946-6481 LOT 4C— WANCHESE SEAFOOD PARK DW R# 2017-0485 401 APPROVAL Page 2 of 3 2. Water Quality Certification The proposed project must comply with all. the conditions of the General Water Quality Certifications) 4097. [15A NCAC 02B .0507(c)] Continuing Compliance 3. TurbiditvStandard The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SA Waters (3)(g) pH: shall he normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0220] Other Conditions 4. This approval and its conditions are final and binding unless contested. [G.S.143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-W00 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between B:OOam and S:OOpm, excluding official, state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: if sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699 4601 I :'A LOT 4C—WANCHESE SEAFOOD PARK DWR# 2017-0485 401APPROVAL Page,3 of 3 This letter completes the review of the Division under section 401 of the Clean Water Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scaFbrauah@ncdenr.eov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4097 Certification of Completion cc: Gregg Bodnar, DCM Morehead City Office (via email) Cynthia Roundtree, DCM Elizabeth City (via email) Josh Pelletier, USACE Washington Regulatory Field Office (via email) Laserfiche File 0:\2016\P76041\0r..'Mgs\P16041-BASE-CAMA.dwg 3/17/2017 201 PM Tmurphy i . m fA i PIP atA oa az fv1 �� ! / o P.P f 9 = Z _. Kgla n Go \ \\ ;�2C9>x fn >pm S� \ 0\ mm A92 y +� 88 I I 40 I �py�q PROJECT COPYRIGHT 02017 QUIBLE & ASSOCIATES, P.C. PAGE 1 _NORTH GAROLiNA COASTAL FEDERATION pW�4 P16041 THIS DOCUMENT IS THE PROPERTY OF 1+� Quible QUIBLE & ASSOCIATES, P.C. ANY 4C 0 p� DRAWN BY ALTERATION OF. THIS DOCUMENT IS ���� T� � � � l y A SS,OClat �"�� PROHIBITED. NO WANC nM SEAFOOD IIMUSTMAL PARK z cEN j-1 P,G JTM/OTH IF THIS DOCUMENT IS NOT SIGNED AND SEALED BY A LICENSED SHALL-51ONAL ENGINEERING "CONSULTING " PLANNING CHECKED BY THEN THIS DOCUMENT SHALL BE WANCHESE DARE COUNTY > ENVIRONMENTAL SCIENCES " SURVEYING CONSIDERED PRELIMINARY, NOT A NORTH CAROLINA NO Lieensefil: C-0208 BDR CERTIFIED DOCUMENT AND SHALL NOT 99 PO Drawer 870. KiHy Hawk, NO 27949 BE USED FOR CONSTRUCTION, O 50 100 M Phone: (252) 491-8147 DATE RECORDATION, SALES OR LAND Fox: (252) 491-6146 CONVEYANCES, UNLESS OTHERWISE 1/19/17 - NaTED. - CRAPHIC'SCALE W'FEET 1"=50 E-Mall:., adminlatraforOgulble:.com:,.,.:.. Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: RECEIVED APR.21 2017 DCM-Flehorlas . WARo Shane Staples, Fisheries Resource Specialist Division of Coastal Management, WaRO Doug Huggett, Major Permits Coordinator Division of Coastal Management ROY COOPER Go.emo MICHAEL S. REGAN socmlmy BRAXTON C. DAVIS Director CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue. Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) r 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This ragency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED . >-� DATE -!`Nothing Compares. -- State ofNnnh Carolina IFav'imemental Quality I Coaaml Management 401 S. Griffin St., Ste 3001 Elizabeth City. NC 27909 252.264-39011252-331-2951 jW ,jy t j ROY COOPER Gurentor tt , MICFIAEL S. REGAN '��l �L�, • `� BRAXTON C. DAVIS CoostalA4anagement Dinrmr ENVIRONMENTAL QUALITY i�'--� ��� / 3 1 Y April 13, 2017 MEMORANDUtow TO: Renee Gledhill -Early A- 1� NC Department of Cultural Resources 41 yb FROM: Doug Huggett, Major Permits Coordinator r Division of Coastal Management jr Si a+ I I SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Authority & NC Coastal Federation Project Location: Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. �/ v\ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED � DATE' APR 2 5 gnl7 !%"P]othing Compares —; Swe of Noah Camlina I rnaimnmenlal Quality I Cowl Management .101 S. Grif ,, SL. Ste 3001 Elisabeth City, NC 27909 252-264-39011252-331 2951 [fm] Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: ROY COOPER Governor MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Director Charlan Owens, District Planner Division of Coastal Management Doug Huggett, Major Permits Coordinator Division of Coastal Management CAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Proposed Project: Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency o lects a project for reasons described in the attached u S'EE -.f� ra�rl�o DATE r-Z-If RECEIVED ^'Nothing Compares MAY U 5 2017 State of North Carolina I Environmental Quality I Coastal Management p i� _ M H D CITY 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 C 252-264-39011252-331-2951 [fax] Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Greg Bodnar, Major Permits Processing Coordinator Division of Coastal Management FROM: Charlan Owen�1(�(ICP, NE District Planner Division of Coast Management ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director SUBJECT: Major Permit Request by NC Seafood Industrial Park Authority to install an 8 foot wide by 215 foot long pier with a 12 foot by 20 foot'IT" terminus platform, a 13 foot by 13 foot boat lift, and an 8 foot by 16 foot floating kayak platform; install a sill demonstration project consisting of five (5) 6 foot wide by 100 foot long wetland sills, and; install a 50 foot wide by 100 foot long aquaculture demonstration project; on Broad Creek at 615 Harbor Road, NC Seafood Industrial Park, in Wanchese, Dare County. DATE: May 2, 2017 Consistency Determination: The request is consistent with/not in conflict with the Dare County 2009 Land Use Plan certified by the CRC on February 24, 2011. Overview: The NC Seafood Industrial Park is located on 54 acres adjacent to the Wanchese Harbor Basin, a manmade basin which adjoins Mill Landing Creek to the west and Broad Creek off the Roanoke Sound to the east. The project area includes .65 acre leasehold Lot 4 and the open waters of Broad Creek in front of the lot. The lot has approximately 1,710 linear feet of shoreline along Broad Creek. Water depths in Broad Creek range from 2.3 feet to 3.2 feet at the shoreline. Submerged Aquatic Vegetation (SAV) is located in the creek at this location. A Coastal Wetland fringe is located along the shoreline. Elevations on the lot are approximately 4 feet above Normal Water Level (NWL). Floodzones on the property include VE (11) and AE (8). Existing site improvements on the lot consist of a two-story office building, asphalt parking area, generator, and cell tower. The shoreline is unimproved. Installation of an 8 foot wide by 215 foot long pier with a 12 foot by 20 foot "T" terminus platform, a 13 foot by 13 foot boat lift, and an 8 foot by 16 foot floating kayak platform; installation of a sill demonstration project consisting of five (5) 6 foot wide by 100 foot long wetland sills, and; installation of a 50 foot wide by 100 foot long aquaculture demonstration area are proposed. The pier will be installed over the wetlands and into the creek. The boat lift will be installed at the pier terminus and the kayak platform will be installed on the eastern side of the pier. The five (5) sills will be installed along approximately 500 linear feet of shoreline approximately 5 feet waterward of the shore and extend 1 foot above NWL. Each will be constructed using one of the following four (4) techniques: granite riprap placed on geotextile filter fabric; recycled oyster and clam shells bagged in nylon mesh; treated lumber boards on pilings, and; an alternative design with �Nothing Compares� RECEIVED State of North Carolina I Environmental Quality l Coastal Management MAY 0 5 2017 Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909 252 264 3901 North, Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 2 of 5 either oyster domes and/or crab pots. To allow for fish passage and water circulation, a 10 foot wide gap between sill structures will be provided. Reflective tape, extending a minimum of 3 feet above Mean High Water, will be placed along the sill at 50 foot intervals. The aquaculture demonstration area will be located 40 feet waterward of the sills and display long line cages, floating cages, raised bottom cages with bag inserts and floating bags. The waters of Broad Creek in this area are classified as HQW:SA waters and are open to shellfish taking. A review of potential historic/archaeological resources was not provided. Anticipated Impacts resulting from this project are expected to include: the filling of 3,000 sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC), and; the shading of 1,464 sq. ft. of Coastal Wetlands/Estuarine Shoreline AEC and 5,761 sq. ft. of Public Trust Area/Estuarine Waters AEC. Basis for Determination: The Dare County Land Classification Map identifies the subject property as "Community Village". As indicated on Page 217, the "Conservation" designation applies to all CAMA Areas of Environmental Concern (AECs). As indicated on Page 211 for the "Community Village" sub -classification, "(w)ater-related land uses and facilities such as boat building, fishing, fish processing and crabbing are characteristic of this sub - class..." As indicated on Page 217 for the "Conservation" designation, "... development should be limited to residential development and traditional accessory uses permitted in the CAMA AECs such as but not limited to piers, docks, and crab - shedders." The following LUP policies may be applicable to this request. Public Access: Policy PA#1, Page 142. "Dare County supports the preservation and protection of the public's right to access and use of the public trust areas and waters." Policy PA #6, Page 144. "Dare County supports efforts by the State of North Carolina to protect working waterfronts and harbors to ensure their continued viability as working waterfronts and access to public trust waters..." RECEIVED Nothing Compares� MAY 0 5 2017 al Quality I Coastal Management Elizabeth City tOffice Northate of 401 South Criffn Street, Suite 300 1 Elizabeth City. North Carolina 2QC M - M H D CITY 252 264 3901 North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 3 of 5 Land Use Compatibility: Coastal Heritage Policy LUC #1, Page 149. "Dare County recognizes the importance of our coastal village heritage and will continue to work toward the preservation of that heritage with appropriate land use guidelines and regulations." Industrial Development Policy LUC #9, Page 156. "...Boat building, commercial fishing, and construction are recognized as traditional occupations and employment sectors in Dare County that are consistent with our coastal heritage." Archaeological/Historic Resources Policy LUC#15, Page 159. "The Dare County Board of Commissioners supports the protection of structures, lands, and artifacts that have been identified by the NC Department of Cultural Resources, Division of Archives and History, as archaeologically or historically significant. On a case -by -case basis individual protection/management strategies should be implemented to ensure archaeological and/or historical resources are not destroyed." Natural Hazards: Estuarine Systems Policy NH#2, Page 180. "Estuarine shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters and the estuarine shoreline. The appropriate tools for this are the existing CAMA permit program and the Areas of Environmental Concerns (AECs) designated under the CAMA program..." RECEIVED MAY 0 5 2017 Nothing Compares DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252 264 3901 North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 4 of 5 Implementation Strategy, Page 180 "1. Rely on existing CAMA AEC regulations to address development activities along the ocean beaches, estuarine shoreline, and other public trust areas in unincorporated Dare County..." Policy NH#3, Page 180. "...Offshore breakwaters, slopes, rip -rap and voluntary setbacks are appropriate alternatives for property owners for addressing estuarine shoreline management in lieu of estuarine bulkheads where these other techniques may be equally effective in abating a shoreline erosion problem." Water Quality: Wetlands Policy WQ #7, Page 192. "Dare County advocates the use of existing (2009) state and federal regulatory programs for protecting and preserving coastal wetland areas of environmental concern..." Policy WQ #10, Page 192. "...Offshore breakwaters, slopes, rip -rap, and voluntary setbacks are appropriate alternatives for property owners for addressing estuarine shoreline management in lieu of estuarine bulkhead where these other techniques may be equally effective in abating a shoreline erosion problem." Fisheries Resources Policy WQ#11, Page 193. "Dare County recognizes the importance of our surrounding waters that serve as habitats for the area's abundant fisheries resources. The continued productivity of Dare County's fisheries shall be fostered through restoration and protection of the unique ecosystems upon which they depend. Dare County supports measures to protect and preserve designated primary nursery areas by the Division of Marine Fisheries..." Nothing Compares_ RECEIVED MAY 0 5 2017 DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909 252 264 3901 North Carolina Department of Environmental Quality Division of Coastal Management MEMORANDUM Page 5 of 5 Policy WQ#13, Page 194. "Local efforts to develop aquaculture as a source of fisheries production are supported provided the proposed fishery or fish species does not negatively impact fisheries. Dare County supports efforts by the State of North Carolina to promote locally harvested seafood." Policy WQ#14, Page 194. "Dare County recognizes the traditional practices of commercial fishing in Dare County and supports the use of traditional shellfish and fish harvesting methods including trawling and beach haul netting..." RECEIVED MAY 0 5 2017 �NcithingCcimpares� DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252 264 3901 !,a Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director 2A oZ Maria Tripp Dunn NC Wildlife Resources Commission Doug Huggett, Major Permits CoordinatorDivision L741 of Coastal ManagementCAMA/DREDGE & FILL Permit Application Review NC Seafood Industrial Park Authority & NC Coastal Federation Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek Pier, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. V y�n—t, Nsrc— This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNEDy DATE RECEIVE® MAY 0 4 2017 ''Nothing Compares State of North Carolina I Environmental Quality I Coastal Management D C M- M H D CITY 401 S. Griffin St., Ste 300I Elizabeth City, NC 27909 252-264-39011252-331-2951 [ful ROY COOPER Qorumor ;e.. MICHAEL S. REGAN kcremry BRAXTON C. DAVIS UinUur Coastal Management ENVIRONMENTAL QUALITY April 13, 2017 MEMORANDUM TO: David B. Barris, Roadside Erosion Control & Vegetation Management Engineer, NCDOT Roadside Environmental Unit FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA/DRLDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Authority & NC Coastal Federation Project Location: Lot 4C Harbor Road, Wanchese, Dare County, in Broad Creek ProposedT49jeet---PYei, platforms, boatlift, wetland sills, aquaculture demonstration area Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/04/17 to 400 Commerce Avenue Morehead City, NC 28557 (fax: 252.247-3330). If you have any questions regarding the proposed project, please contact Cynthia Rountree at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting, data are requested. REPLY: ✓This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE !-"Nothing Compares Stole of North Cuokua I Enviroanwotd Quality I Coastal MMM9CM01 40 t S• ciikia St., Sto 3001 efiu bn0i City. NC 27Y09 252-264-39011252.331-2951 Jkuj TO/TO 39vd 1000N EELVIEEZSZ TE:ET LTOZ/90/90 Bodnar, Gregg From: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil> Sent: Thursday, June 15, 2017 9:44 AM To: Bodnar, Gregg; Pelletier, Josh R CIV CESAW CESAD (US) Subject: RE: Projects in Progress Marcus Jones 201701602 June 15, 2017 Wanchese Industrial Park 201700723 June 15, 2017 Thanks! -----Original Message ----- From: Bodnar, Gregg (mailto:gregg.bodnar@ncdenr.gov) Sent: Tuesday, June 13, 2017 1:50 PM To: Bland, Raleigh W CIV CESAW CESAD (US) <Raleigh.W.Bland@usace.army.mil>; Pelletier, Josh R CIV CESAW CESAD (US) <Josh.R.Pelletier@usace.army.mil> Subject: [Non-DoD Source] Projects in Progress Hey all, Just wanted to check in on a few projects that I'm getting calls on. Laurie and William Moore in Dare Marcus Jones in Beaufort Wanchese Seafood Industrial Park in Dare Jessica Moon in Washington Thanks gentlemen and hope your having a good day. Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Bodnar, Gregg From: Murphey, Steve Sent: Thursday, June 08, 2017 5:27 PM To: Huggett, Doug; Bodnar, Gregg Subject: NCCF demonstration lease Colleagues, I spoke with Erin yesterday and she is fine with DCM conditioning the permit with something to the effect that states the lease must be obtained through DMF prior to use of any demonstration site. Erin said that at the scoping meeting it was Ken who wanted them to show it on the application. Anything else, please let me know and have a great evening. Steve Steve Murphey Section Chief, Habitat and Enhancement Division of Marine Fisheries North Carolina Department of Environmental Quality (252) 808-8046 office steve.murphey@ncdenr.gov PO Box 769 Morehead City, NC 28557 I C'.1- Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 ROY COOPER K�rf MICHAEL S. REGAN Secrennr BRAXTON C. DAVIS Coastal Management E NvRON ME:JTA:. OUd LISY April 13, 2017 Mr. Bob Peele NC Seafood Industrial Park Authority P.O. Box 549 Wanchese, NC 27981 Dear Mr. Peele: The NC Division of Coastal Management hereby acknowledges receipt of the application submitted on behalf of the NC Seafood Industrial Park Authority for State approval for development of their property located at Lot 4C Harbor Road in Wanchese, Dare County. It was received complete on April 7, 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is June 21, 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from April 7, 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of the proposed development. You should post this notice at a conspicuous point along the property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of- way fronting the property, or at a point along the road right-of-way where a private road would lead one into the property. Failure to post t KtI�Cm result in an incomplete application. KtI�C' V Gv !'Nothing Compares - APR 17 2017 State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Suite 300 1 Elizabeth City, NC 27909 252-264-3901 1252-331-2951 [fa j D C M- M H D CITY Mr. Bob Peele NC Seafood Industrial Park Authority April 13, 2017 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact Cynthia Rountree, Field Representative, if you have any questions and/or if you wish to receive a copy of the field report. Sincerely, Frank Jennings District Manager, Northeastern District Division of Coastal Management FJ/yc Enclosure cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City, NC Cynthia Rountree, DCM, Elizabeth City, NC Erin Fleckenstein, NC Coastal Federation, Wanchese, NC Brian Rubino &, Quible and Associates, P.C., Kitty Hawk, NC _m cn�AMA PERMIT APPLIED FOR. - PROJECT: construct a 2151x8' pier with 2 platforms, a boatlift, 5 wetland sills (measuring 1001, 6' wide, extending 1' above Normal Water Level & 5' from shoreline), & an aquaculture demonstration area. COMMENTS ACCEPTED THROQGH APPLICANT: NC Seafood Industrial Park Authority, P.O. Box 549, Wanchese, NC 27981, 252-473-5867; NC Coastal Federation, P.O. Box 276, Wanchese, NC 279817 252-473-1607 05106117 FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Cynthia Rountree, Division of Coastal Management, 401 S. Griffin St., Ste 300, Elizabeth City, NC 27909, 252- 264-3901, ext..233 Coastal Management ENVIRONMENTAL QUALITY EMAIL MEMORANDUM TO: Susan Simpson The Coastland Times Manteo, NC 27954 legals@thecoastlandtimes.net FROM: Yvonne Carver Coastal Management Representative ROY COOPER Gm" " MICHAEL S. REGAN set � rmp BRAXTON C. DAVIS Director DATE: April 13, 2017 SUBJECT: Public Notice: NC Seafood Industrial Park Authority & NC Coastal Federation Please publish the attached Notice in the Sunday, April 16, 2017 issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Melissa Sebastian, NC Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, (Telephone 252-808-2808). Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office (252) 264-3901. Attachment cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City Sarah Young, PIO, DCM, Raleigh Melissa Sebastian, Accounts Payable, DCM, Morehead City File RECEIVED APR 17 Z017 ?"Nothing Compares State of North Carolina I F=40r mental Quality I Coastal Managemeat DCM- M H D CITY 401 S. Griffin St.. Suite 300I Elizabeth City, NC 27909 252-264-39011252-331-2951 [fail NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The NC Department of Environmental Quality hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an AEC as designated under the CAMA was received on 04/07/17. The applicants, the NC Coastal Federation & NC Seafood Industrial Park Authority, are proposing to construct a pier with 2 platforms, a boatlift, 5 wetland sills, & an aquaculture demonstration area in Broad Creek, located at Lot 4C Harbor Road in Wanchese, Dare County. A copy of the entire application may be reviewed at the office of the Division of Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City, NC, 252-264- 3901 during normal business hours. Comments mailed to Braxton Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to 05/06/17, will be considered in making the permit decision. Later comments will be considered up to the time of permit decision. Project modification may occur based on review & comment by the public, state & federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Sunday, April 16, 2017 -_ ,',EIVEC; 17 2017 'This is a word processing form to be completed in Microsoft Word*** NC Division of Coastal Management Major Permit Application Computer Sheet (11/012012) Applicant: N.C. Seafood Industrial Park Date: April 10, 2017 Project Site County Dare Staff., Cynthia Rountree District., NEfizabeth City UWashington ❑Morehead City ❑Wilmington Project Name: Rover File: Date of initial application submittal (EX 1/8/2007): February 14, 2017 Date application `received as complete" in the Field office (E(., 1/&2007): April 7, 2017 Permit Authorization: [:]CAMA Dredge & Fill SBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes ®No Photos Taken: Yes ® No[] Setback Required (riparian): NYes ONO Critical Habitat: Z Yes No ONotSure 15 foot waiver obtained: Yes ®No Hazard Notification Returned: ❑Yes ®No SAV. Yes 0No ❑Not Sure Shell Bottom: ClYes No gNotSure Temporary Impacts: Eyes No Sandbags: Yes ZNo Not Sure Did the land use classification come from countyLUP: ®Yes ONO Mitigation Required (optional): ❑Yes ®No Moratorium Conditions: Mes No NNA Environmental Assessment Done: ❑Yes ®No ❑NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) Future Water Supply (FWS) Nutrient Sensitive Waters (NSIM Swamp Waters (SW) ® High Quality Waters (HQW) ❑Outstanding Resource Waters (ORW) WETLANDS IMPACTED (404) Corp. of Engineers (Jurisdictional El (LS) Sea lavender (Limonium ap.) El (SS) Glasswort (Salicomia sp.) wetlands) —Salt El (CJ) Saw grass (Cladium jamaicense) ® (SA) Salt marsh cordgrass (Sparlina (SY) reed grass (Spartina altemiffora) cynosuroides) El (DS) Salt or spike grass (Distichlis (SC) Bullmsh or three square (Scirpus (TY) Cattail (Typha sp.) spicata) SO ® (JR) Black needlerush (Juncus (SP) Salt/meadow grass (Spartina roemerianus) patens) APPUCA71ON FEE No fee required - $0.00 111(A) Private w/D&F up to 1 acre; 3490 & 111(D) Priv. public or comm w/D&F to 1 can be applied - $250 acre; 3490 can? be applied - $400 Minor Modification to a CAMA Major Major Modification to a CAMA Major El IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 El Permit Transfer - $100 Ill(B) Public or commercial w/ D&F to 1 Express Permit - $2000 acre; 3490 can be applied - $400 Major development extension request - 11. Public or commerciaYno dredge D $100 and/or M - $400 RECEIVE ❑ I. Private no dredge and/or fill - $250 LJ 111(C) Pdv. public or comm w/D&F to 1 17 2017 acre; 3490 can be applied; DCM needs APR DWQ agreement - $400 nc.M- Mn,J •" , . 252-808.2808 :: 1.888.4RCOAST :: �nccoastalmanaaement.net revised: Nov. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 2 of 3) Applicant: N.C. Seafood industrial Park Date: April 10, 2017 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found In yourActivides code sheet TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One Pier or Dock 1 New Work Replace 215 ft 8 ft Maint ❑ ❑ Y ® N Pier "T" Head 1 New Work Replace 12 ft 20 ft Maint ❑ ❑ Y ® N Floating 1 New Wont Replace g ft 16 ft Platform Maint ❑ ❑ Y N N Boatlift 1 New Work Replace 13 ft 13ft Maint ❑ ❑ Y ® N Sill 5 New Wont Replace 100 ft 6ft 3.5 ft Maint ❑ ❑ Y ® N Boat Slips 1 New Wont Replace Maint ❑ ❑ Y ® N lei. 1 New Work Replace 100 ft 50 ft Maint ❑ ❑ Y ® N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint❑ ❑Y❑N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Wont Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace r MH r Maint ❑ ❑ Y ❑ N revised Nov. 2012 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3; Applicant: N.C. Seafood Industrial Park Date: April 10, 2017 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found In your Habitat code sheet. TOTAL Sq. Ft. FINAL Sq. Ft. TOTAL Feet FINAL Feet (Applied for. (Anticipated final (Applied for. (Anticipated final DISTURB TYPE Disturbance total disturbance. Disturbance disturbance. Habitat Name Choose One includes any Excludes any total includes Excludes any anticipated restoration any anticipated restoration andror restoration or and/or temp restoration or temp impact tento impacts) impact amount temp impacts) amount High Marsh Dredge ❑ Fill ❑ Both ❑ Other ® 1,360 sgft 1,360 sqft High Ground Dredge ❑ Fill ❑ Both ❑ Other ® 128 sqft 128 sqft Open Water Dredge ❑ Pill ❑ Both ❑ Other ® 6,537 sqft 6,537 sgft Shallow Bottom Dredge ❑ Fill ® Both ❑ Other ❑ 3,000 sqft 3,000 sqft Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ . Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED APR 17 2017 DCM- MHD CITY 252-808.2808 :: 1-8884RCOAST :: www.ncconstaimananement.net revised: Nov. 2012 MAJOR PERMIT FEE MATRIX Applicant: NC Seafood Industrial Park Authority NC Coastal Federation Selection Development Type Fee DCM % (143001601 4351000931625 6253) DWQ % (243001602 435100095 2341) I. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality ication No. 3900 (See hed can be applied: . Public or commercial Ei lopment, if General $400 100%($400) 0%($0) r Quality Certification 900 (See attached) e a lied: 4aftached) . If General Water El ity Certification No. $400 60%($240) 40%($160) (see attached) could RECEIVED pplied, but DCM staff rmined that additionalw and written DWQAPR 17 2017 urrence is needed because of concerns DCM- M H D CITY related to water quality or a uatic life: III(D). If General Water ® Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) cannot be a lied: IV. For development that ❑ involves the filling and/or $475 60% ($285) 40010 ($190) excavation of more than one acre of wetlands and/or 010en water areas: NC Division of Coastal Management 3159 Og C D Cashier's Official Receipt Date: I Q— 20 — ! Received From: C `ly 1°'� �( , /<Z- rk- $ ! cn� ®r —, Permit No.: 41 r P u•"� i it44 og a c %.1 Check No.: ^2, D3 O f ®® , Applicant's Name: �C P�4, o� J '� ^ pw^ County: L -� `I Al la-ar— R o sAf W a A s .em Project Address: � � `�� Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: T '�C-' o ! mod`•' Signature of Field Representative• Date: / A (o l Date: % Z �' VO �G�`J o1l Pe xv ta �,en OG i January 11, 2017 RE: Lot 4 - Wanchese Seafood Industrial Park CAMA Permitting NC Seafood Industrial Park Authority Wanchese, Dare County, North Carolina JAN ?� 6 DMEC As Director of Wanchese Seafood Industrial Park, I authorize North Carolina Coastal Federation (tenant) and Quible & Associates, P.C. (sub consultant) to act as agent for the purpose of CAMA Permitting associated with the proposed Lot 4 - Wanchese Seafood Industrial Park pier, living shoreline and aquaculture demonstration. 9 22� Authorized Signature Name: Bob Peele Date/— 11-670/7 RECEIVED APR 17 2017 DCM- MHD CITY Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 March 24, 2017 Cynthia Rountree Division of Coastal Management 401 S. Griffin St. Suite 300 Elizabeth City, NC 27909 RE: Parcel 4C Wanchese Seafood Industrial Park NC Coastal Federation Green Cana Mrs. Rountree: P.O. Drawer 870 Received P ox 2522491 81147 web: qulble.c Mw8 2 7 711V CCM-EC Please find enclosed, the Certified Mail green card for Tillet Girls LLC as requested in your email dated 3/24/17. If you have any questions or if you need any additional information, please contact me at 252.261.3300 or at tmurohv0auible.com. Sincerely, Quible & Associates, P.C. Troy Murphy CC: File RECEIVED APR 17 2017 L)CM_ Mt,,) CITY ■ Complete hems 1, 2, and 3. ■ kmiyour name and address on the reverse so that we can ratum the card to you. ■ Attach this card to the back of the mailplece, . Article Addressed to: O's�- —) )VO 413YL)z "o Lo ItiL- r d Agent o Addresses Received tby IPrp7fed Memo)Date of Delivery C d /� -1 / MAC 7 �017 le delivery address dffferem Lom hem 17 ❑ Yes If YES, enter delivery address below: ❑ No D C „ ter,.„, II I'lllll IIII I'II II II I I II'lllll II III Ilill I I III 3 Swim Type ❑ Prlorlty Mall Express® afCm- tlAeC Mall® Restricted Delivery ❑ ReOpiatered Mail Restricted 9590 9402 1688 6053 3745 53 D DerlMed Mall ResMoted Delivery iwer ❑ ReNmYRecelptfor ❑ Collect on Delivery Merchandise I !. Article Number (naraW from service kW ❑ collect on Delivery Restricted Delivery ❑ Signature Confimlatlonm 70117 2680 0002 59311 0742' ❑ Insured Mail 22teil Reetdctad Delivery ❑ Signature Confirmation Reetrkted Delivery rS Form 3811. July 2015 PSN 76a0-02-000-gUb, Domestic Return Receipt ■ Complete items 1, 2, and 3. Cl Agent InPelitt your name and address on the reverse A Cl Agent ee ' so that we can return the card to you. B. Recel d by (Printed Name) Date of DeIN ■ Attach this card to the back of the mailpiece, f,`� �� or on the front if space permits. L 1. Article Addressed to: DLL(L. Is delivery address different from hem 17 l7 Yes 1 / If YES, enter delivery address below: ❑ No WAa 9 � � 1 S. Service Type ❑ Pdodty Mail express® IIIIIIIIIIIIIIililllllllllllilllllllllllllllll DCedit ed Natare DRegsered Mai 9590 9402 1688 6053 3745 53 o Certified N ❑ Collect on 2- Article Number (narrsfer from service label) ❑ Colect on _.... , ❑ Insured M, 7007 2680 0002 5930 0742 0e PS Form 3811, July 2015 PSN 7530-02-000-VUba ire Restricted Delivery ❑ Reeggistered Mail ResMcta< ® Delivery Restricted Delivery O Return Recelpt for )livery Merchandise ;livery Restricted Delivery D Signature ConllnnatlonTM ❑ Signature Confirmation Restricted Delivery - Restricted Dellvay Domestic Return Receipt a R: f 1\4ED APR I 1W DIM. MHD CITY Quible Quible & Associates, P.C. ENGINEERWG - ENVVIONMENrAL SCIENCES - PLANNING - SURVEy1NG SINCE 1959 CERTIFIED MAIL: RETURN RECEIPT REQUESTED February 7, 2017 Tillet Girls, LLC 375 The Lane Wanchese, NC 27981 RE: CAMA Major Permitting Lot 4 — Wanchese Seafood Industrial Park Wanchese, Dare County, North Carolina Sir/Madam: P.O. Dtoww 870 laity Howk NC 27949 Phone: 252-491-8147 Received, web: ulble, 146 eb:52-49 146 As adjacent riparian property owner to the above referenced project, it is required by NCDEQ, Division of Coastal Management (NCDCM) that you be notified of the proposed work that requires CAMA Major Permitting. As depicted on the accompanying site plan, the proposed project primarily includes construction of a new pier/docking facility, five (5) 100 ft. sills, and a 100 ft. x 50 ft. aquaculture demonstration area. Should you have comments to this proposal, please send your written comments to the CAMA Field Representative, Mrs. Cynthia Rountree, 1367 U.S. 17 South Elizabeth City, NC 27909. Written comments must be received within 30 days of receipt of this notice. If you have no objection to the project, please sign and date below and return one copy of this letter to: Brian Rubino, Quible & Associates, P.C., P.O. Drawer 870, Kitty Hawk, NC 27949. Failure to respond In either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates, P.C. Troy Murphy I have no objection to the project as proposed I have an objection to the project for reasons stated below Signature Date RECEIVED APR 17 2017 DCM- MHD CITY ru e . • M1 O QFHC O Er O"' Postage go Ln Cedfied Fee ru O p Return Rersipt Fee (EntloreeMont Required) C3 Restrbted Delivery Fee O (Endorsement Required) 43 .M ibtal Poatege& Fees $ rU c3 Gsen Sox No. l� E 0 RECEIVED APR 17 2017 DCM- MHD CITY Quible P.O. DowerQuible & Asoclates, P.C. eceived IGBy Hawk NC27949 ENGINEERING - ENVIRONMENTAL SCIENCES - PLANNING - SURVEYING SINCE 19N CERTIFIED MAIL: RETURN RECEIPT REQUESTED December 7, 2016 Willie E. Daniels Jr 3652 Mill Landing Rd Wanchese, NO 27981 RE: CAMA Major Permitting Lot 4 — Wanchese Seafood Industrial Park Wanchese, Dare County, North Carolina Sir/Madam: PU9ne: 252-491-8147 Fox: 252-49"146 l0i G h /1'.' web: qulble.c K✓MEC As adjacent riparian property owner to the above referenced project, it is required by NCDEQ, Division of Coastal Management (NCDCM) that you be notified of the proposed work that requires CAMA Major Permitting. As depicted on the accompanying site plan, the proposed project primarily includes construction of a new pier/docking facility, five (5) 100 ft. sills, and a 100 ft. x 50 ft. aquaculture demonstration area. Should you have comments to this proposal, please send your written comments to the CAMA Field Representative, Mrs. Cynthia Rountree, 1367 U.S. 17 South Elizabeth City, NO 27909. Written comments must be received within 30 days of receipt of this notice. If you have no objection to the project, please sign and date below and return one copy of this letter to: Brian Rubino, Quible & Associates, P.C., P.O. Drawer 870, Kitty Hawk, NC 27949. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible ad Asso iates, P.C. Troy Murphy I have no objection to the project as proposed I have an objection to the project for reasons stated below Signature RECEIVED Date APR 17 2017 DCM- MHD CITY Quible Quible & Associates, P.C. ENGINEEMNG • EWWWENTALSOENCES • PLANNING • SUFMVING SNCE 1959 CERTIFIED MAIL: RETURN RECEIPT REQUESTED December 7, 2016 Etheridge Family Properties, LLC P.O. Box 69 Wanchese, NC 27981 RE: CAMA Major Permitting Lot 4 — Wanchese Seafood Industrial Park Wanchese, Dare County, North Carolina Sir/Madam: P.O.Orowar 970 r^ Hawk NC 27949 Received Phone 2524918146 web: quide.com IGh 1 6 '791 DCM-EC As adjacent riparian property owner to the above referenced project, it is required by NCDEQ, Division of Coastal Management (NCDCM) that you be notified of the proposed work that requires CAMA Major Permitting. As depicted on the accompanying site plan, the proposed project primarily includes construction of a new pier/docking facility, five (5) 100 ft. sills, and a 100 ft. x 50 ft. aquacutture demonstration area. Should you have comments to this proposal, please send your written comments to the CAMA Field Representative, Mrs. Cynthia Rountree, 1367 U.S. 17 South Elizabeth City, NC 27909. Written comments must be received within 30 days of receipt of this notice. If you have no objection to the project, please sign and date below and return one copy of this letter to: Brian Rubino, Quible & Associates, P.C., P.O. Drawer 870, Kitty Hawk, NC 27949. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quib�d Asses, P.C. Troy Murphy I have no objection to the project as proposed I have an objection to the project for reasons stated below Signature Date RECEIVED APR 17 2017 DCM- MHD CITY ■ Complete itemslY2;'S"artd 3. Also complete itern 41f Restricted}@livery is desired. x ■ print you ame aM-8cloress on the reverse so that can return the card to you. ■ Attach card to the back of the rnai 1piece, or on th ont if space permits. 1, Article sled to: PO Received JAN 2 t mii DMEC �by(Prinf=drName) ' C. to of livery ;ry address different fron0enn 17 Yes enter delivery address below: O No WW3Nt-sE- !UO c�L / f0/ S. ServlceTYps I Ex 2. Article Number (fraosfer from Samoa labef, PS Form 3811, July 2013 ified Mall® ❑ Prio ity Mai press ❑ Registered ❑ Return Receipt for Merchandise El Insured Mall [I Collect on Delivery 4, Restricted Delivery? (Extra Fee) ❑ Yes i 71107 25LO 0001 0093 1849 Domestic Return Receipt mort ..� Complete items 1, -2j and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: 1w)llie � D50u)gk "ti Agent B. ec I ylFfRt a C: D AOf li I., . Is delivery address different from Rem 1? ❑ Yes If YES, enter delivery address below: ❑ No ff11 f� 3. Service Type ll3Gertifled Mall® ❑ Priority Mail Express In di 2. Article Number (Transfer from service laben PS Form 3811, July'2013 ❑ Registered ❑ Return Receipt for erc an se ❑ Insured Mail ❑ Collect on Delivery 4. Restricted Delivery? (Extra Fee) ❑ Yes 7007 2680 0002 5129 5802 Domestic Return Receipt RECEIVED APR 17 2017 DCM- MHD CITY i 0X,�,N DARE /,q��, REAL ESTATE Y� COUNTY t aye►) t TRANSFER TAX �(!,;T^, I3�lly s 9� Y� L"NSFER NUMBER:113-16 l%LAN SFERFEE: $2,088.97 EXCISE T $418.00 PARCEL N ortion of 024855011 Recorded: 02/24/2016 02:33:10 PM BY: Cathy Valencia VemoNs Mc\Mnan, Reprtar of Deeds Dare Comdy, NC Fee Amt $28.00 NC Exme TAX: $418.00 BOOK 2076 PAGE 561 (3) 700022288 11111111111111 Prepared by: Returnto: E. Crouse Gray, h., Attorney at Law, Starkey Sharp a licensed North Carolina Attorney, Sharp, Michael, Graham & Baker Delinquent taxes, If any a to be paid by the closing PO Drawer 1027 attorney to the County Collector upon disbursement Kitty Hawk, NC 27949 of proceeds. GRAY & LLOYD, L.L.P.0 3120 North CroatariffighwalsNe. 101 All or a portion of the property herein conveyed Kill Devil Hills, North Caroli 7948 _ includes or _X_ does not include the My File No. 12468-004 primary residence of the Grantors. WRTH CAROLINA DEED NORTH CAROLINA DARECOUNTY THIS DEED made this the 23rd da)?)f February, 2016, by and between John Harris & Associates, LLC, a Virginia Limited Liabilo Company, of 9618 Bay Point Drive, Norfolk, VA 23518, Grantor, and North Carolina Coastal Feion, Inc., a North Carolina Corporation of 3609 Highway 24, Newport, NC 28570, Grantee: CC The designation Grantor and Grantee as used herein shall include said parties, their heirs, and successors and assigns, and shall include singular, pluratj gmssculine, feminine or neuter as required by context. 0 WITNESSETW"' THAT the Grantor, for a valuable consideration paid b� e Grantee, the receipt of which is hereby acknowledged has and by these presents does grant, bargauesell and convey, unto the Grantee its successors and assigns, all its right, title and interest in and to the iucture situated on a lot or parcel Y' i6 0 �<11 RECEIVED APR 17 2017 DCM- MHD CITY Book 2076 Papa 501 J 6. of land identified as Lot 4C in the North Carolina Seafood Industrial Park (the "Structure -only"), and all �0 its right title and interest in and to the leasehold of Lot 4C, said property being located in Nags Head V O Township, Village of Wanchese, Dare County, North Carolina, and more particularly described as follows: That certain building together with any fixtures and furnishings located therein which are being conveyed with said building, which is located on Lot 4C ofthe Wanchese Seafood Industrial Park in Wanchese, Dare County, North Carolina, said Lot 4C Harbor Road, Wanchese, North Carolina, said Lot 4C being further described as follows: d ®eing all that parcel of land known, designated and being Lot 4C as shown on that map or plat entitled(R Part "Plat of Lot 411 and 4C of the Wanchese Industrial Park Authority - Wanchese - Nags K Head To ip - Dare County - North Carolina" by W.M. Meekins, Jrs. & Associates, Inc. Said survey a• is into r herein b reference, together with all right, rPo Y B gh; title and interest it holds in the foreclosed leasehold lit The abooe described real property is further conveyed subject to and with those rights granted t pursuant to that certain 20' access easement as shown on the aforesaid plat. o By this deed C16tor does hereby convey all its right, title and interest, if any in and to said Lot 4C and in and to the lco granted to and held by its predecessor(s) in title and any interest under the leasehold interest as referQced herein, to the extent that it claims no further interest whatsoever in any A' of said property. E All or a portion of thesVVWperty herein conveyed does not include the primary residertce of a ti Grantor. TO HAVE AND TO HG�V the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Gr tee in fee simple. And the Grantor covenants with t rho Gy"rantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will wamaQk[[ p'';d defend the title against the lawful claims of all persons claiming by, under or through Grantor, excepir'TQr the exceptions hereinafter stated. 4� Title to the property hereinabove descriQ�a( subject to the following exceptions: 3, 1. Exception is taken to 2016 ad valorem takes. 2. Restrictive covenants and the amendments thereto, if any, of record in the aforesaid Public x Registry. 3. Easements of Record. 4. Any local, county, state or federal laws, ordinanc or regulations relating to zoning, environment, subdivision, occupancy, use, constrQp, or development of the subject property. S �. G (� m 2 d O �l RECEIVED APR 17 Z017 DCM- MHD CITY Book 2076 Pape 562 4 G �0 IN WITNESS WHEREOF, the Grantor has hereunto set their hand and seal on the day and year first above written. John Harris & Associates, LLC G % ./AL Jo . Harris, Manager / �y d M STA CITY/C OF, I, a Notary Public, hereby certify that John W. Harris perso ame before me this and owledged the execution of the foregoing instrument, all in his capaci as a manager in, and in the name and for and on behalf of John Harris & Associates, LLC, a limited liability company organized under the Ie s of the State of Virginia. Witness my hand a;4,Q icial seal this the �. �._ day oE�¢�w ,r�.( , 2016. rti � 6 Notary Publi $ (seAusrAMti <.,'('., ` ;� MycommissioaExpuea: o Registration Number: \ S N:lWgR4.16Y aVllA W.HmgaAwe,LL(.11l/bt-0Wa)IeuNPld La9A NCMdfiR Indwl.Pu4(677 Hubw Rd); P)NC Co6ul Faderaion (Cl.I C.OI.II.IA)tDaaD.REO.am O^ O i 3 \% d 0 �l RECEIVED APR 17 2017 ')CM- MHD CITY Book 2076 Pape 563 1Q6r2k17 Parcel Data Sheet County of Dare, North Carolina *Owner and Parcel Information is based on current data on file and was last updated on January 20 2017 Primary (100%) Owner Information: NORTH CAROLINA COASTAL FEDERATION INC LH 3609 HIGHWAY 24 NEWPORT NC 28570 Parcel Information: Parcel: 024855030 PIN: 070705193586C6 District:17- WANCHESE Subdivision: SUBDIVISION - NONE LotBIkSect: LOT: LEASEHOLD IT 4C BLK: SEC: Multiple Lots: SEAFOOD INDUSTRIAL PARK PlatCabSlide: PL: B SL: 55 Units: 0 Deed Date:02/24/2016 BkPg:2076/0561 Parcel Status: ACTIVE Property Use: PROFESSIONAL BUILDING USE & FEATURES Building Use: Exterior Walls: Full Baths: Bedrooms: Heat -Fuel: Heat -Type: Air Conditioning: MISCELLANEOUS USE LAND USE No Image on File 637 HARBOR RD Tax Year Bide Value: SO Next Year Blda Value: $199.400 RADIO/TV/MIN PIC STUDIO Actual Year Built:1998 Half Baths: Finished sgft for building 1: 3117 Total Finished Sgft for all bldgs: 3117 Tax Year Misc Value: $0 Next Year Misc Value: $0 Tax Year Land Value: SO Next Year Land Value: $0 Land Description : 17-Leasehold Improvement TOTAL LAND AREA: 0 square feet Tax Year Total Value: $0 P F: r' E I V E is Next Year Total Value: $199,400 'Values shown are on file as of January20 2017 AP17 2017 DCM— MHD CITY htWAox.darw4untync.gov/parceicard.php?parcel=024855030 1/1 s APR 17 2017 DCM- MHD CITY a 3 � w i Cr 4P, {} yy {4".Y8 111 � t ov fi . t ��,,SSi 1• t. v t �x �� !{ � , . I 't .333 ZM it � v 1 d r RECEIVED APR 17 2017 DCM- MHD CITY Coastal Management ENVIRONMENTAL QUALITY February 17, 2017 Brian Rubino & Erin Fleckenstein Quible & Associates, P.C. P.O. Drawer 870 Kitty Hawk, NC 27949 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Re: N.C. Seafood Industrial Park Authority Lot #4; N.C. Coastal Federation Dear Mr. Rubino: The NC Division of Coastal Management hereby acknowledges receipt of your revised application on February 14, 2017, for State approval for the development of the referenced project. An initial screening of the submittal package has been conducted as per 15A NCAC 07j.202-204 (copies enclosed). This revealed certain deficiencies, which must be corrected before the application package can be accepted as complete. To assist you in expediting the permitting process as much as possible, I am notifying you of these deficiencies immediately so that they can be quickly corrected to facilitate my detailed review. Because the deficiencies are easily correctable, I am not returning the original application package. Please make the needed changes, and submit the appropriate documentation. With the retained copy of the application, I can commence the detailed review. Please understand that the subsequent detailed review may reveal additional areas where further information or documentation is required to demonstrate compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified of such issues separately. Our initial screening has identified the following deficiencies: 1. Adequate Work Plans or Drawings have not been submitted. Please address the following items: ■ A Plan View must be submitted that: - Indicates Marshlands/Wetlands - Indicates width of Adjacent water body - Indicates the presence of any 404 or Coastal Wetland Marsh in area of proposed work. Specifically, the upper and lower limits of wetlands on property. RECEIVED - Depth and elevation of existing structures FEB 2 7 2017 DCM- MHD CITY State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 Somh Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 2522643901 Brian Rubino February 17, 2017 Page 2 of 2 2. Access to the site for development activities needs to be addressed when 404 wetlands are present. Please provide a description of how the activities will be carried out without crossing such wetlands, or seek authorization for crossing. To expedite our response to your permitting request, we will commence the detailed review of your application for a permit pending the receipt of the additional information requested above. However, the statutorily provided 75/150 days allowed for review cannot commence until such time as we have received a complete application package. Once your application has been accepted as complete, you will receive a separate notification letter. If it is not possible to render a permit decision within 70 days of the date when your application is received complete, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. Please do not hesitate to contact me at our Elizabeth City office (252 264 3901) if you have any questions regarding this letter or the permitting process. Sincerely, Cynthia Rountree Field Representative Division of Coastal Management cc: Doug Huggett, Major Permits Coordinator, DCM, Morehead City Frank Jennings, District Manager, DCM, Elizabeth City Erin Fleckenstein, NC Coastal Federation RECEIVED FEB 2 7 2017 DCM- MHD CITY NOTES FEDERAL U« z z 1. APPUCANT: NORTH CAROLINA COASTAL FEDERATION CHANNEL -ved n • z w n o 2 OWNER: NO SEAFOOD INDUSTRIAL PARK AUTHORITY BRO� FROM 100 LL +t + 1 e'i x w p„) a N o i n' a ATTN: BOB PEELS, DIRECTOR CREEK SHORELINE r� 4 A yj Oz PO BOX 549 WANCHESE. NO 27981 (AR'RBX t/- 223V PYDf� 3. + + 0 � F BOUNDARY k TOPOGRAPHIC DATA SHOWN BASED ON BISSELL ROADWAY 8: DRAINAGE IMPROVEMENTS PLANS FOR WANCHESE gM1 +r cd Doi k+ v SEAFOOD INDUSTRIAL PARK, DATED 04/2007. THIS IS NOT A BOUNDARY SURVEY. WATER DEPTHS AND SHORELINE WERE FIELD +h' +r� +r j�Tj``'���,R,, �����jjlIj]]j {ff{��,_ GJ ''4 z a R N N +'y 6✓�.e -EC OJ 4nyNE SURVEYED BY OUIBLE 6: ASSOCIATES P.C., USING CPS, R7K NETWORK ON 8/5/16. THIS SHALL NOT BE CONSIDERED A CERTIFIED 1-1 O U o SURVEY. O« a � W i a y>° r'� +r r°� +r � di � i a e ° 4. WATER DEPTHS SHOWN ARE Na REFERENCED TO NAVD 88. WATER DEPTHS ARE MEASURED FROM NORMAL WATER h4VEL OF 0.00. +' h, + + +tO m z z z a y w i (NORMAL WATER LEVEL - 0.39 NAVD 88) �1 5. PROPOSED WORK: + +h t+ +r"� +alp M1 A w CONSTRUCTION ON of A 215 F7 X 8 FT PILE SUPPORTED PIER WITH A 12 FT X 20 FT PLATFORM a B. BOAT SLIPS & KAYAK APURTENACES g +r. ,!D +t� +t� +r� +�� w W a. ((1)) 8 FT ■ 16 FT KAYAK PLATFORM +,y� +h� +r •— b. (1) 13 FT X 13FT BOAT LIFT C. ((5) 100 LF SLLS PLACED ALONG THE SHORELINE r'� t4 +r� +t� M1g +r" A,P h�'•. \V D. A 100 FT X 50 FT AOUACULTURE DEMONSTRAMON AREA + + ,pa +' +t� ✓ r'< +rkP2oXo25ED � .� +r1 +a4 +� M1 i PRELIMINARY +y0h Y +t + +• PLATFORM +r PROPOSED M1� \•••� + �' FOR CAMA PROPOSE$r� PERMITTING + + g r� ei +�'^ , hyM1 FLOATING ,'� +t �.,/ i /Dp9l.' A%1OPI / / g +' D ONLY + KAYAK + dJ (PLATFORM + FLOW I 4 DD.Do _ I +,d z to 'to 20 +' �W1 \ ... . ... PROPOSED SILL _ _ 269 ! 270 +M1>P `\ �1 o b I PARGK LINE PER [`[rr II PROPOSED,;SILL 3O'_ J`g jy ' qa` 76: / ••�•1 i I col5rAV/ BON 404 im/BISBELL SL/J OSED OAFSsl (A1546 BY 6MME t ASSX.) 0 PROP +\ PROPOSED SILL I QZ6 gRNJ 0 vrIy Z / - \ ilF gxS ' 1 �I -� �\ PROPOSED \��i / o t� `\ E �.• \'"-' BIE&N DI6IBZEV `V PIER - i \ .�... —...� 5NOR£ilAE R70V42012 V\ z W I \ \ � 1 / � U � _JAEF RE ED I — BLOW EV577145 (/ OFFZEza w az r2TNP 7 '7 W� w z00'ZSo'FWo�rc dMCA 0LO Op7 5 10y0 j2'I a �V ��'L �.. .�L.,.. %IIr-_I•:•I%) � ` III I J [T'f' I I n IT «ZT-at-uo4i~�F aNQH-�O°' wmzo-FNwzNN w a�0Wo zo��ug0 wINA5TATE OF&7RBCAROL PM 07070510566 WTaNOZWzJz �VN Z 1rOZ J OOmW onwzwWW E4577N5 i 'PF�E PAW4NI6 LOT o . 1 J LLT IP5 LO L_ o Gw PlN# 0708/700/!04 I r.j -� O 6041\Drawings\pi6041 3/17/2017 2:01 PM N N X C: C n C r C7 m N z CD 0 m N z z N E at �� 0 n •try 1p C'",� w 1 m n u 9 V m CD CL ® Iv PROJECT ..cc��P ASS 20�7�s QULB1f a IGHT C 20r6s . PA(iB 2 - G'A1dA PLAN DSTAII..4 t It P16041 THIS DOZZ`'62EM IS THE PROPERTY OF II uible srHcc r9ss LOT 4C QUIBLE & ASSOCIATES, P.C. ANY ALTERATION OF THIS DOCUMENT IS l+� O I��1 BY DRAWN PROHIBITED. � IQ l & Associates, P.C. JTM�OTH IF THIS IS NOT SIGNED AND WANC[MM SSAP" �U�L PARS SEALED BY A LICENSED PROFESSIONAL BY A LICENSED THEN THIS DOCUMENT SHALL BE n ENGINEERING a CONSULTING PLANNING ENVIRONMENTAL SCIENCES * SURVEYING CHECKED BY WANCHESE DARE COUNTY BDR CONSIDERED PRELIMINARY, NOT A NORTH CAROLINA ,�I '"'r NC License/: C-0208 CERTIFIED DOCUMENT AND SHALL NOT BE USED FOR CONSTRUCTION, RECORDATION, SALES OR LAND 1/�� PO Drawer 870, Kitty Hawk, 47 27949 Phone: (2n2) 0 NTS NTS DATE 91-81447 Fax: (2n2) d91-B146 1/19/17 CONVEYANCES, NO EO. OTHERWISE GRAPHIC SCALE IN FEET 1"-NTS i. I '-`� E-Mall: adminlsfraforOqulble.com NOTES ;c FEDERAL.. • z i a ;_ 1. APPUCANT: NORTH CARWNA COASTAL FEDERA17ON - ' T CHANNEL yd a 7- i n w • i n o ng 2 OWNER: NC SEAFOOD INDUSTRIAL PARK AUTHORITY BROAD I O 100 LF t`'® +t ''' i t W ° y o o w m ATINz BOB �FXL 4DIRECTOR ... - -. GREEK SHORELINE +A� b w wz a PO OY�^ WANCHESE, NC.27991 -, (A-PROx N-�737'XVE,I - + i,I1 _.. z e..1 }1JU ztlmn 3. BOUNDARY & TOPOGRAPHIC DATA SHOWN BASED ON BISSELL ROADWAY & DRAINAGE IMPROVEMENTS PLANS FOR WANCHESE 'y 9h yl' +t� SEAFOOD INDUSTRIAL PARK. DATED 04/2007. THIS IS NDT A BOUNDARY SURVEY. WATER DEPTHS AND SHORELINE WERE FIELD +» +A +A SURVEYED BY QUIBLE & ASSOCIATES P.C., USING GPS, RTKNETWORK ON 8/6/16. THIS SHALL NOT BE CONSIDERED A CERTIFIED SURVEY. 4, WATER DEPTHS SHOWN ARE MM REFERENCED TO NAVO 86. WATER DEPTHS ARE MEASURED FROM NORMAL WATER I EVIEL OF 0.00. � +� ,ly +t + +A +AIP li rA (NORMAL WATER LEVEL - OZW NAVD 88) "� + +h A +h +tD +tPh +ty +»1il 6 > O w S. PA.WONSTR OF A 215 FT X 6 FT PILE SUPPORTED PIER WORIF- PATH A 12 FT X 20 FT PUIFIXIM + Aq , +hp� B. BOAT SUPS & KAYAK APURIENACE6 A6 +t' +t a (1) 8 FT x 16 FT KAYAK PLATFORM fi +t + 5 +t" _ ai _ IL 13 FT X 13Fr BOAT LIFT C. fS) 100 LF SILLS PLACED ALONG THE SHORELINE + + +A +t + +A� t1h +t +fl^a +9 •. ``�T D. AA 1GD FT X 50 FT AQUACULTURE DEMONSTRATION AREA + p� 1 + t < OROPOSED + .,'C +fl I PRELIMINARY ,�; rP + t� +tH +t 12' X 20• 4 0 ' +' +• +. + Qd PLATFORM+'t +t PROPOSED SILL ! `•..� + +a` FOR CAMA .. g.(/ / +'4 +t,p +t +»� PROPOSE�t��'; /t?}LOLIAONLTIIRo / / o \ , / / PERMITTING e' , 1s• ty' i°5FMQ S'1RA�Tt°�I,/ / q +t h +» +fl4T FLOATING +»� + ' ONLY AREA 4' + KAYAK p¢ ./.•j)0 '-�� i +Py3 j PLATFORM'4 + / / / / / / / /$/ / /11 + + +» + + hit / '- FLOW 5 00.00 qd +»�° s as ry �I - z Z Est �6 + + .0/ O z +h04 +� 1 g� +�... / +h J / pi w -AVht t •..�...�... .PROPOSED SILL-- - - -��Q � g D �• N1'' y OPROSEDSILL y V276 so / f PARG$ uA/ErPER ,BJT5K5f1VE ---------- OhSTiV$EiN 04 �q z PROPOSED �05V Y QBLEJ5GLJ S 04PROPO$EDSILL I - $ z % O 0 In ------ / LS 2j PROPOSED �. _ i i/� Y� OVE ® P6 o ,'-- HE6fll M77M? ��\ PIER rollna Environmental... . ... . 54bRL311✓F FROM 1012 zlu �. � Y/ ana ment Commission N._... _. •� nr ,�V \ J J y DWionn of Water Resource c>ate^Ia as t e 3 TWO.510RY rViAlilt#. '%lD 0- o Y o m adz w L'Ef•7LE it 0n oom6z. ogNg / �. %%� / ��'"�-•:L �Li%4ow I a ui �GJz Fgu"'1 jj F OWM .odd r �or�b 3p•G-A"' ,\T��'� ' I 5TA7EOE L(2,FiN 0RROLf1LT "+a wjaod zM �aGolonR w `��\ T i iv•' -/� !/ pLNA 0701051935% ©voi �c<.z�g "z�' Fuoiw�rc z�z •O ___� `� _.. _.. _.L'-� ._.. _, ":.. � O of o o Do xw mod. I — So�� n t I I I OC 5m youw zLLw wr Z w w V PN6 Loorr —�` ! sPPRD rF9MV AST J II j T7 LET 6fiZL, So ,y f Lx _ J a '� FS u m o c PIN# o7obrW104 ' a d a w 1 • ,