Loading...
HomeMy WebLinkAbout88564C - Comer, RobinI#r!N @DG ILLN9 88564 A s c •D RAL PE IT PreYlousperme 0Date previous permic(ssueModifiearlon pleteReissue Partial Reissue As auihotized by th/eof � OnR �®patmont ro unoreal Quality and the Coastal Resources Co nnAw lan In an area of environmental mexem puneam W: I SA NCAC _/')i' Rules attached. Id General Pomdt RWea available at the iagowing link .:•r, �V�I/A'/��.',JIIYt`Ar),I R/.L/'�'/.'/,T11�/�r�/.�/ !:�lll Type of Project/ Activity 6jr t ff Shoreline length 77 OT Access Length Pier(dock) lengthk8—�- Floating Total Ptatib m area Groin length/# Bulkhead/Ripmp length r—� Avg dlstmn ae offshore Breakw ter/SIII �1 Boatramp — Boathouse/BoatBh Beach Bulidozrng--+ other~� SAV observed: yes Moratorium n/a Yes Site Photos: Yea Riparian Vht% rAttached: yes al inure"rl rasa mmpl:anm statement: an beck of perm MGM GtUQ � .. TANPMyNEUSEtBUFFER (chile one) See note on back regarding giver Basin rules See addidanal noWbendhlarm an back Date (ill AMA ❑DREDGE & FILL N°88564 B C D ENERAL PERMIT Previous permit Date previous permit issued a) ❑ New ❑Modification Complete Reissue ❑ Partial Reissue As authorized by thhe tale f North lina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern Pursuant to: I SA NCAC 11-i1 e ❑ Rules attached. 'V General Permit Rules available at the following link: wvvw.deq.nc.gov/CAMArules Applicant City t Phone Email City wcazFRAY"w�ERIcFAV11111 WP III �I I Affected ❑ cW EW PTA ❑ ES ElpTS Adj. Wtr. Body( ZJ ll�.f'1(i.,,�, !A/) 2�^01f1t..� ," {� (natlipt)nk) AEC(s): ❑OEA IHA ❑U ❑SPIMA ❑PWs Closest Mal. Wtr. Body Y LXAAAla w/ ORWivA11 PNA: vesh `_- f Type of Project/ Activity Shoreline Length 11"7 Access Length Pier (dock) length Fixed Platfor (ss Floating Platform(s) Finger pier(s) ------ Total Platform area Groin length/M Bulkhead/ Riprap length ��- Avg distance offshore Breakwater/Sill nce/len Basi ,c noel SIWV�/ Cu is yards Boat ramp Boathouse/ Boatlift' Beach Bulldozing Other SAV observed: _ yes Moratorium: n/a yes Sites Phntnc ves ❑ TAR/PAM/NEUSE/BUFFER (circle one) ❑ See note on back regarding River Basin rules ❑ See additional notes/conditions on back I Statement of Compliance and Consistency This permit is subject to compliance with this application and permit conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that: 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement from the adjacent riparian property owner(s) has been obtained, or proof of delivery of certified mail notification of the adjacent riparian property owner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar- Pamlico River Basin Buffer Rules Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. If you have any questions, please contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215). Notes/Additional Permit Conditions: Please ensure all debris associated with the removal or construction of the permitted development is contained within the authorized project area and disposed of in an appropriate upland location. Division of Coastal Management Offices Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven — south of the Neuse River, Onslow Counties) Elizabeth City District 401 S. Griffin St. Ste. 300 Elizabeth City, NC 27909 252-264-3901 (Serves: Bertie, Camden, Chowan, Currituck, Dare, Gates, Hertford, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Craven — north of the Neuse River, Hyde, Pamlico, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover and Fender Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 6/01/2021 AMA l DREDGE & FILL N9 84721 A B 1murq - 4 a Previous permit ENERAL PERMIT Date previous permitissued_� New ❑ Modification ❑ Complete Reissue [—]Partial Reissue As authorized lina, Department of Environmental Quality and the �C,o/astal Resources Commission in an area of environmental concern pursuant to: I SA NCAC by S to of North Y-� ❑ Rules attached. General Permit Rules available at the following link v w vdea.nceov/CAMAruks City Phone-# Email Type of Project/ Activity Shoreline Length 1 2 V-J Access Length Pier (dock) length Fined Plattform(s) Floating Plallorm(s) Finger pier(s) Total Platform area Groin length/p Bulkhead/ Riprap length Avg distance offshore m Breakwater/Sill istance/length Basl hannel Cubic yards Boat ram Boathouse/ Boatlift Beach Bulldozing '— Other ^� SAV observed: yes kn Moratorium: n/a yes Site Photos: yes Riparian Waiver Attached: yes A building permit/zoning permit may a required by Authorized M ey�rmxq, TARrPAM/NEUSE/BUFFER (circle one) See note on back regarding River Basin rules ❑ See additional notes/conditions on back aoo- � �byal RECEIVED JUL 11 2022 DCM-MHD CITY