Loading...
HomeMy WebLinkAbout82-17 Moon, JessicaPermit Number 82-17 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermt"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 to Jessica M. Moon, 2931 NC Hwy 32 South, Plymouth, NC 27962 ing development in Washington County at adi. to the Albemarle Sound at 203 near Roper , as requested in the permittee's application dated 12/21/16 (MP-1) and attached mit, issued on. June 29, 2017 , is subject to compliance with the application (where nt with the permit), all applicable regulations, special conditions and notes set forth below. Any violation terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization - Bulkhead This permit does not authorize any construction activities on or within the adjacent property or riparian corridor of either adjacent riparian property owner. Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the alignment of the bulkhead, all as expressly and specifically set forth in the attached permit application and workplan drawing. The alignment of the authorized bulkhead shall be staked by permittee and approved by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. (See attached sheet for Additional Conditions) action may be appealed by the permittee or other ins within twenty (20) days of the issuing date. xmit must be accessible on -site to Department when the project is inspected for compliance. intenance work or project modification not covered requires further Division approval. must cease when the permit expires on December 31, 2020 this permit, the State of North Carolina agrees that t is consistent with 'the North Carolina Coastal t Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Davis, Director of Coastal Management This permit and its conditions are hereby accepted. Signature of Petmittee Jessica M. Moon ADDITIONAL CONDITIONS 3) The bulkhead shall be constructed prior to any backfilling activities. Permit No. 82-17 Page 2 of 2 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The fill material shall be clean and free of any pollutants except in trace quantities. 6) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 7) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. Sediment and Erosion Control 8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately followingcompletion of backfilling activities. General 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 11) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2017-00972). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4097 and assigned the project DWR Project No. 2017-0542. NOTE: Future development of the permittee's property may require a modification of this permit: Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. M WI APPLICATION for Major Development Permit put revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant Landowner Information Business Name tll\� Project Ne�Q (if applicable) NI'Q l Applicant 1: First Name MI Last Name �t SS\tP Y� �`r\ tvNeeV-\ Applicant 2: First Name MI Last Name If additional applicants, please attach an add"al page(s) with names listed. Meiling Address PO Box Capa� State 752\ S PL rV\40U-1\ sec ZIP Country Phone No. FAX No. �'19 U-O\ u.S 2\59A- I" - U614 eirt, — N �— Street Address (Hd#%rwgfrom above) CRY State ZIP N � ' Email 2. AgentlContractor information Business Name V-\-\.-7�r Agent/ Contractor 1: First Name MI Last Name.1. WA Agent/ Contractor 2: First Name MI Last Name o Mailing Address PO Box city state a931 P Ll Ma%K+V 71P Phone No. 1 Off tat Phone No. 2 "11 '�r19 b9t % rin-ar Sbbk °'� a`A 7,Yi q to12, ext. FAX No. Contractor # 1cl, D U 6 -6 Shed Address (if different from above) City State 21P 5 A vV\z Email - JED <Form continues on back> MAY 01 2017 DCM- II!HD CITY J. I' " 5 Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address (� State Rd. # WASt♦tCUb'to11 `a\03 5LlrylME %E NIA Subdivision Nam city n State zip too P F,1' NC, 'Vion 0 Phone No. Lot No.(a) (f many, attach additional page with list) - N a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project N )A i\\A1L1mPi0. k_t -130t,, v c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. BNatural ❑Manmade ❑Unknown ` A Y_ M E e. Is proposed work within city limits or planning judsdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Dyes (RNO work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 10 0 �4 . y"\ t:s c. Size of individual lot(s) d. Approximate elevation of had above NH W (normal high water) or (if many lot sizes, please attach additional page with a list) NWL(normal water level) �// ❑NHW or IaIdWL �\� `� \ CJ t O 'aO \ e. Vegetation on tract V P+AS S DCAA 11,11 f. Man-made features and uses now on tract APR R 2 4 2011 NONE WARU g. Identify and describe the land uses adtacer ti to the proposed project site. existing `X)"\UWTe- \'%Y"Y\k a Y\EyiS - \�Ok0, h. How does local government the tract? I. Is the proposed project consistent with the applicable zoning? zone V\�tA� (Attach zoning compliance certificate, if applicable) Q' a ❑No DNA j. Is the proposed activity part of an urban waterfront redevelopment proposal? Dyes b9No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. Dyes [jNo DNA If yes, by whom? I. is the proposed project located in a National Registered Historic District or does it involve a Dyes rQNo DNA National Register listed or eligible property? <Form continues on next page> R 2_ C E i V L D MAY 01 2017 tRGVASLL ?-`F�190 CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (1) Are there wetlands on the site? ❑Yes 9NO (ii) Are there coastal wetlands on the site? ❑Yes 06c, (III) If yes to either (1) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment systems. & Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment [r]Pfivatetcommunity, b. Give a brief description of purpose, use, and` daily operations of the project when complete. Q0.\`ltA�� `kV\.k'M NE.V, " �rE-0.,C3Vn' N\ V.SE c+AtN-N c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stoned. ` 1 ` C(, 5ii,e1 �`_'rL lt,ExC �Ll1P.�.tJ+p. - �ToY1. X k', ya UA d. List all development activities you propose. APR 2 4 20 r if o �E t �k.ti�a.s E� ��� , v. 1�u�V1�E,�as e. Are the pr2p2Zed activities maintenance of an existing project, new work, or both? L What is the approximate total disturbed lard area resulting from the proposed project? 4rny13 EKI.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes o ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. L Will wastewater or stormwater be discharged into a wetland? ❑Yes o ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes 96 ❑NA If yes, attach a mitigation proposal. R C IV` u <Form continues on back> MAY 01 2017 DG"1,1't-4110 CITY Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Hems (a) — M are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name S'P�yY\E`.S W\L I,.E Y�`(� Phone No. ��a•ncka' otbcke1 Address \4601 4p W b Q.o PS A, c- Milo Name Q�Q�\ �p GE1 W E Lt_g Phone No. Address 1 AtJ 5 0.E fl G'P,AY'- 1'g%1L MIN-T H 1 LL No- Name Phone No. Address g. A list of pree\vvioo\us state or federal permits issued for work on the project tract. Include permit numbers, pennittee, and issuing dates. —4 h. Signed consultant or agent authorization tome, if applicable. I. Wetland delineation, If necessary. J. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C_G.S. 113A 1-10), If necessary. if the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating Information related to this permit application anvgwytip monitoring of the project. EMI I further certify that the information provided in this application is truthful to the best of my knowledge. Date 1%,- %I. 1 u Print Name SAS-a\crt Yv. YVNo o V-, j APR 2 4 2017 Signature 1' \ mq ' 11 M / ,�, y{/P��' 7Mindicate application attachments pertaining to your proposed project. MP-2 Excavation and Fill Information DDCM MP-5 Bridges and Culverts []DCM MP-3 Upland Development r ^ C' V r []DCM MP-4 Structures Information ` C IG MAY 01 2017 Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization Length Wklth Avg. Existing Depth NA NA Final Project NA NA Depth 1. EXCAVATM @'this section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wedands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB _ OWL ❑None (ii) Describe the purpose of the excavation in these areas: 2 DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. c. (1) Do you claim title to disposal area? ❑Yes ❑No ❑NA (it) If no, attach a letter granting permission from the owner d. High -ground excavation irycubic yards. APR 2 4 2017 WARD section not applicable b. Dimensions of disposal area. d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA III) If yes, where? e. (d) Does the disposal area include any coastal wetlands/marsh f. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (di) Describe the purpose of disposal in these areas: (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? RECEIVED MAY 01 2017 r f z.2u:cf 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Length: \ O O 6ulkhead ❑Riprap ❑Breakwater/Sill ❑Other. _ Width: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level. Bulkhead badfill ' k. 1. Riprep _ Breakwater/Sill _ Other L Source of fill material. d. Maximum distance waterward of NHW or NWL: r�5 !;Vk f. (1) Has there been shoreline erosion during preceding 12 hs? �°f t [Yes []No ❑NA (it) If yes, state amount of erosion and source of erosion amount information. S h. Type of fill material. SPvuv� CAN u 4. OTHER FILL ACTIVITIES p7his section not applicable (Excluding Shoreline Stabilization) a. (1) Will fill material be brought to the site? ❑Yes ❑No []NA b. (i) Will fill material be placed in coastal wetiands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or a Amount of material to be laced in the water other wetlands (WL)? If any boxes are checked, provide the () P number of square feet affected. (iii) Dimensions of fill area _ ❑CW _ ❑SAV _ ❑� � / (iv) Purpose of fill ❑WL _ ❑None I re/69 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Sc'.\\ \11�q\r•� \+t` A� �p YL a c c. (i) Will nmig onal aids be required as a result of the project? []Yes No ❑NA (it) If yes, explain what type and how they will be implemented. Date %41• V-6 Project Name (h) Describe the purpose of the All in these areas: II 'I PR 2 What type of construction equipment will be used (e.g., dragane bactkhoe, or hydraulic dredge)? --T�!4. Co YNe_A d. (i) Will wetlands be qpdssed in transporting equipment to project site? ❑Yes ErNo ❑NA (it) If yes, explain steps that will be taken to avoid of minimize environmental impacts. Applicant Name Applicant Signature `C C INVC; m DCM- It H 203 Summerfield Road Roper, NC 27970 - MapQuest Page 1 of 1 Search Results for "tog Summerfield Road Roper, NC 27970" page 1 of 1 0 1. 203 Summerfield Rd 203 Summerfield Rd, Roper, NC 27970-9673 Alb s O Q O MAY tw 1 2�17 DC"vi- MHD CITY h"s://www.mapquest.com/search/results?query=203%2OSummerfield%2ORoad%2ORop... 3/20/2017 DCM Coordinator: Permit #: e5 i� MAELING DISTRIBUTION SHEET_..._ r DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland (Beaufort, Camden, Chowan, Craven, Hertford, Hyde, Perquimans, Tyrrell) fi' J'o-sh Peletier (Bettie, Currituck, Dare, Gates, Pamlico, Pasquotank, Washington) fom Steffans (NC DOT- Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome (NC DOT -Remainder ECity/Washington District) Wilmington: Tyler Crumbley (Brunswick, New Hanover) Liz Hair (Carteret, Onslow, Ponder) Brad Shaver (NCDOT-Brunswick, New Hanover, Onslow, Ponder) Cultural Resources: Renee Gledhill -Earley Public Water Supply: Heidi Cox (WIRO) Clif Whitfield (WARO) ) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton DEMLR/DWR: Karen Higgins Kristy Lynn Carpenter (NC DOT -All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward- (NCDOT-Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Currituck, Dare, Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs — 401 (Carteret, Onslow, Ponder, New Hanover) Chad Coburn — 401(Brunswick) Georgette Scott - Stormwater Joanne Steenhuis - 401(NCDOT-Brunswick, New Hanover, Onslow, Ponder) Wildlife Resources: Maria Dunn (WARD) LPO: Fax Distribution: Permittee #: Agent# Rio Coastal Management ENVIRONMENTAL QUALITY July 5, 2017 Jessica Moon 2931 NC Hwy 32 S Plymouth, N.C. 27962 Dear Sir or Madam: ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director The enclosed pen -nit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff -colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty (20) days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, Enclosure (� , �q tas V. Hugge Major Permits Manager N.C. Division of Coastal Management (Nothing Compares.._ State of North Carolina I Environmental Quality l Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, NC 28557 252 808 2808 Y DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Jessica Moon 2. LOCATION OF PROJECT SITE: The project site is located at 203 Summerfield Road off NC32 in Roper on the Albemarle Sound in Washington County. Photo Index- 2006: 134-6731 G21 2000: 133-1564 Q15 Latitude 35056132.56"N Longitude 76°32'47"W 3. INVESTIGATION TYPE: CAMA/Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 4/18/2017 Was Applicant Present - Yes 5. PROCESSING PROCEDURE: Application Received Complete - 24 April 2017 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - 1994 Washington County Land Use Plan Land Classification From LUP- Conservation (Land) and Conservation (Water) (B) AEC(s) Involved: PTA, EW, CS (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - None Planned -None (F) Type of Structures: Existing - Remnant bulkhead Planned - Bulkhead and backfill (G) Estimated Annual Rate of Erosion: 5ft to 6ft over last year. Source - Applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands Wooded Wetlands (B) Non -Vegetated Wetlands 2,177sq ft River Bottom (C) Other 2,566sq ft Upland (D) Total Area Disturbed: 4,743ft2 (E) Primary Nursery Area: No (F) Water Classification: SB Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead and backfill n the Albemarle Sound on Summerfield Road in Roper. RE(,EIVE'� MAY 01 Z017 _CM- RJ+HD CITY If - Moon Washington County PROJECTSETTING Buddy Futrell has submitted a Major CAMA request on behalf of Jessica Moon to bulkhead and backfill their property on the Albemarle Sound. The 0.47-acre project site is located at 203 Summerfield Rd, offNC32 in the Town of Roper in Washington County. The property is currently residential with a single-family dwelling on site. The properties to the West and East of the project site are residential and are currently stabilized by bulkheads and rip rap. The project site has a remnant bulkhead that connected to both the adjacent properties' bulkheads. The remnant bulkhead averages 21 ft waterward of Normal Water Level (NWL) (max of 25ft waterward of NWL) and the erosion escarpment is an average of 28ft landward of NWL (max of 30ft landward of NWL). The applicant states approximately 5ft to 6ft of erosion occurred over the last year. A large part of this erosion was caused by Hurricane Matthew in 2016. The Albemarle Sound at the project site is classified as SB by the Environmental Management Commission and Coastal by the Marine Fisheries Commission. PROJECT DESCRIPTION The new 100ft bulkhead will connect with the adjoining properties' bulkheads. The new bulkhead will average 21 ft waterward of NWL and backfill to the erosion escarpment that is an average of 28ft landward of NWL (max of 30ft landward of NWL). The area of disturbance will be a max of 30ft landward of the proposed bulkhead impacting 2,177ft2 of sound bottom and 2,566ftZ of high ground for the installation of the bulkhead tiebacks. The project will result in localized turbidity due the installation of the bulkhead. The project will also convert 2,177ft2 of shallow soft bottom to uplands and convert the sandy beach (2,566ft2) to high ground. Kevin Hart- 24 April 2017 Washington Regional Office RECENED MAY 01 2017 DCM- MHD CITY Hart, Kevin From: Jessica Moon <jessicamoon_04@hotmail.com> Sent: Monday, March 27, 2017 5:42 PM To: Hart, Kevin Subject: Re: Summerfield Property We have received the email. We are working on getting the info that is needed to complete the permit. I give Buddy and Patricia Futrell permission to submit the permits and handle all discussions relating to the permit. Thank you Jessica Moon From: Hart, Kevin <kevin.hart@ncdenr.gov> Sent: Monday, March 27, 2017 12:56:15 PM To: Futrell's Plumbing heating Cc: jessicamoon_04@hotmail.com Subject: RE: Summerfield Property Mr. Futrell, I wanted to confirm that you have received this email. Have you had a chance to get some of this information together? Kevin Kevin Hart Division of Coastal Management Department of Environmental Quality 252-948-3936 office Kevin.hart@ncdenr.gov 943 Washington Square Mall Washington NC, 27889 t - 'Nothing Compares-�. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hart, Kevin Sent: Monday, March 20, 2017 9:54 AM To:'Futrell's Plumbing heating' <futrell@embargmail.com> Cc: 'jessicamoon_04@hotmail.com' <jessicamoon_04@hotmail.com> Subject: Summerfield Property RECEIVE) Mr. Futrell, t� MAY 01 2017 00 • Woter Resources ENVIRONMENTAL QUALITY Roanoke Beacon PO Box 726 Plymouth, NC 27962 27 April 2017 Attention; Legal Advertising Department ROY COOPER Governor MICHAEL S. REGAN Secretory BRAXTON C. DAVIS Director Please include the enclosed Notice of Filing in the Public Notice section of the 3 May 2017 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3920. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to: Thank you. ATTACHMENT Cc: File Melissa Sebastian NCDENR COASTAL MANAGEMENT DIVISION 400 COMMERCE AVENUE MOREHEAD NC 28557 252-808-2808 ext. 229 Sincerely, Della Robbins, Administrative Assistant Division of Coastal Management RCE;V � MAY 01 2017 %'e'"ldot}thvcornriww:-� DCM- Il HD CITY Snt.eftirth Cw4= Fa%imv zl QoahtyiCmetd Hzwg mt 943W.higroa Sq=.Xhll Wa&bmjIIm NC27S89 25294664S1 i s 011 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. 113A-119(b) that an application for a development permit in an Area of Environmental Concern as designated under the Coastal Area Management Act (CAMA) was received on 24 April 2017. According to the said application submitted by Jessica Moon, applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper, Washington County, North Carolina A copy of the entire application maybe examined or copied at the office of Jonathan R. Howell, District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC, during normal business hours. Public comments received by 22 May 2017 will be considered. Later comments will be accepted and considered up to the time of permit decision. Project modifications may occur based on further review and comments. Notice of the permit decision in this matter will be provided upon written request. Please publish on: 3 May 2017 Kevin Hart, Field Representative Coastal Management Representative NC Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 (252)948-3936 RLCEWED MAY 01 2017 DCM- KIND CITY ROY COOPER Go mr zl_ MICHAEL S. REGAN Secretory Coastal Management ENVIRONMENTAL OUAUTY BRAXTON C. DAVIS Director 27 April, 2017 Mrs. Jessica Moon c/o Futrell's Plumbing Attn: Kenneth D. Futrell 2931 NC Hwy 32 S Plymouth, NC 27962 Dear Mr. Futrell: The NC Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. It was received on 24 April 2017, and appears to be adequate for processing at this time. The projected deadline for making a decision is 8 July 2017. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Kevin Hart, Field Representative for the Division of Coastal Management is responsible for processing your pemut and he can be reached at 252- 948-3936 or via email at Kevin.Hart(a ncdenr.eov if you have any questions. If this agency does not render a permit decision within 70 days from 24 April 2017, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property, or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. RECEIVED MAY 01 2017 -5�>^Nothinq Compares- En%i� p C M_ �� H D CITY S tm o£V'anh Caralioa. mo 0a1 Qaa* 1 Cmtd \dnqt t 933WahigxcRSRRne Nall WaahuVon VC 2180 2529""81 Mr. Kenneth Futrell 27 April 2017 Page 2 of 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sly, g�incer �� Kevin Hart Coastal Management Representative Division of Coastal Management Washington Regional Office Enclosure Cc: Greg Bodnar - Assistant Major Permit Coordinator Ms. Jessica Moon - Applicant WARO RECE,VCD MAY 01 2017 DC"v1_ VHD C6TY N()'1'I(0111: CAMA PERMIT APPLIED FOR ="�Jflg Ora COMMENTS ACCEPTED THROUGH aQ /May ao)% APPLICANT: sTL.S`2lna imnnh 2�3) Nc N.,v 32 PIvrn Ldk N C �7%Q �49ehf: �cfre/Is �°lu�bi►� FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: -393Co MASOR PERMUF FEE MA7 , X i ' CM I APR 2 4 2017 Seiecdoln Development Type Fee DCM % .I 1 ' (1430016014351000931625 6253) (243001602 4351�5 2341) 1. Private, non-commercial development that does not $250 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o n water areas: Major Modification to a $250 100% ($250) 0% ($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non - El commercial development, if $250 100% ($250) 00/0($0) General Water Quality Certification No. 3490 (See attached can be applied: III(B). Public or commercial development, if General $400 100% ($400) 0% ($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water ❑ Quality Certification No. $400 60% ($240) 40% ($160) 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: Y , III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) !I/�j 3900 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 600/o($285) 400/a ($190) excavation of more than one acre of wetlands and/or R �; E I V i open water areas: MAY 01 2011 DUA- MHD CITY "'This is a word processing form to be completed in Microsoft Word — NC Division of Coastal Management Major Permit Application Computer Sheet (02/15/2010) Applicant: Jessica Moon Date: 25 April 2017 Project Site County Washington Staff. Kevin Hart District: ❑Elizabeth City ❑Morehead City ®Washington ❑Wilmington Project Name: Jessica Moon Rover File: Date application 'received as complete" in the Field office (EX: 1/8/2007): 24 April 2017 Permit Authorization: CAMA ❑Dredge & Fill ZBoth SITE DESCRIPTION/PERMIT INFORMATION PNA: ❑Yes 2No Photos Taken: Yes ❑ No® Setback Required (riparian): ❑Yes ZNo Critical Habitat: ❑Yes ®No []Not Sure 15 foot waiver obtained: ❑Yes ®No Hazard Notification Returned: ❑Yes ❑No SAV: []Yes []No ®Not Sure Shell Bottom: ❑Yes ®No ❑ Not Sure Temporary Impacts: ❑Yes []No Sandbags: ❑Yes ®No ❑ Not Sure Did the land use classification come from county LUP: ®Yes ❑No Mitigation Required (optional): ❑Yes ❑No Moratorium Conditions: ❑Yes ❑No ®NA Environmental Assessment Done: ❑Yes ❑No ®NA SECONDARY WATER CLASSIFICATION — OPTIONAL (choose MAX of 4) ❑ Future Water Supply (FWS) ❑ Nutrient Sensitive Waters (NSW) ❑ Swamp Waters (SW) ❑ High Quality Waters (HQW) ❑ Outstanding Resource Waters (ORW) WETLANDS IMPACTED ❑ (404) Corp. of Engineers (Jurisdictional ❑ (LS) Sea lavender (Limonium sp.) ❑ (SS) Glasswort ( Salicomia sp.) wetlands) ❑ (CJ) Saw grass (Cladium jamaicense) ❑ (SA) Salt marsh cordgrass (Spartina ❑ (SY) Salt reed grass (Spartina altemiflora) cynosuroides) ❑ (DS) Salt or spike grass (Distichlis ❑ (SC) Bullrush or three square (Scirpus (TY) Cattail (Typha sp.) spicata) sp.) ❑ (JR) Black needlerush (Juncos ❑ (SP) Salt/meadow grass (Spartina roemedanus) patens) APPLICATION FEE ❑ No fee required - $0.00 ❑ III(A) Private w/ D&F up to 1 acre; 3490 ® III(D) Priv. public or comm w/ D&F to 1 can be applied - $250 acre; 3490 can't be applied - $400 ❑ Minor Modification to a CAMA Major ❑ Major Modification to a CAMA Major ❑ IV Any development involving D&F of permit - $100 permit - $250 more than 1 acre - $475 ❑ Permit Transfer - $100 ❑ III(B) Public or commercial w/ D&F to 1 ❑ Express Permit - $2000 acre; 3490 can be applied - $400 ❑ Major development extension request - $100 ❑ II. Public or commercial/no dredge and/or fill - $400 RECEIVED [11. Private no dredge and/or fill - $250 El III(C) Priv. public or Comm w /D&F to 1 acre; 3490 can be applied; DCM needs MAY 01 2017 DWQ agreement - $400 DC v1- VHD CITY 252.808.2808 :: 1.8884RCOA8T :: www.nccoastaimananement.net revised: 02/15/10 / '` NC Division of Coastal Mgt. Application Computer Sheet, Page z of 3) Applicant: Jessica Moon Date: 425/2017 Describe below the ACTIVITIES that have been applied for. All values should match the dimension order, and units of measurement found in your Activities code sheet TYPE REPLACE Activity Name Number Choose Choose Dimension 1 Dimension 2 Dimension 3 Dimension 4 One One 1 New Work ® Replace Bulkhead Maint ❑ Ely ® N 100ft New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ Ely ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work El Replace Maint ❑ ❑ Y ❑ N New Work ❑ Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace Maint ❑ ❑ Y ❑ N New Work Replace Maint ❑ ❑ Y ❑ N New Work 0 Replace p C Maint ❑ ❑ Y ❑ N RE, MAY 01 2017 DCM- MiHD CITY revised 02/1S110 NC Division of Coastal Mgt. Application Computer Sheet, Page 3 of 3) Applicant: Jessica Moon Date: 4252017 Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount Shallow Bottom Dredge ❑ Fill S Both ❑ Other ❑ 2177 sq ft 2177 sq It High ground Dredge ❑ Fill ® Both ❑ Other ❑ 2566 sq it 2566 sq it Shoreline Dredge ❑ Fill ® Both ❑ Other ❑ 100 ft 100 it Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge Cl Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ RECEIVED MAY 01 2017 DCM- Il%lp Ct Ty 252.808.2808 :: 1-888.4RCOAST :: www.nccoastalmananement.net revised: 02/15/10 ,, Roper, NC 27970 Ms Bridget Wells 11005 Red Grave lane Mint Hill, NC 28227 Hello, I own the property at 203 Summerfield Road, which is adjacent to your property. I am in the process of applying for a permit with CAMA to repair the waterfront property of my lot. Per LAMA regulations for the permit, I am required to send to you notification of my request to do the repairs to my waterfront property. The repairs will consist of butting my bulkhead to yours so that it will be a straight wall to prevent washout for all of our properties. Should you have any objections or concerns about my waterfront repairs, you should provide in writing to the Division of Coastal Management your concerns. Should you wish to speak with me, I can be reached at 252-793-5668 or 252-799-6634. M Thank you, DCr "1 I APR 2 4 2017 Jessica Moon 2931 NC Hwy 32 South Plymouth, NC 27962 MAY 01 2017 CCM- A",I-ID CITY ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: SAYS-\cS • 'r \� `nE.lAvu \`e°1 Surnvr.e��.e.\a tRa / 9� %ic��� IITAdtlressee ; %cOved by (Printed None) G Of Delivery -�"49$ D- rK5Lraq of o9 zor? la de#very address dwenwit from itern 19 ❑ Yes If YES, ender delivery address below: p No I�I�III�I I II iIIII I IIIIIIII I�II�IIIIIIIII Service Type 13 Norty Mal ExpresW II III3. 0 Adult �re oReMeIRSure 9403 0577 5183 9015 20 ReelriiAed Delivery 1ad Mail® Del ry e aticted9590 ❑ Certified Mail Restricted Delivery ❑ Return Receipt for ❑ Coff c on Deevery Merchandise 2. Article Number (transfer fmm service /abet) 0 Collect on Delivery Restricted Delivery ❑ Signature Con irmaaon^" r \5 1 ��Q W01 � C ` G L � C D O Nsured Mail ❑Insured MaA Restricted Delivery ❑ Signature Co livery n Restricted Delivery lover PS Form 3811, April 2015 PSN 7530-02-000-9053 Domestic Return Receipt ; ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this. card to the back of the mailpiece, or on the front N sDace Dennits. 9JP.\9 �je-k \\w5 vu G�.w� 1twwe IIIIIII�IIIilllll I IIIIIIII IIIIIIIIiI II I IIIIII 9590 9403 0577 5183 9015 37 2. Article Number (Transfer from serv/ce label) 1(s\r, t1,3 o Coot 1D°\R `OA5 PS Form 3811, April 2015 PSN 7SM-02-000-9053 D. Is delvery addreesmlferentfrom Item 11 ti YES, enter delivery address below: ❑ No 3. Service Type ❑ Pdodty Mail express® ❑ AduR SgnaNre ❑ Registered Mail- ❑ PAW[ Signature Restricted DelWery Mail® b RR¢¢gqtsteretl Mail RestrictedB'Lrerliged Dellvary ❑ CcMied Mail Restricted Delivery ❑ Return Reoelpt for ❑ Collect an Delivery Mmhandise ❑ Collect on Delivery ReeWcteo Delivery 0 signature Conilrmation'^ ❑ Insured Mail ❑ Signature Confmretlon ❑ Insured Mall Reabkled Delivery Rastdow Delivery Domestic Return Recept RE"CENEJ MAY 01 2017 Jessica Moon 23 Summerfield Road Roper, NC Due to the damage done by Hurricanes Hermine and Matthew, we are planning to repair the pre- existing bulkhead. The plan is to backfill and slope with sand and dirt and run the bulkhead to the pre-existing bulkhead and tie in to the adjacent property on both the east and west side of the property. Also install a knee wall on the east side of the property. Also replace pier that was destroyed by the storms. °J 4 /P 2�I0�j RECEiVEDN O MAY 01 Z017 DCNI- h7HD CITY REVENUE STAMPS $134.00 PREPARED BY AND RETURN TO: ROBERT WENDEL HUTCHINS THE HUTCHINS LAW FIRM, PA. POST OFFICE DRAWER 1085 PLYMOUTH, NC 27962 NORTH CAROLINA WASHINGTON COUNTY PIN 7820.00-86-0892 CR106M�I THIS DEED, made this 30th day of August, 2016, by and between Louis A Lee and wife, Debbie S Lee, GRANTORS, (Address: 152 Conaby Law, Plymouth, NC 27962) to Jessica Moon, GRANTEE, (Address: 203 Summerfield Road, Roper, NC 27970): WITNESSETH: THAT the said Grantors, for One Dollar ($1.00) and other valuable consideration to them paid by the said Grantee, the receipt of which is hereby acknowledged, have bargained and sold, and by these presents do bargain, grant, sell and convey unto the said Grantee, her successors, heirs and assigns, in fee simple, a lot, tract or parcel of land m Skinnersville Township, Washington County, North Carolina, and more accurately described as follows: 6C 4,40 Al RECE1 2g49,, MAY 01 2017 �0 DCM- AHD CITY BEGIN at a pipe in the Easter line of the now or formerly C. T. White land, which pipe is located North 4 degrees 35 minutes West 958.5 feet along said White line from the Norther edge of the right of way of U. S. FFighway No. 64; thence and along the Northern edge of a thirty-foot right of way, South 56 degrees 38 minutes East 100 feet to the POINT OF BEGINNING; thence and continuing along the Northern edge of said right of way, South 86 degrees 38 minutes Fast 100 feet to a point; thence North 4 degrees 35 minutes West 200 feet to a point; thence and continuing the same course to the waters of the Albemarle Sound; thence Westwardly along the shore of the Albemarle Sound 100 feet, more or less, to a point, said point being North 4 degrees 35 minutes West from the point of beginning; thence South 4 degrees 35 minutes East 210 feet, more or less, to the POINT OF BEGINNING. Also conveyed to Grantor, her heirs and assigns, is a perpetual right of ingress, egress and regress over the following described land: EASEMENT NO. 1: That thirty-foot easement as shown on deed to J. W. Allen, Jr., et als, by W. W. White, et ux dated November 8, 1972, of record in the office of the Washington County Register of Deeds in Book 237, Page 34. EASEMENT NO. 2: BEGINNING in the intersection of the Northern edge of the thirty-foot easement described herein and the Southeaster comer of the land referred to in Easement No. 1; thence North 86 degrees 38 minutes West 30 feet to a point, William Green's Southeastern corner, thence and along Green's Eastern lime North 4 degrees 35 minutes West 220 feet, more or less, to the edge of the Albemarle Sound; thence and in an Easterly direction along the edge of said Sound 30 feet, more or less, to a point, said point lying and being North 4 degrees 35 minutes West 220 feet, more or less, from the point of beginning; thence South 4 degrees 35 minutes East 220 feet, more or less, to the POINT OF BEGINNING. Reserved across the Southern end of said lot herein described is a 30-foot easement in favor of the North Carolina State Highway Commission or other public roads commission, should such commission desire to configure and maintain said road. This conveyance is made subject to those certain Restrictive Covenants as shown in Deed dated May 30, 1974, by James Larkin Little, et ux, to Andrew L. Johnson, et ux, and other deeds of same date to parties purchasing from James Larkin Little, et ux. The intent of the foregoing description is to convey all of Lot No. 2, with access in common to and from said lot and from said lot to and the use of a boat ramp located on the Eastern end of property formerly owned by W. W. White, et ux, conveyed to James Larkin Little, and subsequently conveyed to sundry parties. The foregoing property is the same as that conveyed by Deed to Louis e�G, Divorced, of record in Book 322, Page 32, Washington County Registry. L1 t' ' RECEIVLED APR24201J MAY 01 2017 WA DC 0- P,!HD CITY This conveyance is made together with and subject to legally enforceable easements, restrictions, conditions and rights of way, if any, appearing of record or onsite. All or a portion of the property herein conveyed does or X does not include the primary residence of a Grantor. TO HAVE AND TO HOLD the aforesaid lot, tract or parcel of land and all privileges and appurtenances thereunto belonging to the said Grantee, her successors, heirs and assigns, in fee simple forever. And the said Grantors covenant with the Grantee, that Grantors are seized of the premises in fee simple, have the right to convey the same in fee simple; that title is marketable and free and clear of all encumbrances; and that Grantors will warrant and defend the said title to the same against the lawful claims of all persons whomsoever, except for the exceptions set out aforesaid and hereinafter stated. Title to the property bereinabove described is subject to the following exceptions: 1) Noncompliance with any local, ommty, state or federal government laws, ordmsnces, or regulations relative to zoning subdivision, occupancy, use, construction or the development of the subject property. 2) Subject to rights of way, easements, and restrictions of record, if any IN WITNESS WHEREOF, the Grantors have hereunto set their hands and seals, the day and year first above written ,-4� 4 , (SEAL) &s Le/Qc 9 4-z� —t. &'J' (SEAL) Debbie S Lee STATE OF NORTH CA�ROLINAAj c, COUNTY OF I S /h I,Y�/li /V 1� �� �� a Notary Public of the State and County aforesaid, certify that Louis A Lee and Debbie S Lee, GRANTORS, personally appeared before me this day and acknowledged the execution of the foregoing insOnmment forlhe purposes therein expressed. WITNESS my hand and stamp/mal this 33 1 day of stamptseal ; S Sr :'<N0V';LES NOTARY PUBL'C ` �4 4lNGT6N Couw yY NC X 41-_0 Notary Public My Commission Expires: cabF n,s - , E L- MAY 01 2017 kv /'R2l'1p,, 'I� [)CM,- MHD CITY 203 Summerfield Road Roper, NC 27970 - MapQuest Page 1 of 1 Search Resutts for `203 Summerfietd Road Roper, NC 27970' page 1 of 1 0 1. 203 Summerfield Rd 203 Summerfield Rd, Roper, NC 27970-9673 O 94 RECEIVEI MAY 01 2017 MHD Cl https://www.mapquest.comlsearch/results?query=203%2OSummerfield%2ORoad%2ORop... 3/20/2017 Jessica Moon 23 Summerfield Road Roper, NC Due to the damage done by Hurricanes Hermine and Matthew, we are planning to repair the pre- existing bulkhead. The plan is to backfill and slope with sand and dirt and run the bulkhead to the pre-existing bulkhead and tie in to the adjacent property on both the east and west side of the property. Also install a knee wall on the east side of the property. DCM APR 2 4 2017, RECEWE'D MAY 01 2017 WARO TRACKING FORM Date application first received in WaRO y 1 y / % Date application received as complete f-IN I ✓ Check ✓ Deed Narrative ✓ Location Map `/ MP-1 Plat(s) ` MP-2 Cross Section(s) N/A MP-3. ✓ Green Cards AIA MP-4 FAA Postal Receipts AAA MP - 5 ✓ Letters to Adjacent Property Owners A ent Authorization Form N- A Mitigation Plan 141A 15' Waiver Left Side NZA 15' Wavier Right Side Preliminary review by .3 • owe-\ Date y'25-17 -Cv�jee� 5�nze ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. In Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: SAYr\cS v Y \� V�E.IP.N R,eeE� rum IIIIIIIIIINIII IIIIIIIIIIIIIIIIIIIIIIIII IIIII 9590 9403 0577 5183 9015 20 'ttOtiS n-.4.0 Mai \AvcA 4%R'%% PS Form 3811, April 2015 PSN 7530-02-000-9053 ■ Complete items 1, 2, and 3, ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: �ti uoc� V+\e,o Gaw\x. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III 9590 9403 0577 5183 9015 37 2. Article Number (1ansfer from service label) e1015 ti1'3e aaw 4NC:P ` rb PS Form 3811, April 2015 PSN 753D-02.000-9053 �r XA— Received by (Printed Name) I C. 3kngF5 17. M`EL'4 o D. Is delivery address different from item 1? If YES, enter delivery address below: 0 Of ❑ No Service Type ❑ Priority Mall Expresse mult Signature ❑ Registered Mail — Adult signature Restricted Delivery ❑ Registered Mal RestiloW 15&tified Mail® Desvery CerlRed Mall Restricted Delivery ❑ Return Receipt for Collect on Delivery Merchandise Collect on Delivery Restricted Delivery 11 Signature Confinnatlon^ Insrred Mail ❑ Signature CoMinnatlon Insured Mall Restrk1ed Delivery Restricted Delivery Domestic Return Receipt A. Signature ❑ Agent x " QV ❑ Addressee B. Received by (Printed Name) C. ate of Delivery 1 .W1��C 1 '7 ) D. Is delivery address different from Rem 1? I ❑ es If YES, enter delivery address below: ❑ No 3. Service Type Q Priority Mall Ezprese® ❑ Adult Signature ❑ Registered Mall^ ❑ Adult Signature Restricted Delivery ❑ Registered Mall Restrkbd 6tertifled MattisDelivery ❑ Certified Mail Restricted Delivery ❑ Return Receipt for ❑ Collect an Delivery ❑ Collect on Delivery Restricted Delivery Merchandise O signature CorHtrmatior' ❑ Insured Mail ❑ Signature Confirmation O Insured Mall Restricted Delivery Restricted Delivery Domestic Return Receipt RECE,VEJ MAY 01 Z017 MIA- MHD C6TY DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Jessica Moon County: Washington LOCATION OF PROJECT: 203 Summer8eld Road of NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. DATE APPLICATION RECEIVED COMPLETE BY FIELD: 24 April 2017 FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Kevin Hart // DISTRICT OFFICE: Washington DISTRICT MANAGER REVIEW: 4//1*Aq B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE RECD: $ 400.00 (60/40) PUBLIC NOTICE RECD: END OF NOTICE DATE: ADJ. RIP. PROP NOTICES RECD: DEED RECD: APPLICATION ASSI P�TO: 1ci�d 0�a1�? ON: C) 75 DAY DEADLINE: 1150 DAY DEADLINE: MAIL OUT DATE: FEDERAL DUE DATE: STATE DUE DATE: FED COMMENTS RECD: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS RETURNED OBJECTION S: YES NO NOTES Coastal Management - Regional Representative 1 Coastal Management - LUP Consistency S is Division of Community Assistance 5 T l k Land Quality Section Division of Water Quality '(O Storm Water Management (DWQ) State Properly Office S�1 K Division of Archives & History Division of Environmental Health 7 x Division of Highways S� V k Wildlife Resources Commission Local Permit Office Division of Marine Fisheries Corps of Engineers Yw7 ' I1 1i-I K Bodnar, Gregg From: Hart, Kevin Sent: Tuesday, May 30, 2017 1:03 PM To: Bodnar, Gregg Subject: RE: Jessica Moon Gregg, If the permit is issued, I recommend all standard conditions be applied. Kevin Kevin Hart Division of Coastal Management Department of Environmental Quality 252-948-3936 office Kevin. hart@ncdenr.gov 943 Washington Square Mall Washington NC, 27889 r Nothing Compared... Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg Sent: Wednesday, May 24, 2017 10:49 AM To: Hart, Kevin <kevin.hart@ncdenr.gov> Subject: Jessica Moon Morning Kevin, Any comments for the file on this one? Thanks, G Gregg Bodnar Assistant Major Permits Coordinator Division of Coastal Management Department of Environmental Quality Coastal Management ENVIRONMENTAL OUAUTY ICN Mr. Cliff Whitfield Public Water Supply Section NCDENR WARD ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to. Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557. DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound. in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the -proposed project and return this form by 22 May 2017. Please contact -Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate; in depth comments with supporting data are requested. REPLY fiiTs office has no objection to the project as proposed. V/ This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons. described in the attached comments. Signed et Date 5'�' ` d Ul7 Not ing Compares° suto owalh Cutihu I Fn%iry rnl Qugiw i cmw hLm"Mt 943tVuh Mwn9go Wal RithiaMNC 2780 25.19466491 0 ector ROY COOPER Governor Coastal Management ENVIRONMENTAL QUALITY itTiA v 'IT wh Sa/7 LAND Zvi% Mr. Shannon Jenkins NCDENR Division of Environmental Health MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Coastal Management Division Morehead City Office 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. SigDned`� &, 0( /� Date 5L)h RECEIVED /'Nothing Compares" MAY 0 3 2017 6 nr ervaw Caldu raAe■.sa C.+sn corm Alaoyrnri 943Wwbi%mSq MaU,'M&AiglpgxC 1780 DC M- M H D CITY 252%66N1 Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Lee Padriek Division of Community Assistance FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. t/ This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed ;? ✓ Date_ 7 Nothing Compares StmdVar&c&r&Wlemitamnatd QVISfAcomNl Sums m t 9i3Nn5igtooltam?La 1tLSduaetao,XC:7889 r MEMORANDUM TO: Mr. Shane Staples Division of Coastal Management 943 Washington Sq. Mall FROM: Greg Bodnar . . Major Permits Processing Coordinator Coastal Management Division 400.Commerce Avenue Morehead City NC 2855.7 DATE: 27 April 2017 SUBJECT: CAMA Application: Review APPLICANT: Jessica Moon ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director RErr --- AP"' Dciure WARO Respond to Greg Bodnar Morehead City Office RECEIVED APR 2 7 2017 DOM-Fisherles WARO PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. r Please contract Kevin Hart at 252-948-3936,'if you have any questions regarding the proposed project. When a appropriate,' in depth comments with supporting data are requested. ' REPLY Tliis office has no objection to the project as proposed. / This office has no comment on the proposed' project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This :office objects,to the proposed project for reasons described in the attached commen Signed ZZDate 11117 /'Not tng Compares`" Snq olAofsiCuouul En�iroiuntlil Qrilip!Counl \4nyemm� 9a3N4,hin1on84ov� \t,a (P1�hintroa,\C 278b9 2129466431 Bodnar, Gregg From: Thorpe, Roger Sent: Monday, May 01, 2017 4:32 PM To: Bodnar, Gregg Subject: CAMA Major - Jessica Moon, 203 Summerfield Rd, Roper, NC, Washington County Gregg Thee subject project involves constructing a bulkhead with backfill. This project will not require a State stormwater permit. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 -^"Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER "• Governor REC1!AMo/N0D ENR/DWR MICHAEL S. REGAN APR 2 Secretary Coastal Management 7 2017 ENVIRONMENTAL OOALI7Y BRAXTON C. DAVIS Warr Quality p91.W Director OPSM9otw'%aon MEMORANDUM Washington tiegional OPNce TO: Mr. Anthony Scarbraugh DWR Water Quality Programs 943 Washington Regional Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April.2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed +UJ CL-^� Q� Date M °-i 'a, Nothing Compares" SON efNam CNOW I Em9,ocm+aA Qulliy I ComOl JOn%j nt 943 VMhir#M$q=6aaa 1 ny,hinstm\C 27SS9 2529466431 Water Resources r Environmental Quality May S, 2017 Jessica M. Moon 2931 NC HWY 32 S 1720 Mail Service Center Plymouth, North Carolina 27962 ROY COOPER Governor MICHAEL S. REGAN S-ecrBMri, S. JAY ZIMMERMAN Direclor DWR Project # 2017-0542 Washington County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS 203 Summerfield Road - Bulkhead and backfill Dear Ms. Moon: You have our approval for the impacts listed below for the purpose described in your application dated April 27, 2017 and received by the Division of Water Resources (Division) on April 27, 2017. These impacts are covered by the attached Water Quality General Certification Number 4097 and the conditions listed below. This certification is associated with the use of Regional General Permit Number 291 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved, provided that all the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)]] Type of Impact Amount Amount Plan Approved Approved location/ (units) (units) Reference Permanent Temporary Attached Non -Vegetated Wetlands 0.05 (acres) 0 (acres) Sheet 1 of 1 --"-" Nothing Compares'- ,. State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, Nonh Carolina 27889 252-946-6481 Jessica M. Moon DW R# 2017-0542 401APPROVAL Page 2 of 3 2, Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 4097. [15A NCAC 02B .0507(c)] Continuing Compliance During construction of the proposed project, fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 02B .0200 (3)(f)] 4. This approval and their conditions are final and binding unless contested. [G.S.143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto:/Iwww.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:O0am and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 Jessica M. Moon DWR# 2017-0542 401APPROVAL Page 3 of 3 One (1) copy of the petition must also be served to DENR: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Rules. Please contact Chris Pullinger at 252-948-3922 or chris:aullineera@ncdenr.goy if you have any ,questions or concerns. Sincerely, W,t -r4 Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 4097 Certification of Completion cc: Josh Pelletier, USACE Washington Regulatory Field Office (via e-mail) Kevin Hart, DCM WaRO (via e-mail) Gregg Bodnar, DCM Morehead City (via e-mail) Jessica M. Moon (via e-mail: iessicamoon 04@hotmail.com) Futrell's Plumbing (via e-mail: futrell embargmail.com) DWR WaRO 401 files Laserfiche ector ROY COOPER Governor Coastal Management ENVIRONMENTAL OVALITY RECEIVED MAY 01 2017 DOA STATE PROPERTY MEMORANDUM OFFICE MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. Tim Walton Director State Property Office FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signe Date RECEIVED MAY 0 5 2017 /'Nothing Compares'" fe.er�eACrdu 4weerraiQ.,►a,COIWw.�E.rw DCM- MHD CITY 9t3w„r�..tp..?IaE i ayr.r,,., �C:7E6 MAY 02 2017 E tJVIBOGKENTAI COAIf i MEMORANDUM TO: Ms. Renee Gledhill -Early NC Department of Cultural Resources Archives & History Building FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director -c-k 084 Respond to Greg Bodnar Morehead City Office -NJ8/*' s- s-17 APPLICANT: Jessica Moan f I -'rl 1 PROJECT LOCATION: Project site is located at203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. Wien appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed �� �� Date 17 Nothing Compares" S u:a of\ah C.:dca.Fn.:rcrraril C i 5'! Cu.u: ?:ara;amanf .g Sa 6:9: a 4U 1 'ector ROY COOPER Governor Coastal Management ENVIRONMENTAL OVALITY TO: C-t:�.pSlot .o2. MEMORANDUM Mrs. Maria Dunn NC Wildlife Resources Commission FROM: Greg Bodnar Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Respond to Greg Bodnar Morehead City Office PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed , I . Date s la 101� RECEIVE® Nothing Compares_ MAY 15 2017 SUNef\allCrdm En..q MASQ.A+ty CmUI>SMUSae t ptS WUh,q,on 54un\4u R'a�Aurtn�.SC :'Sbs _,:9466+S: DCM- MHD CITY ector RECEIVE® ROY COOPER Governor Coastal Management INVIRONH NTAI OUAIITV MAY 12 2017 RESIDENT ENGINEER WILLIAMSTON OFFICE lul a �7.7_�YQIh51 MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Mr. David Harris NCDOT Roadside FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. JThis office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached / comments. Signed Date RECENE'-' MAY 19 7017 Nothing Compares SM0Cs.rc&*"Am. ,"Qssw: csel Nfzwj t D^�A_ M}-g �r --. s i PgW■An iagwa8q Mal I R11hngw,Se:R0 VMtYY�� n:wawi ector Coastal Management [NVIRONNNNTAL OVALITY Received luI313CC17;WIDili uI v: - 4 2017 DCM-EC ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director TO: Ms. Charlan Owens District Planner Division of Coastal Management FROM: Greg Bodnar Respond to Greg Bodnar Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 April 2017 SUBJECT: CAMA Application Review APPLICANT: Jessica Moon PROJECT LOCATION: Project site is located at 203 Summerfield Road off NC 32 in Roper on the Albemarle Sound in Washington County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a bulkhead and backfill on the Albemarle Sound on Summerfield Road in Roper. Please indicate below your position or viewpoint on the proposed project and return this form by 22 May 2017. Please contact Kevin Hart at 252-948-3936, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the incorporated. See attached. Thi o ice o' to the X Sr�E �fiaa4�jcoi� ents. sipi proposed project only if the recommended changes are proposed project for reasons described in the attached Date 5-I r- /'Nothing Compares" Sean*Waacwdm' r..+ zw Q48*ICa td)&MM t 94$ WOW@"94� Nun I Rlahhin Nc 17M :s:swsa1 RECEIVED MAY 19 2017 DCM- MHD CITY Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Greg Bodnar, Major Permits Processing Coordinator Division of Coaistg4 Management FROM: Charlan Owen AICP, NE District Planner Division of Coastal Management ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director SUBJECT: Major Permit Request by Jessica Moon to install approximately 100 linear feet of bulkhead with associated backfill along the Albemarle Sound; at 203 Summerfield Road, in Washington County. DATE: May 15, 2017 Consistency Determination: The request is consistent with/not in conflict with the 1994 Washington County Land Use Plan certified by the CRC on July 29, 1994. Overview: The project site consists of a .47 acre lot with approximately 100 linear feet of shoreline along the Albemarle Sound. The lot is located primarily outside of a floodzone, with the shoreline located in an AE Floodzone. A single-family house is located on the site. Shoreline improvements consist of remnant bulkhead located an average of 21 feet and a maximum of 25 feet waterward of Normal Water Level (NWL). An erosion escarpment has formed behind the remnant bulkhead, extending an average of approximately 28 feet and a maximum of 30 feet landward of NWL. Installation of approximately 100 linear feet of bulkhead along the Albemarle Sound is proposed. The bulkhead will be located an average of 21 feet waterward of NWL, landward of the remnant bulkhead, and will tie into existing bulkheads to the east and west. Backfill will be placed behind the bulkhead and within the erosion escarpment. The waters of the Albemarle Sound in this area are classified as SB and are closed to shellfish harvesting. A review of historic and archaeological resources was not provided. A review of Submerged Aquatic Vegetation (SAV) was not provided. Anticipated Impacts resulting from this project are expected to include: the filling of 2,177 sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC) and 2,566 sq. ft. of Uplands within the Estuarine Shoreline AEC. RECEIVED MAY 19 2017 DCM- MHD r'-," Nothing Compares State of North Carolina I Enviraturental Quality I Coastal Maragernent Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252 264 3901 North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 2 of 3 Basis for Determination: The Washington County Land Classification Map identifies the project site as "Transition" and "Conservation". As noted on Page IX-9 of the Land Use Plan (LUP), AECs, including but not limited to public trust areas, estuarine shoreline or estuarine waters as identified in 15A NCAC 7H, and other environmentally significant lands, are identified as "Conservation". The following LUP policies may be applicable to this request. Resource Protection: Policy #2, Page VIII-6. "Preserve and protect Areas of Environmental Concern (AECs) within Washington County." a. Support and complement Coastal Resource Commission efforts to protect, preserve, and manage Areas of Environmental Concern (AECs) c. Support development in AECs only if such development meets the management objectives in 15 NCAC 7H.0203 and the use standards in 15 NCAC 7H.02087 and .0209." d. Ensure that development within the estuarine shoreline does not significantly interfere with existing public rights, usage and access to navigable water and other public resources..." e. Ensure that all land development plans within AECs have evaluated all alternatives to controlling pollution, limiting drainage and reducing other potentially negative impacts related to land use activities." Policy #3, Page VIII-8. "Preserve and protect Areas of Environmental Concern (AECs) within Washington County." RECEIVED MAY 19 2017 --:` NothingCompares� DCM- NIHD CITY State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909 252 264 3901 North Carolina Department of Environmental Quality MEMORANDUM Division of Coastal Management Page 3 of 3 Policy V, Page VIII-10. "Stormwater runoff ...The County will support existing guidelines and land development criteria for stormwater management and runoff related to private land uses... The County supports State and Federal stormwater runoff criteria applicable to land development." Policy #13, Page VIII-11. "The damaging of existing marshes by bulkhead installation When necessary, bulkhead installation should be conducted employing appropriate construction and resource protection techniques. Bulkhead installation, however, is not a critical issue in Washington County at this time." Storm Hazard Mitigation Post -Disaster Recovery and Evacuation Planning Goals. Obiectives and Policies: Policy #2, Page VIII-29. "Coastal Storm Mitigation Policies: b. Policies related to discouraging development in Most Hazardous Areas The County remains supportive of CAMA permitting processes for development standards for shoreline stabilization and drainage along the County's estuarine shoreline areas." MAY 19 2017 pCNi� MHD CIT`� Nothing Compares�� State of North Carolina I Environmental Quality I Coastal Management Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City. North Carolina 27909 252 264 3901 June 26, 2017 Regulatory Division Action ID No. SAW 2017-00972 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of Ms. Jessica Moon for Department of the Army authorization to construct a 100 linear foot bulkhead approximately 21 feet waterward of NWL adjacent to the Albemarle Sound, at 203 Summerfield Road, in Roper, Washington County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 5. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 6. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 7. The permittee shall advise the Corps in writing at least two weeks prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 8. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 9. The permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the permit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). 10. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. hicreases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 11. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. Questions or comments may be addressed to Mr. Josh Pelletier, Washington Field Office, Regulatory Division, telephone (910) 251-4605. Sincerely, Josh Pelletier Regulatory Project Manager Copies Furnished: Mr. Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Ms. Kathy Matthews U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Ken Riley National Marine Fisheries Service Habitat Conservation Service 101 Pivers Island Road Beaufort, North Carolina 28516 Mr. Jeffrey Garnett Wetlands and Marine Regulatory Section Water Protection Division -Region IV U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 J Jonathan Howell, District Manager Washington Field Office North Carolina Division of Coastal Management