HomeMy WebLinkAbout20-18 Renewal 2022 Fulcher Point LLCPermit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
V ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Fulcher Point LLC., 101 South Avenue, Oriental, NC 28571
Permit Number
20-18
Authorizing development in Pamlico County at adi. to Raccoon Creek, at 101 South
Avenue, in Oriental as requested in the permittee's application dated letter dated
This permit, issued on May 5, 2022 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
oe subject to tines, imprisonment or ctvu action; or may cause me perm¢ to oe nun ana vota.
1) This Renewal shall be attached to Permit No. 20-18, which was issued to the permittee on 3/9/18, as
well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
17-0814 v2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2018-00024.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the perm it expires on
December 31, 2023
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
Z_//41�1
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
DCM Coordinator: Permit #:
// !� (— MAILING DISTRIBUTION SHEET /
Permittee: 1~Z 444, iC>t'VLT G(� !p/ Sc�. n Arer e 642;cti(n /5
DCM Field Offices
Elizabeth City Washington , (with revised work plan drawings)
Morehead City Wilmington 1 (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans,
Tyrrell)
Josh Pelletier (Bertie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington)
Tom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome (NC DOT -Remainder ECity/Washington District)
Wilmington: Greg Curry (Brunswick, New Hanover)
Liz Hair (Carteret, Onslow, Pender)
Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Cultural Resources:
Public Water Supply:
Marine Fisheries:
NC DOT:
Shellfish Sanitation:
State Property: .
DEMLR/DWR:
Washington:
Renee Gledhill -Earley at Environmental.Review@ncdcr.gov
Heidi Cox (WIRO)
Kim Harding
David Hams
Shannon Jenkins / Sharon Gupton
Tim Walton / Mike Moser
Sheri Montalvo / Shelton Sullivan
Chris Pullinger — 401
Tina Martin - 401
Clif Whitfield (WARO)
Jimmy Harrison
Roger Thorpe-Stormwater
Garcy Ward- (NCDOT-Beaufort, Bettie, Camden, Carteret, Chowan, Craven, Currituck,
Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Holley Snider — 401 (Pender, Brunswick, New Hanover)
John Perry — 401 (Onslow, Carteret)
Christine Hall - Stormwater
Joanne Steenhuis - 401 (NCDOT-Brunswick, New Hanover, Onslow, Pender)
Wildlife Resources:
Natural Heritage Program
LPO:
� 1 &ILue I
Rodney Butler
(NCDOT) Travis Wilson
tilt Ws'
point �rcbe eafoub; ;�1nc.
PRESH & FROZEN PACKERS
-PbAox25o -
Oriental, N.C. 28571
Phone: (252) 249-0123, 249-2722
FAX (252) 249-2337 "
April 21, 2022
NC Coastal Management Environmental Quality
Re: Permit # 20-18
To Whom it May Concern:
Permit # 20-18 was issued to Fulcher Point, LLC on March 9, 2018. This permit authorized the following
work to be completed:
*Removal of old pilings and railroad bed
*Construction of new vinyl bulkhead
*Excavation of the project area
*Construction of new docks and platform
We are requesting renewal with the intension of completing work within the following year.
Due to Covid, inclement weather and equipment failures the project started late.
There is no change to the original permit.
This project is in compliance with conditions of the current permit.
Sincerely,
�lu�cGlC µfcr'tCf—
Garland C. Fulcher
APR 2 5 2022
EPP SECTION MHO
NC Division of Coastal Management
CAMA Major Permit Renewal Request
District: WaRO Major Permit Staff: Gregg Bodnar
Applicant
Name: Fulcher Point LLC Request Date:04/22/2022
Last Firs)
Project
Address: 101 South Avenue Oriental 28571
Simet Address
001 ZIP Code
CAMA Permit Permit Expiration Payment
No.: 20-18 Date: 12/31/2021 $ 100.00 3877
Agent's
Name:
District Manager/Field Rep Approve? (Initial YE ^
NO
Appropriate Box) I-- ❑
i[..,
Other• Infra nl,riion.
DWR USACE Action
Project No: 17-0814 V2 ID No.: ?c, 8- COD7.4
If Yes,
Has substantial YES Explain
development occurred? Q- NOE]: I?.h� IGr1�lY> t Co^ f't LT r , y(Ar�•� l/ Z
L—'lac v1 4-r-5 15ri-P2-i�
YES NO
Recommend to Renew? R----8
If Not Approved,
provide Justification:
€ IP SECTION WED
15A NCAC 07J .0404 DEVELOPMENT PERIOD EXTENSION
(a) For CAMA minor permits authorizing beach bulldozing, the permit holder may request a one-time 30-day
permit extension. No additional extensions shall be granted after the 30-day extension has expired. Notwithstanding
this Paragraph, the permit holder may apply for another minor pennit authorizing beach bulldozing following
expiration of the 30-day permit extension.
(b) Where no development has been initiated during the development period, the Division of Coastal Management
or Local Permit Officer shall extend the authorized development period for no more than two years upon receipt of a
signed and dated request from the applicant containing the following:
{1) a statement of the intention of the applicant to complete the work.
(2) a statement of the reasons why the project will not be completed before the expiration of the
current permit;
(3) a statement that there has been no change of plans since the issuance of the original permit other
than changes that would have the effect of reducing the scope of the project or previously
approved permit modifications;
/ (4) notice of any change in ownership of the property to be developed and a request for transfer of the
permit, if appropriate; and
(5) a statement that the project is in compliance with all conditions of the current permit.
Where substantial development, either within or outside the AEC, has begun and is continuing on a permitted
project, the permitting authority shall grant as many two year extensions as necessary to complete the initial
development. For the purpose of this Rule, "substantial development' shall be deemed to have occurred on a project
if the per ittee can show that development has progressed beyond basic site preparation, such as land clearing and
grading, and construction has begun and is continuing on the primary structure or structures authorized under the
permit. For purposes of residential subdivision, installation of subdivision roads consistent with an approved
subdivision plat shall constitute substantial development. Renewals for maintenance and repairs of previously
approved projects may be granted for periods not to exceed 10 years.
(c) When an extension request has not met the criteria of Paragraph (b) of this Rule, the Division of Coastal
Management may circulate the request to the commenting State resource agencies along with a copy of the original
permit application. Commenting State resource agencies will be given three weeks in which to comment on the
extension request. Upon the expiration of the commenting period the Division of Coastal Management will notify
the applicant of its actions on the extension request.
(d) Notwithstanding Paragraphs (b) and (c) of this Rule, an extension request may be denied on making findings as
required in either G.S. 113A-120 or G.S. 113-229(e). Changes in circumstances or in development standards shall be
considered and applied by the Division of Coastal Management in making a decision on an extension request.
(e) The. applicant for a major development extension request shall submit, with the request, a check or money order
payable to the Department in the sum of one hundred dollars ($100.00).
(f) Modifications to extended permits may be considered pursuant to 15A NCAC 07J .0405.
IlistoryMote: Authority G.S. 113A-119; 113A-119.1; 113A-124(c)(8);
Eff. March 1S, 1978;
Amended Eff. August 1, 2002; August 1, 1000; April 1, 1995; March 1, 1991; March 1, 1985;
November 1, 1984;
Readopted Eff. August 1, 2021,
RECEIVED
APR 2 5 2022
r e, ntt Class Permit Number o-
NEW
20-18
STATE OF NORTH CAROLINA
a Department of Environmental Quality
Y
Coastal Resources Commission
} • .�errrYi�t
<for
X Major Development in.an Area ofEnvironmental Concern
,pursuant to NCGS 11,3A-118
X Excavation and/or filling pursuantto.NCGS 113-229
Issued to Fulcher Point LLC., 101 South Avenue, Oriental, NC 28571
Authorizing development in Pamlico County at adi. to Raccoon Creek. at 101 South
Avenue, In Oriental as requested inthe:permittee's'application dated 10/12/17.(MP:q, 9115/17 (MP-2), `
3 10/9/17 (MP-4), incl. attached•workplan drawings (3), Sheet I of & Sheet 3 dated "Rec. 9/22/17" &Sheer2 dated "Rec. 10117/17".
This permit, issued on MarchY, 2018 is subject to compliance with the -application (where
consistent with the permit), all applicable regulations, special conditions and notes set -forth below. Any violation
of these -terms may be.subject+to fines,; imprisonmeht,ot..civil action; ormay.causethe permitto'be.null'and.void;
t
Excavation
T) Inorder to protectjuvenile shrimp and finfish populations; no excavation orfilling shall;bepermitted
between April• Land`September 30 of any.year withoutthe prior approval of•theDivisionof Coastal
;Management, in consultation with appropriate resource agencies.
A
2) No excavation shall -take place outside of the area, indicated on:the workplan drawings.
3) Excavation'shall adhere to the tapered depth.cut as depicted on Sheet 3, dated "Rec: 9/22/17".
'Excavation shall.not exceed 43 feet below the normal waterdeve'l. In no case shal1the depth of
excavation exceed the depth of connecting waters. x
(See attached sheets for Additional Conditions)
This permit action maybe appealed by the:permittee or other Signed by the authority of the Secretary' of DEQ' and
•qualified persons within twenty(20) days of the issuing date. Chairman of the Coastal Resources. Commission.
This permit must be 'accessible on -site to 'Department
:personnel when,the project is inspected for compliance.
Any maintenance work or,project modification not covered
'hereunder regdires •further Division approval.
IV, �I'
All work must cease when the, permit expires on ,
Braxtota ,Davis, Director
//,-%*-Division,of Coastal Management
This permit and1s conditions are hereby accepted.
December31,2021 APR 2 5 2022 t
In issuin&this permit, the State of North Carolina agrees that
your.project is consistentwith tenorht Caolina Gqa tatt.�r )
Management Program. ' r 9 :a L� 4 5 t I EA p`', C 1 A
Y}\q<�-<-fiN3u4 t-n\tiJn'�=•PWr�..'^Y'.•�.v w.>i• .ree .;...n ..♦...
Signature of Permittee
{ v.n....•.
Y
i t .
Falcher i'oint'LLC. Permit No. 20-18
Page 2 of 4.
ADDITIONAL CONDITIONS
4) The temporary•placement or.double.handling of excavated or fill materials within waters or vegetated
wetlands is -not authorized.
Sooil.Disoosal
i
r
5) The spoil disposal area. shall be inspected and approved by a representative of the -Division of Coastal
t.
`Management prior• to the commencement of any dredging activities.
>t 6) The permittee,and/or his. cont shall take all necessary precautions to ensure that the spoil material
is properly contained during transport to the disposal'• site, and, that all.the proper.coordination has taken
l place with,the local_or state governments4o ensure:that anydamage to public streets caused by transport
k 'of the spoil material has •been•addressed.
t
Maintenance Clause
7) The Division of Coastal Management shall be notified inwriting at least two (2), weeks in advance of
3 any maintenance work authorized by this permit, and such notification shall include:
A. The number of the original permit.
B. A statement that no:dimensional changes are proposed.
C. A,copy of the original permit plans.with,cross-hatching•indicating.the area,to-be•maintained; the
area to'be used for spoil disposal, and the estimated amount -of material to be "removed. The
loeation, design and holding,capacity of the spoil disposal site shall be approved by a
representative of the Divisionprior to the initiation of any maintenance dredging .activities:
E' D. The date of -map revision'arid-the permittee''s signature,shown anew on -the original plan.
' CommercialDockine'Fk i
9) This permit authorizes only the docks, piers, and other structures and uses Iocafed inor over the water
that.are expressly an&specifically set f'N
orth in the permit application.o other structure,'whether
floating or stationary, shall become a permanent part,of this•commercial docking'facility without permit
modification. No non -water dependent uses of structures,shall be conducted.on, in or over Public Trust
waters without permit modification.
10) No sewage,, whether treated or untreated, shall be discharged at anytime from•any boats using the.
commercial docking facility. Any sewage discharge at the commercial docking facility shall be
considered a violation of this permit for which the permittee4s responsible. This'prohibition•shaltbe
applied and•enforced throughout the entire existence of the.permitted structure.
11) The permittee shall install and maintain at his:experise any signal lights or'signals prescribed,bythe U.S.. y
Coast Guardoluough regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be' attached to the structure in order to make it mor sg its a i o�tr ;of darkness or
inclement weather.
a
APR 2 5 2022
MP SEC tl 79,0M XF)
-X-%"vl iiY+N\-yftihhh:%K•etrXiiS •hY ^:h+(-Yivti{<+^.\Wi'S:-% S'-iti0%J%.T A-0(4\�:y ti..vh\hit.}:.Y.q•1WY.'fP'-.:tidl.A-i-i%fH+/(/n :{Oi bM<4;.\MTan.Y:
Filcher Point LLC. Permit No. 20-18
Page 3 of 4,
ADDITIONAL CONDITIONS
12) -This permit authorizes a maximum of 6 formalizedboat slips.
13) The commercial docking facility and associated stnictures shall'have a minimum setback distance of,
feet between any parts of the,structure and the,adjacent property owner's, Iriparian access;corridor. `.
44)' No attempt,shaltbe made by the �permittee,to,prevent the full,and1ree use,bythe public of all'navigable
waters at or adjacentto theauthorized work.
!
15) , This permit does not authorize the interference •with, any .existing or proposed Federal,project, and the
permittee•shall not'.be entitle&to compensation for.damage to the authorized structure,or work, or injury
which -may be caused from existing o'r future`operations undertaken by the United States in the public
interest.
NOT& It is strongly recommended that the pemiittee exercise all available'precautioiis.in the day-to-day
operation of the facility;to,prevent faoility,waste from,enterinwthe adjacent watersrSuct .
discharge; either directly or indirectly,,.to,adjacentwaters could contravene -state water'quality
standards;.thereby violating state law,
Easement
16) .An Easement from "the Department of Administration's,State. Property.Office'is required under ''N C.G.S!
146-12(e).'T.he perniittee shall'contact=the State'-Property,Office prior to the initiation of construction of
any structures: overstate=owned submerged lan&to obtaiman'easement. Any, required easements shall'
'.l c obtained and'a copy proyided'to the Divisiomof'Coastal Management, prior to>the construction of
t anymew boat'slips�6r other docking facilities authorized under.this-permit.
'Shoreline Stabilization - Buikhead
17) The bulkheadshall,be constructed in accordance with the"alignment depicted.in the workplan drawings.
18) The l ulkhead•shall'be constructed.prior to any backfilling activities.
k 19)'v The bulkhead shall bo structurall-y tightso as'to:preverit seepage of backfiil;materials through tlie°
i structure.
20) The fill. material shall- be clean and free of any pollutants'except in trace quantities. "
21) All backlill material shall be obtained from a high.ground source and'confined behind the permitted
bulkhead.
Sedimentation' and Erosion'Controf
22) Aground cover sufficientto restrain, erosion. shall .be provided'within 30.calendar days of any phase of
E grading on cut or filled slopes. At a minimum, a.silt fence shall'be properly.in to ed(iedd e 1 -
- landward,of the bulkhead;cap'.iinmediately following completion,ofbackfillirig activities.
APR.,2 5'2022
Fulcher Point,LLC.
Permit No. 20-18
Page 4 of 4
,AIDDITIONAL CONDITIONS
General
23) This permit authorizes only the.proposed development,,as,depicied in the attached permit application,
project narrative, and: workplan'drawings. Any other work or development proposed in an Area of
Environmental'Concem,(AEC), including;but not limited, to the Coastal and'Estuarine.Shoreline AECs
and located within the applicant's,property; shall require a.review and authorization from the Division of
Coastal Management prior towork,commencing.
24) This permit shall not be,assigned, transferred; sold, or; otherwise disposed -of to a third party without the
written approval of the Division of Coastal Management.
25)' The permittee shall maintain the.authorized:work in good conditiomand.in conformance with the terms
and conditions of this permit. The permittee,is not relieved of this requirementif he abandons the
permitted activity withouthaviug it transferred to a third'.party:
26) The permittee and/or his or.her contractor shallmeet with a representative of the Division prior to
project initiation.
NOTE: This;permitdoes not eliminate the need to obtain any additional state, federal or local permits;
approvals or authorizations that may'lie required,' including but not to any authorizations
required.from theV,4..Army, Corps,of Engineers.
NOTE: The:N.C. Divisionof Water'Resources,authorized'ihe proposed•project by way of General. Water
Qualityy,,Certification :4097,and assigned ihe,project'DWR' Project No. 17-0814 V2.
NOTE: Thepermittee is'advisedahat'inany land disturbing activities are not authorized within 50 feet of
the.normal waterdevel unless 'specifically exempted:byEnvironmentat:Management•
Commission's'(EMC) Neuse River,buffer regulations in place•at,the-time,of such development.
NOTE: An application�processing,fee of $4QO was•received by',DCM for .this�projea This fee.also
satisfied the;Section 401 applicatiomprocessing.fee requirements of the,Division of Water
Resources.
APR 2 5 2022
R41P �T60N M, HD
I
Ism mr-Y
APPLICATION for
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1.� :Primary Applicant/Candowner /nfonnatioti
Business Name
Project Name (If applicable)
Fulcher Point, LLC
Proposed Bulkhead a Dock improvements, Fulcher Point, LLC
101 South Avenue, Oriental, NC
Applicant 1: First Name
MI
Last Name
Garland
Chris
Fulcher
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
State
101 South Avenue
PO Box 250
Oriental
NC
ZIP
Country
Phone No.
FAX No.
28571
USA
252- 249 -0123 ext.
252- 249 -2337
Street Address (if different from above)
City
Stale
ZIP
Email
2 agent/Contractorinformation
Business Name
Dennis Ferries &Associates
Agent/ Contractor 1: First Name
MI
Last Name
Dennis
A
Ferries
Agent( Contractor 2: First Name
MI
Lest Name
Mailing Address
PO Box
City
State
1266 Roberts Rd.
Grantsboro
NC
ZIP
Phone No. 1
Phone No. 2
28529
252. 249 - 0488 ext.
252 • 670 • 4216 ext.
FAX No.
Contractor #
252-249-2052
Street Address (if di//erentfrom above) I
City a.
State
ZIP
Email Mr.
seafood@fulchersnc.net
APR 2 5 2022
<Form continues on back>
OCT 17 2017
PAP SECTION MHD PCM MHq :mil
252.808.2808 .. 9.888.4121;OA 1' .. www.ncecas4almanagemant,ne4
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3: Project'Cocation
County (can be multiple)
Street Address
State Rd. #
Pamlico
101 South Avenue
Subdivision Name
City
State
Zip
N/A
Oriental
NC
- 28571
Phone No.
Lot No.(s) (if many, attach additional page with list)
252 249-0123 ext.
N/A
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Neuse
Raccon Creek
C. Is the water body Identified In (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
❑x Natural ❑Manmade ❑Unknown
Neuse River
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within.
Town of Oriental
4 Slte Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
210 Linear ft.
14359 sq.ft. sq. ft
C. Size of Individual lot(s)
J082-423; 4786 sq. ft., J082-424; 9573 sq.
d. Approximate elevation of tract above NHW (normal high water) or
ft (If many lot sizes, please attach additional page with a list)
NWL (normal waterlevel)
5.6 feet above❑NHW or ®NWL
e. Vegetation on tract
Existing vegetation includes a limited amount of native grasses and a one decldlous tree.
I. Man-made features and uses now an tract
The only man-made feature attached to the site is an existing commercial dock used by commercial fishing vessel(s) for temporary/ transient
dockage of vessels while in port from fishing activities.
g. Identify and describe the existing land uses ad acent to the proposed project site.
One the East side of the property Is The Town of Oriental Public docks and Restfeems North of South Avenue. On the east side of the
property and south side of South Avenue is Single Family Residential homesite.
To the Southwest is a sefood processing facility.
h. How does local government zone the tract?
1. Is the proposed project consistent with the applicable zoning?
Mull
cc;
(A�ch zoning compliance cer0ficate, if applicable)
®Yes ❑No
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes MNo []NA
If yes,. by whom?
I. Is the proposed project located in a National Registere�d pI-�sprq��V4rsW
National Register listed or eligible property?
ti `46mt
� o doe -1 nvolve a ❑Yes [-]No ®NA
<Form cppnt as oro2gxt page> RECE W%D
OCT 17 2017
252.808.2809 :: •1.8
.. �N �fJ W.n CCOFlS tnlnlan
CITY
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (I) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes [?3No
(iii) If yes to either (1) or (li) above, has a delineation been conducted? []Yes []No NIA
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Bay River Metropolitian Sewer District
o. Describe existing drinking water supply source.
Town of Oriental Water Supply
p. Describe existing storm water management or treatment systems.
Diffuse Flow
5 .4cfiv�tres anallmpacPs
a. Will the project be for commercial, public, or private use? ®Commercial ❑PubiiclGovemment.
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The primary purpose of this project is to provide additional docking facilities for the growing fishing fleet of Fulcher Point, LLC. Secondary
purpose is to repair the existing bulkhead adjacent to the existing building. The bulkhead shows signs of failing and may compromise the
foundation and structural integrity of thebuildingunless repaired and strengthened.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The project will proceed with the installation of the proposed bulkhead along the the southeastern shore of Raccoon Creek and adjacent to the
existing building (see work plans). Dredging will proceed following completion of bulkhead construction. Dredging equipment will include barge
mounted excavator. Dredging spoils to be loaded on Dump body trucks and transported to approved spoils site located at 20666 NC Highway
55, Merritt, NC. Tax Parcel 106-1 Pamlico County. Dock construction and platform construction shall follow dredging operations.
d. List all development activities you propose.
The project will consist of; 1. Installation of sheet vinyl bulkhead along the Southeast Bank of Oriental Harbor usin vibratory hammer attached
to track mounted excavator. 2. Realign and repair existing bulkhead along adjacent building (see work plans), Modi y and widen existing dock
adjacent to Town of oriental Dock (widen to 9 feet). Construct docks: 1@112' long X IV Wide; 1@ 48' long X 8' Wide; and 1 Construct 610
square feet onloading/offloading platform. Also proposed Is ldock@145' long X 6' wide over Raccoon Creek running along the proposed
bulkhead.
e. Are the proposed activities maintenance of an existing project, new work, or both?
Both
f. What Is the approximate total disturbed land area resulting from the proposed project? 3000 [nSq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public sccessway or other area []Yes INNo []NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
I. Will wastewater orstornwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
j. Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mill g�tlo FFO osar b V E
cod
Njr`'. u=0V =
APR 2 5 2022 <Form continues on bacb
OCT '1 7 2017
.Vvvw,nccoar:talr1�8, n t, et �I
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
Instruction booklet on how to propedy prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
I. A list of the names and complete addresses or the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the. Division of Coastal Management
Name. T507 Church street (. )own of Oriental Phone No. 252 249-0555,:
,
Address,PO boz 472 Oriental, -NC 28571 ,
...:.
Name Phone No.
Address
Name - Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Permit # 92-11 dated July 29, 2011; General Permit #54371C dated 9-1-2009
h. Signed consultant or agent authorization form; if applicable.
I. Wetland delineation, If necessary.
J. A signed AEC hazard notice for projects in oceanfront and Inlet areas. (Must be signed by propertyowner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
I understand that any permit Issued In response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands In connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _05-03-2017 Revised 10-12-2017 Print Name Garland Christopher Fulcher
Signature iNNf D h NYC
p ea ', dal e t�� uz'
Please Indicate application attachments pertainiin^ng to your proposed project.
RDCM MP-2 ®DCM MP-3Upl Uplion and andDevelopment lfor i CLEE' VE-D DCM MP-5 Bridges and Culvert
RFCOVEK
®DCM MP-4 Structures Information OCT 1.7
C11.7 2017
APR 2 5 2022
DCM- MHO CITY
w.necoa slsinr t:na;9emavr k.nat
Forth DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Channel
Other
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
NWL)
Breakwater
shoreline
stabilization
Length
200'
175'
Width
50'
105'
AvgExisting
varies 9.5' to 14'
Depth
NWL
2' tT
o
NA
NA
Final Project
Depth
13.5' below N
L
11' to 13'
NA
NA
1 EXCAVATION OThis section not applicable
a Amount of material to be excavated from below NHW or NWL in cubic yards. b. Type of material to be excavated.
3000 cy yds creek mud
c. (1) Does the area to be excavated include coastal wel andslmarsh d. High -ground excavation In cubic yards.
(CW) submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the 50 cu, yds
number of square feet affected.
❑CW _ ❑SAV ❑SB
❑WL _ ®None
(ii) Describe the purpose of the excavation in these areas:
2. DISP.OSAL OF EXCAVATED MATERIAL ❑This section not applicable
a Location of disposal area. D. Dimensions of disposal area.
nc pin: 6489149731 Pamlico County
7n sea ur urnw ar; nRIFNT� Nr �Ss» 500' X 200' agricultural
c. (i) Do you claim title to disposal area? d. (1) Will a disposal area be available for future maintenance?
®Yes []No ❑NA ®Yes ❑No ❑NA
(it) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (1) Does the disposal area Include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW _ ❑SAV _ ❑SB
tAL 9a°nR153E I ONC 76°e11n7 39"
f. (I) Does the disposal include any area In the water?
❑Yes ®No []NA
(ii) If yes, how much water area Is affected?
❑WL ®None E'�9C�
Cl) Describe the purpose of disposal in these areas: 22
NIA m V�p
ED
PR Z 5 ?022 REa
SEP 2 S' 2017
f�' q,(�R�y qry
JJ� �'r�e�v �6 �Ot'! 511E1 0.4-M l,.f,l✓fyR., r�351'v1 ? (jT^!,�
2152•fiO3�?..80ii :: 'I •d3S8-iN2 L"r)115!' :: +,,n. rv.nccr:isttirnanaaemPn't n�+t•
revised: •I �(7.6l0^u
r�i3Y,1Y3 MIylr l/)}r^: (Batsaaati;rn Elan? Fffl, rage ? of ?)
3. SHORELINE STABILIZATION ❑This section not applicable
(If development is a wood groin, use MP-4 — Structures)
a. Tvoa of shoreline slandlzaonn• ,, I ,,....... ,crc
®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: _ Width: 1' CAP
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
Along average normal water of creek 3 feet
e. Type of stabilization material:
vinyl sheeting sea wall
g. Number of square feet of fill to placed below water level.
Bulkhead backfill 220 Riprap
Breakwater/Sill_ Other_
I. Source of fill material.
off site borrow pit
a. (I) Will fill material be brought to the site? []Yes ❑No
If yes,
(H)Amount of material to be placed In the water 0
(III) Dimensions of fill area _
(Iv) Purpose of fill
I. (i) Has therebeen shoreline erosion during preceding 12
months?
❑Yes ®No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
Information.
h. Type of fill material.
FILL SAND
- ®This'sectfon not
(I) Will fill material be placed In coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV _ ❑SB
❑WL []None
(it) Describe the purpose of the fill in these areas:
N/A
n ! M�
5. GENERAL SEP
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment wi'Le„�{�gd,(e.g,,,dg41,���M
controlled? backhoe, or hydraulic dredge)? lllhr NN991�1,^ 444�f10l llff'�Y 101
.AA ppreved silt fence curtain to sturgund di t r6 d areas,9ackhns
Disturbed areas to be revegetaled and growth established.
C. (1) Will navigational aids be required as a result of the project? d. (1) Will wetlands be crossed in transporting equipment to project
❑Yes ❑No 91NA site? []Yes QNo ❑NA
(I!) If yes, explain what type and how they will be Implemented. (11) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
W7 K7)
Date
. 09-18-2017
APR 2.5 2022
Project Nome �; (n � C; C'+^ J a F'O �� I! p.�
Fulcher Point Bulkhead �Sdo�ck imp o3eme t ' 'I /
AppllcantNeme.
![. rlandChris Fulcher _ ..
A It' cant Signature,
�
2,52-80£I-2300 1-9834RCOA'37 r u+.•w ;v,nt^cn:��tabnanankmanl,ned I
re,rised: 12i' &. 115
Form DOM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this farm to Joint Application for CAMA Major Permit, Form DCM MP. f. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please Include all supplemental Information.
I. DOCKINGFACILIFY/MARINA CHARACTERISTICS pThlssecr/pnno)app)icabfe
a (q Is thedockingfedliWmadne: b. 0)Will the ladlitybe open to thegcnemlpubli�?
®Cammerdal OPublltlGoverrmant QPdvate)Communky Yes ®No '
o. 0)Duck(s)anth"plans)
d. (I)AmFinger Piece icluded? (]Yes ONO
(i)Number 3
�d
1(yes:
(dp Lenggr ga'(wds6n0), iQi12', 1Q46', 1Q745'
(li)Number
(W)widlh 1151Y(rtrotlifyeaisting), 1(g1o', 1Q8'1Q6
Lzngth
)
(v)Fleatlng ❑yes pNo
(iv _
(N)Width
(v)Floatir* dyes QNo
Q. 9) Am Platforms included? (MYes ONO
1. (1) Are BoatlidsinQ%rded? ❑ IMNa
oyes:
lryes:
(it)Number 1
(11)Number
(uf)Length 24'
(iiq Length
'(Iv) Widlh 24'
_
(Iv) Width
(Y)Floating Eyes (@No
'-
Hole: Roofed owes am cakulated fmrn ddpVne dhnenskns
g. O Number of signs pmposed
6
(1I) Number of slips eod;U g
g
L Checkdmpmposedlypeofsiting:
❑ Land cut and access channel
®Open vreler, dmdgicg for basin and/or channel
00pen vrelen no dredging required
130ther, please describe:
h. Check all the types of eerdces to be provided.
❑ Fug service, Including hovel HR and/or mg, repair or
maintenenceseMce
❑ Dockage. fuel, and marina supplies
® Dockage ('avut slips') only, number of sups: 6 ❑
Ory storage: number alienate:
❑ Boat mmp(s); numberof boat romps:
❑ Other, plenedescribei:
(. Desedbe the typical boats to be served (e.g.. We mnaboul,
charter boats. Sall boats, mixed types).
Commercial Flshing Tmnlem
k. Typical boat length: 101 I. (I)Will the fedutybe open to the general public?
in. (i)Wiillthe fecnityhavetioplllege? OYes (RJNo
®Yes OND
(il) If yes number of de pilings?
a dolphin clus!ers; 3 axlsung+tpmposed
26).,:aa..2sea :: • ^per., �CDAs? s s✓nviarCG]3r:
RE.CE flif E D
APR 2 5 2022
E'vhP SECTEON MHD
L-cm
Forth 0CM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
DOCKING FACILITY/MARlN.4'CHARACTERlSTIC$
0 This'section not applicable
a. (1) Is the docking facility/marina: b.
(I) Will the facility be open to the general public?
®Commerdal ❑Public/Government ❑Private/Community
❑Yes ®No
c. (1) Dock(s) and/or pler(s) d.
P) Are Finger Piers Included? ❑Yes ®No
(11)Number 3
If yes:
(III) Length 10 90'(existing), 1@103', 1@48'
(ii) Number
(Iv) Width low. 1@9', 1@10'
(II) Length
(v) Floating ❑Yes ®No
(iv) Width
(v) Floating ❑Yes []No
e. (I) Are Platforms Included? ®Yes ❑No f.
(1) Are Boatlifts Included? ❑ ®No
If yes:
If yes:
(li) Number 1
(11) Number
(III) Length 21V -
_
(ill) Length _
(iv) Width ZV
(iv) Width
(v) Floating ❑Yes ®No
_
Note: Roofed areas are calculated from dnpfine dimensions.
g. (!)Number of slips proposed h.
Check all the types of services to be provided.
IDP l0 — lM I Zoo
❑ Full service, Including travel lift and/or rail, repair or
(11) Number of slips existing
maintenance service
0
❑ Dockage, fuel, and marine supplies
® Dockage Net slips") only, number of slips: 7
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
I. Check the proposed type of siting: I. Describe the typical boats to be served (e.g.. open runabout,
❑ Land cut and access channel charter boats, sail boats, mixed types).
®Open water; dredging far basin and/or channel Commercial Fishing Trawlers
[]Open water, no dredging required _
❑Other; please describe:
k• Typical boat length: 100 AV2 facility P general public?
Will the facili be open to the eneral ublic?
m. (i) Will the facility have tie pilings? ❑Yes ®No tl'SECm V ED
®Yes []No APR 2 5 2022 Ulf ly
(11) If yes number of Us pilings? OCT 17 200
4.do)pbin clusters; 3 existing+/proposed
MP SEC ION F'ttll D Dom^
a5?-�o�tarsog ;: I-aot�•nftcttAyT :: vvyrr,1.ncceastainsanacaomr:tr2 nef rellised: 12127166
Farm fl:)CPA UP-4 fStruruires, fags 3 o'r 4)
a. Check each of the following sanitary facilities that will be Included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number. _; Location:
❑ Showers
❑ Boalholding lank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
None
c. Describe the disposal of solid waste, fish offal and trash.
None generated by this operation
d. How will overboard discharge of sewage from boats be controlled?
e. (1) Give the location and number of -No Sewage Discharge" signs proposed.
(il) Give the location and number of'Pumpout Available' signs proposed.
NIA
f. Describe the special design, if applicable, for containing Industrial type pollutants, such as paint, sandblasting waste and
oetroleum nrndurfa. N/A
g. Where will residue from vessel maintenance be disposed oft
h• Give the number of channel markers and "No Wake' signs proposed. 0
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
There will be no fuel handling facilities located within the project area
j. What will bethe marina policy on overnight and live -aboard dockage?
k.
N/A
uescnoe assign measures that promote boat basin flushing?
N/A
I. Ifthis -project is an expansion of an existing marina, what type l�o(tsery esrre�%%rFe�y, r video? IC7 COV ED
APR 2 5 2022
--252-fltII;-?0DF1::'I•E3fi-A6;Gt3A.RT;;vuv+nr.ncco::ista�manag'e'Ynerit.Ne'2 .5�1'� revised: 'i 2/271DS
�1*01111 DC'M PJP-4 (-S2ritctimes, P—II jD 9 of 4)
M. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ®No
n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area?
[--]Yes ®No
o. Is the marinaldocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)7 If any boxes are checked, provide the number of square feet affected.
❑CW —, ❑SAV _. ❑SB _
❑WL _ ®None
P. Is the proposed madna/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
r ovvinvUJt+(lricludingcoveredllRsJ-'
a. (i) Is the boathouse slruclure(s):
❑Commercial ❑PubliclGovemment ❑Pdvale/Community,
(h) Number _
(ill) Length
(iv) Width _
Note: Roofed areas are calculated from ddpline dimensions.
a• (1) Number _
(it) Length
(Ili) Width
a. Length _ b. Average distance from NHW NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
§ MOORING PILINGS and BUOYS
®This section not applicable
a. Is the strucfure(s): b. Number
[]Commercial ❑Public/Government ❑private/Community
c• Distance to be placed beyond shoreline. d. Description of buoy (color, Inscription, size, anchor, etc.)
Note: This should be measured from marsh edge, if present.
e. Arc of the swing _
ti V LH C E It I45 E'0
APR 2 5 2022 IEs V[ED
PAP SE- CT10N M HU D
OCT 17 2017
V011i- 1WHO CITY
252.8g8.28g8 :: 1.888•�tRCDAST :; rrwnnrarceoaa talmananernoni net
revised: 12127106
i"1n➢•'ir7 TJ%�ll �)��^:r?, ($tnrs:trrt'as, 99iaa � o± rl)
7 GENERAL`
a. Proximity of structure(s) to adjacent riparian property lines
35'
Note: For buoy ormoonng piling, use arc of swing including length
of vessel.
c. Width of water body
335,
e. (1) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(11) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docldng facilities.
55'
d. Water depth at waterward end of structureat NLW or NWL
13' below nwl
[$ OTHER ®This stbctlon not appfrahle
. _ .
a. Give complete description:
Applicant Signature . 4B2XA,2.
Dennis A.`Fomes for Christopher Fulcfie
C;E D
APR 2 5 2022
G1a�P ��d ID
IR, LECEWED
OCT 17 2017
D(�R .- UMAD CITY
?82-80f{ h808 :r 1••!}iS3�47iCAS157' ;: ovsvw.ncceostalnaananemen4.not
revised: 12127106